CONSTRUCTION MANAGEMENT PLAN
For Proposed Development of Four Residential Dwellings
Planning Application ref. 3/2016/0290
Site Address
Land Adj. 52 Chapel Hill,
Longridge,
Preston,
Lancashire.
Prepared by
A L Ollerton Ltd.
Astley Croft, 87a Derby Road
Longridge
Preston
Lancashire
PR3 3EE
Land Adj. 52 Chapel Hill, Longridge - Planning Application ref. 3/2016/0290.
Construction Management Plan
A. L. Ollerton Ltd., Astley Croft, 87a Derby Road, Longridge, Preston, Lancashire, PR3 3EE
Contents
1. Scope of Works
2. Enabling Works/Formation of Site Perimeter
3. Site Parking & Storage of Plant & Materials
4. Management of Vehicle Access/Egress & Deliveries
5. Wheel Wash Facility
6. Management of Dirt & Dust
7. Excavation and Ground Works
8. Protection of Existing Trees to be retained
9. Recycling/disposing of waste resulting construction work
10. Noise Control
Appendices
Appendix A – Construction Phase Site Plan
Appendix B – Existing & Proposed Site Plans
Land Adj. 52 Chapel Hill, Longridge - Planning Application ref. 3/2016/0290.
Construction Management Plan
A. L. Ollerton Ltd., Astley Croft, 87a Derby Road, Longridge, Preston, Lancashire, PR3 3EE
1.0 Scope of Works
1.1
The scheme involves the construction of three domestic houses; two semi-detached
units and one detached with separate garage on land off Highfield Drive, Longridge.
The works also include the formation of an access road and landscaping to the three
plots. Existing & Proposed Plans are included in the Appendix to this document for
reference.
2.0 Enabling Works/Formation of Site Perimeter
2.1
2.2
At commencement the perimeter of the site will be established and securely protected
with good quality Heras security fencing to HSG151 standard to the whole of the
perimeter of the site complete with all necessary signage in accordance with HSE
requirements.
The site area is to be stoned to provide a hardstanding for site vehicles, storage of
materials, site cabins etc.
3.0 Site Parking & Storage of Plant & Materials
3.1 All contractor’s vehicles will park within the site area in a designated parking area on
the hard standing. There will be no contractor parking on Highfield Drive.
3.2 All materials and plant will stored within the fenced site area. Materials such as cement
and equipment will be stored in a secure site cabin.
4.0 Management of Vehicle Access/Egress, Deliveries & Loading/Unloading of Plant Material
4.1
4.2
4.3
4.4
4.5
4.6
Access to the site will be via the existing hammer head/track off Highfield Drive.
The access route to the site will be dug out and stoned to provide a hard standing for
contractor’s vehicles. A turning circle will be provided and kept clear on site for
delivery vehicles.
Delivery/tipper wagons will be accompanied onto and from the site by a banksman
who will be in advance of the wagons at all times. Generally deliveries will be by
smaller wagons and the contractor will make merchants aware of the site restrictions
when arranging deliveries.
Construction traffic routes will be kept a safe distance from trench works at all times.
Prior to leaving the site, vehicles will be inspected and the wheels be washed on the
hard standing using a Karcher type jet wash unit.
The contractor will manage the risk of any road contamination by regular monitoring.
Should the road become contaminated any debris will be removed by spade and jet
wash.
Land Adj. 52 Chapel Hill, Longridge - Planning Application ref. 3/2016/0290.
Construction Management Plan
A. L. Ollerton Ltd., Astley Croft, 87a Derby Road, Longridge, Preston, Lancashire, PR3 3EE
5.0 Wheel Wash Facility
5.1
5.2
Prior to leaving the site, vehicles will be inspected and the wheels be washed on the
hard standing using a Karcher type jet wash unit.
The contractor will manage the risk of any road contamination by regular monitoring.
Should the road become contaminated any debris will be removed by spade and jet
wash.
6.0 Management of Dirt & Dust
6.1 If dust emissions are generated in dry period the contractor will use water spray to wet
the material and suppress the dust.
6.2 The site manager will take account of weather conditions and prevailing wind direction
when organising operations to prevent and minimise dust nuisance to neighbouring
properties.
6.3 All site staff will be trained and be aware of the Dust Management Strategy.
6.4 The access road is to be stoned to provide a good, clean working platform and prevent
road contamination.
6.5 In the event of a complaint form a neighbouring property in respect of dust there
concerns will be considered and action taken to prevent future occurrence.
6.6 All site staff will have appropriate PPE to protect them from the effects of dust.
7.0 Excavation and Ground Works
7.1 Location of underground Services
- Prior to commencing excavations the site area will be checked for overhead and
underground services.
- Service plans will be obtained from Utility providers and the site area checked
over using a locating device.
- Once identified service routes will be identified and clearly marked. If markings
are lost during the working operation the exercise will be repeated to ensure
service routes remain clearly marked as required for the duration of the works.
- Works will be undertaken in accordance with the HSE Guidance Document,
Avoiding danger from underground services.
7.2 Excavations
- Trenches with a depth exceeding 1m will be either battered back or suitably
shored and the shoring maintained.
- Trenches will be inspected regularly and excess groundwater pumped out
regularly during inclement weather.
Land Adj. 52 Chapel Hill, Longridge - Planning Application ref. 3/2016/0290.
Construction Management Plan
A. L. Ollerton Ltd., Astley Croft, 87a Derby Road, Longridge, Preston, Lancashire, PR3 3EE
- Vehicle plant will be kept a safe working distance from the trench to prevent
potential collapse.
- No site staff will work below an excavator.
8.0 Protection of Existing Trees to be retained
8.1
Protection will be provided in accordance with BS5837-2012. Heras fencing will be
sited around the trees to prevent site operations affecting root growth etc. at a
minimum distance of half the height of the tree or to the extent of the canopy of the
tree, whichever is greater and maintained for the duration of the construction works.
Protection will be principally as detailed in Appendix A.
9.0 Recycling/disposing of waste resulting construction work
9.1
The land is a green field site so there will be very little waste material from demolition.
In respect of the construction work, the following measures have been identified to
minimise the quantity of waste produced during this project:
- The experienced site manager will be responsible for identifying and segregating
waste on site.
- All waste resultant from the works will be segregated on site.
- Resultant hard core will be re-used where possible in the substructure.
- Re-usable materials will be identified on site and removed for storage and re-sale.
- Recyclable materials will be removed from site for processing in licenced facilities.
10.0 Noise Control
10.1
10.2
Whilst working on site the contractor will adhere to the recommendations of BS 5228-
1, clause 9.3 to minimize noise levels during the execution of the Works.
The project is a relatively simple housing scheme with no notable works which would
cause significant noise pollution. The close proximity of residential housing has been
noted and there will be no operation of heavy plant etc. outside normal working hours
of 8.00am – 5.30pm.
Land Adj. 52 Chapel Hill, Longridge - Planning Application ref. 3/2016/0290.
Construction Management Plan
A. L. Ollerton Ltd., Astley Croft, 87a Derby Road, Longridge, Preston, Lancashire, PR3 3EE
APPENDIX
APPENDIX A: CONSTRUCTION PHASE SITE PLAN
APPENDIX B: EXISTING/PROPOSED SITE PLANS
11744
11744
1200
1887
1200
84905525
6200
15600
12000
4800
6000
4800
4677
6817
11950
unit 1
unit 2
unit 3
unit 4
8 no.parkingspaces
footpath
unit 1 parking
unit 2 parking
unit 4 parking
unit 3 parking
existing kerb line
existing stone wall to back of pavement to bemodified to form new access openings
existing stone built cottages
existing access road
existing trees
refuse
refuse
refuse
refusegarden
garden
garden
garden
0 1 5 10mRECYCLING CENTRE
M.H.
M.H.M.H.
M.H.
M.H.
M.H.
M.H.
existingstone walling to matchstyle and height to thatfacing Chapel Hill
existing kerb edge
existing line of stone wall
stone walling to matchstyle to that facingChapel Hill - 1.0m high
landscaped area withnew tree planting
fenc
e ty
pe
A
fenc
e ty
pe
B
fenc
e ty
pe
B
fenc
e ty
pe
B
fence type C
fence type C
sign to readPRIVATE RESIDENTIALPARKING
pedestrian access
recyclingcentre egress
recyclingcentre access
unit 3 parking
existing lamp postC
H
A
P
E
L
H
IL
L
VACANT LAND
Grass and planting
Grass
Path/ Patio
Roadway
Pavement
Block paving
Trees & bushes
Bins
Key
2 storey 3 Bed Dwelling5.730 x 8.490m; height to ridge8.290mGround floor 40.6m² First Floor40.6m²Total floor area 81.3m² (873 sq.ft)
FENCINGType A - 1500 high close boarding with 3 no.100x100mm cross rails and 100x100 timber posts at1800mm crs fixed by metal shoe cast into concretepadType B - 1500mm high waney edge panel infill with100mm sq. timber post, metal shoe and concretebaseType C - 2.0m high timber acoustic fencing panels assupplied by Jackson Fencing(www.jackson-fencing.co.uk)
N
DATE SCALE
JOB NO.
DRAWING NO.
REVISION
Housing DevelopmentLand Adj 52 Chapel Hill
Mr D Newby
Block Plan
03-2016
287201A1:200 @ A3
PGB Architectural Services LTD Lily Cottage, 12 Glen Avenue, Knowle Green, Preston PR3 2ZQ
07866366565 01254 820092 [email protected] pgb-arch.com
Rev A 08-04-2016 red edge amended
5322
2040 3151
1110
3930
2160
5787
1200
1200
23200
8490
8490
11895
Lounge
Kitchen
W.C.
Ent.upup
scale 1:100
0 1 2 3 4 5mGround Floor Plan
5322
5322
7635
3151 2040
1110
3930
2335
7360
11405
3151 2040 2040 3151
11355
5322
Ent.
Lounge
Kitchen
W.C.
Lounge
Kitchen
W.C.
Ent.Ent.
Lounge
Kitchen
W.C.
1925
upup
900
5322
2750
1565
3060
5321
2295
3152
800
Bed 2
cyl.
up
up
Bed 1
scale 1:100
First Floor Plan
5322
5321 5322
2750
1565
3060
5321 5322
5321
3152 3152
3152Bath
Bed 2
cyl.
up
up
Bed 1
Bath
Bed 3
cyl.
up
up
Bed 1
Bath
Bath
up
up
cyl.
Bed 1
Bed 3
Bed 2
Bed 3Bed 2
Bed 3
DATE SCALE
JOB NO.
DRAWING NO.
REVISION
Housing DevelopmentLand Adj 52 Chapel Hill
Mr D Newby
Floor Plans
03-2016
287202
1:100 @ A3
PGB Architectural Services LTD Lily Cottage, 12 Glen Avenue, Knowle Green, Preston PR3 2ZQ
07866366565 01254 820092 [email protected] pgb-arch.com
Storage
scale 1:100
0 1 2 3 4 5mSecond Floor Plan42
39
Storage
StorageStorage
scale 1:100
Roof Plan
35°
35°
35°
35°
svp ridgevent
veluxvelux
veluxvelux
svp ridgevent
svp ridgevent
svp ridgevent
DATE SCALE
JOB NO.
DRAWING NO.
REVISION
Housing DevelopmentLand Adj 52 Chapel Hill
Mr D Newby
Block Plan
03-2016
287203
1:100 @ A3
PGB Architectural Services LTD Lily Cottage, 12 Glen Avenue, Knowle Green, Preston PR3 2ZQ
07866366565 01254 820092 [email protected] pgb-arch.com
Rear ElevationNorth Facingscale 1:100
2325
2325
1902
m.v. m.v. m.v.
m.v. m.v. m.v.
ventilated ridge
0.000m
4.890m
8.290m
Front Elevation to Chapel HillSouth Facingscale 1:100
2325
2325
grp render effect chimney stack
slate roofing
pvc facsia, verge andsoffits
cut local stonesurrounds
random stonewalling
quoin returns
ventilated ridge
0.500m
5.390m
8.790m
107.600 FFL
existing wallheightproposed wallheight
450
stone dividing wallstone dividing wallline of footpathto Chapel Hill
2014
2014
2014
2014
Side ElevationWest Facingscale 1:1000 1 2 3 4 5m
8.290m
4.890m
2.415m
0.000m
m.v.
m.v.
107.100 FFL
stonecanopy
Side ElevationEast Facingscale 1:100
slate roofing
35°
0.500m
8.790m
5.390m
m.v.
m.v.
existingwall height
render finish to rearelevation
cut local stoneheads and cills torendered elevations
cut local stone plinth
cut stone flagcanopy with stonegallows brackets
DATE SCALE
JOB NO.
DRAWING NO.
REVISION
Housing DevelopmentLand Adj 52 Chapel Hill
Mr D Newby
Elevations
03-2016
287204
1:100 @ A3
PGB Architectural Services LTD Lily Cottage, 12 Glen Avenue, Knowle Green, Preston PR3 2ZQ
07866366565 01254 820092 [email protected] pgb-arch.com
Grass and planting
Grass
Path/ Patio
Roadway
Pavement
Block paving
Trees & bushes
Bins
Key
2 storey 3 Bed Dwelling5.730 x 8.490m; height to ridge8.290mGround floor 40.6m² First Floor40.6m²Total floor area 81.3m² (873 sq.ft)
unit 1
unit 2
unit 3
unit 4
8 no.parkingspaces
Block Planscale 1:5000 5 m20
C
H
A
P
E
L
H
IL
L
Disposal Centre
5
3
5
6
108.2m
5
2
Household Waste
C
H
A
P
E
L
H
IL
L
2
5
4
Ordnance Survey, (c) Crown Copyright 2016. All rights reserved. Licence number 100022432
436700
Location Planscale 1:12500 10 m50
N
serv
ice
roa
d
DATE SCALE
JOB NO.
DRAWING NO.
REVISION
Housing DevelopmentLand Adj 52 Chapel Hill
Mr D Newby
Block and Location Plans
03-2016
287205
1:1250, 1:500 @A3
PGB Architectural Services LTD Lily Cottage, 12 Glen Avenue, Knowle Green, Preston PR3 2ZQ
07866366565 01254 820092 [email protected] pgb-arch.com
Vacant LandRecycling Centre
OBAS
Acce
ss R
oad
Rev A 08-04-2016 red edge amended
1
0
7
.6
0
1
0
7
.6
7
1
0
7
.7
0
1
0
7
.7
6
1
0
7
.8
0
1
0
7
.8
7
1
0
7
.8
2
1
0
7
.7
3
1
0
7
.4
6
1
0
7
.2
3
1
0
6
.2
4
1
0
6
.7
1
1
0
7
.0
2
1
0
7
.4
4
1
0
7
.5
7
1
0
7
.
5
9
1
0
7
.
5
9
1
0
7
.5
5
1
0
7
.
5
3
1
0
7
.
5
0
1
0
5
.8
6
1
0
6
.3
6
1
0
6
.8
3
1
0
7
.0
4
1
0
7
.5
6
1
0
7
.6
7
1
0
7
.
6
0
1
0
7
.
6
9
1
0
7
.6
7
1
0
7
.6
2
1
0
7
.
6
0
1
0
7
.6
7
1
0
7
.7
2
1
0
7
.8
0
1
0
7
.7
9
1
0
7
.7
7
1
0
7
.
7
5
1
0
7
.6
7
1
0
7
.5
5
1
0
7
.
5
4
1
0
7
.9
1
1
0
7
.8
8
1
0
7
.
7
6
1
0
7
.7
5
1
0
7
.6
2
1
0
4
.
1
6
1
0
5
.
5
2
1
0
5
.7
3
1
0
7
.3
8
1
0
7
.3
0
1
0
7
.3
8
1
0
7
.4
3
1
0
7
.4
7
1
0
7
.5
7
1
0
7
.7
0
1
0
7
.5
0
107.5
3
1
0
7
.
4
8
1
0
7
.4
8
1
0
7
.4
6
1
0
7
.4
0
1
0
7
.3
4
1
0
7
.
3
4
107.66
1
0
7
.5
7
1
0
7
.5
1
1
0
7
.4
3
1
0
7
.4
5
1
0
7
.6
2
1
0
7
.4
0
1
0
7
.3
3
1
0
7
.2
8
1
0
7
.2
2
1
0
7
.2
7
1
0
7
.4
9
1
0
7
.4
3
1
0
7
.4
0
1
0
7
.3
3
1
0
7
.3
1
1
0
7
.3
9
1
0
7
.4
0
1
0
6
.7
6
1
0
6
.7
5 106.9
2
106.99
1
0
7
.0
2
106.99
107.43
1
0
7
.
5
5
1
0
7
.
6
6
1
0
7
.
6
5
1
0
7
.
7
2
1
0
7
.
9
4
107.94
107.93
107.78
106.75
106.53
106.61
106.69
106.61
106.61
106.64
106.59
106.71
106.64
106.53
106.70
106.73
106.67
106.59
106.55
106.61
106.69
106.83
106.80
106.64
106.53
106.76
106.77
106.94
107.10
107.01
107.18
107.24
107.36
107.02
107.12
106.90
106.82
107.03
107.03
107.12
107.19
107.33
107.46
1
0
7
.3
2
1
0
7
.3
2
1
0
7
.4
2
1
0
7
.3
7
1
0
7
.2
6
1
0
7
.
3
1
1
0
7
.
3
2
1
0
7
.
3
0
1
0
7
.
2
1
1
0
7
.2
0
107.21
107.22
107.27
107.3
1
107.3
6
107.4
1
107.4
5
107.5
3
1
0
7
.
3
0
1
0
7
.
2
9
1
0
7
.2
9
107.28
107.34
107.37
107.4
1
107.4
5
107.4
9
107.5
5
107.5
8
107.53
1
0
7
.2
9
1
0
7
.2
9
107.2
8
107.30
107.39
107.4
0
107.5
2
107.53
107.42
107.4
5
107.5
3
10
7.4
8
107.28
1
0
8
.
0
9
1
0
8
.0
0
1
0
7
.9
7
107.8
3
1
0
7
.
8
9
108.0
4
107.91
107.87
107.7
5
107.81
107.8
2
107.7
9
107.66
107.8
2
1
0
7
.
3
5
1
0
6
.
6
2
1
0
6
.
4
9
1
0
7
.
4
7
1
0
6
.
6
3
1
0
6
.
6
9
106.56
106.5
3
106.5
81
0
6
.5
4
1
0
6
.
5
4
106.7
2
106.9
2
1
0
6
.
8
4
1
0
7
.0
7
1
0
7
.3
2
1
0
7
.3
2
1
0
7
.
2
3
1
0
7
.
2
5
107.7
1
1
0
7
.6
9
1
0
6
.
9
7
1
0
6
.
9
5
1
0
7
.4
9
1
0
7
.
2
8
1
0
7
.1
6
1
0
7
.4
3
1
0
7
.3
7
1
0
7
.6
0
1
0
7
.
3
7
1
0
7
.3
9
1
0
7
.
2
8
1
0
7
.
2
3
1
0
7
.0
4
1
0
7
.0
4
1
0
6
.9
7
1
0
6
.9
7
106.81
1
0
6
.
6
0
106.6
9
1
0
6
.5
4
1
0
6
.
5
1
1
0
6
.
5
0
1
0
6
.
5
4
1
0
6
.
6
5
1
0
6
.
6
4
1
0
6
.
7
1
1
0
6
.
7
4
1
0
6
.
8
6
1
0
6
.8
9
1
0
6
.
5
9
1
0
6
.
5
8
106.81
1
0
6
.
7
8
1
0
6
.6
5
1
0
7
.0
8
1
0
7
.3
2
1
0
7
.
2
2
1
0
7
.0
6
1
0
7
.
0
0
107.01
1
0
7
.
2
4
107.3
1
107.28
1
0
7
.
1
8
1
0
7
.
1
0
1
0
7
.
0
5
1
0
7
.
0
6
1
0
7
.0
3
1
0
6
.9
7
106.77
106.76
106.62
106.64
106.6
2
106.6
1
1
0
6
.
6
1
106.67
106.66
106.64
1
0
6
.
8
6
1
0
7
.6
3
1
0
7
.6
4
1
0
7
.6
5
1
0
7
.7
5
1
0
7
.
7
8
1
0
7
.
7
0
1
0
7
.
5
7
1
0
7
.5
2
1
0
7
.3
5
1
0
7
.1
3
1
0
6
.8
7
1
0
6
.5
5
1
0
6
.2
6
1
0
5
.9
7
1
0
7
.6
8
1
0
7
.7
9
107.89
107.90
1
0
5
.7
1
1
0
5
.3
7
1
0
7
.3
3
1
0
7
.
7
6
1
0
7
.
6
3
1
0
7
.
7
3
1
0
7
.8
8
107.91
1
0
7
.5
8
1
0
7
.3
5
1
0
7
.6
3
1
0
7
.6
2
1
0
7
.6
6
1
0
7
.3
7
1
0
7
.3
9
1
0
7
.3
8
1
0
7
.4
5
1
0
7
.5
0
1
0
7
.1
0
1
0
7
.0
6
106.8
9
106.7
1
106.7
3
1
0
7
.0
3
1
0
7
.0
4
1
0
7
.0
2
1
0
7
.0
4
1
0
6
.9
8
1
0
7
.
5
0
1
0
7
.3
8
1
0
7
.4
0
1
0
8
.2
0
1
0
7
.4
4
1
0
7
.1
3
1
0
6
.9
6
1
0
6
.6
2
1
0
6
.5
7
106.59
107.41
1
0
6
.5
6
106.82
1
0
6
.
9
6
1
0
6
.
8
9
1
0
6
.8
7
1
0
6
.
6
8
f
e
n
c
e
s
t
o
p
s
kerb
stops
kerb
stops
kerb
stops
FJC1
N1L
f.h
y
d
r
w
.
w
.
c
l
=
1
0
7
.
7
9
c
l=
1
0
7
.6
6
c
l=
1
0
7
.5
8
c
l
=
1
0
7
.
4
7
c
l=
1
0
7
.4
9c
l=
1
0
7
.4
7
c
l
=
1
0
7
.
3
3
c
l
=
1
0
7
.
1
0
s
to
n
e
w
a
ll
(h
t1
.8
)
s
to
n
e
w
a
ll
(h
t1
)
s
to
n
e
w
a
ll
(h
t1
.8
)
dk
dk
d
k
d
k
b
t
m
h
b
t m
h
lp
b
t
bt
e
a
v
=
1
0
8
.8
7
e
a
v
=
1
0
8
.8
1
r
id
g
e
=
1
1
1
.8
4
r
id
g
e
=
1
1
1
.7
5
g
u
=
1
0
7
.3
8
g
u
=
1
0
7
.2
0
b
o
lla
r
d
g
r
a
s
s
c
l
=
1
0
7
.
6
1
c
l=
1
0
7
.4
8
w
o
o
d
(
h
t
1
.7
)
w
o
o
d
(
h
t
1
.
6
)
b
r
o
k
e
n
f
e
n
c
e
skip
g
u
=
1
0
7
.1
9
g
u
=
1
0
7
.3
2
c
l=
1
0
7
.3
3
cl=107.03
e
l
b
o
x
d=.15
d=.15mst
d=.1
d=.15
d=.15
d=.15
d=.15
d=.15
d=.15
d=.15
po
st
106.77
1
0
7
.
0
7
BH
B
H
rough ground
rough ground
e
a
v
=
1
0
8
.8
4
e
a
v
=
1
0
8
.8
2
o
h
=
1
1
4
.
5
8
o
h
=
1
1
3
.
7
4
d
=
.3
5
tarmac
RECYCLING CENTRE
M.H.
M.H.M.H.
M.H.
M.H.
M.H.
M.H. 0 1 3 5 7mBlock Plan
N
DATE SCALE
JOB NO.
DRAWING NO.
REVISION
Housing DevelopmentLand Adj 52 Chapel Hill
Mr D Newby
Existing Block Plan
03-2016
287206
1:250 @A3
PGB Architectural Services LTD Lily Cottage, 12 Glen Avenue, Knowle Green, Preston PR3 2ZQ
07866366565 01254 820092 [email protected] pgb-arch.com