Task 2.2: TRTL FacilityConstruction, Installation, Commissioning
Daniel LaBrier
Oregon State University
School of Nuclear Science and Engineering
2017 INTEGRATED RESEARCH PROJECT BI-ANNUAL MEETING
![Page 2: Construction, Installation, Commissioningresearch.engr.oregonstate.edu/treat-irp/sites/research...some ground since November 2016 Logistical Updates • Lab Re-Allocation of Space](https://reader034.fdocuments.in/reader034/viewer/2022050513/5f9d919c8ca65d3a52274c39/html5/thumbnails/2.jpg)
Background
• Project Lead: Dr. Wade Marcum• Experimental Lead: Dr. Dan LaBrier• New Assistant Professor (SR): Dr. Guillaume Mignot (0.1 FTE)• Faculty Research Assistant: Mr. Aaron Weiss (0.1 FTE)• Graduate Students: Mr. Emory Brown, Mr. Yikuan Yan• Undergraduate Student: Mr. Musa Moussaoui
May 29, 2017
1
![Page 3: Construction, Installation, Commissioningresearch.engr.oregonstate.edu/treat-irp/sites/research...some ground since November 2016 Logistical Updates • Lab Re-Allocation of Space](https://reader034.fdocuments.in/reader034/viewer/2022050513/5f9d919c8ca65d3a52274c39/html5/thumbnails/3.jpg)
Catching up since November…
In our last meeting…
• Updates to laboratory space
• Fabrication process in early stages
• Design still being revised
May 29, 2017
2
![Page 4: Construction, Installation, Commissioningresearch.engr.oregonstate.edu/treat-irp/sites/research...some ground since November 2016 Logistical Updates • Lab Re-Allocation of Space](https://reader034.fdocuments.in/reader034/viewer/2022050513/5f9d919c8ca65d3a52274c39/html5/thumbnails/4.jpg)
Timeline, milestones and deliverables
May 29, 2017
3
Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 422.2
2.2.1 Identify and review industry needs for water loop 100% 100%2.2.2 Develop loop technical and functional requirements 100% 100%2.2.3 Loop design + 100% 100%2.2.4 Loop fabrication 100% 95%2.2.5 Loop shakedown 100% 20%2.2.6 Define flow loop ‘operations tests’ and ‘benchmark tests’ + 100% 40%2.2.7 Operations test conduct 50% 0%2.2.8 Synthesis of operations tests data 30% 0%2.2.9 Benchmark test conduct 0% 0%2.2.10 Synthesis of benchmark test data 0% 0%2.2.11 Modeling of benchmark test with U.S. NRC code TRACE 50% 10%2.2.12 Modeling of benchmark test with RELAP5‐3D 50% 10%2.2.13 Comparison of experimental data & model results for problem 0% 0%2.2.14 Benchmark level evaluation of problem 0% 0%2.2.15 Evaluation of uncertainties in selected problem 0% 0%2.2.16 Submission of benchmark for peer review = 0% 0%
Actual Percent Complete
Loop Thermal‐HydraulicsWater Loop
Task ID [#]Task NameYear 1 Year 2 Year 3
Proposal Percent Complete
Operations tasks still behind, but have gained some ground since November 2016
![Page 5: Construction, Installation, Commissioningresearch.engr.oregonstate.edu/treat-irp/sites/research...some ground since November 2016 Logistical Updates • Lab Re-Allocation of Space](https://reader034.fdocuments.in/reader034/viewer/2022050513/5f9d919c8ca65d3a52274c39/html5/thumbnails/5.jpg)
Logistical Updates
• Lab Re-Allocation of Space – mid-March 2017• Electrical Installation - late March 2017• Control Room Installed - mid-April 2017
• TRTL Delivered to OSU! - April 24 2017
• Control Systems Package (Software) • Design – March/April 2017• Troubleshooting – April 2017 – Present• Projected Final Walkthrough in late June 2017
May 29, 2017
4
![Page 6: Construction, Installation, Commissioningresearch.engr.oregonstate.edu/treat-irp/sites/research...some ground since November 2016 Logistical Updates • Lab Re-Allocation of Space](https://reader034.fdocuments.in/reader034/viewer/2022050513/5f9d919c8ca65d3a52274c39/html5/thumbnails/6.jpg)
Installation of Control Room
May 29, 2017
5
![Page 7: Construction, Installation, Commissioningresearch.engr.oregonstate.edu/treat-irp/sites/research...some ground since November 2016 Logistical Updates • Lab Re-Allocation of Space](https://reader034.fdocuments.in/reader034/viewer/2022050513/5f9d919c8ca65d3a52274c39/html5/thumbnails/7.jpg)
Installation of Control Room
May 29, 2017
6
• Mezzanine for storage (separate supports)
![Page 8: Construction, Installation, Commissioningresearch.engr.oregonstate.edu/treat-irp/sites/research...some ground since November 2016 Logistical Updates • Lab Re-Allocation of Space](https://reader034.fdocuments.in/reader034/viewer/2022050513/5f9d919c8ca65d3a52274c39/html5/thumbnails/8.jpg)
• 120V (w/UPS backup) & network connections installed
• Quad monitor system in place
Control Room
May 29, 2017
7
![Page 9: Construction, Installation, Commissioningresearch.engr.oregonstate.edu/treat-irp/sites/research...some ground since November 2016 Logistical Updates • Lab Re-Allocation of Space](https://reader034.fdocuments.in/reader034/viewer/2022050513/5f9d919c8ca65d3a52274c39/html5/thumbnails/9.jpg)
TRTL Facility – Concept to Actual
May 29, 2017
8
![Page 10: Construction, Installation, Commissioningresearch.engr.oregonstate.edu/treat-irp/sites/research...some ground since November 2016 Logistical Updates • Lab Re-Allocation of Space](https://reader034.fdocuments.in/reader034/viewer/2022050513/5f9d919c8ca65d3a52274c39/html5/thumbnails/10.jpg)
TRTL in Actuality
May 29, 2017
9
![Page 11: Construction, Installation, Commissioningresearch.engr.oregonstate.edu/treat-irp/sites/research...some ground since November 2016 Logistical Updates • Lab Re-Allocation of Space](https://reader034.fdocuments.in/reader034/viewer/2022050513/5f9d919c8ca65d3a52274c39/html5/thumbnails/11.jpg)
Loop Design (2.2.3) to Fabrication/Installation (2.2.4)
May 29, 2017
10
Suction side
Flexible high-pressure hose
Turbine flow meter
Band (pre-conditioning) heaters
Venturi flow meter
Inline heat exchanger
Instrument ‘neck’ & gas plenum
Heater and Instrument Pass-thru
Discharge side
Parker Circulating
Pump
Test section
![Page 12: Construction, Installation, Commissioningresearch.engr.oregonstate.edu/treat-irp/sites/research...some ground since November 2016 Logistical Updates • Lab Re-Allocation of Space](https://reader034.fdocuments.in/reader034/viewer/2022050513/5f9d919c8ca65d3a52274c39/html5/thumbnails/12.jpg)
• Pre-conditioning heaters installed today
• Pulse heater installed in the next 2 weeks
• Utilities including electrical (480/240/120V), water, and air being tied-in within 2 weeks
Current Status of Hardware
May 29, 2017
11
![Page 13: Construction, Installation, Commissioningresearch.engr.oregonstate.edu/treat-irp/sites/research...some ground since November 2016 Logistical Updates • Lab Re-Allocation of Space](https://reader034.fdocuments.in/reader034/viewer/2022050513/5f9d919c8ca65d3a52274c39/html5/thumbnails/13.jpg)
Shakedown (2.2.5) Activities
• Preliminary Wire Tracing for DAS and PLC complete
• Preliminary P&ID Walkthrough (Mechanical Systems/Components) complete
• Controls System in progress (40% complete)
May 29, 2017
12
![Page 14: Construction, Installation, Commissioningresearch.engr.oregonstate.edu/treat-irp/sites/research...some ground since November 2016 Logistical Updates • Lab Re-Allocation of Space](https://reader034.fdocuments.in/reader034/viewer/2022050513/5f9d919c8ca65d3a52274c39/html5/thumbnails/14.jpg)
Operations and Benchmarking Tests (2.2.6)
• Role of TRTL is to provide as much useful information (qualitative and quantitative) for development and implementation of water loop test section in TREAT
• Scientific questions steer the focus of engineering; experimentation provides the feedback
• Consider the ‘life cycle’ of a water loop test in TREAT
May 29, 2017
13
![Page 15: Construction, Installation, Commissioningresearch.engr.oregonstate.edu/treat-irp/sites/research...some ground since November 2016 Logistical Updates • Lab Re-Allocation of Space](https://reader034.fdocuments.in/reader034/viewer/2022050513/5f9d919c8ca65d3a52274c39/html5/thumbnails/15.jpg)
Conceptualizing a Water Loop Test in TREAT
• Determine the form factor
• Loading fuel and instrumentation in HFEF
• Preparing the loop for testing• Water fill• Pre-emptive pressurization• Gas Fill/Purge
May 29, 2017
14
![Page 16: Construction, Installation, Commissioningresearch.engr.oregonstate.edu/treat-irp/sites/research...some ground since November 2016 Logistical Updates • Lab Re-Allocation of Space](https://reader034.fdocuments.in/reader034/viewer/2022050513/5f9d919c8ca65d3a52274c39/html5/thumbnails/16.jpg)
Conceptualizing a Water Loop Test in TREAT
May 29, 2017
15
![Page 17: Construction, Installation, Commissioningresearch.engr.oregonstate.edu/treat-irp/sites/research...some ground since November 2016 Logistical Updates • Lab Re-Allocation of Space](https://reader034.fdocuments.in/reader034/viewer/2022050513/5f9d919c8ca65d3a52274c39/html5/thumbnails/17.jpg)
Operations and Benchmarking Tests
• TRTL can emphasize: • Optimization of test prep procedures• Instrumentation and equipment
loading/unloading/performance• Various cladding types (SS, Zirc-4, etc.)
• Benchmarking tests are a natural extension/continuation from operations tests
May 29, 2017
16
![Page 18: Construction, Installation, Commissioningresearch.engr.oregonstate.edu/treat-irp/sites/research...some ground since November 2016 Logistical Updates • Lab Re-Allocation of Space](https://reader034.fdocuments.in/reader034/viewer/2022050513/5f9d919c8ca65d3a52274c39/html5/thumbnails/18.jpg)
Benchmarking Tests
• Three types of benchmark tests:• Steady-state, no external heat added• Steady-state, additional heat source• Unsteady, heated
• Call on parameter space defined in previous TREAT/RIA tests for boundaries on energy deposition
• Gradual ramp tests for the pulse heater
May 29, 2017
17
![Page 19: Construction, Installation, Commissioningresearch.engr.oregonstate.edu/treat-irp/sites/research...some ground since November 2016 Logistical Updates • Lab Re-Allocation of Space](https://reader034.fdocuments.in/reader034/viewer/2022050513/5f9d919c8ca65d3a52274c39/html5/thumbnails/19.jpg)
Benchmarking Tests• TREAT capabilities are still being
determined, but historically produced pulses for sodium loop tests
• Bridging the gap between TREAT and LWR RIA (pulse) conditions
• Based on guidance from INL and lit review for pulse and energy deposition ranges, our target ramp duration is 25-50 ms for high energy pulses (> 100 kW)
• Investigate longer ramp durations at lower energies
May 29, 2017
180 50 100 150 200 250 300 350 400 450 500
Time [ms]
0
10
20
30
40
50
60
70
80
90
100TRTL Power Ramp Rates
100.00 [kW]50.00 [kW]25.00 [kW]10.00 [kW]5.00 [kW]
Peak Power
0 5 10 15 20 25 30 35 40 45 50
Time [ms]
0
50
100
150
200
250
300
350
400
450
500TRTL Power Ramp Rates
500.00 [kW]250.00 [kW]166.67 [kW]125.00 [kW]100.00 [kW]
Peak Power
![Page 20: Construction, Installation, Commissioningresearch.engr.oregonstate.edu/treat-irp/sites/research...some ground since November 2016 Logistical Updates • Lab Re-Allocation of Space](https://reader034.fdocuments.in/reader034/viewer/2022050513/5f9d919c8ca65d3a52274c39/html5/thumbnails/20.jpg)
Next Steps
• 30-60 days• As-built drawings (2.2.11 & 2.2.12)• Pre-Conditioning Pulse Heater installation• Controls System commissioning• Complete Operations Testing• Procure Cladding Sleeves for Benchmarking
• 90 days• Analysis and Evaluation of Operations Testing• Begin Benchmarking Testing• Progress on TRACE and R5-3D Models
• 180 days• Completion ‘in sight’ for Benchmarking Testing,
TRACE and R5-3D Models• Analysis of Completed (to date) Benchmarking
May 29, 2017
19
![Page 21: Construction, Installation, Commissioningresearch.engr.oregonstate.edu/treat-irp/sites/research...some ground since November 2016 Logistical Updates • Lab Re-Allocation of Space](https://reader034.fdocuments.in/reader034/viewer/2022050513/5f9d919c8ca65d3a52274c39/html5/thumbnails/21.jpg)
Topics for Discussion
• What parameters/techniques should TRTL operations tests emphasize?
• How well can TRTL align with previous transient modes?• Temperature limited• Shaped transients• Extended power transients
• Limiting scope of benchmarking tests to take advantage of previous TREAT campaigns (e.g. limited access to TREXR)
May 29, 2017
20
![Page 22: Construction, Installation, Commissioningresearch.engr.oregonstate.edu/treat-irp/sites/research...some ground since November 2016 Logistical Updates • Lab Re-Allocation of Space](https://reader034.fdocuments.in/reader034/viewer/2022050513/5f9d919c8ca65d3a52274c39/html5/thumbnails/22.jpg)
Thank you!
May 29, 2017
21
![Page 23: Construction, Installation, Commissioningresearch.engr.oregonstate.edu/treat-irp/sites/research...some ground since November 2016 Logistical Updates • Lab Re-Allocation of Space](https://reader034.fdocuments.in/reader034/viewer/2022050513/5f9d919c8ca65d3a52274c39/html5/thumbnails/23.jpg)
Backup Photos of Loop
May 29, 2017
22