Construction Industry, Market, Competitors,
Opportunity
James FrenchANZ Solution Specialist ConstructionNavman Wireless
2
State of The nation, What the Contractors Think!
Where does the opportunity lie?
Is there opportunity?
3
State of the Nation
Next 12 Months• Contractors have reported good
2014/2015, some are reporting record years.
• Outlook– Next 6 months look good,
following 6 months uncertain (NSW excepted)
– WA, QLD, SA Mining companies competing with traditional earth moving contractors driving down price
– Concern about Economy nationally
4
Opportunity
Local Government (500 plus in Aus)Plant and on roadFBT issues, Maintenance
Medium-Large size ContractorsStart-Stop timesHours LocationPreventative MaintenanceAsset Utilisation
Hire companiesAs per contractorsProof of use.
Who do we target?
5
Do contractors start projects on time? finish on time? within budget? and leave
money on the job?
6
Asset UtilisationPhase 1: (Start) too many idle machines on a project, Wrong machines on the job.
During the project: Start and finish times, travel within the project to and from breaks
Phase 2: (Finish)Final push to complete project, contractors throw everything at the project.
Time is both a friend and an Enemy of the Contractor.Defined start and completion dates for project.Environmental restrictions, Noise pollution.Late start early finish
Absolutely and regularly!!!
7
Time is money, how much money can you lose through time?
8
Question 1
Match Software with Manufacturer
Software Manufacturer
Global E force Volvo Trucks
Fleetm@tic Volvo Plant
VisionLink Komatsu
Dynafleet Bell trucks
Komtrax Caterpillar
Care Track Hitachi
9
Time is the key to not leaving money on the job
10
Potential loses through on site plant hoarding. (Detected through asset utilisation in Telematics software)
Asset Utilisation, Hoarding Costs
11
Counterweight
Idler
Front Linkage
Boom
Stick
Question 2 (Identify the key components)
12
The Pitch:
Why do Contractors, hire Companies, Local and state government
organisations need us?
13
Legislative Pressures
Tax
Cost of Fleet/Assets
Competitive edge
Improve productivity, reduce costs, and improve customer service
To solve the following:
14
•WH&S •Fringe Benefit Tax•Fatigue Management•Effective maintenance planning
Legislation
•Reduce Cost•Improve Productivity•Improve Asset Management•Improve Customer Service
Productivity
Core problems for all industry sectors
15
Robert Gilmour Le Tourneau Tandem Scraper
Identify This Machine and it’s inventor
16
The Pitch:
What do contractors need?What can we offer?
17
All Manufacturers, All Models, All Years, One Application. (Fleet integration)
18
Location and Hours Asset utilisationKey on/Key off
Maintenance scheduling
90% of Contractors just want the following information
19
Complete this sentence
I am not a F$#*&!G? Bobcat
Q4
20
1. With KPIs embedded in the platform, Adaptive Intelligence brings Enterprise Performance Management (EPM) to the organisation
2. Single version of the truth for all your Fleet and Operational data
3. Use existing Business rules or implement your own
4. Works on your phone, tablet or desktop
5. Role based approach – right information at the right time
Adaptive Intelligence (Every Contractor needs this to drive efficiencies)
21
Location
Fuel burn
Jobsite weather
Consolidated reporting
Complete jobsite analysis
Preventative maintenance
Total fleet & jobsite utilization
Consolidated reporting and equipment analysis across different OEMs is difficult and time consuming
Fleet Integration through Qtanium Connect
22
How much Time is Lost on East Coast projects because of rain?
10% Hardly ever rains on the East Coast
20% That is the most possible.
30% Could be this high because of Global warming
40% Following the arrival of El Nino
50% Following the arrival of the El Nino’s evil twin
Q5
23
Users sign in to their manufacturer-branded websites and pull the AEMP Standard Data feeds.
Multi-User Account Access (Check before you leap)
24
Who is the real competition?
25
Strengths:
• Experience in Construction industry.• Owned by Cat dealer, access to dealer customers• Product has been available for many years now
Weakness:
• limited resources at a state level.• Not their core business, MC&G is where they concentrate.• They compete with the Cat dealer for business.
Multiple interfaces. (VisionLink and Geo Manager)
• Inexperienced with fleet management.
Sitech
26
Strengths:
• Experience in Construction industry.• Existing relationships with construction companies going back 20 plus years• Well regarded based on personal and professional relationships.• Work to their strengths.
Weakness:
• limited resources and capacity at a state level.• MC&G Survey equipment is their core business
Inexperienced in fleet management.
Position Partners
27
Strengths:
• Experience in Construction industry.• Existing relationships with construction companies at multiple levels throughout an individual corporation.• Highly regarded based on personal and professional relationships.• Big Footprint with multiple branches.• Dedicated departments with reliability engineers
Weakness:
• Concentrate largely on their own product.• Machine and part sales is their core business
OEM and Their Dealers
28
Strengths:
• Existing relationships with construction companies going back 5 plus years• Well regarded based on personal and professional relationships (Critical).• Best in market product by far.
Weakness:
• limited resources and capacity at a state level (Patchy presence in some areas)• Perceived inexperience in Construction industry.• Don’t work to our strengths.• Fear of the market
Experienced in fleet management.
Ourselves/Dealers
29
What is the Average Idle time for a Motor Grader?
30
Who has not yet signed into Qtanium Connect?