Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16....
Transcript of Construction In Progress Reports · 15. Bristol Bay Science Lab and Clinical Space DBB 16....
Constr
Capital P
1. U
2. U
3. U
UAA:
1. A
2. B
3. E
4. E
5. H
6. H
7. M
8. Sc
9. Se
10. W
11. K
12. K
13. K
14. K
15. K
16. K
17. K
18. K
19. M
20. M
21. PUAF:
1. A
2. A
3. C
4. C
5. C
6. C
ruction I
roject Maste
UAA
UAF
UAS
Allied Health,
eatrice McD
ngineering a
ngineering A
Health Scienc
Housing Secu
MAC Housing
cience Build
eawolf Spor
Wendy Willia
odiak Stude
odiak Colleg
PC Career an
PC Generato
PC Kachema
PC Soil Rem
PC Sprinkler
PC Student
Mat‐Su Colleg
Mat‐Su Valley
WSCC Welln
Antenna Insta
Atkinson Pow
ampus‐wide
ritical Electr
TC Aviation
utler Apartm
In‐Progr
er Schedules
, 2nd Floor Re
Donald Build
and Industry
Asset Integri
ces Building
urity Systems
g Renewal
ing Renovat
ts Arena
amson Audit
nt Services R
ge Vocationa
nd Technica
or
ak Bay Camp
ediation
r Renovation
Housing
ge Paramed
y Center for
ness Center
allation Alas
wer Plant Ren
e Energy Upg
rical Distribu
Hangar Ren
ment Retaini
ress Rep
s:
enovations
ing Renewal
y Building
ty and Corro
s Upgrade
tion
orium Seatin
Remodel
al Technolog
l Center
pus Roof Rep
n
ic/Nursing L
Arts & Lear
Renovation
ska Satellite
newal Phase
grades Fairb
tion Renewa
ovation
ing Wall
ports
l
osion Lab
ng Replacem
gy & Wareho
placement
Lab Addition
ning
& Campus R
Facility
e 2
banks Campu
al Phase 1C
ment
ouse Facility,
Renewal
us
Procu
, Phase 1 (PA
urement Me
CMAR &
T
C
C
C
AA)
C
ethod
DBB
DBB
& DBB
TERM
CMAR
DBB
CMAR
DBB
CMAR
Term
DBB
N/D
DBB
DBB
DBB
DBB
DBB
DBB
DBB
DBB
DBB
DBB
DBB
SS
CMAR
DBB
DBB
7. Engineering Facility CMAR
8. Fine Arts Salisbury Theater Renovation N/D
9. Fine Arts Vapor Barrier CMAR
10. Life Sciences Research and Teaching Facility CMAR
11. Student Housing and Dining Facility P3
12. Utilities Wood Center Vault SS
13. West Ridge Steam Capacity Expansion DBB
14. West Ridge Deferred Renewal Master Plan N/A
15. Bristol Bay Science Lab and Clinical Space DBB
16. Kuskokwim Campus Kiln Project DBB
17. Kuskokwim Campus Vo‐Tech Building Room Addition DBB
18. Northwest Campus Nagozruk Restroom Remodel DBB
19. Research Vessel Sikuliaq N/A
UAS: 1. Anderson Building Remodel & Pedestrian Access DBB
2. Auke Lake Way Corridor Improvements and Reconstruction DBB
3. Freshman Student Housing Phase 1 (Banfield Hall Addition) DBB
4. Ketchikan Life Boat Davis Construction DBB
5. Ketchikan Upper Campus Parking Lot Reconstruction DBB
6. Sitka Career and Technical Education Center DBB
Construction Procurement Method abbreviations:
Construction Manager at Risk CMAR
Design ‐ Bid ‐ Build DBB
Design – Build DB
Not Applicable N/A
Not yet Determined N/D
Public Private Partnership P3
Sole Source SS
Term Contractor Construction (Design‐Build) TERM
Construction in Progress Report abbreviations:
Construction Award Amount CAA$
Construction Manager at Risk CMAR or CM@R
Deferred Maintenance and Renewal DM&R
Formal Project Approval FPA
Preliminary Administrative Approval PAA
Project Change Request PCR
Schematic Design Approval SDA
Total Project Cost TPC$
To Be Determined TBD
U
Project Phase 1-classroomMedical SPhase 2—1st Floor
Schedu
PlanningAdvertisiConstruc Project Design TGeneral
Board oPreliminaFormal PSchemat Status UPhase 1 BOR in Dconferen
UAA All
Descriptio---Demolitionms and mocSonography—Upgrade aoffices and c
ule:
& Design: ng & Award
ction:
Team: Team Contractor
of Regentsary Admin AProject Approtic Design A
Update: was comple
December 20ce is schedu
lied He
on: n and replacck-up exam sy, Medical Asand renewal common spa
:
Kumin TBD
Approval Approval oval pproval
eted in Augu012. The prouled for Feb
Februar
ealth Sc
cement of thespace for teassisting, andof mechanic
aces.
JuJa
Ap
& Assoc.
& MotionsJunAugDec
st of 2012 ooject was adruary 8, 201
ry 2013 BOR
cience
e 2nd floor laaching Radio
d EMT (Emecal systems
ly 2011—Jan/ Feb. 2013
pril/May 2013
s: ne 2, 2011 g. 17, 2012c. 7, 2012
on time and wdvertised for 3; and bid o
Update
Buildin
abs (moved tologic Techn
ergency Medand roof rep
an. 2013 3 3—Aug.2013
within budgebids on Jan
opening is sc
ng Ren
to Health Scnology and D
dical Serviceplacement a
Total
TPC$ CAA$3
et. Phase 2 wnuary 15, 20cheduled for
novatio
cience Bldg.)Diagnostic s).
and renovatio
Project Co
5,680,415
TBD
was approve13; pre-bid r February, 2
n
) into
on of
ost:
ed by
2013.
Project Completereplacemarchitect
Schedu
PlanningAdvertisiConstruc Project Design TGeneral
Board oPreliminaFormal PSchemat Status U65% drawFebruaryConstrucsemeste
UAA
Descriptioe renovation
ment of boileural interior
ule:
& Design: ng & Award
ction:
Team: Team Contractor
of Regentsary Admin AProject Approtic Design A
Update: wings were cy. Bid solicitaction is exper 2015.
A Beatr
on: n of 1970’s br, roof and mand exterior
:
ArchiteTBD
Approval Approval oval pproval
completed oation is schected to begi
Februar
rice Mc
building on mmechanical sr improveme
060407
cts Alaska
& Motions7/112/8/1
on October 1eduled for Man in July 201
ry 2013 BOR
cDonald
main campussystems, repents.
6/2011—03/24/2013---05/27/2013---11/2
s: 1/11
/7/11 7/12
12, 2012. 95arch 2013 a13.The build
Update
d Hall R
s. Will includplacement of
2013 2013 2014
5% drawingsnd award by
ding will be “
Renew
de HAZMAT f electrical s
Total
TPC$ CAA$
s to be compy May/June 2off-line” unti
wal
abatement, ystems and
Project Co
16,508,213
TBD
pleted by ear2013. l the Spring
ost:
rly
Project Planningteaching electricalphotogratransportand confexisting b
ScheduPlanningAdvertisiConstruc
Project Design TGeneral
Board oPreliminaFormal PSchemat
Status UDesign DprogressBoard. FManagerConstrucin progre
UAA
Descriptio, programmareas not c
l engineeringammetry/carttation and hiferencing/cobuilding and
ule: & Design: ng & Award
ction:
Team: Team: Contractor
of Regentsary Admin AProject Approtic Design A
Update: Developments. UAA and UFull SDA appr @ Risk (CMction, Inc. in ess.
A Engin
on: ing, design aurrently avag labs, fluidstography/GISghway enginllaborative le structured p
:
LivingstNeeser
Approval Approval oval pproval
t and coordiUAF are periproval was rMAR) Contralate Octobe
February
neering
and construcilable on cams labs, heat aS, seismic aneering, landearning areaparking for th
MaJaAp
ton Slone, Inr Constructio
& Motions
NovSepJun
nation meetiodically updeceived at thact for pre-cor 2012. 65%
2013 BOR Up
and In
ction of a 75mpus. The pand mass tra
and earthquad surveying,
as. The projhe facility an
ay 2011-Decn-March 201
pril 2013-May
nc. on ( Pre-Con
s: v 2009 pt 2011 ne 2012 (Par
ings with thedating the joihe Decembeonstruction s
% design revi
pdate
ndustry
5,000 gsf engproject includansfer labs, ake labs, fou, machine shect will also
nd any displa
c 2012 13 y 2015
nstruction Se
rtial)/ Dec 20
e Municipalitint UAA/UAFer BOR meeservices waiew and cost
y Buildi
gineering labdes: commusoils mecha
undation enghop, wood sinclude reno
aced parking
Total TPC: CCA: Pr
Se$2
Bu
ervices)
012 (Full)
ty of AnchorF Engineerineting. The Cos awarded tt reconciliati
ng
boratory andunications laanics labs, gineering, hop, “dirty” yovation of thg.
Project Co$123,204,0
re-Constructervices: 220,038 uilding: TBD
rage are in ng Advisory onstruction o Neeser ion are curre
d abs,
yard he
ost: 00
tion
ently
Project Planningin room 3Lab vacameet curmechaniccaseworkAt the colaborator
Schedu
PlanningAdvertisiConstruc Project Design TGeneral
Board oPreliminaFormal PSchemat
Status UConstrucDecembeThe Con This will
UAA A
Descriptio, programm
325 of the exated by the Wrrent School cal, plumbink, sinks, eme
ompletion of ry equipmen
ule:
& Design: ng & Award
ction:
Team: Team: Contractor:
of Regentsary Admin AProject Approtic Design A
Update: ction has beeer 4, 2012 intractor is co
be the final
Asset In
on: ing, design axisting enginWWAMI progof Engineerg and architergency eyethe new engt will be relo
:
LivingsKC Cor
Approval Approval oval pproval
en completen conjunctionrrecting pun
Construction
Februar
ntegrity
and construcneering buildgram in the ering programtectural workewash/showegineering facocated to the
FeMaAu
ton Slone, Inrporation
& MotionsAprMaMa
ed by the UAn with the Scch list defici
n in Progres
ry 2013 BOR
y & Cor
ction of a 1,0ding. This prexisting Eng
m needs for ak for the inster, and resecility, the fume new labora
ebruary-May ay-June 201ugust-Novem
nc.
s: ril 2012 y 2012 y 2012
AA term conschool of Engencies.
s report on t
Update
rrosion
000gsf enginroject will regineering Bua corrosion ltallation of fuearch compome hoods, caatory space.
2012 2
mber 2012
struction congineering op
this project.
Lab
neering corrnovate the G
uilding and reab. Work inc
ume hoods, onents for theasework and
Total
TPC: CAA:
ntractor. Graen house.
rosion laboraGross Anatoeconfigure itcludes electportable labe corrosion d associate
Project Co
$350,000
$208,956
and opening
atory omy t to rical,
b lab.
ost:
held
Project
Design/ programseminarstudent
ScheduPlanningAdvertisiConstrucConstruc
Project Design TGeneral
Board oPreliminaFormal PSchematProject C
Status UThe Buildclosed-oResidualProviden
This will funding b
UA
t Descriptioconstruct a
ms of nursingr rooms, laboactivity spac
ule: & Design: ng & Award
ction F&F: ction:
Team: Team: Contractor:
of Regentsary Admin AProject Approtic Design AChange Req
Update: ding was comut and a Fin funding has
nce Dr. and p
be the final balance iden
AA He
on: pproximatelyg, WWAMI/Moratories for ces.
:
Livings Corner
Approval pproval oval pproval uests
mpleted in Aal Project Rs been allocaplanning for
constructionntified at the
Februar
ealth S
y 65,162 groMEDEX and r patient simu
DOAD
ston Slone, rstone Cons
& Motions
JaJFD
August 2011 eport was suated to additHSB 2. Art s
n in progressDec 2012 B
ry 2013 BOR
Scienc
oss square foAllied Healtulators, Med
Dec 2007-SeOct 2009 -NoAug 2009- DeDec 2009-Au
Inc. struction Co
s: an 2008 une 2008 eb 2009
Dec 2012
on time andubmitted to ttional surfacselection an
s report on thBOR meeting
Update
ces Bu
foot facility toh. Project in
d Tech and g
pt 2009 ov 2009 ec 2009 g 2011
ompany
d under budgthe Decembce parking, ad procureme
his project. g will be repo
uilding
o accommodncludes officegross anatom
Total TPC: CAA: Ea
Fo$1
Bu
get. The Prober 2012 BOa pedestrian ent is still in
The three ported on sep
g
date the acaes, classroomy spaces, a
Project Co$46,500,00
arly Siteworkooting/Found,772,370
uilding $28,6
oject has beeOR Meeting.
crossing ovprogress.
rojects usingparately.
ademic oms/ and
ost: 0
k dation
686,630
en
ver
g the
Project Replacemas the as
Schedu
PlanningAdvertisiConstruc Project Design TGeneral
Board oPreliminaFormal PSchematProject C
Status UThe projeproject s This will
Descriptioment of apprssociated so
ule:
& Design: ng & Award
ction
Team: Team Contractor
of Regentsary Admin AProject Approtic Design AChange Req
Update: ect was advehould be com
be the final
UAA H
on: roximately 1
oftware syste
AMC Johnso
Approval Approval oval pproval uests
ertised in Nomplete by th
construction
Februar
Housing
,000 obsoleem required
SEOCDE
on Controls I
& MotionsJULOCNON/A
ovember, anhe end of Jan
n in progress
ry 2013 BOR
g Secu
ete door lockto control th
EP 2012 - OCT 2012 - NEC 2012 – J
ncorporated
s: L 2012
CT 2012 OV 2012 A
nd awarded tnuary 2013.
s report on th
Update
rity Sys
ks in North, Ehem.
CT 2012 OV 2012
JAN 2013
d
to Johnson C
his project.
stem
East, and We
Tota
TPC CAA
Controls in D
est Halls, as
l Project C
$ 1,690 $ 1,026
December.
s well
Cost:
,000 6,998
The
Project This prorenew: fienvelope
Schedu
PlanningAdvertisiPhase 1:Construc Project Design TGeneral
Board oPreliminaFormal PSchematProject C Status UThe projamount
Descriptiooject is currenishes, fixtu
e; and ADA m
ule:
& Design: ng & Award: ction, Phase
Team: Team Contractor
of Regentsary Admin AProject Approtic Design AChange Req
Update: ject Total Pof $12,132
UAA M
on: ently underres, and equmodification
,
1:
Bezek Watters
Approval Approval oval pproval uests
Project Cost,000 and is
Februar
MAC H
r review. Thuipment; mes. The proje
MA TBTB
Durst Seiseson Constru
& MotionsOctJunSepPen
t estimate as currently u
ry 2013 BOR
Housing
his renovatioechanical, eleect will be ac
AR 2012 - D
BD BD
r uction
s: tober 2011ne 2012 ptember 201nding
at 65% desunder revie
Update
g Rene
on of the 6 Mectrical, and
ccomplished
DEC 2012
12
ign is abovew.
ewal
MAC Housingd plumbing s
in phases
Tota
TPC CAA Phase
ve the FPA
g buildings wsystems; buil
l Project C
TBD TBD
e 1 $ 4,132
approved T
will lding
Cost:
2,000
TPC
Project Phase 3 second frenovatiolab, staff
ScheduPlanningAdvertisiConstruc
Board oPreliminaFormal PSchemat
Project Design TGeneral Status UThe projesections ConstrucArt selecused by t
UA
Descriptiocompletes tloor, the maon includes 9work/break
ule: & Design: ng & Award
ction:
of Regentsary Admin AProject Approtic Design A
Team: Team: Contractor:
Update: ect completein the Spring
ction is workction is in prothis project w
AA Sci
on: he renovatioin corridors 9 offices for room and st
:
Approval Approval oval pproval
Architects Watterson
ed in Decemg semester. ing on a chaogress. This will be alloca
Februar
ence B
on of the Scion the 1st anBiology andtudent collab
FeMaMa
& MotionsNovAprPhaPha
s Alaska, AMn Constructio
mber. The neThe building
ange order toproject was
ated to other
ry 2013 BOR
Building
ience Buildinnd 2nd floor, d 5 for Math, boration are
eb 2011-Febarch 2012 ay 2012 – D
s: vember 200ril 2009 ase 1 Septase 3 June
MC, BBFM, Eon
ew Biology Cg is fully occo the pedest
s funded by mr R&R/DM p
Update
g Reno
ng. It includenew elevatoa collection
eas in the ha
b 2012
ec 2012
C C C
8
t.2009, Phase 2011
EHS, Estima
Classroom iscupied and ctrian bridge fmulti-year Rrojects such
ovation
es the East hor, and a newns room, Biollways.
Total ProjTPC Ph I Ph 2 Ph 3 $ CCA Ph 1 $CCA Ph 2 $CCA Ph 3 $
$7
se 2 Sept. 2
ations
s already sccomplete. Wfor building
R&R/DM fundh as BMH an
half of the w roof. The logy lab, LS
ect Cost:$2,645,600$5,100,000$5,300,00013,045,600
1,405,729 3,536,000 2,853,000 7,794,729
2010,
heduled for Watterson
code upgradds. Funding nd/or AHS.
IS
13
des. not
February 2013 BOR Update
UAA Seawolf Sports Arena
Project Description: 196,000 sf multi-use facility that will house a 5,000 seat performance gymnasium for basketball & volleyball; a practice & performance gym for the gymnastics program; support space consisting of a fitness & training room, administration/coaching offices, laundry, A/V production, locker & team rooms for basketball, volleyball, gymnastics, skiing, track & cross country programs. Schedule: Total Project Cost: Planning & Design: Aug 2008- Summer 2012 TPC$ 109,000,000
CAA$ 86,000,000 Advertising & Award: Fall 2011 (CMAR process) Construction: Spring 2012 to Fall 2014 Project Team: Design Team MCG/Hastings-Chivetta General Contractor Cornerstone General Contractor Board of Regents Approval & Motions: Preliminary Admin Approval: Aug 2008 Formal Project Approval(s): Feb 2009 /June 2011 Schematic Design Approval(s): June 2009/Sept 2011 Project Change Requests: June 2011 – approved $109M Status Update: Reconciliation of Phase II pricing is complete and a final GMP contract is fully executed at $86M. Remaining additive alternates have been prioritized by the project team and will be incorporated into the project as construction progresses and remaining construction contingency funds can be released. Interior balcony walls, gymnastics pit walls and upper column/pier pours are now complete. Under slab electrical/plumbing work continues throughout basement area and concrete slab on grade pours are nearing completion (excluding the performance gym area). Over 50% of the structural steel is now on site and the remaining 500 tons are in transit. Metal decking is all on site and approx. 30% of the precast concrete riser panels for the performance gym have been fabricated/cast and delivered to the site. Erection of structural steel began in mid-December and installation of metal decking & wind girts to start very shortly.
Project Thisprojseats wereplaced.concrete
Schedu
PlanningAdvertisiConstruc Project Design TGeneral
Board oPreliminaFormal PSchemat Status UThe seatwas usepercentafinalcon
UAA W
Descriptioectreplacedere removed Electrical afloorwaspa
ule:
& Design: ng & Award
ction:
Team: Team Contractor
of Regentsary Admin AProject Approtic Design A
Update: tingwas pud just for tageoftheTnstructionin
Wendy W
on: dthewornod and takenand cable watchedandre
:
FPC KC Corp
Approval Approval oval pproval
urchased dithe installatTPC.Projectnprogressr
Februar
WilliamRepl
outseats intby a local
was installedepainted,and
05/207/207/2
p./ Northern
& Motions5/36/66/1
irectly throtion resultitwascompreportonth
ry 2013 BOR
mson Alaceme
theWendyWrecycler forat the cent
dnewseatsw
2012—02/202012 2012—01/06
Office Supp
s: 1/12 /12 4/12
ughUAAPng in a lowpletedontimhisproject.
Update
Auditoriuent
WilliamsonAr re‐use. Carter row forwereinstalle
012
6/2013
ply
Procuremenwer Construmeandund
um Sea
Auditorium. rpet was deuse by WW
ed.
Total P
TPC$ 50 CAA$ 16
t and the Tuction Awaderbudget.
ating
Atotalof91emolished anWA staff. Th
roject Cos
00,000
66,731
TermContrrd AmountThiswillb
10ndhe
st:
actort as abethe
UA
Project The UAAof the Stuone class
Schedu
PlanningAdvertisiConstruc Project Design TGeneral
Board oPreliminaFormal PSchemat Status UProject dproject isscheduleinstallatiofunded bR&R/DM This will
AA Kod
DescriptioA Kodiak Coludent Servicsroom, one c
ule:
& Design: ng & Award
ction:
Team: Team Contractor
of Regentsary Admin AProject Approtic Design A
Update: date of comps progressinge. DBR Conson of DIRTT
by multi-yearM projects at
be the fina
diak Co
on: llege Studences area on computer la
:
McCooDBR C
Approval Approval oval pproval
pletion has bg under budstruction is g
wall compor R&R fundsthe Kodiak c
al construct
Februar
ollege S
nt Services Rthe first floob, three offic
JaJuAu
l Carlson Gronstruction,
& Motions5/25/26/1
een extendeget and is e
getting closeonents, ceilin. Funding nocampus.
ion in progr
ry 2013 BOR
Studen
Remodel conr of the Kodces and one
n, 2012- Junne, 2012 – A
ug 19, 2012 –
reen ArchiteInc.
s: 5/12 5/12 3/12
ed to Feb 1, xpected to bto project c
ng tiles, lightsot used by th
ress report
Update
t Servi
nsists of remiak College
e reception a
ne, 2012 Aug, 2012 – Feb 1, 201
ects
2013. The be completeompletion as, and job si
his project w
on this pro
ces Re
modeling 2,2Campus Ce
area.
Total
TPC$ CAA$ 13
Student Serd within the nd is currenite cleanup.
will be allocat
oject.
emode
200 square feenter includin
Project Co
838,100
600,000
rvices Remoextended tly finishing This projectted to other
l
eet ng
ost:
odel
their t was
Status UBezek Ddesign seFinal ConCommun The proje
Project This pro
renovatiworkforcIsland cvocationof 4,624repurpoprogram
ScheduPlanningAdvertisiConstruc Project Design TGeneral
Board oPreliminaFormal PSchematProject C
Kodia
Update: urst Seiser (ervices for thncept Designity Campus
ect is curren
Descriptiooject includeion of an exice developmommunities
nal, health/p4 square feetsing of 5,46
ms.
ule: & Design: ng & Award
ction:
Team: Team: Contractor:
of Regentsary Admin AProject Approtic Design AChange Req
ak Coll& W
(BDS) Archithis project. n Study havProject for t
tly on hold p
on: s the planninisting facility
ment courses. Work incluhysical educt of new outd5 square fee
July 20: July-Au
August
Bezek TBD
Approval pproval: oval: pproval: uest
Februar
ege VWareh
tects was seReview of th
ve been comthe FY14 Ca
pending Cap
ng, programy to provide ts that are in udes the concation/recreadoor covereet of existing
13-June 201ugust 2014
2014-July 2
Durst Seiser
& MotionsFebTBDTBDNA
ry 2013 BOR
Vocatioouse F
elected to prohe program cpleted. This
apital Budge
pital funding
mming, desigthe space anhigh deman
nstruction of ation (HPERd vocational
g space for v
14
2015
r
s: bruary 2012D D
A
Update
onal TeFacility
ovide prograconcept, des
s project is Uet.
for planning
n and constnd amenitiesnd from the lo
21,763 squaR) and maintl training spa
vocational, H
echnoly
amming andsign and na
UAA’s highes
g and design
truction of a s to support ocal and remare feet of nenance spaace; and ren
HPER and ad
Total TPC:
CAA:
logy
conceptual rrative, and st priority
n.
new facility career and
mote Kodiaknew enclosedce; construcnovation anddult enrichm
Project Co$24,300,00
TBD
the
and
k d ction d
ment
ost: 0
Project
This newProgramfabricatiosmall conworkroom
ScheduPlanningAdvertisiConstruc *TPC incat a later
Project Design TGeneral
Board o PreliminaFormal PSchematProject C
Status U
Roofing awill start Process
K
Descriptio
w building wils. Three larg
on lab are thnference room/break area
ule: & Design: ng & Award
ction:
cludes $3.0Mr date.
Team: Team Contractor
of Regents
ary Admin AProject Approtic Design AChange Req
Update:
and exterior this month. Simulator is
KPC Ca
on:
ll be used foge labs for ine main focu
om, eight offa, and stude
:
M for Proces
McCooBlazy C
Approval
Approval oval pproval uests
metals studPlumbing, E
s nearly com
Februar
areer &
or the Procesnstrumentatis of the build
fices for facuent collabora
MaApJu
s Tech Equi
l Carlson GrConstruction
& Motions
FebFebSepFeb
ds are complElectrical, HVpletion.
ry 2013 BOR
& Techn
ss Technologion, electronding. The bu
ulty, work areative spaces.
arch 2011 - Npril 2012 - ly 2012 - J
pment & Ba
reen, RSA, W
s:
bruary 2011bruary 18, 20ptember 23, bruary 9, 20
lete. The extVAC rough in
Update
nical C
gy, Instrumenics and the uilding also cea for an ad. The entire
Nov 2011 May 2012 July 2013
ackfill Renov
WCB, Schne
011 2011 12
terior siding n has started
Center
entation andsimulation lacontains threministrative building is 1
Total TPC $CAA $
vation which
eider, LDN U
has shippedd. The 3D de
Electronicsab and a smee classroomassistant,
19,370 gsf.
Project Co$ 15,250,000$ 7,140,600
will be awar
USKH
d and installesign of the
s maller ms, a
ost: 0* 0
rded
ation
Project The Kenawas unabthe buildneeded talarm syssound atthe existiBrockel a
Schedu
PlanningAdvertisiConstruc
Project Design TGeneral
Board oPreliminaFormal PSchematProject C Status UThe proje
Descriptioai River Camble to keep oings at risk, to provide postem. This ptenuating ening electricaand Steffy B
ule:
& Design: ng & Award
ction:
Team: Team Contractor
of Regentsary Admin AProject Approtic Design AChange Req
Update: ect is under
on: mpus had a operating. Tparticularly w
ower for lighproject will innclosure, witl system. Thuildings.
:
AMC EQuality
Approval Approval oval pproval uests
contract. Su
Februar
KPC G
power outaghe campus ewhen the tets, compute
nstall a naturth an automahe generato
DeSeDe
ngineers Electric
& MotionsAprJunSep
ubmittals are
ry 2013 BOR
Genera
ge during finexperiencesmperatures rs, phones, ral gas fired atic transfer
or will power
ec 2011 –Juleptember 20ec 2012- July
s: ril 17, 2012ne 27, 2012ptember 5, 2
e being prepa
Update
ator
als week in s numerous reach -30F.heating pumstandby genswitch with areas in the
ly 2012 012 y 2013
2012
ared by the
the Fall 201outages eac A standby g
mps, ventilatnerator in a wnecessary m
e Ward, Goo
Total
TPC $CCA $
contractor.
1 semester ch winter putgenerator is ion and fire weather tighmodificationsodrich, McLa
Project Co
$ 550,000 $ 369,000
and tting
ht, s to
ane,
ost:
Project Remove and vapoinstall ne
Schedu
PlanningAdvertisiConstruc Project Design TGeneral
Board oPreliminaFormal PSchemat Status UFunds wethe roof. complete This will
KPC
Descriptiothe original
or barrier, insew metal roo
ule:
& Design: ng & Award
ction:
Team: Team Contractor
of Regentsary Admin AProject Approtic Design A
Update: ere received Contractor
e the project
be the final
Kache
on: zip rib metastall rigid ins
ofing.
:
Bezek Sunlan
Approval Approval oval pproval
d in May 201mobilized toOct 24, 201
construction
Februar
emak B
al roof panelssulation and
DeMaJu
Durst Seiserd Developm
& MotionsMaMaMa
2 to finalizeo the project 12. Final ins
n in progress
ry 2013 BOR
Bay Roo
s from the ornew roof ov
ec 2011 – Apay 2012 l 2012 – Oct
r ment Compan
s: y 2012 y 2012 y 2012
e design, advJul 10, 2012
spection was
s report on th
Update
of Rep
riginal buildiverhangs, cre
pr 2012
t 2012
ny LLC
vertise and a2 and was a
s Oct 29, 20
his project.
placeme
ng. Repair ueate roof ve
Total
TPC$ CAA$
award a conable to subst12.
ent
underlaymenentilation and
Project Co
700,000
573,651
tract to replatantially
nt d
ost:
ace
Project This projsignifican
Schedu
PlanningAdvertisiConstruc
Project Design TGeneral
Board oPreliminaFormal PSchematProject C Status UTesting p In Januasoil on thside and proceed Final out
Descriptioect is cleanint amounts o
ule:
& Design: ng & Award
ction:
Team: Team Contractor
of Regentsary Admin AProject Approtic Design AChange Req
Update: performed in
ry UAA met he West side
testing will bwith planting
come will be
KP
on: ng up a site of diesel con
:
ShannoFoster
Approval Approval oval pproval uests
n September
with the ADe will be pushbe performeg 400 trees p
e a letter from
Februar
PC Soil
off campus ntamination a
ThFeAp
on & WilsonConstruction
& MotionsFebFebFebJun
r came back
DEC and devhed into the
ed in July. If tper acre.
m the ADEC
ry 2013 BOR
Reme
that was usat 14 feet be
hru January 2ebruary 2010pril 2010- Oc
n
s: bruary 9, 20bruary 17, 20bruary 17, 20ne 1, 2010, O
with DRO le
veloped a woopen excav
the tests com
C stating no f
Update
ediation
sed for fire trelow ground
2010 0 – March 20ctober 2013
10 010 010 October 21,
evels above
ork plan for tvation. Tillingme back wit
further actio
n
raining in thelevel.
Total
TPC$ CCA$010
2011, Jan 1
the ADEC c
the Summerg will continuh low DRO l
on needed on
e 1980’s and
Project Co
481,464 $ 162,146
0,2011
cleanup leve
r 2013. Cleaue on the Welevels we wi
n this site.
d had
ost:
el.
n est ll
Project The fire designereplacedrates. Thflow rate
Schedu
PlanningAdvertisiConstruc Project Design TGeneral
Board oPreliminaFormal PSchematProject C
Status U The consThe cont
Descriptiosprinkler syd to work wd with a newhe sprinklere.
ule:
& Design: ng & Award
ction:
Team Team: Contractor:
of Regentsary Admin AProject Approtic Design AChange Req
Update:
struction contractor is ma
KPC
on: ystems in t
with the exisw public war pipes nee
:
MCG, RSA Blazy
Approval Approval oval pproval uests
ntract has beaking good p
Februar
Sprink
he Ward, Gsting water ater line wited to be res
SeApJu
A
& MotionsSepSepSepJuly
een extenderogress and
ry 2013 BOR
kler Re
Goodrich, Mwell and firh a lower o
sized to wor
ep – Feb 201pril 2012 ne 2012 – A
s: ptember 9, 2ptember 9, 2ptember 12, y 23, 2012 a
d four monthd is about 60
Update
enovat
McLane andre pump syoperating prrk with the n
12
April 2013
2011 2011 2011
and Septemb
hs to 4/30/130% complete
tion
d Brockel buystem whichressure andnew water
Total
TPC: $CAA:
ber 24, 2012
3 due to pere.
uildings weh has been d different fpressure a
Project Co
$ 663,120 $ 468,880
2
rmitting dela
re
flow nd
ost:
ys.
Project New studbeds. Fokitchen adesk, a kroom, an
Schedu
PlanningAdvertisiConstruc Project Design TGeneral
Board oPreliminaFormal PSchematProject C Status URoofing astarted. Athe Contcomplete
Descriptiodent housingour of the suiand living rookitchen and and fitness roo
ule:
& Design: ng & Award
ction:
Team: Team: Contractor:
of Regentsary Admin AProject Approtic Design AChange Req
Update: and FramingAlthough theractor’s man
e on schedul
KP
on: g is a two stotes are ADA
om. At the ea maintenanom. The tota
:
Bettisworth Bristol Env
Approval Approval oval pproval uests
g is completee Contractor’nagement tele.
Februar
PC Stu
ory wood fraA compliant. ntrance ther
nce area. Onal sf is 39,87
JuMaJu
h, RSA, BBFvironmental R
& MotionsMaFebSepN/A
e. Plumbing’s on-site maam have im
ry 2013 BOR
dent H
amed buildinThe suites h
re is a commn the second75 sf.
ne 2010 – Aay 2012 – July 2012 – Ju
FM, Dowl, HMRemediation
s: y 13, 2010bruary 19, 20ptember 23, A
, Electrical, Hanagement hproved thing
Update
ousing
g with 24 suhave 4 bedro
mons, multipd floor there
April 2012 une 2012 uly 2013
MS n Services
011 2011
HVAC and Fhas been wegs significan
g
uites for a totooms, two reurpose roomis a study lo
Total
TPC: $CAA:
Fire Protectioeak, several
ntly and work
tal of 96 studestrooms, sm
m, 2 offices, ounge, laund
Project Co
$ 17,800,00$ 11,924,15
on rough-in meetings w
k is expected
dent mall front
dry
ost:
0 58
has with d to
Project GO Bondclassroom
Schedu
PlanningAdvertisiConstruc Project Design TGeneral
Board oPreliminaFormal PSchemat Status UContractothe additremains complete This will
MSC
Descriptiod funded addms, offices,
ule:
& Design: ng & Award
ction:
Team: Team Contractor
of Regentsary Admin AProject Approtic Design A
Update: or was subsion and are for spring co
ed.
be the final
C Para
on: dition to the labs, worksp
:
LivingsNeeser
Approval Approval oval pproval
stantially comoperational
ompletion of
construction
Februar
medic/
Mat-Su campace and sto
FeApJu
tone Slone Ir Constructio
& MotionsFebNovSep
mplete in Defor the Sprin
f the project.
n in progress
ry 2013 BOR
/Nursin
mpus. The Sorage for the
eb 2011 – Mapril 2011 ne 2012 – D
Inc on, Inc
s: b 2009 v 2010 p 2011
cember 201ng semester This is the
s report on th
Update
ng Lab
Snodgrass He paramedic
ar 2012
Dec 2012
2. Campus r. A small amfirst UAA FY
his project.
Additio
Hall addition c and nursing
Total
TPC$ CAA$
programs hamount of lanY11 GO Bon
on
will include g programs.
Project Co
3,625,000
2,438,536
ave moved indscaping nd project to
new
ost:
into
o be
Project The projemusic sptheater/a
Schedu
PlanningAdvertisiConstruc Project Design TGeneral
Board oPreliminaFormal PSchemat Status UDesign wto reviewhas beenadvertise
MSC
Descriptioect will desig
pace and insauditorium fo
ule:
& Design: ng & Award
ction:
Team: Team Contractor
of Regentsary Admin AProject Approtic Design A
Update: work is compw and improvn submitted tement. This
C Valle
on: gn and consttrument stor
or lectures, p
:
Kumin AN/A
Approval Approval oval pproval
pleted and bive the bid doto the Borouis UAA’s las
Februar
y Cent
truct a new frage, displaypublic gather
JuFeMa
Associates
& MotionsFebNovJun
id documentocuments. A ugh and appst FY11 GO
ry 2013 BOR
ter for A
facility that wy areas, gathrings and co
l 2011- Nov eb 2013 ar 2013 – De
s: b 2009 v 2011 n 2012
ts are being section lineroval is anticBond projec
Update
Arts &
will provide ahering/study
onferences.
2012
ec 2014
prepared. De easement scipated prior
ct to be awar
Learnin
a classroomy spaces and
Total
TPC$ CAA$
Design periosetback varir to the consrded for cons
ng
, drama lab,d a 500 seat
Project Co
20,000,000
TBD
od was extenance reques
struction bid struction.
, t
ost:
nded st
PW
Project GO BondThe workflooring aelectronicmechanic
Schedu
PlanningAdvertisiConstruc Project Design TGeneral
Board oPreliminaFormal PSchemat Status UThe wellncompleteconstruct
WSCC W
Descriptiod funded genk will includeand finishes;c entry systecal system u
ule:
& Design: ng & Award
ction:
Team: Team Contractor
of Regentsary Admin AProject Approtic Design A
Update: ness center e. The new tion to contin
Wellne
on: neral renovae: ADA comp; new doors em; ACM remupgrades; en
:
Kumin AEklutna
Approval Approval oval pproval
remodel is nlobby is framnue. The ex
Februar
ess CenRe
ation of the epliant locker/and hardwamoval; replanergy conse
FeDeAp
Associatesa Services L
& MotionsFebDecSep
nearing commed and rooxterior siding
ry 2013 BOR
nter Reenewal
existing Well/restrooms;
are; lighting racement of grvation cont
eb 2011 – Noec 2011 – Japr 2012 – Au
LC
s: b 2009 c 2010 p 2011
mpletion and fing will be i
g will begin in
Update
enovatil
lness Centenew entrancreplacementgalvanized wtrols; and ex
ov 2011 an 2012 ug 2013
the overall pnstalled soon the spring.
on & C
r and Campce and count and electric
water lines; ITxterior siding
Total
TPC$ CAA$
project is abon to allow w.
Campus
us Renewalter space; ncal upgradesT upgrades; improveme
Project Co
5,000,000
2,789,896
out 65% winter
s
. ew s; ; nts.
ost:
February 2013 CIP Update
Schedule:
Planning & Design: June—August 2012
Adver sing & Award: August 2012
Construc on: Phase 1: August—October 2012
Board of Regents Approval & Mo ons:
Preliminary Administra ve Approval Phase 1: August 15, 2012
Schema c Design Approval Phase 1: August 20, 2012
Formal Project Approval Phase 1: August 20, 2012
Status Update: Contractor has completed the ini al site work and founda ons and the balance of the work will be completed July, 2013.
Antenna Installa on Alaska Satellite Facility AS311 Phase 1 (AIASF)
Total Project Cost:
$6,000,000
Phase 1 $1,000,000
Project Descrip on Phase One of the project involves site work on an area of approximately 150 feet by 150 feet, founda on and construc on of a 20-foot high concrete base. The construc on of the concrete base will be expedited as much as the coming winter season will reasonably allow. The site prepara on includes clearing brush and trees, excava on and trenching, grading and improvements to the exis ng service road. This work will also realign the adjacent exis ng ski trail and expand the training/ski head area.
Antenna Installa on Alaska Satellite Facility AS311 Phase 1
Funding Source:
NASA and ITT Exelis Architect/Engineer:
General Contractor:
PDC, Inc.
GHEMM Company
February 2013 CIP Update
Schedule Phase 2:
Planning & Design: October 2006—May 2012
Adver sing & Award: May-June 2012
Construc on: July 2012—July 2013
Board of Regents Approval & Mo ons:
Formal Project Approval June 03, 2011
Schema c Design Approval February 10, 2012
Status Update: The comple on date has been changed to February, 2013. A delay was encountered in obtaining control valves for the tank.
Atkinson Power Plant Renewal Phase 2 (BARN2)
Total Project Cost:
$1,927,000
Project Descrip on Phase 2 work consists of four primary items; De‐aerator Replacement: It is proposed to provide a redundant de-aerator that can be put into service with a short plant shut down in lieu of replacing the exis ng equipment. Feed‐water Heater Replacement: It is proposed to replace the exis ng heater with new equipment at a me of low steam load. This plan will not require a complete plant shutdown. Eliminate Single Points of Failure in Cri cal Piping: The proposed scope of work includes installa on of 12 new valves and some bypass piping. These valves will allow boilers to be isolated and sec ons of the high pressure piping can be bypassed during a boiler failure. Replace Variable Frequency Drives: The alloca on of FY12 funds does not allow the replacement of all VFD’s in the plant, but key VFD’s that power fans and pumps for Boilers 3 and 4, as well as condenser fans for Turbine No. 3 will be replaced in this phase.
Atkinson Power Plant Renewal Phase 2
Funding Source:
FY12 General Funds / Bonds
Architect/Engineer:
General Contractor:
Design Alaska, Inc. and Evergreen Engineering
Kiewit Building Group, Inc.
February 2013 CIP Update
Schedule:
Planning & Design: 2009-2012
Adver sing & Award: N/A
Construc on: January 2013-August 2013
Board of Regents Approval & Mo ons:
Preliminary Admin Approval August 8, 2012
Formal Project Approval September 27, 2012
Schema c Design Approval September 27, 2012
Status Update: Construc on is scheduled to begin in January 2013 and will be ongoing thru August 2013.
Campus-wide Energy Upgrades—Fairbanks Campus (CWEMC)
Total Project Cost:
$6,000,000
Project Descrip on This project will upgrade the ligh ng, HVAC controls and sensors, replace old inefficient motors and controls, and install new door and window seals on 10 University Bldgs. Project cost will be recovered in energy savings in 10 years.
Campus Wide Energy Upgrades—Fairbanks Campus
Architect/Engineer:
General Contractor:
Siemens Bldg Technologies, Inc.
Siemens Bldg Technologies, Inc.
February 2013 CIP Update
Schedule Phase 1C:
Planning & Design: January 2009 - June 2009
Adver sing & Award: May-July 2011
Construc on: July 2011 - August 2012
Board of Regents Approval & Mo ons:
Formal Project Approval April 8, 2011
Schema c Design Approval June 2, 2011
Status Update: Work in this phase is complete. Work on this CM@R contract was done under budget and the savings was returned to UAF. Phase 2 work will start in March, 2013.
Cri cal Electrical Distribu on Renewal Phase 1C (UTERC)
Total Project Cost:
$10,000,000
Project Descrip on Phase 1C scope will install all the major electrical equipment in the building constructed in Phase 1B, including switchgear, transformers, switches, and cable for two new electrical feeders. Addi onal feeders will be installed as funds are available.
Cri cal Electrical Distribu on Renewal Phase 1C
Funding Source:
FY12 R&R Funding
Architect/Engineer:
General Contractor:
PDC Inc. Engineers
Kiewit Building Group, Inc.
February 2013 CIP Update
Schedule:
Planning & Design: May—August 2012
Adver sing & Award: September 2012
Construc on: October 2012—February 2013
Board of Regents Approval & Mo ons:
Formal Project Approval August 27, 2012
Schema c Design Approval August 27, 2012
Preliminary Administra ve Approval August 17, 2012
Status Update:
Construc on is 60% complete. The exterior is insulated and the concrete slab has been poured. Construc on con nues with interior framing and mechanical and electrical rough-in complete. Interior finishes including paint, ceilings, ligh ng, and mechanical fixtures are underway. Project comple on is on schedule for February 2013.
UAF CTC Avia on Hangar Renova on (CTCHR)
Total Project Cost:
$1,725,000
UAF CTC Avia on Hangar Renova on
Project Descrip on This project will provide enough program space for the Avia on programs to move a por on of their teaching opera ons into the new facility. The project construc on includes minor modifica ons to the exis ng hangar and offices, inclusion of new ba ery and sand blas ng rooms, condi oning the unfinished 8,000 sf area, addi on of public restrooms, and new head bolt outlets for winter me parking. Condi oning the 8,000 sf of currently unfinished space includes exterior wall insula on, vapor barrier, under slab u li es, a concrete floor slab and installa on of new mechanical and electrical rooms.
Funding Source:
UAF and CTC Opera ng Funds
USKH, Inc.
TBI Construc on Company
Architect/Engineer:
General Contractor:
February 2013 CIP Update
Schedule:
Planning & Design: April 2012—June 2012
Adver sing & Award: May 2012—June2012
Construc on: June 2012—August 2012
Board of Regents Approval & Mo ons:
Formal Project Approval April 26, 2012
Schema c Design Approval June 06, 2012
Status Update: Approximately 500 feet of failing wood retaining wall has been replaced with concrete walls. New ADA compliant ramp and stairs have been installed and provide access to Cutler Apartments. Deteriorated wooden steps have been replaced and handrails were installed at all front entries. Installa on of headbolt heaters is near comple on. Paint and hydroseeding will be completed in Spring 2013.
UAF Cutler Apartment Retaining Wall (CURW)
Total Project Cost:
$1,460,495
UAF Cutler Apartment Retaining Wall
Project Descrip on This project will construct a new concrete retaining wall, stairs, sidewalks, ADA accessible ramp and head bolt heater outlets to comply with building codes and improve safety throughout the Cutler Apartment complex.
Funding Source:
FY12 Bond Issue Residence Life
PDC Inc. Engineers
Alcan Builders, Inc.
Architect/Engineer:
General Contractor:
February 2013 CIP Update
Status Update: The design firm. UAF, and the CMAR have completed design review of the Design Development set of drawings and the various comments are being incorporated. Structural and Civil design are expedi ng to allow for ground breaking to occur in April. A glazier contractor has been selected and the exterior façade detailed design has begun.
Project Descrip on The Engineering Facility project will building 117,000 gsf of new space and renovate about 23,000gsf of exis ng space in the Duckering Building in support of the UAF College of Engineering and Mines. The six story building will provide space for engineering learning and discovery and will feature open lab concepts and a high-bay area for prac cal applica on of engineering know how.
UAF Engineering Facility
Designer: ECI Hyer, NBBJ, PDC Inc, AMC
CM@Risk: Davis Constructors
Board of Regents Approval & Mo ons:
Preliminary Project Approval September 9, 2006
Formal Project Approval June 4, 2010
Amended Formal Project Approval September 23, 2011
Schema c Design Approval June 8, 2012
Occupancy Date: Fall 2015
Schedule Bar Chart: Design
Construc on
0%
0%
100%
100%
Groundbreaking Mar-2013
Occupancy Sept-2015
UAF Engineering Facility (ENNF)
Total Project Cost: $108,600,000
Funding Source:
SOA Appropria on
February 2013 CIP Update
Schedule:
Planning & Design: September 2012
Adver sing & Award: TBD
Construc on: TBD
Board of Regents Approval & Mo ons:
Preliminary Administra ve Approval January 10, 2012
Formal Project Approval TBD
Schema c Design Approval TBD
Status Update: Planning and programming phase is complete
Fine Arts Salisbury Theater Renova on (FAREN)
Total Project Cost:
$750,000
Fine Arts Salisbury Theater Renova on
Project Descrip on Phase I: Analysis of exis ng condi ons and program/user group needs , followed by op ons and recommenda ons for renova on. Phase II: Design and construc on documents for the renova on of Salisbury Theater.
Architect/Engineer:
General Contractor:
Funding Source:
FY12 General Fund UAF Q Series Bond Bezek Durst Seiser
TBD
February 2013 CIP Update
Schedule:
Planning & Design: October 2012-February 2013
Construc on: March 2013-September 2013
Board of Regents Approval & Mo ons:
Preliminary Administra ve Approval October 18, 2011
Formal Project Approval September 28, 2012
Schema c Design Approval Submi ed to BoR February 2013
Status Update: 65% design review submi al scheduled for Jan. 15, 2013.
Fine Arts Complex Vapor Barrier and Installa on (FAVB)
Total Project Cost:
$5,600,000
Fine Arts Complex Vapor Barrier Design and Installa on
Project Descrip on This project will correct building envelope deficiencies by applica on of spray foam and vapor barrier to the inside of exterior walls to the music wing.
Architect/Engineer:
CM@R:
USKH
Wa erson
February 2013 CIP Update
Status Update: The project has progressed into the next phase of construc on: finishes. Building comple on is well underway with ligh ng, ceilings, final casework, and controls installa ons fully underway. Contractors have completed most of the wiring and plumbing and the permanent power has been turned on to the facility. The exterior of the building is 95% complete. Overall the project remains on schedule for occupancy in the summer of 2013.
Project Descrip on The Murie Building will provide mul use teaching and research labs, classrooms, and office space for life science research and academic purposes. The research por on will provide nearly 60,000 gsf of lab space for biology research. The teaching por on will provide 40,000 gsf of academic classroom and lab space for biology and wildlife degree programs. The project also includes expansion of the West Ridge u lidor steam line, and a greenhouse replacement.
UAF Margaret Murie Building UAF Life Sciences Research and Teaching Facility
Schedule Bar Chart: Design
Construction
BASIC PROJECT INFORMATION:
Designer: Bezek Durst Seiser Inc., Smith Group, PDC Inc., RFD Inc.
CM@Risk: Davis Constructors
Board Approvals: FPA February 2010 SDA November 2010
Total Project Cost: $88,578,000 Construc on Cost: $67,700,000
Occupancy Date: Fall 2013 Funding Source: GO Bond UA Revenue Bond
0%
0%
100%
100% Groundbreaking
Mar-2011 Occupancy Sept-2013
UAF Life Sciences Facility (LFRF)
For actual values refer to a ached budget sheet
$0 $50 $100
Project Management
Building Completion
Construction
Design
Millions
Budget vs ActualActual
Budget
February 2013 CIP Update
UAF Margaret Murie Building UAF Life Sciences Research and Teaching Facility
UAF Life Sciences Facility (LFRF)
Formal Project Approval: $108,600,000 to fund three projects associated with the construc on of the new facili es:
-Life Sciences Facility ($88,275,000) TPC Increase October 2011 for $303,000 -West Ridge Steam Capacity Expansion ($15M) -Arc c Health Greenhouse ($5,325,000) - Refer to AHRG CIP Update
February 2013 CIP Update
Schedule:
Planning & Design: March 22, 2011-February 18. 2013
Adver sing & Award: N/A
Construc on: May 1, 2013-July 16, 2014
Board of Regents Approval & Mo ons:
Formal Project Approval June 2, 2011
Schema c Design Approval September 28, 2012
Status Update: The bonds were sold for the project in December. Design is progressing with final documents to be ready February 18th. Construc on is set to begin the first of May, 2013; with construc on complete in July 2014.
Campus Wide Student Housing & Dining Development (CWHD)
Total Project Cost:
$25,070,000
Campus Wide Student Housing & Dining Development
Project Descrip on: Design and build a new student dining facility adjacent to the Wood Center through a public-private partnership.
Perkins & Will
Ghemm Company
Architect/Engineer:
General Contractor:
February 2013 CIP Update
Schedule:
Planning & Design: September 2012—February 2013
Advertising & Award: April 2013
Construction: April 2013
Board of Regents Approval & Motions:
Preliminary Admin Approval July 1, 2012
Formal Project Approval September 27, 2012
Schematic Design Approval Submitted Feb. 2013 BoR
Status Update: Design Alaska is progressing with the design. Design is 95% complete.
Utilities Wood Center Vault (UTWCV)
Total Project Cost:
$3,000,000
Project Description This project will build new utility infrastructure in the area of the Wood Center and Chapman buildings. The new infrastructure will support the new dining facility and continue the effort to upgrade the utilities campus wide.
Utilities Wood Center Vault
Architect/Engineer:
General Contractor:
Design Alaska
TBD
February 2013 CIP Update
Schedule:
Planning & Design: February - May 2011
Adver sing & Award: April - July 2011
Construc on: August 2011 - October 2012
Board of Regents Approval & Mo ons:
Formal Project Approval November 9, 2011
Schema c Design Approval April 8, 2011
Status Update: Substan al comple on was on November 8, 2012. Landscaping will be completed in June 2013. There has been a significant increase in steam capacity at the west ridge which will serve the Life Sciences building as well as future buildings.
U li es West Ridge Steam Capacity Expansion (UTCE)
Total Project Cost:
$15,000,000
Project Descrip on This project installs a 10-inch steam line and a 6-inch condensate line from the Atkinson Power Plant to the West Ridge in the vicinity of the Arc c Health Research Building to increase the steam capacity for West Ridge and the new Life Sciences Facility. A new u lidor will also be constructed to house the steam piping and other u li es from the u lidor near the Lola Tilly Building to the u lidor west of the Student Recrea on Center.
U li es West Ridge Steam Capacity Expansion
Funding Source:
UA Revenue Bond GO Bond (Life Sciences)
Architect/Engineer:
DB Contractor:
PDC Inc. Engineers
Kiewit Building Group Design Alaska
February 2013 CIP Update
West Ridge Deferred Renewal Master Plan (WRDM)
West Ridge Deferred Renewal Master Plan
Project Descrip on The intent of the project is to create a master plan for the renewal of the facili es on the West Ridge and develop
logical phasing, budgetary es mates, and program space alloca on. The first task will update the current
facili es audit and provide a true reflec on of the quan ty of code correc ons, the amount of deferred
maintenance, and the extent of space renewal pertaining to func onal obsolescence. Upon comple on, an
analysis of logical adjacencies will occur and the plan will make sugges ons for reloca on of programs, including
major changes to various spaces to create these adjacencies. Finally, the plan will create logical phasing plans
with recommended funding levels to become the basis for future capital budget requests.
Schedule:
Planning & Design: January 2012 to September 2013
Design Build Award: N/A
Construc on: N/A
Board of Regents Approval & Mo ons:
Formal Project Approval December 22, 2011
Schema c Design Approval N/A
Total Project Cost:
$700,000
Funding Source:
FY12 Capital Appropria on
Map of Facility Condition Blue is Renew or Replace
Status Update: The project team is working on a master plan for the renewal of the facili es on the West Ridge that will address
and develop logical phasing, budgetary es mates, and program space alloca on. The team has completed
facili es condi on analyses and established a condi on index that has helped guide the master planning efforts.
The design team and execu ve commi ee have also completed advance programming of the space on West
Ridge as it relates to the deficit of teaching and research space noted in the 2010 UAF Master Plan. The next
steps are to work on an analysis of logical program adjacencies and the plan for reloca on of programs, including
major changes to various spaces to create these adjacencies. At the same me, the team will create logical
phasing plans with recommended funding levels to become the basis for future capital budget requests.
Addi onal specific planning for reloca on of func ons in the Geophysical Ins tutes and crea ng be er
suited space for the Irving 1 Animal Quarters is underway as well. Phase 2 planning will take over the
remaining efforts of the master plan.
February 2013 CIP Update
Schedule:
Planning & Design: September 2012-January 2013
Adver sing & Award: February 2013-March 2013
Construc on: April 2013-December 2013
Board of Regents Approval & Mo ons:
Preliminary Project Approval May 17, 2012
Formal Project Approval December 7, 2012
Schema c Design Approval Has been submi ed for Feb 2013 BOR
Status Update: This project is in the design phase.
Bristol Bay Applied Sciences (BBAS)
Total Project Cost:
$2.6 Million
Bristol Bay Applied Sciences
Project Descrip on Renova on of the Napa Auto Parts building to provide space and facili es for the Bristol Bay Campus Applied Sciences program.
Architect/Engineer:
General Contractor:
McCool Carlson Green Architects
TBD
February 2013 CIP Update
Schedule:
Planning & Design: September 2011-February 2012
Adver sing & Award: March 2012
Construc on: May 2012—January 2013
Board of Regents Approval & Mo ons:
Preliminary Project Approval January 25, 2012
Formal Project Approval March 23, 2012
Schema c Design Approval March 23, 2012
Status Update: Project Substan al Comple on inspec on has occurred. Contractor is comple ng minor punch list work. Project is 95% complete.
Kuskokwim Campus Kiln Project (KCKP)
Total Project Cost:
$640,000
Kuskokwim Campus Kiln Project
Project Descrip on Design and install ven la on and electrical service upgrades to accommodate the kiln and po ery wheels for the Ceramic Program which is to be located in Room 155. The kiln will be moved from the local high school to UAF Kuskokwim Campus.
Funding Source:
FY11 DM Alloca on
Architect/Engineer:
General Contractor:
Livingston Sloan, Inc.
Denali General Contractors, Inc.
February 2013 CIP Update
Schedule:
Planning & Design: November 2011—February 2012
Adver sing & Award: March—April 2012
Construc on: April—September 2012
Board of Regents Approval & Mo ons:
Preliminary Project Approval December 13, 2010
Formal Project Approval January 26, 2011
Schema c Design Approval February 24, 2012
Status Update: Project SC inspec on has occurred. Minor punch list work remains. Project is 97% complete.
Kuskokwim Campus Voc-Tech Building Room Addi ons (KCRA)
Total Project Cost:
$1,128,500
Kuskokwim Campus Voc-Tech Building Room Addi ons
Project Descrip on A U.S. Department of Educa on (DOE) Title III Grant was applied for and awarded to the UAF Kuskokwim Campus in Bethel for construc ng restrooms on the second level and addi onal offices and a classroom, in the Voc-Ed Building. These new areas will be used to provide needed addi onal classroom, office and restroom facili es. The approximate area of this project is 3,725 square feet.
Funding Source:
DOE Title III Grant
Architect/Engineer:
General Contractor:
Livingston Sloan, Inc.
Denali General Contractors, Inc.
February 2013 CIP Update
Schedule:
Planning & Design: May—July 2012
Adver sing & Award: July—August 2012
Construc on: September 2012—January 2013
Board of Regents Approval & Mo ons:
Preliminary Project Approval May 15, 2012
Formal Project Approval June 27, 2012
Schema c Design Approval June 27, 2012
Status Update: Project is substan ally complete. Punch list items remaining. Project is 98% complete.
Northwest Campus Nagozruk Restroom Remodel (NWNR)
Total Project Cost:
$434,000
Northwest Campus Nagozruk Restroom Remodel
Project Descrip on This project will remove exis ng finishes and fixtures in both restrooms and replace with new finishes and fixtures. ADA accessibility will be incorporated into the project. The referenced restrooms are original construc on and have finish issues with the surface materials and fixtures, including the ceilings, walls, floors, par ons, toilets, urinals, sinks, mirrors, and hand dryers. If asbestos containing material is encountered in the project area, it will be abated under this project.
Funding Source:
CRCD Opera ng Funds
Architect/Engineer:
General Contractor:
Design Alaska, Inc.
Concor Construc on, Inc.
February 2013 CIP Update
Schedule:
Planning & Design: August 2007-October 2008
Adver sing & Award: February 2009-December 2009
Construc on: January 2010-July 2013
Approvals & Mo ons:
Preliminary Project Approval Board of Regents: September 2008
Formal Project Approval Na onal Science Founda on: December 2008
Schema c Design Approval Na onal Science Founda on: December 2008
Status Update: The launching ceremony for the R/V Sikuliaq was on October 13, 2012 in Marine e, Wisconsin. The Sikuliaq is expected to arrive in Seward in late 2013. Science opera ons will begin in early 2014.
R/V Sikuliaq (ARRV)
Total Project Cost:
$199,500,000
Project Descrip on The R/V Sikuliaq (formerly the Alaska Region Research Vessel) is a 261-foot oceanographic research vessel capable of performing complex science in the ice-choked waters of Alaska and the polar regions. When complete the ship will be one of the most advanced university research vessels in the world and will be able to break ice up to 2.5 feet thick.
Research Vessel Sikuliaq
Funding Source:
NSF Coopera ve Agreement
Architect/Engineer:
General Contractor:
Glosten Associates
Marine e Marine Corpora on
February 2013 Board of Regents
Anderson Building Remodel & Pedestrian Access
Project Description: This project will totally remodel the Juneau campus principal science instruction space to accommodate the needs of the UAS Science program. The project is divided in to two separate construction contracts. The first is the building remodel including classrooms, teaching labs, faculty offices, and research spaces. The second contract will be for the construction of a pedestrian crossing of Glacier Highway. These two elements are being designed, bid and constructed as separate contracts due to the different nature and schedules for the work. In the remodel work major building components will be upgraded or replaced including heating and ventilating equipment and controls, the roof membrane and insulation, new toilet rooms, interior finishes, elevator replacement, classroom and laboratory casework and the emergency generator. Interior space will be reconfigured to improve effectiveness of the teaching and research areas. The number of faculty offices will be reduced. The work has required the building to be vacated during renovation. Interim space for offices and labs is being accommodated elsewhere on campus, at the UAF Fisheries facility at Lena Point and at the old NOAA lab adjacent to the Anderson Building. The pedestrian access work will include a pedestrian bridge connecting to the third floor of the Anderson Building and a paved and lighted pathway to the main campus. Total Project Cost: $10,700,000 Project Schedule: Building Remodel Pedestrian Access
Final Design 9/2008 –9/2009 7/2013 – 10/2013
Bid & Award 10/2009-11/2009 2/2014-3/2014
Construction 12/2009 – 9/2010 4/2014 – 10/2014
Project Approvals:
Formal Project Approval September 2008 Schematic Approval February 2009
Status Update: Building Remodel: Construction contract is completed. Pedestrian Overpass: UAS is awaiting detailed design data on the Alaska DOT&PF’s proposed re-alignment of Glacier Highway. DOT&PF and UAS are re-examining the impacts of the future road and right-of-way re-alignment. Construction is intended for 2014 assuming DOT&PF makes a determination on road alignment in early 2013.
February 2013 Board of Regents
Auke Lake Way Corridor Improvements & Reconstruction
Project Description:
• Reconstruction of Auke Lake Way from Hendrickson to the Egan bus circle to replace pavement, signage and lighting, and add traffic control devices and provide for service and emergency access;
• Reconstruction of the Novatney parking area to a service turn-around; • Construction of a paved and lighted pedestrian connection from the Hendrickson
Building to the Auke Creek bridge path, eliminating pedestrian use of the road; • Reconstruction, paving and drainage of the Chapel-by-the-Lake parking lot as
required by the parking agreement; • Construction of a roof structure atop the path between the main parking lots and the
Whitehead entrance; • Revised entry canopies at the intersections of the Novatney and Whitehead exterior
walkways. • Traffic and signage improvements at the Loop Road intersection.
Total Project Cost: $4,300,000 Project Schedule: Phase 1 Phase 2 Phase 3 Planning & Design 1/2011 – 9/2011 8/2011-3/2012 10/2012 – 3/2013 Bid & Award 5/2011 – 6/2011 4/2012 4/2013 Construction 4/2011 - 10/2012 5/2012-11/2012 5/2013 – 10-2013 Project Approvals
Formal Project Approval December 2010 Schematic Approval (Phase 1) April 2011 Schematic Approval (Phase 2) April 2012 Schematic Approval (Phase 3) March 2013 (anticipated)
Status Update: Phase 2 is substantially complete. Planning for phase 3 is underway.
February 2013 Board of Regents
New Freshman Residence Hall – Phase 1
Project Description:
This project is the first phase of a new Freshman Residence Hall. This project will construct the first sixty beds of what will be a 120 bed facility. The second phase will add the second sixty beds and make improvements to the existing campus cafeteria. The new residence hall will be located on a prime site on the westerly edge of the developed parking area, situated between Noyes Pavilion and the drop-off circle to Egan Library. The residence units are organized in a suite arrangement similar to that utilized for Banfield hall, but slightly increased in size and features. The basic module pairs two double occupancy rooms with a shared bathroom and kitchenette area. The project area is approximately 21,800 square feet. Total Project Cost: $9,250,000 (Phase 1) Project Schedule: Design Jan 2011 to March 2013 Bid & Award April 2013 Construction May 2013 to July 2014 Project Approvals:
Formal Project Approval June 2011 Schematic Approval September 2012
Status Update: 95% design documents are due at the end of January. A ground-source heat pump has been selected as the heating system.
February 2013 Board of Regents
Ketchikan – Life Boat Davit Construction
Project Description: This project will construct a platform for a life boat davit at the lower campus. The project is funded with Title III grants. Total Project Cost: $504,000 (Phase 1) $250,000 (Phase 2)
Project Schedule Phase 1 Phase 2 Design 2008 – 2/2009 2/2013 Construction: 4/2012 – 9/2012 3/2013 – 8/2013
Project Approvals
Formal Project Approval 2/2012 Schematic Design Approval 2/2012 TPB increase 2/2013 (anticipated)
Status Update: This phase of the project is substantially complete. A new Title III grant application has been awarded that would complete the project. An amended total project cost increase is being prepared based on the new federal grant.
February 2013 Board of Regents
Ketchikan Upper Campus Parking Lot Reconstruction
Project Description: A geotechnical report on pavement failure at the upper campus parking lot indicated the need to remove the pavement and 2.5 feet of existing soils, and install a geotexile and non-frost susceptible sub-base and new paving. Total Project Cost: $850,000 Project Schedule: Design Fall – 2011 to Spring 2012 Construction May 2012 to September 2012 Project Approvals:
Formal Project Approval February 2012 Schematic Approval February 2012 Project Budget Increase March 2012
Status Update: Project is complete. Contract close out is in process.
February 2013 Board of Regents
Sitka Career & Technical Education Center
Project Description: A Title III grant is providing funding over two federal fiscal years to remodel portions of the existing facility. The project will:
• Expand the existing student success center, • Create a new instructional design center, • Reconstruct the construction technology laboratory, • Construct new records storage, and • Construct a new lecture hall.
Total Project Cost: $3,755,000 Project Schedule
Planning & Design 11/2008 – 9/2009 Bid & Award 11/2011 – 12/2011 Construction: 1/2012 - 10/2012
Project Approvals
Formal Project Approval December 2010 Schematic Approval July 2011 Total Project Cost Increase November 2011
Status Update: Commissioning was completed in January and the construction contract is in closeout phase.