Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork...

128
ARCHITECTURE 49 Architecture 49 Inc. Suite 1000, Isabella Street Ottawa ON K1S 1V7 T (613) 238-0440 F (613) 238-6597 www.architecture49.com Construction Documents Specification National Defence Construct Confidence and Agility Course (DHTC) Issued for Tender Date: December 19, 2018 File: DND/DCC project number DHTC 1612 Architecture 49 project number 159-00249-03

Transcript of Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork...

Page 1: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

ARCHITECTURE 49

Architecture 49 Inc. Suite 1000, Isabella Street Ottawa ON K1S 1V7 T (613) 238-0440 F (613) 238-6597 www.architecture49.com

Construction Documents

Specification

National Defence Construct Confidence and Agility Course (DHTC)

Issued for Tender

Date: December 19, 2018

File: DND/DCC project number DHTC 1612

Architecture 49 project number 159-00249-03

Page 2: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.
Page 3: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.
Page 4: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.
Page 5: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada TABLE OF CONTENTS Section 00 01 10

Construct Confidence and

Agility Course (DHTC) Page 1 of 2

DHTC 1612

Section

Number

Section Title

Pages

UNCLASSIFIED

00 01 07 SEALS PAGE 2

00 01 10 TABLE OF CONTENTS 2

00 01 11 LIST OF PLANS 2

Division 01 GENERAL CONDITIONS

01 11 00 SUMMARY OF WORK 2

01 14 00 WORK RESTRICTIONS 1

01 32 16.07 CONSTRUCTION PROGRESS SCHEDULE – BAR (GANTT) CHART 2

01 33 00 SUBMITTAL PROCEDURES 5

01 35 29 HEALTH AND SAFETY REQUIREMENTS 4

01 35 35 DND FIRE SAFETY REQUIREMENTS 5

01 41 00 REGULATORY REQUIREMENTS 1

01 45 00 QUALITY CONTROL 4

01 51 00 TEMPORARY UTILITIES 1

01 52 00 CONSTRUCTION FACILITIES 2

01 56 00 TEMPORARY BARRIERS AND ENCLOSURES 1

01 61 00 COMMON PRODUCT REQUIREMENTS 5

01 73 00 EXECUTION 2

01 74 11 CLEANING 1

01 74 21 CONSTRUCTION/DEMOLITION WASTE MANAGEMENT AND DISPOSAL 2

01 77 00 CLOSEOUT PROCEDURES 2

01 78 00 CLOSEOUT SUBMITTALS 5

Division 03 CONCRETE

03 10 00 CONCRETE FORMING AND ACCESSORIES 2

03 20 00 CONCRETE REINFORCING 3

03 30 00.01 CAST-IN-PLACE CONCRETE SHORT FORM 4

Page 6: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada TABLE OF CONTENTS Section 00 01 10

Construct Confidence and

Agility Course (DHTC) Page 2 of 2

DHTC 1612

Section

Number

Section Title

Pages

UNCLASSIFIED

Division 05 METALS

05 12 23 STRUCTURAL STEEL FOR BUILDINGS 5

Division 06 WOOD, PLASTICS AND COMPOSITES

06 10 00.01 TIMBER / LUMBER ROUGH CARPENTRY 5

Division 08 OPENINGS

08 11 00 METAL DOORS AND FRAMES 4

Division 11 EQUIPMENT

11 68 00 PLAYFIELD EQUIPMENT & STRUCTURES 6

Division 31 EARTHWORK

31 22 13 ROUGH GRADING 3

31 23 33.01 EXCAVATING, TRENCHING AND BACKFILLING 3

Division 32 EXTERIOR IMPROVEMENTS

32 15 40 CRUSHED STONE SURFACING 4

32 18 16.13 ENGINEERED WOOD FIBRE SAFETY SURFACE 6

32 91 21 TOPSOIL AND FINISHING GRADING 5

32 92 23 SODDING 5

Division 33 UTILITIES

33 46 16 SUBGRADE DRAINAGE NETWORK 4

END OF TABLE OF CONTENTS

Page 7: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada LIST OF PLANS Section 01 01 11

Construct Confidence and

Agility Course (DHTC) Page 1 of 2

DHTC 1612

Plan

Number

Plan Title

UNCLASSIFIED

000 COVER SHEET

100 LANDSCAPING

101 DEMOLITION PLAN

102 MATERIAL PLAN

103 LAYOUT PLAN

104 OBSTACLES 1&3 PLAN AND SECTIONS

105 OBSTACLE 2A and 2B PLAN AND SECTION

106 OBSTACLE 4 PLAN AND SECTION

107 OBSTACLES 5 PLAN AND SECTION

108 OBSTACLES 6 & 9 PLAN AND SECTION

109 OBSTACLES 7 & 8 PLAN AND SECTION

110 OBSTACLE 10 PLAN AND SECTION

111 OBSTACLE 11A and 11B PLAN AND SECTION

112 OBSTACLES 12 PLAN AND SECTION

113 OBSTACLES 13 PLAN AND SECTION

114 OBSTACLE 14 & 15 PLAN AND SECTION

115 OBSTACLE 16 PLAN AND SECTION

116 OBSTACLE 17 PLAN AND SECTION

117 OBSTACLE 18 PLAN AND SECTION

200 STRUCTURAL

201 KEY PLAN AND GENERAL NOTES

202 GENERAL NOTES

203 GENERAL NOTES

204 TYPICAL DETAILS

205 TYPICAL DETAILS

206 PROJECT DETAILS

207 PLAN AND SECTION – OBSTACLE 1

208 PLAN AND SECTION – OBSTACLE 2

209 PLAN AND SECTION – OBSTACLE 3

210 PLAN AND SECTION – OBSTACLE 4

211 PLAN AND SECTION – OBSTACLE 5

212 PLAN AND SECTION – OBSTACLE 6

213 PLAN AND SECTION – OBSTACLE 7

214 PLAN AND SECTION – OBSTACLE 8

Page 8: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada LIST OF PLANS Section 01 01 11

Construct Confidence and

Agility Course (DHTC) Page 2 of 2

DHTC 1612

Plan

Number

Plan Title

UNCLASSIFIED

215 PLAN AND SECTION – OBSTACLE 9

216 PLAN AND SECTION – OBSTACLE 10

217 PLAN AND SECTION – OBSTACLE 11a

218 PLAN AND SECTION – OBSTACLE 11b

219 PLAN AND SECTION – OBSTACLE 12

220 PLAN AND SECTION – OBSTACLE 13

221 PLAN AND SECTION – OBSTACLE 14 & 15

222 PLAN AND SECTION – OBSTACLE 16

223 PLAN AND SECTION – OBSTACLE 17

224 PLAN AND SECTION – OBSTACLE 17

225 PLAN AND SECTION – OBSTACLE 18

300 CIVIL

301 GRADING PLAN

302 SUBDRAIN PLAN

END OF LIST OF PLANS

Page 9: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada SUMMARY OF WORK Section 01 11 00

Construct Confidence and

Agility Course (DHTC) Page 1 of 2

DHTC 1612

UNCLASSIFIED

Part 1 General

1.1 WORK COVERED BY CONTRACT DOCUMENTS

.1 Work of this Contract comprises general construction of exterior works at Dwyer Hill,

located in Richmond, Ontario; and further identified as “Construct Confidence and

Agility Course.

1.2 CONTRACT METHOD

.1 Construct Work under single stipulated price contract.

1.3 WORK BY OTHERS

.1 Co-operate with other Contractors in carrying out their respective works and carry out

instructions from DCC Representative.

.2 Co-ordinate work with that of other Contractors. If any part of work under this Contract

depends for its proper execution or result upon work of another Contractor, report

promptly to DCC Representative, in writing, any defects which may interfere with proper

execution of Work.

1.4 CONTRACTOR USE OF PREMISES

.1 Unrestricted use of site until Substantial Performance.

.2 Obtain and pay for use of additional storage or work areas needed for operations under

this Contract.

1.5 EXISTING SERVICES

.1 Notify, DCC Representative and utility companies of intended interruption of services

and obtain required permission.

.2 Establish location and extent of service lines in area of work before starting Work. Notify

DCC Representative of findings.

.3 Submit schedule to and obtain approval from DCC Representative for any shut-down or

closure of active service or facility including power and communications services.

Adhere to approved schedule and provide notice to affected parties.

.4 Where unknown services are encountered, immediately advise DCC Representative and

confirm findings in writing.

.5 Protect, relocate or maintain existing active services. When inactive services are

encountered, cap off in manner approved by authorities having jurisdiction.

.6 Record locations of maintained, re-routed and abandoned service lines.

.7 Construct barriers in accordance with Section 01 56 00 - Temporary Barriers and

Enclosures.

1.6 DOCUMENTS REQUIRED

.1 Maintain at job site, one copy each document as follows:

Page 10: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada SUMMARY OF WORK Section 01 11 00

Construct Confidence and

Agility Course (DHTC) Page 2 of 2

DHTC 1612

UNCLASSIFIED

.1 Contract Drawings.

.2 Specifications.

.3 Addenda.

.4 Reviewed Shop Drawings.

.5 List of Outstanding Shop Drawings.

.6 Change Orders.

.7 Other Modifications to Contract.

.8 Field Test Reports.

.9 Copy of Approved Work Schedule.

.10 Health and Safety Plan and Other Safety Related Documents.

.11 Other documents as specified.

Part 2 Products

2.1 NOT USED

.1 Not used.

Part 3 Execution

3.1 NOT USED

.1 Not used.

END OF SECTION

Page 11: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada WORK RESTRICTIONS Section 01 14 00

Construct Confidence and

Agility Course (DHTC) Page 1 of 1

DHTC 1612

UNCLASSIFIED

Part 1 General

1.1 ACCESS AND EGRESS

.1 Design, construct and maintain temporary "access to" and "egress from" work areas, in

accordance with relevant municipal, provincial and other regulations.

1.2 EXISTING SERVICES

.1 Notify DCC Representative and utility companies of intended interruption of services and

obtain required permission.

.2 Give DCC Representative 48 hours of notice for necessary interruption of electrical

service throughout course of work. Keep duration of interruptions minimum. Carry out

interruptions after normal working hours of occupants, preferably on weekends.

.3 Provide for personnel and vehicular traffic.

.4 Construct barriers in accordance with Section 01 56 00 - Temporary Barriers and

Enclosures.

1.3 SPECIAL REQUIREMENTS

.1 Carry out disruption generating activities outside of Standard Work Hours.

.1 Hours of work are from 0800 hours to 1600 hours, unless otherwise instructed by

DCC Representative.

.2 Ensure Contractor's personnel employed on site become familiar with and obey

regulations including safety, fire, traffic and security regulations.

.3 Keep within limits of work and avenues of ingress and egress.

.4 Ingress and egress of Contractor vehicles at site will be controlled according to security

plan developed jointly by Contractor and DCC Representative.

.5 No construction activities are permitted on statutory holidays.

1.4 SITE SECURITY

.1 The Base is a secure facility. Adhere to all Base security requirements, restrictions,

procedures and protocols, as confirmed by DCC Representative.

END OF SECTION

Page 12: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

This page is intentionally left blank.

Page 13: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada CONSTRUCTION PROGRESS SCHEDULE Section 01 32 16.07

Construct Confidence and BAR (GANTT) CHART

Agility Course (DHTC) Page 1 of 2

DHTC 1612

UNCLASSIFIED

1 GENERAL

1.01 DEFINITIONS

.1 Activity: element of Work performed during course of Project. Activity normally has expected

duration, and expected cost and expected resource requirements. Activities can be subdivided into

tasks.

.2 Bar Chart (GANTT Chart): graphic display of schedule-related information. In typical bar chart,

activities or other Project elements are listed down left side of chart, dates are shown across top,

and activity durations are shown as date-placed horizontal bars. Generally Bar Chart should be

derived from commercially available computerized project management system.

.3 Baseline: original approved plan (for project, work package, or activity), plus or minus approved

scope changes.

.4 Construction Work Week: Monday to Friday, inclusive, will provide five day work week and

define schedule calendar working days as part of Bar (GANTT) Chart submission.

.5 Duration: number of work periods (not including holidays or other nonworking periods) required

to complete activity or other project element. Usually expressed as workdays or workweeks.

.6 Master Plan: summary-level schedule that identifies major activities and key milestones.

.7 Milestone: significant event in project, usually completion of major deliverable.

.8 Project Schedule: planned dates for performing activities and the planned dates for meeting

milestones. Dynamic, detailed record of tasks or activities that must be accomplished to satisfy

Project objectives. Monitoring and control process involves using Project Schedule in executing

and controlling activities and is used as basis for decision making throughout project life cycle.

1.02 REQUIREMENTS

.1 Ensure Master Plan and Detail Schedules are practical and remain within specified Contract

duration.

.2 Plan to complete Work in accordance with prescribed milestones and time frame.

.3 Limit activity durations to maximum of approximately 10 working days, to allow for progress

reporting.

.4 Ensure that it is understood that Award of Contract or time of beginning, rate of progress, Interim

Certificate and Final Certificate as defined times of completion are of essence of this contract.

1.03 ACTION AND INFORMATIONAL SUBMITTALS

.1 Provide submittals in accordance with Section 01 33 00 - Submittal Procedures.

.2 Submit Project Schedule to DCC Representative within 10 working days of contract award.

Page 14: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada CONSTRUCTION PROGRESS SCHEDULE Section 01 32 16.07

Construct Confidence and BAR (GANTT) CHART

Agility Course (DHTC) Page 2 of 2

DHTC 1612

UNCLASSIFIED

1.04 MASTER PLAN

.1 Structure schedule to allow orderly planning, organizing and execution of Work as Bar Chart

(GANTT).

.2 DCC Representative will review and return revised schedules within 5 working days.

.3 Revise impractical schedule and resubmit within 5 working days.

1.05 PROJECT SCHEDULE

.1 Develop detailed Project Schedule derived from Master Plan.

.2 Ensure detailed Project Schedule includes as minimum milestone and activity types as follows:

.1 Award.

.2 Shop Drawings, Samples.

.3 Earthwork and subgrade drainage.

.4 Foundations.

.5 Structures.

.6 Topsoil and finishing grading.

.7 Obstacles installation.

.8 Sodding.

1.06 PROJECT SCHEDULE REPORTING

.1 Update Project Schedule on bi-weekly basis reflecting activity changes and completions, as well

as activities in progress.

.2 Include as part of Project Schedule, narrative report identifying problem areas, anticipated delays

and impact with possible mitigation.

2 PRODUCTS

2.01 NOT USED

.1 Not used.

3 EXECUTION

3.01 NOT USED

.1 Not used.

END OF SECTION

Page 15: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada SUBMITTAL PROCEDURES Section 01 33 00

Construct Confidence and

Agility Course (DHTC) Page 1 of 5

DHTC 1612

UNCLASSIFIED

Part 1 General

1.1 DEFINITIONS

.1 Action Submittals: Written and graphic information and physical samples that require

DCC Representative’s responsive action. Unless specifically noted otherwise in

individual sections, the following shall be considered Action Submittals:

.1 Product Data.

.2 Shop Drawings.

.3 Samples.

.2 Informational Submittals: Written and graphic information and physical samples that do

not require DCC Representative’s responsive action. Submittals may be rejected for not

complying with requirements. Unless noted otherwise in individual sections, the

following shall be considered Informational Submittals:

.1 Certificates.

.2 Maintenance Data.

.3 Test and Inspection Reports.

.4 Delegated Design Calculations.

.5 Closeout Submittals.

.6 Sample warranties.

.7 Manufacturer’s installation instructions.

.3 Portable Document Format (PDF): An open standard file format licensed by Adobe

Systems used for representing documents in a device-independent and display resolution-

independent fixed-layout document format.

1.2 ADMINISTRATIVE

.1 Submit to DCC Representative submittals listed for review. Submit promptly and in

orderly sequence to not cause delay in Work. Failure to submit in ample time is not

considered sufficient reason for extension of Contract Time and no claim for extension

by reason of such default will be allowed.

.2 Do not proceed with Work affected by submittal until review is complete.

.3 Present shop drawings, product data, samples and mock-ups in SI Metric units.

.4 Where items or information is not produced in SI Metric units converted values are

acceptable.

.5 Review submittals prior to submission to DCC Representative. This review represents

that necessary requirements have been determined and verified, or will be, and that each

submittal has been checked and co-ordinated with requirements of Work and Contract

Documents. Submittals not stamped, signed, dated and identified as to specific project

will be returned without being examined and considered rejected.

.6 Notify DCC Representative, in writing at time of submission, identifying deviations from

requirements of Contract Documents stating reasons for deviations.

Page 16: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada SUBMITTAL PROCEDURES Section 01 33 00

Construct Confidence and

Agility Course (DHTC) Page 2 of 5

DHTC 1612

UNCLASSIFIED

.7 Verify field measurements and affected adjacent Work are co-ordinated.

.8 Contractor's responsibility for errors and omissions in submission is not relieved by DCC

Representative's review of submittals.

.9 Contractor's responsibility for deviations in submission from requirements of Contract

Documents is not relieved by DCC Representative review.

.10 Keep one reviewed copy of each submission on site.

1.3 ELECTRONIC SUBMITTALS

.1 Submittals (excluding samples) shall be submitted for information and review in

electronic format using the following guidelines:

.1 Provide in Portable Document Format (*.pdf) with selectable text and graphics

that are readable. Generally the documents shall be merged into one bookmarked

document up to 20 mb. Merged documents shall use hierarchical bookmarks to

form a table of contents and provide hyperlinks to the subject topic.

.2 Break down information into documents of "like" or related materials or systems.

.3 Include all final ratings, parameters, specifications, options, etc. In the case

where the DCC Representative returns the submittal “Approved As Noted” and

includes mark-ups or comments that change the originally submitted ratings,

parameters, specifications, options, etc., the Contractor shall correct the

documents in the original electronic document prior to submitting the final

electronic documents.

.4 Highlight specific rating, parameter, specification, option, etc. when original

document includes multiple alternatives. For instance when a range of

performance parameters are given, or various sizes are shown, or various options

are listed, the applicable item shall be indicated by highlight, circle, pointer, etc..

.5 Do not include generalized direction from the DCC Representative that does not

relate to ordering and purchasing the equipment. For instance, notes like,

"Coordinate with xxx for final motor horsepower" are not to be transferred to the

electronic submittal. In that example only the final coordinated sizes would be

indicated.

.6 References within this specification that indicate sheet size refer to electronic

sheet (printing) size.

1.4 SHOP DRAWINGS AND PRODUCT DATA

.1 The term "shop drawings" means drawings, diagrams, illustrations, schedules,

performance charts, brochures and other data which are to be provided by Contractor to

illustrate details of a portion of Work.

.2 Submit drawings stamped and signed by professional engineer registered or licensed in

Province of Ontario.

.3 Indicate materials, methods of construction and attachment or anchorage, erection

diagrams, connections, explanatory notes and other information necessary for completion

of Work. Where articles or equipment attach or connect to other articles or equipment,

Page 17: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada SUBMITTAL PROCEDURES Section 01 33 00

Construct Confidence and

Agility Course (DHTC) Page 3 of 5

DHTC 1612

UNCLASSIFIED

indicate that such items have been co-ordinated, regardless of Section under which

adjacent items will be supplied and installed. Indicate cross references to design drawings

and specifications.

.4 Allow 10 days for DCC Representative's review of each submission.

.5 Adjustments made on shop drawings by DCC Representative are not intended to change

Contract Price. If adjustments affect value of Work, state such in writing to DCC

Representative prior to proceeding with Work.

.6 Make changes in shop drawings as DCC Representative may require, consistent with

Contract Documents. When resubmitting, notify DCC Representative in writing of

revisions other than those requested.

.7 Accompany submissions with transmittal form, containing:

.1 Date.

.2 Project title and number.

.3 Contractor's name and address.

.4 Identification and quantity of each shop drawing, product data and sample.

.5 Other pertinent data.

.8 Submissions include:

.1 Date and revision dates.

.2 Project title and number.

.3 Name and address of:

.1 Subcontractor.

.2 Supplier.

.3 Manufacturer.

.4 Contractor's stamp, signed by Contractor's authorized representative certifying

approval of submissions, verification of field measurements and compliance with

Contract Documents.

.5 Details of appropriate portions of Work as applicable:

.1 Fabrication.

.2 Layout, showing dimensions, including identified field dimensions, and

clearances.

.3 Setting or erection details.

.4 Capacities.

.5 Performance characteristics.

.6 Standards.

.7 Operating weight.

.8 Wiring diagrams.

.9 Single line and schematic diagrams.

.10 Relationship to adjacent work.

Page 18: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada SUBMITTAL PROCEDURES Section 01 33 00

Construct Confidence and

Agility Course (DHTC) Page 4 of 5

DHTC 1612

UNCLASSIFIED

.9 After DCC Representative's review, distribute copies.

.10 Submit electronic shop drawings for each requirement requested in specification Sections

and as DCC Representative may reasonably request.

.11 Submit electronic copies of product data sheets or brochures for requirements requested

in specification Sections and as requested by DCC Representative where shop drawings

will not be prepared due to standardized manufacture of product.

.12 Submit electronic copies of test reports for requirements requested in specification

Sections and as requested by DCC Representative.

.1 Report signed by authorized official of testing laboratory that material, product or

system identical to material, product or system to be provided has been tested in

accord with specified requirements.

.2 Testing must have been within 3 years of date of contract award for project.

.13 Submit electronic copies of certificates for requirements requested in specification

Sections and as requested by DCC Representative.

.1 Statements printed on manufacturer's letterhead and signed by responsible

officials of manufacturer of product, system or material attesting that product,

system or material meets specification requirements.

.2 Certificates must be dated after award of project contract complete with project

name.

.14 Submit electronic copies of manufacturers’ instructions for requirements requested in

specification Sections and as requested by DCC Representative.

.1 Pre-printed material describing installation of product, system or material,

including special notices and Material Safety Data Sheets concerning

impedances, hazards and safety precautions.

.15 Submit electronic copies of Manufacturer's Field Reports for requirements requested in

specification Sections and as requested by DCC Representative.

.16 Documentation of the testing and verification actions taken by manufacturer's

representative to confirm compliance with manufacturer's standards or instructions.

.17 Submit electronic copies of Operation and Maintenance Data for requirements requested

in specification Sections and as requested by DCC Representative.

.18 Delete information not applicable to project.

.19 Supplement standard information to provide details applicable to project.

.20 If upon review by DCC Representative, no errors or omissions are discovered or if only

minor corrections are made, submittal will be returned and fabrication and installation of

Work may proceed. If shop drawings are rejected, noted copy will be returned and

resubmission of corrected shop drawings, through same procedure indicated above, must

be performed before fabrication and installation of Work may proceed.

Page 19: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada SUBMITTAL PROCEDURES Section 01 33 00

Construct Confidence and

Agility Course (DHTC) Page 5 of 5

DHTC 1612

UNCLASSIFIED

1.5 SAMPLES

.1 Submit for review samples in triplicate as requested in respective specification Sections.

Label samples with origin and intended use.

.2 Deliver samples prepaid to DCC Representative's business address.

.3 Notify DCC Representative in writing, at time of submission of deviations in samples

from requirements of Contract Documents.

.4 Where colour, pattern or texture is criterion, submit full range of samples.

.5 Adjustments made on samples by DCC Representative are not intended to change

Contract Price. If adjustments affect value of Work, state such in writing to DCC

Representative prior to proceeding with Work.

.6 Make changes in samples which DCC Representative may require, consistent with

Contract Documents.

.7 Reviewed and accepted samples will become standard of workmanship and material

against which installed Work will be verified.

1.6 INFORMATIONAL SUBMITTALS

.1 Submit electronic copy of test reports for requirements requested in specification

Sections.

.1 Report signed by authorized official of testing laboratory that material, product or

system identical to material, product or system to be provided has been tested in

accord with specified requirements.

.2 Testing must have been within 3 years of date of contract award for project.

.2 Submit electronic copy of certificates for requirements requested in specification

Sections.

.1 Statements printed on manufacturer's letterhead and signed by responsible

officials of manufacturer of product, system or material attesting that product,

system or material meets specification requirements.

.2 Certificates must be dated after award of project contract complete with project

name.

.3 Submit electronic copy of manufacturers’ instructions for requirements requested in

specification Sections.

.1 Pre-printed material describing installation of product, system or material,

including special notices and Material Safety Data Sheets concerning

impedances, hazards and safety precautions.

END OF SECTION

Page 20: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

This page is intentionally left blank.

Page 21: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada HEALTH AND SAFETY REQUIREMENTS Section 01 35 29

Construct Confidence and

Agility Course (DHTC) Page 1 of 4

DHTC 1612

UNCLASSIFIED

Part 1 General

1.1 REFERENCES

.1 Canada Labour Code, Part 2, Canada Occupational Safety and Health Regulations

.2 Health Canada/Workplace Hazardous Materials Information System (WHMIS)

.1 Material Safety Data Sheets (MSDS).

.3 Province of Ontario

.1 Occupational Health and Safety Act and Regulations for Construction Projects, R.S.O.

1990, c.0.1, as amended and O. Reg. 213/91 as amended - Updated 2005.

1.2 SUBMITTALS

.1 Make submittals in accordance with Section 01 33 00 - Submittal Procedures.

.2 Health and Safety Plan:

.1 Submit site-specific Health and Safety Plan for review within 10 days after date of

Notice to Proceed and prior to commencement of Work. Include:

.1 Results of site specific safety hazard assessment.

.2 Results of safety and health risk or hazard analysis for site tasks and

operation found in work plan.

.3 Contractor’s company Health and Safety Plan.

.4 Site specific Health and Safety Plan.

.5 Communications Plan.

.2 DCC Representative will review Contractor's site-specific Health and Safety Plan

and provide comments to Contractor within 10 days after receipt of plan. Revise

plan as appropriate and resubmit plan to DCC Representative within 5 days after

receipt of comments from DCC Representative.

.3 DCC Representative's review of Contractor's final Health and Safety Plan should

not be construed as approval and does not reduce the Contractor's overall

responsibility for construction Health and Safety.

.3 Submit three copies of Contractor's authorized representative's work site health and safety

inspection reports to DCC Representative weekly.

.4 Submit copies of reports or directions issued by authorities having jurisdiction

immediately upon issuance by that authority.

.5 Submit copies of incident and accident reports within 24 hours of occurrence.

.6 Submit WHMIS MSDS - Material Safety Data Sheets to DCC Representative.

.7 Medical Surveillance: where prescribed by legislation, regulation or safety program,

submit certification of medical surveillance for site personnel prior to commencement of

Page 22: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada HEALTH AND SAFETY REQUIREMENTS Section 01 35 29

Construct Confidence and

Agility Course (DHTC) Page 2 of 4

DHTC 1612

UNCLASSIFIED

Work, and submit additional certifications for any new site personnel to DCC

Representative.

.8 Contingency and Emergency Response Plan: Submit On-Site Contingency and Emergency

Response Plan addressing standard operating procedures to be implemented during

emergency situations.

.9 Submit other data, information and documentation upon request by the DCC

Representative as stipulated elsewhere in this section.

1.3 FILING OF NOTICE

.1 File Notice of Project with Provincial authorities prior to beginning of Work.

.2 Contractor shall be responsible and assume the Principal Contractor role for each work

zone location and not the entire complex. Contractor shall provide a written

acknowledgement of this responsibility with 3 weeks of contract award.

.3 Prior to commencement of the work provide the DCC Representative with a copy of the filed

Notice.

1.4 PERMITS

.1 Obtain permits, licenses and compliance certificates at appropriate times and frequencies

as required by the authorities having jurisdiction.

.2 Post permits, licenses and compliance certificates on the work site and provide copies to

DCC Representative.

1.5 SAFETY ASSESSMENT

.1 Perform site specific safety hazard assessment related to project.

1.6 MEETINGS

.1 Schedule and administer Health and Safety meeting with DCC Representative prior to

commencement of Work.

1.7 REGULATORY REQUIREMENTS

.1 Do Work in accordance with Section 01 41 00 - Regulatory Requirements.

1.8 GENERAL REQUIREMENTS

.1 Develop written site-specific Health and Safety Plan based on hazard assessment prior to

beginning site Work and continue to implement, maintain, and enforce plan until final

demobilization from site. Health and Safety Plan must address project specifications.

Page 23: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada HEALTH AND SAFETY REQUIREMENTS Section 01 35 29

Construct Confidence and

Agility Course (DHTC) Page 3 of 4

DHTC 1612

UNCLASSIFIED

.2 DCC Representative may respond in writing, where deficiencies or concerns are noted and

may request re-submission with correction of deficiencies or concerns.

1.9 RESPONSIBILITY

.1 Be responsible for health and safety of persons on site, safety of property on site and for

protection of persons adjacent to site and environment to extent that they may be affected

by conduct of Work.

.2 Contractor will be responsible and assume the role Constructor as described in the Ontario

Occupational Health and Safety Act and Regulations for Construction Projects.

.3 Comply with and enforce compliance by employees with safety requirements of Contract

Documents, applicable federal, provincial, territorial and local statutes, regulations, and

ordinances, and with site-specific Health and Safety Plan.

1.10 COMPLIANCE REQUIREMENTS

.1 Comply with Ontario Occupational Health and Safety Act, R.S.O. 1990, c. 0.1 and

Ontario Regulations for Construction Projects, O. Reg. 213/91.

.2 Comply with Occupational Health and Safety Regulations, 1996.

.3 Comply with Occupational Health and Safety Act, General Safety Regulations, O.I.C.

1999-195.

.4 Comply with Canada Labour Code, Canada Occupational Safety and Health Regulations.

1.11 UNFORSEEN HAZARDS

.1 When unforeseen or peculiar safety-related factor, hazard, or condition occur during

performance of Work, follow procedures in place for Employee's Right to Refuse Work in

accordance with Acts and Regulations of Province having jurisdiction and advise DCC

Representative verbally and in writing.

.2 When unforeseen or peculiar safety-related factor, hazard, or condition occur during

performance of Work, advise Health and Safety co-ordinator and follow procedures in

accordance with Acts and Regulations of Province having jurisdiction and advise DCC

Representative verbally and in writing.

1.12 HEALTH AND SAFETY CO-ORDINATOR

.1 Employ and assign to Work, competent and authorized representative as Health and Safety

Co-ordinator. Health and Safety Co-ordinator must:

.1 Have site-related working experience specific to activities associated with this

project.

.2 Have working knowledge of occupational safety and health regulations.

Page 24: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada HEALTH AND SAFETY REQUIREMENTS Section 01 35 29

Construct Confidence and

Agility Course (DHTC) Page 4 of 4

DHTC 1612

UNCLASSIFIED

.3 Be responsible for completing Contractor's Health and Safety Training Sessions

and ensuring that personnel not successfully completing required training are not

permitted to enter site to perform Work.

.4 Be responsible for implementing, enforcing daily and monitoring site-specific

Contractor's Health and Safety Plan.

.5 Be on site during execution of Work.

1.13 POSTING OF DOCUMENTS

.1 Ensure applicable items, articles, notices and orders are posted in conspicuous location on

site in accordance with Acts and Regulations of Province having jurisdiction, and in

consultation with DCC Representative.

1.14 CORRECTION OF NON-COMPLIANCE

.1 Immediately address health and safety non-compliance issues identified by authority

having jurisdiction or by DCC Representative.

.2 Provide DCC Representative with written report of action taken to correct non-compliance

of health and safety issues identified.

.3 DCC Representative may stop Work if non-compliance of health and safety regulations is

not corrected.

1.15 POWDER ACTUATED DEVICES

.1 Use powder actuated devices only after receipt of written permission from DCC

Representative.

Part 2 PRODUCTS

1.02 NOT USED

.1 Not used.

Part 3 EXECUTION

1.03 NOT USED

.1 Not used.

END OF SECTION

Page 25: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada DND FIRE SAFETY REQUIREMENTS Section 01 35 35

Construct Confidence and

Agility Course (DHTC) Page 1 of 5

DHTC 1612

UNCLASSIFIED

Part 1 General

1.1 CONSTRUCTION FIRE SAFETY

.1 The Contractor shall provide construction fire safety in accordance with the National Fire

Code of Canada.

1.2 FIRE DEPARTMENT BRIEFING

.1 DCC Representative will co-ordinate arrangements for Pre-Commencement Meeting

following contract award. Contractors will be briefed on Fire Safety by the Fire Chief or

his designated representative before work starts.

1.3 REPORTING FIRES

.1 The Contractor shall inform the DCC representative and Fire Chief of all fire incidents at

the construction site, regardless of size.

.2 Know emergency phone number.

.3 Report immediately fire incidents to Fire Department as follows:

.1 Telephone.

.4 When reporting fire by telephone, give location of project site, and be prepared to verify

location.

1.4 FIRE SAFETY PLAN

.1 Submit a fire safety plan for the construction site prior to commencement of construction

work. The fire safety plan shall conform to the National Fire Code of Canada.

.2 The fire safety plan shall be submitted to the DCC Representative for review by local fire

department. Any comments by local fire department shall be implemented by the

Contractor.

.3 The fire safety plan shall be limited to the area of construction only. Contractor is not

responsible for amending fire safety plans in existing buildings.

.4 Post the fire safety plan at the entrance to the construction site or near the construction

site’s health and safety board.

.5 The fire safety plan shall conform to the National Fire Code of Canada, and shall contain,

at minimum:

.1 Emergency procedures to be used in case of fire, including

.1 Notifying the fire department;

Page 26: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada DND FIRE SAFETY REQUIREMENTS Section 01 35 35

Construct Confidence and

Agility Course (DHTC) Page 2 of 5

DHTC 1612

UNCLASSIFIED

.2 Instructing occupants on procedures to be followed when the fire alarm

sounds;

.3 Evacuating occupants from the immediate site, including special

provisions for persons requiring assistance; and

.4 Confining, controlling and extinguishing fires.

.2 The appointment and organization of designated supervisory staff to carry out fire

safety duties.

.3 The training of supervisory staff and other occupants in their responsibilities for

fire safety.

.4 The control of fire hazards on the site.

1.5 EXTERIOR FIRE PROTECTION AND ALARM SYSTEMS

.1 Do not use Fire hydrants or hose systems for other than fire-fighting purposes unless

authorized by the Fire Chief.

1.6 FIRE PROTECTION SYSTEM IMPAIRMENT

.1 Notify the DCC Representative and the Fire Chief 48 hours prior to shutting down any

active fire protection system.

.2 Implement all fire protection system impairments in accordance with the National Fire

Code of Canada and Base Fire Orders. Fire Orders will be provided at the Pre-

Commencement Meeting.

1.7 FIRE EXTINGUISHERS

.1 In addition to other requirements of this specification, supply fire extinguishers, as scaled

by the Fire Chief, necessary to protect work in progress and contractor's physical plant on

site.

.2 Fire extinguishers may be required in the following areas as directed by the Fire Chief

.1 Adjacent to hot works;

.2 In areas where combustibles are stored;

.3 Near or on any internal combustion engines;

.4 Adjacent to areas where flammable liquids or gases are stored or handled;

.5 Adjacent to temporary oil fired or gas fired equipment.

.3 Extinguishers shall be sized as directed by the Fire Chief.

.4 Extinguishers shall be of the dry chemical type unless otherwise required by the hazard

being protected.

Page 27: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada DND FIRE SAFETY REQUIREMENTS Section 01 35 35

Construct Confidence and

Agility Course (DHTC) Page 3 of 5

DHTC 1612

UNCLASSIFIED

1.8 ACCESS FOR FIRE FIGHTING

.1 Access for firefighting shall be provided in accordance with the National Fire Code of

Canada.

1.9 SMOKING PRECAUTIONS

.1 Observe posted smoking restrictions near existing buildings.

1.10 RUBBISH AND WASTE MATERIALS

.1 Keep rubbish and waste materials at minimum quantities.

.2 Burning of rubbish is prohibited.

.3 Remove rubbish from work site at end of work day or shift or as directed.

.4 Storage:

.1 Store oily waste in approved receptacles to ensure maximum cleanliness and

safety.

.2 Deposit greasy or oily rags and materials subject to spontaneous combustion in

approved receptacles and remove specified.

1.11 FLAMMABLE AND COMBUSTIBLE LIQUIDS

.1 Handle, store and use of flammable and combustible liquids in accordance with the

National Fire Code of Canada.

.2 Keep flammable and combustible liquids such as gasoline, kerosene and naphtha for ready

use in quantities not exceeding 45 litres provided they are stored in approved safety cans

bearing Underwriters' Laboratory of Canada or Factory Mutual seal of approval. Obtain

written authorization from Fire Chief for storage of quantities of flammable and

combustible liquids exceeding 45 litres.

.3 Do not transfer flammable or combustible liquids in vicinity of open flames or any type of

heat-producing devices.

.4 Do not use flammable liquids having flash point below 38 degrees C such as naphtha or

gasoline as solvents or cleaning agents.

.5 Store flammable and combustible waste liquids, for disposal, in approved containers

located in safe ventilated area. Keep quantities to a minimum and notify Fire Chief when

disposal is required.

Page 28: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada DND FIRE SAFETY REQUIREMENTS Section 01 35 35

Construct Confidence and

Agility Course (DHTC) Page 4 of 5

DHTC 1612

UNCLASSIFIED

1.12 HOT WORKS

.1 The Contractor shall implement a hot works program in accordance with the National Fire

Code of Canada and NFPA 51 Standard for Fire Prevention during Welding, Cutting and

Other Hot Work.

.2 The Contractor shall obtain from the Fire Chief a "Hot Work" permit for all hot works in

the construction area. Frequency of renewal for hot works permits is at the discretion of

the Fire Chief.

.3 When Work is carried out in dangerous or hazardous areas involving use of heat, provide

fire watchers equipped with sufficient fire extinguishers. Determination of dangerous or

hazardous areas along with level of protection necessary for Fire Watch is at discretion of

the Fire Chief.

.4 Provide fire watch service for work on scale established and in conjunction with the Fire

Chief as defined in the Fire Department Briefing. Fire watchers shall be trained in the use

of fire extinguishing equipment.

.5 Area of hot works

.1 Hot works shall be carried out in an area free of combustible and flammable

content.

.2 Where 1.12.5.1 is not possible,

.1 All flammable and combustible materials within 15m of the hot works

shall be protected in accordance with the National Fire Code of Canada;

.2 A fire watch shall be provided during the hot work and for a period of not

less than 60 minutes unless otherwise directed by the Fire Chief;

.3 A final inspection of the hot work area shall be conducted not less than 4

hours after the completion of hot works unless otherwise directed by the

Fire Chief.

.3 Where there is a possibility of sparks leaking onto combustible materials in areas

adjacent to the areas where the hot work is carried out

.1 Openings in walls, floors or ceilings shall be covered or closed to prevent

the passage of sparks to such adjacent areas, or

.2 Sentence 1.14.5.2 shall apply for those areas.

.6 Protection of flammable and combustible materials

.1 Any combustible or flammable material, dust or residue shall be

.1 Removed from the area where hot works is carried out; or

.2 Protected from ignition by non combustible materials.

.7 Fire extinguisher

.1 A fire extinguisher shall be provided within 3 m of all hot works. Minimum size

shall be 20lbs ABC unless otherwise directed by Fire Chief.

Page 29: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada DND FIRE SAFETY REQUIREMENTS Section 01 35 35

Construct Confidence and

Agility Course (DHTC) Page 5 of 5

DHTC 1612

UNCLASSIFIED

1.13 QUESTIONS AND/OR CLARIFICATION

.1 Direct questions or clarification on Fire Safety in addition to above requirements to the

DCC Representative.

.2 DCC is responsible to obtain clarifications from the Fire Chief. The Contractor is not to

liaise directly with the Fire Chief for notification, authorization or any requests unless the

situation constitutes an immediate emergency.

1.14 FIRE INSPECTION

.1 Co-ordinate site inspections by the Fire Chief through DCC Representative.

.2 Allow the Fire Chief unrestricted access to work site.

.3 Co-operate with the Fire Chief during routine fire safety inspection of work site.

.4 Immediately remedy unsafe fire situations observed by the Fire Chief.

Part 2 Products

2.1 NOT USED

.1 Not Used.

Part 3 Execution

3.1 NOT USED

.1 Not Used.

END OF SECTION

Page 30: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

This page is intentionally left blank.

Page 31: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada REGULATORY REQUIREMENTS Section 01 41 00

Construct Confidence and

Agility Course (DHTC) Page 1 of 1

DHTC 1612

UNCLASSIFIED

Part 1 General

1.1 REFERENCES AND CODES

.1 Perform the Work in accordance with the National Building Code of Canada (NBC) -

2015 and National Fire Code of Canada (NFCC) - 2015, including amendments.

.2 Perform work in accordance with other codes of provincial or local application.

.3 Meet or exceed requirements of:

.1 Contract Documents.

.2 Specified standards, codes and referenced documents.

.4 In the case of conflict or discrepancy between the requirements of the documents

specified in .1 to .3 above, the more stringent requirements shall apply.

1.2 FIRE PROTECTION DESIGN REQUIREMENTS

.1 General: Design shall be in accordance with the following documents, unless otherwise

specified herein:

.1 National Building Code of Canada (NBCC) (applicable edition as specified

above).

.2 National Fire Code of Canada (NFCC) (applicable edition as specified above).

.3 Canadian Forces Fire Marshall (CFFM) Directive FMD 4003 - December 2014 -

Fire Protection and Life Safety Engineering Design.

1.3 LOCAL REGULATIONS

.1 Comply with applicable local regulations and with requirements of Authorities having

Jurisdiction.

END OF SECTION

Page 32: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

This page is intentionally left blank.

Page 33: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada QUALITY CONTROL Section 01 45 00

Construct Confidence and

Agility Course (DHTC) Page 1 of 4

DHTC 1612

UNCLASSIFIED

Part 1 General

1.1 DEFINITIONS

.1 Preconstruction Testing: Tests and inspections performed specifically for Project before

products and materials are incorporated into the Work, to verify performance or

compliance with specified criteria.

.2 Product Testing: Tests and inspections that are performed by a testing agency qualified

to conduct product testing and acceptable to authorities having jurisdiction, to establish

product performance and compliance with specified requirements.

.3 Source Quality-Control Testing: Tests and inspections that are performed at the source,

e.g., plant, mill, factory, or shop.

.4 Field Quality-Control Testing: Tests and inspections that are performed on-site for

installation of the Work and for completed Work.

1.2 INSPECTION

.1 Allow DCC Representative access to Work. If part of Work is in preparation at locations

other than Place of Work, allow access to such Work whenever it is in progress.

.2 Give timely notice requesting inspection if Work is designated for special tests,

inspections or approvals by DCC Representative instructions, or law of Place of Work.

.3 If Contractor covers or permits to be covered Work that has been designated for special

tests, inspections or approvals before such is made, uncover such Work, have inspections

or tests satisfactorily completed and make good such Work.

.4 DCC Representative will order part of Work to be examined if Work is suspected to be

not in accordance with Contract Documents. If, upon examination such work is found

not in accordance with Contract Documents, correct such Work and pay cost of

examination and correction.

1.3 INSPECTION AND TESTING

.1 Contractor shall be responsible for quality control and shall engage and pay for:

.1 Inspection and testing required by laws, ordinances, rules, regulations or order of

public authorities.

.2 Inspection and testing performed exclusively for Contractor’s convenience.

.3 Testing, adjustment and balancing of conveying systems, mechanical and

electrical equipment and systems.

.4 Mill tests and certificates of compliance.

.5 Additional tests as noted elsewhere in this specification.

.6 Where tests or inspection reveal work that is not in accordance with contract

requirements, Contractor shall pay costs for additional tests or inspections as

DCC Representative may require to verify acceptability of corrected work.

Page 34: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada QUALITY CONTROL Section 01 45 00

Construct Confidence and

Agility Course (DHTC) Page 2 of 4

DHTC 1612

UNCLASSIFIED

.2 Independent Inspection/Testing Agencies may also be engaged by DCC Representative

for purpose of inspecting and/or testing portions of Work. Cost of such services will be

borne by DCC Representative.

.1 Employment of inspection/testing agencies by the DCC Representative does not

relax the Contractor’s responsibility for quality control and responsibility to

perform Work in accordance with Contract Documents.

.2 If defects are revealed during inspection or testing by an Inspection/Testing

Agency, the DCC Representative will request additional inspection or testing to

ascertain the full degree of the defect. Contractor shall correct defects and

irregularities as advised by the DCC Representative at no cost to DCC, and shall

pay costs for retesting and re-inspection.

1.4 ACCESS TO WORK

.1 Allow inspection/testing agencies access to Work, off site manufacturing and fabrication

plants.

.2 Co-operate to provide reasonable facilities for such access.

1.5 PROCEDURES

.1 Notify appropriate agency and DCC Representative in advance of requirement for tests,

in order that attendance arrangements can be made.

.2 Submit samples and materials required for testing, as specifically requested in

specifications. Submit with reasonable promptness and in orderly sequence to not cause

delays in Work.

.3 Provide labour and facilities to obtain and handle samples and materials on site. Provide

sufficient space to store and cure test samples.

1.6 REJECTED WORK

.1 Remove defective Work, whether result of poor workmanship, use of defective products

or damage and whether incorporated in Work or not, which has been rejected by DCC

Representative as failing to conform to Contract Documents. Replace or re-execute in

accordance with Contract Documents.

1.7 REPORTS

.1 Submit electronic copy of inspection and test reports to DCC Representative in

accordance with Section 01 33 00 – Submittal Procedures.

.2 Provide copy to subcontractor of work being inspected or tested, and manufacturer or

fabricator of material being inspected or tested.

.3 Test and Inspection Reports: Prepare and submit certified written reports specified in

other Sections. Include the following:

.1 Date of issue.

.2 Project title and number.

Page 35: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada QUALITY CONTROL Section 01 45 00

Construct Confidence and

Agility Course (DHTC) Page 3 of 4

DHTC 1612

UNCLASSIFIED

.3 Name, address, and telephone number of testing agency.

.4 Dates and locations of samples and tests or inspections.

.5 Names of individuals making tests and inspections.

.6 Description of the Work and test and inspection method.

.7 Identification of product and Specification Section.

.8 Complete test or inspection data.

.9 Test and inspection results and an interpretation of test results.

.10 Record of temperature and weather conditions at time of sample taking and

testing and inspecting.

.11 Comments or professional opinion on whether tested or inspected Work complies

with the Contract Document requirements.

.12 Name and signature of laboratory inspector.

.13 Recommendations on retesting and reinspecting.

1.8 TESTS AND MIX DESIGNS

.1 Furnish test results and mix designs as requested.

.2 Cost of tests and mix designs beyond those called for in Contract Documents or beyond

those required by law of Place of Work will be appraised by DCC Representative and

may be authorized as recoverable.

1.9 MILL TESTS

.1 Submit mill test certificates as required of specification Sections.

1.10 TEST AND INSPECTION LOG

.1 Test and Inspection Log: Prepare a record of tests and inspections. Include the

following:

.1 Date test or inspection was conducted.

.2 Description of the Work tested or inspected.

.3 Date test or inspection results were transmitted to DCC Representative.

.4 Identification of testing agency or special inspector conducting test or inspection.

.2 Maintain log at Project site. Post changes and revisions as they occur. Provide access to

test and inspection log for DCC Representative’s reference during normal working hours.

1.11 REPAIR AND PROTECTION

.1 General: On completion of testing, inspecting, sample taking, and similar services, repair

damaged construction and restore substrates and finishes.

.1 Provide materials and comply with installation requirements specified in other

Specification Sections or matching existing substrates and finishes. Restore

patched areas and extend restoration into adjoining areas with durable seams that

Page 36: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada QUALITY CONTROL Section 01 45 00

Construct Confidence and

Agility Course (DHTC) Page 4 of 4

DHTC 1612

UNCLASSIFIED

are as invisible as possible. Comply with the Contract Document requirements

for cutting and patching in Section 01 73 00 - Execution.

.2 Protect construction exposed by or for quality-control service activities.

.3 Repair and protection are Contractor's responsibility, regardless of the assignment of

responsibility for quality-control services.

END OF SECTION

Page 37: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada TEMPORARY UTILITIES Section 01 51 00

Construct Confidence and

Agility Course (DHTC) Page 1 of 1

DHTC 1612

UNCLASSIFIED

Part 1 General

1.1 INSTALLATION AND REMOVAL

.1 Provide temporary utilities in order to execute work expeditiously.

.2 Remove from site all such work after use or as requested by DCC Representative.

1.2 TEMPORARY SANITARY FACILITIES

.1 Provide, pay for and maintain temporary sanitary facilities necessary for own use.

END OF SECTION

Page 38: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

This page is intentionally left blank.

Page 39: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada CONSTRUCTION FACILITIES Section 01 52 00

Construct Confidence and

Agility Course (DHTC) Page 1 of 2

DHTC 1612

UNCLASSIFIED

Part 1 General

1.1 REFERENCES

.1 Canadian Standards Association (CSA International)

.1 CAN/CSA-S269.2-16, Access Scaffolding for Construction Purposes.

1.2 INSTALLATION AND REMOVAL

.1 Provide construction facilities in order to execute work expeditiously.

.2 Remove from site all such work after use.

1.3 SCAFFOLDING

.1 Scaffolding in accordance with CAN/CSA-S269.2.

.2 Provide and maintain scaffolding, swing staging, and platforms as required.

1.4 SITE STORAGE/LOADING

.1 Confine work and operations of employees by Contract Documents. Do not unreasonably

encumber premises with products.

.2 Do not load or permit to load any part of Work with weight or force that will endanger

Work.

1.5 CONSTRUCTION PARKING

.1 Parking will be in location designated by DCC Representative.

1.6 EQUIPMENT, TOOL AND MATERIALS STORAGE

.1 Provide and maintain, in clean and orderly condition, lockable storage of tools,

equipment and materials.

1.7 SANITARY FACILITIES

.1 Provide sanitary facilities for work force in accordance with governing regulations and

ordinances.

.2 Post notices and take precautions as required by local health authorities. Keep area and

premises in sanitary condition.

Page 40: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada CONSTRUCTION FACILITIES Section 01 52 00

Construct Confidence and

Agility Course (DHTC) Page 2 of 2

DHTC 1612

UNCLASSIFIED

1.8 CONSTRUCTION SIGNAGE

.1 No signs or advertisements, other than warning signs, are permitted on site.

.2 Signs and notices for safety and instruction in both official languages. Graphic symbols

to CAN/CSA-Z321.

1.9 PROTECTION AND MAINTENANCE OF TRAFFIC

.1 Contractor's traffic only on roads designated by DCC Representative for hauling material

to and from site. Schedule deliveries 48 hours in advance with DCC Representative.

1.10 CLEAN-UP

.1 Regularly remove construction debris, waste materials, packaging material from work

site.

.2 Clean dirt or mud tracked onto paved or surfaced roadways.

.3 Store materials resulting from demolition activities that are salvageable.

.4 Stack stored new or salvaged material not in construction facilities.

Part 2 Products

.1 Not Used.

Part 3 Eexecution

.1 Not Used.

END OF SECTION

Page 41: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada TEMPORARY BARRIERS Section 01 56 00

Construct Confidence and AND ENCLOSURES

Agility Course (DHTC) Page 1 of 1

DHTC 1612

UNCLASSIFIED

Part 1 General

1.1 INSTALLATION AND REMOVAL

.1 Provide temporary controls in order to execute Work expeditiously.

.2 Remove from site all such work after use.

1.2 ACCESS TO SITE

.1 Primary access to the site will be as designated by DCC Representative.

1.3 PROTECTION FOR OFF-SITE AND PUBLIC PROPERTY

.1 Protect surrounding private and public property from damage during performance of

Work.

.2 Be responsible for damage incurred.

1.4 PROTECTION OF BUILDING FINISHES

.1 Provide protection for finished and partially structures and equipment during

performance of Work.

.2 Provide necessary screens, covers, and hoardings.

.3 Confirm with DCC Representative locations and installation schedule minimum 3 days

prior to installation.

.4 Be responsible for damage incurred due to lack of or improper protection.

END OF SECTION

Page 42: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

This page is intentionally left blank.

Page 43: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada COMMON PRODUCT Section 01 61 00

Construct Confidence and REQUIREMENTS

Agility Course (DHTC) Page 1 of 5

DHTC 1612

UNCLASSIFIED

Part 1 General

1.1 REFERENCES

.1 Within text of each specifications section, reference may be made to reference standards.

.2 Conform to these reference standards, in whole or in part as specifically requested in

specifications.

.3 If there is question as to whether products or systems are in conformance with applicable

standards, DCC Representative reserves right to have such products or systems tested to

prove or disprove conformance. Contractor shall provide documentation to confirm

product or system conformance with specifications and/or applicable standards.

.4 Cost for such testing will be borne by DCC Representative in event of conformance with

Contract Documents or by Contractor in event of non-conformance.

.5 Conform to latest date of issue of referenced standards in effect on date of submission of

Tenders, except where specific date or issue is specifically noted.

1.2 DEFINITIONS

.1 Products: Items obtained for incorporating into the Work, whether purchased for Project

or taken from previously purchased stock. The term "product" includes the terms

"material," "equipment," "system," and terms of similar intent.

1.3 QUALITY

.1 Products, materials, equipment and articles incorporated in Work shall be new, not

damaged or defective, and of best quality for purpose intended. If requested, furnish

evidence as to type, source and quality of products provided.

.2 Procurement policy is to acquire, in cost effective manner, items containing highest

percentage of recycled and recovered materials practicable consistent with maintaining

satisfactory levels of competition.

.3 Defective products, whenever identified prior to completion of Work, will be rejected,

regardless of previous inspections. Inspection does not relieve responsibility, but is

precaution against oversight or error. Remove and replace defective products at own

expense and be responsible for delays and expenses caused by rejection.

.4 Should disputes arise as to quality or fitness of products, decision rests strictly with DCC

Representative based upon requirements of Contract Documents.

.5 Unless otherwise indicated in specifications, maintain uniformity of manufacture for any

particular or like item throughout building.

.6 DCC Representative may reject permanent labels, trademarks and nameplates on

products in prominent locations, except where required for operating instructions, or

when located in mechanical or electrical rooms.

Page 44: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada COMMON PRODUCT Section 01 61 00

Construct Confidence and REQUIREMENTS

Agility Course (DHTC) Page 2 of 5

DHTC 1612

UNCLASSIFIED

1.4 AVAILABILITY

.1 Immediately upon signing Contract, review product delivery requirements and anticipate

foreseeable supply delays for items. If delays in supply of products are foreseeable, notify

DCC Representative of such, in order that substitutions or other remedial action may be

authorized in ample time to prevent delay in performance of Work.

.2 In event of failure to notify DCC Representative at commencement of Work and should it

subsequently appear that Work may be delayed for such reason, DCC Representative

reserves right to substitute more readily available products of similar character, at no

increase in Contract Price or Contract Time.

1.5 STORAGE, HANDLING AND PROTECTION

.1 Handle and store products in manner to prevent damage, adulteration, deterioration and

soiling and in accordance with manufacturer's instructions when applicable.

.2 Store packaged or bundled products in original and undamaged condition with

manufacturer's seal and labels intact. Do not remove from packaging or bundling until

required in Work.

.3 Store products subject to damage from weather in weatherproof enclosures.

.4 Store cementitious products clear of earth or concrete floors, and away from walls.

.5 Keep sand, when used for grout or mortar materials, clean and dry. Store sand on wooden

platforms and cover with waterproof tarpaulins during inclement weather.

.6 Store sheet materials and lumber on flat, solid supports and keep clear of ground. Slope

to shed moisture.

.7 Store and mix paints in heated and ventilated room. Remove oily rags and other

combustible debris from site daily. Take every precaution necessary to prevent

spontaneous combustion.

.8 Remove and replace damaged products at own expense and to satisfaction of DCC

Representative.

.9 Touch-up damaged factory finished surfaces to DCC Representative's satisfaction. Use

touch-up materials to match original. Do not paint over name plates.

1.6 TRANSPORTATION

.1 Pay costs of transportation of products required in performance of Work.

1.7 MANUFACTURER'S INSTRUCTIONS

.1 Unless otherwise indicated in specifications, install or erect products in accordance with

manufacturer's instructions. Do not rely on labels or enclosures provided with products.

Obtain written instructions directly from manufacturers.

.2 Notify DCC Representative in writing, of conflicts between specifications and

manufacturer's instructions, so that DCC Representative will establish course of action.

Page 45: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada COMMON PRODUCT Section 01 61 00

Construct Confidence and REQUIREMENTS

Agility Course (DHTC) Page 3 of 5

DHTC 1612

UNCLASSIFIED

.3 Improper installation or erection of products, due to failure in complying with these

requirements, authorizes DCC Representative to require removal and re-installation at no

increase in Contract Price or Contract Time.

1.8 QUALITY OF WORK

.1 Ensure Quality of Work is of highest standard, executed by workers experienced and

skilled in respective duties for which they are employed. Immediately notify DCC

Representative if required Work is such as to make it impractical to produce required

results.

.2 Do not employ anyone unskilled in their required duties. DCC Representative reserves

right to require dismissal from site, workers deemed incompetent or careless.

.3 Decisions as to standard or fitness of Quality of Work in cases of dispute rest solely with

DCC Representative, whose decision is final.

1.9 CO-ORDINATION

.1 Ensure co-operation of workers in laying out Work. Maintain efficient and continuous

supervision.

.2 Be responsible for coordination and placement of openings, sleeves and accessories.

1.10 REMEDIAL WORK

.1 Perform remedial work required to repair or replace parts or portions of Work identified

as defective or unacceptable. Co-ordinate adjacent affected Work as required.

.2 Perform remedial work by specialists familiar with materials affected. Perform in a

manner to neither damage nor put at risk any portion of Work.

1.11 FASTENINGS

.1 Provide metal fastenings and accessories in same texture, colour and finish as adjacent

materials, unless indicated otherwise.

.2 Prevent electrolytic action between dissimilar metals and materials.

.3 Use non-corrosive hot dip galvanized steel fasteners and anchors for securing exterior

work, unless stainless steel or other material is specifically requested in affected

specification Section.

.4 Space anchors within individual load limit or shear capacity and ensure they provide

positive permanent anchorage. Wood, or any other organic material plugs are not

acceptable.

.5 Keep exposed fastenings to a minimum, space evenly and install neatly.

.6 Fastenings which cause spalling or cracking of material to which anchorage is made are

not acceptable.

Page 46: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada COMMON PRODUCT Section 01 61 00

Construct Confidence and REQUIREMENTS

Agility Course (DHTC) Page 4 of 5

DHTC 1612

UNCLASSIFIED

1.12 FASTENINGS - EQUIPMENT

.1 Use heavy hexagon heads, semi-finished unless otherwise specified. Use No. 304

stainless steel for exterior areas.

.2 Bolts may not project more than one diameter beyond nuts.

.3 Use plain type washers on equipment, sheet metal and soft gasket lock type washers

where vibrations occur. Use resilient washers with stainless steel.

1.13 PROTECTION OF WORK IN PROGRESS

.1 Prevent overloading of parts of building. Do not cut, drill or sleeve load bearing

structural member, unless specifically indicated, without written approval of DCC

Representative.

1.14 EXISTING UTILITIES

.1 When breaking into or connecting to existing services or utilities, execute Work at times

directed by local governing authorities, with minimum of disturbance to Work, and

building occupants.

.2 Protect, relocate or maintain existing active services. When services are encountered, cap

off in manner approved by authority having jurisdiction. Stake and record location of

capped service.

1.15 PRODUCT SELECTION

.1 In accordance with the General Conditions of the Contract, the DCC Representative’s

decision shall be final and conclusive with respect to the Work. This includes decisions

with respect to whether or not the quality or properties of materials or products supplied,

or proposed to be supplied, meets the requirements of the Work.

.2 Within 7 days of written request by the DCC Representative, submit the following

information for materials and equipment proposed for supply:

.1 Name and address of manufacturer.

.2 Trade name, model and catalogue number.

.3 Performance, descriptive and test data.

.4 Manufacturer's installation, erection, or application instructions

.5 Evidence of arrangements to procure.

.3 Contractor's options for selecting products for tendering:

.1 Products specified as "Acceptable products": Select any product named.

.2 Products listed as "Acceptable products": within the contents of this

specification: identify products known to meet the specified criteria. Other

products may exist which meet the requirements specified but have not been

listed.

.3 Where products are specified by referenced standard only, select any product that

meets or exceeds the specified standard.

Page 47: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada COMMON PRODUCT Section 01 61 00

Construct Confidence and REQUIREMENTS

Agility Course (DHTC) Page 5 of 5

DHTC 1612

UNCLASSIFIED

.4 Where products are required to be listed on the Canadian General Standards

Board Qualified Products List select any product so listed.

.5 Materials or products are specified by Prescriptive or Performance specification,

select any material or product meeting the specification.

.6 If the Contractor wishes to use alternative products instead of specified

"Acceptable products", the Contractor shall follow the procedures set out by

DCC Representative. Submit complete technical information for proposed

”alternative products” during tender period, allowing sufficient time for DCC

Representative’s Review.

.7 The term "Acceptable product" is deemed to be a complete and working

commodity as described by a manufacturer's name, catalogue number, trade

name, or any combination thereof.

.8 No substitutions will be permitted after Contract Award except in exceptional

circumstances.

END OF SECTION

Page 48: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

This page is intentionally left blank.

Page 49: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada EXECUTION Section 01 73 00

Construct Confidence and

Agility Course (DHTC) Page 1 of 2

DHTC 1612

UNCLASSIFIED

Part 1 General

1.1 SUBMITTALS

.1 Submittals: in accordance with Section 01 33 00 - Submittal Procedures.

.2 Submit written request to DCC Representative in advance of cutting or alteration outside

the scope of this project which affects:

.1 Structural integrity of elements.

.2 Integrity of weather-exposed or moisture-resistant elements.

.3 Efficiency, maintenance, or safety of operational elements.

.4 Visual qualities of sight-exposed elements.

.3 Include in request:

.1 Identification of project.

.2 Location and description of affected Work.

.3 Statement on necessity for cutting or alteration.

.4 Description of proposed Work, and products to be used.

.5 Alternatives to cutting and patching.

.6 Effect on Work of DCC Representative or separate contractor.

.7 Written permission of affected separate contractor.

.8 Date and time work will be executed.

1.2 PREPARATION

.1 After uncovering, inspect conditions affecting performance of Work.

.2 Provide supports to assure structural integrity of surroundings; provide devices and

methods to protect other portions of project from damage.

.3 Provide protection from elements for areas which are to be exposed by uncovering work.

1.3 EXECUTION

.1 Execute cutting, fitting, and patching to complete Work.

.2 Fit several parts together, to integrate with other Work.

.3 Uncover Work to install ill-timed Work.

.4 Remove and replace defective and non-conforming Work.

.5 On approval of DCC Representative, remove samples of installed Work for testing.

.6 Provide openings in non-structural elements of Work for penetrations of mechanical and

electrical Work.

.7 Execute Work by methods to avoid damage to other Work, and which will provide proper

surfaces to receive patching and finishing.

Page 50: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada EXECUTION Section 01 73 00

Construct Confidence and

Agility Course (DHTC) Page 2 of 2

DHTC 1612

UNCLASSIFIED

.8 Employ original installer to perform cutting and patching for weather-exposed and

moisture-resistant elements, and sight-exposed surfaces.

.9 Cut rigid materials using masonry saw or core drill. Pneumatic or impact tools not

allowed on masonry work without prior approval.

END OF SECTION

Page 51: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada CLEANING Section 01 74 11

Construct Confidence and

Agility Course (DHTC) Page 1 of 1

DHTC 1612

UNCLASSIFIED

Part 1 General

1.1 PROJECT CLEANLINESS

.1 Maintain Work in tidy condition, free from accumulation of waste products and debris.

.2 Remove waste materials from site at regularly scheduled times or dispose of as directed

by DCC Representative. Do not burn waste materials on site.

.3 Make arrangements with and obtain permits from authorities having jurisdiction for

disposal of waste and debris.

.4 Provide on-site containers for collection of waste materials and debris.

.5 Store volatile waste in covered metal containers, and remove from premises at end of

each working day.

.6 Use only cleaning materials recommended by manufacturer of surface to be cleaned, and

as recommended by cleaning material manufacturer.

1.2 FINAL CLEANING

.1 When Work is substantially performed remove surplus products, tools, construction

machinery and equipment not required for performance of remaining Work.

.2 Remove waste products and debris other than that caused by others, and leave Work

clean and suitable for occupancy.

.3 Remove stains, spots, marks and dirt from all surfaces.

.4 Inspect finishes, fitments and equipment and ensure specified workmanship and

operation.

.5 Remove debris and surplus materials from crawl areas and other accessible concealed

spaces.

.6 DCC Representative will provide written acceptance of final cleaning. DCC

Representative may determine that additional cleaning is required.

END OF SECTION

Page 52: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

This page is intentionally left blank.

Page 53: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada CONSTRUCTION / DEMOLITION Section 01 74 21

Construct Confidence and WASTE MANAGEMENT

Agility Course (DHTC) AND DISPOSAL Page 1 of 2

DHTC 1612

UNCLASSIFIED

Part 1 General

1.1 WASTE MANAGEMENT GOALS

.1 Prior to start of Work conduct meeting with DCC Representative to review and discuss

DND’s Waste Management goals.

.2 This Project shall generate the least amount of waste possible. Processes that ensure the

generation of as little waste as possible due to error, poor planning, breakage,

mishandling, contamination, or other factors shall be employed.

1.2 STORAGE, HANDLING AND PROTECTION

.1 Store, materials to be reused, recycled, or salvaged in locations as approved by the DCC

Representative.

.2 Unless specified otherwise, materials for removal become the property of the Contractor.

.3 Retain packaging products for reuse when possible.

.4 Protect, stockpile, store, and catalogue salvaged items.

.5 Separate non-salvageable items from salvageable items. Transport and deliver

non-salvageable items to licensed disposal/recycling facility.

1.3 DISPOSAL OF WASTES

.1 Do not bury rubbish or waste materials.

.2 Do not burn or incinerate waste materials, including land clearing debris.

.3 Do not dispose of volatile materials, mineral spirits, oil or paint thinner into waterways,

storm, or sanitary sewers.

Part 2 Products

.1 Not used.

Part 3 Execution

3.1 APPLICATION

.1 Handle waste materials not reused, salvaged, or recycled in accordance with appropriate

regulations and codes.

Page 54: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada CONSTRUCTION / DEMOLITION Section 01 74 21

Construct Confidence and WASTE MANAGEMENT

Agility Course (DHTC) AND DISPOSAL Page 2 of 2

DHTC 1612

UNCLASSIFIED

3.2 CLEANING

.1 Remove tools and waste materials on completion of Work, and leave work area in clean

and orderly condition.

.2 Clean-up work area as work progresses.

.3 Source separate materials to be reused/recycled into specified storage bins.

3.3 DIVERSION OF MATERIALS

.1 From the following list, separate materials from the general waste stream and stockpile in

separate bins or containers, consistent with applicable fire regulations.

.2 Construction Waste

Material Type Recommended

Diversion %

Cardboard & Paper 100

Plastic Packaging 100

Rubble, Concrete, Asphalt 100

Steel 100

Wood (not painted, treated, or laminated) 100

END OF SECTION

Page 55: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada CLOSEOUT PROCEDURES Section 01 77 00

Construct Confidence and

Agility Course (DHTC) Page 1 of 2

DHTC 1612

UNCLASSIFIED

Part 1 General

1.1 ADMINISTRATIVE REQUIREMENTS

.1 Acceptance of Work Procedures:

.1 Contractor's Inspection: conduct inspection of Work, identify deficiencies and

defects, and repair as required to conform to Contract Documents.

.1 Notify DCC Representative in writing of satisfactory completion of

Contractor's inspection and submit verification that corrections have been

made.

.2 Request DCC Representative's inspection.

.2 DCC Representative's Inspection:

.1 DCC Representative and Contractor shall inspect Work and identify

obvious defects and deficiencies.

.2 Contractor shall correct Work accordingly.

.3 Completion Tasks: submit written certificates that tasks have been performed as

follows:

.1 Work: completed and inspected for compliance with Contract

Documents.

.2 Defects: corrected and deficiencies completed.

.3 Equipment and systems: tested, adjusted, balanced and fully operational.

.4 Certificates required by authorities having jurisdiction: submitted.

.5 Work: complete and ready for final inspection.

.4 Final Inspection:

.1 When completion tasks are done, request final inspection of Work by

DCC Representative.

.2 When Work incomplete according to DCC Representative, complete

outstanding items and request re-inspection.

.5 Commencement Warranty Periods: date of DCC Representative’s acceptance of

submitted declaration of Substantial Completion shall be date for commencement

for warranty period.

.6 Final Payment:

.1 When DCC Representative considers final deficiencies and defects have

been corrected and it appears requirements of Contract have been totally

completed, make application for final payment.

.2 If Work is deemed incomplete by DCC Representative, complete

outstanding items and request re-inspection.

Page 56: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada CLOSEOUT PROCEDURES Section 01 77 00

Construct Confidence and

Agility Course (DHTC) Page 2 of 2

DHTC 1612

UNCLASSIFIED

1.2 FINAL CLEANING

.1 Clean in accordance with Section 01 74 11 - Cleaning.

.1 Remove surplus materials, excess materials, rubbish, tools and equipment.

END OF SECTION

Page 57: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada CLOSEOUT SUBMITTALS Section 01 78 00

Construct Confidence and

Agility Course (DHTC) Page 1 of 5

DHTC 1612

UNCLASSIFIED

Part 1 General

1.1 SECTION INCLUDES

.1 Project record documents.

.2 Operation and maintenance (O & M) manuals.

.3 Spare parts and maintenance materials.

1.2 ADMINISTRATIVE REQUIREMENTS

.1 Pre-warranty Meeting:

.1 Convene meeting one week prior to contract completion with Contractor's

representative and DCC Representative to:

.1 Verify Project requirements.

.2 Review installation instructions and warranty requirements.

.2 DCC Representative will establish communication procedures for:

.1 Notifying construction warranty defects.

.2 Determining priorities for type of defects.

.3 Determining reasonable response time.

1.3 ACTION AND INFORMATIONAL SUBMITTALS

.1 Provide submittals in accordance with Section 01 33 00 - Submittal Procedures.

.2 Spare Parts, Maintenance Materials and Special Tools:

.1 Provide spare parts, maintenance materials and special tools of same quality and

manufacture as products provided in Work.

.2 Provide evidence, if requested, for type, source and quality of products supplied.

.3 Defective products will be rejected, regardless of previous inspections. Replace

products at own expense.

.4 Pay costs of transportation.

1.4 FORMAT

.1 Organize data as instructional manual.

.2 Binders: vinyl, hard covered, 3 'D' ring, loose leaf 219 x 279 mm with spine and face

pockets.

.3 Cover: identify each binder with type or printed title 'Project Record Documents'; list title

of project and identify subject matter of contents.

.4 Arrange content by obstacle, under Section numbers and sequence of Table of Contents.

.5 Provide tabbed fly leaf for each separate product and system, with typed description of

product and major component parts of equipment.

Page 58: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada CLOSEOUT SUBMITTALS Section 01 78 00

Construct Confidence and

Agility Course (DHTC) Page 2 of 5

DHTC 1612

UNCLASSIFIED

.6 Text: manufacturer's printed data, or typewritten data.

.7 Drawings: provide with reinforced punched binder tab.

.1 Bind in with text; fold larger drawings to size of text pages.

.8 Provide 1:1 scaled CAD files in .dwg format on CD.

1.5 CONTENTS - PROJECT RECORD DOCUMENTS

.1 Table of Contents: provide title of project;

.1 Date of submission; names.

.2 Addresses, and telephone numbers of Consultant and Contractor with name of

responsible parties.

.3 Schedule of products and systems, indexed to content of volume.

.2 For each product or system:

.1 List names, addresses and telephone numbers of subcontractors and suppliers,

including local source of supplies and replacement parts.

.3 Product Data: mark each sheet to identify specific products and component parts, and

data applicable to installation; delete inapplicable information.

.4 Drawings: supplement product data to illustrate relations of component parts of

equipment and systems, to show control and flow diagrams.

.5 Typewritten Text: as required to supplement product data.

.1 Provide logical sequence of instructions for each procedure, incorporating

manufacturer's instructions.

1.6 OPERATIONS AND MAINTENANCE MANUALS

.1 Prepare instructions and data using personnel experienced in maintenance and operation

of described products and system.

.2 Two weeks before Interim Completion of the Work, provide Operations and Maintenance

(O&M) manuals. Submit two hard copies, and one electronic copy of each.

.3 Copy will be returned with DCC Representative’s comments.

.4 Revise content of documents as required before final submittal.

1.7 AS -BUILT DOCUMENTS AND SAMPLES

.1 Maintain, at site for DCC Representative’s use, one record copy of:

.1 Contract Drawings.

.2 Specifications.

.3 Addenda.

.4 Change Orders and other modifications to Contract.

.5 Reviewed shop drawings, product data, and samples.

Page 59: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada CLOSEOUT SUBMITTALS Section 01 78 00

Construct Confidence and

Agility Course (DHTC) Page 3 of 5

DHTC 1612

UNCLASSIFIED

.6 Field test records.

.7 Inspection certificates.

.8 Manufacturer's certificates.

.2 Maintain record documents in clean, dry and legible condition.

.1 Do not use record documents for construction purposes.

.3 Keep record documents and samples available for inspection by DCC Representative.

1.8 RECORDING INFORMATION ON PROJECT RECORD DOCUMENTS

.1 Record information on set of black line opaque drawings, specifically designated as

Project Record Drawings and not used for other purposes.

.2 Use felt tip marking pens, maintaining separate colours for each major system, for

recording information.

.3 Record information concurrently with construction progress.

.1 Do not conceal Work until required information is recorded.

.4 Contract Drawings and shop drawings: mark each item to record actual construction,

including:

.1 Measured locations of internal utilities and appurtenances, referenced to visible

and accessible features of construction.

.2 Field changes of dimension and detail.

.3 Changes made by change orders.

.4 Details not on original Contract Drawings.

.5 References to related shop drawings and modifications.

.5 Other Documents: maintain manufacturer's certifications, inspection certifications, field

test records, required by individual specifications sections.

1.9 MATERIALS AND FINISHES

.1 Building products, applied materials, and finishes: include product data, with catalogue

number, size, composition, and colour and texture designations.

.1 Provide information for re-ordering custom manufactured products.

.2 Instructions for cleaning agents and methods, precautions against detrimental agents and

methods, and recommended schedule for cleaning and maintenance.

.3 Moisture-protection and weather-exposed products: include manufacturer's

recommendations for cleaning agents and methods, precautions against detrimental

agents and methods, and recommended schedule for cleaning and maintenance.

.4 Additional requirements: as specified in individual specifications sections.

1.10 MAINTENANCE MATERIALS

.1 Spare Parts:

Page 60: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada CLOSEOUT SUBMITTALS Section 01 78 00

Construct Confidence and

Agility Course (DHTC) Page 4 of 5

DHTC 1612

UNCLASSIFIED

.1 Provide spare parts, in quantities specified in individual specification sections.

.2 Provide items of same manufacture and quality as items in Work.

.3 Deliver to location as directed; place and store.

.4 Receive and catalogue items.

.1 Submit inventory listing to DCC Representative.

.2 Include approved listings in Maintenance Manual.

.5 Obtain receipt for delivered products and submit prior to final payment.

.2 Extra Stock Materials:

.1 Provide maintenance and extra materials, in quantities specified in individual

specification sections.

.2 Provide items of same manufacture and quality as items in Work.

.3 Deliver to location as directed; place and store.

.4 Receive and catalogue items.

.1 Submit inventory listing to DCC Representative.

.2 Include approved listings in Maintenance Manual.

.5 Obtain receipt for delivered products and submit prior to final payment.

.3 Special Tools:

.1 Provide special tools, in quantities specified in individual specification section.

.2 Provide items with tags identifying their associated function and equipment.

.3 Deliver to site; place and store.

.4 Receive and catalogue items.

.1 Submit inventory listing to DCC Representative.

.2 Include approved listings in Maintenance Manual.

1.11 DELIVERY, STORAGE AND HANDLING

.1 Store spare parts, maintenance materials, and special tools in manner to prevent damage

or deterioration.

.2 Store in original and undamaged condition with manufacturer's seal and labels intact.

.3 Store components subject to damage from weather in weatherproof enclosures.

.4 Store paints and freezable materials in a heated and ventilated room.

.5 Remove and replace damaged products at own expense and for review by DCC

Representative.

Page 61: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada CLOSEOUT SUBMITTALS Section 01 78 00

Construct Confidence and

Agility Course (DHTC) Page 5 of 5

DHTC 1612

UNCLASSIFIED

1.12 WARRANTIES AND BONDS

.1 Separate each warranty or bond with index tab sheets keyed to Table of Contents listing

in applicable O & M Manual.

.2 List subcontractor, supplier, and manufacturer, with name, address, and telephone

number of responsible principal.

.3 Obtain warranties and bonds, executed in duplicate by subcontractors, suppliers, and

manufacturers, within ten days after completion of the applicable item of work.

.4 Except for items put into use with DCC Representative’s permission, leave date of

beginning of time of warranty until the Date of Substantial Performance has been advised

by DCC Representative.

.5 Verify that documents are in proper form, contain full information, and are notarized.

.6 Co-execute submittals when required.

.7 Retain warranties and bonds until time specified for submittal.

END OF SECTION

Page 62: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

This page is intentionally left blank.

Page 63: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada CONCRETE FORMING AND ACCESSORIES Section 03 10 00

Construct Confidence and

Agility Course (DHTC) Page 1 of 2

DHTC 1612

UNCLASSIFIED

Part 1 General

1.1 REFERENCES

.1 Canadian Standards Association (CSA International)

.1 CSA-A23.1-14/A23.2-14, Concrete Materials and Methods of Concrete

Construction/Methods of Test and Standard Practices for Concrete.

.2 CSA-O86-14, Engineering Design in Wood.

.3 CSA O121-17, Douglas Fir Plywood.

.4 CAN/CSA-S269.3-M92 (R2013), Concrete Formwork, National Standard of

Canada

Part 2 Products

2.1 MATERIALS

.1 Formwork materials:

.1 For concrete without special architectural features, use wood and wood product

formwork materials to CSA-O121 CAN/CSA-O86.

.2 For concrete with special architectural features or custom formwork finishes, use

formwork materials to CSA-A23.1/A23.2.

.3 Rigid insulation board: to CAN/ULC-S701.

.2 Form release agent: non-toxic, biodegradable, low VOC.

Part 3 Execution

3.1 FABRICATION AND ERECTION

.1 Verify lines, levels and centres before proceeding with formwork/falsework and ensure

dimensions agree with drawings.

.2 Obtain Departmental Representative's approval for use of earth forms framing openings

not indicated on drawings.

.3 Hand trim sides and bottoms and remove loose earth from earth forms before placing

concrete.

.4 Fabricate and erect formwork in accordance with CAN/CSA-S269.3 to produce finished

concrete conforming to shape, dimensions, locations and levels indicated within

tolerances required by CSA-A23.1/A23.2.

.5 Align form joints and make watertight.

.1 Keep form joints to minimum.

Page 64: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada CONCRETE FORMING AND ACCESSORIES Section 03 10 00

Construct Confidence and

Agility Course (DHTC) Page 2 of 2

DHTC 1612

UNCLASSIFIED

.6 Form chases, slots, openings, drips, recesses, expansion and control joints as indicated.

.7 Build in anchors, sleeves, and other inserts required to accommodate Work specified in

other sections.

.1 Ensure that anchors and inserts will not protrude beyond surfaces designated to

receive applied finishes, including painting.

.8 Clean formwork in accordance with CSA-A23.1/A23.2, before placing concrete.

3.2 REMOVAL AND RESHORING

.1 Leave formwork in place for following minimum periods of time after placing concrete.

.1 3 days

.2 Remove formwork when concrete has reached 75 % of its design strength or minimum

period noted above, whichever comes later.

.3 Re-use formwork subject to requirements of CSA-A23.1/A23.2.

END OF SECTION

Page 65: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada CONCRETE REINFORCING Section 03 20 00

Construct Confidence and

Agility Course Page 1 of 3

DHTC 1612

UNCLASSIFIED

Part 1 General

1.1 REFERENCES

.1 ASTM International

.1 ASTM A1064/A1064M-17, Standard Specification for Carbon-Steel Wire and

Welded Wire Reinforcement, Plain and Deformed, for Concrete.

.2 ASTM A775/A775M-17, Standard Specification for Epoxy-Coated Reinforcing

Steel Bars.

.2 CSA International

.1 CSA-A23.1-14/A23.2-14, Concrete Materials and Methods of Concrete

Construction/Test Methods and Standard Practices for Concrete.

.2 CAN/CSA-A23.3-14, Design of Concrete Structures.

.3 CSA-G30.18-09(R2014), Carbon Steel Bars for Concrete Reinforcement.

.3 Reinforcing Steel Institute of Canada (RSIC)

.1 RSIC-2004, Reinforcing Steel Manual of Standard Practice.

1.2 ACTION AND INFORMATIONAL SUBMITTALS

.1 Submit in accordance with Section 01 33 00 - Submittal Procedures.

.2 Prepare reinforcement drawings in accordance with RSIC Manual of Standard Practice.

.3 Shop Drawings:

.1 Submit drawings.

.1 Indicate placing of reinforcement and:

.1 Bar bending details.

.2 Lists.

.3 Quantities of reinforcement.

.4 Sizes, spacing, locations of reinforcement and mechanical

splices if approved by Departmental Representative, with

identifying code marks to permit correct placement without

reference to structural drawings.

.2 Detail lap lengths and bar development lengths to CAN/CSA-A23.3.

.3 Replace defective or damaged materials with new.

Page 66: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada CONCRETE REINFORCING Section 03 20 00

Construct Confidence and

Agility Course Page 2 of 3

DHTC 1612

UNCLASSIFIED

Part 2 Products

2.1 MATERIALS

.1 Substitute different size bars only if permitted in writing by Departmental Representative.

.2 Reinforcing steel: billet steel, grade 400, deformed bars to CSA-G30.18, unless indicated

otherwise.

.3 Welded steel wire fabric: to ASTM A1064/A1064M.

.1 Provide in flat sheets only.

.4 Epoxy Coating of reinforcement: to ASTM A775/A775M.

.5 Chairs, bolsters, bar supports, spacers: to CSA-A23.1/A23.2.

.6 Mechanical splices: subject to approval of Departmental Representative.

2.2 FABRICATION

.1 Fabricate reinforcing steel in accordance with CSA-A23.1/A23.2 Reinforcing Steel

Manual of Standard Practice by the Reinforcing Steel Institute of Canada.

.2 Obtain Departmental Representative's written approval for locations of reinforcement

splices other than those shown on placing drawings.

.3 Ship bundles of bar reinforcement, clearly identified in accordance with bar bending

details and lists.

.1 Ship epoxy coated bars in accordance with ASTM A775A/A775M.

Part 3 Execution

3.1 FIELD BENDING

.1 Do not field bend or field weld reinforcement except where indicated or authorized by

Departmental Representative.

.2 When field bending is authorized, bend without heat, applying slow and steady pressure.

.3 Replace bars, which develop cracks or splits.

3.2 PLACING REINFORCEMENT

.1 Place reinforcing steel as indicated on placing drawings in accordance with CSA-

A23.1/A23.2.

.2 Prior to placing concrete, obtain Departmental Representative's approval of reinforcing

material and placement.

.3 Ensure cover to reinforcement is maintained during concrete pour.

.4 Protect epoxy coated portions of bars with covering during transportation and handling.

Page 67: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada CONCRETE REINFORCING Section 03 20 00

Construct Confidence and

Agility Course Page 3 of 3

DHTC 1612

UNCLASSIFIED

3.3 FIELD TOUCH-UP

.1 Touch up damaged and cut ends of epoxy coated or galvanized reinforcing steel with

compatible finish to provide continuous coating.

3.4 CLEANING

.1 Progress Cleaning:

.1 Leave Work area clean at end of each day.

.2 Final Cleaning: upon completion remove surplus materials, rubbish, tools and equipment.

END OF SECTION

Page 68: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

This page is intentionally left blank.

Page 69: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada CAST-IN-PLACE CONCRETE SHORT FORM Section 03 30 00.01

Construct Confidence and

Agility Course (DHTC) Page 1 of 4

DHTC 1612

UNCLASSIFIED

Part 1 General

1.1 REFERENCES

.1 ASTM International

.1 ASTM D1751-04(2013)e1, Standard Specification for Preformed Expansion

Joint Filler for Concrete Paving and Structural Construction (Non extruding and

Resilient Bituminous Types).

.2 Canadian General Standards Board (CGSB)

.1 CAN/CGSB-19.24-M90, Multicomponent, Chemical-Curing Sealing Compound.

.3 CSA International

.1 CSA-A23.1/A23.2-2014, Concrete Materials and Methods of Concrete

Construction/Methods of Test and Standard Practices for Concrete.

.2 CSA A3000-13, Cementitious Materials Compendium.

1.2 ACTION AND INFORMATIONAL SUBMITTALS

.1 Provide submittals in accordance with Section 01 33 00 - Submittal Procedures.

.2 At least 4 weeks prior to beginning Work, submit to Departmental Representative

concrete mix designs.

.3 Provide testing inspection results reports for review by Departmental Representative and

do not proceed without written approval when deviations from mix design or parameters

are found.

.4 Concrete hauling time: provide for review by Departmental Representative deviations

exceeding maximum allowable time of 60 for concrete to be delivered to site of Work

and discharged after batching.

1.3 QUALITY ASSURANCE

.1 Provide to Departmental Representative, 4 week[s] minimum prior to starting concrete

work, valid and recognized certificate from plant delivering concrete.

.1 Quality Control Plan: provide written report to Departmental Representative

verifying compliance that concrete in place meets performance requirements.

1.4 DELIVERY, STORAGE AND HANDLING

.1 Delivery and Acceptance Requirements:

.1 Concrete hauling time: deliver to site of Work and discharged within 60 minutes

maximum after batching.

Page 70: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada CAST-IN-PLACE CONCRETE SHORT FORM Section 03 30 00.01

Construct Confidence and

Agility Course (DHTC) Page 2 of 4

DHTC 1612

UNCLASSIFIED

.1 Do not modify maximum time limit without receipt of prior written

agreement from Departmental Representative and concrete producer as

described in CSA A23.1/A23.2.

.2 Concrete delivery: ensure continuous concrete delivery from plant meets CSA

A23.1/A23.2.

Part 2 Products

2.1 DESIGN CRITERIA

.1 Alternative 1 - Performance: to CSA A23.1/A23.2, and as described in MIXES of PART

2 - PRODUCTS.

2.2 MATERIALS

.1 Cement: to CSA A3001, Type GU.

.2 Water: to CSA A23.1/A23.2.

.3 Reinforcing bars: to CAN/CSA-G30.18, Grade 400.

.4 Welded steel wire fabric: to ASTM A185.

.5 Premoulded joint filler:

.1 Bituminous impregnated fibreboard: to ASTM D1751.

.6 Joint sealer/filler: grey to CAN/CGSB-19.24, Type 1, Class B.

.7 Sealer: proprietary poly-siloxane resin blend.

.8 Other concrete materials: to CSA A23.1/A23.2.

2.3 MIXES

.1 Alternative 1 - Performance Method for specifying concrete: to meet Departmental

Representative performance criteria to CSA A23.1/A23.2.

.1 Ensure concrete supplier meets performance criteria as established below and

provide verification of compliance as described in PART 3 - VERIFICATION.

.2 Provide concrete mix to meet following hard state requirements:

.1 Durability and class of exposure: as noted on drawings.

.2 Compressive strength at 28 days age: as noted on drawings.

.3 Aggregate size 20 mm maximum.

.3 Concrete supplier's certification.

.4 Provide quality management plan to ensure verification of concrete quality to

specified performance.

Page 71: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada CAST-IN-PLACE CONCRETE SHORT FORM Section 03 30 00.01

Construct Confidence and

Agility Course (DHTC) Page 3 of 4

DHTC 1612

UNCLASSIFIED

Part 3 Execution

3.1 PREPARATION

.1 Provide Departmental Representative 24 hours notice before each concrete pour.

.2 Place concrete reinforcing in accordance with Section 03 20 00 - Concrete Reinforcing.

.3 During concreting operations:

.1 Development of cold joints not allowed.

.2 Ensure concrete delivery and handling facilitates placing with minimum of

rehandling, and without damage to existing structure or Work.

.4 Protect previous Work from staining.

.5 Clean and remove stains prior to application of concrete finishes.

3.2 INSTALLATION/APPLICATION

.1 Do cast-in-place concrete work in accordance with CSA A23.1/A23.2.

.2 Sleeves and inserts:

.1 Cast in sleeves, ties, slots, anchors, reinforcement, frames, conduit, bolts,

waterstops, joint fillers and other inserts required to be built-in.

.2 Sleeves and openings greater than 100 mm x 100 mm not indicated, must be

reviewed by Departmental Representative.

3.3 FINISHES

.1 Formed surfaces exposed to view: sack rubbed finish in accordance with CSA

A23.1/A23.2.

.2 Interior floor slabs to be left exposed to receive epoxy requiring smooth surface: initial

finishing operations followed by final finishing comprising mechanical floating and steel

trowelling as specified in CSA A23.1/A23.2 to produce hard, smooth, dense trowelled

surface free from blemishes.

.3 Equipment pads: provide smooth trowelled surface.

.4 Pavements, walks, curbs and exposed site concrete:

.1 Screed to plane surfaces and use [aluminum] [magnesium] [wood] floats.

.2 Provide round edges and joint spacings using standard tools.

.3 Trowel smooth to provide lightly brushed non-slip finish.

3.4 CONTROL JOINTS

.1 Control joints in slabs on grade at locations indicated, to CSA A23.1/A23.2 and install

specified joint sealer/filler.

Page 72: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada CAST-IN-PLACE CONCRETE SHORT FORM Section 03 30 00.01

Construct Confidence and

Agility Course (DHTC) Page 4 of 4

DHTC 1612

UNCLASSIFIED

3.5 EXPANSION AND ISOLATION JOINTS

.1 Install premoulded joint filler in expansion and isolation joints full depth of slab flush

with finished surface to CSA A23.1/A23.2.

3.6 CURING

.1 Use curing compounds compatible with applied finish on concrete surfaces free of

bonding agents and to CSA A23.1/A23.2.

3.7 SEALING APPLICATION

.1 After curing is complete, apply poly-siloxane resin blend sealer at 4 m2/L.

3.8 SITE TOLERANCES

.1 Concrete floor slab finishing tolerance to CSA A23.1/A23.2.

3.9 FIELD QUALITY CONTROL

.1 Concrete testing: to CSA A23.1/A23.2 by testing laboratory designated by the

Departmental Representative and paid for by the Contractor.

3.10 CLEANING

.1 Clean in accordance with Section 01 74 11 - Cleaning.

.2 Use trigger operated spray nozzles for water hoses.

.3 Designate cleaning area for tools to limit water use and runoff.

.4 Cleaning of concrete equipment to be done in accordance with Section 01 35 43

Environmental Procedures.

END OF SECTION

Page 73: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada STRUCTURAL STEEL FOR BUILDINGS Section 05 12 23

Construct Confidence and

Agility Course (DHTC) Page 1 of 5

DHTC 1612

UNCLASSIFIED

Part 1 General

1.1 REFERENCES

.1 ASTM International Inc.

.1 ASTM A36/A36M-14, Standard Specification for Carbon Structural Steel.

.2 ASTM F3125/F3125M-15a, Standard Specification for Structural Bolts, Steel,

Heat Treated 830 MPa Minimum Tensile Strength Metric.

.3 ASTM F3125/F3125M-15a, Standard Specification for High-Strength Steel

Structural Bolts, Classes 10.9 and 10.9.3, for Structural Steel Joints Metric.

.2 Canadian General Standards Board (CGSB)

.1 CAN/CGSB-85.10-99, Protective Coatings for Metals.

.3 Canadian Institute of Steel Construction (CISC)/Canadian Paint Manufacturers

Association (CPMA).

.1 Handbook of the Canadian Institute of Steel Construction.

.2 CISC/CPMA Standard 2-75, Quick-Drying Primer for use on Structural Steel.

.4 Canadian Standards Association (CSA International)

.1 CSA G40.20-13/G40.21-13, General Requirements for Rolled or Welded

Structural Quality Steel/Structural Quality Steel.

.2 CAN/CSA-G164-M92 (R2003), Hot Dip Galvanizing of Irregularly Shaped

Articles.

.3 CAN/CSA-S16-14, Limit States Design of Steel Structures.

.4 CSA W47.1-09 (R2014), Certification of Companies for Fusion Welding of

Steel.

.5 CSA W48-14, Filler Metals and Allied Materials for Metal Arc Welding.

.6 CSA W55.3-08 (R2013), Certification of companies for resistance welding of

steel and aluminum.

.7 CSA W59-13 (Update No.4 – 2015), Welded Steel Construction (Metal Arc

Welding).

.5 The Society for Protective Coatings (SSPC) and National Association of Corrosion

Engineers (NACE) International

.1 NACE No. 3/SSPC SP-6-06, Commercial Blast Cleaning.

1.2 ACTION AND INFORMATIONAL SUBMITTALS

.1 Provide submittals in accordance with Section 01 33 00 - Submittal Procedures.

.2 Shop Drawings:

.1 Provide drawings stamped and signed by professional engineer registered or

licensed in Province of Ontario, Canada.

Page 74: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada STRUCTURAL STEEL FOR BUILDINGS Section 05 12 23

Construct Confidence and

Agility Course (DHTC) Page 2 of 5

DHTC 1612

UNCLASSIFIED

.3 Erection drawings:

.1 Submit erection drawings indicating details and information necessary for

assembly and erection purposes including:

.1 Description of methods.

.2 Sequence of erection.

.3 Type of equipment used in erection.

.4 Temporary bracings.

.4 Fabrication drawings:

.1 Submit fabrication drawings showing designed assemblies, components and

connections are stamped and signed by qualified professional engineer licensed

in the Province of Ontario, Canada.

.5 Fabricator Reports:

.1 Provide structural steel fabricator's affidavit stating that materials and products

used in fabrication conform to applicable material and products standards

specified and indicated.

Part 2 Products

2.1 DESIGN REQUIREMENTS

.1 Design details and connections in accordance with requirements of CAN/CSA-S16 to

resist forces, moments, and shears and allow for movements indicated.

.2 Shear connections:

.1 Select framed beam shear connections from an industry accepted publication

such as "Handbook of the Canadian Institute of Steel Construction" when

connection for shear only (standard connection) is required.

.2 Select or design connections to support reaction from 1.5 times the maximum

uniformly distributed load that can be safely supported by beam in bending,

provided no point loads act on beam, when shears are not indicated.

.3 Submit sketches and design calculations stamped and signed by qualified professional

engineer licensed in Province of Ontario, Canada for non-standard connections.

2.2 MATERIALS

.1 Structural steel: toCSA-G40.20/G40.21 Grade 300W.

.2 Hollow Structural Sections: to CSA G40.21 Grade 350W Class C or H. Members to be

galvanized to be Class H or stress relieved prior to Galvanizing.

.3 Anchor bolts: to CSA-G40.20/G40.21, Grade 300W.

.4 Bolts, nuts and washers: to ASTM F3125/F3125M.

Page 75: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada STRUCTURAL STEEL FOR BUILDINGS Section 05 12 23

Construct Confidence and

Agility Course (DHTC) Page 3 of 5

DHTC 1612

UNCLASSIFIED

.5 Welding materials: to CSA W48 Series CSA W59 and certified by Canadian Welding

Bureau.

.6 Shop paint primer: to CISC/CPMA2-75solvent reducible alkyd, grey.

.7 Hot dip galvanizing: galvanize steel, to CAN/CSA-G164, minimum zinc coating of 600

g/m2.

2.3 FABRICATION

.1 Fabricate structural steel in accordance with CAN/CSA-S16 and in accordance with

reviewed shop drawings.

.2 Continuously seal members by continuous welds Grind smooth.

2.4 SHOP PAINTING

.1 Clean, prepare surfaces and shop prime structural steel in accordance with CAN/CSA-

S16.

.2 Clean members, remove loose mill scale, rust, oil, dirt and foreign matter. Prepare surface

according to NACE No.3/SSPC-SP-6.

.3 Apply one coat of primer in shop to steel surfaces:

.1 Surfaces to be encased in concrete.

.2 Surfaces and edges to be field welded.

.3 Faying surfaces of slip-critical connections.

.4 Below grade surfaces in contact with soil.

.4 Apply paint under cover, on dry surfaces when surface and air temperatures are above 5

degrees C.

.5 Maintain dry condition and 5 degrees C minimum temperature until paint is thoroughly

dry.

.6 Strip paint from bolts, nuts, sharp edges and corners before prime coat is dry.

Part 3 Execution

3.1 APPLICATION

.1 Manufacturer's Instructions: comply with manufacturer's written recommendations,

including product technical bulletins, handling, storage and installation instructions, and

datasheets.

3.2 GENERAL

.1 Structural steel work: in accordance with CAN/CSA-S16.

.2 Welding: in accordance with CSA W59.

Page 76: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada STRUCTURAL STEEL FOR BUILDINGS Section 05 12 23

Construct Confidence and

Agility Course (DHTC) Page 4 of 5

DHTC 1612

UNCLASSIFIED

.3 Companies to be certified under Division 1 or 2.1 of CSA W47.1 for fusion welding of

steel structures and/or CSA W55.3 for resistance welding of structural components.

3.3 CONNECTION TO EXISTING WORK

.1 Verify dimensions and condition of existing work, report discrepancies and potential

problem areas to Departmental Representative for direction before commencing

fabrication.

3.4 MARKING

.1 Mark materials in accordance with CSA G40.20/G40.21. Do not use die stamping. When

steel is to be left in unpainted condition, place marking at locations not visible from

exterior after erection.

.2 Match marking: shop mark bearing assemblies and splices for fit and match.

3.5 ERECTION

.1 Erect structural steel, as indicated and in accordance with CAN/CSA-S16 and in

accordance with reviewed erection drawings.

.2 Field cutting or altering structural members: to approval of Departmental Representative.

.3 Clean with mechanical brush and touch up shop primer to bolts, rivets, welds and burned

or scratched surfaces at completion of erection.

.4 Continuously seal members by continuous welds where indicated. Grind smooth.

3.6 FIELD QUALITY CONTROL

.1 Inspection and testing of materials and workmanship will be carried out by testing

laboratory designated by Contractor.

.2 Provide safe access and working areas for testing on site, as required by testing agency

and as authorized by Departmental Representative.

.3 Submit test reports to Departmental Representative within 1 weeks of completion of

inspection.

.4 Departmental Representative will pay costs of tests as specified in Section

3.7 FIELD PAINTING

.1 Paint in accordance with Section 09 91 23 - Interior Painting.

.1 Touch up damaged surfaces and surfaces without shop coat with primer to NACE

No.3/SSPC-SP-6 except as specified otherwise. Apply in accordance: MPI

Architectural Painting Specification Manual.

3.8 CLEANING

.1 Clean in accordance with Section 01 74 11 - Cleaning.

Page 77: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada STRUCTURAL STEEL FOR BUILDINGS Section 05 12 23

Construct Confidence and

Agility Course (DHTC) Page 5 of 5

DHTC 1612

UNCLASSIFIED

END OF SECTION

Page 78: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

This page is intentionally left blank.

Page 79: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada TIMBER/LUMBER ROUGH CARPENTRY Section 06 10 00.01

Construct Confidence and

Agility Course (DHTC) Page 1 of 5

DHTC 1612

UNCLASSIFIED

Part 1 General

1.1 REFERENCES

.1 ASTM International

.1 ASTM A123/A123M-15, Standard Specification for Zinc (Hot-Dip Galvanized)

Coatings on Iron and Steel Products.

.2 ASTM A653/A653M-15e1, Standard Specification for Steel Sheet, Zinc-Coated

(Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process.

.2 CSA International

.1 CSA B111-1974 (R2003), Wire Nails, Spikes and Staples.

.2 CSA O121-17, Douglas Fir Plywood.

.3 CSA O141-05 (R2014), Softwood Lumber.

.4 CSA O151-17, Canadian Softwood Plywood.

.5 CSA O153-13, Poplar Plywood.

.6 CSA O325-16, Construction Sheathing.

.7 CAN/CSA-Z809-08 (Update No.1 - 2010), Sustainable Forest Management.

.8 CSA O15, Wood Utility Poles and Reinforcing Stubs

.9 CSA O80, Wood Preservation

.3 Forest Stewardship Council (FSC)

.1 FSC-STD-01-001-(version 4-0), FSC Principle and Criteria for Forest

Stewardship.

.4 Health Canada/Workplace Hazardous Materials Information System (WHMIS)

.1 Material Safety Data Sheets (MSDS).

.5 National Lumber Grades Authority (NLGA)

.1 Standard Grading Rules for Canadian Lumber 2014.

.6 South Coast Air Quality Management District (SCAQMD), California State (SCAQMD)

.1 SCAQMD Rule 1113-A2016, Architectural Coatings.

.2 SCAQMD Rule 1168-A2005, Adhesives and Sealants Applications.

.7 Sustainable Forestry Initiative (SFI)

.1 SFI 2015-2019 Standard.

1.2 ACTION AND INFORMATIONAL SUBMITTALS

.1 Provide submittals in accordance with Section 01 33 00 - Submittal Procedures.

.2 Shop Drawings:

.1 Provide drawings stamped and signed by professional engineer registered or

licensed in Province of Ontario, Canada.

Page 80: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada TIMBER/LUMBER ROUGH CARPENTRY Section 06 10 00.01

Construct Confidence and

Agility Course (DHTC) Page 2 of 5

DHTC 1612

UNCLASSIFIED

.3 Erection drawings:

.1 Submit erection drawings indicating details and information necessary for

assembly and erection purposes including:

.1 Description of methods.

.2 Sequence of erection.

.3 Type of equipment used in erection.

.4 Temporary bracings.

.4 Fabrication drawings:

.1 Submit fabrication drawings showing designed assemblies, components and

connections are stamped and signed by qualified professional engineer licensed

in the Province of Ontario, Canada.

.5 Fabricator Reports:

.1 Provide structural timber fabricator's affidavit stating that materials and products

used in fabrication conform to applicable material and products standards

specified and indicated.

1.3 QUALITY ASSURANCE

.1 Timber/Lumber identification: by grade stamp of an agency certified by Canadian

Lumber Standards Accreditation Board.

.2 Plywood identification: by grade mark in accordance with applicable CSA standards.

.3 Plywood, OSB and wood based composite panel construction sheathing identification: by

grademark in accordance with applicable CSA standards.

.4 Sustainable Standards Certification:

.1 Certified Wood: submit listing of wood products and materials used in

accordance with CAN/CSA-Z809 or FSC or SFI.

1.4 DELIVERY, STORAGE, AND HANDLING

.1 Deliver, store and handle materials in accordance with Section 01 61 00 - Common

Product Requirements

.2 Delivery and Acceptance Requirements: deliver materials to site in original factory

packaging, labelled with manufacturer's name and address.

.3 Storage and Handling Requirements:

.1 Store materials off ground and in dry location and in accordance with

manufacturer's recommendations in clean, dry, well-ventilated area.

.2 Store and protect wood from nicks, scratches, and blemishes.

.3 Replace defective or damaged materials with new.

.4 Waste Management and Disposal:

Page 81: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada TIMBER/LUMBER ROUGH CARPENTRY Section 06 10 00.01

Construct Confidence and

Agility Course (DHTC) Page 3 of 5

DHTC 1612

UNCLASSIFIED

.1 Separate waste materials for recycling in accordance with Section 01 74 21 -

Construction/Demolition Waste Management and Disposal.

Part 2 Products

2.1 DESIGN REQUIREMENTS

.1 Design details and connections in accordance with requirements of CAN/CSA-086-14 to

resist forces, moments, and shears and allow for movements indicated.

.2 Shear connections:

.1 Select or design connections to support reaction from 1.5 times the maximum

uniformly distributed load that can be safely supported by beam in bending,

provided no point loads act on beam, when shears are not indicated.

.3 Submit sketches and design calculations stamped and signed by qualified professional

engineer licensed in Province of Ontario, Canada for non-standard connections.

2.2 LUMBER MATERIAL

.1 Timber/Lumber: unless specified otherwise, softwood, S4S, moisture content 19% or less

in accordance with following standards:

.1 CSA O141.

.2 NLGA Standard Grading Rules for Canadian Lumber.

.3 CAN/CSA-Z809 or FSC or SFI certified.

.2 Furring, blocking, nailing strips, grounds, rough bucks, cants, curbs, fascia backing and

sleepers:

.1 S2S is acceptable.

.2 Board sizes: "standard" or better grade.

.3 Dimension sizes: "standard" light framing or better grade.

.4 Post and timbers sizes: "standard" or better grade.

.3 Wood Utility Poles:

.1 CSA O15.

.2 Pressure treated to CSA O80.

.3 Kiln dried.

.4 Southern Yellow Pine or equivalent.

2.3 PANEL MATERIALS

.1 Douglas fir plywood: to CSA O121, standard construction.

.1 Urea-formaldehyde free.

.2 CAN/CSA-Z809 or FSC or SFI certified.

.2 Canadian softwood plywood (CSP): to CSA O151, standard construction.

Page 82: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada TIMBER/LUMBER ROUGH CARPENTRY Section 06 10 00.01

Construct Confidence and

Agility Course (DHTC) Page 4 of 5

DHTC 1612

UNCLASSIFIED

.1 Urea-formaldehyde free.

.2 CAN/CSA-Z809 or FSC or SFI certified.

.3 Poplar Plywood: to CSA O153, standard construction, urea-formaldehyde free.

.1 Urea-formaldehyde free.

.2 CAN/CSA-Z809 or FSC or SFI certified.

.4 Plywood, OSB and wood based composite panels: to CSA O325.

.1 Urea-formaldehyde free.

.2 CAN/CSA-Z809 or FSC or SFI certified.

2.4 ACCESSORIES

.1 Nails, spikes and staples: to CSA B111.

.2 Bolts: 12.5 mm diameter unless indicated otherwise, complete with nuts and washers.

.3 Proprietary fasteners: toggle bolts, expansion shields and lag bolts, screws and lead or

inorganic fibre plugs, explosive actuated fastening devices, recommended for purpose by

manufacturer.

2.5 FINISHES

.1 Galvanizing: to ASTM A123/A123M OR ASTM A653/A653M, use galvanized fasteners

for exterior work, pressure- preservative and treated lumber.

2.6 WOOD PRESERVATIVE

.1 Surface-applied wood preservative: clear coloured], copper naphthenate or 5%

pentachlorophenol solution, water repellent preservative.

.2 Pentachlorophenol use is restricted to building components that are in ground contact and

subject to decay or insect attack only. Where used, pentachlorophenol-treated wood must

be covered with two coats of an appropriate sealer.

.3 Structures built with wood treated with pentachlorophenol and inorganic arsenicals must

not be used for storing food nor should the wood come in contact with drinking water.

Part 3 Execution

3.1 EXAMINATION

.1 Verification of Conditions: verify conditions of substrates previously installed under

other Sections or Contracts are acceptable for product installation in accordance with

manufacturer's written instructions.

.1 Visually inspect substrate in presence of Architect/Owner’s Representative.

.2 Inform Architect/Owner’s Representative of unacceptable conditions

immediately upon discovery.

Page 83: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada TIMBER/LUMBER ROUGH CARPENTRY Section 06 10 00.01

Construct Confidence and

Agility Course (DHTC) Page 5 of 5

DHTC 1612

UNCLASSIFIED

.3 Proceed with installation only after unacceptable conditions have been remedied

and after receipt of written approval to proceed from Architect/Owner’s

Representative.

3.2 PREPARATION

.1 Treat surfaces of material with wood preservative, before installation.

.2 Apply preservative by dipping, or by brush to completely saturate and maintain wet film

on surface for minimum 3 minute soak on lumber and one minute soak on plywood.

.3 Re-treat surfaces exposed by cutting, trimming or boring with liberal brush application of

preservative before installation.

.4 Treat material as indicated:

.1 Wood cants, fascia backing, curbs, nailers, sleepers on roof deck.

.2 Wood furring on outside surface of exterior masonry and concrete walls.

.3 Wood sleepers supporting wood subflooring over concrete slabs in contact with

ground or fill.

3.3 INSTALLATION

.1 Comply with requirements of NBC, supplemented by the following paragraphs.

.2 Install members true to line, levels and elevations, square and plumb.

.3 Install rough bucks, nailers and linings to rough openings as required to provide backing

for frames and other work.

3.4 ERECTION

.1 Frame, anchor, fasten, tie and brace members to provide necessary strength and rigidity.

.2 Countersink bolts where necessary to provide clearance for other work.

END OF SECTION

Page 84: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

This page is intentionally left blank.

Page 85: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED Government of Canada METAL DOORS AND FRAMES Section 08 11 00 Construct Confidence and Agility Course (DHTC) Page 1 of 4 DHTC 1612

UNCLASSIFIED

Part 1 General

1.1 REFERENCES

.1 American Society for Testing and Materials International (ASTM)

.1 ASTM A653/A653M-15e1, Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process

.2 ASTM B29-[03], Standard Specification for Refined Lead.

.3 ASTM B749-[03], Standard Specification for Lead and Lead Alloy Strip, Sheet and Plate Products.

.2 American National Standards Institute (ANSI) / Builders Hardware Manufacturers Association (BHMA)

.1 ANSI/BHMA A156.1-2013, Butts and Hinges.

.2 ANSI/BHMA A156.13-2012, Mortise Locks.

.3 Canadian General Standards Board (CGSB)

.1 CAN/CGSB-1.181-[99], Ready-Mixed Organic Zinc-Rich Coating.

.2 CGSB 41-GP-19Ma-[84], Rigid Vinyl Extrusions for Windows and Doors.

.4 Canadian Standards Association (CSA International)

.1 CSA-G40.20-[04]/G40.21-[04], General Requirements for Rolled or Welded Structural Quality Steel/Structural Quality Steel.

.2 CSA W59-13, Welded Steel Construction (Metal Arc Welding)

.5 Canadian Steel Door Manufacturers' Association (CSDMA)

.1 CSDMA, Commercial Steel Doors and Frames, 2009

.2 CSDMA, Recommended Selection and Usage Guide for Commercial Steel Doors, 2009

.6 Master Painters Institute (MPI)

.1 MPI Architectural Painting Specifications Manual.

.7 Society for Protective Coatings (SSPC)

.1 Systems and Specifications, SSPC Painting Manual

1.2 SYSTEM DESCRIPTION

.1 Design Requirements:

.1 Design exterior frame assembly to accommodate to expansion and contraction when subjected to minimum and maximum surface temperature of -35 degrees C to 35 degrees C.

1.3 ACTION AND INFORMATIONAL SUBMITTALS

.1 Provide submittals in accordance with Section 01 33 00 - Submittal Procedures.

Page 86: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED Government of Canada METAL DOORS AND FRAMES Section 08 11 00 Construct Confidence and Agility Course (DHTC) Page 2 of 4 DHTC 1612

UNCLASSIFIED

.2 Provide shop drawings: in accordance with Section 01 33 00 - Submittal Procedures.

.1 Submit drawings indicating each type of door, material, steel core thicknesses, mortises, reinforcements, location of exposed fasteners, arrangement of hardware and finishes.

.2 Indicate each type frame material, core thickness, reinforcements, location of anchors and exposed fastenings, reinforcing and finishes.

.3 Submit test and engineering data, and installation instructions.

.3 Provide product data: in accordance with Section 01 33 00 - Submittal Procedures.

.1 Submit manufacturer's instructions, printed product literature and data sheets for door hardware and include product characteristics, performance criteria, physical size, finish and limitations.

.2 Hardware List: .1 Submit contract hardware list. .2 Indicate specified hardware, including make, model, material, function,

size and finish.

1.4 DELIVERY, STORAGE AND HANDLING

.1 Deliver, store and handle materials in accordance with Section 01 61 00 - Common Product Requirements.

.2 Waste Management and Disposal:

.1 Separate waste materials for reuse or recycling in accordance with Section 01 74 21 - Construction/Demolition Waste Management and Disposal].

Part 2 Products

2.1 MATERIALS

.1 Extra heavy duty, uninsulated steel door and frame: fabricate in accordance with CSDMA specifications.

.1 Door: Stiffened steel construction, extra heavy duty welded construction, 1.9mm (14 ga.) base steel thickness.

.2 Frame: 2.7mm (12 ga.) base steel thickness, welded type construction.

.3 Hot dipped galvanized steel sheet: to ASTM A653/A653M, ZF75.

.4 Factory painted to formula EXT 5.3A – Latex, G5 (traditional semi-gloss) finish, colour selected by DCC Representative.

.5 Finishing hardware: .1 Mortise lock: to ANSI/BHMA A156.13, extra heavy duty construction,

knob handle, round escutcheon, normal box type strike with lip projection not beyond jamb, passage function, stainless steel finish. Cylinder keyed into base keying system.

Page 87: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED Government of Canada METAL DOORS AND FRAMES Section 08 11 00 Construct Confidence and Agility Course (DHTC) Page 3 of 4 DHTC 1612

UNCLASSIFIED

.2 Butts and hinges: to ANSI/BHMA A156.1, 2 pairs per door, extra heavy duty construction, stainless steel finish.

2.2 FRAME FABRICATION GENERAL .1 Fabricate frame in accordance with CSDMA specifications.

.2 Blank, reinforce, drill and tap frame for mortised, templated hardware, using templates provided by finish hardware supplier. Reinforce frames for surface mounted hardware.

.3 Protect mortised cutouts with steel guard boxes.

.4 Manufacturer's nameplates on frame are not permitted.

.5 Provide factory-applied touch up primer at areas where zinc coating has been removed during fabrication.

2.3 FRAME ANCHORAGE

.1 Provide appropriate anchorage to floor and wall construction.

.2 Locate each wall anchor immediately above or below each hinge reinforcement on hinge jamb and directly opposite on strike jamb.

.3 Provide 2 anchors for rebate opening heights up to 1520 mm and 1 additional anchor for each additional 760 mm of height or fraction thereof.

2.4 FRAME: WELDED TYPE .1 Welding in accordance with CSA W59.

.2 Accurately mitre or mechanically joint frame product and securely weld on inside of profile.

.3 Grind welded joints and corners to a flat plane, fill with metallic paste and sand to uniform smooth finish.

.4 Securely attach floor anchors to inside of each jamb profile.

.5 Weld in 2 temporary jamb spreaders per frame to maintain proper alignment during shipment.

2.5 DOOR FABRICATION GENERAL

.1 Doors: swing type, flush.

.2 Exterior door: hollow steel construction.

.3 Fabricate doors with longitudinal edges welded.

.4 Blank, reinforce, drill door and tap for mortised, templated hardware.

.5 Factory prepare holes 12.7 mm diameter and larger except mounting and through-bolt holes, on site, at time of hardware installation.

.6 Reinforce doors where required, for surface mounted hardware. Provide flush steel top caps to exterior doors.

Page 88: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED Government of Canada METAL DOORS AND FRAMES Section 08 11 00 Construct Confidence and Agility Course (DHTC) Page 4 of 4 DHTC 1612

UNCLASSIFIED

.7 Provide factory-applied touch-up primer at areas where zinc coating has been removed during fabrication.

.8 Manufacturer's nameplates on door are not permitted.

2.6 HOLLOW STEEL CONSTRUCTION

.1 Reinforce doors with vertical stiffeners, securely welded to face sheets at 150 mm on centre maximum.

.2 Fill voids between stiffeners of exterior doors with polyurethane core.

Part 3 Execution

3.1 MANUFACTURER'S INSTRUCTIONS

.1 Compliance: comply with manufacturer's written recommendations or specifications, including product technical bulletins, handling, storage and installation instructions, and datasheets.

3.2 INSTALLATION GENERAL .1 Install doors and frames to CSDMA Installation Guide.

3.3 FRAME INSTALLATION

.1 Set frames plumb, square, level and at correct elevation.

.2 Secure anchorages and connections to adjacent construction.

.3 Make allowances for deflection of structure to ensure structural loads are not transmitted to frames.

.4 Caulk perimeter of frames [between frame and adjacent material].

3.4 DOOR INSTALLATION

.1 Install doors and hardware in accordance with hardware templates and manufacturer's instructions and Section 08 71 00 - Door Hardware.

.2 Adjust operable parts for correct function.

3.5 FINISH REPAIRS

.1 Touch up with primer finishes damaged during installation.

.2 Fill exposed frame anchors surfaces with imperfections with metallic paste filler and sand to a uniform smooth finish.

END OF SECTION

Page 89: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada PLAYFIELD EQUIPMENT& STRUCTURES Section 11 68 00

Construct Confidence and

Agility Course (DHTC) Page 1 of 6

DHTC 1612

UNCLASSIFIED

Part 1 General

1.1 SECTION INCLUDES

.1 Agility course obstacle construction

.2 Safety surfacing- Engineered wood fiber.

1.2 PERFORMANCE REQUIREMENTS

.1 Delegated Design: Design equipment, including comprehensive engineering analysis by

a qualified professional engineer registered in Place of Work.

.1 Design loads: As indicated on structural drawings.

.2 Thermal Movements: Allow for thermal movements from ambient and surface

temperature changes acting on framing members and secondary components.

.1 Temperature change: 80 deg C ambient.

.3 Design, and verify maximum structural member sizes, and strength, for materials

specified, to support design, and maximum allowable uniform static loads.

1.3 RELATED SECTIONS

.1 Refer to structural drawings for Concrete, Structural wood and steel specifications.

1.4 REFERENCES

.1 American Society for Testing and Materials International, (ASTM)

.1 ASTM A F 1292-09 (or most recent edition), Standard specification for Impact

Attenuation of Surfacing Materials within the Use Zone of Playground Equipment.

.2 ASTM A1011- Standard Specification for Steel, Sheet and Strip, Hot-Rolled,

Carbon, Structural, High-Strength Low-Alloy, High-Strength Low-Alloy with

Improved Formability, and Ultra-High Strength

.3 ASTM A467 Standard Specification for Machine and Coil Chain

.2 Canadian General Standards Board (CGSB)

.1 CAN/CSA-Z614-07, Children's Playspaces and Equipment (current edition)

.3 Canadian Standards Association (CSA)

.1 CSA O86- Engineering Design in Wood

.2 CSA B111-1974, Wire Nails, Spikes and Staples.

.3 CAN/CSA-G185, Hot Dip Galvanizing of Irregularly Shaped Articles, Ceramic

coated.

.4 CAN/CSA-O141-91, Softwood Lumber.

Page 90: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada PLAYFIELD EQUIPMENT& STRUCTURES Section 11 68 00

Construct Confidence and

Agility Course (DHTC) Page 2 of 6

DHTC 1612

UNCLASSIFIED

.5 Can/ CSA –O80 Series -08 Specification of treated wood.

.4 National Lumber Grades Authority (NLGA)

.1 Standard Grading Rules for Canadian Lumber 2000.

1.5 SUBMITTALS

.1 Submit shop drawings in accordance with Section 01 33 00 - Submittal Procedures.

Includes:

.1 Delegated-Design Submittal: For equipment including analysis data and

calculations signed and sealed by the qualified professional engineer responsible for

their preparation.

.2 Installation and Anchoring details for:

.1 Obstacles.

.2 Climbing rope to timber connections.

.3 Include dimensioned layout of the obstacle course as a submittal.

.4 Provide Samples with colour options and finishes for cargo nets, ropes, tires,

cladding material and rope knots.

.2 Items included in Section 01 78 00 – Closeout Submittals.

1.6 PRODUCT DELIEVERY, STORAGE AND HANDLING

.1 The contractor will co-ordinate all truck and equipment traffic /storage so as not to impede

daily use of the site outside the limit of construction.

.2 The contractor will be responsible for any damage to public or private property

.3 Engineered wood fibre will be stored so as to not impede the daily use of the campus

and in such a way as to avoid contamination.

1.7 WASTE MANAGEMENT AND DISPOSAL

.1 Separate waste materials for reuse and recycling in accordance with Section 01 74 21-

Construction Waste Management and Disposal.

.2 Remove from site and dispose of all packaging materials at appropriate recycling facilities.

.3 Collect and separate for disposal paper plastic polystyrene corrugated cardboard packaging

material in appropriate on-site bins for recycling in accordance with Waste Management

Plan.

.4 Separate for reuse and recycling and place in designated containers Steel Metal Plastic

waste in accordance with Waste Management Plan.

.5 Place materials defined as hazardous or toxic in designated containers.

Page 91: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada PLAYFIELD EQUIPMENT& STRUCTURES Section 11 68 00

Construct Confidence and

Agility Course (DHTC) Page 3 of 6

DHTC 1612

UNCLASSIFIED

.6 Unused caulking material must be disposed of at an official hazardous material collections

site as approved by DCC Representative.

.7 Unused sealant material must not be disposed of into sewer system, into streams, lakes,

onto ground or in other location where it will pose health or environmental hazard.

.8 Fold up metal banding, flatten and place in designated area for recycling.

.9 Wood cut-offs are to be diverted from landfill by disposal into on-site wood recycling bin

approved by Departmental Representative.

.10 Reusable materials are to be diverted for reuse at nearest used building materials facility or

similar type facility.

.11 Unused preservatives and fire retardant materials are to be diverted from landfill through

disposal at a special wastes depot.

1.8 QUALITY ASSURANCE

.1 Lumber by grade stamp of an agency certified by Canadian Lumber Standards

Accreditation Board.

.2 The contractor is to supply a 1 kg. sample of the safety surfacing and IPEMA certification

from the manufacturer.

1.9 WARRANTY

.1 Obstacles:

.1 Warranty all metal (steel and aluminum) structural elements against

corrosion for a period of ten (10) years from the date of Substantial

Completion.

.2 Installers Warranty 2 years

Part 2 Products

2.1 MATERIALS

.1 Obstacle materials

.1 Wood-

.1 Structural wood- refer to the structural drawings.

.2 Wood Planks- 31x 140 mm wood planks (Lumber). To CSA141, kiln

dries, SPF No. 2 or better. Moisture content max 19%.

.3 Wood preservation to CSA –O80 Series -08

Page 92: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada PLAYFIELD EQUIPMENT& STRUCTURES Section 11 68 00

Construct Confidence and

Agility Course (DHTC) Page 4 of 6

DHTC 1612

UNCLASSIFIED

.2 Tires- Used/ recycled automobile and truck tires. Minimum 600 mm minimum

diameter. No exposed steel belts or wires. Provide minimum two drainage holes on

the underside of the tires for drainage of the water.

.3 Cargo Net- 25mm (1”) thick 3 strand Poly Dacron Rope RCN1-9 with 9”x9” square

openings. Loc-Tuc to allow each square to keep its square shape. Lanyards should

be attached for mounting purposes. Minimum Breaking Strength: 17,000 lbs.

.4 Ropes- 75mm diameter fibre rope, 55 kN or 12,5000lbs minimum factored capacity

or equivalent.

.5 Ropes – 50mm diameter fibre rope, 55 kN or 12,5000lbs minimum factored

capacity or equivalent.

.6 Wires-

.1 Smooth wire- 9 gauge galvanised smooth wire. As per CSA B111-1974.

.2 Guy Wire- 9.5 dia 6 strandx19 (6X19) wire rope. Galvanised finish. 55Kn

or 12,500lbs minimum break strength or equivalent.

.7 Metal post - refer to the structural drawings for structural steel spec. ASTM A1011.

.8 Fasteners- As noted. Use Flat Countersunk Head Cap Screws. Chains as per ASTM

A467

Part 3

3.1 PREPARATION

.1 Store wood products off the ground.

3.2 EXECUTION

.1 Obstacle Installation:

.1 Layout shall be checked and confirmed with DCC Representative prior to

construction. Fall heights and extent of the safety surface as per CAN/CSA-Z614-

07.

.2 Erect work true-to-line, plumb, square and level with joints aligned. Fit joints and

intersecting members accurately and in true planes adequately fastened.

Install timbers true to line, levels and elevations, square and plumb.

.3 Construct continuous members from pieces of longest practical length.

.4 Select exposed side of timber for appearance. Install lumber and panel materials so

that grade-marks and other defacing marks are concealed or are removed by sanding

where materials are left exposed.

.5 Apply preservative to end cuts where pressure treated lumber is specified. As per

CSA 080.4 (Armor All end cut wood preservative)

.2 Safety surface preparation and installation

Page 93: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada PLAYFIELD EQUIPMENT& STRUCTURES Section 11 68 00

Construct Confidence and

Agility Course (DHTC) Page 5 of 6

DHTC 1612

UNCLASSIFIED

.1 Subgrade and sub drains should be inspected before the installation by DCC

representative.

.2 Engineered wood fibre shall be spread evenly over the entire surface within the

obstacle course perimeter, yielding an even, level surface. Wood fibre shall be

placed in such a manner as to avoid contamination by surrounding material.

.3 Depth of engineered wood fibre shall be a minimum 300 mm (12") or as otherwise

noted as measured at any point within the perimeter after surface has been left

smooth, uniform, firm against deep foot printing, and with a fine loose texture to the

manufacturer’s written recommendations.

.4 Depth of engineered wood fibre is to be maintained until Final Acceptance is given

by the DCC Representative.

.3 Cleaning

.1 Upon completion of Work:

.1 Clean equipment and apparatus in accordance with Section 01 45 00

Quality Control.

Remove protective coverings and test and adjust equipment.

.2 Make good any damaged coatings and finishes.

Part 4 Obstacle Schedule

.1 Wall climb

.2 Tire run – Total 3

.3 Hurdles

.4 Low wire

.5 Commando tower

.6 Balance beam

.7 Over and under hurdles

.8 Incline Wall

.9 The weaver

.10 Rope to ring transition

.11 Tight rope walk

.12 Rope climb traverse

.13 Cargo net

.14 Urban scaling

.15 Window jump

.16 Log hop

.17 Low crawl

.18 Headwall traverse

Page 94: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada PLAYFIELD EQUIPMENT& STRUCTURES Section 11 68 00

Construct Confidence and

Agility Course (DHTC) Page 6 of 6

DHTC 1612

UNCLASSIFIED

.19 Single story roof climb

.20 Monkey bars

END OF SECTION

Page 95: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada ROUGH GRADING Section 31 22 13

Construct Confidence and

Agility Course (DHTC) Page 1 of 3

DHTC 1612

UNCLASSIFIED

Part 1 General

1.1 RELATED REQUIREMENTS

.1 Section 01 45 00 – Quality Control.

.2 Section 31 23 33.01 – Excavating, Trenching and Backfilling.

.3 Section 32 91 21 – Topsoil and Finish Grading.

1.2 REFERENCES

.1 ASTM International

.1 ASTM D698-12e2, Test Method for Laboratory Compaction Characteristics of

Soil Using Standard Effort (600 kN-m/m3).

.2 Underwriters' Laboratories of Canada (ULC).

.3 Geotechnical Investigation Report – DHTC Confidence and Agility Course, Dwyer Hill

Training Centre, WSP Canada Inc. Project 141-15604-05, March 2017.

1.3 ACTION AND INFORMATIONAL SUBMITTALS

.1 Submit in accordance with Section 01 33 00 - Submittal Procedures.

1.4 EXISTING CONDITIONS

.1 Examine geotechnical investigation report by WSP Canada Inc.

.2 Known underground and surface utility lines and buried objects are as indicated on site

plan. Obtain utility locates prior to excavation to confirm existing conditions.

Part 2 Products

2.1 MATERIALS

.1 Topsoil, seed, sod and pathway materials to be in accordance with landscape architecture

specifications.

.2 Engineered wood fill, granular drainage layer, and associated geotextile to be in

accordance with the specifications of the approved supplier of the engineered wood

surfacing system.

.3 Imported subgrade fill to be in accordance with requirements of Section 31 23 33.01 –

Excavating, Trenching and Backfilling.

.4 Excavated or graded material existing on site suitable to use as fill for grading work if

approved by Departmental Representative.

Page 96: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada ROUGH GRADING Section 31 22 13

Construct Confidence and

Agility Course (DHTC) Page 2 of 3

DHTC 1612

UNCLASSIFIED

.5 Granular material and engineered fill material in accordance with requirements of Section

31 23 33.01 – Excavating, Trenching and Backfilling.

Part 3 Execution

3.1 EXAMINATION

.1 Verification of Conditions: verify that conditions of substrate are acceptable for rough

grading installation in accordance with manufacturer's written instructions.

.1 Visually inspect substrate in presence of Departmental Representative.

.2 Inform Departmental Representative of unacceptable conditions immediately

upon discovery.

.3 Proceed with installation only after unacceptable conditions have been remedied

and after receipt of written approval to proceed from Departmental

Representative.

3.2 STRIPPING OF TOPSOIL

.1 Do not handle topsoil while in wet or frozen condition or in any manner in which soil

structure is adversely affected as determined by Departmental Representative.

.2 Commence topsoil stripping of areas as required to achieve final grades indicated on

Drawing 301, after area has been cleared of trees, brush, weeds, and grasses, and

removed from site.

.3 Strip topsoil to depths as required for final design surface level and material. Avoid

mixing topsoil with subsoil.

.4 Stockpile in locations as directed by Departmental Representative. Stockpile height not to

exceed 2 m.

.5 Dispose of unused topsoil off site.

3.3 GRADING

.1 Rough grade to levels, profiles, and contours allowing for surface treatment as indicated.

.2 Prior to placing fill over existing ground, scarify surface to depth of 150 mm minimum

before placing fill over existing ground. Maintain fill and existing surface at

approximately same moisture content to facilitate bonding.

.3 Compact filled and disturbed areas to 95% maximum dry density to ASTM D698.

.4 Do not disturb soil within branch spread of trees or shrubs to remain.

3.4 TESTING

.1 Inspection and testing of imported materials and placed material will be carried out by

approved third party testing laboratory retained and paid for by Contractor. Testing

Page 97: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada ROUGH GRADING Section 31 22 13

Construct Confidence and

Agility Course (DHTC) Page 3 of 3

DHTC 1612

UNCLASSIFIED

agency shall inspect and provide acceptance of subgrade, test and approve imported fill

materials, and carry out compaction tests at a frequency satisfactory for the testing

agency to confirm acceptable conformance with the design requirements. Minimum

compaction test requirements are one test per 500 square metre area for subgrade fill for

each lift of 300mm.

3.5 CLEANING

.1 Leave Work area clean at end of each day.

.2 Final Cleaning: upon completion remove surplus materials, rubbish, tools and equipment.

3.6 PROTECTION

.1 Protect existing fencing, trees, landscaping, natural features, bench marks, buildings,

pavement, surface or underground utility lines which are to remain as directed by

Departmental Representative. If damaged, restore to original or better condition unless

directed otherwise.

.2 Maintain access roads to prevent accumulation of construction related debris on roads.

END OF SECTION

Page 98: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

This page is intentionally left blank.

Page 99: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada EXCAVATING, TRENCHING AND Section 31 23 33.01

Construct Confidence and BACKFILLING

Agility Course (DHTC) Page 1 of 3

DHTC 1612

UNCLASSIFIED

Part 1 General

1.1 REFERENCES

.1 American Society for Testing and Materials (ASTM):

.1 ASTM D 698-12e2, Standard Test Methods for Laboratory Compaction

Characteristics of Soil Using Standard Effort (600 kN-m/m3).

.2 Ontario Provincial Standard Specification (OPSS):

.1 OPSS.MUNI 401 (November 2015), Trenching, Backfilling and

Compacting.

.2 OPSS.MUNI 1004 (November 2013), Material Specification for Aggregates

– Miscellaneous.

.3 OPSS.MUNI 1010 (November 2013), Material Specification for Aggregates

– Base, Subbase, Select Subgrade, and Backfill Material.

1.2 RELATED SECTIONS

.1 Section 01 45 00 – Quality Control.

.2 Section 31 22 13 – Rough Grading.

.3 Section 33 46 16 – Subgrade Drainage Network.

1.3 REGULATIONS

.1 Shore and brace excavations, protect slopes and banks and perform all work in

accordance with Provincial and Municipal regulations and geotechnical report

recommendations, whichever is more stringent.

1.4 TESTS AND INSPECTIONS

.1 Testing of materials and compaction of backfill and base material will be carried out

by approved third party testing laboratory retained and paid for by Contractor.

Testing agency shall inspect and provide acceptance of subgrade, test and approve

imported fill materials, and carry out compaction tests at a frequency satisfactory for

the testing agency to confirm acceptable conformance with the design requirements.

Minimum compaction test requirements are one test per 500 square metre area for

subgrade fill for each lift of 300mm, and one test per 40 lineal metres of trench for

trench backfill.

.2 Do not begin backfilling or filling operations until material has been approved for use

through acceptance of test results by the Departmental Representative.

.3 Before commencing work, conduct, with Departmental Representative, condition

survey of existing structures, trees and other plants, lawns, fencing, service poles,

Page 100: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada EXCAVATING, TRENCHING AND Section 31 23 33.01

Construct Confidence and BACKFILLING

Agility Course (DHTC) Page 2 of 3

DHTC 1612

UNCLASSIFIED

wires, roads and paths, paving, survey bench marks and monuments which may be

affected by work.

1.5 BURIED SERVICES

.1 Before commencing work establish the location of all buried services on and adjacent

to the site.

1.6 PROTECTION

.1 Protect excavations from freezing.

.2 Keep excavations clean, free of standing water, and loose soil.

.3 Protect natural and man-made features required to remain undisturbed. Unless

otherwise indicated or located in an area to be occupied by new construction, protect

existing trees from damage.

.4 Protect buried services that are required to remain in use.

Part 2 Products

2.1 MATERIALS

.1 All imported granular materials to OPSS.MUNI 1004 and OPSS.MUNI 1010.

.2 Engineered fill material, and 19mm Granular Base for curbs and paths, to be

OPSS.MUNI 1010 Granular A.

.3 Material designated as 50mm Granular Sub-Base to be OPSS. MUNI 1010 Granular

B Type II.

.4 Imported subgrade fill material to be OPSS.MUNI Select Subgrade Material.

.5 Subdrain materials to be in conformance with Section 33 46 16 Subgrade Drainage

Network.

Part 3 Execution

3.1 EXCAVATION

.1 Excavate as required to carry out work, in all materials met, in accordance with

OPSS.MUNI 401. Complete excavations for placement of obstacles and associated

course materials, and for subdrainage installation. Do not disturb soil or rock below

sub-base surface except as directed. Notify Departmental Representative when

excavations are complete.

Page 101: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada EXCAVATING, TRENCHING AND Section 31 23 33.01

Construct Confidence and BACKFILLING

Agility Course (DHTC) Page 3 of 3

DHTC 1612

UNCLASSIFIED

3.3 BACKFILLING

.1 Inspection: do not commence backfilling until fill material and spaces to be filled

have been inspected and approved by Departmental Representative.

.2 Remove snow, ice, construction debris, organic soil and standing water from spaces

to be filled.

.3 Lateral support: maintain even levels of backfill around structures as work

progresses, to equalize earth pressures.

.4 Placement of engineered fill, granular base, granular sub-base, pipe sub-bedding,

bedding, surround, and cover shall be done in maximum 150 mm thick lifts. Trench

backfill shall be placed in maximum 200mm thick lifts. Subgrade fill to be placed in

maximum 300mm lifts.

.5 In trenches:

.1 Bedding, surround and cover material shall be in accordance with Section 33

46 16 – Subgrade Drainage Network.

.6 Refer to landscape architecture specifications for engineered wood fibre, curbs,

pathways, associated drainage sublayer requirements, topsoil and sod.

3.4 GRADING

.1 Grade to elevations shown on the Contract Drawings, or match to pre-construction

grades where new grading is not designated at limits of work. Grade to be gradual

between finished spot elevations shown on drawings.

3.6 COMPACTION

.1 Compact exposed subgrade, subgrade fill materials, granular base for curbs, and

subdrain bedding, surround, cover and trench backfill material to 95% Standard

Proctor maximum dry density. Compact engineered fill for structures, and granular

base and sub-base materials for pathways to 98% Standard Proctor maximum dry

density.

.2 Shape and roll alternately to obtain smooth, even and uniformly compacted base.

.3 Apply water as necessary during compaction to obtain specified density.

3.7 TOLERANCES

.1 Surface of subgrade to be within plus or minus 25mm of specified elevation.

END OF SECTION

Page 102: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

This page is intentionally left blank.

Page 103: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada CRUSHED STONE SURFACING Section 32 15 40

Construct Confidence and

Agility Course (DHTC) Page 1 of 4

DHTC 1612

UNCLASSIFIED

Part 1 General

1.1 RELATED REQUIREMENTS

.1 Section 32 91 21 – Topsoil Placement and Grading

1.2 REFERENCES

.1 ASTM International

.1 ASTM C136-06, Standard Test Method for Sieve Analysis of Fine and Coarse

Aggregates.

.2 ASTM D698-07e1, Standard Test Methods for Laboratory Compaction

Characteristics of Soil Using Standard Effort (12,400 ft-lbf/ft3 (600 kN-m/m3).

.2 Canadian General Standards Board (CGSB)

.1 CAN/CGSB-8.2-M88, Sieves, Testing, Woven Wire, Metric.

1.3 SUBMITTALS

.1 Submit samples of crushed stone in accordance with Section 01 33 00 – Submittal Procedures

1.4 DELIVERY, STORAGE AND HANDLING

.1 Deliver, store and handle materials in accordance with Section 01 61 00 - Common

Product Requirements

.2 Store crushed stone as and where directed by DCC Representative.

Part 2 Products

2.1 MATERIALS

.1 Granular sub-base: in accordance following requirements:

.1 Crushed, pit run or screened stone, gravel or sand consisting of hard durable

particles free from clay lumps, cementation, organic material, frozen material and

other deleterious materials.

.2 Gradations: within limits specified when tested to ASTM C136. Sieve sizes to

CAN/CGSB-8.2.

.2 Table:

Sieve Designation % Passing

50 mm 100

4.75 mm 25-85

0.425 mm 5-30

Page 104: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada CRUSHED STONE SURFACING Section 32 15 40

Construct Confidence and

Agility Course (DHTC) Page 2 of 4

DHTC 1612

UNCLASSIFIED

0.075 mm 0-10

.3 Granular base: in accordance with following requirements:

.1 Crushed stone or gravel: hard, durable, angular particles, free from clay lumps,

cementation, organic material, frozen material and other deleterious materials.

.2 Gradations: within limits specified when tested to ASTM C136 Sieve sizes to

CAN/CGSB-8.2.

.3 Table:

Sieve Designation % Passing

19 mm 100

12.5 mm 70-100

4.75 mm 40-70

2.00 mm 23-50

0.425 mm 7-25

0.075 mm 3-8

.4 Liquid limit: ASTM D4318 maximum 25.

.5 Plasticity index: ASTM D4318 maximum 6.

.4 Granular topping:

.1 Screenings: hard, durable, crushed stone particles, free from clay lumps,

cementation, organic material, frozen material and other deleterious materials.

.2 Gradations: within limits specified when tested to ASTM C136.

Sieve Designation % Passing

6 mm 100

4.75 mm 50-100

2.00 mm 30-65

0.425 mm 10-30

0.075 mm 5-10

.5 Edging: Commercial grade plastic edging.

.6 Geotextile filter: non-woven synthetic fibre fabric.

.1 Composed of: minimum 85% by mass of polypropylene or polyester.

.2 Acceptable products must meet the following technical standards:

Mechanical Properties Test Method Unit Min. Average Roll Value

MD CD

Grab Tensile Strength ASTM D4632 lbs (N) 90(401) 90(401)

Grab Tensile Elongation ASTM D4632 % 50 50

Trapezoid Tear Strength ASTM D4533 lbs (N) 40(178) 40(178)

CBR Puncture Strength ASTM D6241 lbs (N) 250 (1113)

Maximum Opening Size

Page 105: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada CRUSHED STONE SURFACING Section 32 15 40

Construct Confidence and

Agility Course (DHTC) Page 3 of 4

DHTC 1612

UNCLASSIFIED

Apparent Opening Size

(AOS)

ASTM D4751 U.S. Sieve

(mm)

50 (0.30)

Minimum Roll Value

Permittivity ASTM D4491 sec-1 2.0

Flow Rate ASTM D4491 gal/min/ft2

(l/min/m2 )

145(5907)

Minimum Test Value

UV Resistance (at 500

hours)

ASTM D4355 % strength

retained

70

.7 Acceptable product alternate will be considered in accordance with Section 01 61 00.

Alternate Products.

Part 3 Execution

3.1 SUBGRADE

.1 Ensure subgrade preparation conforms to levels and compaction required, to allow for

installation of granular base.

3.2 GEOTEXTILE FILTER

.1 Install geotextile filter to manufacturer’s written recommendations.

3.3 GRANULAR SUB-BASE

.1 Granular sub-base material minimum thickness: as indicated.

.2 Place material in uniform layers not to exceed 150 mm compacted thickness.

.1 Compact layer to 98 % Standard Density in accordance with ASTM D698.

3.4 GRANULAR BASE

.1 Granular base material thickness: as indicated.

.2 Spread and compact granular base material in uniform layers not exceeding 50 mm

compacted thickness.

.3 Compact to a density of not less than 100% Standard Density in accordance with ASTM

D698.

3.5 EDGING

.1 Install edging true to grade, in location, adjacent to grass.

Page 106: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada CRUSHED STONE SURFACING Section 32 15 40

Construct Confidence and

Agility Course (DHTC) Page 4 of 4

DHTC 1612

UNCLASSIFIED

3.6 GRANULAR TOPPING

.1 Place granular topping to compacted thickness of 12.5mm (1/2 inch) minimum.

.2 Place material in uniform layers not to exceed 25 mm compacted thickness.

.1 Compact layer to 100 % Standard Density in accordance with ASTM D698.

3.7 FIELD QUALITY CONTROL

.1 Inspection and testing of crushed stone paving: carried out by designated testing

laboratory in accordance with Section 01 45 00 General Conditions.

.2 Costs of tests: paid by the Contractor.

3.8 CLEANING

.1 Progress Cleaning: clean in accordance with Section 01 74 11 - Cleaning.

.1 Leave Work area clean at end of each day.

.2 Final Cleaning: upon completion remove surplus materials, rubbish, tools and equipment

in accordance with Section 01 74 11 - Cleaning.

.3 Waste Management: separate waste materials for recycling in accordance with Section

01 74 21 - Construction Waste Management and Disposal.

.1 Remove recycling containers and bins from site and dispose of materials at

appropriate facility.

3.9 PROTECTION

.1 Prevent damage to buildings, landscaping, trees, fences and adjacent property.

.1 Repair damages incurred.

.2 Provide access to building at all times. Co-ordinate paving schedule to minimize

interference with normal use of premises.

END OF SECTION

Page 107: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada ENGINEERED WOOD FIBRE SAFETY SURFACE Section 32 18 16.13

Construct Confidence and

Agility Course (DHTC) Page 1 of 6

DHTC 1612

1.01 GENERAL

1.02 SECTION INCLUDES

.1 Subsurface drain system.

.2 Engineered Rubber Curb Edge.

.3 Engineered Wood Fibre Safety Surfacing System

1.03 REFERENCES

.1 American Society for Testing and Materials International, (ASTM)

.1 ASTM A F 1292-09 (or most recent edition), Standard specification for Impact

Attenuation of Surfacing Materials within the Use Zone of Playground Equipment.

.2 Canadian General Standards Board (CGSB)

.1 CAN/CSA-Z614-07, Children's Play spaces and Equipment (current edition)

.3 International Play Equipment Manufacturers association (IPEMA).

1.04 SUBMITTALS

.1 Indicate:

.1 Installation and Anchoring details for:

.1 Engineered wood fibre safety surfacing system.

.2 Subsurface drain system

.3 Rubber Curb Edge

.2 Include dimensioned layout of the subsurface drain system as a submittal.

.3 Provide sample of wood fibre safety surface.

.4 Provide sample of rubber curb edge.

.5 Provide IPEMA certification documentation prior to safety surface installation.

1.05 WASTE MANAGEMENT AND DISPOSAL

.1 Remove from site and dispose of all packaging materials at appropriate recycling

facilities.

.2 Collect and separate for disposal paper plastic polystyrene corrugated cardboard

packaging material in appropriate on-site bins for recycling in accordance with Waste

Management Plan.

.3 Separate for reuse and recycling and place in designated containers Steel Metal Plastic

waste in accordance with Waste Management Plan.

.4 Place materials defined as hazardous or toxic in designated containers.

.5 Unused caulking material must be disposed of at an official hazardous material

collections site as approved by Consultant.

Page 108: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada ENGINEERED WOOD FIBRE SAFETY SURFACE Section 32 18 16.13

Construct Confidence and

Agility Course (DHTC) Page 2 of 6

DHTC 1612

.6 Unused sealant material must not be disposed of into sewer system, into streams, lakes,

onto ground or in other location where it will pose health or environmental hazard.

.7 Fold up metal banding, flatten and place in designated area for recycling.

.8 Wood cut-offs are to be diverted from landfill by disposal into on-site wood recycling bin

approved by Departmental Representative.

.9 Reusable materials are to be diverted for reuse at nearest used building materials facility

or similar type facility.

.10 Unused preservatives and fire-retardant materials are to be diverted from landfill through

disposal at a special wastes depot.

1.06 QUALITY ASSURANCE

.1 All safety surfacing material shall be new and installed in accordance with manufacturer’s

written instructions.

.2 Safety surfacing system to be installed by qualified contractor with a minimum of five (5)

years experience in engineered safety surfacing system installations. Contractor to

provide three (3) examples of completed projects similar in scope for review by DCC

Representative upon request.

.3 CSA Z614 approval for safety surfacing

.1 IPEMA Certificate.

1.07 WARRANTY

.1 Manufacturer's Warranty:

.1 Engineered wood fibre safety surface.

.2 Subsurface drain system

.3 Engineered Rubber Curb Edge

2 Products

2.01 ACCEPTABLE MANUFACTURER

.1 Acceptable product alternate will be considered in accordance with Section 01 6100.

Alternate Products

2.02 MATERIALS

.1 Subsurface drain system

.1 The drain conduit shall be of flexible, prefabricated, rounded rectangular shaped,

composite product.

.2 Drainage core shall be made of a high-density polyethylene. The core shall be

constructed using interconnected corrugated pipes that define and provide the

flow channels and structural integrity of the drain. The geotextile shall function

Page 109: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada ENGINEERED WOOD FIBRE SAFETY SURFACE Section 32 18 16.13

Construct Confidence and

Agility Course (DHTC) Page 3 of 6

DHTC 1612

only as a filter. The core of the edge drain shall conform to the following

physical property requirements:

.1 Thickness, inches ASTM D-1777 1.0

.2 Flow Rate, gpm/ft ASTM D-4716 29 (At gradient = 0.1, pressure = 10

psi for 100 hours).

.3 Compressive Strength, psf ASTM D-1621 (modified sand method) 6000

.3 The fittings used with the edge drain shall be of a snap together design. In no

case shall any drainage product be joined without the use of the manufacturers

connector designed specifically for the purpose.

.4 End caps, tee connectors and end outlet to be sized for application.

.5 End screen made of 0.3 inch by 0.3-inch square opening size, 0.063-inch gauge,

stainless steel or galvanized, welded wire mesh shall be installed in the outlet pipe.

When using galvanized welded wire mesh, the screen shall be galvanized after it

has been formed to the shape and dimensions of the pipe

.6 Geotextile for subsurface drain trench lining to be non-woven, conforming to the

following minimum average roll values:

.2 Engineered Rubber Curb Edge

.1 Rubber curb edge shall meet requirements of ASTM F-1292-99 and F355-95.

.2 Minimum dimensional standards 250mm (10.5”) height, 215mm (8.5”) width,

2.43m (96”) length.

.3 The rubber curb edge to be manufactured with minimum 90% recycled rubber

content.

.4 Anchors to be supplied to manufacturer’s written specifications.

.3 Safety Surfacing:

Weight ASTM D-3776 3.0 - 4.0

Tensile Strength ASTM D-4632 100 - 130

Elongation % ASTM D-4632 50 - 70

Puncture, lb ASTM D-751 35 - 60

Mullen Burst, psi ASTM D-3786 110 - 215

Trapezoidal Tear, lb

ASTM D-4533 40 - 42

Coefficient of

Permeability ASTM D-4491 .2 - .4 cm/sec

Flow Rate, gpm/ft2 ASTM D-4491 100 - 140

Permittivity, 1/sec ASTM D-4491 1.3 – 2.0

Apparent Opening

Size ASTM D-4751

60/70 Max. US Std

Sieve Opening

Seam Strength, lb/ft ASTM D-4595 100

Fungus ASTM G-21 No Growth

Page 110: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada ENGINEERED WOOD FIBRE SAFETY SURFACE Section 32 18 16.13

Construct Confidence and

Agility Course (DHTC) Page 4 of 6

DHTC 1612

.1 All equipment and materials to be as indicated on the drawings and shall comply

with the following standards:

.1 International Play Equipment Manufacturer’s Association (IPEMA)

.2 CAN/CSA Z614-98 Children's Playspaces and Equipment.

.2 Ground surfacing: Same installer for granular base and engineered wood fibre

safety surfacing

.1 Granular base (installed below engineered wood fibre safety surfacing)

.1 Type 1 fill (compaction gravel) compacted to 95% proctor.

.2 Thickness: Min 200mm thick.

.3 Slope: As per manufacturer of safety surface.

.2 Acceptable product alternate will be considered in accordance with

Section 01 6100. Alternate Products

.3 Engineered Wood Fibre safety surfacing shall be supplied by an

authorized distributor and delivery slips and/or a warranty certificate

from an authorized supplier are to be submitted to the Consultant prior to

installation.

.4 Engineered Wood Fibre surfacing system shall be provided as a complete

system and include wood fibre safety material, geotextile, and subsurface

drainage system by the same manufacturer.

.3 The system must meet the following conditions:

.1 Materials must be IPEMA certified Engineered Wood Fiber.

.2 Material must consist of random-sized, clean, engineered hardwood

chips. Standard wood chips or bark mulch are not acceptable.

.3 Materials must meet or exceed ASTM F1292 standards for impact -

attenuation.

.4 Materials must be certified by the CSA and approved for playground use

.5 Materials must comply with ASTM F1951 for accessibility under the

Canadians with Disabilities Act.

.6 Materials must be covered by $10,000,000.00 manufacturer’s product

liability insurance as well as provide a minimum 10- year warranty

against loss of resiliency.

.7 Manufacturer must submit assurance in writing that the use Mats does

not affect manufacturer’s product liability insurance or warranty.

.4 Mats are to be a component of safety surfacing system from same manufacturer

and any substitute must be approved by DCC Representative.

.5 Mats to be installed to manufacturer’s written instructions. Mat type must allow

anchoring.

.6 Quality Assurance: Submit manufacturer’s Certificate of Insurance for

$10,000,000 product liability, and sample warranty.

Page 111: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada ENGINEERED WOOD FIBRE SAFETY SURFACE Section 32 18 16.13

Construct Confidence and

Agility Course (DHTC) Page 5 of 6

DHTC 1612

2.03 EXECUTION

.1 Subdrain

.1 Installation of Subsurface drain is not to proceed until after the excavation/grading has

been approved by the Owner’s Representative. Notify Owner’s Representative at least

48 hours before inspection.

.2 The layout of the subsurface drain is to be marked on Site and approved by the

Owner’s Representative prior to trenching. Notify Owner’s Representative at least 48

hours before inspection.

.3 Subsurface drain within the exercise area is to be laid on the prepared surface to

facilitate cross movement of water. Subsurface drain shall be installed below

geotextile and in conformance with details provided.

.1 Exercise area to be graded to drain towards subsurface drain. This

subsurface drain is to be used in conjunction with the appropriate wood

fibre drainage layer to bring excess water out of the exercise area.

.4 Trenches are to be inspected by the Owner’s Representative prior to backfilling.

Notify Owner’s Representative at least 48 hours before inspection.

.5 Pipe is to be placed in the trench and the trench is to be backfilled according to detail

Drawings. Backfill is to be lightly tamped into place to eliminate any voids.

.6 Fittings for the subsurface drain shall be installed in accordance with manufacturer’s

recommendations.

.7 The Contractor shall be responsible for restoration of any surfaces damaged during the

Work under this section.

.8 Contractor is to protect subsurface drain from excessive weight during the duration of

construction and to repair and make good any pipe collapsed prior to acceptance.

.9 Any damaged edge drain pipe or outlet lateral will be replaced or repaired by splicing

in an undamaged section of drain at the Contractor’s expense. The repair must be in

accordance with the manufacturer’s specification and to the satisfaction of the

Owner’s Representative

.10 Outlet pit location will be within 2 metres of general location specified on drawings.

.2 Safety Surfacing System

.1 Engineered Wood Fibre shall be installed within the areas, as defined to a minimum

depth of 350 mm (after compaction). In the case where proposed exercise equipment

includes a maximum fall height greater than 2.4m (8’), depth of material to directly

correspond to maximum fall height of exercise equipment in accordance with

manufacturer’s written specifications.

.2 Installation of entire system, including engineered wood fibre, geotextile, subsurface

drainage and mats shall be done according manufacturer’s instructions. Adequate

drainage within exercise equipment area must be ensured as per same.

.3 Mud grade of exercise area shall be graded to drain to one edge of the exercise area,

and area cleared of any debris which inhibit proper drainage or installation of

products. Drainage pipe shall be installed from the subsurface drainage system

within the exercise area to run outside of the exercise area perimeter to drain into an

Page 112: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada ENGINEERED WOOD FIBRE SAFETY SURFACE Section 32 18 16.13

Construct Confidence and

Agility Course (DHTC) Page 6 of 6

DHTC 1612

existing catch basin. The cost of this shall be included in the price for the engineered

wood fibre supply and installation.

.4 Geotextile must be cut and fit around exercise equipment footings and existing trees

and shrubs. Overlap seams by 300mm.

.5 Installation shall be done by equipment sized to suit the Work being done and the

Engineered Wood Fibre shall be spread by hand as necessary in the immediate

vicinity of the exercise equipment and existing vegetation so as not to damage same.

The exercise equipment shall be swept clean to the satisfaction of the Owner’s

Representative after installation of the Engineered Wood Fibre.

.3 Engineered Rubber Curb Edge

.1 Rubber curb edge shall be installed within the areas, as defined on the Drawings in

accordance with manufacturer’s written specifications.

.2 Anchors to be installed to manufacturer’s written specifications

.4 Cleaning

.1 Upon completion of Work:

.1 Clean equipment and apparatus in accordance with Quality Control.

.2 Make good any damaged coatings and finishes.

.3 Contractor is responsible site repairs and remediation due to construction

damage to the satisfaction of the DCC Representative.

END OF SECTION

Page 113: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada TOPSOIL PLACEMENT AND GRADING Section 32 91 21

Construct Confidence and

Agility Course (DHTC) Page 1 of 5

DHTC 1612

UNCLASSIFIED

Part 1 General

1.1 REFERENCES

.1 Agriculture and Agri-Food Canada

.1 The Canadian System of Soil Classification, Third Edition, 1998.

.2 Canadian Council of Ministers of the Environment

.1 PN1340-2005, Guidelines for Compost Quality.

.3 U.S. Environmental Protection Agency (EPA)/Office of Water

.1 EPA 832R92005, Storm Water Management for Construction Activities:

Developing Pollution Prevention Plans and Best Management Practices.

1.2 DEFINITIONS

.1 Compost:

.1 Mixture of soil and decomposing organic matter used as fertilizer, mulch, or soil

conditioner.

.2 Compost is processed organic matter containing 40% or more organic matter as

determined by Walkley-Black or Loss On Ignition (LOI) test.

.3 Product must be sufficiently decomposed (i.e. stable) so that any further

decomposition does not adversely affect plant growth (C:N ratio below (25) (50)),

and contain no toxic or growth inhibiting contaminates.

.4 Composed bio-solids to: CCME Guidelines for Compost Quality, Category (A)

(B).

1.3 SUBMITTALS

.1 Provide submittals in accordance with Section 01 33 00 - Submittal Procedures.

.2 Quality control submittals:

.1 Soil Test results

.2 Samples of the products which are proposed to use for soil amendments.

.3 Quality control submittals:

.1 Soil testing: submit certified test reports showing compliance with specified

performance characteristics and physical properties as described in PART 2 -

SOURCE QUALITY CONTROL.

Page 114: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada TOPSOIL PLACEMENT AND GRADING Section 32 91 21

Construct Confidence and

Agility Course (DHTC) Page 2 of 5

DHTC 1612

UNCLASSIFIED

.2 Certificates: submit product certificates signed by manufacturer certifying

materials comply with specified performance characteristics and criteria and

physical requirements.

1.4 WASTE MANAGEMENT AND DISPOSAL

.1 Divert unused soil amendments from landfill to official hazardous material collections site

approved by DCC Representative

.2 Do not dispose of unused soil amendments into sewer systems, into lakes, streams, onto

ground or in locations where it will pose health or environmental hazard.

Part 2 Products

2.1 TOPSOIL

.1 Topsoil for seeded/sodded areas: mixture of particulates, micro-organisms and organic

matter which provides suitable medium for supporting intended plant growth.

.1 Soil texture based on The Canadian System of Soil Classification, to consist of

[20% sand, minimum 7 % clay, and contain8 % organic matter by weight.

.2 Contain no toxic elements or growth inhibiting materials.

.3 Finished surface free from:

.1 Debris and stones over 50 mm diameter.

.2 Course vegetative material, 10 mm diameter and 100 mm length,

occupying more than 2% of soil volume.

.4 Consistence: friable when moist.

2.2 SOIL AMENDMENTS

.1 Fertilizer:

.1 Chemical fertilizer with an N-P-K analysis of 1-2-1 ratio at a rate to provide 48 kg

actual Nitrogen, 96 kg actual Phosphate and 48 kg actual Potassium per hectare.

.2 Fertilizer shall be standard commercial brands meeting the requirements of the

Canada Fertilizer Act and the Canadian Fertilizer Quality Assurance Program.

.3 All Granular, pelletized or pill form; and dry and free flowing.

.4 Sand: washed coarse silica sand, medium to course textured.

.2 Peatmoss:

.1 Derived from partially decomposed species of Sphagnum Mosses.

.2 Elastic and homogeneous, brown in colour.

.3 Free of wood and deleterious material which could prohibit growth.

Page 115: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada TOPSOIL PLACEMENT AND GRADING Section 32 91 21

Construct Confidence and

Agility Course (DHTC) Page 3 of 5

DHTC 1612

UNCLASSIFIED

.4 Shredded particle minimum size: 5mm.

.3 Sand: washed coarse silica sand, medium to course textured.

.4 Organic matter: compost Category A in accordance with CCME PN1340 unprocessed

organic matter, such as rotted manure, hay, straw, bark residue or sawdust, meeting the

organic matter, stability and contaminant requirements.

.5 Use composts meeting Category B requirements for land fill reclamation and large scale

industrial applications.

.6 Limestone:

.1 Ground agricultural limestone.

.2 Gradation requirements: percentage passing by weight, 90% passing 1.0 mm

sieve, 50% passing 0.125 mm sieve.

.7 Fertilizer: industry accepted standard medium containing nitrogen, phosphorous,

potassium and other micro-nutrients suitable to specific plant species or application or

defined by soil test.

2.3 SOURCE QUALITY CONTROL

.1 Advise DCC Representative of sources of topsoil to be utilized with sufficient lead time

for testing.

.2 Contractor is responsible for amendments to supply topsoil as specified.

.3 Soil testing by recognized testing facility for PH, P and K, and organic matter.

.4 Testing of topsoil will be in accordance with Section 01 45 00 General Conditions

.1 Soil sampling, testing and analysis to be in accordance with Provincial standards.

Part 3 Execution

3.1 TEMPORARY EROSION AND SEDIMENTATION CONTROL

.1 Provide temporary erosion and sedimentation control measures to prevent soil erosion and

discharge of soil-bearing water runoff or airborne dust to adjacent properties and

walkways, according to requirements of authorities having jurisdiction, specific to site,

that complies with EPA 832/R-92-005 or requirements of authorities having jurisdiction,

whichever is more stringent.

.2 Inspect, repair, and maintain erosion and sedimentation control measures during

construction until permanent vegetation has been established.

Page 116: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada TOPSOIL PLACEMENT AND GRADING Section 32 91 21

Construct Confidence and

Agility Course (DHTC) Page 4 of 5

DHTC 1612

UNCLASSIFIED

.3 Remove erosion and sedimentation controls and restore and stabilize areas disturbed

during removal.

3.2 STRIPPING OF TOPSOIL

.1 Begin topsoil stripping of areas as directed by DCC Representative after area has been

cleared of brush, weeds and grasses and removed from site.

.2 Strip topsoil to depths as indicated

.1 Avoid mixing topsoil with subsoil where textural quality will be moved outside

acceptable range of intended application.

.3 Stockpile in locations as directed by DCC Representative.

.1 Stockpile height not to exceed 1.8m.

.4 Disposal of unused topsoil is to be in an environmentally responsible manner but not used

as landfill as directed by DCC Representative. Protect stockpiles from contamination and

compaction.

3.3 PREPARATION OF EXISTING GRADE

.1 Verify that grades are correct.

.1 If discrepancies occur, notify DCC Representative and do not commence work

until instructed by DCC Representative.

.2 Grade soil, eliminating uneven areas and low spots, ensuring positive drainage.

.3 Remove debris, roots, branches, stones in excess of 50mm diameter and other deleterious

materials.

.1 Remove soil contaminated with calcium chloride, toxic materials and petroleum

products.

.2 Remove debris which protrudes more than 75mm above surface.

.3 Dispose of removed material off site.

.4 Cultivate entire area which is to receive topsoil to minimum depth of 100mm.

.1 Cross cultivate those areas where equipment used for hauling and spreading has

compacted soil.

3.4 PLACING AND SPREADING OF TOPSOIL/PLANTING SOIL

.1 Place topsoil after DCC Representative has accepted subgrade.

.2 Spread topsoil in uniform layers not exceeding 150 mm.

Page 117: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada TOPSOIL PLACEMENT AND GRADING Section 32 91 21

Construct Confidence and

Agility Course (DHTC) Page 5 of 5

DHTC 1612

UNCLASSIFIED

.3 For sodded areas keep topsoil 15mm below finished grade.

.4 Spread topsoil as indicated to following minimum depths after settlement.

.1 150 mm for seeded areas.

.2 135 mm for sodded areas.

.5 Manually spread topsoil/planting soil around trees, shrubs and obstacles.

3.5 FINISH GRADING

.1 Grade to eliminate rough spots and low areas and ensure positive drainage.

.1 Prepare loose friable bed by means of cultivation and subsequent raking.

.2 Consolidate topsoil to required bulk density using equipment approved by DCC

Representative.

.1 Leave surfaces smooth, uniform and firm against deep footprinting.

3.6 ACCEPTANCE

.1 DCC Representative will inspect and test topsoil in place and determine acceptance of

material, depth of topsoil and finish grading.

.2 Contractor is responsible for repairing areas damaged during construction to the

satisfaction of the DCC Representative.

3.7 SURPLUS MATERIAL

.1 Dispose of materials except topsoil not required where directed by DCC Representative.

3.8 CLEANING

.1 Upon completion of installation, remove surplus materials, rubbish, tools and equipment

barriers.

.2 Restore stockpile sites acceptable to DCC Representative.

END OF SECTION

Page 118: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

This page is intentionally left blank.

Page 119: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada SODDING Section 32 92 23

Construct Confidence and

Agility Course (DHTC) Page 1 of 5

DHTC 1612

UNCLASSIFIED

Approved:

Part 1 General

1.1 RELATED REQUIREMENTS

.1 Section 32 91 21 – Topsoil Placement and Grading

1.2 QUALITY ASSURANCE

.1 Test Reports: certified test reports showing compliance with specified performance

characteristics and physical properties.

.2 Certificates: product certificates signed by manufacturer certifying materials comply with

specified performance characteristics and criteria and physical requirements.

.3 Pre-Installation Meetings: conduct pre-installation meeting to verify project

requirements, installation instructions and warranty requirements.

1.3 SCHEDULING

.1 Schedule sod laying to coincide with preparation of soil surface.

.2 Schedule sod installation when frost is not present in ground.

1.4 WASTE MANAGEMENT AND DISPOSAL

.1 Divert unused fertilizer from landfill to official hazardous material collections site.

.2 Do not dispose of unused fertilizer into sewer systems, into lakes, streams, onto ground

or in locations where it will pose health or environmental hazard.

1.5 WARRANTY

.1 Warranty on sodded areas for one year after the recognized completion date.

.2 Sod which is not green at the end of the warranty period shall be replaced at no additional

cost to Contract.

Part 2 Products

2.1 MATERIALS

.1 Turf grass sod with a mineral soil layer containing a minimum of 70% percent inorganic

soil. Upon delivery or 30 days following delivery, the salinity rating shall be less than 4.0

mm hos/cm on a saturated paste basis. The pH range shall be between 6.0 – 8.0. Sod

supplied shall have been sown in nursery fields with Canada Certified No. 1 or Canada

Certified No. 2 grass seed and mixed by percentage of weight to meet the following

certified seed blends or mixtures:

.1 Turf Grass Nursery Sod types:

Page 120: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada SODDING Section 32 92 23

Construct Confidence and

Agility Course (DHTC) Page 2 of 5

DHTC 1612

UNCLASSIFIED

.1 Number One Kentucky Bluegrass Sod - Fescue Sod: Nursery Sod grown

solely from seed mixture of cultivars of Kentucky Bluegrass and

Creeping Red Fescue, containing not less than 95% Kentucky Bluegrass

cultivars and 5% Creeping Red Fescue. The thickness of the soil portion

of sod shall be 25 mm.

.2 Any variations to the above referenced seed blends or mixtures shall be

approved by the DCC Representative prior to placement of sod.

.2 Turf Grass Nursery Sod quality:

.1 Not more than two broadleaf weeds or ten other weeds per 40 m².

.2 Density of sod sufficient so that no soil is visible from height of 1500

mm when mown to height of 50 mm.

.3 Mowing height limit: 35 to 65 mm.

.4 A uniform inorganic soil layer thickness of not less than 12 mm and not

greater than 19 mm and shall be consistent throughout all loads delivered

to the work site.

.5 Organic thatch layer within the sod shall not exceed an uncompressed

thickness of 12 mm and in all cases, the final rolled and compacted

topsoil/sod growing medium shall be maintained at not less than 100 mm

in depth.

.6 Turf grass sod shall be free of disease, turf damaging insects and any

grass species, strains or cultivars other than specified herein.

.2 Water:

.1 Coordinate and arrange water source that is clean and potable.

.3 Fertilizer:

.1 To Canada "Fertilizers Act" and "Fertilizers Regulations"

.2 Complete, synthetic, slow release with 65% of nitrogen content in

water-insoluble form

.4 Herbicides: not permitted.

.5 Insecticides: not permitted.

2.2 SOURCE QUALITY CONTROL

.1 Obtain approval from DCC Representative for sod at source.

.2 When proposed source of sod is approved, use no other source without written

authorization from DCC Representative.

Page 121: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada SODDING Section 32 92 23

Construct Confidence and

Agility Course (DHTC) Page 3 of 5

DHTC 1612

UNCLASSIFIED

Part 3 Execution

3.1 PREPARATION

.1 Verify that grades are correct and prepared in accordance with Section 32 91 21 - Topsoil

Placement and Grading. If discrepancies occur, notify DCC Representative and do not

commence Work until instructed by DCC Representative.

.2 Do not perform work under adverse field conditions such as frozen soil, excessively wet

soil or soil covered with snow, ice, or standing water.

.3 Fine grade surface free of humps and hollows to smooth, even grade, elevations

indicated, to tolerance of plus or minus 8 mm, for Turf Grass Nursery Sod

.4 Remove and dispose of weeds; debris; stones 50 mm in diameter and larger; soil

contaminated by oil, gasoline and other deleterious materials in accordance with waste

management and disposal requirements.

3.2 SOD PLACEMENT

.1 Lay sod during growing season. Sodding during dry summer, freezing temperatures or

over frozen soil is not acceptable.

.2 Lay sod within 24 hours of being lifted if air temperature exceeds 20 degrees C.

.3 Lay sod sections in rows, perpendicular to slope, joints staggered. Butt sections closely

without overlapping or leaving gaps between sections. Cut out irregular or thin sections

with sharp implements.

.4 Roll sod as directed by DCC Representative. Provide close contact between sod and soil

by light rolling. Use of heavy roller to correct irregularities in grade is not permitted.

.5 The sod shall be placed evenly and closely packed together, leaving no open joints and no

overlap on adjacent pieces of sod. A full row of sod, not less than 450 mm in width shall

be placed along the perimeter of the sodded area, parallel to planting or walkway areas.

.6 Where big roll sod is to be placed, ensure that any reinforcement netting that may be used

to assist with the harvesting or placement of the sod roll is removed before final

placement of the sod.

.7 Water immediately after sod laying to obtain moisture penetration through sod into top

100 mm of topsoil.

.8 All visible joints, low, bare or dead spots shall be repaired to the satisfaction of the DCC

Representative prior to the commencement of the maintenance period.

.9 Sodding operations shall be completed within two working days after placing the sod.

This shall be deemed to include watering, rolling, and repairing any visible joints and

low, bare or dead spots within the sodded area.

3.3 SOD PLACEMENT ON SLOPES AND PEGGING

.1 Start laying sod at bottom of slopes.

Page 122: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada SODDING Section 32 92 23

Construct Confidence and

Agility Course (DHTC) Page 4 of 5

DHTC 1612

UNCLASSIFIED

.2 Peg sod in all areas where slope exceeds 10%.

3.4 FERTILIZING PROGRAM

.1 Fertilize during establishment and warranty periods to program as approved by the DCC

Representative.

.2 During both the placement and maintenance of sod, all sidewalks, streets, approaches,

driveways and properties near the sodding operation shall be kept clean at all times by the

Contractor.

.3 Upon completion of installation, remove surplus materials, rubbish, tools and equipment

barriers.

3.5 WATERING AND ROLLING

.1 Immediately after placement of sod, water the area in sufficient quantities and

frequencies required to obtain root development and sod growth. All costs to provide

water for sodded areas shall be borne by the Contractor. These costs may include hydrant

permit and meter rental fees.

.2 After the sod and topsoil has dried sufficiently to prevent damage, the areas shall be

rolled (the edges pounded if necessary) with a mechanical roller minimum weight of

220kg and minimum width of 760mm to form a uniform even surface and level with

adjoining existing grades, sidewalks and curbs. heavy rolling to correct irregularities in

grade will not be permitted. Sodded areas near existing fixtures that are unable to be

rolled shall be thoroughly tamped to ensure a good bond between topsoil and sod.

3.6 MAINTENANCE DURING ESTABLISHMENT PERIOD

.1 Maintain sod areas from the start of Work until a full 30 days after the recognized

completion date. Contractor shall provide and pay for continuous maintenance of the

sodded area until the criteria specified for termination of the maintenance period has been

met.

.2 Perform following operations from time of installation until acceptance.

.1 Water sodded areas in sufficient quantities and at frequency required to maintain

optimum soil moisture condition to depth of 75 to 100 mm.

.2 Cut grass to 50 mm when or prior to it reaching height of 75 mm. Remove

clippings which will smother grassed areas.

.3 Maintain sodded areas weed free 95%.Control weeds by mechanical means only

utilizing acceptable integrated pest management practices. Chemical herbicides

and pesticides are not permitted.

.4 Fertilize areas in accordance with fertilizing program. Spread half of required

amount of fertilizer in one direction and remainder at right angles and water in

well.

Page 123: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada SODDING Section 32 92 23

Construct Confidence and

Agility Course (DHTC) Page 5 of 5

DHTC 1612

UNCLASSIFIED

3.7 ACCEPTANCE

.1 Turf Grass Nursery Sod areas will be accepted by DCC Representative provided that:

.1 Sodded areas are properly established.

.2 Sod is free of bare and dead spots.

.3 No surface soil is visible from height of 1500 mm when grass has been cut to

height of 50 mm.

.4 Sodded areas have been cut minimum two times prior to acceptance.

.2 Areas sodded in fall will be accepted in following spring one month after start of growing

season provided acceptance conditions are fulfilled.

.3 Any areas sodded after September 15th which do not show an even stand of live growth

and/or adequate root development in that year shall have the maintenance period

commence on May 15th of the following year or such date as mutually agreed upon by all

parties, at which time all sod must show an even stand of live growth. Deficient sod shall

be replaced and the area so replaced shall be further maintained for a period of thirty (30)

days. Maintenance shall be understood to include replacement of damaged or vandalized

area and any required spring clean-up.

3.8 MAINTENANCE DURING WARRANTY PERIOD

.1 Perform following operations from time of acceptance until end of warranty period:

.1 Water sodded areas at weekly intervals to obtain optimum soil moisture

conditions to depth of 100 mm.

.2 Repair and r-sod dead or bare spots to satisfaction of DCC Representative.

.3 Cut grass and remove clippings that will smother grass as directed by DCC

Representative to height as follows:

.1 Sod: 50 mm during normal growing conditions.

.2 Cut grass at two week intervals or as directed by DCC Representative,

but at intervals so that approximately one third of growth is removed in

single cut.

.3 Fertilize areas in accordance with fertilizing program. Spread half of

required amount of fertilizer in one direction and remainder at right

angles and water in well.

.4 Control weeds by mechanical means only utilizing acceptable integrated

pest management practices. Chemical herbicides and pesticides are not

permitted.

END OF SECTION

Page 124: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

This page is intentionally left blank.

Page 125: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada SUBDRAINAGE PIPING Section 33 46 16

Construct Confidence and

Agility Course (DHTC) Page 1 of 4

DHTC 1612

UNCLASSIFIED

Part 1 General

1.1 RELATED REQUIREMENTS

.1 Section 31 23 33.01 – Excavating, Trenching and Backfilling.

1.2 MEASUREMENT AND PAYMENT

.1 All work associated with supply and installation of the subgrade drainage network is

included in the lump sum price for the project.

1.3 REFERENCES

.1 Ontario Provincial Standard Specifications (OPSS):

.1 OPSS 405 (November 2008), Pipe Subdrains.

.2 OPSS 1840 (November 2015), Non-Pressure Polyethylene Plastic Pipe Products.

.3 OPSS.MUNI 410 (November 2015), Pipe Sewer Installation in Open Cut.

.4 OPSS.MUNI 1004 (November 2013), Aggregates – Miscellaneous.

.5 OPSS.MUNI 1010 (November 2013), Aggregates – Base, Subbase, Select

Subgrade, and Backfill Material.

.6 OPSS.MUNI 1860 (April 2018), Geotextiles.

.2 CSA International

.1 CAN/CSA-B1800-18, Thermoplastic Nonpressure Pipe Compendium.

1.4 ADMINISTRATIVE REQUIREMENTS

.1 Inform Departmental Representative of proposed source of bedding materials and provide

access for sampling at least 2 weeks prior to commencing work.

1.5 ACTION AND INFORMATIONAL SUBMITTALS

.1 Submit in accordance with Section 01 33 00 - Submittal Procedures.

.2 Product Data:

.1 Submit manufacturer's instructions, printed product literature and data sheets for

pipes, pipe fittings, and aggregate and include product characteristics,

performance criteria, physical size, finish and limitations.

.3 Certificates:

.1 Submit manufacturer's certification that drain pipe materials meet requirements

of this Section.

.2 Certification to be marked on pipe.

1.6 DELIVERY, STORAGE AND HANDLING

.1 Deliver, store and handle materials in accordance with manufacturer's written

instructions.

Page 126: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada SUBDRAINAGE PIPING Section 33 46 16

Construct Confidence and

Agility Course (DHTC) Page 2 of 4

DHTC 1612

UNCLASSIFIED

.2 Delivery and Acceptance Requirements: deliver materials to site in original factory

packaging, labelled with manufacturer's name and address.

.3 Storage and Handling Requirements:

.1 Store materials in accordance with manufacturer's recommendations.

.2 Store and protect pipes from damage.

.3 Replace defective or damaged materials with new.

Part 2 Products

2.1 MATERIALS

.1 Perforated plastic pipe and fittings: to CAN/CSA-B1800 and OPSS 1840. Nominal pipe

size 150 mm. Pipe to be double walled, with smooth inside and corrugated outside.

Minimum stiffness of 210 kPa. Pipe installed within limits of obstacle course to be

perforated and provided with manufacturer supplied geotextile filter sock. Pipes installed

outside of limits of obstacle course to be non-perforated, and installed with 100mm thick

granular bedding and 150mm thick granular cover.

.2 Bedding, surround and cover material for pipes installed outside of obstacle course limits

shall be OPSS.MUNI 1010 Granular A material.

.3 Drainage layer clear stone and associated geotextile to be in accordance with material

specifications of drainage system provided by the supplier of the engineered wood fibre

system.

.4 Clear stone fill for seepage pits shall be 53mm material in accordance with Table 2 of

OPSS.MUNI 1004.

.5 Geotextile wrap for seepage pits to be in accordance with OPSS.MUNI 1860, Class 1,

non-woven, FOS of 0.3mm.

.6 Permanent, semi-rigid erosion control mats, complete with sod and integral soil anchors,

designed to prevent soil and vegetation loss resulting from excessive water flow (velocity

and shear stress), with system conforming to the following requirements:

.1 Mass/unit area: Minimum of 4.5 kg/m2 as per ASTM D6566.

.2 Thickness: Minimum of 11.5mm as per ASTM D6525.

.3 Wide width tensile strength: Minimum of 4 Kn/m as per ASTM D4595.

.4 Percent open area: 40 to 60%.

.5 UV Stability: Minimum of 85% as per ASTM C4355.

.6 Manning’s “n” value: 0.035 to 0.045

.7 Culvert outfall test exit velocity: Minimum of 4.8 m/sec.

.8 Velocity Day 1 performance, fully vegetated: Minimum of 5.5 m/sec.

.9 Shear Day 1 performance, fully vegetated: Minimum of 63 kg/m2.

Page 127: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada SUBDRAINAGE PIPING Section 33 46 16

Construct Confidence and

Agility Course (DHTC) Page 3 of 4

DHTC 1612

UNCLASSIFIED

Part 3 Execution

3.1 EXAMINATION

.1 Verification of Conditions: verify that conditions of substrate previously installed under

other Sections or Contracts are acceptable for sub-drainage piping installation in

accordance with manufacturer's written instructions.

.1 Visually inspect substrate in presence of Departmental Representative.

.2 Inform Departmental Representative of unacceptable conditions immediately

upon discovery.

.3 Proceed with installation only after unacceptable conditions have been remedied

and after receipt of written approval to proceed from Departmental

Representative.

3.2 TRENCHING

.1 Do excavating, trenching and backfilling in accordance with Section 31 23 33.01 -

Excavating, Trenching and Backfilling.

.2 Place geotextile material and granular material after approval of trench or excavation by

Departmental Representative.

3.3 BEDDING

.1 Place 100 mm layer of bedding material for non-perforated pipe to full trench width, and

compact to minimum 95% of maximum density to ASTM D698.

3.4 INSTALLATION OF PIPE SUB-DRAINS

.1 Lay pipe drains on prepared bed, true to line and grade with inverts smooth and free of

sags or high points.

.1 Ensure barrel of each pipe is in contact with bed throughout full length.

.2 Begin laying at outlet and proceed in upstream direction.

.3 Lay perforated pipes with perforations downwards.

.4 Make joints tight in accordance with manufacturer's instructions.

.5 Plug open upstream ends of pipes with watertight concrete, steel or wood bulkheads.

.6 Surround non-perforated pipe with bedding gravel and compact as per requirements

noted on Section 31 23 33.01 – Excavating, Trenching and Backfilling.

.7 Perforated pipe to be supplied with pre-installed geotextile filter provided by pipe

supplier.

.8 Backfill remainder of trench to Section 31 23 33.01 - Excavating, Trenching and

Backfilling.

.9 Do not place bedding surround and backfill materials in frozen condition.

.10 Protect sub-drains against flotation during installation.

Page 128: Construction Documents Specification National Defence · .2 Shop Drawings, Samples. .3 Earthwork and subgrade drainage. .4 Foundations. .5 Structures. .6 Topsoil and finishing grading.

UNCLASSIFIED

Government of Canada SUBDRAINAGE PIPING Section 33 46 16

Construct Confidence and

Agility Course (DHTC) Page 4 of 4

DHTC 1612

UNCLASSIFIED

3.5 INSTALLATION OF SEEPAGE PITS

.1 Excavate and install seepage pits in locations shown and to dimensions indicated in

drawing package. Overlap geotextile surround material a minimum of 300mm.

3.6 INSTALLATION OF EROSION CONTROL MATS

.1 Install erosion control mats in accordance with manufacturer’s installation instructions.

3.7 CLEANING

.1 Progress Cleaning:

.1 Leave Work area clean at end of each day.

.2 Final Cleaning: upon completion remove surplus materials, rubbish, tools and equipment.

END OF SECTION