![Page 1: Construction Documents ACT 380 1. Objective To acquire a basic understanding of the contents and relationship between the documents which make up the.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649ec95503460f94bd65ce/html5/thumbnails/1.jpg)
Construction Documents
ACT 380
1
![Page 2: Construction Documents ACT 380 1. Objective To acquire a basic understanding of the contents and relationship between the documents which make up the.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649ec95503460f94bd65ce/html5/thumbnails/2.jpg)
Objective
To acquire a basic understanding of the contents and relationship between the documents which make up the Construction Documents
2
![Page 3: Construction Documents ACT 380 1. Objective To acquire a basic understanding of the contents and relationship between the documents which make up the.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649ec95503460f94bd65ce/html5/thumbnails/3.jpg)
CONSTRUCTION DOCUMENTS
O Written and graphic documentsO Prepared or assembled by A/EO Communicate the design of the
projectO Used to administer the contract for
construction
3
![Page 4: Construction Documents ACT 380 1. Objective To acquire a basic understanding of the contents and relationship between the documents which make up the.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649ec95503460f94bd65ce/html5/thumbnails/4.jpg)
CONSTRUCTION DOCUMENTS
O TWO PARTSO Procurement RequirementsO Contract Documents
4
![Page 5: Construction Documents ACT 380 1. Objective To acquire a basic understanding of the contents and relationship between the documents which make up the.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649ec95503460f94bd65ce/html5/thumbnails/5.jpg)
Procurement Requirements
O Are used to attract bidders and explain the procedures to follow in preparing and submitting bids
O The (procurement) bidding requirements should NOT contain contracting requirements
5
![Page 6: Construction Documents ACT 380 1. Objective To acquire a basic understanding of the contents and relationship between the documents which make up the.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649ec95503460f94bd65ce/html5/thumbnails/6.jpg)
Procurement Requirements con’t
O They help builders follow established procedures and submit bids that will not be disqualified because of technicalities
6
![Page 7: Construction Documents ACT 380 1. Objective To acquire a basic understanding of the contents and relationship between the documents which make up the.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649ec95503460f94bd65ce/html5/thumbnails/7.jpg)
Procurement Requirements
O SolicitationO Instructions for procurementO Information available including
resource drawingsO Procurement forms and supplementsO Addenda
7
![Page 8: Construction Documents ACT 380 1. Objective To acquire a basic understanding of the contents and relationship between the documents which make up the.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649ec95503460f94bd65ce/html5/thumbnails/8.jpg)
Contract DocumentsO The LEGALLY ENFORCEABLE
requirements that become part of the contract when the agreement is signed
O They include all of the construction documents EXCEPT procurement requirements
8
![Page 9: Construction Documents ACT 380 1. Objective To acquire a basic understanding of the contents and relationship between the documents which make up the.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649ec95503460f94bd65ce/html5/thumbnails/9.jpg)
Key Points to NoteO An important principle of
specification writing is that each requirement should be stated only ONE time and in the right place (should not be repeated in any of the other documents)
O Doing this will simplify retrieving information and avoid possible conflicts and discrepancies
9
![Page 10: Construction Documents ACT 380 1. Objective To acquire a basic understanding of the contents and relationship between the documents which make up the.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649ec95503460f94bd65ce/html5/thumbnails/10.jpg)
Coordinating Construction Documents
O A useful reference for coordinating construction documents was prepared by EJCDC and published by EJCDC (Document N-122) and AIA (Document A521)
O For each subject included in the construction documents, a suggested primary location and, if needed, a secondary location is shown. See page 5.82 Figure 5.9-D for example of Uniform Location of Subject Matter form
10
![Page 11: Construction Documents ACT 380 1. Objective To acquire a basic understanding of the contents and relationship between the documents which make up the.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649ec95503460f94bd65ce/html5/thumbnails/11.jpg)
CONTRACT DOCUMENTS
O Contract FormsO Conditions of the Contract (General
& Supplementary)O Specifications – DIV 2-49O DrawingsO AddendaO Contract Modifications
11
![Page 12: Construction Documents ACT 380 1. Objective To acquire a basic understanding of the contents and relationship between the documents which make up the.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649ec95503460f94bd65ce/html5/thumbnails/12.jpg)
CONTRACT DOCUMENTS
O Contract FormsAgreement -- written document signed by the
owner and the contractor binding them into a legal contract
Performance Bond – provides a guarantee that if the contractor defaults or fails to perform, there will be funds to complete the contract terms
Payment Bond – provides a guarantee that subcontractors, material suppliers, and other providing labor, goods, and services for the project…will be paid
Certificates – may include insurance and certificates of compliance with applicable laws and regulations
12
![Page 13: Construction Documents ACT 380 1. Objective To acquire a basic understanding of the contents and relationship between the documents which make up the.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649ec95503460f94bd65ce/html5/thumbnails/13.jpg)
CONTRACT DOCUMENTS
O Conditions of the ContractGeneral Conditions AIA A201
- general clauses that establish how the project is to be administered; contain provisions that are common practice in the United States
Supplementary Conditions- modify or supplement the general conditions as needed to provide for requirements specific to a project (e.g. insurance requirements and wage rates)
13
![Page 14: Construction Documents ACT 380 1. Objective To acquire a basic understanding of the contents and relationship between the documents which make up the.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649ec95503460f94bd65ce/html5/thumbnails/14.jpg)
CONTRACT DOCUMENTS
O Project SpecificationsO Contract DrawingsO AddendaO Modifications
O Change OrdersO Construction Change DirectivesO Architect’s Supplemental
Instructions
14
![Page 15: Construction Documents ACT 380 1. Objective To acquire a basic understanding of the contents and relationship between the documents which make up the.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649ec95503460f94bd65ce/html5/thumbnails/15.jpg)
Contract ModificationsOCan be WRITTEN or GRAPHICOAFTER Contract is SignedOTYPES OF MODIFICATIONS
O Change Orders (American Institute of Architects OR Engineers Joint Contract Documents Committee)
O Construction Change Directive (AIA) OR Work Change Directive (EJCDC)
O Written Amendment (EJCDC)15
![Page 16: Construction Documents ACT 380 1. Objective To acquire a basic understanding of the contents and relationship between the documents which make up the.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649ec95503460f94bd65ce/html5/thumbnails/16.jpg)
16
The Basic Relationships Among the Various Documents
See page 5.3 –Figure 5.1-A for overview graphic
![Page 17: Construction Documents ACT 380 1. Objective To acquire a basic understanding of the contents and relationship between the documents which make up the.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649ec95503460f94bd65ce/html5/thumbnails/17.jpg)
Project ManualOAIA coined the phrase in 1964O INCLUDES: See page 5.75 Fig 5.9-
AO Introductory Info --listsO Procurement Req. --bidding formsO Contracting Req. -- contract forms,
conditions of the contractO Specifications
OProcurement Requirements are often bound in the manual, but are NOT part of the Contract Documents
17
![Page 18: Construction Documents ACT 380 1. Objective To acquire a basic understanding of the contents and relationship between the documents which make up the.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649ec95503460f94bd65ce/html5/thumbnails/18.jpg)
Problems Which May Arise if Incomplete Coordination of Design Team & Incorrect
Construction DocumentsO Duplications – part of work is specified in
multiple locationsO Omissions – information that is excludedO Discrepancies – conflicting information in the
contract documentsO Division 1 Responsibility – Division 1-General
Requirements is usually the responsibility of the design team leader, it affects all divisions and requires input from all disciplines
O Terminology Differences – it is not uncommon for the terms on drawings and specifications to differ because they are not prepared by the same person
18