Construction Design 2011

13
E01 Existing Brick Wall Replaced with Fence DP CP CD P01 Proposed Office Building Existing Single Storey Building Existing Double Storey Residential Building Existing Double Storey Residential Building Existing Double Storey Residential Building Existing Single Storey Building Existing Trees Removed CP P02 P03 2960 2400 2400 2300 1900 4500 VIF 3632 1233 SP1 SP3 SP2 19.23m 96°32’20’’ 19.21m 276°35’00’’ 18.07m 6°27’30’’ 18.02m 6°22’20’’ Remove Existing Fence 3806 877 Refer to Landscape Architect Refer to Landscape Architect New Retaining Wall Holmwood Place Union Place LPD 44.47 43.44 44.38 Scale Tutor Drawn by Date Project Description: Notes: ABPL-30041 Construction Design Student No: 320815 Name: Xiaolan Wang Tutor: Tim Derham Group: 1 Scheme: 1 Sheet Size A2 Project Address: Commercial Office Building Development - Scheme 1 1 Holmwood Place, Carlton 3053 VIC 1 : 100 Site Plan 1/MAY/2011 Xiaolan Wang Tim Derham A01 No. Description Date N o r th 1 : 100 Site 1 CP - Concrete Paving CD - Concrete Driveway P01, P02, P03 - Carpark E01 - Sewerage Easement SP1, SP2 - Telecommunication Service Pit SP3 - Sewerage Service Pit DP - Downpipe Sewerage Pipe Fence Line 1 Preliminary Submission 3/May Site Area: 351.43 sqr.m Building Coverage: 133.59 sqr.m LPD - Legal Point of Discharge 2 Final Submission 19/May

description

 

Transcript of Construction Design 2011

Page 1: Construction Design 2011

E01

Existing Brick Wall Replacedwith Fence

DP

CP

CD P01

Proposed Office Building

Existing Single StoreyBuilding

Existing Double StoreyResidential Building

Existing Double StoreyResidential Building

Existing Double StoreyResidential Building

Existing Single StoreyBuilding

Existing Trees Removed

CP

P02

P032960

2400

2400

2300

1900 4500 VIF

3632

1233

SP1SP3

SP2

19.23m

96°32’20’’

19.21m

276°35’00’’

18.0

7m

6°2

7’3

0’’

18.0

2m

6°2

2’2

0’’

Remove Existing Fence

3806

877

Refer to LandscapeArchitect

Refer to LandscapeArchitect

New Retaining Wall

Holmwood Place

Union Place

LPD

44.47

43.44

44.38

Scale

Tutor

Drawn by

Date

Project Description:

Notes:

ABPL-30041ConstructionDesign

Student No: 320815Name: Xiaolan Wang

Tutor: Tim DerhamGroup: 1Scheme: 1

Sheet Size A2

Project Address:

Commercial Office BuildingDevelopment - Scheme 1

1 Holmwood Place, Carlton 3053 VIC

1 : 100

Site Plan1/MAY/2011

Xiaolan Wang

Tim Derham

A01

No. Description Date

North

1 : 100

Site1

CP - Concrete PavingCD - Concrete DrivewayP01, P02, P03 - CarparkE01 - Sewerage EasementSP1, SP2 - Telecommunication Service PitSP3 - Sewerage Service PitDP - Downpipe

Sewerage Pipe

Fence Line

1 Preliminary Submission 3/May

Site Area: 351.43 sqr.mBuilding Coverage: 133.59 sqr.m

LPD - Legal Point of Discharge

2 Final Submission 19/May

Page 2: Construction Design 2011

A05

1

A061A08 1

A07

1

A B C D E F

1

2

3

4

D

1

D

2

D

6

D

7

D

8

D

5

D

4

D

3

CW

10

CW

9

CW

8

CW

7

CW

6

CW

11

CW

12

CW

13

CW

14

CW

1

CW

2

CW

3

CW

4

CW

5

W

2W

1

W

3

W

4

A

A09

A

A09

B

A10

B

A10

C

A11

18300

3100 2980 3600 5896 2280

300 1400 150 1400 150 1400 150 1275 150 1080 740 4950 150 4705 300

18300

3100 2980 3600 5896 2280

300 1400 150 1400 150 1400 150 1275 150 2215 4300 1425 95140 2600 850 300

300 VIF VIF150 1400 150 1400 150 1275 250 1830 285 EQ EQ EQ 1660 1300 1300 1150

1890 1304 3661 2700 95 2045 300

7300

1435

4145

1420

300

1703

95

2328

150

946

79

1400

300

7300

1650

4000

1650

OVEROVER OVER OVER

11215 740 300 740 405 2400 220 1900 380

FLOOR ABOVE

Wall

Type 1

Wall

Type 2

Wall

Type 3

Belo

w L

andin

g

RL 44.47

RL 43.44

RL 45.71

Exhibition and Meeting Area

Reception

Kitchenette

Storage

Toilet

FFL 45.71

FFL 45.71

FFL 45.71

FFL 45.71

FFL 45.71

FW

FW

FW

Finish: PC

Finish: PC

Finish: CT

Finish: PC

Finish: CT

FW

1

2

3

4

1 2 3 4 5 6 7 8 9 10 11 12

18 17 16 15 14 13

FFL 45.71

G

J

I

7

6

5

EX

PO

SE

D B

EA

M A

BO

VE

H

Scale

Tutor

Drawn by

Date

Project Description:

Notes:

ABPL-30041ConstructionDesign

Student No: 320815Name: Xiaolan Wang

Tutor: Tim DerhamGroup: 1Scheme: 1

Sheet Size A2

Project Address:

Commercial Office BuildingDevelopment - Scheme 1

1 Holmwood Place, Carlton 3053 VIC

1 : 50

Ground Floor Plan1/MAY/2011

Xiaolan Wang

Tim Derham

A02

No. Description Date

1 : 50

Ground FloorA

North

D - DoorW - WindowCW - Curtain Window

Wall Type 1 - 300mm Precast Concrete Thermal Mass Wall

Wall Type 2 - 150mm Precast Concrete PanelWall Type 3 - 90mm Interior Partition WallWall Type 4 - Metal Frame Wall w/ Corten Rusted

Metal Finishing on Both Sides

Finish: PC - Polished Concrete Floor FinishFinish: CT - Ceramic Tile Floor FinishFinish: TB - Timber Board Floor FinishFinish: GC - General Carpet Floor FinishFinish: RM - Corten Rusted Metal Floor Finish

RL - Relative LevelFFL - Finished Floor LevelFW - Floor Waste

1 Preliminary Submission 3/May

2 Final Submission 19/May

Page 3: Construction Design 2011

A05

1

A061A08 1

A07

1

A B C D E F

1

2

3

4

D

9

D

10

D

11

D

12 CW

19CW

20CW

21CW

22 CW

23

CW

17 CW

18

CW

16

CW

15

CW

30

CW

29

CW

28

CW

27

CW

25

CW

24

D

13

A

A09

A

A09

B

A10

B

A10

C

A11

1

A13

16210

160

3423

95

3653

95

8625

160

230

VIF / EQ

1118

VIF / EQ

1118

VIF / EQ

111895

VIF / EQ

1218

VIF / EQ

1218

VIF / EQ

121895

VIF / EQ

1426

VIF / EQ

1426

VIF / EQ

1426

VIF / EQ

1426

VIF / EQ

1426

VIF / EQ

1426

105.00°

15.00°

10030

4090

1830100160

6985

160

5604

126

935

130

5320

Wall

Type 1

Wall

Typ

e 3

Wall

Typ

e 4

FFL 77.51

Deck

FFL 77.71

General Office

FFL 77.71

Manager's Office

FFL 77.71

Board Room

Void

Finish: GC

Finish: GC

Finish: GC

Finish: RM

Finish: PC

Fall Minimal

1 2 3 4 5 6 7 8 9 10 11 12

18 17 16 15 14 13

FFL 77.51

Fall Min.

G

J

I

7

6

5

4070

1090

3550

3748

8753

H

Scale

Tutor

Drawn by

Date

Project Description:

Notes:

ABPL-30041ConstructionDesign

Student No: 320815Name: Xiaolan Wang

Tutor: Tim DerhamGroup: 1Scheme: 1

Sheet Size A2

Project Address:

Commercial Office BuildingDevelopment - Scheme 1

1 Holmwood Place, Carlton 3053 VIC

1 : 50

First Floor Plan1/MAY/2011

Xiaolan Wang

Tim Derham

A03

No. Description Date

1 : 50

First Floor1

North

D - DoorW - WindowCW - Curtain Window

Wall Type 1 - 300mm Precast Concrete Thermal Mass Wall

Wall Type 2 - 150mm Precast Concrete PanelWall Type 3 - 90mm Interior Partition WallWall Type 4 - Metal Frame Wall w/ Corten Rusted

Metal Finishing on Both Sides

Finish: PC - Polished Concrete Floor FinishFinish: CT - Ceramic Tile Floor FinishFinish: TB - Timber Board Floor FinishFinish: GC - General Carpet Floor FinishFinish: RM - Corten Rusted Metal Floor Finish

RL - Relative LevelFFL - Finished Floor LevelFW - Floor Waste

1 Preliminary Submission 3/May

2 Final Submission 19/May

Page 4: Construction Design 2011

A05

1

A061A08 1

A07

1

A

A09

A

A09

B

A10

B

A10

C

A11

Fall 2°

Fall 2°

Fall 2°

Fall 2°

Fall 2°

350mm Box Gutter

DP

OF

Ground Floor Outline

Overhang

160mm Parapet Wall

First Floor Deck

Flashings

Sump

Aluminium TrimdekSheeting

Scale

Tutor

Drawn by

Date

Project Description:

Notes:

ABPL-30041ConstructionDesign

Student No: 320815Name: Xiaolan Wang

Tutor: Tim DerhamGroup: 1Scheme: 1

Sheet Size A2

Project Address:

Commercial Office BuildingDevelopment - Scheme 1

1 Holmwood Place, Carlton 3053 VIC

1 : 50

Roof Plan1/MAY/2011

Xiaolan Wang

Tim Derham

A04

No. Description Date

North

1 : 50

Roof1

OF - OverflowDP - Downpipe

1 Preliminary Submission 3/May

2 Final Submission 19/May

Page 5: Construction Design 2011

Ground Floor

4571

First Floor

7771

Roof

10971

ABCDEF

D

1

CW

11

CW

12

CW

13

CW

14

CW

1

CW

2

CW

3

CW

16

CW

15

D

10

D

11CW

17

CW

18

D

12CW

19

CW

20

CW

21

CW

22

CW

23

D

3CW

4

CW

5

B

A10

B

A10

C

A11

2210

990

750

350

2100

700

Finish: RM

Finish: RM

Finish: RC

CL 7421

FFL

CL 10621

RL

FFL

Downpipe

Corten Metal Handrail

F F F F F F F F F F

F F F F F F F F F

Parapet

RL 11321

Scale

Tutor

Drawn by

Date

Project Description:

Notes:

ABPL-30041ConstructionDesign

Student No: 320815Name: Xiaolan Wang

Tutor: Tim DerhamGroup: 1Scheme: 1

Sheet Size A2

Project Address:

Commercial Office BuildingDevelopment - Scheme 1

1 Holmwood Place, Carlton 3053 VIC

1 : 50

North Elevation1/MAY/2011

Xiaolan Wang

Tim Derham

A05

No. Description Date

1 : 50

North Elevation1

D - DoorW - WindowCW - Curtain Window

Finish: RC - Rough Concrete Wall Finish (Precast)Finish: RM - Corten Rusted Metal Wall Finish

RL - Relative LevelFFL - Finished Floor LevelFW - Floor WasteCL - Ceiling Level

1 Preliminary Submission 3/May

2 Final Submission 19/May

Page 6: Construction Design 2011

Ground Floor

4571

First Floor

7771

Roof

10971

1234

A

A09

A

A09

Finish: RM

Finish: RC

CL 7421

FFL

CL 10621

RL

FFL

Finish: RC

Finish: RM

Finish: RC

Finish: RC

700

2100

350

900

3050

700

2100

1100

3200

375

Expansion Joints

Parapet

RL 11321

Scale

Tutor

Drawn by

Date

Project Description:

Notes:

ABPL-30041ConstructionDesign

Student No: 320815Name: Xiaolan Wang

Tutor: Tim DerhamGroup: 1Scheme: 1

Sheet Size A2

Project Address:

Commercial Office BuildingDevelopment - Scheme 1

1 Holmwood Place, Carlton 3053 VIC

1 : 50

East Elevation1/MAY/2011

Xiaolan Wang

Tim Derham

A06

No. Description Date

1 : 50

East Elevation1

D - DoorW - WindowCW - Curtain Window

Finish: RC - Rough Concrete Wall Finish (Precast)Finish: RM - Corten Rusted Metal Wall Finish

RL - Relative LevelFFL - Finished Floor LevelFW - Floor WasteCL - Ceiling Level

1 Preliminary Submission 3/May

2 Final Submission 19/May

Page 7: Construction Design 2011

Ground Floor

4571

First Floor

7771

Roof

10971

A B C D E F

CW

26

CW

25

CW

24

CW

6

CW

7

CW

8CW

9

CW

10

CW

30

CW

29

CW

28

CW

27

W

2

W

1

W

3

W

4

D

2

B

A10

B

A10C

A11

Finish: RM

Finish: RC

CL 7421

FFL

CL 10621

RL

FFL

Finish: RM

Downpipe

D

13

4050

3050

700

2100

1100

3441

F

F

F

F

F

F

F

F

F

F

F

F

F F

Parapet

RL 11321

Scale

Tutor

Drawn by

Date

Project Description:

Notes:

ABPL-30041ConstructionDesign

Student No: 320815Name: Xiaolan Wang

Tutor: Tim DerhamGroup: 1Scheme: 1

Sheet Size A2

Project Address:

Commercial Office BuildingDevelopment - Scheme 1

1 Holmwood Place, Carlton 3053 VIC

1 : 50

South Elevation1/MAY/2011

Xiaolan Wang

Tim Derham

A07

No. Description Date

1 : 50

South Elevation1

D - DoorW - WindowCW - Curtain Window

Finish: RC - Rough Concrete Wall Finish (Precast)Finish: RM - Corten Rusted Metal Wall Finish

RL - Relative LevelFFL - Finished Floor LevelFW - Floor WasteCL - Ceiling Level

1 Preliminary Submission 3/May

2 Final Submission 19/May

Page 8: Construction Design 2011

Ground Floor

4571

First Floor

7771

Roof

10971

1 2 3 4

A

A09

A

A09

Finish: RC

Finish: RC

CL 7421

FFL

CL 10621

RL

FFL

Finish: RM

Finish: RC

Downpipe

4050

3050

700

6680

Expansion Joints

Parapet

RL 11321

Scale

Tutor

Drawn by

Date

Project Description:

Notes:

ABPL-30041ConstructionDesign

Student No: 320815Name: Xiaolan Wang

Tutor: Tim DerhamGroup: 1Scheme: 1

Sheet Size A2

Project Address:

Commercial Office BuildingDevelopment - Scheme 1

1 Holmwood Place, Carlton 3053 VIC

1 : 50

West Elevation1/MAY/2011

Xiaolan Wang

Tim Derham

A08

No. Description Date

1 : 50

West Elevation1

D - DoorW - WindowCW - Curtain Window

Finish: RC - Rough Concrete Wall Finish (Precast)Finish: RM - Corten Rusted Metal Wall Finish

RL - Relative LevelFFL - Finished Floor LevelFW - Floor WasteCL - Ceiling Level

1 Preliminary Submission 3/May

2 Final Submission 19/May

Page 9: Construction Design 2011

Ground Floor

4571

First Floor

7771

Roof

10971

A B C D E F

B

A10

B

A10

C

A11

1A12

Exhibition and Meeting Area Storage

General OfficeManager's OfficeBoard Room

80mm gap betweenceiling and walls

Wall Type 1

Wall Type 4

Strip Footing

D

10

D

11

D

12

D

4

D

1D

3

CW

12

CW

13

CW

14

CW

1

CW

2

CW

3

CW

19

CW

20

CW

21

CW

22

CW

23

CW

15

CL 7421

FFL

CL 10621

RL

FFL

Verify neighbouringbuilding footingdeepth on site

CW

17

Aluminium Trimdek

Sarking/Insulation/Sarking/Safety Mesh

Parapet

RL 11321

Scale

Tutor

Drawn by

Date

Project Description:

Notes:

ABPL-30041ConstructionDesign

Student No: 320815Name: Xiaolan Wang

Tutor: Tim DerhamGroup: 1Scheme: 1

Sheet Size A2

Project Address:

Commercial Office BuildingDevelopment - Scheme 1

1 Holmwood Place, Carlton 3053 VIC

1 : 50

Section A-A1/MAY/2011

Xiaolan Wang

Tim Derham

A09

No. Description Date

1 : 50

Section A-AA

D - DoorW - WindowCW - Curtain Window

Wall Type 1 - 300mm Precast Concrete Thermal Mass Wall

Wall Type 2 - 150mm Precast Concrete PanelWall Type 3 - 90mm Interior Partition WallWall Type 4 - Metal Frame Wall w/ Corten Rusted

Metal Finishing on Both Sides

RL - Relative LevelFFL - Finished Floor Level

1 Preliminary Submission 3/May

2 Final Submission 19/May

Page 10: Construction Design 2011

Ground Floor

4571

First Floor

7771

Roof

10971

1 2 3 4

A

A09

A

A09

Reception

Manager's Office

D

6

80mm gap betweenceiling and walls

CL 7421

FFL

CL 10621

RL

FFL

Aluminium TrimdekRoof Sheeting

150UB Roof Beams

150UB

250UB

5mm Corten RustedMetal Sheeting

150UB Partially Exposed

Sarking/Insulation/Sarking/Safty Mesh

350mm Box Gutter

New Retaining Wall

Parapet

RL 11321

Scale

Tutor

Drawn by

Date

Project Description:

Notes:

ABPL-30041ConstructionDesign

Student No: 320815Name: Xiaolan Wang

Tutor: Tim DerhamGroup: 1Scheme: 1

Sheet Size A2

Project Address:

Commercial Office BuildingDevelopment - Scheme 1

1 Holmwood Place, Carlton 3053 VIC

1 : 50

Section B-B1/MAY/2011

Xiaolan Wang

Tim Derham

A10

No. Description Date

1 : 50

Section B-BB

D - DoorW - WindowCW - Curtain Window

Wall Type 1 - 300mm Precast Concrete Thermal Mass Wall

Wall Type 2 - 150mm Precast Concrete PanelWall Type 3 - 90mm Interior Partition WallWall Type 4 - Metal Frame Wall w/ Corten Rusted

Metal Finishing on Both Sides

RL - Relative LevelFFL - Finished Floor Level

1 Preliminary Submission 3/May

2 Final Submission 19/May

Page 11: Construction Design 2011

Ground Floor

4571

First Floor

7771

Roof

10971

3-12TM Trench Mesh Reinforcement

Edge Beam

Waterproof Membrane

50mm Sandbed

Slab Reinforcement

Polished Concrete Floor Finish

Connection Per Manufacturer Specification

Styrofoam Insulation Layer (Thermal Mass System)

Thermal Mass Connector

Expansion Joint Per Manufacturer Specification

Connection Per Manufacturer Specification

150mm Bondek Slab

250UB

5mm Corten Metal Sheeting

Plasterboard Suspended Ceiling

80mm Gap Between Window & Ceiling 150UB

150UB Roof BeamC Purlins

Capping & Roof Flashing

CL 7421FFL

CL 10621RL

FFL

Plasterboard Suspended Ceiling

Polished Concrete Rendered Ceiling

Aluminium Trimdek Roof Sheeting

Blinding Concrete Scale

Tutor

Drawn by

Date

Project Description:

Notes:

ABPL-30041ConstructionDesign

Student No: 320815Name: Xiaolan Wang

Tutor: Tim DerhamGroup: 1Scheme: 1

Sheet Size A2

Project Address:

Commercial Office BuildingDevelopment - Scheme 1

1 Holmwood Place, Carlton 3053 VIC

1 : 20

Detail Section1/MAY/2011

Xiaolan Wang

Tim Derham

A11

No. Description Date

1 : 20

Detail SectionC

RL - Relative LevelFFL - Finished Floor Level

1 Preliminary Submission 3/May

Parapet

RL 11321

2 Final Submission 19/May

Page 12: Construction Design 2011

Styrofoam Insulation Layer (Thermal Mass System)

Thermal Mass Connector

Connection Per Manufecturer Specification

150mm Bondek Slab

30mm Fibre Cement Sheet

250UB

1mm Corten Rusted Metal Sheeting

Support Stud

1mm Corten Rusted Metal Sheeting

Carpet

Metal Wall Stud

Scale

Tutor

Drawn by

Date

Project Description:

Notes:

ABPL-30041ConstructionDesign

Student No: 320815Name: Xiaolan Wang

Tutor: Tim DerhamGroup: 1Scheme: 1

Sheet Size A2

Project Address:

Commercial Office BuildingDevelopment - Scheme 1

1 Holmwood Place, Carlton 3053 VIC

1 : 5

Vertical Detail1/MAY/2011

Xiaolan Wang

Tim Derham

A12

No. Description Date

1 : 5

Vertical Detail1

1 Preliminary Submission 3/May

2 Final Submission 19/May

Page 13: Construction Design 2011

1mm Corten Rusted MetalSheeting

125SHS

Aluminium Window Frame

Handrail (First Floor Gallery)

Handrail (Frist Floor Deck)

1mm Corten Rusted Metal Sheeting

Support Stud1mm Corten Rusted MetalSheeting

1mm Corten Rusted MetalSheeting

Double Glazing Window

30mm Fibre Cement Sheet

Metal Wall Stud

Scale

Tutor

Drawn by

Date

Project Description:

Notes:

ABPL-30041ConstructionDesign

Student No: 320815Name: Xiaolan Wang

Tutor: Tim DerhamGroup: 1Scheme: 1

Sheet Size A2

Project Address:

Commercial Office BuildingDevelopment - Scheme 1

1 Holmwood Place, Carlton 3053 VIC

1 : 5

Horizontal Detail1/MAY/2011

Xiaolan Wang

Tim Derham

A13

No. Description Date

1 : 5

Horizontal Detail1

1 Preliminary Submission 3/May

2 Final Submission 19/May