25 November 2020 Re: Development Application (Not for Bank Use) Project: 31 The Crescent, Homebush NSW 2140
To whom it may concern The purpose of this Council QS Letter is to present the Quantity Survey Report prepared by Construction Consultants (QS) dated 15 May 2018 (Refer to Appendix A) and to assess and comment on the amended plans provided by Urban Link Pty Ltd. The proposed modified design comprises seventy-two (72) x boarding rooms (approx. 24m2/room) and two (2) x basement parking (approx. 796m2). In comparison with Drawing prepared by Urban Link Pty Ltd, Project No. 18-064, dated 10/05/2018, there is an increase in the total number of boarding rooms by twenty-two (22) through an additional two (2) storeys. I wish to advise that the proposed Total Development Cost for the modified design is $7,002,792 excl. GST or $7,703,071 incl. GST.
Previously, based on the Quantity Survey prepared by Construction Consultants (QS) dated 15/04/2018, the proposed Total Development Cost was $5,113,174 excl. GST or $5,624,491 incl. GST (Refer to Appendix A). Thus, based on the proposed modification to the original DA design, the variance in cost would result in an increase in the vicinity of approx. $1,889,618 excl. GST or $2,078,580 incl. GST.
It is important to note that our budget estimate is excludes the following:
- Land Acquisition; - Marketing and financing; - Legal costs; - Project Management; - Building insurance costs; - Railcorp requirements; - Major services diversions, external connections and /or improvement; - Amplification / amendment to existing services; - Underpinning of existing structure; - Amendments to plans, incomplete documentation; - Taxes, levies and charges;
P a g e | 2
- Disabled access; - Energy and water efficiency; - Roadworks and Public Domain Works; - Decontamination works (Asbestos Removal, etc); - Rock excavation; - Dewatering / Drainage pit & pump-out; - Blinds / Fly screens; - Loose furniture / FF&Es; - External roadworks / Public domain works; - Authorities Fees (S94 Contribution and the like); - Contingency allowance.
The revised cost estimate has been based on Architectural Drawings prepared by Urban Link Pty Ltd., Project number 18-064, Drawing Nos. 3, 12, 18 to 20, Revision F, dated 07/11/2020. Please refer to Appendix B for a copy of the part of the Architectural Drawings.
Sincerely
Michael M. Dakhoul FAIQS MAIB MCIOB ICECA FAIQS Reg. No. 3618
Appendix A Elemental Cost Summary
Elemental Summary31 The Crescent, Homebush
Code Item % Cost ($) / m2 Total Cost ($)
PR Preliminaries 15.00 312 1,050,734
AR Demolition 1.04 22 72,569
XP Site Preparation 0.09 2 6,047
SB
Substructure (Shoring, Excavation and Basement
Structure) 9.33 194 653,581
CL Columns 1.55 32 108,854
UF Upper floors 6.39 133 447,509
SC Staircases 0.78 16 54,427
RF Roof 1.04 22 72,569
EW External Walls 8.85 184 619,861
WW Windows 2.76 57 193,518
ED External Doors 0.43 9 30,237
NW Internal Walls 4.32 90 302,371
NS Internal Screens 0.47 10 33,261
ND Internal Doors 2.42 50 169,328
WF Wall Finishes 3.07 64 215,166
FF Floor Finishes 2.80 58 196,068
CF Ceiling Finishes 2.37 49 165,831
FT Fitments 4.59 95 321,469
PB Hydraulic Services (incl. External Services) 5.41 112 378,771
AC
Mechanical Services (Basement and wet areas
Ventilation, Air Conditioning if applicable) 2.05 43 143,897
FP Fire Services 1.05 22 73,238
LP Electrical Services (incl. Substation) 7.47 155 523,025
TS Transportation Services (Lifts, Escalators and the like) 2.25 47 157,233
XR/XN Siteworks (Boundary walls, Fencing and Gates, etc.) 1.30 27 91,316
XL Landscaping and Improvements 2.59 54 181,423
BM Builder's Margin 8.51 177 595,655
Total Construction Cost (excl. GST) 6,857,959
Add Consultants Fees 2.07 43 144,833
Total Development Cost (excl. GST) 100.00 2,078 7,002,792
Add GST 700,279
Total Development Cost (incl. GST) 7,703,071
Construction Consultants (QS)
1 of 1
25/11/2020
Appendix B Quantity Survey Report dated 15.05.2018
Construction Consultants (QS) Quantity Surveyor Report – DA Submission only (Not for Bank Use) 31 The Crescent, Homebush
1 | P a g e
QUANTITY SURVEY REPORT
Not for Bank Use
Source: Google Maps
Project: Proposed Boarding House Development At No. 31 The Crescent Homebush NSW 2140
Applicant: Urban Link Pty Ltd
Builder: Developer Managed
Report Date: 15 May 2018
Construction Consultants (QS) Quantity Surveyor Report – DA Submission only (Not for Bank Use) 31 The Crescent, Homebush
2 | P a g e
Table of Contents 1. Instruction .............................................................................................................. 3
2. Brief Development Description ............................................................................. 3
3. Construction Cost Estimate ................................................................................... 3
4. Areas ...................................................................................................................... 4
5. Quality of Finishes .................................................................................................. 5
6. Documentation ...................................................................................................... 5
7. Exclusions ............................................................................................................... 5
8. Design Assumptions / Parameters ......................................................................... 6
9. Contingency Allowance .......................................................................................... 6
10. Disclaimer ............................................................................................................... 6
Appendix A Council Schedule Appendix B Elemental Cost Estimate Summary Appendix C Assumed Schedule of Finishes Appendix D Reduced Architectural Drawings
Construction Consultants (QS) Quantity Surveyor Report – DA Submission only (Not for Bank Use) 31 The Crescent, Homebush
3 | P a g e
1. Instruction We have undertaken a study of the probable cost of construction for the above project, based on the supplied architectural drawings and other information provided. We have also taken into consideration the proposed method of procurement (Developer Managed). 2. Brief Development Description
The proposal includes the demolition of existing structure(s) and the construction of a five (5) storey Boarding House with associated basement car parking, at No. 31 The Crescent, Homebush. The proposed development consists of:
• Twelve (12) x car spaces within Basement 2 to Basement 1;
• Fifty (50) x boarding rooms (incl. Manager’s Room) within Ground Floor to Level 4;
• One (1) x communal living room within Ground Floor.
Typically, each boarding room comprises an open plan bedroom/living area, bathroom and kitchenette. 3. Construction Cost Estimate
Description Amount ($)
Total Construction Cost 5,006,134
Add Consultants Fees 107,040
Total Development Cost (excl. GST) 5,113,174
Add GST 511,317
Total Development Cost (incl. GST) 5,624,491
The required Council Schedule is attached in Appendix A. Also, please refer to Appendix B for an Elemental Cost Estimate Summary prepared in accordance with the Environmental Planning and Assessment Regulation 2000 (Reg 25J) - Section 94A Levy - Determination of proposed cost of Development. A detailed report may be obtained upon request. Our Construction Cost Estimate may be considered as reasonable, based on the proposed level of finishes and in the absence of the Structural and Services drawings, the Contract Documents and DA Conditions.
Construction Consultants (QS) Quantity Surveyor Report – DA Submission only (Not for Bank Use) 31 The Crescent, Homebush
4 | P a g e
4. Areas According to the architectural drawings, the proposed approximate Floor Areas may be presented as follows:
Building Level Description F.E.C.A*
(m2) U.C.A**
(m2) G.F.A***
Total (m2)
Basement 2 Parking 398 398
Basement 1 Parking 398 398
Ground Floor Ramp 54 54
Ground Floor Boarding Rooms incl.
Manager's Room 146 11 157
Ground Floor Common Area incl.
Common Room 120 25 145
Level 1 Boarding Rooms 261 24 286
Level 1 Common Area 72 72
Level 2 Boarding Rooms 261 24 286
Level 2 Common Area 72 72
Level 3 Boarding Rooms 261 24 286
Level 3 Common Area 72 72
Level 4 Boarding Rooms 261 15 276
Level 4 Common Area 72 72
Total 2,395 178 2,573
*F.E.C.A (Fully Enclosed Covered Area): The sum of all such areas at all building floor levels, including basements (except unexcavated portions), floored roof spaces and attics, garages, penthouses, enclosed porches and attached enclosed covered ways alongside building, equipment rooms, lift shafts, vertical ducts, staircases and any other fully enclosed spaces and useable areas of the building, computed by measuring from the normal inside face of exterior walls but ignoring any projections such as plinths, columns, piers and the like which project from the normal inside face of exterior walls. It shall not include open courts, light wells, connecting or isolated covered ways and net open areas of upper portions of rooms, lobbies, halls interstitial spaces and the like which extend through the storey being computed. **U.C.A (Unenclosed Covered Area): The sum of all such areas at all building floor levels, including roofed balconies, open verandahs, porches and porticos, attached open covered ways alongside buildings, undercrofts and useable space under buildings, unenclosed access galleries (including ground floor) and any other trafficable covered areas of the building which are not totally enclosed by full height walls, computed by measuring the area between the enclosing walls or balustrade (ie. from the inside face of the UCA excluding the wall or balustrade thickness). When the covering element (i.e. roof or upper floor) is supported by columns, is cantilevered or is suspended, or any combination of these, the measurements shall be taken to the edge of the paving or to the edge of the cover, whichever is the lesser. UCA shall not include eaves overhangs, sun shading, awnings and the like where these do not relate to clearly defined trafficable covered areas, nor shall it include connecting or isolated covered ways. ***G.F.A (Gross Floor Area): The sum of the 'Fully Enclosed Covered Area' and 'Unenclosed Covered Area' as defined. The G.F.A definition used here is different to the Gross Building Area defined in the ANZRPGN 4 Methods of Measurement used by Valuation and Property Industry Professionals.
Construction Consultants (QS) Quantity Surveyor Report – DA Submission only (Not for Bank Use) 31 The Crescent, Homebush
5 | P a g e
5. Quality of Finishes Finishes may be considered of Standard commercial quality, as described in the attached Schedule of Finishes (Appendix C), prepared by Construction Consultants (QS) and based on information supplied by the Developer. The quality of finishes proposed, are appropriate to the type, scale and location of this project. The quality of finishes proposed, are appropriate to the type, scale and location of this project. 6. Documentation Our Cost Estimate was based on Architectural Drawings prepared by Urban Link Pty Ltd, Project No. 18-064, Drawing Nos. DA1001, DA1002, DA2002, DA2004, DA2901, DA2904, DA3001, DA3002 and DA6302, Revision A, Dated 10/05/2018. Please refer to Appendix D for a reduced copy of part of these drawings. 7. Exclusions Our Cost Estimate does not include the following:
- Land Acquisition; - Marketing and financing; - Legal costs; - Project Management; - Building insurance costs; - Railcorp requirements; - Major services diversions, external connections and /or improvement; - Amplification / amendment to existing services; - Underpinning of existing structure; - Amendments to plans, incomplete documentation; - Taxes, levies and charges; - Disabled access; - Energy and water efficiency; - Roadworks and Public Domain Works; - Decontamination works (Asbestos Removal, etc); - Rock excavation; - Dewatering / Drainage pit & pump-out; - Blinds / Fly screens; - Loose furniture / FF&Es; - External roadworks / Public domain works; - Authorities Fees (S94 Contribution and the like); - Contingency allowance.
Construction Consultants (QS) Quantity Surveyor Report – DA Submission only (Not for Bank Use) 31 The Crescent, Homebush
6 | P a g e
8. Design Assumptions / Parameters In the absence of engineering drawings, the structure of the proposed buildings was assumed of conventional nature, comprising the following:
- Reinforced concrete soldier piles / shotcrete to basement shoring; - Reinforced concrete strip / pad footings; - Reinforced concrete columns and floor slabs (Framed structure).
Our Indicative Cost Estimate was based on the assumption that the whole development will be constructed in a single stage (i.e. not a staged development). If the building is to be completed in stages, the cost of preliminaries and Building services may increase. This Cost Estimate may provide no more than a rough guide to the probable cost of the proposed development. Costs may vary considerably, due to a range of variables:
- Further Geotechnical investigation; - Structural and services documentation; - Contract conditions; - Final PC Items and Provisional Allowances; - Variations in the proposed fixtures and finishes; - DA Conditions.
9. Contingency Allowance A Contingency Allowance (generally between 5% and 10%) will not be included for the purpose of this Report. 10. Disclaimer This Certificate has been prepared for the sole purpose of providing an Initial Cost Estimate for DA Council Submission only (not for bank use). This Quantity Survey Certificate is not to be used for any other purpose. This Report is confidential to the developer. The Writer does not accept any contractual, tortuous or other form of liability for any consequences, loss or damage which may arise as a result of any other person acting upon or using this report. Report and estimate prepared by
Michael M. Dakhoul B. Build (Hons. 1) AAIQS MAIB MCIOB ICECA AAIQS Reg. No. 3618
Appendix A Council Schedule
Appendix B Elemental Cost Estimate Summary
Elemental Summary31 The Crescent, Homebush
Code Item % Cost ($) / m2 Total Cost ($)
PR Preliminaries 14.97 297 765,402
AR Demolition 0.98 19 49,894
XP Site Preparation 0.08 2 4,158
SB
Substructure (Shoring, Excavation and Basement
Structure) 12.21 243 624,292
CL Columns 1.46 29 74,841
UF Upper floors 6.02 120 307,678
SC Staircases 0.73 15 37,420
RF Roof 0.98 19 49,894
EW External Walls 8.33 166 426,175
WW Windows 2.60 52 133,050
ED External Doors 0.41 8 20,789
NW Internal Walls 4.07 81 207,890
NS Internal Screens 0.45 9 22,868
ND Internal Doors 2.28 45 116,419
WF Wall Finishes 2.95 59 150,919
FF Floor Finishes 2.69 53 137,490
CF Ceiling Finishes 2.28 45 116,701
FT Fitments 4.33 86 221,319
PB Hydraulic Services (incl. External Services) 5.23 104 267,284
AC
Mechanical Services (Basement and wet areas
Ventilation, Air Conditioning if applicable) 2.30 46 117,442
FP Fire Services 1.36 27 69,459
LP Electrical Services (incl. Substation) 7.24 144 370,344
TS Transportation Services (Lifts, Escalators and the like) 2.11 42 108,103
XR/XN Siteworks (Boundary walls, Fencing and Gates, etc.) 1.23 24 62,783
XL Landscaping and Improvements 2.44 48 124,734
BM Builder's Margin 8.19 163 418,787
Total Construction Cost (excl. GST) 5,006,134
Add Consultants Fees 2.09 42 107,040
Total Development Cost (excl. GST) 100.00 1,987 5,113,174
Add GST 511,317
Total Development Cost (incl. GST) 5,624,491
Construction Consultants (QS)
1 of 1
15/05/2018
Appendix C Assumed Schedule of Finishes
Construction Consultants (QS) 15/05/2018
1
Proposed Boarding House 31 The Crescent, Homebush
ASSUMED SCHEDULE OF FINISHES
BUILDING INTERIOR
Internal finishes and Fittings Internal Bathroom Doors Hollow core / plain / painted Room Front Doors Fire rated / plain / painted Door Handles Lockset to room doors Metal lever to internal doors Kitchen Stone benchtop and polyurethane doors Walls Generally face brickwork Ceilings Set plaster / painted Cornices Standard Cove
Bathroom Fittings Shower Screens Powder coated alum. Semi-Frameless / Safety glass WC Suite Vitreous China Suite with 6/3 dual flush Vanity Unit Laminated top with Semi-recessed basin Mirror Wall mounted mirror above each vanity unit Tapware Single Lever Mixer / Chrome Bathroom Fittings Stainless steel Floor Finishes Rooms Carpet Hallways Carpet Bathrooms Ceramic tiles Fixtures Hot water unit Basic Air conditioning Split system Intercom Excl. Alarm Excl. Transportation Lift (1 off) Exclusions – FF&Es Loose furniture Artworks Signage Beds & Mattresses Bedside tables Coffee table and kettle Office table and chairs Manchester and curtains Utensils Fridges / Microwaves Washing Machine / Dryers Heaters
Construction Consultants (QS) 15/05/2018
2
BUILDING EXTERIOR External walls Refer to architectural drawings Windows and sliding doors Powder coat / aluminum framed Handrails / balustrades Powder coated metal Roof Refer to architectural drawings Individual Garage Doors N/A Main Basement Entry Door Overhead / automatic Letterboxes Powder coated classic
Appendix D Reduced Architectural Drawings
Copyright URBAN LINK PTY LTD ©
NotesCONTRACTOR MUST VARIFY ALL DIMENSIONS ON SITE BEFORECOMMENCING WORK OR PREPARING SHOP DRAWINGS.DO NOT SCALE DRAWINGS.
Rev Description DateProject
31 The Crescent, HomebushMIXED USE DEVELOPMENT
Drawing Title
BASEMENT 1 & 2Date of Issue10/05/2018
DrawnER
ApprovedZB
Scale
@A1 Sheet Size
Project Number
18-064Drawing Number
DA2002Revision
StatusPRE - DEVELOPMENT APPLICATION
50mm on original
Boarding house - 20180410.plnU:\Data\2018 Jobs\2018-064 31 The Crescent homebush\4. CAD\1. DA\Boarding house - 20180410.pln10/05/20182:50 PM
Business Address: Level 10, 11-15 Deane Street, Burwood NSW 2134Postal Address: PO BOX 2223 Burwood North NSW 2134Phone Number: +61 29745 2014Nominated Architects:Ziad Boumelhem Reg no 8008Youssef El Khawaja Reg no 8933
Nicolas Toubia Reg no 9336
A DVELOPMENT APPLICATION 10/05/2018
A
CLIENT:
1 2 3 4 5 6 7
8
9101112131415
SECTION A SECTION ADA2904
RL 2,700
RAMP 12.50 % RL 2,950
RAMP 25.00 %
15.54 m2
67.64 m2
43.10 m2
BD
BDGFEDCBABD
BD
1
2
3
60014,040
600
7011,339
2,4002,400
3,600600
600 5,400 5,800 5,400 5,400 5,800 2,400 600 3,00011,330 34,400
14,987
12,588
600
300
2,400
2,400
300
1,200
1,180
1,200
1,200
1,200
1,200
1,460
15,240
2,320
2,400
2,400
2,400
299
600
18,741 3,786 3,735 3,581 4,037 1,800 7,05042,730
2,700
10.01 m2
9.36 m2
SHARED
BASEMENT 26 CAR SPACES
6 MOTOR CYCLES6 BICYCLES
LIFT
WASTE BINS
BULK WASTE
1 2 3 4 5 6 7
8
9101112131415
SECTION A SECTION ADA2904
RAMP 25.00 %
RL 5,450
RAMP 12.50 %
RL 5,700RL 5,700
RAMP 12.50 % RL 5,950
RAMP 25.00 %
15.54 m2
67.64 m2
43.10 m2
BD
BDGFEDCBABD
BD
1
2
3
7011,338
2,4022,400
3,600600
600 5,400 5,800 5,400 2,800 2,600 5,800 2,400 600 3,00011,330 34,400
14,987
12,588
600
300
2,400
2,400
300
1,200
1,180
1,200
1,200
1,200
1,200
1,200
15,240
2,850
2,400
2,400
2,400
299
600
15,240
18,741 3,786 3,735 3,581 4,037 1,800 7,05042,730
3,884
3,735
3,735
3,886
27,300
5,700
SHARED
BASEMENT 16 CAR SPACES
6 MOTOR CYCLES6 BICYCLES
LIFT
BASEMENT 02 1:100
BASEMENT 01 1:100
Copyright URBAN LINK PTY LTD ©
NotesCONTRACTOR MUST VARIFY ALL DIMENSIONS ON SITE BEFORECOMMENCING WORK OR PREPARING SHOP DRAWINGS.DO NOT SCALE DRAWINGS.
Rev Description DateProject
31 The Crescent, HomebushMIXED USE DEVELOPMENT
Drawing Title
GROUND FL & LEVEL 1Date of Issue10/05/2018
DrawnER
ApprovedZB
Scale
@A1 Sheet Size
Project Number
18-064Drawing Number
DA2002Revision
StatusPRE - DEVELOPMENT APPLICATION
50mm on original
Boarding house - 20180410.plnU:\Data\2018 Jobs\2018-064 31 The Crescent homebush\4. CAD\1. DA\Boarding house - 20180410.pln10/05/20182:50 PM
Business Address: Level 10, 11-15 Deane Street, Burwood NSW 2134Postal Address: PO BOX 2223 Burwood North NSW 2134Phone Number: +61 29745 2014Nominated Architects:Ziad Boumelhem Reg no 8008Youssef El Khawaja Reg no 8933
Nicolas Toubia Reg no 9336
A DVELOPMENT APPLICATION 10/05/2018
A
CLIENT:
SECTION A SECTION ADA2904
RL 8,000
RAMP 12.50 %
RL 8,250
RAMP 25.00 %
RL 8,850
RAMP 12.50 %
RL 9,100
35.78 m2 RL 6,850
RAMP 25.00 %
RL 8,850
RAMP 12.50 %
RL 9,100
25.17 m2
24.15 m2
25.90 m224.47 m2
23.15 m223.15 m2
15.54 m2
23.15 m2
233.76 m2
19.97 m2
123456
1
2
3
4
5
6
1 2 3 4 5 6
1234567
8
9 10 11 12 13 14 15
1
2
3
4
5
6
1
2
3
4
5
6
BD
BDGFEDCBABD
BD
1
2
3
2507,321
200
1,550
1,550
1,750
2,600
1,550
1,550
15,240
18,741 3,786 3,735 3,581 4,037 1,800 7,05042,730
3,884
3,735
3,735
3,886
9,300
9,300
9,300131.71 m2
23.95 m2
11.36 m2 11.21 m2
ENTRY
LOBBY
DRIVEWAY
SRV
GUTTERRL16.21
GUTTERRL16.24 GUTTER
RL14.832ND FLOOR BALCONYRL13.69
2ND FLOOR BALCONYRL13.66
BALCONYRL11.65
1ST FLOOR BALCONYRL11.04
BENCH MARKCUT IN ISLANDRL8.105 AHD
AWNI
NGRL
11.8
1
ROOFRL15.52
7.87
8.05li
p
8.03g
ut
8.17t
k8.2
1
8.26
8.15
8.15
8.11
8.06t
k7.9
4gut
7.96li
p
8.11
8.07
8.10
8.11
8.08
8.00
7.95t
k 7.84g
ut
7.80g
ut
7.94t
k
7.93
7.99
7.96
7.97
7.92
7.88t
k7.7
4gut7.7
7lip
7.93 7.9
0tk
8.11
8.08
8.08
8.13
8.06
8.198.3
68.2
9
8.14
8.28
STORMWATER PITGrate RL:7.71Invert RL:6.94Pipe Ø 0.400
STORMWATER PITGrate RL:7.78Invert RL:7.04Pipe Ø 0.400
ELP
SS
SS
GAS
SS
SS
SS
SS
COM
SS
COM
WM
D: 0.4S: 6H: 8
D: 0.3S: 3H: 8
D: 0.6S: 8H: 12
D: 0.6S: 8H: 12
D: 0.3S: 3H: 8
D: 0.3S: 3H: 8
D: 0.3S: 3H: 8
D: 0.3S: 3H: 8
D: 0.3S: 3H: 8
D: 0.3S: 3H: 8
D: 0.3S: 3H: 8
D: 0.3S: 3H: 8
D: 0.3S: 3H: 8
D: 0.3S: 3H: 8
D: 0.3S: 3H: 8
BALCONYBALCONY
BALCONY
TWO STOREYBRICK
BUILDINGNo.30
THREESTOREY BRICK
UNIT BLOCK
289°
47'
55"
15.24
19° 47' 55"45.735
109°
47
' 5
5"
199° 47' 55"45.735
15.248
WINDOW(2ND):HEADRL16.06SILLRL14.62WINDOW(1ST):HEADRL13.40SILLRL11.94
WINDOW(2ND):HEADRL16.06SILLRL14.87WINDOW(1ST):HEADRL13.40SILLRL12.19
WINDOW(2ND):HEADRL15.03SILLRL13.41WINDOW(1ST):HEADRL12.09SILLRL11.45
WINDOW(2ND):HEADRL16.06SILLRL14.87WINDOW(1ST):HEADRL13.40SILLRL12.19
WINDOW(2ND):HEADRL16.06SILLRL14.62WINDOW(1ST):HEADRL13.40SILLRL11.83
WINDOW(2ND):HEAD RL15.92SILLINACCESSIBLEWINDOW(1ST):HEAD RL13.26SILLINACCESSIBLE
WINDOW(1ST):HEADRL13.88SILLRL12.45WINDOW(GND):HEAD RL10.73SILLINACCESSIBLE
WINDOW(1ST):HEADRL13.88SILLRL12.45WINDOW(GND):HEAD RL10.73SILLINACCESSIBLE
WINDOW(GND):HEADRL11.35SILLRL10.38
WINDOW(1ST):HEADRL13.81SILLRL12.81
WINDOW(1ST):HEADRL13.81SILLRL13.14
WINDOW(1ST):HEADRL13.81SILLRL13.14
WINDOW(1ST):HEADRL13.81SILLRL13.14
DOOR (1ST):TOP RL13.79FLOORINACCESSIBLE
DOOR (2ND):TOP RL15.91FLOORINACCESSIBLEDOOR (1ST):TOP RL13.25FLOORINACCESSIBLE
TH
E
CR
ES
CE
NT
SP 13994
TRAF
FIC
ISLA
ND
TRAF
FIC
ISLA
ND
TRAFFICISLAND
8.27
8.32
8.10
7.97
8.14
8.27
8.28
REF.
W
REF.
W
REF. W
REF.
W
RE
F .
W
RE
F .
W
9,300
17.33 m2
17.33 m217.33 m2
20.37 m2
18.14 m2
18.24 m2
MANAGER'SROOM
G01
COMMONLOUNGEBIN
COMPLIANTPLATFORMLIFT
BIN
BIN ROBE
BIN
ROBE
BIN
R O B E
BIN
R O B E
G02
G03
G04 G05
G06
GROUND FL
COMMUNAL OPENSPACE
P.O.S
P.O.S
P.O.S P.O.S
P.O.STOTAL LANDSCAPE
SECTION A SECTION ADA2904
23.15 m2
23.15 m2
25.17 m2
25.22 m2
25.90 m2
23.15 m2
23.15 m2
23.15 m2
23.15 m223.15 m223.15 m2
17.89 m2
19.21 m2
19.19 m2
1234567
8
9 10 11 12 13 14 15
1234567
8
9 10 11 12 13 14 15
BD
BDGFEDCBABD
BD
1
2
3
250
200
1,800
1,550
1,550
15,240
7,927 12,804 22,000
18,741 3,786 3,735 3,581 4,037 1,800 7,05042,730
3,884
3,735
3,735
3,886
12,300
GUTTERRL16.21
GUTTERRL16.24 GUTTER
RL14.832ND FLOOR BALCONYRL13.69
2ND FLOOR BALCONYRL13.66
BALCONYRL11.65
1ST FLOOR BALCONYRL11.04
STORMWATERCHANNEL
WallRL:7.85InvertRL:6.32
BENCH MARKCUT IN ISLANDRL8.105 AHD
AWNI
NGRL
11.8
1
ROOFRL15.52
7.87
8.05li
p
8.03g
ut
8.17t
k8.2
1
8.26
8.15
8.15
8.11
8.06t
k7.9
4gut
7.96li
p
8.11
8.07
8.10
8.11
8.08
8.00
7.95t
k 7.84g
ut
7.80g
ut
7.94t
k
7.93
7.99
7.96
7.97
7.92
7.88t
k7.7
4gut7.7
7lip
7.93 7.9
0tk
8.11
8.08
8.08
8.13
8.06
8.198.3
68.2
9
8.14
8.28
STORMWATER PITGrate RL:7.71Invert RL:6.94Pipe Ø 0.400
STORMWATER PITGrate RL:7.78Invert RL:7.04Pipe Ø 0.400
ELP
SS
SS
GAS
SS
SS
SS
SS
COM
SS
COM
WM
D: 0.4S: 6H: 8
D: 0.3S: 3H: 8
D: 0.6S: 8H: 12
D: 0.6S: 8H: 12
D: 0.3S: 3H: 8
D: 0.3S: 3H: 8
D: 0.3S: 3H: 8
D: 0.3S: 3H: 8
D: 0.3S: 3H: 8
D: 0.3S: 3H: 8
D: 0.3S: 3H: 8
D: 0.3S: 3H: 8
D: 0.3S: 3H: 8
D: 0.3S: 3H: 8
D: 0.3S: 3H: 8
BALCONYBALCONY
BALCONY
TWO STOREYBRICK
BUILDINGNo.30
THREESTOREY BRICK
UNIT BLOCK
FB
289°
47'
55"
15.24
19° 47' 55"45.735
109°
47
' 5
5"
199° 47' 55"45.735
15.24
(A)
8
WINDOW(2ND):HEADRL16.06SILLRL14.62WINDOW(1ST):HEADRL13.40SILLRL11.94
WINDOW(2ND):HEADRL16.06SILLRL14.87WINDOW(1ST):HEADRL13.40SILLRL12.19
WINDOW(2ND):HEADRL15.03SILLRL13.41WINDOW(1ST):HEADRL12.09SILLRL11.45
WINDOW(2ND):HEADRL16.06SILLRL14.87WINDOW(1ST):HEADRL13.40SILLRL12.19
WINDOW(2ND):HEADRL16.06SILLRL14.62WINDOW(1ST):HEADRL13.40SILLRL11.83
WINDOW(2ND):HEAD RL15.92SILLINACCESSIBLEWINDOW(1ST):HEAD RL13.26SILLINACCESSIBLE
WINDOW(1ST):HEADRL13.88SILLRL12.45WINDOW(GND):HEAD RL10.73SILLINACCESSIBLE
WINDOW(1ST):HEADRL13.88SILLRL12.45WINDOW(GND):HEAD RL10.73SILLINACCESSIBLE
WINDOW(GND):HEADRL11.35SILLRL10.38
WINDOW(1ST):HEADRL13.81SILLRL12.81
WINDOW(1ST):HEADRL13.81SILLRL13.14
WINDOW(1ST):HEADRL13.81SILLRL13.14
WINDOW(1ST):HEADRL13.81SILLRL13.14
DOOR (1ST):TOP RL13.79FLOORINACCESSIBLE
DOOR (2ND):TOP RL15.91FLOORINACCESSIBLEDOOR (1ST):TOP RL13.25FLOORINACCESSIBLE
TH
E
CR
ES
CE
NT
SP 13994
TRAF
FIC
ISLA
ND
TRAF
FIC
ISLA
ND
TRAFFICISLAND
REF.
W
REF.
W
REF.
W
REF. W
REF.
W
REF.
W
RE
F .
W
RE
F .
W
RE
F.
W
RE
F .
W
REF.
W
17.33 m2
17.33 m2
17.33 m2
17.33 m2
17.33 m2
17.33 m2
17.33 m217.33 m2
BIN
BIN
ROBE
BIN
BIN
ROBE
BIN
ROBE
BIN
ROBE
BIN
R O B E
BIN
R O B E
BIN
R O B E
BIN
R O B E
BIN
ROBE101
102
103
104 105 106
107108
109
110
111
LEVEL 1
GROUND FLOOR PLAN 1:100
LEVEL 1 1:100
Copyright URBAN LINK PTY LTD ©
NotesCONTRACTOR MUST VARIFY ALL DIMENSIONS ON SITE BEFORECOMMENCING WORK OR PREPARING SHOP DRAWINGS.DO NOT SCALE DRAWINGS.
Rev Description DateProject
31 The Crescent, HomebushMIXED USE DEVELOPMENT
Drawing Title
LEVEL 2- 3 PLANDate of Issue10/05/2018
DrawnER
ApprovedZB
Scale
@A1 Sheet Size
Project Number
18-064Drawing Number
DA2002Revision
StatusPRE - DEVELOPMENT APPLICATION
50mm on original
Boarding house - 20180410.plnU:\Data\2018 Jobs\2018-064 31 The Crescent homebush\4. CAD\1. DA\Boarding house - 20180410.pln10/05/20182:50 PM
Business Address: Level 10, 11-15 Deane Street, Burwood NSW 2134Postal Address: PO BOX 2223 Burwood North NSW 2134Phone Number: +61 29745 2014Nominated Architects:Ziad Boumelhem Reg no 8008Youssef El Khawaja Reg no 8933
Nicolas Toubia Reg no 9336
A DVELOPMENT APPLICATION 10/05/2018
A
CLIENT:
SECTION A SECTION ADA2904
23.15 m2
23.15 m2
25.17 m2
25.22 m2
23.15 m2
23.15 m2
23.15 m2
23.15 m223.15 m223.15 m2
19.21 m2
19.19 m 2
25.90 m217.89 m2
1234567
8
9 10 11 12 13 14 15
1234567
8
9 10 11 12 13 14 15
BD
BDGFEDCBABD
BD
1
2
3
15,240
7,927 12,804 22,000
250
200
1,800
1,550
1,550
18,741 3,786 3,735 3,581 4,037 1,800 7,05042,730
3,884
3,735
3,735
3,886
15,300
GUTTERRL16.21
GUTTERRL16.24 GUTTER
RL14.832ND FLOOR BALCONYRL13.69
2ND FLOOR BALCONYRL13.66
BALCONYRL11.65
1ST FLOOR BALCONYRL11.04
BENCH MARKCUT IN ISLANDRL8.105 AHD
AWNI
NGRL
11.8
1
ROOFRL15.52
7.87
8.05li
p
8.03g
ut
8.17t
k8.2
1
8.26
8.15
8.15
8.11
8.06t
k7.9
4gut
7.96li
p
8.11
8.07
8.10
8.11
8.08
8.00
7.95t
k 7.84g
ut
7.80g
ut
7.94t
k
7.93
7.99
7.96
7.97
7.92
7.88t
k7.7
4gut7.7
7lip
7.93 7.9
0tk
8.11
8.08
8.08
8.13
8.06
8.198.3
68.2
9
8.14
8.28
STORMWATER PITGrate RL:7.71Invert RL:6.94Pipe Ø 0.400
STORMWATER PITGrate RL:7.78Invert RL:7.04Pipe Ø 0.400
ELP
SS
SS
GAS
SS
SS
SS
SS
COM
SS
COM
WM
BALCONYBALCONY
BALCONY
TWO STOREYBRICK
BUILDINGNo.30
THREESTOREY BRICK
UNIT BLOCK
289°
47'
55"
15.24
19° 47' 55"45.735
109°
47
' 5
5"
199° 47' 55"45.735
15.248
WINDOW(2ND):HEADRL16.06SILLRL14.62WINDOW(1ST):HEADRL13.40SILLRL11.94
WINDOW(2ND):HEADRL16.06SILLRL14.87WINDOW(1ST):HEADRL13.40SILLRL12.19
WINDOW(2ND):HEADRL15.03SILLRL13.41WINDOW(1ST):HEADRL12.09SILLRL11.45
WINDOW(2ND):HEADRL16.06SILLRL14.87WINDOW(1ST):HEADRL13.40SILLRL12.19
WINDOW(2ND):HEADRL16.06SILLRL14.62WINDOW(1ST):HEADRL13.40SILLRL11.83
WINDOW(2ND):HEAD RL15.92SILLINACCESSIBLEWINDOW(1ST):HEAD RL13.26SILLINACCESSIBLE
WINDOW(1ST):HEADRL13.88SILLRL12.45WINDOW(GND):HEAD RL10.73SILLINACCESSIBLE
WINDOW(1ST):HEADRL13.88SILLRL12.45WINDOW(GND):HEAD RL10.73SILLINACCESSIBLE
WINDOW(GND):HEADRL11.35SILLRL10.38
WINDOW(1ST):HEADRL13.81SILLRL12.81
WINDOW(1ST):HEADRL13.81SILLRL13.14
WINDOW(1ST):HEADRL13.81SILLRL13.14
WINDOW(1ST):HEADRL13.81SILLRL13.14
DOOR (1ST):TOP RL13.79FLOORINACCESSIBLE
DOOR (2ND):TOP RL15.91FLOORINACCESSIBLEDOOR (1ST):TOP RL13.25FLOORINACCESSIBLE
TH
E
CR
ES
CE
NT
SP 13994
TRAF
FIC
ISLA
ND
TRAF
FIC
ISLA
ND
TRAFFICISLAND
REF.
W
RE
F .
W
REF.
W
REF. W
REF.
W
REF.
W
RE
F .
W
RE
F .
W
RE
F.
W
REF.
W
REF.
W
17.33 m2
17.33 m2
17.33 m2
17.33 m2
17.33 m2
17.33 m2
17.33 m217.33 m2
BIN
BIN
R O B E
BIN
ROBE
BIN
ROBE
BIN
ROBE
BIN
ROBE
BIN
R O B E
BIN
R O B E
BIN
R O B E
BIN
BIN
ROBE201
202
203
204 205 206
207208
209
210
211
LEVEL 2
SECTION A SECTION ADA2904
23.15 m2
23.15 m2
25.17 m2
25.22 m2
23.15 m2
23.15 m2
23.15 m2
23.15 m223.15 m223.15 m2
19 .21 m2
19.19 m 2
25.90 m217.89 m2
1234567
8
9 10 11 12 13 14 15
BD
BDGFEDCBABD
BD
1
2
3
1234567
8
9 10 11 12 13 14 15
250
200
1,800
1,550
1,550
15,240
7,927 12,804 22,000
18,741 3,786 3,735 3,581 4,037 1,800 7,05042,730
3,884
3,735
3,735
3,886
18,300
GUTTERRL16.21
GUTTERRL16.24 GUTTER
RL14.832ND FLOOR BALCONYRL13.69
2ND FLOOR BALCONYRL13.66
BALCONYRL11.65
1ST FLOOR BALCONYRL11.04
BENCH MARKCUT IN ISLANDRL8.105 AHD
AWNI
NGRL
11.8
1
ROOFRL15.52
7.87
8.05li
p
8.03g
ut
8.17t
k8.2
1
8.26
8.15
8.15
8.11
8.06t
k7.9
4gut
7.96li
p
8.11
8.07
8.10
8.11
8.08
8.00
7.95t
k 7.84g
ut
7.80g
ut
7.94t
k
7.93
7.99
7.96
7.97
7.92
7.88t
k7.7
4gut7.7
7lip
7.93 7.9
0tk
8.11
8.08
8.08
8.13
8.06
8.198.3
68.2
9
8.14
8.28
STORMWATER PITGrate RL:7.71Invert RL:6.94Pipe Ø 0.400
STORMWATER PITGrate RL:7.78Invert RL:7.04Pipe Ø 0.400
ELP
SS
SS
GAS
SS
SS
SS
SS
COM
SS
COM
WM
BALCONYBALCONY
BALCONY
TWO STOREYBRICK
BUILDINGNo.30
THREESTOREY BRICK
UNIT BLOCK
289°
47'
55"
15.24
19° 47' 55"45.735
109°
47
' 5
5"
199° 47' 55"45.735
15.248
WINDOW(2ND):HEADRL16.06SILLRL14.62WINDOW(1ST):HEADRL13.40SILLRL11.94
WINDOW(2ND):HEADRL16.06SILLRL14.87WINDOW(1ST):HEADRL13.40SILLRL12.19
WINDOW(2ND):HEADRL15.03SILLRL13.41WINDOW(1ST):HEADRL12.09SILLRL11.45
WINDOW(2ND):HEADRL16.06SILLRL14.87WINDOW(1ST):HEADRL13.40SILLRL12.19
WINDOW(2ND):HEADRL16.06SILLRL14.62WINDOW(1ST):HEADRL13.40SILLRL11.83
WINDOW(2ND):HEAD RL15.92SILLINACCESSIBLEWINDOW(1ST):HEAD RL13.26SILLINACCESSIBLE
WINDOW(1ST):HEADRL13.88SILLRL12.45WINDOW(GND):HEAD RL10.73SILLINACCESSIBLE
WINDOW(1ST):HEADRL13.88SILLRL12.45WINDOW(GND):HEAD RL10.73SILLINACCESSIBLE
WINDOW(GND):HEADRL11.35SILLRL10.38
WINDOW(1ST):HEADRL13.81SILLRL12.81
WINDOW(1ST):HEADRL13.81SILLRL13.14
WINDOW(1ST):HEADRL13.81SILLRL13.14
WINDOW(1ST):HEADRL13.81SILLRL13.14
DOOR (1ST):TOP RL13.79FLOORINACCESSIBLE
DOOR (2ND):TOP RL15.91FLOORINACCESSIBLEDOOR (1ST):TOP RL13.25FLOORINACCESSIBLE
TH
E
CR
ES
CE
NT
SP 13994
TRAF
FIC
ISLA
ND
TRAF
FIC
ISLA
ND
TRAFFICISLAND
REF.
W
RE
F .
W
REF.
W
REF. W
REF.
W
REF.
W
RE
F .
W
RE
F .
W
RE
F.
W
REF.
W
REF.
W
17.33 m2
17.33 m2
17.33 m2
17.33 m2
17.33 m2
17.33 m2
17.33 m217.33 m2
BIN
BIN
R O B E
BIN
ROBE
BIN
ROBE
BIN
ROBE
BIN
ROBE
BIN
R O B E
BIN
R O B E
BIN
R O B E
BIN
301
302
303
304 305 306
307308
309
310
311
LEVEL 3
BIN
ROBE
LEVEL 2 1:100
LEVEL 3 1:100
Copyright URBAN LINK PTY LTD ©
NotesCONTRACTOR MUST VARIFY ALL DIMENSIONS ON SITE BEFORECOMMENCING WORK OR PREPARING SHOP DRAWINGS.DO NOT SCALE DRAWINGS.
Rev Description DateProject
31 The Crescent, HomebushMIXED USE DEVELOPMENT
Drawing Title
LEVEL 4 & ROOF PLANDate of Issue10/05/2018
DrawnER
ApprovedZB
Scale
@A1 Sheet Size
Project Number
18-064Drawing Number
DA2004Revision
StatusPRE - DEVELOPMENT APPLICATION
50mm on original
Boarding house - 20180410.plnU:\Data\2018 Jobs\2018-064 31 The Crescent homebush\4. CAD\1. DA\Boarding house - 20180410.pln10/05/20182:50 PM
Business Address: Level 10, 11-15 Deane Street, Burwood NSW 2134Postal Address: PO BOX 2223 Burwood North NSW 2134Phone Number: +61 29745 2014Nominated Architects:Ziad Boumelhem Reg no 8008Youssef El Khawaja Reg no 8933
Nicolas Toubia Reg no 9336
A DVELOPMENT APPLICATION 10/05/2018
A
CLIENT:
SECTION A SECTION ADA2904
23.15 m2
25.17 m2
25.22 m2
25.90 m2
23.15 m2
23.15 m223.15 m223.15 m2
20.37 m2
19 .21 m2
19.19 m 2
23.15 m2
23.15 m2
23.15 m2
BD
BDGFEDCBABD
BD
1
2
3
1234567
8
9 10 11 12 13 14 15
250
3,139
250
200
1,800
1,550
1,550
15,240
7,927 12,804 22,000
18,741 3,786 3,735 3,581 4,037 1,800 7,05042,730
3,884
3,735
3,735
3,886
21,300
GUTTERRL16.21
GUTTERRL16.24 GUTTER
RL14.832ND FLOOR BALCONYRL13.69
2ND FLOOR BALCONYRL13.66
BALCONYRL11.65
1ST FLOOR BALCONYRL11.04
BENCH MARKCUT IN ISLANDRL8.105 AHD
AWNI
NGRL
11.8
1
ROOFRL15.52
7.87
8.05li
p
8.03g
ut
8.17t
k8.2
1
8.26
8.15
8.15
8.11
8.06t
k7.9
4gut
7.96li
p
8.11
8.07
8.10
8.11
8.08
8.00
7.95t
k 7.84g
ut
7.80g
ut
7.94t
k
7.93
7.99
7.96
7.97
7.92
7.88t
k7.7
4gut7.7
7lip
7.93 7.9
0tk
8.11
8.08
8.08
8.13
8.06
8.198.3
68.2
9
8.14
8.28
STORMWATER PITGrate RL:7.71Invert RL:6.94Pipe Ø 0.400
STORMWATER PITGrate RL:7.78Invert RL:7.04Pipe Ø 0.400
ELP
SS
SS
GAS
SS
SS
SS
SS
COM
SS
COM
WM
BALCONYBALCONY
BALCONY
TWO STOREYBRICK
BUILDINGNo.30
THREESTOREY BRICK
UNIT BLOCK
289°
47'
55"
15.24
19° 47' 55"45.735
109°
47
' 5
5"
199° 47' 55"45.735
15.248
WINDOW(2ND):HEADRL16.06SILLRL14.62WINDOW(1ST):HEADRL13.40SILLRL11.94
WINDOW(2ND):HEADRL16.06SILLRL14.87WINDOW(1ST):HEADRL13.40SILLRL12.19
WINDOW(2ND):HEADRL15.03SILLRL13.41WINDOW(1ST):HEADRL12.09SILLRL11.45
WINDOW(2ND):HEADRL16.06SILLRL14.87WINDOW(1ST):HEADRL13.40SILLRL12.19
WINDOW(2ND):HEADRL16.06SILLRL14.62WINDOW(1ST):HEADRL13.40SILLRL11.83
WINDOW(2ND):HEAD RL15.92SILLINACCESSIBLEWINDOW(1ST):HEAD RL13.26SILLINACCESSIBLE
WINDOW(1ST):HEADRL13.88SILLRL12.45WINDOW(GND):HEAD RL10.73SILLINACCESSIBLE
WINDOW(1ST):HEADRL13.88SILLRL12.45WINDOW(GND):HEAD RL10.73SILLINACCESSIBLE
WINDOW(GND):HEADRL11.35SILLRL10.38
WINDOW(1ST):HEADRL13.81SILLRL12.81
WINDOW(1ST):HEADRL13.81SILLRL13.14
WINDOW(1ST):HEADRL13.81SILLRL13.14
WINDOW(1ST):HEADRL13.81SILLRL13.14
DOOR (1ST):TOP RL13.79FLOORINACCESSIBLE
DOOR (2ND):TOP RL15.91FLOORINACCESSIBLEDOOR (1ST):TOP RL13.25FLOORINACCESSIBLE
TH
E
CR
ES
CE
NT
SP 13994
TRAF
FIC
ISLA
ND
TRAF
FIC
ISLA
ND
TRAFFICISLAND
REF.
W
RE
F.
W
REF. W
RE
F .
W
RE
F .
W
RE
F .
W
REF.
W
REF.
W
REF. W
REF.
W
REF.
W
17.33 m2
17.33 m2
17.33 m217.33 m2 17.33 m2
17.33 m2
17.33 m2
17.33 m2
BIN
BIN
R O B E
BIN ROBE
BIN
R O B E
BIN
R O B E
BIN
R O B E
BIN
BIN
ROBE
BIN
ROBE
BIN
ROBE
BIN
ROBE
401
402
403
404 405 406
407408
409
410
411
LEVEL 4
SECTION A SECTION ADA2904
BD
BDGFEDCBABD
BD
1
2
3
15,240
7,927 12,804 22,000
18,741 3,786 3,735 3,581 4,037 1,800 7,05042,730
3,884
3,735
3,735
3,886
24,300 25,300
GUTTERRL16.21
GUTTERRL16.24 GUTTER
RL14.832ND FLOOR BALCONYRL13.69
2ND FLOOR BALCONYRL13.66
BALCONYRL11.65
1ST FLOOR BALCONYRL11.04
STORMWATERCHANNEL
WallRL:7.85InvertRL:6.32
BENCH MARKCUT IN ISLANDRL8.105 AHD
AWNI
NGRL
11.8
1
ROOFRL15.52
7.87
8.05li
p
8.03g
ut
8.17t
k8.2
1
8.26
8.15
8.15
8.11
8.06t
k7.9
4gut
7.96li
p
8.11
8.07
8.10
8.11
8.08
8.00
7.95t
k 7.84g
ut
7.80g
ut
7.94t
k
7.93
7.99
7.96
7.97
7.92
7.88t
k7.7
4gut7.7
7lip
7.93 7.9
0tk
8.11
8.08
8.08
8.13
8.06
8.198.3
68.2
9
8.14
8.28
STORMWATER PITGrate RL:7.71Invert RL:6.94Pipe Ø 0.400
STORMWATER PITGrate RL:7.78Invert RL:7.04Pipe Ø 0.400
ELP
SS
SS
GAS
SS
SS
SS
SS
COM
SS
COM
WM
D: 0.4S: 6H: 8
D: 0.3S: 3H: 8
D: 0.6S: 8H: 12
D: 0.6S: 8H: 12
D: 0.3S: 3H: 8
D: 0.3S: 3H: 8
D: 0.3S: 3H: 8
D: 0.3S: 3H: 8
D: 0.3S: 3H: 8
D: 0.3S: 3H: 8
D: 0.3S: 3H: 8
D: 0.3S: 3H: 8
D: 0.3S: 3H: 8
D: 0.3S: 3H: 8
D: 0.3S: 3H: 8
BALCONYBALCONY
BALCONY
TWO STOREYBRICK
BUILDINGNo.30
THREESTOREY BRICK
UNIT BLOCK
FB
289°
47'
55"
15.24
19° 47' 55"45.735
109°
47
' 5
5"
199° 47' 55"45.735
15.24
(A)
8
WINDOW(2ND):HEADRL16.06SILLRL14.62WINDOW(1ST):HEADRL13.40SILLRL11.94
WINDOW(2ND):HEADRL16.06SILLRL14.87WINDOW(1ST):HEADRL13.40SILLRL12.19
WINDOW(2ND):HEADRL15.03SILLRL13.41WINDOW(1ST):HEADRL12.09SILLRL11.45
WINDOW(2ND):HEADRL16.06SILLRL14.87WINDOW(1ST):HEADRL13.40SILLRL12.19
WINDOW(2ND):HEADRL16.06SILLRL14.62WINDOW(1ST):HEADRL13.40SILLRL11.83
WINDOW(2ND):HEAD RL15.92SILLINACCESSIBLEWINDOW(1ST):HEAD RL13.26SILLINACCESSIBLE
WINDOW(1ST):HEADRL13.88SILLRL12.45WINDOW(GND):HEAD RL10.73SILLINACCESSIBLE
WINDOW(1ST):HEADRL13.88SILLRL12.45WINDOW(GND):HEAD RL10.73SILLINACCESSIBLE
WINDOW(GND):HEADRL11.35SILLRL10.38
WINDOW(1ST):HEADRL13.81SILLRL12.81
WINDOW(1ST):HEADRL13.81SILLRL13.14
WINDOW(1ST):HEADRL13.81SILLRL13.14
WINDOW(1ST):HEADRL13.81SILLRL13.14
DOOR (1ST):TOP RL13.79FLOORINACCESSIBLE
DOOR (2ND):TOP RL15.91FLOORINACCESSIBLEDOOR (1ST):TOP RL13.25FLOORINACCESSIBLE
TH
E
CR
ES
CE
NT
SP 13994
TRAF
FIC
ISLA
ND
TRAF
FIC
ISLA
ND
TRAFFICISLAND
NON-TRAFFICABLEROOF
LIFTOVER RUN
VEHIC
ULAR
ACCE
SSPE
DEST
RIAN
ACCE
SS
LEVEL 4 1:100
ROOF PLAN 1:100