    Datasheet B-84567-SB-PP0-DSR-ST-60-0009  – Rev 1Fuel Gas Filter CoalescerConocoPhillips (Grissik) Ltd. Page 2 of 2

    Revision Sheet

    REVISION DATE DESCRIPTION OF CHANGE

    0A 15-Apr-15 First Issuance

    0B 29-May-15 Incorporate client’s comment 

    0C 26-Jun-15 Incorporate client’s comment 

    1 7-Jul-15Issued for Use

    - Revise gas flowrate due to relocation of GTG fuel gas system line

    Additional Approvers (If Applicable)

    Name Designation Signature Date

    ConocoPhillips (Grissik) Ltd.

  • 8/16/2019 Connocophilips Gas Suban

    3/41

    1 ITEM

    2 SERVICE

    3 TAG NUMBER

    4 LOCATION

    5 NUMBER

    6 TYPE

    7 P&ID REF. NO

    8 DESIGN

    10 Design Pressure Psig 490

    11 Design TemperatureoF -20 / 225

    12

    13 OPERATING CASE

    14

    Case-1

    Max Case

    (Note 1)

    Case-2

     Backup Case

    (Note 1)

    Case-3

    Start-up Case

    (Note 1)

    15 Operating Pressure (P) Psig 357.2 357 356.8

    16 Operating Temperature (T)oF 171.7 170.8 170.7

    17 VAPOUR

    18 Mass Flowrate Note 1 lb/hr 44907 42306 15269

    19 Molar Flowrate MMscfd 21.26 21.14 7.63

    20 Density lb/ft3

    1.098 1.039 1.034

    21 Viscosity cP 0.0137 0.0135 0.013522 Molecular Weight - 19.24 18.23 18.23

    23 LIQUID HYDROCARBON

    24 Mass Flowrate Note 1 lb/hr 0.443 - -

    25 Volume Flowrate bpd 0.051 - -

    26 Density lb/ft3

    37.37 - -

    27 Viscosity cP 0.2539 - -

    28 LIQUID AQEUOUS

    29 Mass Flowrate lb/hr  - - -

    30 Volume Flowrate bpd - - -

    31 Density lb/ft3 - - -

    32 Viscosity cP - - -

    33 VESSEL

    34 Horizontal / Vertical -

    35 Shell Diameter in

    36 Shell Length (T/T) in37 Material of Construction -

    38 Corrosion Allowance in

    39 Insulation -

    40 INTERNALS (Note 11)

    41 Solids Removal Efficiency

    42 Liquids Removal Efficiency

    44

    45

    46 Inlet Device

    47 Vortex Breaker Required

    48 Other Internals

    49 NOTES

    50 1. Flowrate already includes 10% design margin

    51 2. VTA = Vendor To Advise.

    52 3. Material of construction is 316L SS. To be validated during EPCI stage.

    53

    54

    55

    56

    57

    58

    1 07-Jul-15 Issued for Use ADI AND/YHT MCH

    0C 26-Jun-15 Re-Issued for Approval ADI AND/YHT MCH

    0B 29-May-15 Issued for Approval ADI AND/YHT MCH

    0A 15-Apr-15 First Issuance ADI AND/YHT MCH

    Rev. Date Description Prepared Check Approved

    Process Datasheet for Fuel Gas Filter Coalescer

    Sheet 1 of 3

    Rev 1

    PROCESS DATASHEET FOR GAS FILTER COALESCER

    FILTER COALESCER

    FUEL GAS FILTER COALESCER

    60NAD-303A/B

    SUBAN GAS PLANT

    2 x 100%

    Vertical

    VTA

    VTASS 316L (VTA) (Note 3)

    NIL

    FILTER COALESCER TYPE

    B-84567-SB-PP0-PID-ST-60-0012 SHEET 1

    UNIT

    UNIT

    Hot Insulation

    10 microns at 99.9%

    3 microns at 99.9%

    Clean Pressure Drop (Allow / Calc) 3 / VTA

    Dirty Pressure Drop (Changeout /

    Collapse)5 / VTA

    VTA

    VTA

    VTA

    SUBAN COMPRESSION PROJECT

    Doc. No : B-84567-SB-PP0-DSR-ST-60-0009ConocoPhillips (Grissik) Ltd.

  • 8/16/2019 Connocophilips Gas Suban

    4/41

    PROCESS DATASHEET FOR GAS FILTER COALESCER

     59

    60 Mark Service

    61 N1 Gas Inlet

    62 N2 Gas Outlet

    63 N3A Liquid outlet - upper section

    64 N3B Liquid outlet - bottom section

    65 N4A/B LG connection - bottom section

    66 N5A/B LG / LT connection - upper section for switchover  

    67 N6A/B PDT connection

    68 N7A/B LTZ connection - at upper section for trip

    69 N8 TI connection

    70 N9 PI connection

    71 N10 Quick opening closure

    72 N11A/B LT connection - alarm for bottom section

    73 N12 Equalization line for liquid trap - upper section

    74 N13 Equalization line for liquid trap - upper section

    75 N14 Vent connection

    76

    77

    78

    79

    80

    8182

    83

    84

    85

    86

    87

    88

    89

    90

    91

    92

    93

    94

    95

    9697

    98

    99

    100

    101

    102

    103

    104

    105

    106

    107

    108

    109

    110

    111

    112

    113

    114

    115

    116

    117

    118

    119

    1 07-Jul-15 Issued for Use ADI AND/YHT MCH

    0C 26-Jun-15 Re-Issued for Approval ADI AND/YHT MCH

    0B 29-May-15 Issued for Approval ADI AND/YHT MCH

    0A 15-Apr-15 First Issuance ADI AND/YHT MCH

    Rev. Date Description Prepared Check Approved

    Process Datasheet for Fuel Gas Filter Coalescer

    Sheet 2 of 3

    Rev 1

    NOZZLE SCHEDULE

    1 8 (VTA) 300#

    1 2 300#

    Number Size (in) Flange Rating

    1 10 (VTA) 300#

    2 2 300#

    2 2 300#

    1 2 300#

    2 2 300#

    1 2 300#

    1 VTA 300#

    2 2 300#

    1 2 300#

    1 2 300#

    1 2 300#

    2 2 300#

    1 2 300#

    SKETCH

    SUBAN COMPRESSION PROJECT

    Doc. No : B-84567-SB-PP0-DSR-ST-60-0009ConocoPhillips (Grissik) Ltd.ConocoPhillips (Grissik) Ltd.

  • 8/16/2019 Connocophilips Gas Suban

    5/41

    PROCESS DATASHEET FOR GAS FILTER COALESCER

     120

    121

    122

    123 Case-1Case-2

    Backup Case

    Case-3

    Start-up Case

    124 Nitrogen 0.00181 0.00187 0.00187

    125 CO2 0.05740 0.03482 0.03482

    126 Methane 0.88127 0.91051 0.91051

    127 Ethane 0.03397 0.03447 0.03447

    128 Propane 0.00998 0.00970 0.00970

    129 i-Butane 0.00297 0.00269 0.00269

    130 n-Butane 0.00296 0.00254 0.00254

    131 i-Pentane 0.00164 0.00119 0.00119

    132 n-Pentane 0.00105 0.00069 0.00069

    133 n-Hexane 0.00167 0.00069 0.00069

    134 Mcyclopentan 0.00017 0.00007 0.00007

    135 Benzene 0.00061 0.00021 0.00021

    136 Cyclohexane 0.00017 0.00006 0.00006

    137 n-Heptane 0.00080 0.00018 0.00018

    138 Mcyclohexane 0.00022 0.00005 0.00005

    139 Toluene 0.00042 0.00007 0.00007

    140 n-Octane 0.00050 0.00006 0.00006

    141 m-Xylene 0.00009 0.00001 0.00001

    142 p-Xylene 0.00009 0.00001 0.00001

    143 o-Xylene 0.00004 0.00000 0.00000

    144 n-Nonane 0.00020 0.00001 0.00001

    145 124-MBenzene 0.00002 0.00000 0.00000

    146 n-Decane 0.00008 0.00000 0.00000

    147 n-C11 0.00003 0.00000 0.00000

    148 n-C12 0.00001 0.00000 0.00000

    149 n-C13 0.00000 0.00000 0.00000

    150 n-C14 0.00000 0.00000 0.00000

    151 n-C15 0.00000 0.00000 0.00000

    152 n-C16 0.00000 0.00000 0.00000

    153 n-C17 0.00000 0.00000 0.00000

    154 n-C18 0.00000 0.00000 0.00000

    155 n-C19 0.00000 0.00000 0.00000

    156 n-C20 0.00000 0.00000 0.00000157 H2O 0.00180 0.00008 0.00008

    158 H2S 40 ppm 3 - 4 ppm 3 - 4 ppm

    159 Mercury < 1 µg/Nm3

    < 1 µg/Nm3

    < 1 µg/Nm3

    160

    161

    162

    163

    164

    165

    166

    167

    168

    169

    170

    171172

    173

    174

    175

    176

    177

    178

    179

    1 07-Jul-15 Issued for Use ADI AND/YHT MCH

    0C 26-Jun-15 Re-Issued for Approval ADI AND/YHT MCH

    0B 29-May-15 Issued for Approval ADI AND/YHT MCH

    0A 15-Apr-15 First Issuance ADI AND/YHT MCH

    Rev. Date Description Prepared Check Approved

    Process Datasheet for Fuel Gas Filter Coalescer

    Sheet 3 of 3

    Rev 1

    Mole FractionComposition

    SUBAN COMPRESSION PROJECT

    Doc. No : B-84567-SB-PP0-DSR-ST-60-0009

    FEED COMPOSITION

    ConocoPhillips (Grissik) Ltd.ConocoPhillips (Grissik) Ltd.

  • 8/16/2019 Connocophilips Gas Suban

    6/41

    SUBAN COMPRESSION PROJECT

     Attachment for Process Datasheet Fuel Gas Filter Coalescer 

    Attachment List -

    Attachment List

    1. Attachment 1 – Fuel Gas Demand

    2. Attachment 2 – HYSYS Snapshot

    3. Attachment 3 – Liquid Produced

    4. Attachment 4 – Minimum Design Temperature

    5. Attachment 5 – Pressure Drop Check

    6. Attachment 6 – GTC and GTG Fuel Gas Demand

    7. Attachment 7 – LP Fuel Gas Demand

    8. Attachment 8 – Line Sizing

    9. Attachment 9 – Required Filtration Performance

    ConocoPhillips (Grissik) Ltd.

  • 8/16/2019 Connocophilips Gas Suban

    7/41

    SUBAN COMPRESSION PROJECT

     Attachment for Process Datasheet Fuel Gas Filter Coalescer 

    - -

    Attachment 1

    Fuel Gas Demand

    ConocoPhillips (Grissik) Ltd.

  • 8/16/2019 Connocophilips Gas Suban

    8/41

  • 8/16/2019 Connocophilips Gas Suban

    9/41

    SUBAN COMPRESSION PROJECT

     Attachment for Process Datasheet Fuel Gas Filter Coalescer 

    Sheet 2 of 2

    FUEL GAS DEMAND

    Train BHP Required

    Incl. Losses 2% (HP)

    (Note 1)

    Heat Rate

    (Btu/hp-hr)

    (Note 1)

    LHV

    (Btu/scf)

    GTC Fuel Gas

    Demand per

    train (MMscfd)

    (Note 2)

    No Train

    Running

    Incl.

    Switchover

    (Note 3)

    GTC Fuel

    Gas Total

    Demand

    (MMscfd)

    Early Life 5323.38 7709 933.6 1.16 4.5 5.22 1.13 0.001 2.30 8.66

    Mid-Life-1 12279.78 7709 933.1 2.68 4.5 12.05 1.13 0.001 2.30 15.49Mid Life-2 15144.96 7709 933.1 3.30 4.5 14.86 1.13 0.001 2.30 18.30

    Late-Life 14353.44 7709 934.1 3.13 4.5 14.07 1.13 0.001 2.30 17.51

    Beyond PSC Life 13517.04 7709 938.5 2.93 4.5 13.19 1.13 0.001 2.30 16.63

    Highest Gas Demand 16193.00 7709 933.1 3.53 4.5 15.89 1.13 0.001 2.30 19.33

    Start-up case 16193.00 7709 939.4 3.51 1.0 3.51 1.13 0.001 2.30 6.94

    Backup Case 16193.00 7709 939.4 3.51 4.5 15.79 1.13 0.001 2.30 19.22

    Notes: 1. GTC horse power and heat rate is taken from vendor datasheet in Attachment 5 which still exclude 2% of gearbox losses

    2. 10% design margin is applied to GTC Fuel Gas demand as stated by GTC vendor (see attachment 5)

    3. Number of train running is included switchover scenario in which the backup compressor will run at 50% load

    4. Purge Gas consumption is calculated by FLARENET with backpressure of 2 psig (Attachment 6). This value to be revalidated during EPCI stage.

    5. Pilot Gas demand is referred to vendor qoutation by NAO (Attachment 6). This value to be revalidated during EPCI stage.

    6. GTG Fuel Gas demand is taken from maximum flowrate to existing GTG as per PFD (attachment 8) which is higher than data provided from GTG

    vendor. This value to be revalidated during EPCI stage.

    Attachment 1 - Fuel Gas Demand

    1. GTC Fuel Gas Demand

    3. Pilot Gas

    (MMscfd)

    (Note 5)

    2. Purge Gas

    (MMscfd)

    (Note 4)

    5. Total Fuel Gas

    Demand

    (MMscfd)

    4. GTG Fuel

    Gas Demand

    ConocoPhillips (Grissik) Ltd.

  • 8/16/2019 Connocophilips Gas Suban

    10/41

  • 8/16/2019 Connocophilips Gas Suban

    11/41

    SUBAN COMPRESSION PROJECT

     Attachment for Process Datasheet Fuel Gas Filter Coalescer 

    Attachment 2 - HYSYS Snapshot Sheet 1 of 3

    Case with Highest Gas Demand

    ConocoPhillips (Grissik) Ltd.

  • 8/16/2019 Connocophilips Gas Suban

    12/41

    SUBAN COMPRESSION PROJECT

     Attachment for Process Datasheet Fuel Gas Filter Coalescer 

    Attachment 2 - HYSYS Snapshot Sheet 2 of 3

    Backup case

    ConocoPhillips (Grissik) Ltd.

  • 8/16/2019 Connocophilips Gas Suban

    13/41

  • 8/16/2019 Connocophilips Gas Suban

    14/41

    SUBAN COMPRESSION PROJECT

     Attachment for Process Datasheet Fuel Gas Filter Coalescer 

    - -

    Attachment 3

    Liquid Produced

    ConocoPhillips (Grissik) Ltd.

  • 8/16/2019 Connocophilips Gas Suban

    15/41

    SUBAN COMPRESSION PROJECT

     Attachment for Process Datasheet Fuel Gas Filter Coalescer 

    Attachment 3 - Liquid Produced Calculation Sheet 1 of 1

    Determined liquid rate to be handled by Fuel Gas Filter Coalescer (60NAD-303A/B)

    Gas Flowrate

    (MMscfd)

    Liquid flowrate

    (bpd) (Note 2)Remark

    Early Life 9.52 0.000

    Mid-Life-1 17.04 0.000

    Mid Life-2 20.13 0.000

    Late-Life 19.26 0.000

    Beyond PSC Life 18.29 0.000

    Startup case 7.63 0.000

    Backup case 21.14 0.000

    0.1 gal/MMscf 21.26 0.051 Note 1

    Note:

    1. Since no liquid is produced in all cases, for sizing purpose liquid amount is determined by using

      assumption of 0.1 gal/MMscf. The nominal flowrate is taken based on highest fuel gas demand.

    2. Liquid flowrate is taken from HYSYS snapshot in Attachment 1.

    Based on this composistion,

    there is no liquid found.

    ConocoPhillips (Grissik) Ltd.

  • 8/16/2019 Connocophilips Gas Suban

    16/41

  • 8/16/2019 Connocophilips Gas Suban

    17/41

    SUBAN COMPRESSION PROJECT

     Attachment for Process Datasheet Fuel Gas Filter Coalescer 

    Attachment 4 - Minimum Design Temperature Sheet 1 of 3

    Minimum Design Temperature Summary

    Temperature (oF) Remark

    Minimum blowdown temperature 14.99

    154.1 Note 1

    -20.00

    Note 1: For pressurizing case as modelled in snapshot below, Fuel/Seal Gas Heater (60HAP-301) is

    already on duty since it is required to operate before gas can be distributed through Mercury

    Removal Unit (60NAF-301). Therefore, during pressurizing from 0 atm, the temperature result

      is still considerably high.

    Pressurizing case

    Case-1: Pressurizing in min. ambient temp

    Selected Minimum Design Temperature

    ConocoPhillips (Grissik) Ltd.

  • 8/16/2019 Connocophilips Gas Suban

    18/41

    SUBAN COMPRESSION PROJECT

     Attachment for Process Datasheet Fuel Gas Filter Coalescer 

    Attachment 4 - Minimum Design Temperature Sheet 2 of 3

    1. With the exception for pressurizing in minimum ambient temperature (case-2), the lowest predicted

      temperature for Fuel / Seal Gas Filter Coalescer is -5.35oF (case-3), therefore the minimum design

    ConocoPhillips (Grissik) Ltd.

  • 8/16/2019 Connocophilips Gas Suban

    19/41

    SUBAN COMPRESSION PROJECT

     Attachment for Process Datasheet Fuel Gas Filter Coalescer 

    Attachment 4 - Minimum Design Temperature Sheet 3 of 3

    1. With the exception for pressurizing in minimum ambient temperature (case-2), the lowest predicted

      temperature for Fuel / Seal Gas Filter Coalescer is -5.35oF (case-3), therefore the minimum design

    ConocoPhillips (Grissik) Ltd.

  • 8/16/2019 Connocophilips Gas Suban

    20/41

    SUBAN COMPRESSION PROJECT

     Attachment for Process Datasheet Fuel Gas Filter Coalescer 

    - -

    Attachment 5

    Pressure Drop Check

    ConocoPhillips (Grissik) Ltd.

  • 8/16/2019 Connocophilips Gas Suban

    21/41

    SUBAN COMPRESSION PROJECT

     Attachment for Process Datasheet Fuel Gas Filter Coalescer 

    Attachment 5 - Pressure Drop Check Sheet 1 of 2

    1st stage no

    leak

    2nd stage no

    leakLeak case

    1st stage no

    leak

    2nd stage no

    leakLeak case

    Case-1 887 1131 994 937 1181 1044 1270 1220

    Case-2 578 957 744 628 1007 794 1270 1220

    Case-3 471 885 652 521 935 702 1270 1220

    Case-4 359 811 557 409 861 607 1240 1190

    Case-5 260 779 487 310 829 537 1060 1010

    Notes:Operating pressure and pressure drop allocation is given in sketch below, to be validated during EPCI phase.

    Compressor

    Discharge Header

    Pressure (psig)

    Required seal gas pressure as per GTC

    spec (psig)Settle out Pressure, psig Pressure at the

    Seal Gas Supply

    Skid (psig)

    ConocoPhilli s (Grissik) Ltd.

    TO SEAL GASDISTRIBUTIONSYSTEM

  • 8/16/2019 Connocophilips Gas Suban

    22/41

  • 8/16/2019 Connocophilips Gas Suban

    23/41

    SUBAN COMPRESSION PROJECT

     Attachment for Process Datasheet Fuel Gas Filter Coalescer 

    - -

    Attachment 6

    GTC and GTG Fuel Gas Demand

    ConocoPhillips (Grissik) Ltd.

  • 8/16/2019 Connocophilips Gas Suban

    24/41

    SUBAN COMPRESSION PROJECT

     Attachment for Process Datasheet Fuel Gas Filter Coalescer 

    Attachment 6 - GTC and GTG Fuel Gas Demand Sheet 1 of 6

    Note:

    1. BHP for each compressor case above is used for fuel gas demand calculation as given in

      Attachment 1, note that no external or girbox losses given in the value above.

    ConocoPhillips (Grissik) Ltd.

  • 8/16/2019 Connocophilips Gas Suban

    25/41

    SUBAN COMPRESSION PROJECT

     Attachment for Process Datasheet Fuel Gas Filter Coalescer 

    Attachment 6 - GTC and GTG Fuel Gas Demand Sheet 2 of 6

    Note:

    1. BHP for each compressor case above is used for fuel gas demand calculation as given in

      Attachment 1, note that no external or girbox losses given in the value above.

    ConocoPhillips (Grissik) Ltd.

  • 8/16/2019 Connocophilips Gas Suban

    26/41

    SUBAN COMPRESSION PROJECT

     Attachment for Process Datasheet Fuel Gas Filter Coalescer 

    Attachment 6 - GTC and GTG Fuel Gas Demand Sheet 3 of 6

    Note:

    1. BHP for each compressor case above is used for fuel gas demand calculation as given in

      Attachment 1, note that no external or girbox losses given in the value above.

    ConocoPhillips (Grissik) Ltd.

  • 8/16/2019 Connocophilips Gas Suban

    27/41

  • 8/16/2019 Connocophilips Gas Suban

    28/41

    SUBAN COMPRESSION PROJECT

     Attachment for Process Datasheet Fuel Gas Filter Coalescer 

    Attachment 6 - GTC and GTG Fuel Gas Demand Sheet 5 of 6

    Note:

    1. BHP for each compressor case above is used for fuel gas demand calculation as given in

      Attachment 1, note that no external or girbox losses given in the value above.

    Note:

    1. Heat rate 7709 Btu/HP-hr at maximum ambient temperature 100oF above is used for fuel gas

      demand calculation as given in Attachment 1.

    ConocoPhillips (Grissik) Ltd.

  • 8/16/2019 Connocophilips Gas Suban

    29/41

    SUBAN COMPRESSION PROJECT

     Attachment for Process Datasheet Fuel Gas Filter Coalescer 

    Attachment 6 - GTC Fuel Gas Demand Sheet 6 of 6

    Note: 1. 1600 scfm (2.30 MMscfd) is used as a basis for GTG fuel gas demand.

      2. Existing GTG use same model to the new GTG proposed model which is Taurus 70.

    ConocoPhillips (Grissik) Ltd.

  • 8/16/2019 Connocophilips Gas Suban

    30/41

    SUBAN COMPRESSION PROJECT

     Attachment for Process Datasheet Fuel Gas Filter Coalescer 

    - -

    Attachment 7

    LP Fuel Gas Demand

    ConocoPhillips (Grissik) Ltd.

  • 8/16/2019 Connocophilips Gas Suban

    31/41

    SUBAN COMPRESSION PROJECT

     Attachment for Process Datasheet Fuel Gas Filter Coalescer 

    Attachment 7 - LP Fuel Gas Demand Sheet 1 of 2

    Vendor Data for Pilot Gas Demand

    Note: 1. 45000 BTU/hr is taken as a basis for Pilot Gas Demand.

    ConocoPhillips (Grissik) Ltd.

  • 8/16/2019 Connocophilips Gas Suban

    32/41

    SUBAN COMPRESSION PROJECT

     Attachment for Process Datasheet Fuel Gas Filter Coalescer 

    Attachment 7 - LP Fuel Gas Demand Sheet 2 of 2

    Flarenet snapshot calculation for Purge Gas Demand

    Note:

    1. Above snapshot is taken from flare header sizing result as a part of Blowdown, Relief and Flare Study

    Doc.No. B-84567-SB-PP0-DRT-ST-00-0006.

    ConocoPhillips (Grissik) Ltd.

    Purge gas to flare header is1.13 MMscfd (2,422 lb/hr)

  • 8/16/2019 Connocophilips Gas Suban

    33/41

    SUBAN COMPRESSION PROJECT

     Attachment for Process Datasheet Fuel Gas Filter Coalescer 

    - -

    Attachment 8

    Line Sizing

    ConocoPhillips (Grissik) Ltd.

  • 8/16/2019 Connocophilips Gas Suban

    34/41

  • 8/16/2019 Connocophilips Gas Suban

    35/41

    SUBAN COMPRESSION PROJECT

     Attachment for Process Datasheet Fuel Gas Filter Coalescer 

    Attachment 8 - Nozzle and Line Sizing Sheet 2 of 6ConocoPhillips (Grissik) Ltd.

  • 8/16/2019 Connocophilips Gas Suban

    36/41

    SUBAN COMPRESSION PROJECT

     Attachment for Process Datasheet Fuel Gas Filter Coalescer 

    Attachment 8 - Nozzle and Line Sizing Sheet 3 of 6ConocoPhillips (Grissik) Ltd.

  • 8/16/2019 Connocophilips Gas Suban

    37/41

    SUBAN COMPRESSION PROJECT

     Attachment for Process Datasheet Fuel Gas Filter Coalescer 

    Attachment 8 - Nozzle and Line Sizing Sheet 4 of 6ConocoPhillips (Grissik) Ltd.

  • 8/16/2019 Connocophilips Gas Suban

    38/41

    SUBAN COMPRESSION PROJECT

     Attachment for Process Datasheet Fuel Gas Filter Coalescer 

    Attachment 8 - Nozzle and Line Sizing Sheet 5 of 6ConocoPhillips (Grissik) Ltd.

  • 8/16/2019 Connocophilips Gas Suban

    39/41

  • 8/16/2019 Connocophilips Gas Suban

    40/41

    SUBAN COMPRESSION PROJECT

     Attachment for Process Datasheet Fuel Gas Filter Coalescer 

    - -

    Attachment 9

    Required Filtration Performance

    ConocoPhillips (Grissik) Ltd.

  • 8/16/2019 Connocophilips Gas Suban

    41/41

    SUBAN COMPRESSION PROJECT

     Attachment for Process Datasheet Fuel Gas Filter Coalescer 

    Attachment 9 - Required Filtration Performance Sheet 1 of 1

    GTC Vendor Data for Required Filtration Performance

    ConocoPhillips (Grissik) Ltd.