Connection set, DHW circulation pump Installation ... · Connection set, DHW circulation...

12
5712 866 GB 3/2010 Dispose after installation. Installation instructions for contractors VIESMANN Connection set, DHW circulation pump for Vitodens and Vitoladens Safety instructions Please follow these safety instructions closely to prevent accidents and material losses. Safety instructions explained ! Please note This symbol warns against the risk of material losses and envi- ronmental pollution. Note Details identified by the word "Note" con- tain additional information. Installation, initial start-up, inspection, maintenance and repairs must only be carried out by a competent person (heat- ing engineer/installation contractor). Before working on the equipment/heat- ing system, isolate the power supply (e.g. by removing a separate mains fuse or by means of a mains isolator) and safeguard against unauthorised recon- nection. When using gas as fuel, also close the main gas shut-off valve and safeguard against unauthorised reopening. Repairing components which fulfil a safety function can compromise the safe operation of your heating system. For replacements, use only original spare parts supplied or approved by Viessmann. Application information Vitodens 222-F, type FS2A, FS2B Vitodens 333-F, type FS3A, FS3B Vitodens 333-F, type FR3A, FR3B Vitoladens 333-F, type VP3T, VP3U

Transcript of Connection set, DHW circulation pump Installation ... · Connection set, DHW circulation...

Page 1: Connection set, DHW circulation pump Installation ... · Connection set, DHW circulation pumpVIESMANN ... Boiler installation instructions Making the electrical connections of the

5712 866 GB 3/2010 Dispose after installation.

Installation instructionsfor contractors

VIESMANN

Connection set, DHW circulation pumpfor Vitodens and Vitoladens

Safety instructions

Please follow these safety instructions closely to prevent accidents andmaterial losses.

Safety instructions explained

! Please noteThis symbol warns against therisk of material losses and envi-ronmental pollution.

NoteDetails identified by the word "Note" con-tain additional information.

Installation, initial start-up, inspection,maintenance and repairs must only becarried out by a competent person (heat-ing engineer/installation contractor).

Before working on the equipment/heat-ing system, isolate the power supply(e.g. by removing a separate mains fuseor by means of a mains isolator) andsafeguard against unauthorised recon-nection.

When using gas as fuel, also close themain gas shut-off valve and safeguardagainst unauthorised reopening.

Repairing components which fulfil asafety function can compromise the safeoperation of your heating system. For replacements, use only originalspare parts supplied or approved byViessmann.

Application information

■ Vitodens 222-F, type FS2A, FS2B■ Vitodens 333-F, type FS3A, FS3B

■ Vitodens 333-F, type FR3A, FR3B■ Vitoladens 333-F, type VP3T, VP3U

Page 2: Connection set, DHW circulation pump Installation ... · Connection set, DHW circulation pumpVIESMANN ... Boiler installation instructions Making the electrical connections of the

2

Vitodens 222-F, type FS2A andVitodens 333-F, type FS3A and Vito-ladens 333-F, type VP3T

Connect the DHW circulation pump tothe external extension H1 or H2.

Installation instructions, externalextension

Vitodens 222-F, type FS2B, Vitodens333-F, type FS3B and Vitoladens 333-F, type VP3U

Connect the DHW circulation pump toextension AM1 or EA1.

Installation instructions, exten-sion

Vitodens 333-F, type FR3A and typeFR3B

Connect the DHW circulation pump tothe internal extension inside the boilercontrol unit.

Boiler installation instructions

Making the electrical connections of the circulation pump

5712

866

GB

Page 3: Connection set, DHW circulation pump Installation ... · Connection set, DHW circulation pumpVIESMANN ... Boiler installation instructions Making the electrical connections of the

3

Fitting external extension H2

1.

2.

A

The external extension H2 A can be fit-ted inside the boiler.

Making the electrical connections of the… (cont.)

5712

866

GB

Page 4: Connection set, DHW circulation pump Installation ... · Connection set, DHW circulation pumpVIESMANN ... Boiler installation instructions Making the electrical connections of the

4

Fitting extension AM1 or EA1

3.

4.

2.

1.

Secure extension AM1 or EA1 to theretainer supplied.

Making the electrical connections of the… (cont.)

5712

866

GB

Page 5: Connection set, DHW circulation pump Installation ... · Connection set, DHW circulation pumpVIESMANN ... Boiler installation instructions Making the electrical connections of the

5

Fit plastic sleeve A in the following boilers:■ Vitodens 222-F, type FS2A■ Vitodens 333-F, type FR3A■ Vitoladens 333-F, type VP3T

! Please noteDo not fit plastic sleeve A in thefollowing boilers:■ Vitodens 222-F, type FS2B■ Vitodens 333-F, type FS3A■ Vitodens 333-F, type FR3B■ Vitoladens 333-F, type VP3U

1.

3.

2.

A

NoteStep 2: Bend the plastic sleeve A carefully; do not kink it.

Fitting the connection set57

12 8

66 G

B

Page 6: Connection set, DHW circulation pump Installation ... · Connection set, DHW circulation pumpVIESMANN ... Boiler installation instructions Making the electrical connections of the

6

1.

2.

3.

A

NoteHere, install the shorter of the two twinnipples A.

Fitting the connection set (cont.)

5712

866

GB

Page 7: Connection set, DHW circulation pump Installation ... · Connection set, DHW circulation pumpVIESMANN ... Boiler installation instructions Making the electrical connections of the

7

2.

1.

Fitting the connection set (cont.)

5712

866

GB

Page 8: Connection set, DHW circulation pump Installation ... · Connection set, DHW circulation pumpVIESMANN ... Boiler installation instructions Making the electrical connections of the

8

4.

3.

1.

2.

Fitting the connection set (cont.)

5712

866

GB

Page 9: Connection set, DHW circulation pump Installation ... · Connection set, DHW circulation pumpVIESMANN ... Boiler installation instructions Making the electrical connections of the

9

2.

1.

?3.

A

NoteHere, install the longer of the two twinnipples A.

Fitting the connection set (cont.)

5712

866

GB

Page 10: Connection set, DHW circulation pump Installation ... · Connection set, DHW circulation pumpVIESMANN ... Boiler installation instructions Making the electrical connections of the

10

According to EN 806, the line volume inside the DHW circulation line should be cir-culated three times per hour to prevent excessive cooling.The flow rate is adjusted at flow regulating valve A.

L1

L 2

A

Calculating the required circulation vol-ume Vp (volume of the total DHW circu-lation and supply line):

Line volume of copper pipe:Int. diameterDN

Line volume VLl/m

12 0.1315 0.2020 0.31

Example:■ Supply line DN 20, line length L1

= 20 m■ DHW circulation line DN 12, line length

L2 = 20 m■ Circulation volume Vp = 3 x V/h

V = L1 x VL + L2 x VLV = 20 m x 0.31 l/m + 20 m x 0.13 l/mV = 6.2 l + 2.6 lV = 8.8 lVp = 3 x V/hVp = 3 x 8.8 l/hVp = 26.4 l/h = 0.44 l/min

Value to be set at the flow regulatingvalve: 0.44 l/min.

Adjusting the circulation volume

5712

866

GB

Page 11: Connection set, DHW circulation pump Installation ... · Connection set, DHW circulation pumpVIESMANN ... Boiler installation instructions Making the electrical connections of the

11

Flow regulating valve

B A

DD

FB A

0.30.51.0

1.5

l/min

!0.30.51.0

1.5

Adjusting the circulation volume (cont.)

5712

866

GB

Page 12: Connection set, DHW circulation pump Installation ... · Connection set, DHW circulation pumpVIESMANN ... Boiler installation instructions Making the electrical connections of the

12

Viessmann LimitedHortonwood 30, TelfordShropshire, TF1 7YP, GBTelephone: +44 1952 675000Fax: +44 1952 675040E-mail: [email protected]

Viessmann Werke GmbH&Co KGD-35107 AllendorfTelephone: +49 6452 70-0Fax: +49 6452 70-2780www.viessmann.com

5712

866

GB

Sub

ject

to te

chni

cal m

odifi

catio

ns.

Prin

ted

on e

nviro

nmen

tally

frie

ndly

,ch

lorin

e-fre

e bl

each

ed p

aper