Connecting with VTA’s

Contracting Opportunities

March 22, 2019

Page 2: Connecting with VTA’s Contracting Opportunitiesvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · improvements and improvements identified in the Project Study Report-Project Development

Upcoming Highway Program Contracting Opportunities

Gene GonzaloEngineering Group Manager – Capital Projects

Casey EmotoDeputy Director – Mobility and Project Development

Page 3: Connecting with VTA’s Contracting Opportunitiesvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · improvements and improvements identified in the Project Study Report-Project Development

3

VTA Highway Program Projects

▪ SR 237/Middlefield Interchange Improvement Project

▪ SR 85 Noise Reduction Phase 2 – Pilot Project

▪ US 101/San Antonio Road/Charleston Road /Rengstorff Avenue Improvement

▪ SR 237/Calaveras Blvd/McCarthy Blvd Improvement

▪ I-280 Soundwalls between SR 87 and Los Gatos Creek

Page 4: Connecting with VTA’s Contracting Opportunitiesvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · improvements and improvements identified in the Project Study Report-Project Development

4

SR 237/Middlefield Interchange

Improvement Project

Page 5: Connecting with VTA’s Contracting Opportunitiesvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · improvements and improvements identified in the Project Study Report-Project Development

5

SR 237/Middlefield Interchange Improvement Project

▪ Scope – Provide Project Approval/Environmental Document (PA/ED) tasks for improvements at SR 237 and Middlefield Road in the City of Mountain View. Scope of work includes, but is not limited to ramp improvements, modification or construction of new local traffic signalized intersections, bicycle and pedestrian improvements and improvements identified in the Project Study Report-Project Development Support (PSR-PDS) approved in 2013.

▪ Schedule – PA/ED Phase (Starting Mid-2019)

▪ SBE Opportunities – Professional Services such as General Civil Engineering Design, Traffic, Environmental, Community Outreach, Structure Design, Electrical, Hydraulic, Landscape Design, Complete Streets, and Graphic Design.

Page 6: Connecting with VTA’s Contracting Opportunitiesvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · improvements and improvements identified in the Project Study Report-Project Development

6

SR 85 Noise Reduction Phase 2 – Pilot Project

Page 7: Connecting with VTA’s Contracting Opportunitiesvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · improvements and improvements identified in the Project Study Report-Project Development

7

SR 85 Noise Reduction Phase 2 – Pilot Project

▪ Scope – Provide Project Initiation Document (PID) tasks to implement the pilot test phase of noise reduction treatments at five test locations including collecting of before and after noise measurements.

▪ Schedule – PID Phase (Starting Mid-2019)

▪ SBE Opportunities – Professional Services such as General Civil Engineering Design, Traffic Noise Analysis, and Noise Abatement Design.

Page 8: Connecting with VTA’s Contracting Opportunitiesvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · improvements and improvements identified in the Project Study Report-Project Development

8

US 101/San Antonio Road/Charleston Road

/Rengstorff Avenue Improvement

Page 9: Connecting with VTA’s Contracting Opportunitiesvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · improvements and improvements identified in the Project Study Report-Project Development

9

US 101/San Antonio Road/Charleston Road /Rengstorff

Avenue Improvement

▪ Scope – Provide Project Initiation Document (PID) tasks including Alternative Analysis to modify the US 101/San Antonio Rd and US 101/Charleston Rd/ Rengstorff Ave interchanges in the cities of Mountain View and Palo Alto.

▪ Schedule – PID Phase (Starting Mid 2019)

▪ SBE Opportunities – Professional Services such as General Civil Engineering Design, Traffic, Environmental, Structure Design, and Graphic Design. Other engineering services in future phases would include Community Outreach, Structure Design, Electrical, Hydraulic, Landscape Design, Complete Streets, and Graphic Design.

Page 10: Connecting with VTA’s Contracting Opportunitiesvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · improvements and improvements identified in the Project Study Report-Project Development

10

SR 237/Calaveras Blvd/McCarthy Blvd

Improvement

SR 237/Calaveras Blvd. /McCarthy Blvd

Page 11: Connecting with VTA’s Contracting Opportunitiesvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · improvements and improvements identified in the Project Study Report-Project Development

11

SR 237/Calaveras Blvd/McCarthy Blvd Improvement

▪ Scope – Design and Construct HOV bypass lane at the westbound SR 237 on-ramp from Calaveras Boulevard. Extend existing HOV bypass on McCarthy Blvd to the limit line.

▪ Schedule – All Phases (Starting Mid-2019)

▪ SBE Opportunities - Engineering Services such as General Civil Engineering Design Traffic, Environmental, Electrical, Structure Design.

Page 12: Connecting with VTA’s Contracting Opportunitiesvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · improvements and improvements identified in the Project Study Report-Project Development

12

I-280 Soundwalls between SR 87 and

Los Gatos Creek

Page 13: Connecting with VTA’s Contracting Opportunitiesvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · improvements and improvements identified in the Project Study Report-Project Development

13

I-280 Soundwalls between SR 87 and Los Gatos Creek

▪ Scope – Project Approval/Environmental Document (PA/ED) tasks to construct new soundwalls along I-280 on both sides between SR 87 and Los Gatos Creek Bridge in San Jose.

▪ Schedule – PA/ED Phase (Starting Mid-2019)

▪ SBE Opportunities - Professional Services such as General Civil Engineering Design,Environmental, Structure Design, and Geotechnical Design.

Page 14: Connecting with VTA’s Contracting Opportunitiesvtaorgcontent.s3-us-west-1.amazonaws.com/Site... · improvements and improvements identified in the Project Study Report-Project Development

14

QUESTIONS