Cong Trinh Thep
-
Upload
lathanh-september-eighteenth -
Category
Documents
-
view
238 -
download
0
Transcript of Cong Trinh Thep
-
7/31/2019 Cong Trinh Thep
1/48
The C3P
-
7/31/2019 Cong Trinh Thep
2/48
What is C3P ?
Centre de Parachvement Poutrelles et
Palplanches
"Finishing Operational Centre for Beams andSteel Sheet Piles"
Beam & Piling Finishing Center (C3P)
-
7/31/2019 Cong Trinh Thep
3/48
Special Finishing AMB.Lambinet
Staff: 43
KLEINLUX
COMETAL WALLUX
BRIDGES +HEAVY FINISHING
MISC. FIN / ACB / IFBCAR PARKS
SURFACETREATMENT
The Main Products
SPECIALFINISHING AM
-
7/31/2019 Cong Trinh Thep
4/48
Grey mill
Eurostructures Office
C3P Hall
Special Finishing AM
Surf. Treatment KLEINLUX
Location of the different Beam& Piling Finishing units
-
7/31/2019 Cong Trinh Thep
5/48
-
7/31/2019 Cong Trinh Thep
6/48
Reduced tolerances
Cutting of sections with depths up to 1100mm
Sawing
L
a
b
L
a
b
Bundle cutting
Oblique cut up to 45
-
7/31/2019 Cong Trinh Thep
7/48
Oxygen cutting
Plasma cutting
Oxygen-Plasma Cutting /Coping
Coping of flanges
and webs
-
7/31/2019 Cong Trinh Thep
8/48
6 - 40 mm
Max. thick: 125mm
40 - 120 mm
Drilling
-
7/31/2019 Cong Trinh Thep
9/48
-
7/31/2019 Cong Trinh Thep
10/48
Automatic and manual welding ofcover plates, stiffeners
Welding following EN ISO14555 valid for bridge applications
Welding
-
7/31/2019 Cong Trinh Thep
11/48
Welding
Cross-column
Fabrication ofa jumbo section
-
7/31/2019 Cong Trinh Thep
12/48
HL 1000 M
T-cutting
HD400x592
-
7/31/2019 Cong Trinh Thep
13/48
Bending of beams with a constantradius:
Bending along the strong andweak axis of beamsBending of T-sectionsBending of U-sections
Bending
Bending up to 550mmR = 35m
-
7/31/2019 Cong Trinh Thep
14/48
Shotblasting according to SA 2.5, 3.0 and primer
Painting
-
7/31/2019 Cong Trinh Thep
15/48
Cold galvanizingApplication of complete paint systems (primer + final paint systemlayers according to DB-TL, ZTV-Kor, ISO EN 12944)
Painting
-
7/31/2019 Cong Trinh Thep
16/48
Application - Bridges
-
7/31/2019 Cong Trinh Thep
17/48
HLR 1100120 to
Eiffage TP (F)
Composite bridge
-
7/31/2019 Cong Trinh Thep
18/48
AdvantagesNo weldingNo stud connectors
Fatigue behaviour
+=
Oxycutting
VFT-WIB Beam system
Prefabricated Composite Bridges
VFT WIB Beam system
-
7/31/2019 Cong Trinh Thep
19/48
Assembling of the
rolled beams in pairs
VFT-WIB Beam systemPrefabricated Composite Bridges
-
7/31/2019 Cong Trinh Thep
20/48
Application - Car Parks
-
7/31/2019 Cong Trinh Thep
21/48
Galvanizing partner oncustomers choice
Car parks: Galvanizing
-
7/31/2019 Cong Trinh Thep
22/48
Car Parks
IPE/A360-550 S460
1070 toAirport Dsseldorf (D)
-
7/31/2019 Cong Trinh Thep
23/48
Car ParksIPE/A 360-550 S460
280 to
Kassel (D)
-
7/31/2019 Cong Trinh Thep
24/48
Application Cellular Beams ACB
AngelinaFabrication process
-
7/31/2019 Cong Trinh Thep
25/48
Oxycutting
AngelinaFabrication process
Initial
profile
from
Arcelor
Mitt
alse
ction
ranges
-
7/31/2019 Cong Trinh Thep
26/48
AngelinaFabrication process
-
7/31/2019 Cong Trinh Thep
27/48
RotationOxycutting Separation
gp
AngelinaFabrication process
-
7/31/2019 Cong Trinh Thep
28/48
AssemblingSeparation RotationOxycutting
gp
AngelinaFabrication process
-
7/31/2019 Cong Trinh Thep
29/48
Separation RotationOxycutting WeldingAssembling
gp
AngelinaFabrication process
-
7/31/2019 Cong Trinh Thep
30/48
AssemblingSeparation RotationOxycutting Welding Final length
Fina
llen
gth
-
7/31/2019 Cong Trinh Thep
31/48
Initial profile
from ArcelorMittalsection ranges
Final beam Angelina
h H 1,5 h
A li ti C ll l B ACB
-
7/31/2019 Cong Trinh Thep
32/48
IMD (CH)
Application Cellular Beams ACB
Application Cellular Beams ACB
-
7/31/2019 Cong Trinh Thep
33/48
Application Cellular Beams ACB
Purificationplant
Beggen (L)
Application Cellular Beams ACB
-
7/31/2019 Cong Trinh Thep
34/48
Klimahaus Bremerhaven (D)
Application Cellular Beams ACB
HE 1000 B/M 1000267 toFmax= 267mm
Application Cellular Beams ACB
-
7/31/2019 Cong Trinh Thep
35/48
Industrial
Wendelstein (G)
Application Cellular Beams ACB
Application Cellular Beams ACB
-
7/31/2019 Cong Trinh Thep
36/48
Skiing descend (F)
Application Cellular Beams ACB
Application Angelina Beam
-
7/31/2019 Cong Trinh Thep
37/48
Recent projectsWallerich S.A. (F)
Fabrication hall
Surface: 3900m2210t with 80t galvanised Angelinas from IPE 550
1st Angelina project in France
Wallerich S.A.
Application Angelina Beam
Application Angelina Beam
-
7/31/2019 Cong Trinh Thep
38/48
Application Angelina Beam
Application Angelina Beam
-
7/31/2019 Cong Trinh Thep
39/48
Parker Hannefin
Head Office(CH)
Application Angelina Beam
Application Angelina Beam
-
7/31/2019 Cong Trinh Thep
40/48
Optifutura FribourgIndustrial (CH)
Application Angelina Beam
Application IFB Beams
-
7/31/2019 Cong Trinh Thep
41/48
Application IFB Beams
Rives de Clausen
Luxembourg-Grund
500 to
Applications
-
7/31/2019 Cong Trinh Thep
42/48
Applications
VERTIGOLuxembourg
1000 to
Applications
-
7/31/2019 Cong Trinh Thep
43/48
Applications
Casino2000 (L)
Exhibition hall
Surface: 2000m2
230t up to bended HE 800
Recent projects
-
7/31/2019 Cong Trinh Thep
44/48
Casino2000 (L)
-
7/31/2019 Cong Trinh Thep
45/48
Heavy Finishing
-
7/31/2019 Cong Trinh Thep
46/48
Fabrication hall for Liebherr at Rostock (D)
2200to
HE 1000 B
Heavy Finishing
Heavy Finishing
-
7/31/2019 Cong Trinh Thep
47/48
Fabrication hall / Warehouse Liebherr
Surface: 30.700 m2
5.200 to HE/HL 1100
y g
Heavy Finishing
-
7/31/2019 Cong Trinh Thep
48/48
y g