    PURPOSE

    Configuration status accounting (CSA) is the process of creating

    and organizing the knowledge base necessary for the

    performance of configuration management

    In addition to acilitating M! the purpose o SA is

    to provide a highly reliable source o confgurationinormation to support all program or pro"ectactivities including program management

    systems engineering

    manufacturing

    software development and maintenance

    logistic support

    modification

    maintenance.

  • 7/24/2019 Configuration Status Accounting-Introduction

    3/26

    Activity Configuration Status Accounting

  • 7/24/2019 Configuration Status Accounting-Introduction

    4/26

    Configuration Status Report Include

    A list of the configuration items that comprise a baseline

    The date when each version of each configuration item was

    baselined

    A list of the specifications that describe each configurationitem

    The history of baseline changes including rationales for

    change

    A list of open change reuests by configuration item !eficiencies identified by configuration audits

    The status of works associated with approved change

    reuests by C".

  • 7/24/2019 Configuration Status Accounting-Introduction

    5/26

    Four Principle

    hange Re#uests A Change #euest (C#) is a general term for a reuest to

    change an artifact or process. The general process associated

    with C#s is described in Concepts$ Change #euest

    %anagement. Categories Aging (Time &ased #eports)'ow long have Change #euests of the

    various kinds been open *hat is the +lag time,, of when in the lifecycle

    defects are found- versus when are they being fied

    !istribution (Count &ased #eports)'ow many Change #euests are

    there in the various categories by owner- priority or state of fi

    Trend (Time and Count #elated #eports)'*hat is the cumulative number

    of defects being found and fied over time *hat is the rate of defect

    discovery and fi

  • 7/24/2019 Configuration Status Accounting-Introduction

    6/26

    Build Reports &uild #eports list all the files- their location- and

    incorporated changes that make up a build for a specific

    version of the software. &uild #eports can be maintained both at the system and

    subsystem level$

    %ersion &escriptions Similar to #elease /otes- 0ersion !escriptions describe

    the details of a software release.

    Audits There two kinds of audits that are covered in the

    contet of Configuration %anagement

    1$2hysical Configuration Audits

    3$4unctional Configuration Audits.

  • 7/24/2019 Configuration Status Accounting-Introduction

    7/26

    TYPICAL CSA INFORMATION OVER THE

    ACQUISITION PROGRAM LIFE CYCLE

    Ne' and innovative methods o capturing theconfguration o installed and spare items and

    sot'are versions are becoming commonplace$ (hese methods include bar coding and the

    interrogation o embedded identifcation via on)e#uipment data buses and on)board support

    e#uipment$ (he technology or this process is no'

    commonplace in the commercial personalcomputer industry and the automotive industry$

  • 7/24/2019 Configuration Status Accounting-Introduction

    8/26

    (he inormation that is loaded into SA is

    considered *metadata!* that is! inormation aboutthe data$ It provides status and cross)reerencesactual (echnical &ata +ackage ,(&+- inormationthat is stored digitally in data repositories$

    .ach design activity establishes a documentrepository or the Is developed! produced! ormaintained by an /0ce o +ro"ect Responsibility

    ,/+R- under their authority$ (he data repositoriesare normally maintained by the inventory controlpoint responsible or the provisioning1supplysupport o the I$

  • 7/24/2019 Configuration Status Accounting-Introduction

    9/26

    SA records should be maintained in such range anddepth as to be responsive to the re#uirements o the

    various support activities or access to confgurationinormation$

    (he data repository is the central point or thecollection! storage! processing! and promulgation o thisdata$

    onfguration inormation should be available on are#uest basis! either by hard copy or online computeraccess$

    (he SA records are used as *best source* input dataor purchasing data packages! design studies! andmanagement analyses re#uested by thesupporting1design activities$ In particular! the SAmetadata records must accurately re2ect the status othe confguration documents ,specifcations! dra'ings!lists! test reports! etc$- maintained in the documentrepositories$

  • 7/24/2019 Configuration Status Accounting-Introduction

    10/26

    Concept n! Tec"nolo#$ %e&elop'ent

    (ypical inormation sources include3 Mission need statements

    Baseline perormance! cost! and schedule

    goals System re#uirements documents or

    alternative confgurations

    +reliminary system perormance

    Specifcations or selected confguration .ngineering change proposals or contract

    change proposals! as applicable

  • 7/24/2019 Configuration Status Accounting-Introduction

    11/26

    (ypical outputs include3 urrent revision o each document

    urrent &ocument hange Authority ,&A-

    and approval status or each document

  • 7/24/2019 Configuration Status Accounting-Introduction

    12/26

    S$(te' %e&elop'ent n!%e'on(trtion

    System perormance specifcation

    I perormance specifcations

    I detailed specifcations

    .ngineering dra'ings and associated lists

    A& fles

    (est plans and procedures! and results

    Audit plan

    (ypical inormation sources include3

  • 7/24/2019 Configuration Status Accounting-Introduction

    13/26

    Audit report

    Audit certifcation

    .ngineering change proposals

    Notice o Revision ,N/RS-

    .ngineering orders! change notices!

    Installation and as)built verifcation

    Removal and reinstallation

  • 7/24/2019 Configuration Status Accounting-Introduction

    14/26

    (ypical outputinclude3

    &A release and approval status o each document

    4unctional! allocated! and product baselines

    As)designed confguration! current and as o any priordate

    As)built confguration! current up to time o delivery!and any prior date

    As)delivered confguration

  • 7/24/2019 Configuration Status Accounting-Introduction

    15/26

    ont5Status o .+s and R4&s in process

    .6ectivity ad incorporation status o approved

    .+s and R4&s! including retroft e6ectivity

    (est and certifcation re#uirements to be completed prior to

    milestones! such as revie's! demonstrations! tests! trials anddelivery

    %erifcation and audit status and action items

  • 7/24/2019 Configuration Status Accounting-Introduction

    16/26

    Pro!uction n!%eplo$'ent

    (ypical inormation sourcesinclude3 All development phase items System I location by serial number Support e#uipment and sot'are Spares

    (rainers (raining material/peratig and

    maintenance manuals

  • 7/24/2019 Configuration Status Accounting-Introduction

    17/26

    ont$$

    I delivery dates and 'arranty data Shel lie or operating limits on

    components 'ith limited lie or limitedactivation

    /perational history ,e$g3 or aircrat)takeo6s and landing

    %erifcation1validation o retroft

    instruction! retroft kits Incorporation o retroft kits Installation o spares! replacements by

    maintenance action

  • 7/24/2019 Configuration Status Accounting-Introduction

    18/26

    (ypical output include3

    All development phase items urrent confguration o all systems1Is in

    all locations ,as)modifed1 as)maintained-

    Re#uired and on)board confguration o allsupport e#uipment! spares! traines!training! manuals! sot'are! acilitiesneeded to operate and maintain all

    systems1is at all sites Status o all re#uested! in)process! and

    approved changes and deviation re#uests

  • 7/24/2019 Configuration Status Accounting-Introduction

    19/26

    ont$$

    Authorization and ordering actionsre#uired to implement approved changes!including recurring retroft

    7arranty status o all is

    +redicted replacement date or criticalcomponent

    Retroft actions necessary to bring anyserial)numbered I to the current or any

    prior confguration

  • 7/24/2019 Configuration Status Accounting-Introduction

    20/26

    Opertionl Support

    (ypical inormation sources include3 All production and deployment phase items

    (ypical outputs include3 All production and deployment phase items

  • 7/24/2019 Configuration Status Accounting-Introduction

    21/26

    CONFIGURATION STATUS ACCOUNTINGPROCESS EVALUATION CHEC)LIST

    &ocumented process

    SA inormation

    SA system

    Metrics

    (ypical inormation sources include3

  • 7/24/2019 Configuration Status Accounting-Introduction

    22/26

    %ocu'ente! proce((

    Is there a documented confgurationstatus accounting ,SA- process8

    Is the documented process ollo'ed8

    Are personnel rom all disciplinesinvolved in the process inormed andkno'ledgeable about the proceduresthey are supposed to ollo'8

  • 7/24/2019 Configuration Status Accounting-Introduction

    23/26

    CSA in*or'tion

    9as an accurate! timely inormation baseconcerning the product and its associatedproduct inormation! appropriate to the

    applicable phase,s- o the cycle! beenestablish8

    Is confguration inormation appropriateto the product systematically recorded

    and disseminated8 Is applicable SA inormation captured as

    M tasks are perormed and is it

    available or display or retrieval in atimel ashion8

  • 7/24/2019 Configuration Status Accounting-Introduction

    24/26

    CSA ($(te'

    Is the data collection and inormationprocessing system based on and

    consistent 'ith the confguration statusaccounting inormation needs o theorganization8

    Are the data relationships in the systembased on a sound set o business rules8

  • 7/24/2019 Configuration Status Accounting-Introduction

    25/26

    Metric(

    &oes the status accounting data beingcollected and the inormation system

    enable meaningul metrics to bedeveloped and used to maintain andimprove the M process

  • 7/24/2019 Configuration Status Accounting-Introduction