A conference summing up the project:
Building the Investment Offer of the Lublin Province
on the Basis of the Identified Potential of Renewable
Sources of Energy (an opportunity study)
Lublin, 13 November 2012
Plan of presentation
Legal regulations concerning renewable sources of energy
The use of renewable energy in Poland and EU
Available funds for the support of renewable sources investments
Renewable sources potential in the Lublin Province
• Building the investment offer of the Lublin Province on the basis of
the identified potential of renewable sources of energy (an
opportunity study)
• Opportunity studies for selected locations
Summary
Legal acts and strategic documents
EU documents
Energy and climate objectives (3x20)
Directive 2009/28/WE of the European Parliament and of the Council of 23 April
2009 on the promotion of the use of energy from renewable sources
Polish documents
Energy law, Act of of 10 April 1997
Energy efficiency, Act of 15 April 2011
Draft Act on renewable sources of energy of 26 July 2012
‟National renewable energy action plan”, document adopted by Council of Ministers
on 7 December 2010
‟Energetic Policy of Poland until 2030”, document adopted by Council of Ministers
on 10 November 2009
Legal acts and strategic documents
Regulations of the Province
Program of Development of Alternative Sources of Energy in the Lublin Province (2006)
Program of Development of Energy Sector in the Lublin Province (2009)
Localisation and investment conditions of building agricultural biogas power station in the Lublin
Province (2009 – 2010)
An introductory analisys of the potential of biomass possible to use for energetic purposes in the
Lublin Province, Department of Economy and Innovation of Marshal’s Office of the Lublin Province
(2009)
An analisys of possible locations of wind energy installations in the Lublin Province (2009)
A complex evaluation of conditions for production of biogas in the Lublin Province, Department of
Economy and Innovation of Marshal’s Office of the Lublin Province (2012)
Current state and perspectives of development of the hydroenergy sector in the Lublin Province
(2012)
Reneweble Sources of Energy in Poland and EU
Comparison of power/production obtained from renewable energy in Poland and EU
Nominal
power of wind
installations in
2011 [MW]
Power of
hydro-electric
power stations
[<10 MW] 2008
[MW]
Power of
photovoltaic
installations
in 2008 [MW]
Production of
electrical energy
from solid biomass
(electrical power
stations and
electrical power
and heating
stations) in 2009
(TWh)
Number of
biogas power
stations
/installed power
[MW]
Poland 1 536.70 250 1.6 4.907 178 / 111
UE 84 000 12 932 9 533.30 62.186 data n/a
Lublin Province compared to other provinces in Poland-
production of electrical energy from renewable sources in 2010
0
2000
4000
6000
8000
10000
12000 10888,8
2098,2 1519,7
1010,6 927,6 821,6 783,8 770,1 697,6 658,9 429,8 315,7 269,6 236,3 197,1 137,5 14,5
Produkcja energii elektrycznej z OZE w 2010 r. [GWh]
Support for renewable sources of energy within RPO WL 2007 - 2013
Local Governments
Action 6.2 Enviroment friendly energy - 11 projects being realised for total sum of 70.6
million zloty (subsidy of 54.5 mln zloty)
Entrepreneurs
Action 1.4 scheme A and B Investment subsidies for adapting companies to the
requirements of enviromental protection and renewable energy
5 projects being realised for 23 million zloty (subsidy of 8.3 million zloty)
Scheme A (adapting companies) – call for proposals closed on 12.11.2012.
Scheme B (Investments connected with production and use of renewable energy)
Call for proposals from 31.10.2012 to 05.02.2013.
Total amount of subsidy: 66 million zloty,
subsidy up to 5 million zloty per project (60 – 70% qualified costs)
Other available sources of financing renewable sources of energy
National Fund for Water Protection and Water Management
Section.5.1 part. 3 (continuous call for projects) – domestic funds, subsidies (up to 45%) for
partial repayment of bank loan capital designated for the purchase and installation of solar
collectors for individuals and housing cooperatives
Section. 5.4. Efficient energy use Part 2. Co-financing of investments leading to energy
savings in companies – domestic funds, a loan up to 75 %
(call for proposals) from 02.11.2012 to 21.12.2012
5.7. Optimalisation and rationalisation of energy use: electrical, thermal and warm water supply
BENEFICIARIES: enterpreneurs, local goverments, higher education institutions. Subsidy.
(call for proposals) from 3 DECEMBER 2012 TO 31 JANUARY 2013
NORWEGIAN FUNDS A complex thermomodernisation together with an exchange of old-
fasioned sources of heat and realisation of projects with a use of renewable sources of energy,
subsidy of 170 thousand- 2 mln euros, BENEFICIARIES: governmental organisations, non-
govermental organisations (realising public tasks) (CALL FOR PROPOSALS) expected Oct-
Dec 2012
Diagnosed potential of renewable sources of energy in the Lublin Province
Hydropower (without the Vistula na Bug rivers), 444.5 GWh/yr
Biomass: 35 016 857 GJ (9 734 746 MWh/yr)
Solar energy 950 – 1,020 kWh/ m2, photovoltaic systems:
1 640 275 MWh
potential of solar energy from photothermal systems: 24 619.012 TWh
Biogas: 68 mln m3 of energetic value of 2.5 million GJ
potentially produced electric energy: 289 082.345 MWh,
thermal energy: 272 212.245 MWh
Energetical potential: 2 531.644 GWh/year, possible installation of wind
turbins of total power ranging from 6,000 to 11,000 MW
Examples of realised
investments
Uhnin,1,27 MW
Zamość, solar collectors
Biłgoraj, solar collectors
Siedliszczki, Piaski commune, 0,99
MW
Projects realised by the Department of Economy and
Innovation of Marshal’s Office of the Lublin Province
The analisys of the economic potential of the region in the context of strategic fields
of development of the Province
Regional System of Economic Change Management
The analisys of the export potential of the region – research on external markets in
the context of the social and economic situation in the Lublin Province
The building of the investment offer of the Lublin Province on the basis of the
identified potential of renewable sources of energy (an opportunity study)
Innovative methods and possibilities of obtaining renewable sources of energy in
Lublin region on the example of good practices and experience of a Suiss partner – a
project prepared together with a Suiss partner (Institute of Technology in Zurych)
Project’s goal The building of the investment offer of the Lublin Province on the basis of the identified
potential of renewable sources of energy (an opportunity study)
• Promotion of the Lublin Province as an attractive and friendly place for investors
• Promotion of the possibilities of development and benefits of the use of renewable
sources of energy in the Lublin Province
• Improvement of competitiveness of the economy of the Lublin province taking into
consideration natural resources
• Promotion of innovation growth of the Lublin Province
• Growth of interest of investors in the Lublin Province
• Growth of interest in issues concerning sustainable development policy
• An increase of social awerness of the use of renewable sources of energy
• An increase of knowledge of local goverments and investors about the possibilities
and benefits of the use of renewable sources of energy
Users of the project
• Regional, domestic and foreign investors
• Entrepreneurs
• Managers making decisions about investments in their companies
• Institutions from business environment
• Local goverments
Opportunity studies for the locations pointed out in the document
‟An expertise pointing out 5 possible locations of the use of renewble
sources of energy within the area the of Lublin Province”
1. A building of a farm biogas powerstation, power 0.5 MWe together with a
production of briquette from post-fermentation material in Dyniska Nowe.
2. The use of granules made from biomass for heating the buildings of the primary
and middle schools in Strzyżów.
3. A buidling of a photovoltaic farm in a hybrid version with a biogas power station,
total power 4 MW in Wisznice commune.
4. A buidling of a wind farm, power about 50 MW near Borków and Osówka.
5. A building of a small hydrostation, power 0.15 MW in Kijowiec, Zalesie,
Kijowiec, the Krzna river.
Localisation of the project: Dyniska Nowe, Lubycza
Królewska commune, Tomaszowski County
Installed power: 0.5 MW electric power and heating power
0.6 MW
Annual production: about 4000 MWh electric power
and about 4800 MWh heating power
Estimated cost of investment: 9,300,000 zloty
Cost of maintenence: 1, 310, 000 zloty per year
Total income for a biogas power station in the first year of
functioning: 2, 314, 040 zloty
Time of return on investment without subsidy: 9 years 7
months,
with subsidy of 70%: 2 years 11 months
Localisation of the project: School Complex in Strzyżów,
Hrubieszów county, Horodło commune
Total power of 2 digestors MAXI BIO types: 200 kW
Total cost of investment: about 130,000 zloty
Cost of maintenence: about 75, 000 zloty
Time of return of investment: about 1 year
Localisation of the project: near Kolonia Wisznice and Curyn, Wisznice
commune, Bialski county
Photovoltaic farm, power 3 MWp, biogas power station, power 1 MWel
In the study an alternative project was proposed – building only a farm
without a biogas power station
Energy produced from a photovoltaic farm: 2850 MWh
Annual production of energy from biogas power station: about 8 000 MWh
electric energy and about 30 000 GJ of thermal energy
Building costs of a photovoltaic farm: about 24.3 million zloty, costs of
building of a biogas power station 17.6 million zloty, cost of project in the
hybrid version: 41.9 million zloty
Maintanance cost of the farm, power 3 MWp: 240, 000 zloty per year
Income from a farm power 3 MWp: about 1.3 million zloty
Income for a biogas power station: 3.35 million zloty
Return on Investment without subsidy: about 16 – 17 years.
with subsidy of 70%: about 7 years.
Localisation - Borków – Garbów commune and Osówka –
Niemce commune, Lublin County
Building of a complex of wind power stations of total power of
about 50 MW
Installing 25 wind turbins of about 2 MW power each
Estimated annual production: about 105, 000 MWh
Total investment cost: about 347, 500, 000 zloty
Income from sale of electric energy and certificates of origin:
about 49, 400, 000 zloty per year
Cost of maintenance: 24, 650, 000 zloty
Localisation: a weir located on the Krzna river
in Kijowiec (Kijowiec Kolonia area), Zalesie, commune,
Bialski county
Installed power of hydroelectric power station: 0.15 MW,
average power 0.11 MW
Height H = 1,4 m, average flow Q = 10.1m3/s
Estimated annual production of electric energy:
964 MWh
Total investment cost: 3.5 million zloty
Income: 432, 739,6 zloty
Cost of maintenance: 40 000 zloty
Return on investment without subsidy: 8 years,
with subsidy of 70%: 2.5 years
Summary
The analisys of potential investments made in the opportunity study showed that
each of the investment is possible to carry out.
The created investment offer in the form of this final Report is a complex
investment offer promoting Lublin Province as an attractive area for investment in
renewable sources of energy for regional, domestic and foreign investors.
The document is a source of information about legal regulations concerning
renewable energy, its future, and its current level of use.
Proper administrative and marketing actions of local authorities (both at a county
and commune levels), can cause real growth of investment in renewable sources
installation in the area of the Lublin Province.
THANK YOU FOR YOUR ATTENTION
Department of Economy and Innovation
Marshal’s Office of Lubelskie Province
ul. Stefczyka 3, 20-151 Lublin
Phone +48 81 537 16 51
Fax. + 48 81 537 16 37
www.oze.lubelskie.pl
THANK YOU FOR YOUR ATTENTION
PIOTR JANCZAREK
Department of Economy and Innovation Marshal’s Office of Lubelskie Province ul. Stefczyka 3, 20-151 Lublin Phone +48 81 537 16 51 Fax. + 48 81 537 16 37 www.oze.lubelskie.pl