CONDITION SURVEY REPORT WITH LIFE CYCLE COSTS
Transcript of CONDITION SURVEY REPORT WITH LIFE CYCLE COSTS
R. Pickering Ltd. Registered Office: 1 Manor Court •Black Dike Lane •Upper Poppleton •York YO26 6QP • Company Number: 08254924
•Regulated by RICS •Telephone 07904604035 Email: [email protected]
R. Pickering Ltd. Chartered Building Surveyors
Design
Project Management
CONDITION SURVEY REPORT WITH LIFE CYCLE COSTS
For:
Keswick Leisure Pool Station Road
Keswick
Cumbria
CA12 4NE
PREPARED ON BEHALF OF:
Greenwich Leisure Limited (GLL)
Middlegate House
The Royal Arsenal
Woolwich
London
SE18 6SX
PREPARED BY:
R. Pickering Ltd. 1 Manor Court
Upper Poppleton
York
YO266QP
DATE: February 2018 REV. A (29.03.18)
R. Pickering Ltd. • 1 Manor Court• Upper Poppleton• York YO266QP
CONTENTS
1.00 EXECUTIVE SUMMARY .......................................................................................................... 1
2.00 SCOPE OF INSPECTION .......................................................................................................... 3
3.00 LIMITATIONS OF THE INSPECTION ......................................................................................... 4
3.01 THE SITE ................................................................................................................................ 5
3.02 FORMAT OF REPORT ............................................................................................................. 5
3.03 DESCRIPTION OF THE BUILDING ............................................................................................ 5
4.00 ROOF COVERINGS ................................................................................................................. 6
4.01 CHIMNEYS ............................................................................................................................. 6
4.02 RAINWATER GOODS .............................................................................................................. 7
4.03 EXTERNAL TIMBER WORK, FACIAS AND SOFFITS ................................................................... 7
4.04 EXTERNAL WALLS .................................................................................................................. 8
4.05 WINDOWS AND DOORS ........................................................................................................ 8
4.06 HARD STANDINGS/CAR PARKING AREAS (CURSORY INSPECTION ONLY) .............................. 9
4.07 BOUNDARY WALLS, FENCES AND SO FORTH (CURSORY INSPECTION ONLY) ....................... 10
4.08 CHANGING ROOMS (VILLAGE CHANGING FACILITY) ............................................................ 10
4.09 STAFF OFFICES, STAFF TOILETS, RECEPTION, THE GEOFF GILMORE SUITE, FIRST AID ROOM
AND MANAGERS OFFICE ................................................................................................................. 13
4.10 POOL AREA .......................................................................................................................... 14
4.11 INTERNAL WALLS AND PARTITIONS .................................................................................... 15
4.12 THE SWIMMING POOL AND SURROUNDING WALKWAYS (CURSORY INSPECTION ONLY) ... 15
4.13 MALE, FEMALE AND DISABLED TOILETS PROVIDED ADJACENT POOLSIDE AND KITCHEN .... 16
4.14 KITCHEN AND ASSOCIATED STORE ROOMS (GENERAL COMMENT ONLY) ........................... 16
4.15 GYMNASIUM ....................................................................................................................... 17
4.16 PLANT ROOMS .................................................................................................................... 17
4.17 SUBSTATION STRUCTURE (GENERAL COMMENTS ONLY) .................................................... 17
5.00 SUMMARY OF WORKS IDENTIFIED ...................................................................................... 19
5.01 RECOMMENDATIONS AND PRIORITES ........................................................................... 19-33
R. Pickering Ltd. • 1 Manor Court• Upper Poppleton• York YO266QP
Keswick Leisure Pool, Keswick
Condition Survey Report
1
R. Pickering Ltd. Tel: 07904604035 Email:[email protected]
EXECUTIVE SUMMARY
1.00 EXECUTIVE SUMMARY
a. The building inspected is a substantial community asset providing swimming and fitness
facility.
b. The structure is positioned on Station Road, Keswick, Cumbria. The building is surrounded by
predominantly residential properties and is positioned adjacent Fitz Park, a large garden park
area believed to be owned and managed by the local authority.
c. Keswick Leisure Pool comprises a relatively large swimming pool with typical associated
facilities including catering, changing areas and gymnasium. The building is steel frame
construction with dual pitched roof structures.
d. It is believed that the building was constructed in 1987 and was designed with a 25-year life
expectancy.
e. Allerdale Borough Council is the landlord for the subject building. Greenwich Leisure Ltd (GLL)
is the current tenant for the building. It is understood that the existing lease expires within six
years.
f. It is understood that GLL have incurred relatively significant expenditure for the general
upkeep and maintenance of the existing building, including wholesale replacement of the
atrium rooflight positioned above the swimming pool area.
g. Based on our inspection, we consider that the subject building is in poor condition, significantly
thermally inefficient and possibly beyond economical repair. For example, it is understood that
the pool tank and/or associated infrastructure is currently leaking water. This issue is believed
to cost around £5000 per year.
h. In addition, the existing roof coverings exhibit widespread issues resulting in rainwater ingress
within many areas of the building.
i. It is understood that the belowground drainage system frequently requires specialist
contractors to remove blockages. An inspection of the belowground drainage was not
completed as part of this inspection.
j. The windows surrounding the pool and gymnasium are deemed to be in very poor condition
and should be considered for replacement within the next six-month period. Furthermore,
given the rainwater ingress and deteriorated building fabric within the gymnasium, we suggest
and alternative location within the building should be chosen for this facility. Alternatively,
refurbishment of the existing area should be sanctioned.
k. In summary, the subject building was designed to comply with building regulations during the
late 1980s. Since this time, the requirement for thermal insulation within buildings has
R. Pickering Ltd. • 1 Manor Court• Upper Poppleton• York YO266QP
Keswick Leisure Pool, Keswick
Condition Survey Report
2
R. Pickering Ltd. Tel: 07904604035 Email:[email protected]
significantly changed. On this basis, and in view of the defects identified, it is believed that the
subject building is currently beyond the end of its useful life and should be considered for
replacement.
R. Pickering Ltd. • 1 Manor Court• Upper Poppleton• York YO266QP
Keswick Leisure Pool, Keswick
Condition Survey Report
3
R. Pickering Ltd. Tel: 07904604035 Email:[email protected]
CONDITON SURVEY REPORT – KESWICK LEISURE POOL, KESWICK
2.00 SCOPE OF INSPECTION
a. The building inspected is known as:
Keswick Leisure Pool
Station Road
Keswick
Cumbria
CA12 4NE
b. The inspection of the subject building was completed from ground level with the aide of
binoculars.
c. The purpose of the inspection was to establish condition of the building fabric with
consideration to the remaining six-year lease agreement and full repairing tenant obligations.
It does not aim to identify every single defect but merely provide a summary of the general
building fabric and anticipated costs for repair.
d. The inspection was carried out by R. Pickering BSc. (Hons) MRICS - Chartered Building Surveyor
for and on behalf of R. Pickering Ltd. on Monday 5th February 2018.
e. Weather at the time of inspection was overcast and cold.
R. Pickering Ltd. • 1 Manor Court• Upper Poppleton• York YO266QP
Keswick Leisure Pool, Keswick
Condition Survey Report
4
R. Pickering Ltd. Tel: 07904604035 Email:[email protected]
3.00 LIMITATIONS OF THE INSPECTION
a. The scope of the survey is specifically limited to the following elements and areas of the
building:
Externally
I. Roof coverings;
II. Chimneys/flues;
III. Rainwater goods including gutters, pipes and so forth;
IV. Timber work, facias and soffits;
V. External walls;
VI. Windows and doors;
VII. Hard standings and carparks (cursory only);
VIII. Boundary walls, fences and so forth;
Internally
IX. Roof voids;
X. Internal walls and partitions;
XI. Ceiling finishes;
XII. Doors, screens Etc;
XIII. Floor coverings/finishes;
XIV. Staircases;
XV. Internal decorations generally;
XVI. Sanitary ware;
b. During the inspection of the building, we checked all visible, exposed and accessible elements
of construction in order to assess the condition of the fabric. This Report specifically excludes
all covered, unexposed or inaccessible and buried elements of construction, such as flues,
foundations and below ground walling.
c. Our internal inspection of the building was limited to the areas available for inspection. The
inspection specifically excluded the swimming pool.
d. We have not arranged for any exposure works to be carried out to the superstructure or below
ground.
e. The Report submitted is for your use only and while it may be shown to other professional
advisors acting for you the contents are not to be disclosed to, nor made use of by any third
party without our prior written consent. Without such consent we are unable to accept
responsibility to any third party.
R. Pickering Ltd. • 1 Manor Court• Upper Poppleton• York YO266QP
Keswick Leisure Pool, Keswick
Condition Survey Report
5
R. Pickering Ltd. Tel: 07904604035 Email:[email protected]
f. This Report should be construed as a comment on the condition of the elements inspected and
the quality of construction and not an inventory of every single defect, some of which would
not significantly affect the enjoyment of the property.
3.01 THE SITE
a. The subject building is positioned in Keswick, Cumbria and is predominantly situated within a
residential area.
b. We have not consulted any geological or ordnance survey maps and have been unable to
establish any details as to previous use of the site. We are unable to comment within the terms
of this report, which is restricted in its scope, as to whether there are any hidden problems
with the ground upon which the building is built.
3.02 FORMAT OF REPORT
a. This Report will comment on the condition of the building fabric on an elemental basis. Each
section will describe the subject element, report on condition and provide recommendation
for repairs and/or replacement together with a projected life expectancy.
3.03 DESCRIPTION OF THE BUILDING
a. The building inspected is a substantial structure constructed over 2 storeys in-part. The subject
building comprises a steel frame structure supporting dual pitched roof structures. The
building provides community swimming pool and associated fitness facility. A dedicated car
parking area is positioned to the north of the building.
b. The principal/front entrance of the building faces approximately south.
c. It is understood that the subject building was constructed in 1987. At time of construction, the
design life expectancy was 25 years. The Tenant, GLL have a full repairing lease agreement
which is scheduled to expire in 6 years, circa 2024.
d. A copy of the indicative floor plan is appended to the rear of this Report for information
purposes.
R. Pickering Ltd. • 1 Manor Court• Upper Poppleton• York YO266QP
Keswick Leisure Pool, Keswick
Condition Survey Report
6
R. Pickering Ltd. Tel: 07904604035 Email:[email protected]
COMMENT ON CONSTITUENT ELEMENTS
EXTERNALLY
4.00 ROOF COVERINGS
Description
a. Roof coverings to the main body of the property comprise pre-finished profiled metal sheet
laid over dual pitched roof structures. It is unknown if the roof covering incorporates thermal
insulation. The roof structure positioned over the swimming pool, gymnasium and kitchen are
formed in a pyramid structure incorporating projecting lantern roof lights at high-level, refer
to figures 2, 6 and 8. The roof coverings incorporate a concealed gutter detail above eaves
level which appears to be lined with prefinished metal sheet.
b. A glazed roof light detail is provided above the gymnasium. The rooflight appears to comprise
prefinished aluminium frame with double glazed units.
Condition
c. It is understood that the glazed lantern detail position over the swimming pool was stripped
and replaced approximately two years ago.
d. Based on the areas inspected, we believe that the existing metal sheet roof covering is deemed
to be in fair condition, commensurate with the age of the building. Typically, profiled metal
sheet has a Life expectancy in the region of 40-50 years. However, it is apparent that the
mechanical fixings used to secure the metal sheet exhibit evidence of surface corrosion which
can lead to failure and rainwater ingress.
e. The rooflight structure positioned above the gymnasium is deemed to be in very poor
condition, allowing rainwater ingress during periods of rainfall.
Recommendations
f. Given the remaining six-year tenancy agreement, wholesale stripping of roof coverings is
considered financially unviable. However, it may be worthwhile setting aside an appropriate
budget to include for typical backlog maintenance, possibly including replacement of corroding
metal fixings, checking and repairing abutment flashings and general details.
g. It is recommended that the rooflights positioned above the gymnasium are replaced within
the forthcoming 12 months period.
4.01 CHIMNEYS
Description
a. There are no chimneys provided to the building.
R. Pickering Ltd. • 1 Manor Court• Upper Poppleton• York YO266QP
Keswick Leisure Pool, Keswick
Condition Survey Report
7
R. Pickering Ltd. Tel: 07904604035 Email:[email protected]
b. The flues serving the boilers will be included within the Mechanical and Electrical Consultants
Inspection Report – appended to the rear of this Report, refer to Appendix B.
4.02 RAINWATER GOODS
Description
a. Rainwater goods to the main body of the property typically comprise concealed gutters
positioned above eaves level. Based on our inspection from ground level, it appears that the
gutters comprise prefinished metal sheet linings. Eaves level guttering is provided around the
plant room and gymnasium structures.
b. All gutters are served by circular metal rainwater pipes which discharge at ground level into a
variety of open and concealed rainwater gullies.
Condition
c. Based on the areas inspected, it appears that the rainwater goods are in very poor state of
repair creating significant problems internally as a result of rainwater ingress.
d. It was noted that rainwater ingress is particularly prevalent at the junction between valley
gutters and eaves level gutters.
e. We noted significant amounts of vegetation within the rainwater goods. Having spoken with a
GLL site representative, it is understood that access to clean the gutters is very restricted and
difficult.
Recommendation
f. Based on the extent of damage created by rainwater ingress via gutter linings, it is strongly
recommended that a package of work is implemented to replace or repair gutter lining details.
In addition to this, it may also be worthwhile considering re-detailing some of the gutter
junctions to improve rainwater discharge. It was noted generally that the valley gutters appear
to be very narrow which may be assisting with the build-up of vegetation, refer to Figs. 3 and
10.
4.03 EXTERNAL TIMBER WORK, FACIAS AND SOFFITS
Description
a. Prefinished profiled metal soffit and fascia is provided at eaves level around the perimeter of
the building.
Condition
b. The condition of the profiled metal sheet soffit and fascia is deemed to be fair, commensurate
with the age of the building. It is noted that localised deterioration of the decorative coating
has occurred.
R. Pickering Ltd. • 1 Manor Court• Upper Poppleton• York YO266QP
Keswick Leisure Pool, Keswick
Condition Survey Report
8
R. Pickering Ltd. Tel: 07904604035 Email:[email protected]
Recommendation
c. You may wish to consider decoration of the facias and soffits for cosmetic purposes only.
4.04 EXTERNAL WALLS
Description
a. External walls appear to comprise cavity wall construction formed with concrete blockwork. A
pebble dash coating with decorative finish is applied externally.
b. Window openings are provided with projecting precast concrete cills.
Condition
c. Typically, external walls appear to be in fair condition, acting as intended. However, localised
sections of the wall have been affected by moisture damage resulting in spoiling of finishes,
refer to Fig. 5.
d. Localised sections of the projecting window cills are spalling, requiring attention.
Recommendation
e. As previously noted, it is recommended that the rainwater goods serving the building are
repaired. Following completion of this work, you may wish to undertake cosmetic
enhancements such as redecoration of external render.
f. It is recommended that a package of work is sanctioned to include for repairs to spalling
sections of projecting window cill, refer to Fig. 7.
4.05 WINDOWS AND DOORS
Description
a. Painted timber double glazed windows are provided around the perimeter of the building. The
windows are finished with a decorative coating.
b. A painted metal horizontal sliding door is provided to the kitchen store access.
c. 2 No. sets of double doors providing access into the main reception area to the front of the
building. The doors comprise pre-finished aluminium frames with double glazed unit infill.
d. Painted timber louvred doors are provided to the plant room, fitted in painted timber frames.
e. 2 sets of fire exit doors are provided within the north east corner of the swimming pool area. The
doors comprise prefinished aluminium frames with double glazed units.
Condition
f. The majority of windows are deemed to be in poor condition exhibiting timber decay. In addition,
the majority of double glazed units have failed, requiring replacement.
R. Pickering Ltd. • 1 Manor Court• Upper Poppleton• York YO266QP
Keswick Leisure Pool, Keswick
Condition Survey Report
9
R. Pickering Ltd. Tel: 07904604035 Email:[email protected]
g. The sliding metal access door provided to the kitchen store is deemed to be in fair condition,
acting as intended.
h. The principal entrance doors provided to reception are deemed to be in fair condition, acting as
intended.
i. The louvred doors provided to the plant rooms are deemed to be in poor condition, requiring
attention to decayed sections and missing louvre details. Some of the doors are deemed to be
structurally unstable, presenting a security concern.
Recommendations
j. It is recommended that a package of works is sanctioned to allow for replacement of the windows
surrounding the gymnasium and swimming pool area. Alternatively, it may be worthwhile
obtaining a quotation for the replacement of the failed double-glazed units surrounding the pool,
together with wholesale redecoration of the timber frames. (Note: the window surrounding the
gymnasium are in very poor condition requiring replacement regardless). An alternative option
may be to provide corporate branded privacy film to the failed double-glazed units, improving
the appearance of the building.
k. It is recommended that the louvred doors serving the plant rooms are appropriately repaired
and/or replaced, as deemed necessary.
4.06 HARD STANDINGS/CAR PARKING AREAS (CURSORY INSPECTION ONLY)
Description
a. A pedestrian access footpath is provided around the perimeter of the building. Typically, the
footpath measures approximately 1.1 m wide and comprises precast concrete paving.
b. A car parking area is provided to the north of the building comprising bitumen macadam surface
with elastomeric line markings. Soft planted borders are provided at intervals around the car
park.
c. A pedestrian footpath provides access from Station Road to the main entrance of the building.
The footpath comprises bitumen macadam surface with pin kerb perimeter.
d. A timber structure provides enclosure to the substation positioned to the rear of the boiler room.
e. Numerous relatively mature trees are positioned along the south west boundary.
Condition
f. We noted that sections of the paved concrete path are uneven and may present a trip hazard.
g. The pedestrian access path to the front of the building is deemed to be in fair condition, acting
as intended.
h. Giving the remaining period of the lease agreement, the existing car parking facility is deemed to
be in fair condition, acting as intended. The condition of the bitumen macadam surface is deemed
R. Pickering Ltd. • 1 Manor Court• Upper Poppleton• York YO266QP
Keswick Leisure Pool, Keswick
Condition Survey Report
10
R. Pickering Ltd. Tel: 07904604035 Email:[email protected]
to be fair and we see no requirement for significant upgrades within the forthcoming six-year
period.
i. The timber structure providing enclosure to the substation to the rear of the boiler room is
deemed to be in poor condition, requiring attention.
j. A timber pedestrian access gate is positioned to the south-west corner of the swimming pool
structure.
Recommendations
k. It is recommended that the timber enclosure surrounding the electrical substation is replaced
within the forthcoming 12-month period.
l. It is recommended that the timber gate positioned to the south-west corner of the swimming
pool structure is repaired and redecorated.
m. You may wish to lift and re-set sections of uneven paving around the perimeter of the building.
n. It is recommended that an arboriculturist is appointed to inspect the trees positioned around the
building, reporting the general condition of the trees and any requirement to undertake tree
surgery works.
4.07 BOUNDARY WALLS, FENCES AND SO FORTH (CURSORY INSPECTION ONLY)
Description
a. The boundary of the site is relatively clearly defined with access roads, fences and walls.
b. A timber post and wire mesh fence is provided along the west boundary.
c. A timber fence and pedestrian gate is provided around the bin store to the rear of the building.
Condition
d. Timber fencing and pedestrian gate positioned around the bin store is deemed to be in poor
condition, requiring attention.
e. Given the remaining six-year lease period, we do not anticipate significant expenditure on
boundaries and so forth. However, it will be worthwhile setting aside a budget to deal with
possible reactive maintenance issues such as accidental damage Etc.
Recommendations
f. It is recommended that the timber fencing and pedestrian gate positioned around the bin store
is repaired and/or replaced within the forthcoming 12-month period.
INTERNALLY
4.08 CHANGING ROOMS (VILLAGE CHANGING FACILITY)
R. Pickering Ltd. • 1 Manor Court• Upper Poppleton• York YO266QP
Keswick Leisure Pool, Keswick
Condition Survey Report
11
R. Pickering Ltd. Tel: 07904604035 Email:[email protected]
CEILING
Description
a. Suspended ceiling grid with recessed tiles.
Condition
b. Fair condition, soiled and dated.
Recommendation
c. For cosmetic reasons, consider replacement of ceiling.
WALL FINISHES
Description
d. Typically, walls are of cloud with hygienic wall cladding system, floor to ceiling.
e. Communal shower area provided with ceramic wall tiles, floor to ceiling.
Condition
f. Fair condition, acting as intended. Localised soiling and dated.
Recommendation
g. Consider replacement for cosmetic reasons.
FLOOR FINISHES
Description
h. Sheet vinyl with water welded joints. A coved formed skirting is provided around the perimeter.
Condition
i. The existing floor covering is deemed to be in poor condition with evidence of widespread
deterioration. The perimeter upstand is damaged in many areas.
Recommendation
j. Consider wholesale stripping and replacement in conjunction with changing area refurbishment
project.
CUBICLES AND LOCKERS
Description
k. The cubicles and lockers appear to comprise solid grade laminate with decorative finish.
R. Pickering Ltd. • 1 Manor Court• Upper Poppleton• York YO266QP
Keswick Leisure Pool, Keswick
Condition Survey Report
12
R. Pickering Ltd. Tel: 07904604035 Email:[email protected]
Condition
l. The cubicles lockers appear to be in fair condition, typically acting as intended with localised
evidence of wear and tear.
Recommendation
m. Include replacement of cubicles and lockers in conjunction with changing area refurbishment
project.
INTERNAL WALLS AND PARTITIONS
Description
n. Masonry partitions are provided with the changing area, forming the enclosure to the male and
female toilets, staff room and disabled toilet.
Condition
o. Internal partitions appear to be structurally stable, acting as intended.
Recommendation
p. Cosmetic repairs, as noted above to surface finishes, in conjunction with changing room
refurbishment project.
SANITARY WARE
Description
q. Sanitary ware is provided within the male, female and disabled toilet. Communal showers
provided adjacent the poolside entrance.
r. Recessed ceramic wash hand basins on vanity units are provided within the male and female
toilets.
s. Ceramic WC is with IPS panels are provided within solid grade laminate cubicles within the male
and female WCs. Ceramic wall mounted urinals are provided within the male WCs.
t. 7 No. projecting shower heads are provided within the communal shower area, fitted with push-
button operating devices. A single shower is provided within the disabled WC.
Condition
u. Typically, sanitary ware appears to be in fair condition, acting as intended. It was noted that the
installations appear rather dated and benefit from replacement.
Recommendation
R. Pickering Ltd. • 1 Manor Court• Upper Poppleton• York YO266QP
Keswick Leisure Pool, Keswick
Condition Survey Report
13
R. Pickering Ltd. Tel: 07904604035 Email:[email protected]
v. It is recommended that the sanitary ware is considered for replacement in conjunction with the
changing area refurbishment package of work.
DOORS AND FRAMES
Description
w. Painted solid core timber doors fitted within timber linings are provided to the disabled shower
room, storeroom and male and female toilets.
x. Timber veneered partially glazed double doors are provided to the entrance and exit points of
the changing rooms.
Condition
y. The painted timber solid core doors are deemed to be in fair condition although soiled and poor
fitting.
z. The doors are provided to the entrance and exit of the changing areas are deemed to be in fair
condition, acting as intended.
Recommendation
aa. It is recommended that the doors and frames are considered for replacement in conjunction with
changing area refurbishment project.
4.09 STAFF OFFICES, STAFF TOILETS, RECEPTION, THE GEOFF GILMORE SUITE, FIRST AID ROOM
AND MANAGERS OFFICE
CEILINGS
Description
a. Suspended ceilings with metal grid provided within the offices, first aid room and manager’s
office.
b. The reception area is provided with an open ceiling incorporating pre-finished profiled metal
sheet. In addition, painted timber tongued and grooved boarding is positioned above the
reception desk and ice cream machine. A section of suspended ceiling tiles is positioned above
the vending machines.
Condition
c. The suspended ceilings are deemed to be in fair condition, soiled but acting as intended.
Recommendation
d. Ideally, the suspended ceilings should be considered for replacement to improve the general
internal environment.
INTERNAL WALLS AND PARTITIONS
R. Pickering Ltd. • 1 Manor Court• Upper Poppleton• York YO266QP
Keswick Leisure Pool, Keswick
Condition Survey Report
14
R. Pickering Ltd. Tel: 07904604035 Email:[email protected]
Description
e. Internal walls throughout the areas typically comprise masonry with plaster and decorative finish.
Condition
f. Generally, internal walls and politicians appear to be in fair condition, acting as intended. The
decorative finish to the walls is aged and soiled.
g. We noted localised areas of low-level moisture which is indicative of rising damp.
Recommendation
h. You may wish to consider wholesale redecoration of the internal walls. Whilst completing this
work, there will be a requirement to undertake localised damp remedially works.
FLOOR FINISHES
Description
i. Sheet vinyl is provided throughout the areas.
Condition
j. Typically, the sheet vinyl is in fair condition but soiled.
Recommendation
k. Ideally, the sheet vinyl should be considered for replacement within the forthcoming 6-year
period.
INTERNAL DOORS AND FRAMES
Description
l. Typically, doors comprise painted and veneer faced solid core doors fitted within timber linings.
Condition
m. Doors are deemed to be in fair condition. Evidence of typical wear and tear expected from a
building of this type and usage.
Recommendation
n. You may wish to replace the majority of internal doors in conjunction with any proposed
refurbishment projects.
o. Refer to the building Fire Risk Assessment regarding fire precautions issues/measures required.
4.10 POOL AREA
R. Pickering Ltd. • 1 Manor Court• Upper Poppleton• York YO266QP
Keswick Leisure Pool, Keswick
Condition Survey Report
15
R. Pickering Ltd. Tel: 07904604035 Email:[email protected]
CEILINGS
Description
a. The area is provided with an exposed metal building frame therefore ceilings are not provided.
b. A pre-finished profiled ventilated metal soffit and fascia is provided around the perimeter of the
pool area above external walls and window openings.
Condition
c. The soffit and fascia provided around the perimeter of the pool area is deemed to be in poor
condition. We noted significant condensation on the underside of the soffit which is indicative of
lack of appropriate thermal insulation.
Recommendation
d. It is strongly recommended that the perimeter fascia and soffit surrounding the pool area is
modified to prevent the build-up of condensation. It is anticipated that this work will require
partial removal of the fascia/soffit to allow the introduction of thermal installation.
4.11 INTERNAL WALLS AND PARTITIONS
a. Not applicable.
4.12 THE SWIMMING POOL AND SURROUNDING WALKWAYS (CURSORY INSPECTION ONLY)
Description
a. The pool slide and associated equipment was specifically excluded from our inspection.
b. The swimming pool measures approximately 16×10 m and varies in depth. In addition to the pool,
a walkway is provided around the perimeter and raised features including vegetation/planters
provided at intervals.
c. A projecting viewing gallery/platform is provided approve the deep end of the pool. The structure
comprises metal frame with spiral staircase access.
Condition
d. Following conversations with GLL representatives, it is understood that a long-standing issue with
leakage from the pool is being encountered it is understood that this issue is estimated to cost in
the region of £5000 per year.
e. General of the condition of ceramic tiling to the pool and surrounding areas is deemed fair,
commensurate with the age of the building. We noted sections of partially de-bonded tiles that
require resetting and/or replacing.
f. The metal guard rail surrounding the pool, in-part exhibits localised evidence of corrosion.
R. Pickering Ltd. • 1 Manor Court• Upper Poppleton• York YO266QP
Keswick Leisure Pool, Keswick
Condition Survey Report
16
R. Pickering Ltd. Tel: 07904604035 Email:[email protected]
g. The column supporting the viewing gallery feature exhibits evidence of corrosion below the
waterline. Without detailed exposure works, it is impossible to determine the full extent of this
problem.
h. During our inspection, we were made aware of a horizontal fracture which extends around the
perimeter of the pool, above water level. The fracture is evident within tile joints. It is understood
that this defect is currently being monitored.
Recommendations
i. It is strongly recommended that they suggested leakage of the pool is further investigated fully
establish the cause before implementing remedially action.
j. Given the remaining six-year lease period, it is recommended that localised tile repairs are
completed to damaged sections.
k. It is strongly recommended that further investigation is completed to the corrosion positioned
on the viewing gallery column base.
l. It is recommended that consideration is given to modifying the fascia and soffit detail surrounding
the pool area to reduce the possibility of condensation occurring.
4.13 MALE, FEMALE AND DISABLED TOILETS PROVIDED ADJACENT POOLSIDE AND KITCHEN
Description
m. The above areas are provided with conventional ceramic WCs, wash hand basins, urinals and so
forth.
Condition
n. Generally, the sanitary ware and finishes appear to be acting as intended. However, the areas
would benefit from wholesale refurbishment within the forthcoming six-year period.
Recommendation
o. You may wish to consider refurbishment of the male, female and disabled toilets.
4.14 KITCHEN AND ASSOCIATED STORE ROOMS (GENERAL COMMENT ONLY)
Description
a. It is understood that the existing kitchen is used on an occasional basis only.
b. Our inspection excluded catering equipment.
Condition
c. Generally, the kitchen and associated areas are deemed to be in fair/poor condition. Finishes
throughout are aged and soiled and should be considered for refurbishment.
Recommendation
R. Pickering Ltd. • 1 Manor Court• Upper Poppleton• York YO266QP
Keswick Leisure Pool, Keswick
Condition Survey Report
17
R. Pickering Ltd. Tel: 07904604035 Email:[email protected]
d. Depending on your intentions for the kitchen area, you may wish to consider refurbishment or
conversion for other use.
4.15 GYMNASIUM
Description
a. The gymnasium is positioned within a partially glazed enclosure typically comprising painted
timber double glazed units. The pitched roof positioned above the gymnasium incorporates a
rooflight which has previously been noted in this report to be defective.
b. A suspended ceiling grid with air-conditioning units is positioned above the gymnasium area
approximately 3.2 m above finished floor level. It is understood that this detail has been provided
to reduce heat loss and conceal the defective roof above.
Condition
c. Issues regarding rainwater ingress within the gymnasium have previously noted within this
report. Before completing any enhancement work within this area, it will be necessary to ensure
the building envelope is watertight.
d. Generally, internal finishes are deemed to be in fair/poor condition and should be considered for
refurbishment.
Recommendation
e. It is recommended that the subject area is made watertight before completing an internal
refurbishment project.
4.16 PLANT ROOMS
a. Excluded from inspection for time being.
4.17 SUBSTATION STRUCTURE (GENERAL COMMENTS ONLY)
Description
a. The subject structure is positioned to the north of the carpark and comprises external masonry
wall supporting a dual pitched roof with Westmorland slate covering. It is understood that the
buildings electrical substation is positioned within this structure together with a storage facility.
Condition
b. The subject building appears to be in fair condition, suitable for its intended use. However, the
roof coverings have been damaged, resulting in numerous missing slates. In addition, the timber
doors to the building are in poor condition, requiring repair and redecoration.
Recommendation
c. It is recommended that the vegetation growth on the building is carefully removed before
necessary roof repairs are completed.
R. Pickering Ltd. • 1 Manor Court• Upper Poppleton• York YO266QP
Keswick Leisure Pool, Keswick
Condition Survey Report
18
R. Pickering Ltd. Tel: 07904604035 Email:[email protected]
d. It is recommended that the timber doors are repaired and redecorated.
R. Pickering Ltd. • 1 Manor Court• Upper Poppleton• York YO266QP
Keswick Leisure Pool, Keswick
Condition Survey Report
19
R. Pickering Ltd. Tel: 07904604035 Email:[email protected]
5.00 SUMMARY OF WORKS IDENTIFIED
a. The following Schedule summarises the findings of the inspection and categorises the urgency
of repairs/actions and suggested timescale.
5.01 RECOMMENDATIONS AND PRIORITES
b. The priorities given in the following tables are classified as follows:
Priority of Works:
CATEGORY 1 -
UNAVOIDABLE:
Potential health and safety risk
Deferral would impede operational effectiveness.
Work required to maintain wind and weathertight
condition.
CATEGORY 2 -
ESSENTIAL:
Within 3 – 6 months: deferral would risk further
deterioration and increase cost of repairs.
CATEGORY 3 - URGENT: Within 1 year: to preserve function and performance.
CATEGORY 4 -
DESIRABLE:
Non-essential but should be completed within
recommended timescale.
R. Pickering Ltd. • 1 Manor Court• Upper Poppleton• York YO266QP
Keswick Leisure Pool, Keswick
Condition Survey Report
20
R. Pickering Ltd. Tel: 07904604035 Email:[email protected]
ITEM ELEMENT/LOCATION/
DESCRIPTION
SUMMARY OF
CONDITION
DEFECT SOLUTION PRIORITY YEAR. YEAR YEAR YEAR YEAR YEAR
Keswick Leisure Pool, Keswick 2018 2019 2020 2021 2022 2023
5.0 EXTERNAL BUILDING
ELEMENTS
5.1 Roof Coverings
5.1.1
5.1.2
Pre-finished profile metal
sheet covering with
associated trims, flashing
Etc
Several roof lights are
provided with the roof
detail.
Poor condition.
Evidence of localised
rain water ingress
particularly adjacent
gutter and valley
details.
It is understood that
the roof light
positioned above the
swimming pool has
recently been
replaced.
The roof light
positioned above the
gymnasium is in poor
condition. It appears
that the subject detail
is allowing rain water
ingress.
Ideally, the existing roof
details should be
throughout refurbished
or replaced to prevent
rain water ingress.
It is recommended that
the rooflights positioned
above the gymnasium are
replaced within the
forthcoming 12 months
period – cost includes for
over clad.
1
1
£10,000
£8,000
5.2 Chimney Stacks
5.2.1
There are no chimneys
provided to the building.
The flues serving the
boilers will be
included within the
Mechanical and
Electrical Consultants
Inspection Report –
appended to the rear
of this Report.
R. Pickering Ltd. • 1 Manor Court• Upper Poppleton• York YO266QP
Keswick Leisure Pool, Keswick
Condition Survey Report
21
R. Pickering Ltd. Tel: 07904604035 Email:[email protected]
ITEM ELEMENT/LOCATION/
DESCRIPTION
SUMMARY OF
CONDITION
DEFECT SOLUTION PRIORITY YEAR. YEAR YEAR YEAR YEAR YEAR
Keswick Leisure Pool, Keswick 2018 2019 2020 2021 2022 2023
5.3 Rain Water Goods
5.3.1
Rainwater goods to the
main body of the
property typically
comprise concealed
gutter is positioned
above eaves level. Based
on our inspection from
ground level, it appears
that the gutters comprise
prefinished metal sheet
linings. Eaves level
guttering is provided
around the Plant Room
and gymnasium
structures.
Based on the areas
inspected, it appears
that the rainwater
goods are in very poor
state of repair
creating significant
problems internally as
a result of rainwater
ingress.
It was noted that
Rainwater ingress is
particularly prevalent
at the junction
between valley
gutters and eaves
level gutters.
Based on the extent of
damage created by
rainwater ingress via
gutter linings, it is
strongly recommended
that a package of work is
implemented to replace
of repair gutter lining
details. In addition to this,
it may also be worthwhile
considering re-detailing
some of the gutter
junctions to improve
rainwater discharge. It
was noted generally that
the valley gutters appear
to be very narrow which
May be assisting with the
build-up of vegetation.
1 £6,000 £5,000 £5,000 £5,000
5.4 External Timber Work,
Facias and Soffits
5.4.1
Prefinished profiled
metal soffits and fascia is
provided at eaves level
around the perimeter of
the building.
The condition of the
profiled metal sheet
soffit and fascia is
deemed to be fair,
commensurate with
the age of the
building. It is noted
that localised
deterioration of the
decorative coating has
occurred.
You may wish to consider
decoration of the facias
and soffits for cosmetic
purposes only.
4 £20,000
R. Pickering Ltd. • 1 Manor Court• Upper Poppleton• York YO266QP
Keswick Leisure Pool, Keswick
Condition Survey Report
22
R. Pickering Ltd. Tel: 07904604035 Email:[email protected]
ITEM ELEMENT/LOCATION/
DESCRIPTION
SUMMARY OF
CONDITION
DEFECT SOLUTION PRIORITY YEAR. YEAR YEAR YEAR YEAR YEAR
Keswick Leisure Pool, Keswick 2018 2019 2020 2021 2022 2023
5.5 External Walls
5.5.1
5.5.2
External walls appear to
comprise cavity wall
construction formed with
concrete block work. A
pebble – coating with
decorative finish is
applied externally.
Window openings are
provided with projecting
precast cills.
Typically, external
walls appear to be in
fair condition, acting
as intended. However,
localised sections of
the wall have been
affected by moisture
damage resulting in
spoiling of finishes.
Localised sections of
the projecting window
cills are spalling,
requiring attention.
As previously noted, it is
recommended that the
rainwater goods serving
the building are repaired.
Following completion of
this work, you may wish
to undertake cosmetic
enhancements such as
redecoration of external
render.
It is recommended that a
package of work is
sanctioned to include for
repairs to spalling
sections of projecting
window cills.
4
2
£6,000
£6,000
5.6 Windows and Doors
5.6.1
Painted timber double
glazed windows are
provided around the
perimeter of the building.
The windows are finished
with a decorative coating.
The majority of
windows are deemed
to be in poor condition
exhibiting timber
decay. In addition, the
majority of double
glazed units have
failed, requiring
replacement.
It is recommended that a
package of works is
sanctioned to allow for
refurbishment of the
windows surrounding the
gymnasium and
swimming pool area.
Alternatively, it may be
worthwhile obtaining a
quotation for the
replacement of the failed
DG units surrounding the
pool, together with
wholesale redecoration
of the timber frames.
(note: the windows
surrounding the
gymnasium are in very
1
£10,000
£15,000
R. Pickering Ltd. • 1 Manor Court• Upper Poppleton• York YO266QP
Keswick Leisure Pool, Keswick
Condition Survey Report
23
R. Pickering Ltd. Tel: 07904604035 Email:[email protected]
ITEM ELEMENT/LOCATION/
DESCRIPTION
SUMMARY OF
CONDITION
DEFECT SOLUTION PRIORITY YEAR. YEAR YEAR YEAR YEAR YEAR
Keswick Leisure Pool, Keswick 2018 2019 2020 2021 2022 2023
5.6.2
5.6.3
5.6.4
A painted metal
horizontal sliding door is
provided to the kitchen
store access.
2 No. sets of double doors
provide access into the
main reception area to
the front of the building.
The doors comprise pre-
finished aluminium
frames with double
glazed unit infill.
Painted timber louvred
doors are provided to the
plant rooms, fitted within
painted timber frames.
The sliding metal
access door provided
to the kitchen store is
deemed to be in fair
condition, acting as
intended.
The principal entrance
doors provided to
reception are deemed
to be in fair condition,
acting as intended.
The louvre doors
provided to the plant
rooms are deemed to
be in poor condition,
requiring attention to
decayed sections and
missing louvre details.
Some of the doors are
deemed to be
structurally unstable,
presenting a security
concern.
poor condition requiring
replacement regardless.).
As an alternative you may
consider installation of
corporate branded
privacy film to the failed
double-glazed units,
improving the
appearance of the
building.
It is recommended that
the louvre doors serving
the plant rooms are
appropriately repaired
and/or replaced, as
deemed necessary.
1
£5,000
R. Pickering Ltd. • 1 Manor Court• Upper Poppleton• York YO266QP
Keswick Leisure Pool, Keswick
Condition Survey Report
24
R. Pickering Ltd. Tel: 07904604035 Email:[email protected]
ITEM ELEMENT/LOCATION/
DESCRIPTION
SUMMARY OF
CONDITION
DEFECT SOLUTION PRIORITY YEAR. YEAR YEAR YEAR YEAR YEAR
Keswick Leisure Pool, Keswick 2018 2019 2020 2021 2022 2023
5.7 Hard Standings/Car
Parking Areas
5.7.1
5.7.2
5.7.3
A pedestrian access
footpath is provided
around the perimeter of
the building. Typically,
the footpath measures
approximately 1.1 m
wide and comprises
precast concrete paving.
A car parking area is
provided to the north of
the building comprising
bitumen macadam
surface with elastomeric
line markings. Soft
planted borders are
provided at intervals
around the car park.
A pedestrian footpath
provides access from
Station Road to the main
entrance of the building.
The footpath comprises
bitumen macadam
surface with pin kerb
perimeter.
We noted that
sections of the paved
concrete path are
uneven and may
present a trip hazard.
Given the remaining
period of the lease
agreement, the
existing car parking
facility is deemed to
be in fair condition,
acting as intended.
The condition of the
bitumen macadam
surface is deemed to
be fair and we see no
requirement for
upgrades or repairs
within the
forthcoming six-year
period.
Lift and re-set sections of
uneven paving around
the perimeter of the
building.
1
£4,000
R. Pickering Ltd. • 1 Manor Court• Upper Poppleton• York YO266QP
Keswick Leisure Pool, Keswick
Condition Survey Report
25
R. Pickering Ltd. Tel: 07904604035 Email:[email protected]
ITEM ELEMENT/LOCATION/
DESCRIPTION
SUMMARY OF
CONDITION
DEFECT SOLUTION PRIORITY YEAR. YEAR YEAR YEAR YEAR YEAR
Keswick Leisure Pool, Keswick 2018 2019 2020 2021 2022 2023
5.7.4
5.7.5
A timber structure
provides enclosure to the
substation positioned to
the rear of the boiler
room.
Numerous relatively
mature trees are
positioned along the
south west boundary.
The timber structure is
deemed to be in poor
condition, requiring
attention.
It is recommended that
the timber enclosure is
replaced within the
forthcoming 12-month
period.
It is recommended that
an arboriculturist is
appointed to inspect the
trees positioned around
the building, reporting
the general condition of
the trees and any
requirement to
undertake tree surgery
works.
2
1
£4,000
£1,200
5.8 Boundary Walls, Fences s
5.8.1
5.8.2
The boundary of the site
is relatively clearly
defined with access
roads, fences and walls.
A timber post and wire
mesh fence is provided
along the west boundary.
A timber fence and
pedestrian gate is
provided around the bin
store to the rear of the
building.
Given the remaining
six-year lease period,
we do not anticipate
significant
expenditure on
boundaries and so
forth. However, it will
be worthwhile setting
aside a budget to deal
with possible reactive
maintenance issues
such as accidental
damage Etc.
Timber fencing and
pedestrian gates
positioned around the
bin store is deemed to
be in poor condition,
requiring attention.
It is recommended that
the timber fencing and
pedestrian gate
positioned around the bin
store is repaired and/or
replaced within the
1/2
To be
reassessed at
later date
R. Pickering Ltd. • 1 Manor Court• Upper Poppleton• York YO266QP
Keswick Leisure Pool, Keswick
Condition Survey Report
26
R. Pickering Ltd. Tel: 07904604035 Email:[email protected]
ITEM ELEMENT/LOCATION/
DESCRIPTION
SUMMARY OF
CONDITION
DEFECT SOLUTION PRIORITY YEAR. YEAR YEAR YEAR YEAR YEAR
Keswick Leisure Pool, Keswick 2018 2019 2020 2021 2022 2023
forthcoming 12-month
period.
INTERNAL AREAS
5.9 Changing Rooms (Village Changing Facility)
5.9.1
5.9.2
5.9.3
5.9.4
CEILING
Suspended ceiling grid
with recessed tiles.
WALL FINISHES
Typically, walls are over-
clad with hygienic wall
cladding system, floor to
ceiling.
Communal shower area
provided with ceramic
wall tiles, floor to ceiling.
FLOOR FINISHES
Sheet vinyl with hot
welded joints. A coved
formed skirting is
provided around the
perimeter.
CUBICLES AND LOCKERS
The cubicles and lockers
appear to comprise solid
grid laminate with
decorative finish.
Fair condition, soiled
and dated.
Fair condition, acting
as intended. Localised
soiling and dated.
The existing floor
covering is deemed to
be in poor condition
with evidence of
widespread
deterioration. The
perimeter upstand is
damaged in many
areas.
The cubicles lockers
appear to be in fair
condition, typically
acting as intended
For cosmetic reasons,
consider replacement of
ceiling – cost for tiles only
Consider replacement for
cosmetic reasons.
Consider wholesale
stripping and
replacement in
conjunction with
changing area
refurbishment project.
Include replacement of
cubicles and lockers in
conjunction with
4
4
1
4
£2,000
To be
reassessed
at later date
To be
reassessed
at later date
To be
reassessed
at later date
R. Pickering Ltd. • 1 Manor Court• Upper Poppleton• York YO266QP
Keswick Leisure Pool, Keswick
Condition Survey Report
27
R. Pickering Ltd. Tel: 07904604035 Email:[email protected]
ITEM ELEMENT/LOCATION/
DESCRIPTION
SUMMARY OF
CONDITION
DEFECT SOLUTION PRIORITY YEAR. YEAR YEAR YEAR YEAR YEAR
Keswick Leisure Pool, Keswick 2018 2019 2020 2021 2022 2023
5.9.5
5.9.6
INTERNAL WALLS AND
PARTITIONS
Masonry partitions are
provided with the
changing area, forming
the enclosure to the male
and female toilets, staff
room and disabled toilet.
SANITARY WARE
Sanitary ware is provided
within the male, female
and disabled toilet.
communal showers
provided adjacent the
poolside entrance.
Recessed ceramic wash
hand basin is on vanity
units are provided within
the male and female
toilets.
Ceramic WCs with IPS
panels are provided
within solid grade
laminate cubicles within
the male and female
WCs. Ceramic wall
mounted urinals are
provided within the male
WC.
7 No. projecting shower
heads are provided
within the communal
shower area, fitted with
with localised
evidence of wear and
tear.
Internal partitions
appear to be
structurally stable,
acting as intended.
Typically, sanitary
ware appears to be in
fair condition, acting
as intended. It was
noted that the
installations appear
rather dated and
benefit from
replacement.
changing area
refurbishment project.
Cosmetic repairs to
surface finishes, in
conjunction with
changing room
refurbishment project.
It is recommended that
the sanitary ware is
considered for
replacement in
conjunction with the
changing area
refurbishment package of
work.
4
3/4
£2,000
(for
investigation
of foul smell
only)
£1,000
R. Pickering Ltd. • 1 Manor Court• Upper Poppleton• York YO266QP
Keswick Leisure Pool, Keswick
Condition Survey Report
28
R. Pickering Ltd. Tel: 07904604035 Email:[email protected]
ITEM ELEMENT/LOCATION/
DESCRIPTION
SUMMARY OF
CONDITION
DEFECT SOLUTION PRIORITY YEAR. YEAR YEAR YEAR YEAR YEAR
Keswick Leisure Pool, Keswick 2018 2019 2020 2021 2022 2023
5.6.7
5.6.8
5.6.9
pushbutton operating
devices. A single shower
is provided within the
disabled WC.
DOORS AND FRAMES
Painted solid core timber
doors fitted within timber
linings are provided to
the disabled shower
room, storeroom and
male and female toilets.
Timber veneered partially
glazed double doors are
provided to the entrance
and exit points of the
changing rooms.
The painted timber
solid core doors are
deemed to be in fair
condition although
soiled and poor fitting.
The doors are
provided to the
entrance and exit of
the changing areas are
deemed to be in fair
condition, acting as
intended.
It is recommended that
the doors and frames are
considered for
replacement in
conjunction with
changing area
refurbishment project.
4
To be
reassessed
at later date
5.10 Staff Offices, Staff Toilets, Reception, The Geoff Gilmore Suite, First Aid Room
and Managers Office
5.10.1
CEILINGS
Suspended ceilings with
metal grid is provided
within the offices, first aid
room and managers
office.
The reception is provided
with an open ceiling
The suspended
ceilings are deemed to
be in fair condition,
soiled but acting as
intended.
Ideally, the suspended
ceilings should be
considered for
replacement to improve
the general internal
environment.
4
To be
reassessed
at later date
R. Pickering Ltd. • 1 Manor Court• Upper Poppleton• York YO266QP
Keswick Leisure Pool, Keswick
Condition Survey Report
29
R. Pickering Ltd. Tel: 07904604035 Email:[email protected]
ITEM ELEMENT/LOCATION/
DESCRIPTION
SUMMARY OF
CONDITION
DEFECT SOLUTION PRIORITY YEAR. YEAR YEAR YEAR YEAR YEAR
Keswick Leisure Pool, Keswick 2018 2019 2020 2021 2022 2023
5.10.2
5.10.3
5.10.4
incorporating pre-
finished profiled metal
sheet. In addition,
painted timber tongued
and grooved boarding is
positioned above the
reception desk and ice
cream machine. Sections
of suspended ceiling with
tiles is positioned above
the vending machines.
INTERNAL WALLS AND
PARTITIONS
Internal walls throughout
the areas typically
comprise masonry with
plaster and decorative
finish.
FLOOR FINISHES
Sheet vinyl is provided
throughout the areas.
INTERNAL DOORS AND
FRAMES
Typically, doors comprise
painted or veneer faced
Generally, internal
walls and partitions
appear to be in fair
condition, acting as
intended. The
decorative finish to
the walls is aged and
soiled.
We noted localised
areas of low-level
moisture which is
indicative of rising
damp.
Typically, the sheet
vinyl is in fair
condition but soiled.
Doors are deemed to
be in fair condition.
Evidence of typical
You may wish to consider
wholesale redecoration
of the internal walls.
Whilst completing this
work, there will be a
requirement to
undertake localised damp
remedially works.
Ideally, the sheet vinyl
should be considered for
replacement within the
forthcoming 6-year
period.
You may wish to replace
the majority of internal
doors in conjunction with
3/4
4
4
£1,000
To be
reassessed
at later date
To be
reassessed
at later date
R. Pickering Ltd. • 1 Manor Court• Upper Poppleton• York YO266QP
Keswick Leisure Pool, Keswick
Condition Survey Report
30
R. Pickering Ltd. Tel: 07904604035 Email:[email protected]
ITEM ELEMENT/LOCATION/
DESCRIPTION
SUMMARY OF
CONDITION
DEFECT SOLUTION PRIORITY YEAR. YEAR YEAR YEAR YEAR YEAR
Keswick Leisure Pool, Keswick 2018 2019 2020 2021 2022 2023
solid core doors fitted
within timber linings.
wear and tear
expected from a
building of this type
and usage.
any proposed
refurbishment projects.
Refer to the building Fire
Risk Assessment
regarding fire precautions
issues/measures
required.
1
NA
5.11 Pool Area
5.11.1 CEILINGS
The area is provided with
an exposed metal
building frame therefore
ceilings are not provided.
A pre-finished profiled
ventilated metal soffit
and fascia is provided
around the perimeter of
the pool area above
external walls and
window openings.
The soffit and fascia
provided around the
perimeter of the pool
area is deemed to be
in poor condition. We
noted significant
condensation on the
underside of the soffit
which is indicative of
lack of appropriate
thermal insulation.
It is strongly
recommended that the
perimeter fascia and
soffit surrounding the
pool area is modified to
prevent the build-up of
condensation. It is
anticipated that this work
will require partial
removal of the
fascia/soffit to allow the
introduction of thermal
installation.
1/2
£25,000
5.12 The Swimming Pool and Surrounding Walkways
5.12.1
The pool slide and
associated equipment
was specifically excluded
from our inspection.
The swimming pool
measures approximately
16×10 m and varies in
depth. In addition to the
pool, walkway is provided
around the perimeter
It is understood that a
long-standing issue
with leakage from the
pool is being
encountered it is
understood that this
issue is estimated to
cost in the region of
£5000 per year.
It is strongly
recommended that the
suggested leakage of the
pool is further
investigated fully
establish the cause
before implementing
remedially action. Cost is
provisional for
investigation and repairs.
1
£40,000
(subject to
further
investigation)
R. Pickering Ltd. • 1 Manor Court• Upper Poppleton• York YO266QP
Keswick Leisure Pool, Keswick
Condition Survey Report
31
R. Pickering Ltd. Tel: 07904604035 Email:[email protected]
ITEM ELEMENT/LOCATION/
DESCRIPTION
SUMMARY OF
CONDITION
DEFECT SOLUTION PRIORITY YEAR. YEAR YEAR YEAR YEAR YEAR
Keswick Leisure Pool, Keswick 2018 2019 2020 2021 2022 2023
5.12.2
and raised features
including
vegetation/planters
provided at intervals.
A projecting viewing
gallery/platform is
provided above the deep
end of the pool. The
structure comprises
metal frame with spiral
staircase access.
The condition of
ceramic tiling to the
pool and surrounding
areas is deemed fair,
commensurate with
the age of the
building. We noted
sections of partially
de-bonded tiles that
require resetting
and/or replacing.
The metal guard rail
surrounding the pool
exhibis localised
evidence of corrosion.
The column
supporting the
viewing gallery
feature exhibits
evidence of corrosion
below the waterline.
Without detailed
exposure works, it is
impossible to
determine the full
extent of this
problem.
During our inspection,
we were made aware
of a horizontal
fracture which
extends around the
perimeter of the pool,
above water level. The
fracture is evident
within tile joints. It is
understood that this
Given the remaining six-
year lease period, it is
recommended that
localised tile repairs are
completed to damaged
sections.
It is strongly
recommended that
further investigation is
completed to the
corrosion positioned on
the viewing gallery
column base within the
pool. Investigate only.
1
1
£3,000
£5,000
R. Pickering Ltd. • 1 Manor Court• Upper Poppleton• York YO266QP
Keswick Leisure Pool, Keswick
Condition Survey Report
32
R. Pickering Ltd. Tel: 07904604035 Email:[email protected]
ITEM ELEMENT/LOCATION/
DESCRIPTION
SUMMARY OF
CONDITION
DEFECT SOLUTION PRIORITY YEAR. YEAR YEAR YEAR YEAR YEAR
Keswick Leisure Pool, Keswick 2018 2019 2020 2021 2022 2023
defect is currently
being monitored.
5.13 Male, Female and Disabled Toilets Provided
Adjacent Poolside and Kitchen
5.13.1 The above areas are
provided with
conventional ceramic
WCs, wash hand basins,
urinals and so forth.
Generally, the sanitary
ware and finishes
appear to be acting as
intended. However,
the areas would
benefit from
wholesale
refurbishment within
the forthcoming six-
year period.
You may wish to consider
refurbishment of the
male, female and
disabled toilets.
4 To be
reassessed
at later date
5.14 Gymnasium
5.14.1 The gymnasium is
positioned within a
partially glazed enclosure
typically comprising
painted timber double
glazed units. The pitched
roof positioned above the
gymnasium incorporates
a rooflight which has
previously been noted in
this report to be
defective.
A suspended ceiling grid
with air-conditioning
units is positioned above
the gymnasium area
approximately 3.2 m
above finished floor level.
It is understood that this
detail has been provided
Issues regarding
rainwater ingress
within the gymnasium
have previously noted
within this report.
Before completing any
enhancement work
within this area, it will
be necessary to
ensure the building
envelope is
watertight.
Generally, internal
finishes are deemed
to be in fair/poor
condition and should
be considered for
refurbishment.
It is recommended that
the subject area is made
watertight before
completing an internal
refurbishment project.
1 Cost included
elsewhere
R. Pickering Ltd. • 1 Manor Court• Upper Poppleton• York YO266QP
Keswick Leisure Pool, Keswick
Condition Survey Report
33
R. Pickering Ltd. Tel: 07904604035 Email:[email protected]
ITEM ELEMENT/LOCATION/
DESCRIPTION
SUMMARY OF
CONDITION
DEFECT SOLUTION PRIORITY YEAR. YEAR YEAR YEAR YEAR YEAR
Keswick Leisure Pool, Keswick 2018 2019 2020 2021 2022 2023
to reduce heat loss and
conceal the defective
roof above.
5.15 Plant Rooms
5.15 Excluded for time being
5.16 Sub Station Structure
5.16.1 The subject structure is
positioned to the north of
the carpark and
comprises external
masonry wall supporting
a dual pitched roof with
Westmorland slate
covering. It is understood
that the buildings
electrical substation is
positioned within this
structure together with a
storage facility.
The subject building
appears to be in fair
condition, suitable for
its intended use.
However, the roof
coverings have been
damaged, resulting in
numerous missing
slates. In addition, the
timber doors to the
building are in poor
condition, requiring
repair and
redecoration.
It is recommended that
the vegetation growth on
the building is carefully
removed before
necessary roof repairs are
completed.
It is recommended that
the timber doors are
repaired and
redecorated.
1 £3,000
R. PICKERING LTD.
Building Fabric Report
Total costs for the works identified with the above schedule £110,200 £5,000 £6,000 £11,000 £45,000 £15,000
ENG DESIGN
Mechanical and Electrical Report
Refer to Mechanical and Electrical Report prepared by ENG Design appended to
the rear of this document.
£59,300
R. Pickering Ltd. • 1 Manor Court• Upper Poppleton• York YO266QP
Keswick Leisure Pool, Keswick
Condition Survey Report
34
R. Pickering Ltd. Tel: 07904604035 Email:[email protected]
SUMMARY OF COSTS
Sub Total £251,500
Contingency
10%
£25,150
Sub Total £276,650
VAT 20% £55,330
Total £331,980
R. Pickering Ltd. • 1 Manor Court• Upper Poppleton• York YO266QP
Keswick Leisure Pool, Keswick
R. Pickering Ltd. Tel: 07904604035 Email:[email protected]
APPENDIX A
Schedule of Photographs
R. Pickering Ltd. • 1 Manor Court• Upper Poppleton• York YO266QP
Keswick Leisure Pool, Keswick
Condition Survey Report
32
R. Pickering Ltd. Tel: 07904604035 Email:[email protected]
Fig. 1 – Showing front (south) elevation
Fig 2 – Showing rear (north) elevation
R. Pickering Ltd. • 1 Manor Court• Upper Poppleton• York YO266QP
Keswick Leisure Pool, Keswick
Condition Survey Report
33
R. Pickering Ltd. Tel: 07904604035 Email:[email protected]
Fig. 3 – Showing typical roof coverings and valley detail. Note width of valley
Fig 4 – Showing typical louvred doors to plant rooms
R. Pickering Ltd. • 1 Manor Court• Upper Poppleton• York YO266QP
Keswick Leisure Pool, Keswick
Condition Survey Report
34
R. Pickering Ltd. Tel: 07904604035 Email:[email protected]
Fig. 5 – Showing external render, rear elevation. Note moisture damage
Fig 6 – Showing glazing detail around gymnasium
R. Pickering Ltd. • 1 Manor Court• Upper Poppleton• York YO266QP
Keswick Leisure Pool, Keswick
Condition Survey Report
35
R. Pickering Ltd. Tel: 07904604035 Email:[email protected]
Fig. 7 – Showing timber decay and spalling concrete cill to gymnasium windows
Fig 8 – Showing typical internal image of pool area
R. Pickering Ltd. • 1 Manor Court• Upper Poppleton• York YO266QP
Keswick Leisure Pool, Keswick
Condition Survey Report
36
R. Pickering Ltd. Tel: 07904604035 Email:[email protected]
Fig. 9 – Showing typical view of poolside windows. Note failed double-glazed units
Fig 10 – Showing roof structure above pool side. Note evidence of rain water ingress
R. Pickering Ltd. • 1 Manor Court• Upper Poppleton• York YO266QP
Keswick Leisure Pool, Keswick
Condition Survey Report
37
R. Pickering Ltd. Tel: 07904604035 Email:[email protected]
Fig. 11 – Showing typical view of changing area
R. Pickering Ltd. • 1 Manor Court• Upper Poppleton• York YO266QP
Keswick Leisure Pool, Keswick
R. Pickering Ltd. Tel: 07904604035 Email:[email protected]
APPENDIX B
Mechanical and Electrical Report
prepared by ENG Design
ENG BUILDING
SERVICES
CONSULTANTS
DESIGN
_____________________________________________________________________
KESWICK LEISURE CENTRE SURVEY REPORT
_____________________________________________________________________
Report on the condition of the mechanical and electrical installations following a survey on 5 February 2018
EngDesign Limited 106 – 108 Bermondsey Street London SE1 3TX
3009-M-DRAFT 12 February 2018
CPH
Page 2
BACKGROUND EngDesign Limited were instructed by Greenwich Leisure Limited to undertake a survey of the services installation at Keswick Leisure centre. The survey was undertaken on 5 February 2018. The agreement between GLL and Allerdale Council has a further six years to run. The purpose of the report is to assess the condition of the services and likely works to the end of the lease. The Centre was constructed in 1986/7 and was originally the leisure part of a time share development. When this venture failed the Council took over the building and operated it as a leisure facility for the general public. GLL have only recently been the operator. The centre comprises a Leisure Pool with a slide and wave machine, a small gym, changing areas and a commercial kitchen. The kitchen use has diminished over the years and is now used only occasionally for snacks and frying. There is a boiler room, pool plant room and an electrical intake room on the ground floor. The ventilation plant is located in the roof voids. Controls panels are located in the boiler room and the roof void. There is a BMS system which is accessed through a PC in the poolside office. There are no operating instructions, record drawings or design criteria.
SUMMARY Most of the services are original, 31 years old. Although they could be considered beyond their useful life there is no sign of imminent wholesale plant failure. Over the years several of the main plant items have been replaced either through failure or to comply with regulations and this policy should be maintained until the end of the agreement. At the end of the lease a substantial services replacement program will be required. The centre relies now on one boiler only and we advise that a further boiler is installed to replace the two failed units. This will bring the boiler capacity back to the original requirements and also give more security of supplies and potential reduced heating costs. The pool extract fan is damaged and requires repair/replacement: the present extract rate is presently low. The services are 31 years old and reflect the technology at the time.
Page 3
SERVICES DESCRIPTION Ventilation The pool is ventilated by separate supply and extract air handling units in the roof void. Air is introduced into the pool at mid height, with air directed towards the perimeter glazing and the pool via circular painted metal ductwork and diffusers. Extract is at high level again via circular metal ductwork. The supply unit comprises panel filters, heater battery, run round coil and supply fan. The extract unit comprises filter, run round coil, DX coil and extract fan. The kitchen has a central hood with removable washable filters linked to a bifurcated fan in the roof void. Supply air is provided by an air handling unit in the roof void comprising filter, heater battery and supply fan. Air enters the kitchen at a single grille via insulated rectangular metal ductwork. Changing areas, entrance lobby and staff areas are ventilated by a common air handling unit again located in the roof void. There are separate supply and extract air handling units with recirculation. The supply unit comprises a filter, heater battery, run round coil and supply fan. The extract unit comprises a filter, run round coil and extract fan. The gym has window extract fans but could not locate any supply system. Access to the main ventilation plant is via ladders from the ground floor and is not ideal. Any significant plant replacement would likely need sections of the roof removed. Heating Originally four gas fired boilers supplied heating for the centre. Two of these were replaced by a larger boiler about thirteen years ago. The remaining two original boilers are now deemed unsafe and abandoned. Heating water is distributed via three twin pump arrangements: constant temperature pumps provide water to the air handling plants and radiators; pool water heating pumps to the heat exchanger in the pool plant room; domestic hot water heating pumps to the heat exchanger in the boiler room. Pipework is insulated steel. Domestic Hot Water A new insulated plate heat exchanger replaced the original calorifier(s) four years ago. It has no buffer vessel. A new pump to allow water testing is incorporated. Insulated copper pipework. Twin secondary pumps on the hot water flow. Cold Water
Page 4
A metered cold water main enters the building in the boiler house. The large metal sectional storage tanks have been replaced by a single GRP tank in the roof void. Copper insulated pipework. Heating/Cooling Units The gym has three units with ceiling cassettes and adjacent local external plant. The poolside office has a small cooling unit. Controls The controls have been updated/replaced with a BMS system added about eight years ago. The main control panel in the boiler room was replaced four years ago. There is a further control panel in the roof void which is probably original. Power and Lighting The electrical supply enters the building by the boiler house with distribution boards within the centre. Lighting has been upgraded over the years with the pool having LED lighting. Fire Alarm System Cat2 system with detectors and break glasses throughout the centre. Four zone control panel at the rear of reception Pool Alarm Control panel at the rear of reception
PLANT LIFE EXPECTANCY As plant ages, replacement components become difficult or impossible to source, maintenance costs rise and the operational efficiency drops. Life expectancy is also dependent on the quality of the original installation and servicing thereafter. It is generally considered that ventilation plant with moving parts, such as fans and packaged air-handling units require replacement between 10-15 years; with the distribution ductwork and associated insulation lasting up to 25 years. Controls often need replacement after 10-15 years, mainly through obsolescence of software and components, and technological improvements of available controls sophistication.
Page 5
CONDITION ASSESSMENT A good proportion of the plant and distribution systems are original. Fortunately the original equipment was of a good standard and specification and generally plant that has failed has been replaced. It appears that maintenance throughout the plant’s life has been undertaken and we do not see any major wholesale services replacements being required in the near/medium term. There will be plant failures, no doubt, but these can be dealt with when they occur. There are two items, though that require action in the short term.
• The centre is only running on one boiler. On the day of the visit the temperature was at or around 0C all day. The boiler was continually firing and not reaching design temperature. A new condensing boiler should be considered. If this was arranged to take the main load then reduced heating costs should be achieved.
• The main pool extract fan has shed impellors and only one of the twin fans is effective. The extract volume will be significantly reduced and this means there will be surplus pool air exiting the pool into the surrounding spaces.
Other observations
• Plant access to the roof void areas is difficult. As a consequence the roof spaces have become dumping areas. A roof plant area clearing program would be beneficial.
• The main pool plant is by single speed fans. Consider inverter drives which will allow better air volume control and reduced night time operation.
• Measure the main pool plant air volumes and check against good practise.
• The gym building fabric is clearly poor with heating provided to the roof void to avoid condensation. This is a complete waste of energy and the building deficiencies should be corrected. It would be sensible to include a buffer area between the gym and pool in any re-design of the area.
The condition, age, performance and other details of surveyed services equipment are set out within table A1, found as an appendix to this report. A ‘traffic light’ system has been applied to the plant assessment; with colour indications thus:-
• Green Working order, or identified as complying with expected performance
• Amber Requires investigation, or minor problem/defect which should be addressed
• Red Significant issue that suggests immediate repair or replacement
TABLE A1
ITEM LOCATION DESCRIPTION AGE COMMENT Costs
Boilers Boiler Room Hoval Equinox EQ638 (638kW output)
2 no. Hoval GS 960Ex (281kW output)
abandoned and labled unsafe to operate
13
31
There were originally 4 No gas boilers rated at 281kW. Two of the boilers were replaced
with this large boiler. The remaining two have been abandoned. It was very cold on the day
of the visit (0C) and the single boiler was struggling to maintain temperature. Large boiler in
good working order. Install a further boiler to provide the load and security of heating -
system relies on a single aging boiler currently.
£40,000
Hot Water Heating Boiler Room UK Heat Exchangers C20314 with
insulated jacket. New pump for sampling
4 Original calorifier replaced with a plate heat exchanger.
HWS Secondary
Pumps
Boiler Room Wilo SB30
Wilo RS25/6.3
4
15
3 speed pumps installed on the flow. Surprised to see two secondary pumps. Second pump
normally kept as a spare rather than installed to avoid Legionella issues.
Booster Pumps Boiler Room Baric TCSLT52 31 Turned off and disused. Assume this was part of the tank replacement works
HWS Primary
Pumps
Boiler Room Wilo TOP-S50/10
?
15
31
Pumps operating. The older pump has a replacement motor.
Constant
Temperature
Pumps
Boiler Room Holden Brooks Pullen 60-200
Wiko BL50/170-1
25
15
Newer pump operating but older pump needs attention. £2,500
Pool Water Pumps Boiler Room Wilo TOP-S80/10
?
10
31
Pumps operating. The older pump has a replacement motor.
Pressurisation Unit Boiler Room Jet unit with expansion vessel. 10 Operating satisfactorily
Controls Boiler Room
Roof plant
Plantrooms
Office
Main boiler house control panel
Changing Room Panel
Loose Controls
BMS
3
?
3-8
8
The controls have all been renewed or overhauled in the last eight years. The BMS system
is a Priva system with plant graphics, all operating satisfactorily.
Cold Water Main Boiler Room Metered supply enters building in the
corner of the boiler room
31 No issues
Boiler Room
Pipework and
Valves
Boiler Room Steel insulated pipework. 31 Pipework is original except where alterations made for plant replacement. No leaks
evident. Insulation needs attention in places. Could not find dosing set.
£600
TABLE A1
Pool Water Heating Pool Plantroom UK Heat Exchangers C19949 with
insulated jacket.
6 Good condition
Pool Supply AHU Roof Void Trane 5-SE 12. A-43-D-753. 86/5/646 31 Access from Pool Plant Room. Limited access to the internal condition of the AHU, but what
seen showed remarkably little corrosion evident. The base of the AHU, where corrosion
often is found was sound. Heater battery and filters all looked in reasonable condition.
There is a run around split coil between the supply and extract AHU which has new
pipework sections but was not operating. This needs further investigation.
£1,200
Pool Extract AHU Roof Void Trane 5-SE 12. A-43-D-754. 86/5/647 31 Access from ladder in room off service entrance to kitchen. Again internally in reasonable
condition. See comment above re run around coil. The extract fan is damaged with impellor
blades missing. New fan or impellor required. See below re DX coil
£10,000
CHP Roof Void ? 31 Access from ladder in room off service entrance to kitchen. Suspect this plant was
abandoned many years ago. There is a DX coil in the Pool AHU extract which may have
preheated pool water.
Kitchen Extract Roof Void ? 31 Access from ladder in room off service entrance to kitchen. Access to the fan poor.
Bifurcated fan with galvanised ductwork to kitchen below. Washable filters in hood below.
Kitchen equipment use much diminished from original installation. System turned on
manually for occasional use. Filters and internal ductwork look clean and in reasonable
condition.
Kitchen supply Roof Void Flakt. 4987-4505-004
KDAA-11-04-1-X-X-1
31 Access from ladder in room off service entrance to kitchen. Heater battery has been
disconnected and heating water supply used for heating to gym ceiing void. Galvanised
ductwork to supply diffuser in kitchen.
Fire Alarm System Panel in
reception area
Supplied by FTS Fire and Security. 15? 4 zone control panel with detectors throughout the centre
Pool Alarm Panel in
reception area
Staff call 1000 15?
TABLE A1
Changing Room
Supply
Roof Void Trane 3 SE 2.25
A-43-D-755
86/5/649
31 Access from the toilet service void adjacent to reception. AHU serves a range of ducwork
serving the changing areas and reception below. All areas served by a common supply
without room temperature control. There is a recirculation path beween the supply and
extract systems and also a run around coil which has a noisy pump. Damaged ductwork
insulation needs attention.
£5,000
Changing Room
Extract
Roof Void Trane 3 SE 2.25
A-43-D-755
86/5/650
31 Access from the toilet service void adjacent to reception. See above re run around coil.
CWS Tanks Roof Void 3mx2mx1m fibreglass tank 10? This tank is resting on the abandoned larger tanks. At some time the water storage has
been reduced and the original steel tanks abandoned.
Gym
Cooling/Heating
External -
adjacent to gym
Hitachi Utopia Supercharge RAS-5HQE5
Fujitsu AOYG36LETL
20
1
This 20 year old heating and cooling unit is still operating and assume has had replacement
refridgerant. Two new additional units installed last year.
Lighting All areas Mixture of tungsten, halogen, fluoresent
lamps. The pool lighting is recently
installed LEDs.
various
Power All areas Main intake in room adjacent to boiler
room.
31
£59,300