Concurrent and Parallel Competing Critical Delay Demonstration Float Map A

7

Click here to load reader

Transcript of Concurrent and Parallel Competing Critical Delay Demonstration Float Map A

Page 1: Concurrent and Parallel Competing Critical Delay Demonstration Float Map A

West Building  ‐ Block 5 ‐ M340 to M460 Update Programmes ‐ Most Critical In Red and Critical within 20 days in Green

$BCP$4 FinalColumn #

40998 M340 M350 M360 M370 M380 M390 M400 M410 M420 M430 M440 M450

29/04/11

30/04/11

27/05/11

28/05/11

24/06/11

25/06/11

29/07/11

30/07/11

02/09/11

03/09/11

30/09/11

01/10/11

28/10/11

29/10/11

25/11/11

26/11/11

30/12/11

31/12/11

03/02/12

04/02/12

02/03/12

03/03/12

30/03/12

31/03/12

15/02/13

ACT Title OD Start Finish (*)Dur(*)Tota(*)Dur(*)Tot (*)Dur(*)Tot (*)Dur(*)Tot (*)Dur(*)Tot (*)Dur(*)Tot (*)Dur(*)Tot (*)Dur(*)Tot (*)Dur(*)Tot (*)Dur(*)Tot (*)Dur(*)Tot (*)Dur(*)TotWBS 1 Level 1 Level 2 Level 3 Level 4 Level 5 Level 6 Most CriMost CritMost CritMost Most CrCOSPMZ0620 Structural elements up to Mezz. floo 10/06/09 30/07/09 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.SP Super structure M450 C1 O SP Super structureCOSP010620 Structural elements up to 1st floor (I 17/06/09 27/08/09 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.SP Super structure M450 C1 O SP Super structureCOSP020620 Structural elements up to 2nd floor ( 27/07/09 24/09/09 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.SP Super structure M450 C1 O SP Super structureCOSP030620 Structural elements up to 3rd floor ( 13/08/09 06/10/09 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.SP Super structure M450 C1 O SP Super structureCOSP040620 Structural elements up to 4th floor ( 25/08/09 15/10/09 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.SP Super structure M450 C1 O SP Super structureCOSP050620 Structural elements up to 5th floor ( 16/09/09 27/10/09 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.SP Super structure M450 C1 O SP Super structureCOSP060620 Structural elements up to 6th floor ( 28/09/09 08/11/09 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.SP Super structure M450 C1 O SP Super structureCOSP070620 Structural elements up to 7th floor ( 17/10/09 17/11/09 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.SP Super structure M450 C1 O SP Super structureCOSP080620 Structural elements up to 8th floor ( 24/10/09 01/12/09 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.SP Super structure M450 C1 O SP Super structureCOSP090620 Structural elements up to 9th floor ( 04/11/09 10/12/09 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.SP Super structure M450 C1 O SP Super structureCOSP100620 Structural elements up to 10th floor  15/11/09 22/12/09 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.SP Super structure M450 C1 O SP Super structureCOSP110620 Structural elements up to 11th floor  25/11/09 06/01/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.SP Super structure M450 C1 O SP Super structureCOSP120620 Structural elements up to 12th floor  13/12/09 18/01/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.SP Super structure M450 C1 O SP Super structureCOSP130620 Structural elements up to 13th floor  30/12/09 28/01/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.SP Super structure M450 C1 O SP Super structureCOSP140620 Structural elements up to 14th floor  09/01/10 11/02/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.SP Super structure M450 C1 O SP Super structureCOSP150620 Structural elements up to 15th floor  21/01/10 25/02/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.SP Super structure M450 C1 O SP Super structureCOSPRF0620 Structural elements up to RF floor (In 07/02/10 15/03/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.SP Super structure M450 C1 O SP Super structureCOSPUR0620 Structural elements up to UR floor & 20/02/10 14/04/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.SP Super structure M450 C1 O SP Super structureCOMF011830 MEP 2nd fixes 12/11/09 12/12/11 75 ‐247 77 ‐249 78 ‐265 80 ‐283 80 ‐303 84 ‐321 87.2 ‐337 95.2 ‐355 100 0 100 0 100 0 100 0 M450.C1.O.MF.01 1st Floor M450 C1 O MF 01 1st Floor 1 2 3 4 5COMF011835 Plaster to column 20/03/10 07/01/12 80 ‐253 80 ‐255 80 ‐271 85 ‐288 85 ‐308 85 ‐324 85 ‐339 90 ‐354 90 ‐342 100 0 100 0 100 0 M450.C1.O.MF.01 1st Floor M450 C1 O MF 01 1st Floor 2 3 4 5COMF011840 Office Fitout (1st & 2nd Fix Trades) 18/04/10 04/04/12 1 ‐242 1 ‐244 1 ‐260 5 ‐279 5 ‐299 5 ‐315 5 ‐331 15 ‐342 20 ‐350 80 ‐343 90 ‐352 90 ‐362 M450.C1.O.MF.01 1st Floor M450 C1 O MF 01 1st Floor 2 3 4 5COMF011845 Basecoat Painting works 26/04/10 16/01/12 36 ‐253 36 ‐255 36 ‐271 36 ‐288 36 ‐308 36 ‐324 36 ‐339 36 ‐354 36 ‐350 100 0 100 0 100 0 M450.C1.O.MF.01 1st Floor M450 C1 O MF 01 1st Floor 2 3 4 5COMF011850 Stone Work @ lift lobby 12/09/10 05/04/11 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.01 1st Floor M450 C1 O MF 01 1st FloorCOMF011860 Ceramic tiles ‐ Wet area 27/10/10 14/01/12 80 ‐211 80 ‐213 80 ‐229 80 ‐246 80 ‐266 80 ‐282 80 ‐297 80 ‐313 80 ‐308 100 0 100 0 100 0 M450.C1.O.MF.01 1st Floor M450 C1 O MF 01 1st FloorCOMF011865 Testing & clearance prior to false cei 03/05/11 10/01/12 0 ‐213 16 ‐214 16 ‐230 16 ‐247 16 ‐267 16 ‐274 16.7 ‐287 16.7 ‐303 16 ‐297 100 0 100 0 100 0 M450.C1.O.MF.01 1st Floor M450 C1 O MF 01 1st Floor 5COMF011935 MEP final fixes to lift lobby/Corrid./W 13/09/11 26/06/12 0 ‐258 0 ‐250 0 ‐266 0 ‐283 0 ‐303 2 ‐319 2.44 ‐335 3 ‐349 2 ‐355 45 ‐361 90 ‐375 90 ‐390 M450.C1.O.MF.01 1st Floor M450 C1 O MF 01 1st Floor 1 2 3 4 5COMF011925 Ceiling works to lift lobby & bulkhea 18/09/11 10/01/12 0 ‐244 0 ‐245 0 ‐261 0 ‐265 0 ‐275 60 ‐282 80 ‐293 80 ‐309 80 ‐297 100 0 100 0 100 0 M450.C1.O.MF.01 1st Floor M450 C1 O MF 01 1st FloorCOMF011855 Ceiling Grid & Gyp. Bulkhead ‐ Tenan 24/09/11 15/01/12 0 ‐255 0 ‐255 0 ‐271 0 ‐288 0 ‐308 70 ‐324 78 ‐339 85 ‐354 85 ‐350 100 0 100 0 100 0 M450.C1.O.MF.01 1st Floor M450 C1 O MF 01 1st Floor 2 3 4 5COMF011895 Ceiling Installation  @ Corridore area 26/09/11 11/01/12 0 ‐257 0 ‐238 0 ‐254 0 ‐274 0 ‐267 30 ‐271 30 ‐287 45 ‐288 45 ‐308 100 0 100 0 100 0 M450.C1.O.MF.01 1st Floor M450 C1 O MF 01 1st FloorCOMF011920 Stone Floor @ Corridore area 08/11/11 14/01/12 0 ‐258 0 ‐249 0 ‐264 0 ‐274 0 ‐286 0 ‐302 0 ‐314 90 ‐330 90 ‐315 100 0 100 0 100 0 M450.C1.O.MF.01 1st Floor M450 C1 O MF 01 1st FloorCOMF011870 Screed work @ Corridore area 08/11/11 15/11/11 0 ‐187 0 ‐203 0 ‐219 0 ‐239 0 ‐259 0 ‐271 0 ‐287 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.01 1st Floor M450 C1 O MF 01 1st FloorCOMF011875 Floor Trunking & Raised Floor Install 23/11/11 15/01/12 0 ‐255 0 ‐255 0 ‐271 0 ‐288 0 ‐308 0 ‐324 0 ‐339 5 ‐354 37 ‐350 100 0 100 0 100 0 M450.C1.O.MF.01 1st Floor M450 C1 O MF 01 1st Floor 2 3 4 5COMF011915 Threshold & Door Install‐ Wet area 29/12/11 20/02/12 0 ‐222 0 ‐223 0 ‐239 0 ‐259 0 ‐279 0 ‐295 0 ‐311 0 ‐327 0 ‐341 90 ‐347 100 0 100 0 M450.C1.O.MF.01 1st Floor M450 C1 O MF 01 1st FloorCOMF011905 Final Ceiling Tiles install ‐ Tenant Are 02/01/12 05/02/12 0 ‐255 0 ‐255 0 ‐271 0 ‐288 0 ‐308 0 ‐324 0 ‐339 0 ‐354 0 ‐359 85 ‐349 100 0 100 0 M450.C1.O.MF.01 1st Floor M450 C1 O MF 01 1st FloorCOMF011885 Suspended Ceiling‐ Wet area 02/01/12 16/01/12 0 ‐222 0 ‐221 0 ‐237 0 ‐255 0 ‐266 0 ‐282 0 ‐298 0 ‐314 0 ‐329 100 0 100 0 100 0 M450.C1.O.MF.01 1st Floor M450 C1 O MF 01 1st FloorCOMF011890 Plumbing Fixture Install & Mirror‐ W 03/01/12 11/03/12 0 ‐222 0 ‐223 0 ‐239 0 ‐259 0 ‐279 0 ‐295 0 ‐311 0 ‐327 0 ‐341 90 ‐347 90 ‐360 100 0 M450.C1.O.MF.01 1st Floor M450 C1 O MF 01 1st Floor 2 3 4 5COMF011900 MEP final fixes to Tenant Area 14/01/12 26/06/12 0 ‐250 0 ‐250 0 ‐266 0 ‐283 0 ‐303 0 ‐319 0 ‐335 0 ‐349 0 ‐355 50 ‐360 90 ‐375 90 ‐390 M450.C1.O.MF.01 1st Floor M450 C1 O MF 01 1st Floor 1 2 3 4 5COMF011910 Door Installation ‐ Tenant area 16/01/12 23/01/12 0 ‐249 0 ‐249 0 ‐265 0 ‐282 0 ‐302 0 ‐318 0 ‐334 0 ‐348 0 ‐345 100 0 100 0 100 0 M450.C1.O.MF.01 1st Floor M450 C1 O MF 01 1st FloorCOMF011940 Door Installation @Corrid. & Plant R 16/01/12 02/02/12 0 ‐249 0 ‐249 0 ‐256 0 ‐273 0 ‐292 0 ‐309 0 ‐323 0 ‐338 0 ‐357 100 0 100 0 100 0 M450.C1.O.MF.01 1st Floor M450 C1 O MF 01 1st FloorCOMF011945 Final Painting works to Tenant Area 04/02/12 11/03/12 0 ‐255 0 ‐255 0 ‐271 0 ‐288 0 ‐308 0 ‐324 0 ‐339 0 ‐354 0 ‐359 0 ‐350 80 ‐351 100 0 M450.C1.O.MF.01 1st Floor M450 C1 O MF 01 1st FloorCOMF011950 Sliding Door @ Lift Lobby 04/02/12 09/02/12 0 ‐244 0 ‐245 0 ‐261 0 ‐265 0 ‐275 0 ‐291 0 ‐306 0 ‐322 0 ‐334 0 ‐320 100 0 100 0 M450.C1.O.MF.01 1st Floor M450 C1 O MF 01 1st FloorCOMF011930 Final Painting/Vinyl wall paper works 11/02/12 15/06/12 0 ‐256 0 ‐247 0 ‐263 0 ‐276 0 ‐296 0 ‐312 0 ‐328 0 ‐342 0 ‐347 0 ‐361 30 ‐370 80 ‐384 M450.C1.O.MF.01 1st Floor M450 C1 O MF 01 1st FloorCOMF011880 Installation of Cubicle ‐ Wet area 28/05/12 13/06/12 0 ‐217 0 ‐223 0 ‐239 0 ‐259 0 ‐279 0 ‐295 0 ‐311 0 ‐327 0 ‐341 0 ‐347 0 ‐360 0 ‐375 M450.C1.O.MF.01 1st Floor M450 C1 O MF 01 1st FloorCOMF011955 Snagging & Keys 27/06/12 13/07/12 0 ‐255 0 ‐255 0 ‐271 0 ‐288 0 ‐308 0 ‐324 0 ‐339 0 ‐354 0 ‐359 0 ‐355 0 ‐367 0 ‐383 M450.C1.O.MF.01 1st Floor M450 C1 O MF 01 1st FloorCOMF021820 MEP 2nd fixes 27/11/09 03/12/11 85 ‐243 95 ‐254 95 ‐270 95 ‐287 95 ‐307 97 ‐322 98.7 ‐338 98.7 ‐354 100 0 100 0 100 0 100 0 M450.C1.O.MF.02 2nd Floor M450 C1 O MF 02 2nd Floor 2 3 4 5COMF023230 Plaster to column & lift lobby 20/03/10 28/11/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.02 2nd Floor M450 C1 O MF 02 2nd FloorCOMF023220 Office Fitout (1st & 2nd Fix Trades) 08/04/10 05/04/12 66 ‐257 95 ‐248 95 ‐264 95 ‐274 95 ‐289 95 ‐302 95.3 ‐317 95.3 ‐333 95 ‐353 95 ‐364 95 ‐375 95 ‐390 M450.C1.O.MF.02 2nd Floor M450 C1 O MF 02 2nd Floor 1 2 3 4 5COMF023260 Basecoat Painting works 05/05/10 15/11/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.02 2nd Floor M450 C1 O MF 02 2nd FloorCOMF022420 Ceramic tiles 13/05/10 15/05/11 90 ‐203 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.02 2nd Floor M450 C1 O MF 02 2nd FloorCOMF022620 Stone Work @ lift lobby 01/08/10 07/04/11 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.02 2nd Floor M450 C1 O MF 02 2nd FloorCOMF024810 Screed work @ Corridore area 14/02/11 20/02/11 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.02 2nd Floor M450 C1 O MF 02 2nd FloorCOMF024730 Ceiling Grid & Gyp. Bulkhead ‐ Tenan 17/02/11 02/07/11 75 ‐257 81 ‐250 95 ‐266 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.02 2nd Floor M450 C1 O MF 02 2nd Floor 1 2 3 4 5COMF024750 MEP final fixes to Tenant Area 15/03/11 09/04/12 25 ‐237 25 ‐240 25 ‐241 35 ‐259 45 ‐282 45 ‐298 45 ‐314 45 ‐330 45 ‐349 90 ‐360 90 ‐375 95 ‐390 M450.C1.O.MF.02 2nd Floor M450 C1 O MF 02 2nd Floor 1 2 3 4 5COMF022550 Ceramic tiles ‐ Wet area (Balance/Re 15/03/11 26/07/11 83 ‐221 83 ‐231 98 ‐246 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.02 2nd Floor M450 C1 O MF 02 2nd Floor 2 3 4 5COMF022160 Testing & clearance prior to false cei 15/03/11 21/03/11 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.02 2nd Floor M450 C1 O MF 02 2nd FloorCOMF022980 Suspended Ceiling‐ Wet area 22/03/11 02/04/11 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.02 2nd Floor M450 C1 O MF 02 2nd FloorCOMF024740 Floor Trunking & Raised Floor Install 25/03/11 09/08/11 25 ‐244 25 ‐246 85 ‐242 95 ‐261 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.02 2nd Floor M450 C1 O MF 02 2nd Floor 2 3 4 5COMF024760 Final Ceiling Tiles install ‐ Tenant Are 25/03/11 03/01/12 25 ‐244 30 ‐246 35 ‐245 70 ‐258 95 ‐283 95 ‐298 95 ‐315 95 ‐331 95 ‐350 100 0 100 0 100 0 M450.C1.O.MF.02 2nd Floor M450 C1 O MF 02 2nd Floor 2 3 4 5COMF024780 Final Painting works to Tenant Area 28/03/11 18/02/12 30 ‐240 76 ‐236 75 ‐235 75 ‐253 75 ‐279 75 ‐295 75 ‐311 75 ‐327 75 ‐346 95 ‐353 100 0 100 0 M450.C1.O.MF.02 2nd Floor M450 C1 O MF 02 2nd Floor 2 3 4 5COMF024770 Door Installation ‐ Tenant area 28/03/11 15/01/12 25 ‐238 25 ‐241 25 ‐241 25 ‐261 25 ‐287 25 ‐303 25 ‐319 25 ‐335 25 ‐354 100 0 100 0 100 0 M450.C1.O.MF.02 2nd Floor M450 C1 O MF 02 2nd Floor 1 2 3 4 5COMF024830 Stone Floor @ Corridore area 01/04/11 07/04/11 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.02 2nd Floor M450 C1 O MF 02 2nd FloorCOMF024800 Sliding Door @ Lift Lobby 20/04/11 24/07/11 0 ‐231 50 ‐225 50 ‐241 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.02 2nd Floor M450 C1 O MF 02 2nd FloorCOMF022990 Plumbing Fixture Install & Mirror‐ W 27/04/11 14/01/12 0 ‐221 90 ‐225 90 ‐241 95 ‐260 95 ‐280 95 ‐296 95 ‐312 95 ‐328 95 ‐341 100 0 100 0 100 0 M450.C1.O.MF.02 2nd Floor M450 C1 O MF 02 2nd Floor 2 3 4 5COMF023000 Threshold & Door Install‐ Wet area 30/04/11 13/02/12 0 ‐221 16 ‐225 15 ‐241 15 ‐260 15 ‐280 15 ‐296 15 ‐312 15 ‐328 30 ‐341 90 ‐357 100 0 100 0 M450.C1.O.MF.02 2nd Floor M450 C1 O MF 02 2nd Floor 2 3 4 5COMF024820 Ceiling Installation  @ Corridore area 02/05/11 07/01/12 0 ‐258 20 ‐255 50 ‐270 50 ‐280 60 ‐292 85 ‐308 85 ‐322 85 ‐338 85 ‐353 100 0 100 0 100 0 M450.C1.O.MF.02 2nd Floor M450 C1 O MF 02 2nd Floor 2 3 4 5COMF024790 Ceiling works to lift lobby & bulkhea 02/05/11 23/07/11 0 ‐243 28 ‐248 30 ‐264 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.02 2nd Floor M450 C1 O MF 02 2nd Floor 2 3 4 5COMF024850 MEP final fixes to lift lobby/Corrid./W 09/05/11 09/04/12 0 ‐237 21 ‐240 25 ‐249 30 ‐269 40 ‐287 40 ‐298 40 ‐314 59 ‐330 59 ‐349 90 ‐360 90 ‐375 97 ‐390 M450.C1.O.MF.02 2nd Floor M450 C1 O MF 02 2nd Floor 1 2 3 4 5COMF024840 Final Painting/Vinyl wall paper works 01/09/11 10/03/12 0 ‐235 0 ‐236 0 ‐249 0 ‐269 5 ‐287 35 ‐297 35 ‐313 35 ‐329 35 ‐344 70 ‐358 90 ‐370 100 0 M450.C1.O.MF.02 2nd Floor M450 C1 O MF 02 2nd Floor 2 3 4 5COMF024860 Door Installation @Corrid. & Plant R 28/12/11 28/01/12 0 ‐239 0 ‐241 0 ‐253 0 ‐273 0 ‐292 0 ‐306 0 ‐322 0 ‐338 0 ‐354 100 0 100 0 100 0 M450.C1.O.MF.02 2nd Floor M450 C1 O MF 02 2nd FloorCOMF022970 Installation of Cubicle ‐ Wet area 11/02/12 13/02/12 0 ‐221 0 ‐234 0 ‐250 0 ‐270 0 ‐290 0 ‐306 0 ‐322 0 ‐331 0 ‐343 0 ‐357 100 0 100 0 M450.C1.O.MF.02 2nd Floor M450 C1 O MF 02 2nd Floor

1 of 7

VAIO
Typewritten Text
VAIO
Typewritten Text
VAIO
Stamp
VAIO
Line
VAIO
Stamp
VAIO
Line
VAIO
Line
VAIO
Line
VAIO
Stamp
VAIO
Stamp
VAIO
Line
VAIO
Line
VAIO
Line
VAIO
Stamp
VAIO
Line
VAIO
Line
VAIO
Line
VAIO
Line
VAIO
Stamp
VAIO
Line
VAIO
Line
Page 2: Concurrent and Parallel Competing Critical Delay Demonstration Float Map A

West Building  ‐ Block 5 ‐ M340 to M460 Update Programmes ‐ Most Critical In Red and Critical within 20 days in Green

COMF029165 Snagging & Keys 09/04/12 25/04/12 0 ‐240 0 ‐236 0 ‐244 0 ‐264 0 ‐283 0 ‐296 0 ‐312 0 ‐328 0 ‐345 0 ‐357 0 ‐369 0 ‐384 M450.C1.O.MF.02 2nd Floor M450 C1 O MF 02 2nd FloorCOMF031940 MEP 2nd fixes 12/12/09 04/12/11 64 ‐253 95 ‐255 95 ‐271 95 ‐288 95 ‐308 95 ‐324 96 ‐339 96 ‐355 100 0 100 0 100 0 100 0 M450.C1.O.MF.03 3rd Floor M450 C1 O MF 03 3rd Floor 2 3 4 5COMF033250 Plaster to column & lift lobby 20/03/10 20/11/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.03 3rd Floor M450 C1 O MF 03 3rd FloorCOMF033340 Office Fitout (1st & 2nd Fix Trades) 27/04/10 06/04/12 62 ‐257 90 ‐250 90 ‐265 90 ‐279 90 ‐293 90 ‐306 90 ‐321 90 ‐337 90 ‐357 95 ‐364 95 ‐373 95 ‐389 M450.C1.O.MF.03 3rd Floor M450 C1 O MF 03 3rd Floor 2 3 4 5COMF033270 Basecoat Painting works 05/05/10 27/11/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.03 3rd Floor M450 C1 O MF 03 3rd FloorCOMF032540 Ceramic tiles 01/06/10 17/05/11 90 ‐203 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.03 3rd Floor M450 C1 O MF 03 3rd FloorCOMF032740 Stone Work @ lift lobby 09/08/10 12/10/11 93 ‐227 93 ‐243 96 ‐259 96 ‐256 98 ‐270 98 ‐286 98 ‐302 98 ‐318 100 0 100 0 100 0 100 0 M450.C1.O.MF.03 3rd Floor M450 C1 O MF 03 3rd FloorCOMF034670 Screed work @ Corridore area 21/02/11 27/02/11 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.03 3rd Floor M450 C1 O MF 03 3rd FloorCOMF034590 Ceiling Grid & Gyp. Bulkhead ‐ Tenan 24/02/11 07/07/11 75 ‐257 81 ‐250 90 ‐266 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.03 3rd Floor M450 C1 O MF 03 3rd Floor 1 2 3 4 5COMF032150 Testing & clearance prior to false cei 15/03/11 12/05/11 83 ‐244 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.03 3rd Floor M450 C1 O MF 03 3rd Floor 2 3 4 5COMF032745 Ceramic tiles ‐ Wet area (Balance/Re 15/03/11 17/05/11 75 ‐227 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.03 3rd Floor M450 C1 O MF 03 3rd Floor 4 5COMF032940 Suspended Ceiling‐ Wet area 26/03/11 14/08/11 27 ‐225 47 ‐223 50 ‐239 70 ‐258 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.03 3rd Floor M450 C1 O MF 03 3rd Floor 2 3 4 5COMF034640 Final Painting works to Tenant Area 01/05/11 18/02/12 0 ‐257 76 ‐247 76 ‐239 76 ‐255 76 ‐282 76 ‐298 76.9 ‐314 76.9 ‐330 76 ‐350 80 ‐353 100 0 100 0 M450.C1.O.MF.03 3rd Floor M450 C1 O MF 03 3rd Floor 2 3 4 5COMF034660 Sliding Door @ Lift Lobby 02/05/11 02/01/12 0 ‐233 20 ‐226 20 ‐242 20 ‐252 20 ‐272 45 ‐288 50 ‐304 50 ‐320 50 ‐334 100 0 100 0 100 0 M450.C1.O.MF.03 3rd Floor M450 C1 O MF 03 3rd FloorCOMF034680 Ceiling Installation  @ Corridore area 10/05/11 08/01/12 0 ‐258 20 ‐249 25 ‐264 25 ‐274 35 ‐286 70 ‐302 70 ‐313 70 ‐329 72 ‐349 100 0 100 0 100 0 M450.C1.O.MF.03 3rd Floor M450 C1 O MF 03 3rd Floor 2 3 4 5COMF034600 Floor Trunking & Raised Floor Install 26/05/11 14/08/11 0 ‐257 0 ‐257 80 ‐247 95 ‐264 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.03 3rd Floor M450 C1 O MF 03 3rd Floor 2 3 4 5COMF034690 Stone Floor @ Corridore area 28/06/11 14/07/11 0 ‐258 0 ‐249 0 ‐264 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.03 3rd Floor M450 C1 O MF 03 3rd FloorCOMF034620 Final Ceiling Tiles install ‐ Tenant Are 23/07/11 02/01/12 0 ‐257 0 ‐257 0 ‐249 60 ‐259 85 ‐283 85 ‐299 85 ‐316 85 ‐332 85 ‐352 100 0 100 0 100 0 M450.C1.O.MF.03 3rd Floor M450 C1 O MF 03 3rd Floor 2 3 4 5COMF034650 Ceiling works to lift lobby & bulkhea 23/07/11 07/01/12 0 ‐244 0 ‐245 0 ‐261 70 ‐258 70 ‐272 70 ‐288 70 ‐304 70 ‐320 98 ‐334 100 0 100 0 100 0 M450.C1.O.MF.03 3rd Floor M450 C1 O MF 03 3rd Floor 2 3 4 5COMF034610 MEP final fixes to Tenant Area 06/08/11 13/04/12 0 ‐250 0 ‐250 0 ‐242 0 ‐264 13 ‐288 30 ‐300 30 ‐316 40 ‐330 40 ‐350 90 ‐360 90 ‐375 90 ‐390 M450.C1.O.MF.03 3rd Floor M450 C1 O MF 03 3rd Floor 1 2 3 4 5COMF034710 MEP final fixes to lift lobby/Corrid./W 21/08/11 13/04/12 0 ‐250 0 ‐250 0 ‐253 0 ‐269 7 ‐288 10 ‐300 11 ‐316 53 ‐330 53 ‐350 90 ‐360 90 ‐375 96 ‐390 M450.C1.O.MF.03 3rd Floor M450 C1 O MF 03 3rd Floor 1 2 3 4 5COMF032950 Plumbing Fixture Install & Mirror‐ W 08/11/11 09/01/12 0 ‐227 0 ‐234 0 ‐250 0 ‐270 0 ‐290 0 ‐306 0 ‐322 70 ‐331 70 ‐343 100 0 100 0 100 0 M450.C1.O.MF.03 3rd Floor M450 C1 O MF 03 3rd Floor 2 3 4 5COMF032960 Threshold & Door Install‐ Wet area 03/12/11 18/02/12 0 ‐227 0 ‐234 0 ‐250 0 ‐270 0 ‐290 0 ‐306 0 ‐322 0 ‐331 30 ‐343 90 ‐356 100 0 100 0 M450.C1.O.MF.03 3rd Floor M450 C1 O MF 03 3rd FloorCOMF034720 Door Installation @Corrid. & Plant R 28/12/11 31/01/12 0 ‐249 0 ‐249 0 ‐256 0 ‐273 0 ‐292 0 ‐306 0 ‐322 0 ‐338 0 ‐357 100 0 100 0 100 0 M450.C1.O.MF.03 3rd Floor M450 C1 O MF 03 3rd FloorCOMF034630 Door Installation ‐ Tenant area 02/01/12 16/01/12 0 ‐251 0 ‐249 0 ‐241 0 ‐263 0 ‐289 0 ‐305 0 ‐321 0 ‐337 0 ‐357 100 0 100 0 100 0 M450.C1.O.MF.03 3rd Floor M450 C1 O MF 03 3rd FloorCOMF034700 Final Painting/Vinyl wall paper works 21/01/12 04/04/12 0 ‐246 0 ‐243 0 ‐252 0 ‐269 0 ‐287 0 ‐298 0 ‐314 0 ‐330 0 ‐346 70 ‐358 80 ‐370 80 ‐384 M450.C1.O.MF.03 3rd Floor M450 C1 O MF 03 3rd Floor 2 3 4 5COMF032930 Installation of Cubicle ‐ Wet area 30/03/12 17/04/12 0 ‐227 0 ‐234 0 ‐250 0 ‐270 0 ‐290 0 ‐306 0 ‐322 0 ‐331 0 ‐343 0 ‐356 0 ‐369 0 ‐385 M450.C1.O.MF.03 3rd Floor M450 C1 O MF 03 3rd FloorCOMF039155 Snagging & Keys 17/04/12 03/05/12 0 ‐257 0 ‐246 0 ‐250 0 ‐270 0 ‐290 0 ‐306 0 ‐322 0 ‐331 0 ‐349 0 ‐357 0 ‐369 0 ‐385 M450.C1.O.MF.03 3rd Floor M450 C1 O MF 03 3rd FloorCOMF041930 MEP 2nd fixes 27/12/09 04/12/11 81 ‐253 95 ‐255 95 ‐271 95 ‐288 95 ‐308 95 ‐324 96 ‐339 96 ‐355 100 0 100 0 100 0 100 0 M450.C1.O.MF.04 4th Floor M450 C1 O MF 04 4th Floor 2 3 4 5COMF043250 Plaster to column & lift lobby 20/03/10 11/11/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.04 4th Floor M450 C1 O MF 04 4th FloorCOMF043330 Office Fitout (1st & 2nd Fix Trades) 04/05/10 05/04/12 65 ‐256 95 ‐247 95 ‐263 95 ‐279 95 ‐294 95 ‐307 95.3 ‐320 95.3 ‐336 95 ‐356 95 ‐368 95 ‐373 95 ‐389 M450.C1.O.MF.04 4th Floor M450 C1 O MF 04 4th Floor 2 3 4 5COMF043270 Basecoat Painting works 06/05/10 23/11/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.04 4th Floor M450 C1 O MF 04 4th FloorCOMF042530 Ceramic tiles 05/06/10 19/05/11 90 ‐203 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.04 4th Floor M450 C1 O MF 04 4th FloorCOMF042730 Stone Work @ lift lobby 14/08/10 14/10/11 93 ‐222 93 ‐238 96 ‐254 98 ‐265 98 ‐275 98 ‐290 98 ‐306 98 ‐322 100 0 100 0 100 0 100 0 M450.C1.O.MF.04 4th Floor M450 C1 O MF 04 4th Floor 2 3 4 5COMF044540 Screed work @ Corridore area 28/02/11 16/03/11 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.04 4th Floor M450 C1 O MF 04 4th FloorCOMF043950 Ceiling Grid & Gyp. Bulkhead ‐ Tenan 03/03/11 14/07/11 75 ‐257 81 ‐250 85 ‐266 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.04 4th Floor M450 C1 O MF 04 4th Floor 1 2 3 4 5COMF042140 Testing & clearance prior to false cei 16/03/11 01/05/11 83 ‐241 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.04 4th Floor M450 C1 O MF 04 4th FloorCOMF043955 Ceramic tiles ‐ Wet area (Balance/Re 16/03/11 02/08/11 75 ‐225 75 ‐226 75 ‐242 98 ‐261 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.04 4th Floor M450 C1 O MF 04 4th FloorCOMF042900 Suspended Ceiling‐ Wet area 30/03/11 14/08/11 20 ‐225 50 ‐223 50 ‐239 70 ‐258 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.04 4th Floor M450 C1 O MF 04 4th Floor 2 3 4 5COMF044010 Sliding Door @ Lift Lobby 03/05/11 04/01/12 0 ‐234 20 ‐231 20 ‐247 20 ‐254 20 ‐274 20 ‐290 20 ‐305 20 ‐321 20 ‐334 100 0 100 0 100 0 M450.C1.O.MF.04 4th Floor M450 C1 O MF 04 4th FloorCOMF044550 Ceiling Installation  @ Corridore area 10/05/11 08/01/12 0 ‐258 20 ‐245 25 ‐260 25 ‐274 35 ‐286 35 ‐302 60 ‐311 60 ‐326 70 ‐345 100 0 100 0 100 0 M450.C1.O.MF.04 4th Floor M450 C1 O MF 04 4th Floor 2 3 4 5COMF043970 Final Ceiling Tiles install ‐ Tenant Are 10/05/11 03/01/12 0 ‐257 10 ‐257 15 ‐249 60 ‐259 85 ‐283 85 ‐299 90 ‐316 90 ‐332 90 ‐352 100 0 100 0 100 0 M450.C1.O.MF.04 4th Floor M450 C1 O MF 04 4th Floor 2 3 4 5COMF043960 Floor Trunking & Raised Floor Install 05/06/11 14/08/11 0 ‐257 0 ‐252 60 ‐248 95 ‐262 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.04 4th Floor M450 C1 O MF 04 4th Floor 2 3 4 5COMF044560 Stone Floor @ Corridore area 28/06/11 14/07/11 0 ‐258 0 ‐249 0 ‐264 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.04 4th Floor M450 C1 O MF 04 4th FloorCOMF044000 Ceiling works to lift lobby & bulkhea 24/07/11 08/01/12 0 ‐244 0 ‐245 0 ‐261 70 ‐258 70 ‐274 70 ‐290 70 ‐305 70 ‐321 95 ‐334 100 0 100 0 100 0 M450.C1.O.MF.04 4th Floor M450 C1 O MF 04 4th Floor 2 3 4 5COMF044530 MEP final fixes to Tenant Area 06/08/11 19/04/12 0 ‐250 0 ‐250 0 ‐243 0 ‐264 13 ‐288 27 ‐300 27 ‐316 37 ‐330 37 ‐350 90 ‐360 90 ‐375 90 ‐390 M450.C1.O.MF.04 4th Floor M450 C1 O MF 04 4th Floor 1 2 3 4 5COMF044570 MEP final fixes to lift lobby/Corrid./W 22/08/11 19/04/12 0 ‐250 0 ‐250 0 ‐254 0 ‐269 4 ‐288 8 ‐300 8.54 ‐316 43 ‐330 43 ‐350 90 ‐361 90 ‐375 98 ‐390 M450.C1.O.MF.04 4th Floor M450 C1 O MF 04 4th Floor 1 2 3 4 5COMF042910 Plumbing Fixture Install & Mirror‐ W 08/11/11 08/01/12 0 ‐227 0 ‐233 0 ‐249 0 ‐269 0 ‐289 0 ‐305 0 ‐321 70 ‐330 70 ‐342 100 0 100 0 100 0 M450.C1.O.MF.04 4th Floor M450 C1 O MF 04 4th Floor 2 3 4 5COMF042920 Threshold & Door Install‐ Wet area 04/12/11 18/02/12 0 ‐227 0 ‐233 0 ‐249 0 ‐269 0 ‐289 0 ‐305 0 ‐321 0 ‐330 30 ‐342 90 ‐356 100 0 100 0 M450.C1.O.MF.04 4th Floor M450 C1 O MF 04 4th FloorCOMF043990 Final Painting works to Tenant Area 02/01/12 20/02/12 0 ‐257 0 ‐257 0 ‐249 0 ‐262 0 ‐289 0 ‐305 0 ‐320 0 ‐336 0 ‐356 70 ‐353 100 0 100 0 M450.C1.O.MF.04 4th Floor M450 C1 O MF 04 4th Floor 2 3 4 5COMF043980 Door Installation ‐ Tenant area 02/01/12 16/01/12 0 ‐251 0 ‐248 0 ‐245 0 ‐262 0 ‐289 0 ‐305 0 ‐320 0 ‐336 0 ‐356 100 0 100 0 100 0 M450.C1.O.MF.04 4th Floor M450 C1 O MF 04 4th FloorCOMF044580 Door Installation @Corrid. & Plant R 02/01/12 31/01/12 0 ‐249 0 ‐249 0 ‐256 0 ‐273 0 ‐292 0 ‐306 0 ‐322 0 ‐338 0 ‐357 100 0 100 0 100 0 M450.C1.O.MF.04 4th Floor M450 C1 O MF 04 4th FloorCOMF044020 Final Painting/Vinyl wall paper works 11/02/12 10/04/12 0 ‐247 0 ‐243 0 ‐253 0 ‐269 0 ‐287 0 ‐298 0 ‐314 0 ‐330 0 ‐346 0 ‐361 80 ‐370 80 ‐384 M450.C1.O.MF.04 4th Floor M450 C1 O MF 04 4th Floor 2 3 4 5COMF042890 Installation of Cubicle ‐ Wet area 04/04/12 20/04/12 6 ‐227 6 ‐233 6 ‐249 6 ‐269 6 ‐289 6 ‐305 6.25 ‐321 6.25 ‐330 6 ‐342 6 ‐356 0 ‐369 0 ‐385 M450.C1.O.MF.04 4th Floor M450 C1 O MF 04 4th Floor 2 3 4 5COMF049145 Snagging & Keys 23/04/12 09/05/12 0 ‐257 0 ‐256 0 ‐250 0 ‐270 0 ‐290 0 ‐306 0 ‐322 0 ‐336 0 ‐356 0 ‐357 0 ‐369 0 ‐385 M450.C1.O.MF.04 4th Floor M450 C1 O MF 04 4th FloorCOMF051920 MEP 2nd fixes 11/01/10 04/12/11 83 ‐253 95 ‐255 95 ‐271 95 ‐288 95 ‐308 95 ‐324 96 ‐339 96 ‐355 100 0 100 0 100 0 100 0 M450.C1.O.MF.05 5th Floor M450 C1 O MF 05 5th Floor 2 3 4 5COMF053250 Plaster to column & lift lobby 10/04/10 28/11/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.05 5th Floor M450 C1 O MF 05 5th FloorCOMF053270 Basecoat Painting works 08/05/10 19/12/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.05 5th Floor M450 C1 O MF 05 5th FloorCOMF053320 Office Fitout (1st & 2nd Fix Trades) 17/05/10 05/04/12 58 ‐257 95 ‐246 95 ‐262 95 ‐280 95 ‐295 95 ‐308 95.3 ‐314 95.3 ‐330 95 ‐349 95 ‐364 95 ‐370 95 ‐386 M450.C1.O.MF.05 5th Floor M450 C1 O MF 05 5th Floor 2 3 4 5COMF052520 Ceramic tiles ‐ Wet area 20/06/10 19/05/11 90 ‐224 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.05 5th Floor M450 C1 O MF 05 5th FloorCOMF052720 Stone Work @ lift lobby 04/10/10 16/10/11 93 ‐222 93 ‐238 96 ‐253 98 ‐265 98 ‐275 98 ‐290 98 ‐306 98 ‐322 100 0 100 0 100 0 100 0 M450.C1.O.MF.05 5th Floor M450 C1 O MF 05 5th Floor 2 3 4 5COMF054490 Screed work @ Corridore area 07/03/11 20/03/11 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.05 5th Floor M450 C1 O MF 05 5th FloorCOMF053860 Ceiling Grid & Gyp. Bulkhead ‐ Tenan 10/03/11 02/08/11 75 ‐257 81 ‐250 85 ‐266 98 ‐280 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.05 5th Floor M450 C1 O MF 05 5th Floor 1 2 3 4 5COMF052130 Testing & clearance prior to false cei 20/03/11 02/05/11 50 ‐241 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.05 5th Floor M450 C1 O MF 05 5th FloorCOMF052860 Suspended Ceiling‐ Wet area 05/04/11 14/08/11 16 ‐225 47 ‐223 50 ‐239 70 ‐258 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.05 5th Floor M450 C1 O MF 05 5th Floor 2 3 4 5COMF053900 Final Painting works to Tenant Area 09/05/11 20/02/12 0 ‐257 60 ‐257 60 ‐249 60 ‐262 60 ‐289 60 ‐305 60.9 ‐320 60.9 ‐336 60 ‐356 70 ‐353 100 0 100 0 M450.C1.O.MF.05 5th Floor M450 C1 O MF 05 5th Floor 2 3 4 5COMF054500 Ceiling Installation  @ Corridore area 10/05/11 08/01/12 0 ‐257 27 ‐239 27 ‐255 27 ‐274 30 ‐286 30 ‐302 60 ‐311 60 ‐326 70 ‐341 100 0 100 0 100 0 M450.C1.O.MF.05 5th Floor M450 C1 O MF 05 5th Floor 2 3 4 5COMF053880 Final Ceiling Tiles install ‐ Tenant Are 11/05/11 03/01/12 0 ‐257 10 ‐257 10 ‐253 20 ‐260 85 ‐283 85 ‐299 85 ‐315 88 ‐332 90 ‐352 100 0 100 0 100 0 M450.C1.O.MF.05 5th Floor M450 C1 O MF 05 5th Floor 2 3 4 5COMF053870 Floor Trunking & Raised Floor Install 16/06/11 15/08/11 0 ‐257 0 ‐248 35 ‐253 70 ‐260 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.05 5th Floor M450 C1 O MF 05 5th Floor 2 3 4 5COMF054510 Stone Floor @ Corridore area 30/06/11 13/07/11 0 ‐258 0 ‐249 0 ‐264 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.05 5th Floor M450 C1 O MF 05 5th FloorCOMF053910 Ceiling works to lift lobby & bulkhea 24/07/11 08/01/12 0 ‐244 0 ‐245 0 ‐261 70 ‐258 70 ‐275 70 ‐291 70 ‐306 70 ‐322 95 ‐334 100 0 100 0 100 0 M450.C1.O.MF.05 5th Floor M450 C1 O MF 05 5th Floor 2 3 4 5COMF054480 MEP final fixes to Tenant Area 08/08/11 25/04/12 0 ‐250 0 ‐250 0 ‐248 0 ‐264 10 ‐288 24 ‐300 24 ‐316 35 ‐330 35 ‐350 90 ‐360 90 ‐375 90 ‐390 M450.C1.O.MF.05 5th Floor M450 C1 O MF 05 5th Floor 1 2 3 4 5COMF054520 MEP final fixes to lift lobby/Corrid./W 11/09/11 25/04/12 0 ‐250 0 ‐250 0 ‐255 0 ‐269 0 ‐288 6 ‐300 6.1 ‐316 38 ‐330 37 ‐350 90 ‐361 90 ‐375 97 ‐390 M450.C1.O.MF.05 5th Floor M450 C1 O MF 05 5th Floor 1 2 3 4 5COMF052870 Plumbing Fixture Install & Mirror‐ W 08/11/11 08/01/12 0 ‐225 0 ‐232 0 ‐248 0 ‐268 0 ‐288 0 ‐304 0 ‐320 70 ‐329 70 ‐341 100 0 100 0 100 0 M450.C1.O.MF.05 5th Floor M450 C1 O MF 05 5th Floor 2 3 4 5COMF052880 Threshold & Door Install‐ Wet area 04/12/11 19/02/12 0 ‐225 0 ‐232 0 ‐248 0 ‐268 0 ‐288 0 ‐304 0 ‐320 0 ‐329 30 ‐341 90 ‐354 100 0 100 0 M450.C1.O.MF.05 5th Floor M450 C1 O MF 05 5th FloorCOMF053920 Sliding Door @ Lift Lobby 04/01/12 07/01/12 0 ‐235 0 ‐236 0 ‐252 0 ‐255 0 ‐275 0 ‐291 0 ‐306 0 ‐322 0 ‐334 100 0 100 0 100 0 M450.C1.O.MF.05 5th Floor M450 C1 O MF 05 5th FloorCOMF053890 Door Installation ‐ Tenant area 07/01/12 16/01/12 0 ‐252 0 ‐241 0 ‐245 0 ‐254 0 ‐283 0 ‐299 0 ‐314 0 ‐330 0 ‐349 100 0 100 0 100 0 M450.C1.O.MF.05 5th Floor M450 C1 O MF 05 5th FloorCOMF053940 Door Installation @Corrid. & Plant R 07/01/12 31/01/12 0 ‐249 0 ‐249 0 ‐256 0 ‐273 0 ‐292 0 ‐306 0 ‐322 0 ‐338 0 ‐357 100 0 100 0 100 0 M450.C1.O.MF.05 5th Floor M450 C1 O MF 05 5th FloorCOMF053930 Final Painting/Vinyl wall paper works 11/02/12 16/04/12 0 ‐247 0 ‐243 0 ‐254 0 ‐269 0 ‐287 0 ‐298 0 ‐314 0 ‐330 0 ‐346 0 ‐361 80 ‐370 80 ‐384 M450.C1.O.MF.05 5th Floor M450 C1 O MF 05 5th Floor 2 3 4 5

2 of 7

Page 3: Concurrent and Parallel Competing Critical Delay Demonstration Float Map A

West Building  ‐ Block 5 ‐ M340 to M460 Update Programmes ‐ Most Critical In Red and Critical within 20 days in Green

COMF052850 Installation of Cubicle ‐ Wet area 09/04/12 25/04/12 0 ‐225 0 ‐232 0 ‐248 0 ‐268 0 ‐288 0 ‐304 0 ‐320 0 ‐329 0 ‐342 0 ‐354 0 ‐367 0 ‐383 M450.C1.O.MF.05 5th Floor M450 C1 O MF 05 5th FloorCOMF059135 Snagging & Keys 30/04/12 15/05/12 0 ‐257 0 ‐256 0 ‐250 0 ‐270 0 ‐290 0 ‐306 0 ‐322 0 ‐336 0 ‐356 0 ‐357 0 ‐369 0 ‐385 M450.C1.O.MF.05 5th Floor M450 C1 O MF 05 5th FloorCOMF061910 MEP 2nd fixes 14/01/10 05/12/11 83 ‐253 97 ‐255 99 ‐271 99 ‐288 99 ‐308 99 ‐324 99 ‐339 99 ‐355 100 0 100 0 100 0 100 0 M450.C1.O.MF.06 6th Floor M450 C1 O MF 06 6th Floor 2 3 4 5COMF063270 Plaster to column & lift lobby 15/04/10 01/12/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.06 6th Floor M450 C1 O MF 06 6th FloorCOMF063290 Basecoat Painting works 09/05/10 29/11/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.06 6th Floor M450 C1 O MF 06 6th FloorCOMF063310 Office Fitout (1st & 2nd Fix Trades) 23/05/10 06/04/12 55 ‐257 95 ‐245 95 ‐261 95 ‐278 95 ‐296 95 ‐309 95 ‐315 95 ‐329 95 ‐347 95 ‐361 95 ‐367 95 ‐383 M450.C1.O.MF.06 6th Floor M450 C1 O MF 06 6th Floor 2 3 4 5COMF062510 Ceramic tiles ‐ Wet area 17/07/10 19/05/11 95 ‐222 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.06 6th Floor M450 C1 O MF 06 6th FloorCOMF062710 Stone Work @ lift lobby 28/10/10 18/10/11 87 ‐219 93 ‐235 99 ‐250 99 ‐265 99 ‐275 99 ‐290 99 ‐304 99 ‐320 100 0 100 0 100 0 100 0 M450.C1.O.MF.06 6th Floor M450 C1 O MF 06 6th Floor 2 3 4 5COMF064440 Screed work @ Corridore area 14/03/11 23/03/11 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.06 6th Floor M450 C1 O MF 06 6th FloorCOMF063770 Ceiling Grid & Gyp. Bulkhead ‐ Tenan 17/03/11 26/09/11 75 ‐257 81 ‐250 81 ‐266 95 ‐280 98 ‐296 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.06 6th Floor M450 C1 O MF 06 6th Floor 1 2 3 4 5COMF062120 Testing & clearance prior to false cei 21/03/11 04/05/11 30 ‐239 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.06 6th Floor M450 C1 O MF 06 6th FloorCOMF062820 Suspended Ceiling‐ Wet area 10/04/11 09/01/12 16 ‐225 47 ‐223 50 ‐239 70 ‐258 85 ‐269 85 ‐285 88 ‐300 88 ‐314 88 ‐329 100 0 100 0 100 0 M450.C1.O.MF.06 6th Floor M450 C1 O MF 06 6th Floor 2 3 4 5COMF063810 Final Painting works to Tenant Area 12/05/11 20/02/12 0 ‐257 53 ‐257 53 ‐259 53 ‐264 55 ‐289 55 ‐305 55 ‐320 55 ‐336 55 ‐356 70 ‐353 100 0 100 0 M450.C1.O.MF.06 6th Floor M450 C1 O MF 06 6th Floor 2 3 4 5COMF063780 Floor Trunking & Raised Floor Install 20/06/11 15/12/11 0 ‐257 0 ‐250 0 ‐266 40 ‐270 80 ‐269 80 ‐296 85 ‐309 85 ‐324 100 0 100 0 100 0 100 0 M450.C1.O.MF.06 6th Floor M450 C1 O MF 06 6th Floor 2 3 4 5COMF064460 Stone Floor @ Corridore area 02/07/11 10/12/11 0 ‐258 0 ‐249 0 ‐264 50 ‐269 50 ‐286 50 ‐302 95 ‐314 98 ‐330 100 0 100 0 100 0 100 0 M450.C1.O.MF.06 6th Floor M450 C1 O MF 06 6th Floor 2 3 4 5COMF063820 Ceiling works to lift lobby & bulkhea 25/07/11 09/01/12 0 ‐244 0 ‐245 0 ‐261 70 ‐257 70 ‐272 70 ‐288 70 ‐304 70 ‐320 95 ‐330 100 0 100 0 100 0 M450.C1.O.MF.06 6th Floor M450 C1 O MF 06 6th FloorCOMF064430 MEP final fixes to Tenant Area 07/08/11 01/05/12 0 ‐250 0 ‐250 0 ‐259 0 ‐264 10 ‐288 25 ‐300 25 ‐316 35 ‐330 35 ‐350 90 ‐360 90 ‐375 90 ‐390 M450.C1.O.MF.06 6th Floor M450 C1 O MF 06 6th Floor 1 2 3 4 5COMF063790 Final Ceiling Tiles install ‐ Tenant Are 15/08/11 04/01/12 0 ‐257 0 ‐257 0 ‐266 0 ‐270 55 ‐280 55 ‐299 60 ‐315 65 ‐331 65 ‐351 100 0 100 0 100 0 M450.C1.O.MF.06 6th Floor M450 C1 O MF 06 6th Floor 2 3 4 5COMF064450 Ceiling Installation  @ Corridore area 27/08/11 09/01/12 0 ‐257 0 ‐238 0 ‐254 0 ‐274 26 ‐286 30 ‐302 60 ‐311 60 ‐326 70 ‐337 100 0 100 0 100 0 M450.C1.O.MF.06 6th Floor M450 C1 O MF 06 6th Floor 2 3 4 5COMF064470 MEP final fixes to lift lobby/Corrid./W 11/09/11 01/05/12 0 ‐250 0 ‐250 0 ‐259 0 ‐269 0 ‐288 6 ‐300 6.1 ‐316 38 ‐330 37 ‐350 90 ‐361 90 ‐375 97 ‐390 M450.C1.O.MF.06 6th Floor M450 C1 O MF 06 6th Floor 1 2 3 4 5COMF062830 Plumbing Fixture Install & Mirror‐ W 12/11/11 09/01/12 0 ‐225 0 ‐231 0 ‐247 0 ‐267 0 ‐287 0 ‐303 0 ‐319 70 ‐328 70 ‐340 100 0 100 0 100 0 M450.C1.O.MF.06 6th Floor M450 C1 O MF 06 6th Floor 2 3 4 5COMF062840 Threshold & Door Install‐ Wet area 04/12/11 19/02/12 0 ‐225 0 ‐231 0 ‐247 0 ‐267 0 ‐287 0 ‐303 0 ‐319 0 ‐328 30 ‐340 90 ‐354 100 0 100 0 M450.C1.O.MF.06 6th Floor M450 C1 O MF 06 6th FloorCOMF063800 Door Installation ‐ Tenant area 28/12/11 16/01/12 0 ‐252 0 ‐239 0 ‐255 0 ‐260 0 ‐269 0 ‐294 0 ‐308 0 ‐324 0 ‐345 100 0 100 0 100 0 M450.C1.O.MF.06 6th Floor M450 C1 O MF 06 6th FloorCOMF063850 Door Installation @Corrid. & Plant R 02/01/12 31/01/12 0 ‐249 0 ‐249 0 ‐256 0 ‐273 0 ‐292 0 ‐306 0 ‐322 0 ‐338 0 ‐357 100 0 100 0 100 0 M450.C1.O.MF.06 6th Floor M450 C1 O MF 06 6th FloorCOMF063830 Sliding Door @ Lift Lobby 02/01/12 05/01/12 0 ‐236 0 ‐237 0 ‐253 0 ‐255 0 ‐275 0 ‐291 0 ‐306 0 ‐322 0 ‐334 100 0 100 0 100 0 M450.C1.O.MF.06 6th Floor M450 C1 O MF 06 6th FloorCOMF063840 Final Painting/Vinyl wall paper works 04/02/12 20/04/12 0 ‐248 0 ‐243 0 ‐255 0 ‐269 0 ‐287 0 ‐298 0 ‐314 0 ‐330 0 ‐346 0 ‐361 80 ‐370 80 ‐384 M450.C1.O.MF.06 6th Floor M450 C1 O MF 06 6th Floor 2 3 4 5COMF062810 Installation of Cubicle ‐ Wet area 12/04/12 30/04/12 0 ‐225 0 ‐231 0 ‐247 0 ‐267 0 ‐287 0 ‐303 0 ‐319 0 ‐328 0 ‐342 0 ‐354 0 ‐367 0 ‐383 M450.C1.O.MF.06 6th Floor M450 C1 O MF 06 6th FloorCOMF069125 Snagging & Keys 04/05/12 21/05/12 0 ‐257 0 ‐256 0 ‐258 0 ‐270 0 ‐290 0 ‐306 0 ‐322 0 ‐336 0 ‐356 0 ‐357 0 ‐369 0 ‐385 M450.C1.O.MF.06 6th Floor M450 C1 O MF 06 6th FloorCOMF071900 MEP 2nd fixes 11/01/10 05/12/11 80 ‐253 90 ‐255 90 ‐271 90 ‐288 90 ‐308 91 ‐324 96 ‐339 96 ‐355 100 0 100 0 100 0 100 0 M450.C1.O.MF.07 7th Floor M450 C1 O MF 07 7th Floor 2 3 4 5COMF073250 Plaster to column & lift lobby 15/04/10 01/11/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.07 7th Floor M450 C1 O MF 07 7th FloorCOMF073270 Basecoat Painting works 18/05/10 01/12/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.07 7th Floor M450 C1 O MF 07 7th FloorCOMF073300 Office Fitout (1st & 2nd Fix Trades) 25/05/10 05/04/12 54 ‐251 95 ‐240 95 ‐256 95 ‐273 95 ‐290 95 ‐306 95.3 ‐313 95.3 ‐327 95 ‐342 95 ‐354 95 ‐360 95 ‐376 M450.C1.O.MF.07 7th Floor M450 C1 O MF 07 7th Floor 2 3 4 5COMF072500 Ceramic tiles ‐ Wet area 04/10/10 19/05/11 90 ‐222 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.07 7th Floor M450 C1 O MF 07 7th FloorCOMF072700 Stone Work @ lift lobby 01/12/10 23/10/11 81 ‐216 87 ‐232 96 ‐248 98 ‐265 98 ‐275 98 ‐290 98 ‐304 98 ‐320 100 0 100 0 100 0 100 0 M450.C1.O.MF.07 7th Floor M450 C1 O MF 07 7th Floor 2 3 4 5COMF073680 Ceiling Grid & Gyp. Bulkhead ‐ Tenan 10/03/11 27/09/11 59 ‐257 75 ‐250 75 ‐266 83 ‐280 98 ‐296 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.07 7th Floor M450 C1 O MF 07 7th Floor 1 2 3 4 5COMF074390 Screed work @ Corridore area 21/03/11 27/03/11 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.07 7th Floor M450 C1 O MF 07 7th FloorCOMF072780 Suspended Ceiling‐ Wet area 28/04/11 09/01/12 0 ‐225 47 ‐223 50 ‐239 60 ‐258 80 ‐269 80 ‐285 80 ‐300 80 ‐314 80 ‐329 100 0 100 0 100 0 M450.C1.O.MF.07 7th Floor M450 C1 O MF 07 7th Floor 2 3 4 5COMF072110 Testing & clearance prior to false cei 30/04/11 04/05/11 0 ‐237 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.07 7th Floor M450 C1 O MF 07 7th FloorCOMF073690 Floor Trunking & Raised Floor Install 22/06/11 09/11/11 0 ‐257 0 ‐250 0 ‐266 55 ‐263 75 ‐270 80 ‐296 85 ‐310 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.07 7th Floor M450 C1 O MF 07 7th Floor 2 3 4 5COMF074410 Stone Floor @ Corridore area 03/07/11 10/12/11 0 ‐258 0 ‐249 0 ‐264 80 ‐269 90 ‐286 90 ‐302 95 ‐314 97 ‐330 100 0 100 0 100 0 100 0 M450.C1.O.MF.07 7th Floor M450 C1 O MF 07 7th Floor 2 3 4 5COMF073730 Ceiling works to lift lobby & bulkhea 25/07/11 09/01/12 0 ‐244 0 ‐245 0 ‐261 70 ‐258 70 ‐270 70 ‐286 70 ‐302 70 ‐318 90 ‐327 100 0 100 0 100 0 M450.C1.O.MF.07 7th Floor M450 C1 O MF 07 7th FloorCOMF073700 Final Ceiling Tiles install ‐ Tenant Are 04/08/11 04/01/12 0 ‐257 0 ‐257 0 ‐266 0 ‐270 30 ‐280 60 ‐299 80 ‐315 85 ‐331 85 ‐351 100 0 100 0 100 0 M450.C1.O.MF.07 7th Floor M450 C1 O MF 07 7th Floor 2 3 4 5COMF074380 MEP final fixes to Tenant Area 08/08/11 07/05/12 0 ‐250 0 ‐250 0 ‐259 0 ‐264 6 ‐288 24 ‐300 24 ‐316 31 ‐330 31 ‐350 90 ‐360 90 ‐375 90 ‐390 M450.C1.O.MF.07 7th Floor M450 C1 O MF 07 7th Floor 1 2 3 4 5COMF074400 Ceiling Installation  @ Corridore area 16/08/11 09/01/12 0 ‐257 0 ‐238 0 ‐254 0 ‐274 30 ‐279 30 ‐294 60 ‐307 60 ‐322 60 ‐334 100 0 100 0 100 0 M450.C1.O.MF.07 7th Floor M450 C1 O MF 07 7th FloorCOMF074420 MEP final fixes to lift lobby/Corrid./W 11/09/11 07/05/12 0 ‐250 0 ‐250 0 ‐259 0 ‐269 0 ‐288 6 ‐300 6.1 ‐316 35 ‐330 35 ‐350 90 ‐361 90 ‐375 97 ‐390 M450.C1.O.MF.07 7th Floor M450 C1 O MF 07 7th Floor 1 2 3 4 5COMF072790 Plumbing Fixture Install & Mirror‐ W 12/11/11 09/01/12 0 ‐225 0 ‐231 0 ‐247 0 ‐267 0 ‐287 0 ‐303 0 ‐319 70 ‐328 70 ‐342 100 0 100 0 100 0 M450.C1.O.MF.07 7th Floor M450 C1 O MF 07 7th Floor 2 3 4 5COMF073740 Sliding Door @ Lift Lobby 29/12/11 03/01/12 0 ‐237 0 ‐237 0 ‐253 0 ‐255 0 ‐275 0 ‐291 0 ‐306 0 ‐322 0 ‐334 100 0 100 0 100 0 M450.C1.O.MF.07 7th Floor M450 C1 O MF 07 7th FloorCOMF072800 Threshold & Door Install‐ Wet area 29/12/11 19/02/12 0 ‐225 0 ‐231 0 ‐247 0 ‐267 0 ‐287 0 ‐303 0 ‐319 0 ‐328 0 ‐342 90 ‐354 100 0 100 0 M450.C1.O.MF.07 7th Floor M450 C1 O MF 07 7th FloorCOMF073710 Door Installation ‐ Tenant area 02/01/12 17/01/12 0 ‐252 0 ‐244 0 ‐260 0 ‐257 0 ‐270 0 ‐296 0 ‐310 0 ‐329 0 ‐347 100 0 100 0 100 0 M450.C1.O.MF.07 7th Floor M450 C1 O MF 07 7th FloorCOMF073720 Final Painting works to Tenant Area 14/01/12 20/02/12 0 ‐257 0 ‐257 0 ‐266 0 ‐270 0 ‐289 0 ‐305 0 ‐320 0 ‐336 0 ‐356 50 ‐353 100 0 100 0 M450.C1.O.MF.07 7th Floor M450 C1 O MF 07 7th Floor 2 3 4 5COMF073760 Door Installation @Corrid. & Plant R 14/01/12 01/02/12 0 ‐249 0 ‐249 0 ‐256 0 ‐273 0 ‐292 0 ‐306 0 ‐322 0 ‐338 0 ‐357 100 0 100 0 100 0 M450.C1.O.MF.07 7th Floor M450 C1 O MF 07 7th FloorCOMF073750 Final Painting/Vinyl wall paper works 04/02/12 26/04/12 0 ‐249 0 ‐243 0 ‐255 0 ‐269 0 ‐287 0 ‐298 0 ‐314 0 ‐330 0 ‐346 0 ‐361 80 ‐370 80 ‐384 M450.C1.O.MF.07 7th Floor M450 C1 O MF 07 7th Floor 2 3 4 5COMF072770 Installation of Cubicle ‐ Wet area 17/04/12 03/05/12 0 ‐225 0 ‐231 0 ‐247 0 ‐267 0 ‐287 0 ‐303 0 ‐319 0 ‐328 0 ‐342 0 ‐354 0 ‐367 0 ‐383 M450.C1.O.MF.07 7th Floor M450 C1 O MF 07 7th FloorCOMF079115 Snagging & Keys 08/05/12 25/05/12 0 ‐257 0 ‐257 0 ‐266 0 ‐270 0 ‐290 0 ‐306 0 ‐322 0 ‐336 0 ‐356 0 ‐357 0 ‐369 0 ‐385 M450.C1.O.MF.07 7th Floor M450 C1 O MF 07 7th FloorCOMF081890 MEP 2nd fixes 16/01/10 05/12/11 80 ‐253 89 ‐255 90 ‐271 90 ‐288 90 ‐308 91 ‐324 92.8 ‐339 92.8 ‐355 100 0 100 0 100 0 100 0 M450.C1.O.MF.08 8th Floor M450 C1 O MF 08 8th Floor 2 3 4 5COMF083270 Plaster to column & lift lobby 15/04/10 01/12/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.08 8th Floor M450 C1 O MF 08 8th FloorCOMF083290 Office Fitout (1st & 2nd Fix Trades) 29/05/10 06/04/12 54 ‐252 80 ‐246 80 ‐262 80 ‐282 80 ‐299 80 ‐318 80 ‐326 85 ‐332 85 ‐352 90 ‐359 95 ‐361 95 ‐377 M450.C1.O.MF.08 8th Floor M450 C1 O MF 08 8th Floor 2 3 4 5COMF083310 Basecoat Painting works 12/06/10 02/12/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.08 8th Floor M450 C1 O MF 08 8th FloorCOMF082490 Ceramic tiles ‐ Wet area 11/10/10 03/08/11 90 ‐195 90 ‐210 90 ‐226 98 ‐246 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.08 8th Floor M450 C1 O MF 08 8th FloorCOMF082690 Stone Work @ lift lobby 02/12/10 25/10/11 80 ‐213 87 ‐229 96 ‐245 98 ‐265 98 ‐275 98 ‐290 98 ‐304 98 ‐320 100 0 100 0 100 0 100 0 M450.C1.O.MF.08 8th Floor M450 C1 O MF 08 8th Floor 2 3 4 5COMF084340 Screed work @ Corridore area 26/03/11 30/03/11 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.08 8th Floor M450 C1 O MF 08 8th FloorCOMF083610 Ceiling Grid & Gyp. Bulkhead ‐ Tenan 15/04/11 10/12/11 9 ‐257 53 ‐250 53 ‐266 75 ‐282 75 ‐299 75 ‐318 98 ‐326 98 ‐332 100 0 100 0 100 0 100 0 M450.C1.O.MF.08 8th Floor M450 C1 O MF 08 8th Floor 1 2 3 4 5COMF082740 Suspended Ceiling‐ Wet area 01/05/11 09/01/12 0 ‐225 47 ‐223 50 ‐239 50 ‐258 80 ‐269 80 ‐285 80 ‐300 80 ‐314 80 ‐329 100 0 100 0 100 0 M450.C1.O.MF.08 8th Floor M450 C1 O MF 08 8th Floor 2 3 4 5COMF082100 Testing & clearance prior to false cei 03/05/11 09/01/12 0 ‐234 66 ‐231 66 ‐247 66 ‐258 80 ‐267 80 ‐283 80 ‐299 80 ‐315 80 ‐323 100 0 100 0 100 0 M450.C1.O.MF.08 8th Floor M450 C1 O MF 08 8th Floor 4 5COMF084360 Stone Floor @ Corridore area 12/07/11 11/12/11 0 ‐258 0 ‐249 0 ‐264 80 ‐269 90 ‐286 90 ‐302 95 ‐314 95 ‐330 100 0 100 0 100 0 100 0 M450.C1.O.MF.08 8th Floor M450 C1 O MF 08 8th Floor 2 3 4 5COMF083210 Ceiling works to lift lobby & bulkhea 27/07/11 09/01/12 0 ‐244 0 ‐245 0 ‐261 50 ‐258 70 ‐268 70 ‐284 70 ‐300 70 ‐316 95 ‐323 100 0 100 0 100 0 M450.C1.O.MF.08 8th Floor M450 C1 O MF 08 8th FloorCOMF083620 Floor Trunking & Raised Floor Install 28/07/11 14/11/11 0 ‐257 0 ‐250 0 ‐266 10 ‐279 75 ‐272 75 ‐288 80 ‐303 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.08 8th Floor M450 C1 O MF 08 8th Floor 2 3 4 5COMF084350 Ceiling Installation  @ Corridore area 16/08/11 09/01/12 0 ‐257 0 ‐238 0 ‐254 0 ‐274 30 ‐274 30 ‐290 60 ‐303 60 ‐318 60 ‐330 100 0 100 0 100 0 M450.C1.O.MF.08 8th Floor M450 C1 O MF 08 8th Floor 3 4 5COMF083630 Final Ceiling Tiles install ‐ Tenant Are 22/08/11 03/01/12 0 ‐257 0 ‐257 0 ‐266 0 ‐279 30 ‐280 50 ‐299 75 ‐315 85 ‐331 85 ‐351 100 0 100 0 100 0 M450.C1.O.MF.08 8th Floor M450 C1 O MF 08 8th Floor 2 3 4 5COMF084330 MEP final fixes to Tenant Area 06/09/11 11/05/12 0 ‐250 0 ‐250 0 ‐259 0 ‐272 0 ‐288 22 ‐300 24 ‐316 31 ‐330 31 ‐350 90 ‐360 90 ‐375 90 ‐390 M450.C1.O.MF.08 8th Floor M450 C1 O MF 08 8th Floor 1 2 3 4 5COMF084370 MEP final fixes to lift lobby/Corrid./W 12/09/11 11/05/12 0 ‐251 0 ‐250 0 ‐259 0 ‐272 0 ‐288 6 ‐300 6.1 ‐316 35 ‐330 35 ‐350 90 ‐361 90 ‐375 97 ‐390 M450.C1.O.MF.08 8th Floor M450 C1 O MF 08 8th Floor 1 2 3 4 5COMF082750 Plumbing Fixture Install & Mirror‐ W 14/11/11 09/01/12 0 ‐225 0 ‐230 0 ‐246 0 ‐266 0 ‐286 0 ‐302 0 ‐318 70 ‐327 70 ‐341 100 0 100 0 100 0 M450.C1.O.MF.08 8th Floor M450 C1 O MF 08 8th Floor 2 3 4 5COMF083640 Door Installation ‐ Tenant area 29/12/11 17/01/12 0 ‐252 0 ‐244 0 ‐260 0 ‐273 0 ‐272 0 ‐288 0 ‐303 0 ‐316 0 ‐352 100 0 100 0 100 0 M450.C1.O.MF.08 8th Floor M450 C1 O MF 08 8th FloorCOMF083220 Sliding Door @ Lift Lobby 29/12/11 03/01/12 0 ‐238 0 ‐238 0 ‐254 0 ‐255 0 ‐275 0 ‐291 0 ‐306 0 ‐322 0 ‐334 100 0 100 0 100 0 M450.C1.O.MF.08 8th Floor M450 C1 O MF 08 8th FloorCOMF082760 Threshold & Door Install‐ Wet area 02/01/12 19/02/12 0 ‐225 0 ‐230 0 ‐246 0 ‐266 0 ‐286 0 ‐302 0 ‐318 0 ‐327 0 ‐341 90 ‐353 100 0 100 0 M450.C1.O.MF.08 8th Floor M450 C1 O MF 08 8th FloorCOMF083670 Door Installation @Corrid. & Plant R 07/01/12 01/02/12 0 ‐249 0 ‐249 0 ‐256 0 ‐273 0 ‐292 0 ‐306 0 ‐322 0 ‐338 0 ‐357 100 0 100 0 100 0 M450.C1.O.MF.08 8th Floor M450 C1 O MF 08 8th FloorCOMF083650 Final Painting works to Tenant Area 15/01/12 03/03/12 0 ‐257 0 ‐257 0 ‐266 0 ‐279 0 ‐289 0 ‐305 0 ‐320 0 ‐336 0 ‐356 50 ‐353 90 ‐354 100 0 M450.C1.O.MF.08 8th Floor M450 C1 O MF 08 8th Floor 2 3 4 5COMF083660 Final Painting/Vinyl wall paper works 04/02/12 02/05/12 0 ‐250 0 ‐243 0 ‐256 0 ‐269 0 ‐287 0 ‐298 0 ‐314 0 ‐330 0 ‐346 0 ‐361 80 ‐370 80 ‐384 M450.C1.O.MF.08 8th Floor M450 C1 O MF 08 8th Floor 2 3 4 5COMF082730 Installation of Cubicle ‐ Wet area 20/04/12 08/05/12 0 ‐224 0 ‐230 0 ‐246 0 ‐266 0 ‐286 0 ‐302 0 ‐318 0 ‐328 0 ‐342 0 ‐353 0 ‐366 0 ‐382 M450.C1.O.MF.08 8th Floor M450 C1 O MF 08 8th Floor

3 of 7

Page 4: Concurrent and Parallel Competing Critical Delay Demonstration Float Map A

West Building  ‐ Block 5 ‐ M340 to M460 Update Programmes ‐ Most Critical In Red and Critical within 20 days in Green

COMF089105 Snagging & Keys 15/05/12 30/05/12 0 ‐257 0 ‐257 0 ‐266 0 ‐278 0 ‐290 0 ‐306 0 ‐322 0 ‐336 0 ‐356 0 ‐357 0 ‐369 0 ‐385 M450.C1.O.MF.08 8th Floor M450 C1 O MF 08 8th FloorCOMF091880 MEP 2nd fixes 21/01/10 06/12/11 80 ‐253 85 ‐255 85 ‐271 85 ‐288 85 ‐308 90 ‐324 91.9 ‐339 91.9 ‐355 100 0 100 0 100 0 100 0 M450.C1.O.MF.09 9th Floor M450 C1 O MF 09 9th Floor 2 3 4 5COMF093250 Plaster to column & lift lobby 15/04/10 01/12/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.09 9th Floor M450 C1 O MF 09 9th FloorCOMF093280 Office Fitout (1st & 2nd Fix Trades) 31/05/10 06/04/12 54 ‐249 89 ‐240 90 ‐256 90 ‐273 90 ‐291 90 ‐310 90 ‐317 90 ‐327 90 ‐345 90 ‐356 95 ‐357 95 ‐373 M450.C1.O.MF.09 9th Floor M450 C1 O MF 09 9th Floor 2 3 4 5COMF093270 Basecoat Painting works 19/06/10 01/12/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.09 9th Floor M450 C1 O MF 09 9th FloorCOMF092480 Ceramic tiles ‐ Wet area 14/10/10 26/11/11 90 ‐219 90 ‐220 92 ‐236 92 ‐253 95 ‐273 95 ‐289 98 ‐304 98 ‐314 100 0 100 0 100 0 100 0 M450.C1.O.MF.09 9th Floor M450 C1 O MF 09 9th FloorCOMF092680 Stone Work @ lift lobby 04/12/10 01/11/11 80 ‐213 87 ‐229 96 ‐245 98 ‐265 98 ‐275 98 ‐290 98 ‐304 98 ‐320 100 0 100 0 100 0 100 0 M450.C1.O.MF.09 9th Floor M450 C1 O MF 09 9th Floor 2 3 4 5COMF094290 Screed work @ Corridore area 29/03/11 04/04/11 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.09 9th Floor M450 C1 O MF 09 9th FloorCOMF092090 Testing & clearance prior to false cei 03/05/11 09/01/12 0 ‐231 50 ‐229 50 ‐245 50 ‐257 50 ‐267 80 ‐281 80 ‐296 80 ‐312 80 ‐321 100 0 100 0 100 0 M450.C1.O.MF.09 9th Floor M450 C1 O MF 09 9th Floor 2 3 4 5COMF092700 Suspended Ceiling‐ Wet area 08/05/11 09/01/12 0 ‐225 47 ‐223 50 ‐239 55 ‐258 70 ‐269 70 ‐285 70 ‐300 70 ‐314 70 ‐329 100 0 100 0 100 0 M450.C1.O.MF.09 9th Floor M450 C1 O MF 09 9th Floor 2 3 4 5COMF093550 Ceiling Grid & Gyp. Bulkhead ‐ Tenan 10/05/11 01/10/11 0 ‐257 6 ‐252 40 ‐266 60 ‐282 90 ‐299 95 ‐318 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.09 9th Floor M450 C1 O MF 09 9th FloorCOMF094310 Stone Floor @ Corridore area 11/07/11 11/12/11 0 ‐258 0 ‐249 0 ‐264 80 ‐269 90 ‐286 90 ‐302 95 ‐314 95 ‐330 100 0 100 0 100 0 100 0 M450.C1.O.MF.09 9th Floor M450 C1 O MF 09 9th Floor 2 3 4 5COMF093180 Ceiling works to lift lobby & bulkhea 26/07/11 09/01/12 0 ‐244 0 ‐245 0 ‐261 70 ‐257 70 ‐267 70 ‐282 70 ‐298 70 ‐314 80 ‐321 100 0 100 0 100 0 M450.C1.O.MF.09 9th Floor M450 C1 O MF 09 9th FloorCOMF093560 Floor Trunking & Raised Floor Install 15/08/11 14/11/11 0 ‐257 0 ‐252 0 ‐266 0 ‐282 50 ‐286 75 ‐288 85 ‐317 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.09 9th Floor M450 C1 O MF 09 9th Floor 2 3 4 5COMF094300 Ceiling Installation  @ Corridore area 27/08/11 09/01/12 0 ‐257 0 ‐238 0 ‐254 0 ‐274 30 ‐270 30 ‐286 60 ‐299 60 ‐314 60 ‐327 100 0 100 0 100 0 M450.C1.O.MF.09 9th Floor M450 C1 O MF 09 9th Floor 3 4 5COMF093570 Final Ceiling Tiles install ‐ Tenant Are 03/09/11 03/01/12 0 ‐257 0 ‐257 0 ‐266 0 ‐282 0 ‐286 60 ‐299 85 ‐315 85 ‐331 85 ‐351 100 0 100 0 100 0 M450.C1.O.MF.09 9th Floor M450 C1 O MF 09 9th Floor 2 3 4 5COMF094320 MEP final fixes to lift lobby/Corrid./W 12/09/11 17/05/12 0 ‐252 0 ‐250 0 ‐259 0 ‐275 0 ‐288 6 ‐300 6.1 ‐316 24 ‐330 24 ‐350 90 ‐361 90 ‐375 97 ‐390 M450.C1.O.MF.09 9th Floor M450 C1 O MF 09 9th Floor 1 2 3 4 5COMF094280 MEP final fixes to Tenant Area 17/09/11 17/05/12 0 ‐250 0 ‐250 0 ‐259 0 ‐275 0 ‐288 22 ‐300 24 ‐316 31 ‐330 31 ‐350 90 ‐360 90 ‐375 90 ‐390 M450.C1.O.MF.09 9th Floor M450 C1 O MF 09 9th Floor 1 2 3 4 5COMF092710 Plumbing Fixture Install & Mirror‐ W 14/11/11 09/01/12 0 ‐225 0 ‐230 0 ‐246 0 ‐266 0 ‐286 0 ‐302 0 ‐318 70 ‐327 70 ‐341 100 0 100 0 100 0 M450.C1.O.MF.09 9th Floor M450 C1 O MF 09 9th Floor 2 3 4 5COMF093580 Door Installation ‐ Tenant area 27/12/11 17/01/12 0 ‐252 0 ‐246 0 ‐260 0 ‐276 0 ‐280 0 ‐288 0 ‐317 0 ‐332 0 ‐349 100 0 100 0 100 0 M450.C1.O.MF.09 9th Floor M450 C1 O MF 09 9th FloorCOMF093190 Sliding Door @ Lift Lobby 29/12/11 05/01/12 0 ‐239 0 ‐239 0 ‐255 0 ‐255 0 ‐275 0 ‐291 0 ‐306 0 ‐322 0 ‐334 100 0 100 0 100 0 M450.C1.O.MF.09 9th Floor M450 C1 O MF 09 9th FloorCOMF093200 Door Installation @Corrid. & Plant R 08/01/12 02/02/12 0 ‐249 0 ‐249 0 ‐256 0 ‐273 0 ‐292 0 ‐306 0 ‐322 0 ‐338 0 ‐357 100 0 100 0 100 0 M450.C1.O.MF.09 9th Floor M450 C1 O MF 09 9th FloorCOMF092720 Threshold & Door Install‐ Wet area 14/01/12 20/02/12 0 ‐225 0 ‐230 0 ‐246 0 ‐266 0 ‐286 0 ‐302 0 ‐318 0 ‐327 0 ‐341 90 ‐352 100 0 100 0 M450.C1.O.MF.09 9th Floor M450 C1 O MF 09 9th FloorCOMF093590 Final Painting works to Tenant Area 15/01/12 04/03/12 0 ‐257 0 ‐257 0 ‐266 0 ‐282 0 ‐289 0 ‐305 0 ‐320 0 ‐336 0 ‐356 50 ‐353 90 ‐354 100 0 M450.C1.O.MF.09 9th Floor M450 C1 O MF 09 9th Floor 2 3 4 5COMF093600 Final Painting/Vinyl wall paper works 05/02/12 08/05/12 0 ‐250 0 ‐243 0 ‐257 0 ‐269 0 ‐287 0 ‐298 0 ‐314 0 ‐330 0 ‐346 0 ‐361 80 ‐370 80 ‐384 M450.C1.O.MF.09 9th Floor M450 C1 O MF 09 9th Floor 2 3 4 5COMF092690 Installation of Cubicle ‐ Wet area 25/04/12 11/05/12 0 ‐223 0 ‐230 0 ‐246 0 ‐266 0 ‐286 0 ‐302 0 ‐318 0 ‐328 0 ‐342 0 ‐352 0 ‐365 0 ‐381 M450.C1.O.MF.09 9th Floor M450 C1 O MF 09 9th FloorCOMF099095 Snagging & Keys 18/05/12 05/06/12 0 ‐257 0 ‐257 0 ‐266 0 ‐282 0 ‐290 0 ‐306 0 ‐322 0 ‐336 0 ‐356 0 ‐357 0 ‐369 0 ‐385 M450.C1.O.MF.09 9th Floor M450 C1 O MF 09 9th FloorCOMF021150 2nd Floor 14/11/09 06/03/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.1 Blockwork ParM450 C1 O MF 1 Blockwork PartitionsCOMF031160 3rd Floor 25/11/09 07/03/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.1 Blockwork ParM450 C1 O MF 1 Blockwork PartitionsCOMF041170 4th Floor 06/12/09 17/03/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.1 Blockwork ParM450 C1 O MF 1 Blockwork PartitionsCOMF051180 5th Floor 19/12/09 27/03/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.1 Blockwork ParM450 C1 O MF 1 Blockwork PartitionsCOMF061190 6th Floor 06/01/10 29/03/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.1 Blockwork ParM450 C1 O MF 1 Blockwork PartitionsCOMF071200 7th Floor 17/01/10 04/04/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.1 Blockwork ParM450 C1 O MF 1 Blockwork PartitionsCOMF081210 8th Floor 03/02/10 08/04/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.1 Blockwork ParM450 C1 O MF 1 Blockwork PartitionsCOMF091220 9th Floor 09/02/10 10/04/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.1 Blockwork ParM450 C1 O MF 1 Blockwork PartitionsCOMF101230 10th Floor 14/02/10 13/04/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.1 Blockwork ParM450 C1 O MF 1 Blockwork PartitionsCOMF111410 11th Floor 24/02/10 03/05/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.1 Blockwork ParM450 C1 O MF 1 Blockwork PartitionsCOMFMZ1040 Mezzanine Floor 01/03/10 10/07/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.1 Blockwork ParM450 C1 O MF 1 Blockwork PartitionsCOMF121420 12th Floor 08/03/10 10/05/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.1 Blockwork ParM450 C1 O MF 1 Blockwork PartitionsCOMFGF1030 Ground Floor 13/03/10 10/07/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.1 Blockwork ParM450 C1 O MF 1 Blockwork PartitionsCOMF131600 13th Floor 21/03/10 20/05/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.1 Blockwork ParM450 C1 O MF 1 Blockwork PartitionsCOMF141780 14th Floor 07/04/10 24/07/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.1 Blockwork ParM450 C1 O MF 1 Blockwork PartitionsCOMF151040 15th Floor 18/04/10 05/09/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.1 Blockwork ParM450 C1 O MF 1 Blockwork PartitionsCOMF161050 16th Floor 06/05/10 25/09/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.1 Blockwork ParM450 C1 O MF 1 Blockwork PartitionsCOMF101870 MEP 2nd fixes 23/01/10 06/12/11 80 ‐253 80 ‐255 80 ‐271 80 ‐288 80 ‐308 90 ‐324 91.9 ‐339 91.9 ‐355 100 0 100 0 100 0 100 0 M450.C1.O.MF.10 10th Floor M450 C1 O MF 10 10th Floor 2 3 4 5COMF103250 Plaster to column & lift lobby 15/04/10 16/12/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.10 10th Floor M450 C1 O MF 10 10th FloorCOMF103270 Office Fitout (1st & 2nd Fix Trades) 01/06/10 13/04/12 50 ‐246 80 ‐237 80 ‐253 80 ‐273 80 ‐293 85 ‐309 85 ‐319 85 ‐329 85 ‐348 90 ‐353 90 ‐358 90 ‐374 M450.C1.O.MF.10 10th Floor M450 C1 O MF 10 10th Floor 2 3 4 5COMF103290 Basecoat Painting works 26/06/10 07/12/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.10 10th Floor M450 C1 O MF 10 10th FloorCOMF102470 Ceramic tiles ‐ Wet area 17/10/10 26/11/11 90 ‐215 90 ‐217 90 ‐233 92 ‐250 92 ‐270 92 ‐286 92 ‐301 92 ‐315 100 0 100 0 100 0 100 0 M450.C1.O.MF.10 10th Floor M450 C1 O MF 10 10th FloorCOMF102670 Stone Work @ lift lobby 05/12/10 02/11/11 80 ‐213 87 ‐229 96 ‐245 98 ‐265 98 ‐275 98 ‐290 98 ‐304 98 ‐320 100 0 100 0 100 0 100 0 M450.C1.O.MF.10 10th Floor M450 C1 O MF 10 10th Floor 2 3 4 5COMF104240 Screed work @ Corridore area 02/04/11 07/04/11 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.10 10th Floor M450 C1 O MF 10 10th FloorCOMF102080 Testing & clearance prior to false cei 03/05/11 09/01/12 0 ‐228 66 ‐226 66 ‐242 66 ‐256 80 ‐263 80 ‐279 80 ‐295 80 ‐311 80 ‐317 100 0 100 0 100 0 M450.C1.O.MF.10 10th Floor M450 C1 O MF 10 10th Floor 4 5COMF102620 Suspended Ceiling‐ Wet area 03/05/11 10/01/12 0 ‐222 50 ‐221 50 ‐237 60 ‐255 80 ‐266 80 ‐282 80 ‐298 80 ‐314 80 ‐329 100 0 100 0 100 0 M450.C1.O.MF.10 10th Floor M450 C1 O MF 10 10th Floor 3 4 5COMF103490 Ceiling Grid & Gyp. Bulkhead ‐ Tenan 27/05/11 27/09/11 0 ‐255 0 ‐249 40 ‐263 40 ‐279 70 ‐299 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.10 10th Floor M450 C1 O MF 10 10th Floor 2 3 4 5COMF104260 Stone Floor @ Corridore area 11/07/11 12/12/11 0 ‐258 0 ‐249 0 ‐264 60 ‐269 60 ‐286 95 ‐302 95 ‐314 95 ‐330 100 0 100 0 100 0 100 0 M450.C1.O.MF.10 10th Floor M450 C1 O MF 10 10th Floor 2 3 4 5COMF103150 Ceiling works to lift lobby & bulkhea 26/07/11 14/01/12 0 ‐244 0 ‐245 0 ‐261 70 ‐257 70 ‐264 70 ‐280 70 ‐296 70 ‐312 80 ‐317 100 0 100 0 100 0 M450.C1.O.MF.10 10th Floor M450 C1 O MF 10 10th FloorCOMF104250 Ceiling Installation  @ Corridore area 28/08/11 10/01/12 0 ‐257 0 ‐238 0 ‐254 0 ‐274 26 ‐270 30 ‐281 60 ‐295 60 ‐310 60 ‐324 100 0 100 0 100 0 M450.C1.O.MF.10 10th Floor M450 C1 O MF 10 10th FloorCOMF103500 Floor Trunking & Raised Floor Install 30/08/11 03/01/12 0 ‐255 0 ‐249 0 ‐263 0 ‐279 5 ‐298 45 ‐314 60 ‐319 75 ‐326 85 ‐340 100 0 100 0 100 0 M450.C1.O.MF.10 10th Floor M450 C1 O MF 10 10th Floor 2 3 4 5COMF104270 MEP final fixes to lift lobby/Corrid./W 12/09/11 23/05/12 0 ‐253 0 ‐250 0 ‐259 0 ‐275 0 ‐293 2 ‐312 2.44 ‐318 21 ‐330 20 ‐350 75 ‐361 90 ‐375 97 ‐390 M450.C1.O.MF.10 10th Floor M450 C1 O MF 10 10th Floor 1 2 3 4 5COMF103510 Final Ceiling Tiles install ‐ Tenant Are 17/09/11 21/01/12 0 ‐255 0 ‐254 0 ‐263 0 ‐279 0 ‐298 40 ‐314 60 ‐318 70 ‐331 70 ‐351 100 0 100 0 100 0 M450.C1.O.MF.10 10th Floor M450 C1 O MF 10 10th Floor 1 2 3 4 5COMF104230 MEP final fixes to Tenant Area 01/10/11 23/05/12 0 ‐250 0 ‐250 0 ‐259 0 ‐275 0 ‐293 0 ‐312 12 ‐318 23 ‐330 23 ‐350 90 ‐360 90 ‐375 90 ‐390 M450.C1.O.MF.10 10th Floor M450 C1 O MF 10 10th Floor 1 2 3 4 5COMF142670 Plumbing Fixture Install & Mirror‐ W 15/11/11 10/01/12 0 ‐222 0 ‐226 0 ‐242 0 ‐262 0 ‐282 0 ‐298 0 ‐314 70 ‐323 70 ‐337 100 0 100 0 100 0 M450.C1.O.MF.10 10th Floor M450 C1 O MF 10 10th Floor 2 3 4 5COMF103160 Sliding Door @ Lift Lobby 28/12/11 04/01/12 0 ‐239 0 ‐240 0 ‐256 0 ‐255 0 ‐275 0 ‐291 0 ‐306 0 ‐322 0 ‐334 100 0 100 0 100 0 M450.C1.O.MF.10 10th Floor M450 C1 O MF 10 10th FloorCOMF103520 Door Installation ‐ Tenant area 29/12/11 17/01/12 0 ‐249 0 ‐243 0 ‐258 0 ‐274 0 ‐292 0 ‐311 0 ‐319 0 ‐326 0 ‐340 100 0 100 0 100 0 M450.C1.O.MF.10 10th Floor M450 C1 O MF 10 10th FloorCOMF102680 Threshold & Door Install‐ Wet area 02/01/12 20/02/12 0 ‐222 0 ‐226 0 ‐242 0 ‐262 0 ‐282 0 ‐298 0 ‐314 0 ‐323 0 ‐337 90 ‐349 100 0 100 0 M450.C1.O.MF.10 10th Floor M450 C1 O MF 10 10th FloorCOMF103170 Door Installation @Corrid. & Plant R 09/01/12 01/02/12 0 ‐249 0 ‐249 0 ‐256 0 ‐273 0 ‐292 0 ‐306 0 ‐322 0 ‐338 0 ‐357 100 0 100 0 100 0 M450.C1.O.MF.10 10th Floor M450 C1 O MF 10 10th FloorCOMF103530 Final Painting works to Tenant Area 15/01/12 04/03/12 0 ‐255 0 ‐254 0 ‐263 0 ‐279 0 ‐298 0 ‐311 0 ‐319 0 ‐334 0 ‐354 55 ‐350 90 ‐351 100 0 M450.C1.O.MF.10 10th Floor M450 C1 O MF 10 10th Floor 2 3 4 5COMF103540 Final Painting/Vinyl wall paper works 05/02/12 14/05/12 0 ‐251 0 ‐243 0 ‐258 0 ‐269 0 ‐287 0 ‐298 0 ‐314 0 ‐330 0 ‐346 0 ‐361 80 ‐370 80 ‐384 M450.C1.O.MF.10 10th Floor M450 C1 O MF 10 10th Floor 2 3 4 5COMF102610 Installation of Cubicle ‐ Wet area 30/04/12 16/05/12 0 ‐220 0 ‐226 0 ‐242 0 ‐262 0 ‐282 0 ‐298 0 ‐314 0 ‐328 0 ‐342 0 ‐349 0 ‐362 0 ‐378 M450.C1.O.MF.10 10th Floor M450 C1 O MF 10 10th FloorCOMF109085 Snagging & Keys 24/05/12 11/06/12 0 ‐255 0 ‐254 0 ‐263 0 ‐279 0 ‐298 0 ‐311 0 ‐319 0 ‐334 0 ‐354 0 ‐355 0 ‐367 0 ‐383 M450.C1.O.MF.10 10th Floor M450 C1 O MF 10 10th FloorCOMF111860 MEP 2nd fixes 01/03/10 06/12/11 80 ‐253 80 ‐255 80 ‐271 80 ‐288 80 ‐308 90 ‐324 90.3 ‐339 90.8 ‐355 100 0 100 0 100 0 100 0 M450.C1.O.MF.11 11th Floor M450 C1 O MF 11 11th Floor 2 3 4 5COMF113250 Plaster to column & lift lobby 02/05/10 08/12/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.11 11th Floor M450 C1 O MF 11 11th FloorCOMF113260 Office Fitout (1st & 2nd Fix Trades) 02/06/10 13/04/12 50 ‐243 80 ‐236 80 ‐252 80 ‐270 80 ‐290 80 ‐311 80 ‐322 80 ‐332 80 ‐352 90 ‐350 90 ‐355 90 ‐371 M450.C1.O.MF.11 11th Floor M450 C1 O MF 11 11th Floor 2 3 4 5COMF113275 Basecoat Painting works 03/07/10 08/12/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.11 11th Floor M450 C1 O MF 11 11th FloorCOMF112460 Ceramic tiles ‐ Wet area 21/10/10 27/11/11 90 ‐215 90 ‐216 90 ‐232 95 ‐249 98 ‐268 98 ‐284 98 ‐300 98 ‐314 100 0 100 0 100 0 100 0 M450.C1.O.MF.11 11th Floor M450 C1 O MF 11 11th FloorCOMF112660 Stone Work @ lift lobby 06/12/10 05/11/11 80 ‐213 87 ‐229 96 ‐245 98 ‐265 98 ‐275 98 ‐290 98 ‐304 98 ‐320 100 0 100 0 100 0 100 0 M450.C1.O.MF.11 11th Floor M450 C1 O MF 11 11th Floor 2 3 4 5COMF114190 Screed work @ Corridore area 05/04/11 11/04/11 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.11 11th Floor M450 C1 O MF 11 11th FloorCOMF112580 Suspended Ceiling‐ Wet area 04/05/11 10/01/12 0 ‐222 47 ‐221 20 ‐237 60 ‐255 80 ‐266 80 ‐282 80 ‐298 80 ‐314 90 ‐329 100 0 100 0 100 0 M450.C1.O.MF.11 11th Floor M450 C1 O MF 11 11th Floor 3 4 5COMF112070 Testing & clearance prior to false cei 09/05/11 09/01/12 0 ‐226 40 ‐225 40 ‐241 40 ‐258 80 ‐262 80 ‐278 80 ‐293 80 ‐309 80 ‐312 100 0 100 0 100 0 M450.C1.O.MF.11 11th Floor M450 C1 O MF 11 11th Floor 2 3 4 5

4 of 7

Page 5: Concurrent and Parallel Competing Critical Delay Demonstration Float Map A

West Building  ‐ Block 5 ‐ M340 to M460 Update Programmes ‐ Most Critical In Red and Critical within 20 days in Green

COMF113430 Ceiling Grid & Gyp. Bulkhead ‐ Tenan 29/05/11 13/09/11 0 ‐255 0 ‐249 35 ‐263 55 ‐279 98 ‐299 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.11 11th Floor M450 C1 O MF 11 11th Floor 2 3 4 5COMF114210 Stone Floor @ Corridore area 10/07/11 12/12/11 0 ‐258 0 ‐249 0 ‐264 80 ‐269 90 ‐286 90 ‐302 95 ‐314 95 ‐330 100 0 100 0 100 0 100 0 M450.C1.O.MF.11 11th Floor M450 C1 O MF 11 11th Floor 2 3 4 5COMF113120 Ceiling works to lift lobby & bulkhea 02/08/11 16/01/12 0 ‐244 0 ‐245 0 ‐261 0 ‐258 70 ‐262 70 ‐278 70 ‐294 70 ‐310 90 ‐312 100 0 100 0 100 0 M450.C1.O.MF.11 11th Floor M450 C1 O MF 11 11th FloorCOMF114200 Ceiling Installation  @ Corridore area 17/08/11 10/01/12 0 ‐257 0 ‐238 0 ‐254 0 ‐274 30 ‐268 30 ‐278 60 ‐291 60 ‐306 60 ‐321 100 0 100 0 100 0 M450.C1.O.MF.11 11th Floor M450 C1 O MF 11 11th Floor 4 5COMF113440 Floor Trunking & Raised Floor Install 31/08/11 21/11/11 0 ‐255 0 ‐249 0 ‐263 0 ‐279 5 ‐298 45 ‐309 55 ‐318 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.11 11th Floor M450 C1 O MF 11 11th Floor 1 2 3 4 5COMF113450 Final Ceiling Tiles install ‐ Tenant Are 12/09/11 28/01/12 0 ‐255 0 ‐254 0 ‐263 0 ‐279 0 ‐298 50 ‐314 85 ‐318 85 ‐331 85 ‐351 100 0 100 0 100 0 M450.C1.O.MF.11 11th Floor M450 C1 O MF 11 11th Floor 2 3 4 5COMF114220 MEP final fixes to lift lobby/Corrid./W 12/09/11 29/05/12 0 ‐254 0 ‐250 0 ‐260 0 ‐275 0 ‐293 2 ‐312 2.44 ‐318 21 ‐330 20 ‐350 75 ‐361 90 ‐375 97 ‐390 M450.C1.O.MF.11 11th Floor M450 C1 O MF 11 11th Floor 1 2 3 4 5COMF114180 MEP final fixes to Tenant Area 02/10/11 29/05/12 0 ‐250 0 ‐250 0 ‐259 0 ‐275 0 ‐293 0 ‐312 14 ‐318 23 ‐330 23 ‐350 90 ‐360 90 ‐375 90 ‐390 M450.C1.O.MF.11 11th Floor M450 C1 O MF 11 11th Floor 1 2 3 4 5COMF112590 Plumbing Fixture Install & Mirror‐ W 15/11/11 11/01/12 0 ‐222 0 ‐225 0 ‐241 0 ‐261 0 ‐281 0 ‐297 0 ‐313 35 ‐326 70 ‐335 100 0 100 0 100 0 M450.C1.O.MF.11 11th Floor M450 C1 O MF 11 11th Floor 2 3 4 5COMF112600 Threshold & Door Install‐ Wet area 17/12/11 20/02/12 0 ‐222 0 ‐225 0 ‐241 0 ‐261 0 ‐281 0 ‐297 0 ‐313 0 ‐326 30 ‐335 95 ‐348 100 0 100 0 M450.C1.O.MF.11 11th Floor M450 C1 O MF 11 11th FloorCOMF113460 Door Installation ‐ Tenant area 29/12/11 17/01/12 0 ‐249 0 ‐243 0 ‐258 0 ‐274 0 ‐292 0 ‐308 0 ‐318 0 ‐324 0 ‐344 100 0 100 0 100 0 M450.C1.O.MF.11 11th Floor M450 C1 O MF 11 11th FloorCOMF113130 Sliding Door @ Lift Lobby 29/12/11 05/01/12 0 ‐240 0 ‐241 0 ‐257 0 ‐255 0 ‐275 0 ‐291 0 ‐306 0 ‐322 0 ‐334 100 0 100 0 100 0 M450.C1.O.MF.11 11th Floor M450 C1 O MF 11 11th FloorCOMF113140 Door Installation @Corrid. & Plant R 10/01/12 01/02/12 0 ‐249 0 ‐249 0 ‐256 0 ‐273 0 ‐292 0 ‐306 0 ‐322 0 ‐338 0 ‐357 100 0 100 0 100 0 M450.C1.O.MF.11 11th Floor M450 C1 O MF 11 11th FloorCOMF113470 Final Painting works to Tenant Area 16/01/12 05/03/12 0 ‐255 0 ‐254 0 ‐263 0 ‐279 0 ‐298 0 ‐311 0 ‐319 0 ‐334 0 ‐354 45 ‐350 85 ‐351 100 0 M450.C1.O.MF.11 11th Floor M450 C1 O MF 11 11th Floor 2 3 4 5COMF113480 Final Painting/Vinyl wall paper works 05/02/12 18/05/12 0 ‐252 0 ‐243 0 ‐259 0 ‐269 0 ‐287 0 ‐298 0 ‐314 0 ‐330 0 ‐346 0 ‐361 80 ‐370 80 ‐384 M450.C1.O.MF.11 11th Floor M450 C1 O MF 11 11th Floor 2 3 4 5COMF112570 Installation of Cubicle ‐ Wet area 03/05/12 21/05/12 0 ‐219 0 ‐225 0 ‐241 0 ‐261 0 ‐281 0 ‐297 0 ‐313 0 ‐328 0 ‐342 0 ‐348 0 ‐361 0 ‐377 M450.C1.O.MF.11 11th Floor M450 C1 O MF 11 11th FloorCOMF119075 Snagging & Keys 30/05/12 15/06/12 0 ‐255 0 ‐254 0 ‐263 0 ‐279 0 ‐298 0 ‐311 0 ‐319 0 ‐334 0 ‐354 0 ‐355 0 ‐367 0 ‐383 M450.C1.O.MF.11 11th Floor M450 C1 O MF 11 11th FloorCOMF121850 MEP 2nd fixes 22/03/10 07/12/11 80 ‐253 80 ‐255 80 ‐271 80 ‐288 80 ‐308 90 ‐324 90.3 ‐339 90.8 ‐355 100 0 100 0 100 0 100 0 M450.C1.O.MF.12 12th Floor M450 C1 O MF 12 12th Floor 2 3 4 5COMF123255 Plaster to column & lift lobby 04/05/10 30/11/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.12 12th Floor M450 C1 O MF 12 12th FloorCOMF123250 Office Fitout (1st & 2nd Fix Trades) 03/06/10 13/04/12 34 ‐254 80 ‐235 80 ‐251 80 ‐268 80 ‐288 80 ‐313 80 ‐324 80 ‐334 80 ‐352 90 ‐346 90 ‐355 90 ‐371 M450.C1.O.MF.12 12th Floor M450 C1 O MF 12 12th Floor 1 2 3 4 5COMF123280 Basecoat Painting works 10/07/10 01/12/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.12 12th Floor M450 C1 O MF 12 12th FloorCOMF122450 Ceramic tiles ‐ Wet area 26/10/10 27/11/11 90 ‐214 90 ‐215 90 ‐231 92 ‐248 95 ‐268 95 ‐284 95 ‐299 95 ‐314 100 0 100 0 100 0 100 0 M450.C1.O.MF.12 12th Floor M450 C1 O MF 12 12th FloorCOMF122650 Stone Work @ lift lobby 08/12/10 07/11/11 80 ‐213 80 ‐229 94 ‐245 95 ‐265 98 ‐275 98 ‐290 98 ‐304 98 ‐320 100 0 100 0 100 0 100 0 M450.C1.O.MF.12 12th Floor M450 C1 O MF 12 12th Floor 2 3 4 5COMF124140 Screed work @ Corridore area 06/04/11 12/04/11 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.12 12th Floor M450 C1 O MF 12 12th FloorCOMF122060 Testing & clearance prior to false cei 04/05/11 09/01/12 0 ‐224 66 ‐221 66 ‐237 66 ‐254 80 ‐260 80 ‐276 80 ‐291 80 ‐307 80 ‐311 100 0 100 0 100 0 M450.C1.O.MF.12 12th Floor M450 C1 O MF 12 12th FloorCOMF122530 Suspended Ceiling‐ Wet area 04/05/11 10/01/12 0 ‐222 16 ‐221 16 ‐237 60 ‐255 80 ‐266 80 ‐282 80 ‐298 80 ‐314 80 ‐329 100 0 100 0 100 0 M450.C1.O.MF.12 12th Floor M450 C1 O MF 12 12th Floor 3 4 5COMF123370 Ceiling Grid & Gyp. Bulkhead ‐ Tenan 13/06/11 28/09/11 0 ‐255 0 ‐251 10 ‐264 20 ‐279 98 ‐299 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.12 12th Floor M450 C1 O MF 12 12th Floor 2 3 4 5COMF124160 Stone Floor @ Corridore area 11/07/11 13/12/11 0 ‐258 0 ‐249 0 ‐264 80 ‐269 90 ‐286 90 ‐302 95 ‐314 95 ‐330 100 0 100 0 100 0 100 0 M450.C1.O.MF.12 12th Floor M450 C1 O MF 12 12th Floor 2 3 4 5COMF123090 Ceiling works to lift lobby & bulkhea 03/08/11 29/01/12 0 ‐244 0 ‐245 0 ‐261 0 ‐258 70 ‐260 70 ‐276 70 ‐292 70 ‐308 70 ‐311 100 0 100 0 100 0 M450.C1.O.MF.12 12th Floor M450 C1 O MF 12 12th FloorCOMF124150 Ceiling Installation  @ Corridore area 30/08/11 10/01/12 0 ‐257 0 ‐238 0 ‐254 0 ‐274 15 ‐267 30 ‐274 60 ‐287 60 ‐302 60 ‐318 100 0 100 0 100 0 M450.C1.O.MF.12 12th Floor M450 C1 O MF 12 12th Floor 4 5COMF124170 MEP final fixes to lift lobby/Corrid./W 13/09/11 04/06/12 0 ‐254 0 ‐250 0 ‐261 0 ‐275 0 ‐295 2 ‐317 2.44 ‐325 19 ‐330 19 ‐350 70 ‐361 90 ‐375 97 ‐390 M450.C1.O.MF.12 12th Floor M450 C1 O MF 12 12th Floor 1 2 3 4 5COMF123390 Final Ceiling Tiles install ‐ Tenant Are 24/09/11 29/01/12 0 ‐255 0 ‐254 0 ‐264 0 ‐279 0 ‐299 85 ‐314 85 ‐320 85 ‐331 85 ‐351 100 0 100 0 100 0 M450.C1.O.MF.12 12th Floor M450 C1 O MF 12 12th Floor 2 3 4 5COMF123380 Floor Trunking & Raised Floor Install 27/09/11 03/01/12 0 ‐255 0 ‐251 0 ‐264 0 ‐279 0 ‐299 10 ‐317 20 ‐326 80 ‐321 90 ‐336 100 0 100 0 100 0 M450.C1.O.MF.12 12th Floor M450 C1 O MF 12 12th Floor 2 3 4 5COMF124130 MEP final fixes to Tenant Area 16/10/11 04/06/12 0 ‐250 0 ‐250 0 ‐260 0 ‐275 0 ‐295 0 ‐317 10 ‐325 21 ‐330 21 ‐350 90 ‐360 90 ‐375 90 ‐390 M450.C1.O.MF.12 12th Floor M450 C1 O MF 12 12th Floor 1 2 3 4 5COMF122540 Plumbing Fixture Install & Mirror‐ W 15/11/11 11/01/12 0 ‐222 0 ‐225 0 ‐241 0 ‐261 0 ‐281 0 ‐297 0 ‐313 20 ‐327 60 ‐337 100 0 100 0 100 0 M450.C1.O.MF.12 12th Floor M450 C1 O MF 12 12th Floor 2 3 4 5COMF123100 Sliding Door @ Lift Lobby 27/12/11 04/01/12 0 ‐241 0 ‐241 0 ‐257 0 ‐255 0 ‐275 0 ‐291 0 ‐306 0 ‐322 0 ‐334 100 0 100 0 100 0 M450.C1.O.MF.12 12th Floor M450 C1 O MF 12 12th FloorCOMF123400 Door Installation ‐ Tenant area 29/12/11 17/01/12 0 ‐249 0 ‐246 0 ‐259 0 ‐274 0 ‐294 0 ‐316 0 ‐326 0 ‐321 0 ‐336 100 0 100 0 100 0 M450.C1.O.MF.12 12th Floor M450 C1 O MF 12 12th FloorCOMF122550 Threshold & Door Install‐ Wet area 29/12/11 20/02/12 0 ‐222 0 ‐225 0 ‐241 0 ‐261 0 ‐281 0 ‐297 0 ‐313 0 ‐327 0 ‐337 90 ‐347 100 0 100 0 M450.C1.O.MF.12 12th Floor M450 C1 O MF 12 12th FloorCOMF123110 Door Installation @Corrid. & Plant R 10/01/12 01/02/12 0 ‐249 0 ‐249 0 ‐256 0 ‐273 0 ‐292 0 ‐309 0 ‐322 0 ‐338 0 ‐357 100 0 100 0 100 0 M450.C1.O.MF.12 12th Floor M450 C1 O MF 12 12th FloorCOMF123410 Final Painting works to Tenant Area 17/01/12 24/04/12 0 ‐255 0 ‐254 0 ‐264 0 ‐279 0 ‐299 0 ‐316 0 ‐326 0 ‐334 0 ‐354 40 ‐350 85 ‐351 90 ‐358 M450.C1.O.MF.12 12th Floor M450 C1 O MF 12 12th Floor 2 3 4 5COMF123420 Final Painting/Vinyl wall paper works 11/02/12 24/05/12 0 ‐253 0 ‐244 0 ‐259 0 ‐269 0 ‐288 0 ‐298 0 ‐314 0 ‐330 0 ‐346 0 ‐361 80 ‐370 80 ‐384 M450.C1.O.MF.12 12th Floor M450 C1 O MF 12 12th Floor 2 3 4 5COMF122520 Installation of Cubicle ‐ Wet area 08/05/12 24/05/12 0 ‐218 0 ‐225 0 ‐241 0 ‐261 0 ‐281 0 ‐297 0 ‐313 0 ‐328 0 ‐342 0 ‐347 0 ‐361 0 ‐377 M450.C1.O.MF.12 12th Floor M450 C1 O MF 12 12th FloorCOMF129065 Snagging & Keys 05/06/12 21/06/12 0 ‐255 0 ‐254 0 ‐264 0 ‐279 0 ‐299 0 ‐316 0 ‐326 0 ‐335 0 ‐354 0 ‐355 0 ‐367 0 ‐383 M450.C1.O.MF.12 12th Floor M450 C1 O MF 12 12th FloorCOMF131840 MEP 2nd fixes 23/03/10 07/12/11 80 ‐253 80 ‐255 80 ‐271 80 ‐288 80 ‐308 89 ‐324 89.9 ‐339 90.2 ‐355 100 0 100 0 100 0 100 0 M450.C1.O.MF.13 13th Floor M450 C1 O MF 13 13th Floor 2 3 4 5COMF133270 Plaster to column & lift lobby 02/05/10 28/12/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.13 13th Floor M450 C1 O MF 13 13th FloorCOMF133240 Office Fitout (1st & 2nd Fix Trades) 12/06/10 13/04/12 34 ‐250 72 ‐235 73 ‐251 75 ‐268 75 ‐288 80 ‐304 80 ‐323 80 ‐336 80 ‐352 80 ‐352 90 ‐355 90 ‐371 M450.C1.O.MF.13 13th Floor M450 C1 O MF 13 13th Floor 2 3 4 5COMF132440 Ceramic tiles ‐ Wet area 28/10/10 28/11/11 90 ‐214 90 ‐215 90 ‐231 92 ‐248 95 ‐268 95 ‐284 95 ‐299 95 ‐314 100 0 100 0 100 0 100 0 M450.C1.O.MF.13 13th Floor M450 C1 O MF 13 13th FloorCOMF132640 Stone Work @ lift lobby 14/03/11 09/11/11 34 ‐213 75 ‐229 94 ‐245 96 ‐265 98 ‐275 98 ‐290 98 ‐304 98 ‐320 100 0 100 0 100 0 100 0 M450.C1.O.MF.13 13th Floor M450 C1 O MF 13 13th Floor 2 3 4 5COMF134080 Screed work @ Corridore area 07/04/11 13/04/11 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.13 13th Floor M450 C1 O MF 13 13th FloorCOMF132050 Testing & clearance prior to false cei 05/05/11 14/01/12 0 ‐221 60 ‐219 60 ‐235 60 ‐252 60 ‐262 60 ‐278 60 ‐291 70 ‐306 70 ‐308 100 0 100 0 100 0 M450.C1.O.MF.13 13th Floor M450 C1 O MF 13 13th FloorCOMF132490 Suspended Ceiling‐ Wet area 02/07/11 21/01/12 0 ‐222 0 ‐221 0 ‐237 60 ‐255 80 ‐266 80 ‐282 80 ‐298 80 ‐314 80 ‐329 100 0 100 0 100 0 M450.C1.O.MF.13 13th Floor M450 C1 O MF 13 13th Floor 3 4 5COMF134100 Stone Floor @ Corridore area 13/07/11 13/12/11 0 ‐258 0 ‐249 0 ‐264 50 ‐269 55 ‐286 55 ‐302 80 ‐314 95 ‐330 100 0 100 0 100 0 100 0 M450.C1.O.MF.13 13th Floor M450 C1 O MF 13 13th Floor 2 3 4 5COMF133060 Ceiling works to lift lobby & bulkhea 04/08/11 22/01/12 0 ‐244 0 ‐245 0 ‐261 0 ‐265 70 ‐275 70 ‐290 70 ‐304 70 ‐320 70 ‐308 100 0 100 0 100 0 M450.C1.O.MF.13 13th Floor M450 C1 O MF 13 13th FloorCOMF133280 Ceiling Grid & Gyp. Bulkhead ‐ Tenan 08/08/11 16/10/11 0 ‐255 0 ‐251 0 ‐267 0 ‐284 90 ‐299 95 ‐307 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.13 13th Floor M450 C1 O MF 13 13th FloorCOMF134090 Ceiling Installation  @ Corridore area 06/09/11 11/01/12 0 ‐257 0 ‐238 0 ‐254 0 ‐274 0 ‐267 30 ‐273 60 ‐285 60 ‐298 60 ‐315 100 0 100 0 100 0 M450.C1.O.MF.13 13th Floor M450 C1 O MF 13 13th Floor 4 5COMF134110 MEP final fixes to lift lobby/Corrid./W 13/09/11 08/06/12 0 ‐255 0 ‐250 0 ‐262 0 ‐279 0 ‐295 2 ‐317 2.44 ‐325 11 ‐331 10 ‐350 70 ‐361 90 ‐375 97 ‐390 M450.C1.O.MF.13 13th Floor M450 C1 O MF 13 13th Floor 1 2 3 4 5COMF133340 Final Ceiling Tiles install ‐ Tenant Are 01/10/11 18/02/12 0 ‐255 0 ‐254 0 ‐267 0 ‐284 0 ‐299 0 ‐309 80 ‐319 80 ‐330 80 ‐350 98 ‐352 100 0 100 0 M450.C1.O.MF.13 13th Floor M450 C1 O MF 13 13th Floor 2 3 4 5COMF133310 Floor Trunking & Raised Floor Install 02/10/11 14/01/12 0 ‐255 0 ‐251 0 ‐267 0 ‐284 0 ‐299 0 ‐307 20 ‐323 43 ‐332 65 ‐341 100 0 100 0 100 0 M450.C1.O.MF.13 13th Floor M450 C1 O MF 13 13th Floor 2 3 4 5COMF134120 MEP final fixes to Tenant Area 17/10/11 08/06/12 0 ‐250 0 ‐250 0 ‐262 0 ‐279 0 ‐295 0 ‐317 10 ‐325 10 ‐331 10 ‐350 90 ‐360 90 ‐375 90 ‐390 M450.C1.O.MF.13 13th Floor M450 C1 O MF 13 13th Floor 1 2 3 4 5COMF132500 Plumbing Fixture Install & Mirror‐ W 21/11/11 11/01/12 0 ‐222 0 ‐224 0 ‐240 0 ‐260 0 ‐280 0 ‐296 0 ‐312 20 ‐326 60 ‐336 100 0 100 0 100 0 M450.C1.O.MF.13 13th Floor M450 C1 O MF 13 13th Floor 2 3 4 5COMF133350 Door Installation ‐ Tenant area 27/12/11 22/01/12 0 ‐249 0 ‐246 0 ‐261 0 ‐278 0 ‐294 0 ‐302 0 ‐323 0 ‐332 0 ‐341 100 0 100 0 100 0 M450.C1.O.MF.13 13th Floor M450 C1 O MF 13 13th FloorCOMF133070 Sliding Door @ Lift Lobby 29/12/11 04/01/12 0 ‐242 0 ‐242 0 ‐258 0 ‐262 0 ‐275 0 ‐291 0 ‐306 0 ‐322 0 ‐334 100 0 100 0 100 0 M450.C1.O.MF.13 13th Floor M450 C1 O MF 13 13th FloorCOMF132510 Threshold & Door Install‐ Wet area 29/12/11 20/02/12 0 ‐222 0 ‐224 0 ‐240 0 ‐260 0 ‐280 0 ‐296 0 ‐312 0 ‐326 0 ‐336 90 ‐346 100 0 100 0 M450.C1.O.MF.13 13th Floor M450 C1 O MF 13 13th FloorCOMF133080 Door Installation @Corrid. & Plant R 11/01/12 02/02/12 0 ‐249 0 ‐249 0 ‐256 0 ‐273 0 ‐292 0 ‐309 0 ‐322 0 ‐338 0 ‐357 100 0 100 0 100 0 M450.C1.O.MF.13 13th Floor M450 C1 O MF 13 13th FloorCOMF133360 Final Painting works to Tenant Area 17/01/12 27/04/12 0 ‐255 0 ‐254 0 ‐267 0 ‐284 0 ‐299 0 ‐316 0 ‐325 0 ‐334 0 ‐354 35 ‐350 85 ‐351 90 ‐358 M450.C1.O.MF.13 13th Floor M450 C1 O MF 13 13th Floor 2 3 4 5COMF133330 Final Painting/Vinyl wall paper works 12/02/12 30/05/12 0 ‐254 0 ‐245 0 ‐260 0 ‐272 0 ‐288 0 ‐298 0 ‐314 0 ‐330 0 ‐346 0 ‐361 80 ‐370 80 ‐384 M450.C1.O.MF.13 13th Floor M450 C1 O MF 13 13th Floor 2 3 4 5COMF132480 Installation of Cubicle ‐ Wet area 11/05/12 29/05/12 0 ‐218 0 ‐225 0 ‐241 0 ‐261 0 ‐281 0 ‐297 0 ‐313 0 ‐328 0 ‐342 0 ‐347 0 ‐361 0 ‐377 M450.C1.O.MF.13 13th Floor M450 C1 O MF 13 13th FloorCOMF139055 Snagging & Keys 11/06/12 27/06/12 0 ‐255 0 ‐254 0 ‐267 0 ‐284 0 ‐299 0 ‐316 0 ‐326 0 ‐335 0 ‐355 0 ‐355 0 ‐367 0 ‐383 M450.C1.O.MF.13 13th Floor M450 C1 O MF 13 13th FloorCOMF141830 MEP 2nd fixes 24/03/10 07/12/11 77 ‐253 79 ‐255 80 ‐271 80 ‐288 80 ‐308 83 ‐324 84.1 ‐339 84.1 ‐355 100 0 100 0 100 0 100 0 M450.C1.O.MF.14 14th Floor M450 C1 O MF 14 14th Floor 2 3 4 5COMF143290 Plaster to column & lift lobby 02/05/10 01/12/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.14 14th Floor M450 C1 O MF 14 14th FloorCOMF143230 Office Fitout (1st & 2nd Fix Trades) 14/06/10 13/04/12 47 ‐236 80 ‐234 80 ‐250 80 ‐267 80 ‐287 80 ‐303 80 ‐318 80 ‐338 80 ‐352 80 ‐348 90 ‐355 90 ‐371 M450.C1.O.MF.14 14th Floor M450 C1 O MF 14 14th Floor 1 2 3 4 5COMF142430 Ceramic tiles ‐ Wet area 02/11/10 28/11/11 90 ‐212 90 ‐214 90 ‐230 92 ‐246 95 ‐266 95 ‐282 95 ‐298 95 ‐313 100 0 100 0 100 0 100 0 M450.C1.O.MF.14 14th Floor M450 C1 O MF 14 14th FloorCOMF142630 Stone Work @ lift lobby 20/03/11 12/11/11 34 ‐213 83 ‐229 90 ‐245 95 ‐265 95 ‐275 95 ‐290 95 ‐304 95 ‐320 100 0 100 0 100 0 100 0 M450.C1.O.MF.14 14th Floor M450 C1 O MF 14 14th Floor 2 3 4 5COMF144050 Screed work @ Corridore area 09/04/11 14/04/11 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.14 14th Floor M450 C1 O MF 14 14th FloorCOMF142040 Testing & clearance prior to false cei 03/05/11 15/01/12 0 ‐219 33 ‐218 40 ‐234 40 ‐251 40 ‐266 40 ‐281 40 ‐295 70 ‐308 70 ‐307 100 0 100 0 100 0 M450.C1.O.MF.14 14th Floor M450 C1 O MF 14 14th FloorCOMF144070 Stone Floor @ Corridore area 11/07/11 11/01/12 0 ‐258 0 ‐249 0 ‐264 80 ‐269 90 ‐286 90 ‐302 95 ‐314 95 ‐330 95 ‐314 100 0 100 0 100 0 M450.C1.O.MF.14 14th Floor M450 C1 O MF 14 14th Floor 2 3 4 5COMF142450 Suspended Ceiling‐ Wet area 27/07/11 22/01/12 0 ‐222 0 ‐221 0 ‐237 41 ‐255 60 ‐266 70 ‐282 70 ‐298 70 ‐314 70 ‐329 100 0 100 0 100 0 M450.C1.O.MF.14 14th Floor M450 C1 O MF 14 14th Floor 3 4 5COMF143030 Ceiling works to lift lobby & bulkhea 09/08/11 22/01/12 0 ‐244 0 ‐245 0 ‐261 0 ‐265 70 ‐267 70 ‐282 70 ‐296 70 ‐311 70 ‐307 100 0 100 0 100 0 M450.C1.O.MF.14 14th Floor M450 C1 O MF 14 14th FloorCOMF143240 Ceiling Grid & Gyp. Bulkhead ‐ Tenan 21/08/11 16/11/11 0 ‐255 0 ‐252 0 ‐268 0 ‐285 70 ‐299 95 ‐307 98 ‐318 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.14 14th Floor M450 C1 O MF 14 14th Floor 1 2 3 4 5

5 of 7

Page 6: Concurrent and Parallel Competing Critical Delay Demonstration Float Map A

West Building  ‐ Block 5 ‐ M340 to M460 Update Programmes ‐ Most Critical In Red and Critical within 20 days in Green

COMF144060 Ceiling Installation  @ Corridore area 05/09/11 16/01/12 0 ‐257 0 ‐238 0 ‐254 0 ‐274 0 ‐267 30 ‐271 60 ‐285 60 ‐295 60 ‐315 100 0 100 0 100 0 M450.C1.O.MF.14 14th Floor M450 C1 O MF 14 14th Floor 4 5COMF144030 MEP final fixes to lift lobby/Corrid./W 13/09/11 14/06/12 0 ‐256 0 ‐250 0 ‐263 0 ‐280 0 ‐295 2 ‐317 2.44 ‐325 3 ‐338 2 ‐351 60 ‐361 90 ‐375 97 ‐390 M450.C1.O.MF.14 14th Floor M450 C1 O MF 14 14th Floor 1 2 3 4 5COMF143250 Floor Trunking & Raised Floor Install 02/10/11 11/01/12 0 ‐255 0 ‐252 0 ‐268 0 ‐285 0 ‐299 0 ‐307 15 ‐308 20 ‐338 20 ‐352 100 0 100 0 100 0 M450.C1.O.MF.14 14th Floor M450 C1 O MF 14 14th Floor 2 3 4 5COMF143260 Final Ceiling Tiles install ‐ Tenant Are 06/10/11 04/02/12 0 ‐255 0 ‐254 0 ‐268 0 ‐285 0 ‐299 0 ‐309 45 ‐314 65 ‐332 70 ‐348 98 ‐352 100 0 100 0 M450.C1.O.MF.14 14th Floor M450 C1 O MF 14 14th Floor 2 3 4 5COMF144040 MEP final fixes to Tenant Area 18/10/11 14/06/12 0 ‐250 0 ‐250 0 ‐263 0 ‐280 0 ‐295 0 ‐317 10 ‐325 10 ‐338 10 ‐351 90 ‐360 90 ‐375 90 ‐390 M450.C1.O.MF.14 14th Floor M450 C1 O MF 14 14th Floor 1 2 3 4 5COMF142460 Plumbing Fixture Install & Mirror‐ W 20/11/11 16/01/12 0 ‐222 0 ‐225 0 ‐241 0 ‐261 0 ‐281 0 ‐297 0 ‐313 20 ‐327 20 ‐341 100 0 100 0 100 0 M450.C1.O.MF.14 14th Floor M450 C1 O MF 14 14th Floor 2 3 4 5COMF143040 Sliding Door @ Lift Lobby 28/12/11 05/01/12 0 ‐243 0 ‐243 0 ‐259 0 ‐263 0 ‐275 0 ‐291 0 ‐306 0 ‐322 0 ‐334 100 0 100 0 100 0 M450.C1.O.MF.14 14th Floor M450 C1 O MF 14 14th FloorCOMF142470 Threshold & Door Install‐ Wet area 02/01/12 20/02/12 0 ‐222 0 ‐225 0 ‐241 0 ‐261 0 ‐281 0 ‐297 0 ‐313 0 ‐327 0 ‐341 90 ‐347 100 0 100 0 M450.C1.O.MF.14 14th Floor M450 C1 O MF 14 14th FloorCOMF143270 Door Installation ‐ Tenant area 14/01/12 22/01/12 0 ‐249 0 ‐246 0 ‐262 0 ‐279 0 ‐294 0 ‐302 0 ‐308 0 ‐338 0 ‐352 100 0 100 0 100 0 M450.C1.O.MF.14 14th Floor M450 C1 O MF 14 14th FloorCOMF143050 Door Installation @Corrid. & Plant R 17/01/12 04/02/12 0 ‐249 0 ‐249 0 ‐256 0 ‐273 0 ‐292 0 ‐309 0 ‐322 0 ‐338 0 ‐357 75 ‐329 100 0 100 0 M450.C1.O.MF.14 14th Floor M450 C1 O MF 14 14th FloorCOMF143320 Final Painting works to Tenant Area 28/01/12 03/05/12 0 ‐255 0 ‐254 0 ‐268 0 ‐285 0 ‐299 0 ‐316 0 ‐325 0 ‐338 0 ‐354 15 ‐350 90 ‐351 90 ‐358 M450.C1.O.MF.14 14th Floor M450 C1 O MF 14 14th Floor 2 3 4 5COMF143300 Final Painting/Vinyl wall paper works 11/02/12 05/06/12 0 ‐254 0 ‐245 0 ‐261 0 ‐273 0 ‐288 0 ‐299 0 ‐314 0 ‐330 0 ‐346 0 ‐361 80 ‐370 80 ‐384 M450.C1.O.MF.14 14th Floor M450 C1 O MF 14 14th Floor 2 3 4 5COMF142440 Installation of Cubicle ‐ Wet area 18/05/12 05/06/12 0 ‐218 0 ‐225 0 ‐241 0 ‐261 0 ‐281 0 ‐297 0 ‐313 0 ‐328 0 ‐342 0 ‐347 0 ‐361 0 ‐377 M450.C1.O.MF.14 14th Floor M450 C1 O MF 14 14th FloorCOMF149045 Snagging & Keys 15/06/12 03/07/12 0 ‐255 0 ‐254 0 ‐268 0 ‐285 0 ‐299 0 ‐316 0 ‐326 0 ‐338 0 ‐356 0 ‐355 0 ‐367 0 ‐383 M450.C1.O.MF.14 14th Floor M450 C1 O MF 14 14th FloorCOMF151950 MEP 2nd fixes 19/06/10 08/12/11 64 ‐253 80 ‐255 80 ‐271 80 ‐288 80 ‐308 83 ‐324 84.2 ‐339 84.2 ‐355 100 0 100 0 100 0 100 0 M450.C1.O.MF.15 15th Floor M450 C1 O MF 15 15th Floor 2 3 4 5COMF153250 Plaster to column & lift lobby 01/08/10 01/01/11 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.15 15th Floor M450 C1 O MF 15 15th FloorCOMF155100 Ceramic tiles ‐ Wet area 14/03/11 29/01/12 80 ‐212 80 ‐213 85 ‐229 85 ‐246 85 ‐266 85 ‐282 85 ‐298 85 ‐314 85 ‐310 100 0 100 0 100 0 M450.C1.O.MF.15 15th Floor M450 C1 O MF 15 15th FloorCOMF155150 Stone Work @ lift lobby 23/03/11 14/11/11 34 ‐204 70 ‐220 90 ‐235 95 ‐255 95 ‐275 95 ‐290 95 ‐304 95 ‐319 100 0 100 0 100 0 100 0 M450.C1.O.MF.15 15th Floor M450 C1 O MF 15 15th Floor 2 3 4 5COMF155180 Screed work @ Corridore area 15/04/11 07/01/12 79 ‐187 79 ‐203 90 ‐218 90 ‐238 90 ‐258 90 ‐271 90 ‐285 90 ‐295 90 ‐315 100 0 100 0 100 0 M450.C1.O.MF.15 15th Floor M450 C1 O MF 15 15th Floor 4 5COMF152180 Testing & clearance prior to false cei 03/05/11 02/04/12 0 ‐216 33 ‐216 33 ‐232 33 ‐249 33 ‐269 33 ‐284 33.3 ‐297 33.3 ‐313 33 ‐309 80 ‐320 80 ‐333 80 ‐349 M450.C1.O.MF.15 15th Floor M450 C1 O MF 15 15th FloorCOMF154870 Office Fitout (1st & 2nd Fix Trades) 04/05/11 19/04/12 0 ‐235 15 ‐237 15 ‐253 18 ‐272 20 ‐291 20 ‐307 20 ‐323 20 ‐339 20 ‐359 70 ‐342 70 ‐358 70 ‐374 M450.C1.O.MF.15 15th Floor M450 C1 O MF 15 15th Floor 2 3 4 5COMF155240 Operable Wall Door Installation 10/05/11 21/01/12 0 ‐363 20 ‐360 20 ‐384 20 ‐390 20 ‐406 20 ‐430 20 ‐402 20 ‐426 20 ‐456 100 0 100 0 100 0 M450.C1.O.MF.15 15th Floor M450 C1 O MF 15 15th FloorCOMF155200 Stone Floor @ Corridore area 28/07/11 06/02/12 0 ‐258 0 ‐249 0 ‐264 9 ‐273 45 ‐286 70 ‐302 90 ‐314 90 ‐330 90 ‐315 95 ‐327 100 0 100 0 M450.C1.O.MF.15 15th Floor M450 C1 O MF 15 15th Floor 2 3 4 5COMF155220 MEP final fixes to lift lobby/Corrid./W 13/09/11 20/06/12 0 ‐257 0 ‐250 0 ‐266 0 ‐283 0 ‐303 2 ‐319 2.44 ‐334 3 ‐338 2 ‐355 15 ‐361 15 ‐375 15 ‐390 M450.C1.O.MF.15 15th Floor M450 C1 O MF 15 15th Floor 1 2 3 4 5COMF155160 Ceiling works to lift lobby & bulkhea 17/10/11 06/04/12 0 ‐244 0 ‐245 0 ‐261 0 ‐265 0 ‐275 0 ‐290 15 ‐304 20 ‐319 20 ‐309 65 ‐320 80 ‐333 80 ‐349 M450.C1.O.MF.15 15th Floor M450 C1 O MF 15 15th FloorCOMF155190 Ceiling Installation  @ Corridore area 26/10/11 03/04/12 0 ‐257 0 ‐238 0 ‐254 0 ‐274 0 ‐267 0 ‐271 5 ‐285 20 ‐295 20 ‐315 80 ‐327 80 ‐342 80 ‐358 M450.C1.O.MF.15 15th Floor M450 C1 O MF 15 15th Floor 4 5COMF154960 Ceiling Grid & Gyp. Bulkhead ‐ Tenan 31/10/11 22/01/12 0 ‐255 0 ‐254 0 ‐270 0 ‐287 0 ‐307 0 ‐323 0 ‐339 92 ‐339 92 ‐359 100 0 100 0 100 0 M450.C1.O.MF.15 15th Floor M450 C1 O MF 15 15th FloorCOMF155050 Floor Trunking & Raised Floor Install 02/01/12 02/05/12 0 ‐255 0 ‐254 0 ‐270 0 ‐287 0 ‐307 0 ‐323 0 ‐339 0 ‐339 0 ‐359 90 ‐348 90 ‐358 90 ‐374 M450.C1.O.MF.15 15th Floor M450 C1 O MF 15 15th Floor 2 3 4 5COMF155130 Plumbing Fixture Install & Mirror‐ W 02/01/12 11/06/12 0 ‐222 0 ‐224 0 ‐240 0 ‐260 0 ‐280 0 ‐296 0 ‐312 0 ‐328 0 ‐342 90 ‐347 90 ‐361 90 ‐377 M450.C1.O.MF.15 15th Floor M450 C1 O MF 15 15th Floor 2 3 4 5COMF155140 Threshold & Door Install‐ Wet area 02/01/12 12/06/12 0 ‐222 0 ‐224 0 ‐240 0 ‐260 0 ‐280 0 ‐296 0 ‐312 0 ‐328 0 ‐342 90 ‐347 90 ‐361 90 ‐377 M450.C1.O.MF.15 15th Floor M450 C1 O MF 15 15th FloorCOMF155070 Final Ceiling Tiles install ‐ Tenant Are 16/01/12 02/05/12 0 ‐255 0 ‐254 0 ‐270 0 ‐287 0 ‐307 0 ‐323 0 ‐339 0 ‐339 0 ‐359 50 ‐349 60 ‐355 60 ‐367 M450.C1.O.MF.15 15th Floor M450 C1 O MF 15 15th Floor 2 3 4 5COMF155230 Door Installation @Corrid. & Plant R 28/01/12 11/03/12 0 ‐249 0 ‐249 0 ‐256 0 ‐273 0 ‐292 0 ‐309 0 ‐323 0 ‐338 0 ‐357 42 ‐326 90 ‐334 100 0 M450.C1.O.MF.15 15th Floor M450 C1 O MF 15 15th Floor 4 5COMF155080 Door Installation ‐ Tenant area 28/01/12 20/04/12 0 ‐249 0 ‐248 0 ‐264 0 ‐281 0 ‐301 0 ‐317 0 ‐333 0 ‐333 0 ‐353 66 ‐337 87 ‐344 87 ‐360 M450.C1.O.MF.15 15th Floor M450 C1 O MF 15 15th Floor 3 4 5COMF155120 Suspended Ceiling‐ Wet area 04/02/12 04/04/12 0 ‐222 0 ‐221 0 ‐237 0 ‐255 0 ‐266 0 ‐282 0 ‐298 0 ‐314 0 ‐329 0 ‐314 70 ‐323 70 ‐339 M450.C1.O.MF.15 15th Floor M450 C1 O MF 15 15th Floor 5COMF155170 Sliding Door @ Lift Lobby 06/04/12 24/04/12 0 ‐243 0 ‐244 0 ‐260 0 ‐264 0 ‐275 0 ‐291 0 ‐306 0 ‐322 0 ‐334 0 ‐320 0 ‐333 0 ‐349 M450.C1.O.MF.15 15th Floor M450 C1 O MF 15 15th FloorCOMF155090 Final Painting works to Tenant Area 02/05/12 24/05/12 0 ‐255 0 ‐254 0 ‐270 0 ‐287 0 ‐307 0 ‐323 0 ‐339 0 ‐339 0 ‐359 0 ‐350 0 ‐351 0 ‐367 M450.C1.O.MF.15 15th Floor M450 C1 O MF 15 15th FloorCOMF155060 MEP final fixes to Tenant Area 16/05/12 20/06/12 0 ‐250 0 ‐250 0 ‐266 0 ‐283 0 ‐303 0 ‐319 0 ‐334 0 ‐338 0 ‐355 0 ‐360 0 ‐375 0 ‐390 M450.C1.O.MF.15 15th Floor M450 C1 O MF 15 15th FloorCOMF155210 Final Painting/Vinyl wall paper works 18/05/12 11/06/12 0 ‐255 0 ‐246 0 ‐262 0 ‐275 0 ‐295 0 ‐311 0 ‐327 0 ‐330 0 ‐347 0 ‐361 0 ‐370 0 ‐384 M450.C1.O.MF.15 15th Floor M450 C1 O MF 15 15th FloorCOMF155110 Installation of Cubicle ‐ Wet area 23/05/12 08/06/12 0 ‐217 0 ‐224 0 ‐240 0 ‐260 0 ‐280 0 ‐296 0 ‐312 0 ‐328 0 ‐342 0 ‐347 0 ‐361 0 ‐377 M450.C1.O.MF.15 15th Floor M450 C1 O MF 15 15th FloorCOMF159185 Snagging & Keys 21/06/12 09/07/12 0 ‐255 0 ‐254 0 ‐270 0 ‐287 0 ‐307 0 ‐323 0 ‐339 0 ‐339 0 ‐359 0 ‐355 0 ‐367 0 ‐383 M450.C1.O.MF.15 15th Floor M450 C1 O MF 15 15th FloorCOSBGF0020 Curtain wall Glazing surrounding Sta 02/05/11 04/04/12 0 ‐227 23 ‐218 68 ‐207 70 ‐226 90 ‐234 90 ‐250 90 ‐266 90 ‐282 95 ‐299 95 ‐319 95 ‐334 95 ‐350 M450.C1.O.MF.2 Staircase M450 C1 O MF 2 StaircaseCOSBGF0025 Ballustrade & Handrail Installation 09/11/11 23/05/12 0 ‐231 0 ‐247 0 ‐263 0 ‐283 0 ‐303 0 ‐319 0 ‐335 10 ‐351 10 ‐371 15 ‐366 38 ‐368 75 ‐378 M450.C1.O.MF.2 Staircase M450 C1 O MF 2 StaircaseCOMFXE2835 Precast Stair ‐ Trade & Riser Installat 07/01/12 22/05/12 0 ‐231 0 ‐247 0 ‐263 0 ‐283 0 ‐303 0 ‐319 0 ‐335 0 ‐351 0 ‐371 55 ‐366 55 ‐368 60 ‐378 M450.C1.O.MF.2 Staircase M450 C1 O MF 2 Staircase 2 3 4 5COMFEL7410 Lifts 11 to 18 23/06/10 14/01/12 85 ‐199 88 ‐213 95 ‐225 95 ‐245 95 ‐265 95 ‐281 95 ‐297 95 ‐313 95 ‐333 100 0 100 0 100 0 M450.C1.O.MF.EL Lift Works M450 C1 O MF EL Lift Works 3 4 5COMFEL7420 Lifts 19 to 20 03/07/10 15/01/12 90 ‐199 92 ‐213 95 ‐225 95 ‐245 95 ‐265 95 ‐281 95 ‐297 95 ‐313 95 ‐333 100 0 100 0 100 0 M450.C1.O.MF.EL Lift Works M450 C1 O MF EL Lift Works 3 4 5COMFEL7470 Lift Plant Room Equipment Installatio 08/12/10 16/01/12 85 ‐196 95 ‐208 95 ‐224 95 ‐244 95 ‐264 95 ‐280 95 ‐296 95 ‐312 95 ‐332 100 0 100 0 100 0 M450.C1.O.MF.EL Lift Works M450 C1 O MF EL Lift WorksCOMFEL7440 Lift Car Fit‐outs 22/03/12 12/07/12 0 ‐208 0 ‐224 0 ‐240 0 ‐260 0 ‐280 0 ‐296 0 ‐303 0 ‐319 0 ‐333 0 ‐350 0 ‐366 20 ‐372 M450.C1.O.MF.EL Lift Works M450 C1 O MF EL Lift WorksCOMFEL7460 Final Testing 30/03/12 03/05/12 0 ‐199 0 ‐213 0 ‐225 0 ‐245 0 ‐265 0 ‐281 0 ‐297 0 ‐313 0 ‐333 0 ‐350 0 ‐366 0 ‐372 M450.C1.O.MF.EL Lift Works M450 C1 O MF EL Lift WorksCOMFGF1810 MEP 2nd fixes 10/07/10 12/12/11 80 ‐233 80 ‐236 80 ‐252 80 ‐272 80 ‐292 80 ‐297 80 ‐307 80 ‐319 100 0 100 0 100 0 100 0 M450.C1.O.MF.GF Ground FlooM450 C1 O MF GF Ground Floor & Mezzanine 2 3 4 5COMFGF3250 Plaster to column & lift lobby 24/07/10 10/08/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.GF Ground FlooM450 C1 O MF GF Ground Floor & MezzanineCOMFGF2610 Stone Works @ Lift Lobby 12/09/10 07/01/12 91 ‐202 91 ‐218 95 ‐233 95 ‐253 95 ‐273 95 ‐289 95 ‐305 95 ‐321 95 ‐321 100 0 100 0 100 0 M450.C1.O.MF.GF Ground FlooM450 C1 O MF GF Ground Floor & Mezzanine 2 3 4 5COMFGF3410 Internal structural glazing incl. Painti 18/10/10 08/01/12 75 ‐250 80 ‐255 85 ‐269 85 ‐289 85 ‐309 85 ‐325 85 ‐337 85 ‐353 85 ‐359 100 0 100 0 100 0 M450.C1.O.MF.GF Ground FlooM450 C1 O MF GF Ground Floor & Mezzanine 2 3 4 5COMFGF3030 External Column Stone Cladding 02/03/11 07/04/11 98 ‐202 98 ‐218 98 ‐233 98 ‐253 98 ‐273 98 ‐289 98 ‐305 98 ‐321 100 0 100 0 100 0 100 0 M450.C1.O.MF.GF Ground FlooM450 C1 O MF GF Ground Floor & MezzanineCOMFGF3260 Lift Lobby/Pavillion Glazing Work 09/03/11 03/04/12 30 ‐245 60 ‐247 80 ‐253 80 ‐273 80 ‐293 90 ‐305 90 ‐317 90 ‐333 90 ‐353 95 ‐334 95 ‐348 95 ‐356 M450.C1.O.MF.GF Ground FlooM450 C1 O MF GF Ground Floor & Mezzanine 3 4 5COMFGF3280 Installation of Structure Steel for Fea 30/04/11 01/12/11 0 ‐250 58 ‐255 58 ‐269 60 ‐289 60 ‐309 60 ‐325 60 ‐337 60 ‐353 100 0 100 0 100 0 100 0 M450.C1.O.MF.GF Ground FlooM450 C1 O MF GF Ground Floor & MezzanineCOMFGF2020 Testing & clearance prior to false cei 05/05/11 07/01/12 0 ‐233 81 ‐236 81 ‐252 81 ‐272 81 ‐292 81 ‐297 81.3 ‐307 81.3 ‐319 81 ‐332 100 0 100 0 100 0 M450.C1.O.MF.GF Ground FlooM450 C1 O MF GF Ground Floor & MezzanineCOMFGF3010 Lift Lobby/Pavillion Ceiling  Work 10/09/11 10/01/12 0 ‐246 0 ‐251 0 ‐265 0 ‐285 0 ‐305 35 ‐321 55 ‐337 70 ‐353 70 ‐359 100 0 100 0 100 0 M450.C1.O.MF.GF Ground FlooM450 C1 O MF GF Ground Floor & MezzanineCOMFGF3040 Lift Lobby/Pavillion Stone Floor 12/10/11 13/02/12 0 ‐250 0 ‐255 0 ‐269 0 ‐289 0 ‐309 0 ‐325 45 ‐337 85 ‐353 85 ‐359 95 ‐338 100 0 100 0 M450.C1.O.MF.GF Ground FlooM450 C1 O MF GF Ground Floor & Mezzanine 3 4 5COMFGF3270 Installation of Feature Wall 10/12/11 27/02/12 0 ‐250 0 ‐255 0 ‐269 0 ‐289 0 ‐309 0 ‐325 0 ‐337 0 ‐353 30 ‐359 75 ‐338 100 0 100 0 M450.C1.O.MF.GF Ground FlooM450 C1 O MF GF Ground Floor & Mezzanine 3 4 5COMFGF3050 Installation of Sliding Doors 14/01/12 12/02/12 0 ‐250 0 ‐255 0 ‐269 0 ‐289 0 ‐309 0 ‐325 0 ‐337 0 ‐353 0 ‐359 82 ‐335 100 0 100 0 M450.C1.O.MF.GF Ground FlooM450 C1 O MF GF Ground Floor & MezzanineCOMFGF4030 MEP final fixes 14/01/12 04/05/12 0 ‐250 0 ‐255 0 ‐269 0 ‐289 0 ‐309 0 ‐325 0 ‐337 0 ‐353 0 ‐359 70 ‐338 90 ‐340 90 ‐356 M450.C1.O.MF.GF Ground FlooM450 C1 O MF GF Ground Floor & MezzanineCOMFGF3020 Joinery Works 10/03/12 03/05/12 0 ‐249 0 ‐254 0 ‐268 0 ‐288 0 ‐308 0 ‐324 0 ‐336 0 ‐352 0 ‐358 0 ‐337 0 ‐348 85 ‐354 M450.C1.O.MF.GF Ground FlooM450 C1 O MF GF Ground Floor & MezzanineCOMFGF2410 Granite tiles to Water Feature 30/03/12 07/06/12 0 ‐184 0 ‐198 0 ‐214 0 ‐234 0 ‐254 0 ‐270 0 ‐286 0 ‐302 0 ‐322 0 ‐342 0 ‐358 0 ‐374 M450.C1.O.MF.GF Ground FlooM450 C1 O MF GF Ground Floor & MezzanineCOMFGF9010 Snagging & Keys 08/06/12 04/07/12 0 ‐249 0 ‐254 0 ‐268 0 ‐288 0 ‐308 0 ‐324 0 ‐336 0 ‐352 0 ‐358 0 ‐342 0 ‐358 0 ‐374 M450.C1.O.MF.GF Ground FlooM450 C1 O MF GF Ground Floor & MezzanineCOMFHO9870 Signage 11/02/12 13/07/12 0 ‐226 0 ‐241 0 ‐250 0 ‐270 0 ‐281 0 ‐297 0 ‐313 0 ‐329 0 ‐319 0 ‐336 5 ‐351 5 ‐367 M450.C1.O.MF.HO Final Fix ItemM450 C1 O MF HO Final Fix Items & Handing OverCOMFHO9860 Carpeting to Level 15 and Matwells 01/05/12 22/05/12 0 ‐222 0 ‐227 0 ‐241 0 ‐261 0 ‐281 0 ‐297 0 ‐309 0 ‐325 0 ‐331 0 ‐307 0 ‐321 0 ‐337 M450.C1.O.MF.HO Final Fix ItemM450 C1 O MF HO Final Fix Items & Handing OverCOMFHO0001 Final Testing & Commissioning 22/05/12 31/07/12 0 ‐258 0 ‐255 0 ‐269 0 ‐289 0 ‐309 0 ‐325 0 ‐337 0 ‐353 0 ‐359 0 ‐361 0 ‐375 0 ‐390 M450.C1.O.MF.HO Final Fix ItemM450 C1 O MF HO Final Fix Items & Handing OverCOMFHO0002 Final Snagging & Handing Over 13/06/12 22/08/12 0 ‐258 0 ‐257 0 ‐271 0 ‐289 0 ‐309 0 ‐325 0 ‐339 0 ‐354 0 ‐371 0 ‐366 0 ‐375 0 ‐390 M450.C1.O.MF.HO Final Fix ItemM450 C1 O MF HO Final Fix Items & Handing OverCOMFGF7810 Bracket & Railing 28/08/10 09/01/12 80 ‐202 80 ‐218 80 ‐234 80 ‐254 85 ‐270 85 ‐286 85 ‐302 85 ‐318 95 ‐331 100 0 100 0 100 0 M450.C1.O.MF.MU Window CleM450 C1 O MF MU Window Cleaning System 3 4 5COMFGF7820 Final Fixes 30/03/12 03/05/12 0 ‐208 0 ‐224 0 ‐240 0 ‐260 0 ‐280 0 ‐296 0 ‐312 0 ‐328 0 ‐331 0 ‐336 0 ‐352 0 ‐368 M450.C1.O.MF.MU Window CleM450 C1 O MF MU Window Cleaning SystemCOMFRF1260 Foam concrete 15/09/10 01/11/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.RF Roof M450 C1 O MF RF RoofCOMFRF1270 W/P membrane 02/11/10 13/11/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.RF Roof M450 C1 O MF RF RoofCOMFRF1280 Separation layers 14/11/10 30/11/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.RF Roof M450 C1 O MF RF RoofCOMFRF1290 Gravel & tiles 07/01/12 04/05/12 0 ‐208 0 ‐224 0 ‐240 0 ‐260 0 ‐280 0 ‐296 0 ‐312 0 ‐328 0 ‐331 90 ‐336 90 ‐352 95 ‐368 M450.C1.O.MF.RF Roof M450 C1 O MF RF Roof 3 4 5COMFRI1820 Drainage & AC duct risers 10/01/10 10/12/11 90 ‐245 90 ‐255 90 ‐270 90 ‐280 90 ‐292 90 ‐308 90 ‐322 90 ‐338 100 0 100 0 100 0 100 0 M450.C1.O.MF.RI Risers & Plan M450 C1 O MF RI Risers & Plantrooms 2 3 4 5COMFRI1830 Water, CHW & FF risers 10/01/10 11/12/11 89 ‐236 95 ‐246 95 ‐262 95 ‐272 95 ‐287 95 ‐300 95.8 ‐315 95.8 ‐331 100 0 100 0 100 0 100 0 M450.C1.O.MF.RI Risers & Plan M450 C1 O MF RI Risers & Plantrooms 2 3 4 5COMFRI1860 Load and position air handling units 01/04/10 01/07/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.RI Risers & Plan M450 C1 O MF RI Risers & PlantroomsCOMFRI1840 Cable trays, Feeder cable riser 01/07/10 10/12/11 88 ‐232 94 ‐246 95 ‐262 95 ‐272 95 ‐286 95 ‐300 95 ‐315 95 ‐331 100 0 100 0 100 0 100 0 M450.C1.O.MF.RI Risers & Plan M450 C1 O MF RI Risers & Plantrooms 2 3 4 5COMFRI1880 HV Room Ground Floor ‐Office 24/10/10 31/03/11 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.RI Risers & Plan M450 C1 O MF RI Risers & Plantrooms

6 of 7

Page 7: Concurrent and Parallel Competing Critical Delay Demonstration Float Map A

West Building  ‐ Block 5 ‐ M340 to M460 Update Programmes ‐ Most Critical In Red and Critical within 20 days in Green

COMFRI1850 Fixing Bus bar (Vertical & Horiz.) 01/02/11 13/04/11 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.RI Risers & Plan M450 C1 O MF RI Risers & PlantroomsCOMFUR1260 Foam concrete 01/12/10 26/12/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.UR Upper Roof M450 C1 O MF UR Upper RoofCOMFUR1270 W/P membrane 26/12/10 18/02/12 87 ‐125 87 ‐141 90 ‐157 90 ‐177 90 ‐197 90 ‐213 90 ‐229 90 ‐245 90 ‐265 90 ‐285 100 0 100 0 M450.C1.O.MF.UR Upper Roof M450 C1 O MF UR Upper RoofCOMFUR1280 Separation layers 10/02/11 18/02/12 87 ‐125 87 ‐141 90 ‐157 90 ‐177 90 ‐197 90 ‐213 90 ‐229 90 ‐245 90 ‐265 90 ‐285 100 0 100 0 M450.C1.O.MF.UR Upper Roof M450 C1 O MF UR Upper RoofCOMFUR1290 Gravel & tiles 04/02/12 07/05/12 0 ‐183 0 ‐199 0 ‐215 0 ‐235 0 ‐248 0 ‐264 0 ‐280 0 ‐296 0 ‐299 0 ‐304 60 ‐316 93 ‐328 M450.C1.O.MF.UR Upper Roof M450 C1 O MF UR Upper RoofCOMFXE2830 Curtain Glazing walls 13/02/10 06/02/12 90 ‐258 99 ‐250 99 ‐265 99 ‐275 99 ‐290 99 ‐303 99.2 ‐318 99.2 ‐334 99 ‐354 99 ‐365 100 0 100 0 M450.C1.O.MF.XE External Env M450 C1 O MF XE External Envelope 1 2 3 4 5COMFXE2840 Metal Cladding 13/03/10 09/04/11 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.XE External Env M450 C1 O MF XE External EnvelopeCOMFXE3650 Steel structure 25/07/10 27/10/10 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.XE External Env M450 C1 O MF XE External EnvelopeCOMFXE2820 Aluminum louvers 30/11/10 02/11/11 45 ‐205 54 ‐216 54 ‐233 54 ‐253 54 ‐273 55 ‐288 95 ‐282 100 0 100 0 100 0 100 0 100 0 M450.C1.O.MF.XE External Env M450 C1 O MF XE External EnvelopeCOMFXE3680 Terracotta Tiles 13/02/11 04/04/12 50 ‐224 68 ‐240 70 ‐256 73 ‐276 85 ‐296 85 ‐297 88 ‐301 92 ‐308 92 ‐328 95 ‐336 95 ‐352 95 ‐368 M450.C1.O.MF.XE External Env M450 C1 O MF XE External EnvelopeCOMFXE4810 Terracotta louvers 21/03/11 10/04/12 10 ‐224 10 ‐240 10 ‐256 10 ‐276 10 ‐296 35 ‐297 55 ‐301 70 ‐308 70 ‐328 90 ‐341 90 ‐352 90 ‐368 M450.C1.O.MF.XE External Env M450 C1 O MF XE External Envelope 2 3 4 5COMFXE3660 Sealants, snagging and final cleaning 15/10/11 07/05/12 0 ‐224 0 ‐240 0 ‐256 0 ‐276 0 ‐296 0 ‐297 80 ‐301 80 ‐308 80 ‐328 80 ‐341 80 ‐352 80 ‐368 M450.C1.O.MF.XE External Env M450 C1 O MF XE External Envelope

477

7 of 7