Concreting at Low Ambient Temperatures at Salma Dam Project Afghanistan - A Case Study

download Concreting at Low Ambient Temperatures at Salma Dam Project Afghanistan - A Case Study

of 5

Transcript of Concreting at Low Ambient Temperatures at Salma Dam Project Afghanistan - A Case Study

  • 8/10/2019 Concreting at Low Ambient Temperatures at Salma Dam Project Afghanistan - A Case Study

    1/5

    Int. j. eng. sci., Vol(2), No (12), December, 2013. pp. 466-4

    TI Journals

    International Journal of Engineering Scienceswww.tijournals.com

    ISSN:

    2306-6474

    Copyright 2013. All rights reserved for TI Journals.

  • 8/10/2019 Concreting at Low Ambient Temperatures at Salma Dam Project Afghanistan - A Case Study

    2/5

    467 Concreting at Low Ambient Temperatures at Salma Dam Project Afghanistan - A Case Study

    International Journal of Engineering Sciences Vol(2), No (12), December, 2013.

  • 8/10/2019 Concreting at Low Ambient Temperatures at Salma Dam Project Afghanistan - A Case Study

    3/5

    468Raj Kumar *, A.N.N. Prasad, N. V. Mahure, Pankaj Sharma, S. L. Gupta, Murari Ratnam

    International Journal of Engineering Sciences Vol(2), No (12), December, 2013.

  • 8/10/2019 Concreting at Low Ambient Temperatures at Salma Dam Project Afghanistan - A Case Study

    4/5

    469 Concreting at Low Ambient Temperatures at Salma Dam Project Afghanistan - A Case Study

    International Journal of Engineering Sciences Vol(2), No (12), December, 2013.

  • 8/10/2019 Concreting at Low Ambient Temperatures at Salma Dam Project Afghanistan - A Case Study

    5/5

    470Raj Kumar *, A.N.N. Prasad, N. V. Mahure, Pankaj Sharma, S. L. Gupta, Murari Ratnam

    International Journal of Engineering Sciences Vol(2), No (12), December, 2013.