    CONCRETE TECHNOLOGY

    CC203

    CIVIL ENGINEERING DEPARTMENT

    POLYTECHNIC OF SULTAN AZLAN SHAH

    B

    Group Name

    CONCRETE LABORATORY

    ..Laboratory / Workshops Name

    EN. ANUAR BIN WAHAB

    Lecturers Name

    2..

    Number of Practical

    MORTAR

    ..

    Title of Practical

    Lecturers Comment

    .

    .

    ..

    ..

    Mark :______________%

    4/7/2013..

    Date & Time of Practical

    11/4/2013

    .Due Date

    No. Matrix of Group Members :

    15DKA12F108415DKA12F104115DKA12F1113

    .

    .

  • 7/27/2019 Concrete Laboratory

    2/9

    CONCRETE LABORATORY

    CIVIL ENGINEERING DEPARTMENT

    SULTAN AZLAN SHAH POLYTECHNIC

    EXPERIMENT : 3

    TITLE : MORTAR TEST

    INTRODUCTION : Mortar may be defined as a paste formed by mixing water, a fine

    aggregate and a binding material in a specified proportion. Thisexperiment to see the strength of mortar.

    OBJECTIVE : To determine the compressive strength of 1:2 cement and mortar cubes

    after 7 days curing.

    THEORY : The compressive strength of cement mortar is determine in order to

    verify whether the cement conforms to the standards specifications ( BS 12:1971)and whether it will be able to develop the required compressive strength of

    concrete.

    APPARATUS : 1. Universal testing machine or compression testing machine as per BS

    1881 :part 4:1970.

    : 2. Cubes mould (150 X 150 X 150) mm

    : 3. Vibrating machine as per BS 12:1971

    : 4. Sand

    : 5. Measuring

    : 6. Trowel

  • 7/27/2019 Concrete Laboratory

    3/9

    PICTURE APPARATUS

    Cube mould

    sand

    SAFETY AND HEALTH

    When everyone in the workshop must wear shirts and shoes workshop workshops.

    When to do a job you need to wear gloves when working. Use the tools in the workshop right way. Sure that no one in front of you when doing a job. Do not interfere with a friend when being worked.

    PROCEDURE

    Mix proportions, mixing and curing of specimens.

    1. Calculate the material required. The material for each cube shall be mixed separately andthe quantities of cement and standard and shall be as follows :

    i. Cement :2500 gii. Standard :6000 g

    iii. Water cement ratio :0.6

  • 7/27/2019 Concrete Laboratory

    4/9

    2. Place on a nonporous plate or china dish a mixture of cement and standard sand in theproportion of 1:2 by weight and mix dry with a trowel for one minute and then with water

    until the mixture is of uniform colour. The percentage of water to be used shall be water

    cement ratio 0.6. the time of mixing (gauging) shall be in any mixing not less than 3

    minutes and if the time taken to obtain a uniform colour exceeds 4 minutes, the mixture

    shall be rejected and the operation is repeated with the fresh quantity of cement, sand

    and water.

    3. Place the assembled mould on the table of the vibrating machine and firmly hold it inposition by means of a suitable clamp. Securely attach a hopper shall not be removed

    until completion of the vibrating period.

    4. Immediately after mixing of mortar in the hopper of the mortar as explained above, fillthe entire quantity the cube mould and compact by vibration. The period of vibration

    shall be 2 minutes at the specified

    12000 + 400 vibrations perminutes.

    5. Remove the mould from the machine and keep it at temperature of 27 + 2 in anatmosphere for at least 90% relative humidity for 24hour after completion of vibrations.

    6. At the end of this period, remove the cube from the mould and mark for identificationand immediately submerge in clean and fresh water and keep there until taken out just

    prior to breacking. The water in which the cube are submerge shall be renewed after

    every 7 days and shall be maintained at the temperatus of 27+2. Keeping the cubes

    wet till they are placed in machine for testing.

    TESTING & RESULT

    Remove any projecting fins and wipe surface water off the cube specimens. The compressive

    strength shall be the average of the strength of three cubes for each period respectively.

    Cube 7days

    Maximum load in KN Strength

    Cube1 99.9 KN 4.44 N/MM

    Cube2 88.9 KN 3.95 N/MM

  • 7/27/2019 Concrete Laboratory

    5/9

    QUESTION

    1. How the cement can affect the strength of concrete ?Cavitation in concrete

    There are many cavities, power will be reduced. Hollow can occur depending on the water and

    cement as well as the amount of water loss from the concrete.

    The ratio of water and cement content

    An increase in the ratio of water and cement content resulted in an increase in the degree ofcavitation on the concrete drying the same. With this cause can reduce the compressive strength

    of concrete.

    2. Why do you need to know the strength of concrete?To identify the actual concrete strength at a certain age, for safety reasons to continue the work

    next.

    To know the actual concrete strength of various grades of concrete types that can be used incertain structures.

  • 7/27/2019 Concrete Laboratory

    6/9

    CONCRETE LABORATORY

    CIVIL ENGINEERING DEPARTMENT

    SULTAN AZLAN SHAH POLYTECHNIC

    EXPERIMENT : 3

    TITLE : CEMENT SET TIME

    INTRODUCTION : This experiment aimed to cement good quality or not, as well as

    hydration. Fresh cement between 0-45 minutes, if it's 45 minutes past the

    mean cement quality still further, this is only the initial setting time.

    setting end time, it takes a relatively long time 3-10 hours, To see the mark

    on the cement surface without the cutter of the Vikat apparatus.

    THEORY : The time form the addition of water to the initial and final setting stage

    are know as setting time. Setting refer to changes of the cement paste from fluid

    to rigid. The setting process is accompanied by the temperature changes,hydration resolves in the formation of the cell around each particles of cement.

    INITIAL SETTING TIME

    The means of controlling the rate at which cement stiffened is by intergrading

    measured quantities of gypsum defined has the beginning of the noticeable

    stiffening in the cement paste and correspond to the rapid rise in temperature. This

    normally takes about 45-175 minutes.

    FINAL SETTING TIME

    This refer to completion of setting which correspond to the peak temperature in

    the cement paste. The sifening cement paste increases as the volume of the cell

    increases and the stage at which this is complete, the final hardening process

    begins.it normally takes between 3 hours to 10 hours for this to happen.

  • 7/27/2019 Concrete Laboratory

    7/9

    APPARATUS :

    1. Vicats apparatus with initial setting time needle and final setting time needle.2.

    Weighing balance accurate up to 0.1 gm.3. Non porous plate (Glass or Metal).

    4. Stop watch.5. Spatula.6. Trowel of about 210 gm weight.7. Measuring cylinder 250 ml capacity.

    PICTURE APPARATUS

    SAFETY AND HEALTH

    When everyone in the workshop must wear shirts and shoes workshop workshops. When to do a job you need to wear gloves when working. Use the tools in the workshop right way. Sure that no one in front of you when doing a job. Do not interfere with a friend when being worked.

    MATERIAL

    1. Water2. Portland cement

    PROCEDURE

    A. DETERMINE THE INITIAL SETTING TIME OF CEMENT.

    1. Mix 400 g of cement with % of water obtained from the standard consistencey test forcement.

    2. Leave the mixed cement for 45 minutes before testing it .3. Place specimen ring under Vicat apparatus and lock needle No.2(1 mm) on surface of

    paste to test the initial setting time of cement. Set indicator scale to zero.

  • 7/27/2019 Concrete Laboratory

    8/9

    4. Release weighted needle and record the penetration in mm.5. Repeat processes in different points of the mixture surface.

    B.

    DETERMINE THE FINAL SETTING TIME OF CEMENT.

    1. Final setting time of cement tested using needle No.3(5 mm) and placed in moisturesurrounding. Test done by placing the needle on the mixed cement surface. After the final

    setting time, the point of the needle will leave a mark on the cement surface. This

    procedures are done after 10 hours the cement mixture prepared.

    RESULT

    Test A

    Moisture content for standard consistency mixture : 26 %

    : 104 ml

    Test B

    Initial setting time of cement : 195 %

    Final setting time of cement : 3-10 hour

    QUESTION

    1. What is the effect on setting time of cement if water added is less or more than 85 % ofnormal constituency of cement ?

    LESS

    Cement will dry quickly and result in an impact cracking.

    MORE

    It takes time to harden and cause separation between water and cement.

    2. State the significance of determining the initial and final setting times.

  • 7/27/2019 Concrete Laboratory

    9/9

    Initial setting time

    To determine the quality of cement or not.

    Final setting time

    To see the mark on the cement surface without the cutter of the Vikat apparatus.