Concrete Electric Pole Factory Design

download Concrete Electric Pole Factory Design

of 4

Transcript of Concrete Electric Pole Factory Design

  • 8/13/2019 Concrete Electric Pole Factory Design

    1/4

    CYRUS Engineering Suite H187 Ikota Shopping Complex V.G.C Ajah Lagos

    Tel.: 08029308809.07036438781; email: [email protected]

    Concrete Electric Pole Factory Design

    Project Briefing

    Laying out a factory involves deciding where to put all the facilities, machines,

    equipment and staff in the production operation.

    Layout determines the way in which materials and other inputs flow through the

    operation.

    The following will be required as the necessary pre-construction engineering

    services:

    Subsoil investigationto determine nature of underline strata and bearing

    capacity for foundation analysis and design.

    Architectural designrequired for space planning to determine work

    centers for production operation.

    Structural designnecessary for determining member sizing and

    construction specification.

    Electrical and mechanical

    required for power supply and plumbing.

    Bill of Quantitiesto determine the project cost.

  • 8/13/2019 Concrete Electric Pole Factory Design

    2/4

    CYRUS Engineering Suite H187 Ikota Shopping Complex V.G.C Ajah Lagos

    Tel.: 08029308809.07036438781; email: [email protected]

    Type of Production

    Jobbing operation; characterize by wide variety of products and low

    volume.

    Batch operation; characterize by medium variety and medium

    volume.

    Continuous operation; characterize by low variety and high volume.

    The proposed concrete pole production factory is intended to produce four

    different concrete poles at 150 pieces per day; therefore it can be classed as a

    continuous type operation.

    Basic Factory Layout Types

    Process Layout

    Cell Layout

    Product Layout

    Since we are primarily concerned with a continuous operation in the

    concrete pole production we shall be adopting a product layout for the

    proposed factory.

  • 8/13/2019 Concrete Electric Pole Factory Design

    3/4

    CYRUS Engineering Suite H187 Ikota Shopping Complex V.G.C Ajah Lagos

    Tel.: 08029308809.07036438781; email: [email protected]

    Product Layout

    In product layout design the machines and equipment are located so that

    each product follows a pre-arranged route through a series of processes.

    The product flow along a line of processes that is clear and predictable.

    Product layout have high fixed cost to set up the manufacturing lines and

    low variable costs for producing large volumes of the same product.

    Layout Design

    The layout design will determine:

    Work centers of the operation i.e. the exact location of the facilities,

    equipment and staff.

    Space to be devoted to each work centers

    Task to be undertaken by each work center.

  • 8/13/2019 Concrete Electric Pole Factory Design

    4/4

    CYRUS Engineering Suite H187 Ikota Shopping Complex V.G.C Ajah Lagos

    Tel.: 08029308809.07036438781; email: [email protected]

    Project Engineering Design Billing

    N

    Subsoil investigation -------------------------- 200,000/plot

    Architectural design --------------------------- 250,000

    Structural design ------------------------------- 300,000

    Electrical and Mechanical design ---------- 100,000

    Bill of quantities -------------------------------- 70,000