Conceptual Water Treatment Facility Site Layout*

1
Conceptual Water Treatment Facility Site Layout* *Design subject to change PROPOSED FACILITY FOOTPRINT APPROXIMATELY 4.5 ACRES UPDATED MAY 6, 2021 PARCEL BOUNDARY

Transcript of Conceptual Water Treatment Facility Site Layout*

Page 1: Conceptual Water Treatment Facility Site Layout*

Conceptual Water Treatment Facility Site Layout**Design subject to change

PROPOSED FACILITY FOOTPRINT

APPROXIMATELY 4.5 ACRES

UPDATED MAY 6, 2021

PARCEL BOUNDARY