Concepts for New Recycler Lambertons GW Foster Dec 2000.

17
Concepts for New Recycler Lambertons GW Foster Dec 2000

Transcript of Concepts for New Recycler Lambertons GW Foster Dec 2000.

Page 1: Concepts for New Recycler Lambertons GW Foster Dec 2000.

Concepts for New Recycler Lambertons

GW Foster

Dec 2000

Page 2: Concepts for New Recycler Lambertons GW Foster Dec 2000.

Concepts for New Recycler Lambertons

GW Foster Dec 2000

YOU CAN NEVER BE:

• Too Thin

• Too Rich

• Have too much Aperture

for Beam Transfers

Page 3: Concepts for New Recycler Lambertons GW Foster Dec 2000.

Lambertson Challenges

• Septum Width– Lamination die ~2x material

~0.125”

• Septum Straightness– Stacking– Overall Warpage

• Vacuum– Laminations have large area– Iron Rusts

• Bend Field– Iron Limit ~1 T– Perm. Mag. (Ferrite) Limit ~0.5T

Page 4: Concepts for New Recycler Lambertons GW Foster Dec 2000.

Recycler Lambertson

Page 5: Concepts for New Recycler Lambertons GW Foster Dec 2000.

Recycler LambertsonField Map

Page 6: Concepts for New Recycler Lambertons GW Foster Dec 2000.

Recycler Lambertson Specifications

Page 7: Concepts for New Recycler Lambertons GW Foster Dec 2000.

Specific Problems with Recycler Lambertsons

• Brick Trim of field shape (skew quad) not exact– ~1% skew quad field defect

• Gun Boring of Field-free region not very precise– Effective Septum Width ~0.2”– Septum extremely thin some

places

• Vacuum problems required Stainless beam pipe insert

• Overall Septum Width ~0.3”

Page 8: Concepts for New Recycler Lambertons GW Foster Dec 2000.

Trimming Skew Quad With Side Brick Position

Lambertson Field Defects vs. Side Brick Position

-200

-100

0

100

200

300

400

500

600

0 0.25 0.5 0.75 1

Side Brick Overhang Distance Below Pole Tip Surface (in.)

Cal

cula

ted

Fie

ld D

efec

t (

un

its

at 1

")

Calc. Skew Quad

Calc. Skew Octupole

As-Built (approx)

Page 9: Concepts for New Recycler Lambertons GW Foster Dec 2000.

New Lambertson Concepts

• Copper-Plated Steel to solve vacuum problems– (Suggested by Helen Edwards)

• Vacuum Shell: either– Brazed Connections to Stainless– Thin Stainless Skin on Insert

• Separates Vacuum & Septum design from Structure & Magnetics.

Page 10: Concepts for New Recycler Lambertons GW Foster Dec 2000.

Copper Plated Steel

Field Free Region

BendRegion

Stainless Vacuum Bridge

BrazeJoints

New LambertsonSeptum And Vacuum Pipe

Page 11: Concepts for New Recycler Lambertons GW Foster Dec 2000.

Welded Stainless Skin Option

Page 12: Concepts for New Recycler Lambertons GW Foster Dec 2000.

Vacuum Flange at Ends(Brazed or Welded)

Page 13: Concepts for New Recycler Lambertons GW Foster Dec 2000.

Pole Tip For Permanent Magnet

Page 14: Concepts for New Recycler Lambertons GW Foster Dec 2000.

Machined Steel Base Plate for Lambertson

Page 15: Concepts for New Recycler Lambertons GW Foster Dec 2000.

Permanent Magnet Ferrite(3 Layers for B~0.3T)

Page 16: Concepts for New Recycler Lambertons GW Foster Dec 2000.

Steel Cover Plates

Page 17: Concepts for New Recycler Lambertons GW Foster Dec 2000.

New Recycler Lambertson?