FOUNDATIONS FOR OFFSHORE WIND TURBINES

Concepción, Enero del 2008Felipe Villalobos

Universidad Católica de la Santísima Concepción

http://www.kentishflats.co.uk

Page 2: Concepción, Enero del 2008 Felipe Villalobos Universidad ...

Offshore wind energy in Europe

Arklow Bank

Blyth

North Hoyle

Barrow

Scroby Sands

Kentish Flats

Frederikshavn

Horns RevSamsø

Ems-EmdenIrene Vorrink

Lely

Nysted

MiddelgrundenYttre Stengrund

Utgrunden

http://www.offshorewindenergy.org

Page 3: Concepción, Enero del 2008 Felipe Villalobos Universidad ...

The foundation problem

http://www.kentishflats.co.uk

?

?

???

Environmental Forces:

Waves + Wind + Currents

Gravity

Page 4: Concepción, Enero del 2008 Felipe Villalobos Universidad ...

Gravity base and pile foundations

Gravity base foundation being floated out to TunoeKnob Photograph © 1996 by Flemming Hagensen

Limited by sea depth (< 10 m) and turbine size (< 3 MW)

Monopile foundation at Kentish FlatsGravity base foundations at Nysted

Page 5: Concepción, Enero del 2008 Felipe Villalobos Universidad ...

For larger turbines (> 4 MW) foundation sizes and time increase considerably

Ems Emden 4.5 MW turbine

Page 6: Concepción, Enero del 2008 Felipe Villalobos Universidad ...

Suction caissons

ROV pump(remote operated vehicles)

valve

3 m diameter suction caisson

12 m diameter suction caisson

Page 7: Concepción, Enero del 2008 Felipe Villalobos Universidad ...

Research programme

Theoretical analyses

Laboratory model tests

Field trials

100 m

30 m

4 MN

90 m6 MN

Trials and monitoring offshore

Page 8: Concepción, Enero del 2008 Felipe Villalobos Universidad ...

Experimental procedures

Page 9: Concepción, Enero del 2008 Felipe Villalobos Universidad ...

Installation results

0

20

40

60

80

100

120

140

0 500 1000 1500 2000Vertical loads, V' and V' + S (N)

Ski

rt pe

netra

tion,

h (m

m)

V' = 60 N

V'V' + S

by suction

by pushing

-The use of suction reduces the net vertical load required to install a caisson

-This is possible due to the hydraulic gradients created by the application of suction

Page 10: Concepción, Enero del 2008 Felipe Villalobos Universidad ...

Yield surface fromload-displacement response

Vo V

M/2R or H

Vt

M/2R or H

V2V1 V3

V3

Yield point

2R or u

V1

V2

w

V1V2

V3

L

y3y2y1

Page 11: Concepción, Enero del 2008 Felipe Villalobos Universidad ...

Final Comments- The foundation design is governed by the harsher

and cyclic nature of loading conditions offshore- Suction caisson foundations might become an

option, in particular for large wind turbines - Beneficial effect in the monotonic and cyclic

response of the caisson when the vertical load increases

- Results to be used in the construction of a hyperplasticity model

Page 12: Concepción, Enero del 2008 Felipe Villalobos Universidad ...

http://www.civil.ucsc.cl [email protected]