Con Kehely BA, BAI, MUBC Chartered Engineer, National Transport Authority Design Section Sutton 2...
-
Upload
loren-payne -
Category
Documents
-
view
225 -
download
3
Transcript of Con Kehely BA, BAI, MUBC Chartered Engineer, National Transport Authority Design Section Sutton 2...
![Page 1: Con Kehely BA, BAI, MUBC Chartered Engineer, National Transport Authority Design Section Sutton 2 Sandycove Cycle Route Interim Solution at Clontarf](https://reader035.fdocuments.in/reader035/viewer/2022062300/56649e605503460f94b5b834/html5/thumbnails/1.jpg)
Con Kehely BA, BAI, MUBC Chartered Engineer,
National Transport Authority Design Section
Sutton 2 Sandycove Cycle RouteInterim Solution at Clontarf / Dollymount
(Wooden Bridge to Causeway Road)
![Page 2: Con Kehely BA, BAI, MUBC Chartered Engineer, National Transport Authority Design Section Sutton 2 Sandycove Cycle Route Interim Solution at Clontarf](https://reader035.fdocuments.in/reader035/viewer/2022062300/56649e605503460f94b5b834/html5/thumbnails/2.jpg)
S2S:- WOODEN BRIDGE TO CAUSEWAY ROAD
![Page 3: Con Kehely BA, BAI, MUBC Chartered Engineer, National Transport Authority Design Section Sutton 2 Sandycove Cycle Route Interim Solution at Clontarf](https://reader035.fdocuments.in/reader035/viewer/2022062300/56649e605503460f94b5b834/html5/thumbnails/3.jpg)
Roads• Traffic• Condition
Sea Defences• Erosion• Flooding
Ecology• SPA• SCA• pNHA
S2S:- WOODEN BRIDGE TO CAUSEWAY ROAD
![Page 4: Con Kehely BA, BAI, MUBC Chartered Engineer, National Transport Authority Design Section Sutton 2 Sandycove Cycle Route Interim Solution at Clontarf](https://reader035.fdocuments.in/reader035/viewer/2022062300/56649e605503460f94b5b834/html5/thumbnails/4.jpg)
S2S:- WOODEN BRIDGE TO CAUSEWAY ROAD
![Page 5: Con Kehely BA, BAI, MUBC Chartered Engineer, National Transport Authority Design Section Sutton 2 Sandycove Cycle Route Interim Solution at Clontarf](https://reader035.fdocuments.in/reader035/viewer/2022062300/56649e605503460f94b5b834/html5/thumbnails/5.jpg)
S2S:- WOODEN BRIDGE TO CAUSEWAY ROAD
![Page 6: Con Kehely BA, BAI, MUBC Chartered Engineer, National Transport Authority Design Section Sutton 2 Sandycove Cycle Route Interim Solution at Clontarf](https://reader035.fdocuments.in/reader035/viewer/2022062300/56649e605503460f94b5b834/html5/thumbnails/6.jpg)
S2S:- WOODEN BRIDGE TO CAUSEWAY ROAD
![Page 7: Con Kehely BA, BAI, MUBC Chartered Engineer, National Transport Authority Design Section Sutton 2 Sandycove Cycle Route Interim Solution at Clontarf](https://reader035.fdocuments.in/reader035/viewer/2022062300/56649e605503460f94b5b834/html5/thumbnails/7.jpg)
![Page 8: Con Kehely BA, BAI, MUBC Chartered Engineer, National Transport Authority Design Section Sutton 2 Sandycove Cycle Route Interim Solution at Clontarf](https://reader035.fdocuments.in/reader035/viewer/2022062300/56649e605503460f94b5b834/html5/thumbnails/8.jpg)
S2S:- WOODEN BRIDGE TO CAUSEWAY ROAD
![Page 9: Con Kehely BA, BAI, MUBC Chartered Engineer, National Transport Authority Design Section Sutton 2 Sandycove Cycle Route Interim Solution at Clontarf](https://reader035.fdocuments.in/reader035/viewer/2022062300/56649e605503460f94b5b834/html5/thumbnails/9.jpg)
![Page 10: Con Kehely BA, BAI, MUBC Chartered Engineer, National Transport Authority Design Section Sutton 2 Sandycove Cycle Route Interim Solution at Clontarf](https://reader035.fdocuments.in/reader035/viewer/2022062300/56649e605503460f94b5b834/html5/thumbnails/10.jpg)
![Page 11: Con Kehely BA, BAI, MUBC Chartered Engineer, National Transport Authority Design Section Sutton 2 Sandycove Cycle Route Interim Solution at Clontarf](https://reader035.fdocuments.in/reader035/viewer/2022062300/56649e605503460f94b5b834/html5/thumbnails/11.jpg)
S2S:- WOODEN BRIDGE TO CAUSEWAY ROAD
NEXT STEPS
•Planning Application / Public Display
•Cost
•Construction mid 2013
![Page 12: Con Kehely BA, BAI, MUBC Chartered Engineer, National Transport Authority Design Section Sutton 2 Sandycove Cycle Route Interim Solution at Clontarf](https://reader035.fdocuments.in/reader035/viewer/2022062300/56649e605503460f94b5b834/html5/thumbnails/12.jpg)
CONCLUSION
• Interim Solution
• Deliverable in Short Term
• Cycling
• Walking
• Additional flood defence
• Coastal erosion
• Trunk Water Main
QUESTIONS ?