COMPREHENSIVE SOLUTIONS INSTALLATIONS & RENEWABLE … · 1. COMPANY BACKGROUND INFORMATION WHO WE...
Transcript of COMPREHENSIVE SOLUTIONS INSTALLATIONS & RENEWABLE … · 1. COMPANY BACKGROUND INFORMATION WHO WE...
COMPREHENSIVE SOLUTIONS –
INSTALLATIONS & RENEWABLE ENERGIES GENERAL CAPATILITIES PRESENTATION
INDEX
1. COMPANY BACKGROUND INFORMATION
Who we are
Corporate Philosophy
General Information
2. CLIENTS & SECTORS
3. GEOGRAPHICAL PRESENCE
4. SERVICE OFFERING
List of Services
Past Experience
5. QUALITY MANAGEMENT
COMPANY BACKGROUND INFORMATION
1. COMPANY BACKGROUND INFORMATION
WHO WE ARE:
UCALSA INSTALACIONES Y RENOVABLES S.L. (U-I.R.), was born with the aim of responding the growing demand in the energy and renewable energies sector for integral solutions, both nationally and internationally, offering a specialized quality service for our customers.
Integrated within the UCALSA GROUP ,complementing the current activities, we have created a new Company that unites the potential of the UCALSA group with the experience of the team led by Ambrosio Sanchez Romero former General Manager of CONDUSAV, with a recognized capacity in the construction of renewable energy turnkey projects. Including Temporary Installations, electro-mechanical assembly, prefabrication of pipes, assembly of equipment and special welding.
In addition to the financial support of the group, we have a highly qualified and professional technical team, with solid experience in turnkey projects for the construction of temporary facilities, their integral management, the assembly and prefabrication of pipelines, structures and special welding.
1. COMPANY BACKGROUND INFORMATION
CORPORATE PHILOSOPHY :
U-Instalaciones y Renovables mission is to provide an integrated facility management service that enables the client to concentrate on core operational
business.
THE CLIENT: Extensive knowledge of the client in order to adapt to their specific needs, taking into account their cultural conditioning, specific activity in the area, etc.
THE PLACE: Accustomed on implementing projects on a short-term basis and in different places, evaluating the geographic, political, security and logistical factors of the
place to adapt quickly to them, taking into account aspects such as training the local labour force.
THE SERVICE: Vast experience on the ground that allows us to create specific projects tailored to the needs of the client, providing the human resources and essential
materials to ensure the ideal supply.
THE TIME: We attach great importance to compliance of the project execution program, meeting the intermediate milestones and the project’s final dossier.
Our/Your
Committed to sustainable development, and that our activity
benefits the economic, social and environmental
environments in which we are present.
23 years serving the most demanding users in the most
delicate environments.
In all sectors, especially those that are very sensitive to quality such as
Industry & Energy, Renewables and Industrial Refrigeration.
Multiple Services and Sectors
Turnkey construction & Comprehensive services for renewable energy
projects including but not limited to:
Temporary Facilities
Electro-mechanical assemblies
Prefabrication of pipes
Assembly of Equipment and special welding.
Equality Plan
U-Instalaciones & Renovables also handles the maintenance of the
executed projects, ensuring their performance.
U-Instalaciones & Renovables U-Facilities &
Renewable meets the highest standards of quality,
safety and health laws demanded by the European
Union, and local laws of the countries where we
operate. In most cases, our internal Quality / HSE
controls goes beyond those required by law.
Currently within UCALSA GROUP we are certified in
the main accreditation systems
SECTORS QUALITY
GROUP
110 millon € turnover
Creemos en nuestra gente
1.500 employees
Mexico, Haiti, Guadeloupe, Perú, Bolivia, Norway, Spain, Bosnia, Kosovo, Morocco, Algeria, Chad, Darfur,
Equatorial Guinea, Gabon, D.R. Congo, Angola, South Africa, Cyprus, Lebanon, Iraq, Kurdistan, Kuwait,
Afghanistan, Pakistan
25 our global footprint
Project Managers, Engineers, Technical Engineers, Site Managers, Supervisors, Team Leaders, Approved
Welders, Pipe Fitters, Assistants, Quality & HSE Technicians
Project Management
Exclusive Subcontractor/Contractor
225 Clients
More than 20 nationalities make Ucalsa Group a
benchmark in the sector.
SECTORS & CLIENTS
INDUSTRY & ENERGY (Incl. “Onshore” & “Offshore” Operations)
Steel Plants, Refineries, Power Generation Plants, Gas Pipelines, Gas
Compression Stations, Petrochemical Plants, etc.
RENEWABLE ENERGIES
Equipment Assembly, Solar Photovoltaic Power Plants, Thermosolar plants (Solar
Field and Power Island), Wind Parks including installations.
INDUSTRIAL REFRIGERATION
Exclusive Area for Food Industry (industrial cooling), Assembly of Auxiliary
Lines.
REPSOL PRODIEL
CEPSA TSK
DRAGADOS OFFSHORE SENER
ACCIONA DURO FELGUERA
TECNICAS
REUNIDAS MAN
GRUPO ALONSO
GALLARDO ABENER & ABEINSA
Among the most important are :
GEOGRAPHICAL PRESENCE
PAST PROJECTS
1 Mexico 13 Darfur
2 Haiti 14 Equatorial Guinea
3 Guadeloupe 15 Gabon
4 Perú 16 D.R. Congo
5 Bolivia 17 Angola
6 Norway 18 South Africa
7 Spain 19 Cyprus
8 Bosnia 20 Lebanon
9 Kosovo 21 Iraq
10 Morocco 22 Kurdistan
11 Algeria 23 Kuwait
12 Chad 24 Afghanistan
25 Pakistan
SERVICES
1. SERVICES
CORE SERVICES:
CONSTRUCTION OF TEMPORARY FACILITIES
FACILITY MAINTENANCE
ASSEMBLY AND PREFABRICATION OF PIPES & STRUCTURES, MODULES
ASSEMBLY OF EQUIPMENT AND SPECIAL WELDING
CONSTRUCTION OF TEMPORARY FACILITIES:
DESIGN, ENGINEERING AND LEGALIZATION OF PROJECTS.
CIVIL WORKS
Earthworks
Construction
Metallic structures, Fireproofing
Photovoltaic plants
Minor construction
Paving/Asphalting
Control and Safety Systems
INSTALLATIONS
Electrical installations: medium and low voltage electricity installations, lighting and power circuits, aerial and underground connection transformation centers/substations/generators).
Mechanical installations: Air Conditioning and Heating, ventilation / air extraction systems, solar energy, plumbing / supply and sewage network / rainwater collection system, sewage treatment (WWTP, Septic Tank), Water Storage.
Fire fighting and protection systems
Telecommunications & CCTV
ASSEMBLY AND PREFABRICATION OF PIPES & STRUCTURES, MODULES:
DESIGN, ENGINEERING Y PREFABRICATION.
ASSEMBLY & WELDING OF PIPES FOR:
THERMOELECTRIC POWER PLANTS
OFFSHORE PLATFORMS
REFINERIES AND COMBINED CYCLES
RENEWABLE ENERGY
MINING SECTOR
STEEL PLANTS
INDUSTRIAL REFRIGERATION
MAINTENANCE OF INSTALLATIONS
ASSEMBLY OF EQUIPMENT AND SPECIAL WELDING FOR:
THERMOELECTRIC POWER PLANTS
OFFSHORE PLATFORMS
REFINERIES AND COMBINED CYCLES
RENEWABLE ENERGY
MINING SECTOR
STEEL PLANTS
INDUSTRIAL REFRIGERATION
MAINTENANCE OF INSTALLATIONS
ASSEMBLY OF EQUIPMENT AND SPECIAL WELDING:
2. PAST EXPERIENCE
PLATFORMS, TERMINALS, DREDGES …
REFINERIES AND COMBINED CYCLES
RENEWABLE ENERGY
MINING SECTOR
STEEL PLANTS
INDUSTRIAL REFRIGERATION
THERMOELECTRIC POWER PLANTS
TEMPORARY FACILITIES
PMRT TALARA PROJECT - PERU
SCOPE
• EPC Contract (Engineering, Procurement & Construction) for the Temporary Facilities for Modernization Project of the Talara Refinery (PMRT) based
on the construction system EMMEDUE:
• 4.000 m2 Warehouse and 16.000 m2 of Laydown Area
• 16.600 m2 camp with 420 beds including kitchen, dining room, VIP mess, canteen, mini-market, social center, laundry, multi-sport track, paddle tennis court, pool with bar area
• 800 m2 Modular Construction Site Offices (Flat Pack)
• 5.400 m2 Temporary offices including training rooms, canteen, medical ward, maintenance and communications
• Service include Catering, Maintenance, Laundry, Cleaning, Waste Removal, Pest Control, Supply of Water, Electrical Energy Supply, Environmental Control
CLIENT
Técnicas Reunidas de Talara, S.A.
DURATION AMOUNT
CONSTRUCTION : 18 Months Oct. 2014 – Apr. 2016 33.000.000 $
SERVICES
: 42 Months (Start Nov. 2015) 15.235.000 $
PMRT TALARA PROJECT - PERU
PMRT TALARA PROJECT - PERU
Warehouse
PMRT TALARA PROJECT - PERU
Temporary Offices– Técnicas Reunidas/Petroperu
PMRT TALARA PROJECT - PERU
Camp
During Construction
PMRT TALARA PROJECT - PERU
Camp (Interior)
PMRT TALARA PROJECT - PERU
Catering & Canteen
PMRT TALARA PROJECT - PERU
THERMOELECTRIC POWER PLANTS…
POINTE JARRY PROJECT
MONCOBRA, S.A
POINTE À PITRE – GUADELOUPE (FRANCE)
ASSEMBLY & WELDING OF PIPES, STEAM TRACER LINES
YEAR 2013-2014
THERMOELECTRIC POWER PLANTS
210.000 Hours aprox.
PLATFORMS, TERMINALS…
PROJECT JASMINE
DRAGADOS-OFFSHORE, S.A
PUERTO REAL - CADIZ (SPAIN)
ASSEMBLY & WELDING OF PIPES
YEAR 2012
PLATFORMS & TERMINALS
70.000 Hours aprox.
PROJECT SOUTH ARNE
DRAGADOS-OFFSHORE, S.A
PUERTO REAL - CADIZ (SPAIN)
ASSEMBLY & WELDING OF PIPES
YEAR 2012 30.000 Hours aprox.
PLATFORMS & TERMINALS
CAJÓN ADRIATIC TERMINAL GNL PROJECT
ACCIONA INFRAESTRUCTURAS
ALGECIRAS - CADIZ (SPAIN)
ASSEMBLY OF LINES & EQUIPMENT
YEAR 2007/2008 65.000 Hours aprox.
PLATFORMS & TERMINALS
REFINERIES AND COMBINED CYCLES…
PROJECT C-10
REPSOL
REPSOL REFINERY CARTAGENA (SPAIN)
UNITS GASCÓN 620, COQUER 652, RACK 6 & 9, and STEAM TRACER
PREFABRICATION, ASSEMBLY, WELDING OF PIPES AND SUPPORTS.
COMPLETED YEAR 2010/2011
370.000 Hours aprox.
REFINERIES AND COMBINED CYCLES
PROJECT ACPDM
CEPSA
REFINERY CEPSA LA RÁBIDA (SPAIN)
CRUDE UNIT // SULPHUR BLOCK UNIT & AMINES LPG4
ASSEMBLY, PIPE WELDING, SUPPORTS & EQUIPMENT.
TRACING FOR CRUDE OIL PLANTS, VACUUM AND GASCON.
YEAR 2008/2009
REFINERIES AND COMBINED CYCLES
380.000 Hours aprox.
FENOL III
CEPSA QUIMICA
REFINERY CEPSA LA RÁBIDA (SPAIN)
HYDROGEN PLANT, CUMENE Y OXIDATION.
PREFABRICATION , PIPE ASSEMBLY & ACCESSORIES
YEAR 2006/2007 220.000 Hours aprox.
REFINERIES AND COMBINED CYCLES
NEW PIPELINE FOR CRUDE OIL SUPPLY PROJECT
CEPSA
REFINERY CEPSA LA RÁBIDA (SPAIN)
CRUDE OIL PIPELINE
PREFABRICATION , ASSEMBLY, WELDING OF PIPES AND SUPPORTS
YEAR 2013 10.800 Hours aprox.
REFINERIES AND COMBINED CYCLES
STORAGE TERMINAL VOPAK PROJECT
OHL
ALGECIRAS- CADIZ (SPAIN)
PUMP ROOM
MANUFACTURING, ASSEMBLING, TESTING & REASSEMBLING OF PIPES.
YEAR 2012 35.000 Hours aprox.
REFINERIES AND COMBINED CYCLES
NAFTAS AROMAX REFINING PROJECT
CEPSA QUIMICA
REFINERY CEPSA LA RÁBIDA (SPAIN)
RACK 4 ELEVATIONS, FURNACE, TOWERS, STRUCTURES & EQUIPMENT.
ASSEMBLY AND PREFABRICATION OF PIPES
YEAR 2006
80.000 Hours aprox.
REFINERIES AND COMBINED CYCLES
RENEWABLE ENERGY…
PROJECT NOOR I
CONSORTIUM TSK-ACCIONA-SENER
OUARZAZATE - MORROCO
ASSEMBLY OF HEADERS
YEAR 2014-2015 90.000 Hours aprox.
RENEWABLE ENERGY
KHI SOLAR ONE PROJECT
ABEINSA
UPINGTON – SOUTH AFRICA
AEROCONDENSER ASSEMBLY
YEAR 2014
RENEWABLE ENERGY
30.000 Hours aprox.
KAXU SOLAR ONE PROJECT
ABEINSA
POFADDER – SOUTH AFRICA
SOLAR FIELD ASSEMBLY (HTF y HCE)
YEAR 2013-2014 230.000 Hours aprox.
RENEWABLE ENERGY
THERMOSOLAR PROJECT CASABLANCA
MONCOBRA
TALARRUBIAS- BADAJOZ (SPAIN)
SOLAR FIELD ASSEMBLY (BOP , HTF Y SALES)
YEAR 2012 115.000 Hours aprox.
RENEWABLE ENERGY
THERMOSOLAR PLANT - VALLESOL II PROJECT
COBRA - SENER
SAN JOSÉ DEL VALLE - CADIZ (SPAIN)
BOP - ASSEMBLY, WELDING OF PIPES AND SUPPORTS
YEAR 2011 38.000 Hours aprox.
RENEWABLE ENERGY
SOLAR FIELD MORON PROJECT
JV ACCIONA INFRAESTRUCTURA IDOM
MORÓN DE LA FRONTERA - SEVILLA (SPAIN)
SOLAR FIELD - PREFABRICATION , ASSEMBLY, WELDING OF PIPES AND SUPPORTS
YEAR 2011 80.000 Hours aprox.
RENEWABLE ENERGY
SOLAR FIELD OLIVENZA PROJECT
JV ACCIONA INFRAESTRUCTURA IDOM
OLIVENZA - BADAJOZ (SPAIN)
PREFABRICATION & ASSEMBLY OF PIPES
YEAR 2011 60.000 Hours aprox.
RENEWABLE ENERGY
PROJECT EXTRESOL III
COBRA-SENER
TORRE MIGUEL SESMERO - BADAJOZ (SPAIN)
BOP, HTF & SALES - PREFABRICATION , ASSEMBLY, WELDING OF PIPES AND SUPPORTS
YEAR 2011 140.000 Hours aprox.
RENEWABLE ENERGY
PROJECT SOLNOVA I, III, IV
ABENER
SANLÚCAR LA MAYOR - SEVILLA (SPAIN)
SOLNOVA I - BOP, EQUIPMENT INSTALLATION, PIPELINES, STRUCTURES & SPECIAL WELDING.
SOLNOVA III Y IV - PRESSURISATION & VENTING PIPES. PUMP ADJUSTMENT
YEAR 2008-2009-2010 150.000 Hours aprox.
RENEWABLE ENERGY
SOLAR FARM PROJECT ANDASOL I Y ANDASOL II
SULZER
ALDEIRE Y LA CALAHORRA- GRANADA (SPAIN)
ASSEMBLY OF PRESSURISATION & VENTING SYSTEM
YEAR 2010 115.000 Hours aprox.
RENEWABLE ENERGY
MINING SECTOR…
THICKENER ASSEMBLING PROJECT
MEFASA
MINAS DE AGUAS TEÑIDAS- CALAÑAS – HUELVA (SPAIN)
ASSEMBLY & WELDING OF THICKENER
YEAR 2010
MINING SECTOR
15.000 Hours aprox.
SLUDGE PLANT PROJECT
MATSA
MINAS DE AGUAS TEÑIDAS- CALAÑAS – HUELVA (SPAIN)
PREFABRICATION & ASSEMBLY OF SLUDGE PLANT
YEAR 2008-2009 110.000 Hours aprox.
MINING SECTOR
STEEL PLANTS…
STEEL PLANT EXTENSION BALBOA II PROJECT
GRUPO ALFONSO GALLARDO
JEREZ DE LOS CABALLEROS – BADAJOZ (SPAIN)
ASSEMBLY & WELDING FOR FURNACES & ROLLING MILL.
YEAR 2008-2009
STEEL PLANTS
140.000 Hours aprox.
STEEL PLANT BALBOA II PROJECT
DANIELI
JEREZ DE LOS CABALLEROS – BADAJOZ (SPAIN)
ASSEMBLY & WELDING AT FUME EXTRACTOR/FILTER, DUCTS, FURNACES, EQUIPMENTS,
YEAR 2007-2008 150.000 Hours aprox.
STEEL PLANTS
INDUSTRIAL REFRIGERATION …
INDUSTRIAL COOLING PROJECTS
EL POZO, FRESÓN DE PALOS, SÁNCHEZ ROMERO CARVAJAL, MCDONALD’S, DANONE
MURCIA, HUELVA, TENERIFE Y SEVILLA - (SPAIN)
MANUFACTURING & ASSEMBLY OF FREEZER TUNNELS & COOLING CHAMBERS.
FINALIZED YEAR 2006
INDUSTRIAL REFRIGERATION
QUALITY MANAGEMENT
Respect, ethics and confidentiality
Total quality as an instrument to achieve excellent results
The enrichment of our experience is translated into a continuous updating of the protocols of action by all the responsible parties involved in the realization of the Services.
Social Responsibility is not a desirable goal, but a firm commitment to society.
ISO 9001: 2008
Quality
Management
Systems
ISO 14001:2004
Environmental
management
systems
ISO 22000:2005 OHSAS 18001:2007
Occupational Health and
Safety Management Systems
SA 8000:2014 Social
responsability
GLOBAL COMPACT
NETWORK SPAIN
commitment to the 10
principles of the Global
Compact
We are currently certified in the main accreditation systems.
CONTACT
Ambrosio Sánchez Romero
General Manager
U - Instalaciones & Renovables
C/ Oquendo 23 – 4º
28006 Madrid
Tel: +34 91 781 3780
Cel: +34 600 440 510
Ángel Herraiz Rolania
Director of Business Development
U - Instalaciones & Renovables
C/ Oquendo 23 – 4º
28006 Madrid
Tel: +34 91 781 3780
Cel: +34 630 527 818