Comprehensive Plan
ENVISION CAMDEN COUNTYENVISION CAMDEN COUNTY
John ManuelEnvironmental Author
Monday, November 14, 2011Monday, November 14, 2011
![Page 2: Comprehensive Plan ENVISION CAMDEN COUNTY John Manuel Environmental Author Monday, November 14, 2011.](https://reader036.fdocuments.in/reader036/viewer/2022062422/56649ee15503460f94bf2663/html5/thumbnails/2.jpg)
Workshop OverviewWorkshop Overview
• Welcome and Introductions
• What We Tell You– Comprehensive Transportation Plan
– Comprehensive Plan
• What You Tell Us– Community Survey
– Keypad Polling Exercise
– Group Discussion Exercise
• Adjourn
![Page 3: Comprehensive Plan ENVISION CAMDEN COUNTY John Manuel Environmental Author Monday, November 14, 2011.](https://reader036.fdocuments.in/reader036/viewer/2022062422/56649ee15503460f94bf2663/html5/thumbnails/3.jpg)
Comprehensive Transportation Comprehensive Transportation PlanPlan
• Purpose:– Identify existing and future transportation
deficiencies
– Generate information decision-makers can use to guide future transportation decisions
• Primary Objectives– Improve Mobility and Safety
• Product– Comprehensive Transportation Plan
![Page 4: Comprehensive Plan ENVISION CAMDEN COUNTY John Manuel Environmental Author Monday, November 14, 2011.](https://reader036.fdocuments.in/reader036/viewer/2022062422/56649ee15503460f94bf2663/html5/thumbnails/4.jpg)
Comprehensive PlanComprehensive Plan• Road map for making future short and
long range policy decisions
• “Comprehensive” because it covers wide range of community issues (transportation, land use, economy, environment, health, community, design, infrastructure, etc.)
• Three part planning process:– Identifying Planning Influences and Opportunities– Developing a Community Vision – Constructing a Policy Framework and Implementation Plan
![Page 5: Comprehensive Plan ENVISION CAMDEN COUNTY John Manuel Environmental Author Monday, November 14, 2011.](https://reader036.fdocuments.in/reader036/viewer/2022062422/56649ee15503460f94bf2663/html5/thumbnails/5.jpg)
Comprehensive Plan Comprehensive Plan Project ScheduleProject Schedule
Camden County, NC Comprehensive Plan Project Schedule
Tasks July Aug. Sept. Oct. Nov. Dec. Jan. Feb. March April May JuneTask 1: Project Initiation and Community Assessment SC SCTask 2: Issue Identification and Needs Assessment PW BOC/SCTask 3: Development of Alternative Plans SCTask 4: Selection and Refinement of Plan BOC/SC/PWTask 5: Development of Recommended Plan BOC/SCTask 6: Project ReportingTask 7: Camden County Environmental Culture Document
BOC Meeting with Board of County CommissionersPW Public Workshop
Updated: August 11, 2011 SC Steering/Technical Committee Meeting
2011 2012Camden County, NC Comprehensive Plan Project Schedule
Tasks July Aug. Sept. Oct. Nov. Dec. Jan. Feb. March April May JuneTask 1: Project Initiation and Community Assessment SC SCTask 2: Issue Identification and Needs Assessment PW BOC/SCTask 3: Development of Alternative Plans SCTask 4: Selection and Refinement of Plan BOC/SC/PWTask 5: Development of Recommended Plan BOC/SCTask 6: Project ReportingTask 7: Camden County Environmental Culture Document
BOC Meeting with Board of County CommissionersPW Public Workshop
Updated: August 11, 2011 SC
![Page 6: Comprehensive Plan ENVISION CAMDEN COUNTY John Manuel Environmental Author Monday, November 14, 2011.](https://reader036.fdocuments.in/reader036/viewer/2022062422/56649ee15503460f94bf2663/html5/thumbnails/6.jpg)
Comprehensive Plan: Comprehensive Plan:
Community Planning Influences Community Planning Influences ReportReport
• Report sets out foundational information for plan
• Purpose to provide factual basis for development of policy framework
• Three parts to report:
– Part 1: Summary of Planning Initiatives
– Part 2: Summary of Existing Conditions
– Part 3: Summary of Key Planning Influences and Opportunities
![Page 7: Comprehensive Plan ENVISION CAMDEN COUNTY John Manuel Environmental Author Monday, November 14, 2011.](https://reader036.fdocuments.in/reader036/viewer/2022062422/56649ee15503460f94bf2663/html5/thumbnails/7.jpg)
Comprehensive Plan: Comprehensive Plan:
Part 1 – Summary of Planning Part 1 – Summary of Planning InitiativesInitiatives
• Solid Planning Foundation for Development of Comprehensive Plan
Land Use and Infrastructure•2005 Advanced Core CAMA Land Use Plan•Camden County Hazard Mitigation Plan•Long Range Water and Sewer Service Plan•CAMA Sea Level Rise Policy
Economic Development• Camden County 21st Century Community Strategic Plan•Camden County / US 17 Corridor Master Plan• Green Industrial Park Feasibility Study
Transportation Plans•Comprehensive Transportation Plan•Hampton Roads TPO Long Range Transportation Plan•US 17 Great Dismal Swamp Corridor Study
![Page 8: Comprehensive Plan ENVISION CAMDEN COUNTY John Manuel Environmental Author Monday, November 14, 2011.](https://reader036.fdocuments.in/reader036/viewer/2022062422/56649ee15503460f94bf2663/html5/thumbnails/8.jpg)
Comprehensive Plan: Comprehensive Plan:
Part 2 – Summary of Existing Part 2 – Summary of Existing ConditionsConditions
• Facts and Trends
• Broad array of community planning topics:
• Regional Context and Planning Area
• Population (historic and projected)
• Economy / Agriculture
• Natural Systems and Hazards
• Land Use and Development
• Transportation
• Stormwater
• Water / Wastewater
• Recreation
• Community Health
• Public Services
![Page 9: Comprehensive Plan ENVISION CAMDEN COUNTY John Manuel Environmental Author Monday, November 14, 2011.](https://reader036.fdocuments.in/reader036/viewer/2022062422/56649ee15503460f94bf2663/html5/thumbnails/9.jpg)
Comprehensive Plan: Comprehensive Plan:
Part 2 – Summary of Existing Part 2 – Summary of Existing ConditionsConditions
• Key County Attributes: – Location in the
Hampton Roads region
– Natural features / resources
– Affordable cost of living
–Well educated workforce
– Schools
![Page 10: Comprehensive Plan ENVISION CAMDEN COUNTY John Manuel Environmental Author Monday, November 14, 2011.](https://reader036.fdocuments.in/reader036/viewer/2022062422/56649ee15503460f94bf2663/html5/thumbnails/10.jpg)
Comprehensive Plan: Comprehensive Plan:
Part 2 – Summary of Existing Part 2 – Summary of Existing ConditionsConditions
• Population Trends: – The County had a very healthy rate of
growth over the last decade – 3.78% annual average growth
– Significant considering the County had a 3.5 year moratorium on development during this period
– Highest growing County in region
![Page 11: Comprehensive Plan ENVISION CAMDEN COUNTY John Manuel Environmental Author Monday, November 14, 2011.](https://reader036.fdocuments.in/reader036/viewer/2022062422/56649ee15503460f94bf2663/html5/thumbnails/11.jpg)
Comprehensive Plan: Comprehensive Plan:
Part 2 – Summary of Existing Part 2 – Summary of Existing ConditionsConditions
• Population Projections: – Projections vary by source
– Growth expected but at slower pace
Source 2010 Pop 2030 Pop ChangeAnnual
Average Growth Rate
State Demographer 9,980 11,600 1,620 0.75%
Woods & Poole 9,980 13,994 4,014 1.8%
![Page 12: Comprehensive Plan ENVISION CAMDEN COUNTY John Manuel Environmental Author Monday, November 14, 2011.](https://reader036.fdocuments.in/reader036/viewer/2022062422/56649ee15503460f94bf2663/html5/thumbnails/12.jpg)
Comprehensive Plan: Comprehensive Plan:
Part 2 – Summary of Existing Part 2 – Summary of Existing ConditionsConditions
• Housing– Housing stock in very good condition, but lacks
diversity• 99% of homes are single-family units (detached,
modular, manufactured)
– National and state trends show changing market demands for more diverse housing products
– Opportunity to create housing that reflects rural nature of community but provides new housing opportunities
![Page 13: Comprehensive Plan ENVISION CAMDEN COUNTY John Manuel Environmental Author Monday, November 14, 2011.](https://reader036.fdocuments.in/reader036/viewer/2022062422/56649ee15503460f94bf2663/html5/thumbnails/13.jpg)
Comprehensive Plan: Comprehensive Plan:
Part 2 – Summary of Existing Part 2 – Summary of Existing ConditionsConditions
• Economy– Few options for employment
– Highly skilled workforce
– Employment in the County represents approximately half of the jobs needed to employ the local workforce
– Opportunity to expand local employment and provide new jobs “close to home”
![Page 14: Comprehensive Plan ENVISION CAMDEN COUNTY John Manuel Environmental Author Monday, November 14, 2011.](https://reader036.fdocuments.in/reader036/viewer/2022062422/56649ee15503460f94bf2663/html5/thumbnails/14.jpg)
Comprehensive Plan: Comprehensive Plan:
Part 2 – Summary of Existing Part 2 – Summary of Existing ConditionsConditions
• Agriculture– Farming Operations Grew Between 2002-2007
![Page 15: Comprehensive Plan ENVISION CAMDEN COUNTY John Manuel Environmental Author Monday, November 14, 2011.](https://reader036.fdocuments.in/reader036/viewer/2022062422/56649ee15503460f94bf2663/html5/thumbnails/15.jpg)
Comprehensive Plan: Comprehensive Plan:
Part 2 – Summary of Existing Part 2 – Summary of Existing ConditionsConditions
• Workers Commute Out of County – 29.3% to Pasquotank Cty and 23.6 % to Hampton Roads area
![Page 16: Comprehensive Plan ENVISION CAMDEN COUNTY John Manuel Environmental Author Monday, November 14, 2011.](https://reader036.fdocuments.in/reader036/viewer/2022062422/56649ee15503460f94bf2663/html5/thumbnails/16.jpg)
Comprehensive Plan: Comprehensive Plan:
Part 2 – Summary of Existing Part 2 – Summary of Existing ConditionsConditions
• Natural Features are Abundant and Limit Development Potential
• 21 out of 24 soil types severely limit septic system use
• 60% of County in wetlands
• 67% of County in floodplain
• 26% of County is designated Significant Natural Heritage Areas
![Page 17: Comprehensive Plan ENVISION CAMDEN COUNTY John Manuel Environmental Author Monday, November 14, 2011.](https://reader036.fdocuments.in/reader036/viewer/2022062422/56649ee15503460f94bf2663/html5/thumbnails/17.jpg)
Comprehensive Plan: Comprehensive Plan:
Part 2 – Summary of Existing Part 2 – Summary of Existing ConditionsConditions
• Land Use: Majority is in a natural state, agricultural, or low-density single family development (1 acre +)
![Page 18: Comprehensive Plan ENVISION CAMDEN COUNTY John Manuel Environmental Author Monday, November 14, 2011.](https://reader036.fdocuments.in/reader036/viewer/2022062422/56649ee15503460f94bf2663/html5/thumbnails/18.jpg)
Comprehensive Plan: Comprehensive Plan:
Part 2 – Summary of Existing Part 2 – Summary of Existing ConditionsConditions
• Development Focus on Northern US 17 Corridor
![Page 19: Comprehensive Plan ENVISION CAMDEN COUNTY John Manuel Environmental Author Monday, November 14, 2011.](https://reader036.fdocuments.in/reader036/viewer/2022062422/56649ee15503460f94bf2663/html5/thumbnails/19.jpg)
Comprehensive Plan: Comprehensive Plan:
Part 2 – Summary of Existing Part 2 – Summary of Existing ConditionsConditions
• Transportation Infrastructure Adequate but Limited to Vehicular Travel
![Page 20: Comprehensive Plan ENVISION CAMDEN COUNTY John Manuel Environmental Author Monday, November 14, 2011.](https://reader036.fdocuments.in/reader036/viewer/2022062422/56649ee15503460f94bf2663/html5/thumbnails/20.jpg)
Comprehensive Plan: Comprehensive Plan:
Part 2 – Summary of Existing Part 2 – Summary of Existing ConditionsConditions
• Stormwater Management is a Critical Challenge
• Key considerations: Low topographic relief, high groundwater tables, and poor draining soils
• These features limit the ability to employ best management practices and low-impact development techniques
![Page 21: Comprehensive Plan ENVISION CAMDEN COUNTY John Manuel Environmental Author Monday, November 14, 2011.](https://reader036.fdocuments.in/reader036/viewer/2022062422/56649ee15503460f94bf2663/html5/thumbnails/21.jpg)
Comprehensive Plan: Comprehensive Plan:
Part 2 – Summary of Existing Part 2 – Summary of Existing ConditionsConditions
• Water/Wastewater
– Raw Water Supply Needed to Meet Needs of Future Populations
– Wastewater treatment is a critical challenge; may septic systems are inadequate and expected to fail
– Water and Sewer Master Plan identifies the need for three localized wastewater treatment systems to expand needed service - may be cost prohibitive
![Page 22: Comprehensive Plan ENVISION CAMDEN COUNTY John Manuel Environmental Author Monday, November 14, 2011.](https://reader036.fdocuments.in/reader036/viewer/2022062422/56649ee15503460f94bf2663/html5/thumbnails/22.jpg)
Comprehensive Plan: Comprehensive Plan:
Part 2 – Summary of Existing Part 2 – Summary of Existing ConditionsConditions
• Parks and Recreation– Recreational opportunities have increased
– Opportunities exist to expand further and provide a solid base for an eco-tourism industry sector in the County
• Hiking/biking trails
• Blueways and other water activities
• Hunting/fishing
• Sports and tournaments
• Environmental education
![Page 23: Comprehensive Plan ENVISION CAMDEN COUNTY John Manuel Environmental Author Monday, November 14, 2011.](https://reader036.fdocuments.in/reader036/viewer/2022062422/56649ee15503460f94bf2663/html5/thumbnails/23.jpg)
Comprehensive Plan: Comprehensive Plan:
Part 2 – Summary of Existing Part 2 – Summary of Existing ConditionsConditions
• Government Facilities– Needed New Public Facilities
• High school
• Administrative office space
• Expansion of reverse osmosis water treatment plant
• Sewer system expansion
• Parks and recreation
– Also need long-term strategy for solid waste/recycling
![Page 24: Comprehensive Plan ENVISION CAMDEN COUNTY John Manuel Environmental Author Monday, November 14, 2011.](https://reader036.fdocuments.in/reader036/viewer/2022062422/56649ee15503460f94bf2663/html5/thumbnails/24.jpg)
Comprehensive Plan: Comprehensive Plan:
Part 3 –Influences and Part 3 –Influences and OpportunitiesOpportunities
1. Camden Plantation
2. Camden Town Center
3. Eco Industrial Park
4. Hales Lake Wind Farm
5. South Mills Small Area Plan
6. Expansion of Dismal Swamp State Park and New Bike Trail Linking Park to Virginia
Are there others we should include?
![Page 25: Comprehensive Plan ENVISION CAMDEN COUNTY John Manuel Environmental Author Monday, November 14, 2011.](https://reader036.fdocuments.in/reader036/viewer/2022062422/56649ee15503460f94bf2663/html5/thumbnails/25.jpg)
Comprehensive Plan: Comprehensive Plan:
Preliminary Topics to Address in Preliminary Topics to Address in PlanPlan
1. Recreational transportation
2. Community facilities (county offices, storm shelter, schools, recreation)
3. Public appearance
4. Water / sewer
5. Economic development (waterfront, business development)
6. Educational programs
7. Curbing sprawl
8. EMS service
9. County representation on Planning Board
10. Community building
11. Public / traffic safety
12. Zoning conflicts
13. Adult living community
14. Agriculture
Are there others to add?
![Page 26: Comprehensive Plan ENVISION CAMDEN COUNTY John Manuel Environmental Author Monday, November 14, 2011.](https://reader036.fdocuments.in/reader036/viewer/2022062422/56649ee15503460f94bf2663/html5/thumbnails/26.jpg)
Comprehensive Plan: Comprehensive Plan:
Community SurveyCommunity Survey
• Prepared joint CTP and CP survey
• Available online or in hard copy
• Deadline for survey: December 31, 2011
![Page 27: Comprehensive Plan ENVISION CAMDEN COUNTY John Manuel Environmental Author Monday, November 14, 2011.](https://reader036.fdocuments.in/reader036/viewer/2022062422/56649ee15503460f94bf2663/html5/thumbnails/27.jpg)
Keypad Polling ExerciseKeypad Polling Exercise
• Interactive, real-time polling
• Anonymous, no pressure to provide true opinion
• Learn what others think
![Page 28: Comprehensive Plan ENVISION CAMDEN COUNTY John Manuel Environmental Author Monday, November 14, 2011.](https://reader036.fdocuments.in/reader036/viewer/2022062422/56649ee15503460f94bf2663/html5/thumbnails/28.jpg)
Warm Up Question: Warm Up Question: Which team do you prefer?Which team do you prefer?
1 2 3 4 5
0% 0% 0%0%0%
1. ECU2. UNC3. NC State4. Duke5. Other
![Page 29: Comprehensive Plan ENVISION CAMDEN COUNTY John Manuel Environmental Author Monday, November 14, 2011.](https://reader036.fdocuments.in/reader036/viewer/2022062422/56649ee15503460f94bf2663/html5/thumbnails/29.jpg)
1. Do you live in Camden 1. Do you live in Camden County?County?
1 2 3 4
0% 0%0%0%
1. Yes2. No, but I work
here3. No, but I own
property here4. No, I live and
work elsewhere and don’t own property here
![Page 30: Comprehensive Plan ENVISION CAMDEN COUNTY John Manuel Environmental Author Monday, November 14, 2011.](https://reader036.fdocuments.in/reader036/viewer/2022062422/56649ee15503460f94bf2663/html5/thumbnails/30.jpg)
2. If you live in Camden 2. If you live in Camden County, how long have you County, how long have you
lived here?lived here?
1 2 3 4 5 6 7
0% 0% 0% 0%0%0%0%
1. 0-4 years2. 5-9 years3. 10-19 years4. 20-29 years5. 30-39 years6. 40-49 years7. 50+ years
![Page 31: Comprehensive Plan ENVISION CAMDEN COUNTY John Manuel Environmental Author Monday, November 14, 2011.](https://reader036.fdocuments.in/reader036/viewer/2022062422/56649ee15503460f94bf2663/html5/thumbnails/31.jpg)
3. For those that work outside 3. For those that work outside the county, what is your the county, what is your
profession?profession?
1 2 3 4 5 6 7 8 9 10
0% 0% 0% 0% 0%0%0%0%0%0%
1. Sales2. Manufacturing3. Military4. Government /Education5. Medical6. Real estate
development / Construction
7. Technology / Professional Services
8. Hospitality9. Agriculture10. Other
![Page 32: Comprehensive Plan ENVISION CAMDEN COUNTY John Manuel Environmental Author Monday, November 14, 2011.](https://reader036.fdocuments.in/reader036/viewer/2022062422/56649ee15503460f94bf2663/html5/thumbnails/32.jpg)
4. What do you like most 4. What do you like most about Camden County?about Camden County?
1 2 3 4 5 6 7 8
0% 0% 0% 0%0%0%0%0%
1. Rural setting and low density development
2. Small town environment and slower pace of life
3. Natural features – rivers and Dismal Swamp
4. Access to NC coast5. Access to Hampton Roads
area6. Sense of Community7. Affordable Cost of Living8. Other
![Page 33: Comprehensive Plan ENVISION CAMDEN COUNTY John Manuel Environmental Author Monday, November 14, 2011.](https://reader036.fdocuments.in/reader036/viewer/2022062422/56649ee15503460f94bf2663/html5/thumbnails/33.jpg)
5. What do you like second 5. What do you like second most about Camden County?most about Camden County?
1 2 3 4 5 6 7 8
0% 0% 0% 0%0%0%0%0%
1. Rural setting and low density development
2. Small town environment and slower pace of life
3. Natural features – rivers and Dismal Swamp
4. Access to NC coast
5. Access to Hampton Roads area
6. Sense of Community
7. Affordable Cost of Living
8. Other
![Page 34: Comprehensive Plan ENVISION CAMDEN COUNTY John Manuel Environmental Author Monday, November 14, 2011.](https://reader036.fdocuments.in/reader036/viewer/2022062422/56649ee15503460f94bf2663/html5/thumbnails/34.jpg)
6. What do you like least about 6. What do you like least about Camden County?Camden County?
1 2 3 4 5 6
0% 0% 0%0%0%0%
1. Lack of employment opportunities
2. Lack of commercial establishments
3. Lack of housing choices
4. Few places to walk/bike
5. Few places to have community gatherings
6. Other
![Page 35: Comprehensive Plan ENVISION CAMDEN COUNTY John Manuel Environmental Author Monday, November 14, 2011.](https://reader036.fdocuments.in/reader036/viewer/2022062422/56649ee15503460f94bf2663/html5/thumbnails/35.jpg)
7. Which phrase best 7. Which phrase best describes Camden County describes Camden County
today?today?
1 2 3 4 5 6 7
0% 0% 0% 0%0%0%0%
1. Tranquil – A place for peaceful living
2. Bedroom community – Mostly serve people working elsewhere
3. Full service – Provides everything you need
4. Fragmented – It’s a fragmented collection of developments
5. My hometown – It’s a great place to establish roots, to raise a family and grow old
6. Not home – It’s a great place to live for a while, but it’s not “home”
7. Other
![Page 36: Comprehensive Plan ENVISION CAMDEN COUNTY John Manuel Environmental Author Monday, November 14, 2011.](https://reader036.fdocuments.in/reader036/viewer/2022062422/56649ee15503460f94bf2663/html5/thumbnails/36.jpg)
8. Which phrase best describes 8. Which phrase best describes your hope for Camden County in your hope for Camden County in
the future?the future?
1 2 3 4 5 6 7
0% 0% 0% 0%0%0%0%
1. Tranquil – A place for peaceful living
2. Bedroom community – Mostly serve people working elsewhere
3. Full service – Provides everything you need
4. Fragmented – It’s a fragmented collection of developments
5. My hometown – It’s a great place to establish roots, to raise a family and grow old
6. Not home – It’s a great place to live for a while, but it’s not “home”
7. Other
![Page 37: Comprehensive Plan ENVISION CAMDEN COUNTY John Manuel Environmental Author Monday, November 14, 2011.](https://reader036.fdocuments.in/reader036/viewer/2022062422/56649ee15503460f94bf2663/html5/thumbnails/37.jpg)
9. Future growth in Camden 9. Future growth in Camden County should….County should….
1 2 3 4 5
0% 0% 0%0%0%
1. Be targeted (geographically) to minimize negative impacts on the natural environment
2. Be driven by the free market
3. Be managed to most efficiently use existing infrastructure
4. Be targeted through development of new infrastructure
5. Other
![Page 38: Comprehensive Plan ENVISION CAMDEN COUNTY John Manuel Environmental Author Monday, November 14, 2011.](https://reader036.fdocuments.in/reader036/viewer/2022062422/56649ee15503460f94bf2663/html5/thumbnails/38.jpg)
10. Camden County should grow 10. Camden County should grow in the following manner…in the following manner…
1 2 3
0% 0%0%
1. Continue Current Trend: Expansion via dispersed, single-use developments
2. Become More Compact: Higher intensity, more efficient, mixed-use developments in targeted locations
3. Don’t know/no opinion
![Page 39: Comprehensive Plan ENVISION CAMDEN COUNTY John Manuel Environmental Author Monday, November 14, 2011.](https://reader036.fdocuments.in/reader036/viewer/2022062422/56649ee15503460f94bf2663/html5/thumbnails/39.jpg)
11. How strongly do you support the following 11. How strongly do you support the following statement? “In considering new development, statement? “In considering new development, quality and appearance are more important than the quality and appearance are more important than the
number of units or how intensely they number of units or how intensely they are organized.” are organized.”
1 2 3 4 5 6
0% 0% 0%0%0%0%
1. Strongly agree2. Agree3. Neutral4. Disagree5. Strongly disagree6. Don’t know / no
opinion
![Page 40: Comprehensive Plan ENVISION CAMDEN COUNTY John Manuel Environmental Author Monday, November 14, 2011.](https://reader036.fdocuments.in/reader036/viewer/2022062422/56649ee15503460f94bf2663/html5/thumbnails/40.jpg)
12. If Camden County offered a 12. If Camden County offered a job for your skill set, would you job for your skill set, would you
work here?work here?
1 2 3 4 5 6
0% 0% 0%0%0%0%
1. Strongly agree2. Agree3. Neutral4. Disagree5. Strongly disagree6. Don’t know / no
opinions
![Page 41: Comprehensive Plan ENVISION CAMDEN COUNTY John Manuel Environmental Author Monday, November 14, 2011.](https://reader036.fdocuments.in/reader036/viewer/2022062422/56649ee15503460f94bf2663/html5/thumbnails/41.jpg)
Group Discussion ExerciseGroup Discussion Exercise
• Discuss 6 questions – 4 of which have mapping elements
• Facilitator and scribe for each table
• [Insert color coding]
![Page 42: Comprehensive Plan ENVISION CAMDEN COUNTY John Manuel Environmental Author Monday, November 14, 2011.](https://reader036.fdocuments.in/reader036/viewer/2022062422/56649ee15503460f94bf2663/html5/thumbnails/42.jpg)
Thanks for your Thanks for your participation!participation!
• Visit all stations and provide input• Fill in comment form and leave with
planners• Survey online or at County Planning
Department• Information on planning efforts and