COMPLNT. 2010-11

126
Complaint summary for the month of July, 2010 1 Complaint a) Summary of complaints ( In Nos. ) Region (A) 28 31 31 28 (B) 28 10 10 28 b) Details of Jis disposed during the month ( In Nos.) Accepted 1 2 0 1 0 0 5 0 NW/10-11/09 NE/10-11/04 c) Break-up of complaints ( In Nos.) NDT D S /V W E C P N M L 2 1 0 0 0 1 0 0 0 d) Sumary of complaints ( In Nos. ): ( Other Regions) S. No. Region a) Eastern 9 4 3 10 b) Western 8 4 5 7 c) Southern 0 1 0 1 Total: 17 9 8 18 2 Quality of Inspection S. No. Description Nos. 1 Cases where IE has issued rejection memo. 2 Call cancellation issued by IE 3 Reponse time in attending call 4 Up to 7 days 5 Beyond 7 days Opening Balance Received during the month Disposed during the month Closing balance All complaints Complaints requiring Upheld ( with Case No.) Sorting ( With case No.) Rectification ( with case No.) Price Reduction ( with Lifted before JI Not on RITES A/c Transit damaged NS/09-10/37 NN/10-11/23 Dimension al variation Surface defects Welding defects Electrical defects Chemical defects Physical defects Micro & Macro structure Load/ Performan ce test Opening Balance Received during the month Disposed during the month Closing balance % of total

Transcript of COMPLNT. 2010-11

Page 1: COMPLNT. 2010-11

Complaint summary for the month of July, 2010

1 Complainta) Summary of complaints ( In Nos. )

Region

(A) 28 31 31 28

(B) 28 10 10 28

b) Details of Jis disposed during the month ( In Nos.)

Accepted

1 2 0 1 0 0 5 0 0 NW/10-11/09 NE/10-11/04

c) Break-up of complaints ( In Nos.)

NDT

D S /V W E C P N M L O 2 1 0 0 0 1 0 0 0 0

d) Sumary of complaints ( In Nos. ): ( Other Regions)

S. No. Region

a) Eastern 9 4 3 10b) Western 8 4 5 7c) Southern 0 1 0 1

Total: 17 9 8 18

2 Quality of Inspection

S. No. Description Nos. % of total

1 Cases where IE has issued rejection memo.2 Call cancellation issued by IE3 Reponse time in attending call4 Up to 7 days5 Beyond 7 days

Opening Balance

Received during the month

Disposed during the month

Closing balance

All complaintsComplaints requiring JI

Upheld ( with Case No.)

Sorting ( With case No.)

Rectification ( with case No.)

Price Reduction ( with case No.)

Lifted before JI

Not on RITES A/c

Transit damaged

Unstamped

NS/09-10/37 NN/10-11/23

Dimensional variation

Surface defects

Welding defects

Electrical defects

Chemical defects

Physical defects

Micro & Macro structure

Load/ Performance test

Other defects

Opening Balance

Received during the month

Disposed during the month

Closing balance

Page 2: COMPLNT. 2010-11

1 Serial No

2 Date of complaint

3 Detail of consignee

4 P.O. No. & Date

5 Inspecting Region

6 Name of Inspecting Engineer

7 Inspection Certificate No. & Date

8 Book No. Set No.

9 Name of Contractor/Firm

10 Description of material

11 Quantity passed

12 Quantity rejected

13 Value of Rejected material

14 Reason of Rejection

15 Date of Inspection

16 Conclusion of JI

17 Remarks

Page 3: COMPLNT. 2010-11

Complaint cases of Shri Rajesh Kumar Sood for the year 2008-09

UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF IC

115 NN/08-09/115 20439 11.01.08 RCF C&W KXH 200 Nos. 200 Nos. 21.10.08 22.10.08 25.08.08 D Upheld 06.04.09

60 NS/08-09/60 04793 07.12.07 SR CW MAS 205 Nos. 205 Nos. D Accepted

18 NS/08-09/71 42015 03.12.08 SR CSD MAS 77 Nos. 77 Nos. 14.47 23.03.09 Accepted

S. No.

CONSI-GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

CLASSIFICATION

DATE OF MINOR PENALTY CHARGE SHEET

Premier Polyfilm, Ghaziabad

PVC Flooring Roll

JP Srivastava

Tear strength found 31.5 & 42.5 against 40 & 45N/MM

Joint inspection held on 22.10.08. Sample under testing. As per lab test report, material failed in testing.

Premier Polyfilm, Ghaziabad

Flexible Poly Vinyl Chloride PVC

JP Srivastava

23.01.09 23.03.09

Weight is 3099 grams per aquar metre as against 2900 grams max. specified in S. No. 2 of table. of RDSO specification.

Joint inspection held on 23.01.09. Material accepted during joint inspection.

23.01.09 Mar'09

22.12.07 332/16

Premier Polyfilm, Ghaziabad

Flexible Poly Vinyl Chloride PVC

JP Srivastava

Supply is in unfinished condition with loose threads projecting on both the edges of the curtain cloth as against finished fabric required in specified in para of RDSO specification C-9911 (Rev.3)

Joint inspection held on 25.03.09. Material accepted during Joint inspection.

25.03.09 Apr'09

08.01.09 613/018

Page 4: COMPLNT. 2010-11

Complaint cases of the year 2009-10 Cumulative Statement

UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF IC CLASSIFICATION

1 NN/09-10/01 03226 20.08.08 NR DSL SSB LS Cheema 3 Nos. 3 Nos. 0.95 01.04.09 11.05.09 Nov-09 V

2 NN/09-10/02 03310 27.09.07 NR DSL TKD LS Cheema 35 Nos. 35 Nos. 01.04.09 14.05.09 Feb-09 V Accepted

3 NN/09-10/03 10324 01.12.08 RCF C&W KXH 7000 Nos. 7000 Nos. 3.51 01.04.09 Feb-09

4 NN/09-10/04 Mukand Udyog, Delhi 03040 13.08.08 NR GSD SSB GS Chawla 52000 Mtrs. 3.12 01.04.09 11.05.09 Dec-08 E

5 NN/09-10/05 54438 04.06.08 DMW DSL PTA PK Bagga 9.37 01.04.09 14.05.09 Feb-08 P Accepted

6 NN/09-10/06 PD Steels, Mohali 54400 02.05.08 DMW DSL PTA 18 Nos. 01.04.09 16.05.09 Nov-08 D Rectification

7 NN/09-10/07 70425 23.12.08 RCF C&W KXH RK Jain 1365 Nos. 1365 Nos. 1.41 01.04.09 Feb-09 Accepted

COM NO.

CONSI-GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

ACTION TAKEN

Hindustan Radiators & Exchanger, Jodhpur

Hydraulic Oil Cooler Assembly

Fins are badly damaged which effects the system of oil. Strengthening plates fins are made of steel against the requirement of brass as per drawing.

Joint inspection held on 11.05.09. Fins of hydraulic oil cooler were found damaged. It is a case of transit damage.

Transit damage

National Engineering Industries, Jaipur

Rubber Spring for Roller Bearing

Facsimile stamps not talley with the manufacturers

Joint inspection held on 14.05.09. Material accepted during joint inspection.

Panson Fasteners, Jallandhar

Hex Head Bolts for Axle Box arrangement

Deepak Kumar

Elongation observed 19.2% against 23% Min. Threading M20 not satisfactory in 2 samples. IA is given for identification PF 4-6 provided in 5 samples but no identification in 3 samples.

Joint inspection was fixed for 17.06.09. Firm has lifted the material before joint inspection.

No JI June'09

Lifted before JI

Cord Flexible Twin Core

52000 Mtrs.

Sample fails to meet the requirements of IS specification. In respect of DC high volt. ( Water immersion test)

Joint inspection held on 11.05.09. Material failed in type test which is not an acceptance test. Hence rejection not on RITES A/c.

Not on RITES A/c

Kabra Hand Made Paper Industries, Delhi

Shirt and Trouser suit

279 Nos. 525 Nos. 1227 Nos.

279 Nos. 525 Nos. 1227 Nos.

The quality of the cloth is not as per PO i.e D-7023 ES of JCT Mill ( Test report of JCT Mill, Phagwara )

Joint inspection held on 14.05.09. During JI, sample sent for testing by consignee has passed in testing.

Armature Core for TM

Bipin Sharma

12 Nos. 7 Nos.

28.78

16.78

All the 18 Nos. Armature assembly have over size pinion seal size. 7 Nos. shafts are found variation in one or other dimension. 3 Nos. armature core have more corelosses ( quantum not fiven by DMW).

Joint inspection held on 16.05.09. During JI, approved pinion for checking of the area under question was not available at DMW. JI was conducted with not approved pinion and material was rejected. But this is a case of rectification. Now, DMW has approved a gauge to check the tapper area which was earlier not available. Fresh two lots have been accepted by DMW.

Kohinoor Rubber Industries, Faridabad

Water Hose 50mm

In lining % of elongation -108% against 25%

Joint inspection held on 05.05.09. During JI, samaple sent to third lab for testing. As per lab test report, material found acceptable.

05.05.09 Aug'09

Page 5: COMPLNT. 2010-11

Complaint cases of the year 2009-10 Cumulative Statement

UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF IC CLASSIFICATIONCOM NO.

CONSI-GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

ACTION TAKEN

8 NN/09-10/08 40069 02.01.09 RCF C&W KXH 552 Nos. 552 Nos. 32.29 01.04.09 Mar-09 Accepted

9 NN/09-10/09 50582 07.02.08 RCF C&W KXH 1400 Nos. 1400 Nos. 0.54 01.04.09 ROZCP not applied No JI Mar-09 V Accepted

10 NN/09-10/10 20408 03.12.08 RCF C&W KXH RK Chhabra 20 Nos. 20 Nos. 0.55 01.04.09 Feb-09

1 NN/09-10/11 Super Steels, Mohali 10417 29.12.08 RCF C&W KXH PP Gupta 50 Nos. 50 Nos. 0.92 01.04.09 Chemical composition Jan-09

12 NN/09-10/12 20472 20.11.07 RCF C&W KXH 175 Nos. 59 Nos. 1.25 15.04.09 06.05.09 Mar-09 P Rectification

13 NN/09-10/13 04403 06.10.08 NR WS JUDW KD Sharma 09.04.09 30.07.09 May-09 D Upheld

2 NN/09-10/14 04525 07.12.07 Bush `S' NR WS JUDW PP Gupta 2650 Nos. 2650 Nos. 0.22 13.04.09 12.05.09 Mar-09 C Accepted

15 NN/09-10/15 20065 20.05.08 RCF C&W KXH RK Shukla 11 Nos. 7 Nos. 4.59 16.04.09 17.06.09 Mar-09 V

16 NN/09-10/16 50563 13.01.09 RCF C&W KXH RK Chhabra 50 Nos. 50 Nos. 0.82 20.04.09 Mar-09 C

3 NN/09-10/17 04527 07.12.07 Bush `U' NR WS JUDW PP Gupta 2200 Nos. 2200 Nos. 0.22 13.04.09 12.05.09 Mar-09 C Accepted

Jyoti Divya Fabrication, Ghaziabad

Seamless Pipe in length of 6000mm

Pankaj Sood

Rejected due to one pipe found welded out of 5 pipes ( Samples) against seamless.

Joint inspection held on 05.05.09. During JI, sample was sent to third party lab for testing has passed.

05.05.09 Aug'09

Panaroma Industries, Jallandhar

Web for Chair Angle

Deepak Kumar

Joint inspection was fixed for 06.05.09. Rejection withdrawn vide R/Note dated 23.04.09.

Batra Coach Builders, Ambala City

Chair angle set for SLRD Coaches

Mass of round tube found 0.57kg/m against 0.839+/-10% Min. Spec protection procedure applied but poor coverage observed. Pipe outer dia found 15-88-15-92 against 16.7-17.5.

Joint inspection was fixed for 06.05.09. Firm has lifted the rejected material before joint inspection.

No JI May'09

C & D

Lifted before JI

Brake Beam for BMBC Coaches

Joint inspection fixed on 17.06.09. Firm has lifted the rejected material before joint inspection.

No JI June'09

Lifted before JI

Mohan Tech, Kapurthala

Emergency Openable Window

Nagesh Yadav

Rejected due to rubber profile found deformed and defective

Joint inspection was held on 06.05.09. Firm has rectified the material. Material accepted after rectification.

Relaible Safety Glass, Noida

Sealed window glass unit

640 Nos. 350 Nos.

640 Nos. 350 Nos.

Dimensional variation i.e thickness required 25.5mm but thickness found 22.5mm to 022.8mm

Joint inspection held on 30.07.09. During JI, 80 Nos. samples drawn randomly from both the lots and thickness found less than specified. Hence entire lot of 990 Nos. stands rejected.

Harsh Industries, Mohali

Material failed in lab test I.e less % of carbon

Joint inspection held on 12.05.09. Sample sent to outside lab by consignee has passed.

Gambhir Sons, Gurgaon

Chair Angle and partition frame

Crack observed in 45x45 sq tube and 20x20 sq. tube. Weight of round tube 10mm bore found 0.725 kg/mtr against 0.755 to 0.923 kg/mtr

Joint inspection held on 17.06.09. During JI, RITES holograms were found only on 50% of the supply.

Not on RITES A/c

Plasto Power Engineers, Sangrur

Brake Lever Bearing

Si observed 0.02, 0.037, 0.037% against 0.03% Min.

Joint inspection was fixed for 12.05.09. Firm has lifted the material before joint inspection.

No JI May'09

Lifted before JI

Harsh Industries, Mohali

Material failed in lab test I.e less % of carbon

Joint inspection held on 12.05.09. Sample sent to outside lab by consignee has passed.

Page 6: COMPLNT. 2010-11

Complaint cases of the year 2009-10 Cumulative Statement

UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF IC CLASSIFICATIONCOM NO.

CONSI-GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

ACTION TAKEN

18 NN/09-10/18 03994 15.09.08 NR GSD AMV RK Saxena 3600 Ltrs. 3600 Ltrs. 3.24 22.04.09 Dec-08 Accepted

19 NN/09-10/19 32969 15.09.08 NER DSL GD 8333 Mtrs. 8333 Mtrs 1.16 23.04.09 16.05.09 Dec-08 V

20 NN/09-10/20 04175 24.09.08 NR GSD AMV RK Saxena 2880 Ltrs. 2880 Ltrs. 2.78 22.04.09 Jan-09 Accepted

21 NN/09-10/21 72085 31.03.08 NR TSW MB RK Vamne 2055 Mtrs. 2055 Mtrs. 0.96 04.05.09 11.05.09 Jun-08

22 NN/09-10/22 04077 19.12.08 NCR GSD CNB 5100 Nos. 5100 Nos. 14.32 06.05.09 25.05.09 E

Rako Mercantile Traders, Lucknow

Enemal Middle Buff

Testing of viscosity by ford cup No. 4 at 27+/-2deg.c spcified limit 80-120 seconds but found result 190 seconds.

Joint inspection held on 12.05.09 Sample was sent for testing by consignee. Rejection withdrawn vide AMM/AMV letter dated 30.06.09.

12.05.09 July'09

Peekay Industries, Delhi

PVC Cable two core

Anurag Yadav

Material received single core cord flexible wire instead of PVC two core cable.

Joint inspection held on 16.05.09. During JI, the sample selected as per sampling pattern of specn it was oberved that RITES hologram afixed on the material are not matching as mentioned in IC. It was confirmed that 4 inspections were carried out by same IE at the firm's premises on the same date and wrong material was despatched to the consignee.

Not on RITES A/c

Pushker Paint Industries, Lucknow

Ready Mixed Paint Semi Gloss Golden Yellow

Material not as per specification

Joint inspection held on 12.05.09. Sample was sent by consignee for lab test. Rejection withdrawn vide AMM/AMV letter dated 30.06.09.

12.05.09 July'09

Deco Industries, Delhi

Cross Linked Poly XLPE Insulated PVC Wire

Material failed in lab test.

Joint inspection held on 11.05.09. Since a very long case. The test report has not been received at your end. Hence case is being closed "not on RITES A/c'.

Not on RITES A/c

Minor Penalty C/Sheet issued to IE on 22.06.10

Lord Krishna Electronic Industries, Delhi

T-5 Watt Energy Efficient Tube Light

Anurag Yadav

Poor quality and performance. Not working cover heating in plastic bottom.

Joint inspection held on 25.05.09 and found as under choke is heating in fitting, causing plastic fitting melting and bending. Material is under warrantee clause. Firm has agreed to replace the material. During RITES inspection acceptance test were conducted. On the basis of acceptance test result material was passed and IC was issued. Hence rejection is not on RITES A/c.

26.02.09 618/070

Not on RITES A/c

Page 7: COMPLNT. 2010-11

Complaint cases of the year 2009-10 Cumulative Statement

UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF IC CLASSIFICATIONCOM NO.

CONSI-GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

ACTION TAKEN

23 NN/09-10/23 72553 18.12.08 NWR WS Ajmer RK Vamne 150 Sets 150 Sets 6.42 18.05.09 25.05.09 E

24 NN/09-10/24 20348 18.12.08 RCF C&W KXH GS Chawla 102 Nos. 31 Nos. 8.31 13.05.09 AUG'09 Deleted

25 NN/09-10/25 20337 26.11.07 RCF C&W KXH KD Sharma 361 Nos. 361 Nos. 0.43 13.05.09 03.09.09 C Accepted

26 NN/09-10/26 10605 02.03.07 RCF C&W KXH RK Saxena 5.71 12.05.09 06.08.09 Mar-09 V Upheld

27 NN/09-10/27 30226 15.03.08 RCF C&W KXH 692 Nos. 692 Nos. 6.28 12.05.09 03.06.09

28 NN/09-10/28 21044 18.03.08 RCF C&W KXH AK Dua 34 Nos. 34 Nos. 6.47 12.05.09

29 NN/09-10/29 20218 07.08.08 Foot Step RCF C&W KXH 236 Nos. 236 Nos. 0.93 13.05.09 03.06.09 V Sorting

30 NN/09-10/30 10538 22.01.09 RCF C&W KXH 1250 Nos. 1250 Nos. 0.98 13.05.09 04.06.09 D Sorting

31 NN/09-10/31 NTF India, Gurgaon 70211 26.11.07 RCF C&W KXH RK Shukla 4 Nos. 4 Nos. 3.71 13.05.09 06.08.09 Accepted

Sidwal Refrigeration, New Delhi

Heater Assembly 3 KW Capacity

As per clause 5.10 of RDSO SMI No. RDSO/AC/SMI/18 dt. Oct.,81 the IR value should be above 2 megh Ohms

Joint inspection held on 25.05.09. 20 samples randomly taken from the rejected lot of 108 sets with proper RITES holograms and stickers and found there is no specific guidline for taking IR value on lot condition. Rejection not on RITES A/c

09.02.09 589/076

Not on RITES A/c

Precision Safety Equipment, New Delhi

Smoke Detector Unit for LHB EOG Coaches

The reason of rejection material supplied excess than order qty.

JI was scheduled for 19.08.09. Case deleted because of material supplied excess than order qty.

30.03.09 650/015

Rotatory Electricals, Hardwar

Terminal Pad for Underframe

In link to RCF-7-1-005 alt d. MG observed nil against 1.7 to 2.6%. Improvement advice is given for in link to BIS5082 Gr.1950 1998

Joint inspection was fixed on 03.06.09. Dy. CMM has referred review of specification. Material accepted after review.

31.03.09 641/051

PTC Industries, Lucknow

Control Arm Lower Left ( Rough casting)

35 Nos. 36 Nos.

23 Nos. 25 Nos.

Due to lineer void, deep cavities, pin holes, blow holes

Joint inspection held on 06.08.09. 5 samples each were drawn jointly from the rejected lot of 25 & 23 Nos. and checked visually. The linear void observed in one sample and blow holes in two samples. Hence whole lot stands rejected.

AK Industries, New Delhi

Fire Extinguisher

Pankaj Sood

After discharging observed 6.3kg, 6.1kg, 5.7 kg, 6.2 kg against 5.75kg

Joint inspection held on 03.06.09. This is a nine months old supply, shelf life is one year only. Discharge should be 85% as per IS:2171

09.08.08 484/027

Not on RITES A/c

Shivalik Fasterner, Mohali

SS Inlay Inidan Style with out side wash basin

Chemical composition. Ni found 7.85% against 8.35% to 1.65% in SS Inlay ring.

Joint inspection was fixed for 04.06.09. Firm has lifted the rejected material before JI.

No JI June'09

25.03.09 685/041

Lifted before JI

Rajinder Dass & Co, Mohali

Rajesh Sood

Poor surface finish observed ( small sized depressions, cavities)

Joint inspection held on 03.06.09. Blow holes found in some pces. Material re-offered after sorting.

16.04.09 670/030

Meenakshi Engineering Works, Kapurthala

Brake Head Assembly

Satish Kumar

Dimension observed 75.92 to 77.95mm against 75+/-1.5

Joint inspection held on 04.06.09. Material accepted after segregation.

07.04.09 633/083

Lavatory Module for LPCEA

Woven roving not used. Corundum not used.

Joint inspection held on 06.08.09. Material accepted during joint inspection.

07.04.09 637/043

Page 8: COMPLNT. 2010-11

Complaint cases of the year 2009-10 Cumulative Statement

UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF IC CLASSIFICATIONCOM NO.

CONSI-GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

ACTION TAKEN

32 NN/09-10/32 03118 11.04.08 RCF C&W KXH RK Jain 24 Nos. 24 Nos. 13.57 25.05.09 D

33 NN/09-10/33 00001 01.01.09 NWR DSL BGKT Sudesh Jain 250 Nos. 250 Nos. 1.31 13.05.09 10.06.09

34 NN/09-10/34 05378 28.11.08 NR GSD AMV RK Saxena 7740 Ltrs. 7740 Ltrs. 7.59 19.05.09 10.06.09 C Accepted

35 NN/09-10/35 06383 13.03.08 NR WS JUDW RK Saxena 1760 Ltrs. 1760 Ltrs. 1.38 18.05.09 11.06.09 C Accepted

36 NN/09-10/36 01636 25.11.08 NWR DSL BGKT 306 Nos. 306 Nos. 5.72 22.05.09 10.06.09 D Accepted

37 NN/09-10/37 10315 21.11.08 RCF C&W KXH 2500 Nos. 2500 Nos. 1.97 01.06.09 20.03.09

JMD Engineers, Faridabad (IRCON)

Wheel Turn Table

Wheel bearing plate: Dimensions found 300x37x30mm in place of 250x60x15mm. No provision has been made for water outlet from bearing housing. No provision has been made to align the wheel in longitudianl and across directions.

Joint inspection held on 03.06.09. Rejection not on RITES A/c.

03.06.09 July,09

09.08.08 449/097

Not on RITES A/c

JS Industries, Sonebhadra

Fuel Oil Cross over hose arrangement

The material rejected as end fitting not matching with drawing

Joint inspection held on 10.06.09. Reason of rejection is not on RITES A/c.

19.03.09 630/099

Not on RITES A/c

Pushker Paint Industries, Lucknow

Paint Synthetic Undercoating white

Water content % by mass composition. Volume solids phthalic anhydride content

Joint inspection held on 10.06.09. During JI, samples were sent to third party lab for testing. AMM/AMV's letter dated 17.08.09 rejection memo hereby withdrawn and material accepted.

16.03.09 654/040

Rako Mercantile Traders, Lucknow

Enemal Interior White

Practically unsuitable on shop floor and also faild in lab test i.e. more surface dry, more hard dry and more tack free

Joint inspection held on 11.06.09. Sampe sent to independent test house by consignee for testing has passed in testing.

18.03.09 654/049

Dharmbeer & Sons, Noida

Traction Motor Air Bellows leather bellows

Pankaj Sood

Material rejected as sort in length and other dimension such as flange length wire hole distance flange width no of bellows not matching with drawing.

Joint inspection held on 10.06.09. Dimensions of T.M. air bellows were checked in streched condition at 200 Kg weight as per drg and were found to be within tolerance limit. Hence the rejection is not on RITES A/c. Rejection memo has been withdrawn by consignee vide letter dt. 23.06.09.

18.03.09 665/017

G.T. Auto Industries, Jallandhar

Adjuster for Brake Block

Nagesh Yadav

P-found 0.06, 0.065, 0.073% against 0.04% Max. +0.005

Joint inspection was fixed for 17.06.09. Firm has lifted the material before joint inspection.

No JI June'09

Lifted before JI

Page 9: COMPLNT. 2010-11

Complaint cases of the year 2009-10 Cumulative Statement

UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF IC CLASSIFICATIONCOM NO.

CONSI-GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

ACTION TAKEN

1 NN/09-10/38 00245 04.03.08 NWR DSL Ajmer Rajiv Ahuja 8300 Ltrs. 8300 Ltrs. 6.99 01.06.09 08.07.09

39 NN/09-10/39 55016 22.09.08 DMW DSL PTA Iqbal Singh 5550 Nos. 5550 Nos. 1.84 05.06.09 30.06.09 D Rectification

40 NN/09-10/40 54504 07.07.08 DMW DSL PTA Iqbal Singh 05.06.09 22.06.09 Accepted

41 NN/09-10/41 12143 10.09.08 Hose Flexible NER DSL GD 5098 Mtrs. 5098 Mtrs. 0.74 01.06.09 27.07.09

42 NN/09-10/42 24.08.07 RCF C&W KXH Iqbal Singh 1 No. 1 No. 15.46 12.06.09 19.06.09 V Rectification

Modi Industries Ltd, Modi Nagar

Paint Enamel Air Craft Blue

Phthalic anhydride content of non volatile vehice % by mass

Joint inspection held on 08.07.09. During JI, samples were taken and sent to NTH for lab test. The paint has failed in lab test. But the same parameters of the paint were tested by the IE from an outside lab was passed. Hence rejection not on RITES A/c.

11.11.08 138/069

Not on RITES A/c

Bimco Engg. Enterprises, Ludhiana

Nut (Main Connecting Rod Bolt) fully machined

Thread no gauge passing. Nut face and cap damaged. Face 0.005 to 0.015"

Joint inspection held on 30.06.09. During JI, 12 samples of nuts from two packages are selected as samples. Face sq. is found more than specified as 0.0015" ( 40 micron) . There was no drag marks observed on the two nuts through which not go gague was passed. The case was recommended for rectification during joint inspection.

30.03.09 672/006

Aay Ess Forging Industries, Ludhiana

Bolt (Forged) Main Connecting Rod

4400 Nos. 8200 Nos.

4400 Nos. 8200 Nos.

Hardness found upto 25RC as against specified BHN 293-321 RC- (30-40) vide specn D86800-A

Joint inspection held on 22.06.09. Material was inspected as per P.O., although the consignee required material as per some other drawing. Hence rejection withdrawn and material accepted.

19.12.08 580/048 23.05.09 711/015

Super Seal Flexible Hose, Noida

Pankaj Sood

Construction of hose pipe should be as per spciifcation SAE 100 RSR but the construction of hose pied received is as per SAE 100RS

Joint inspection held on 27.07.09. Rejection not on RITES A/c.

24.01.09 625/012

Not on RITES A/c

AMT International, Mandi Govindgarh

OP1575

EOT Crane 3T Capacity

Holes provided on end carriages for mounting of beam are not covered. Mounting of main beam on end carriage is not proper. Main hoist wire rope is to be fitted with 2 clamps it should be as per IS.

Joint inspection held on 19.06.09. Some installation points still pending. Firm is agreed to rectifiy the pending works. Hence material will be accepted after rectification.

14.09.08 507/089

Page 10: COMPLNT. 2010-11

Complaint cases of the year 2009-10 Cumulative Statement

UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF IC CLASSIFICATIONCOM NO.

CONSI-GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

ACTION TAKEN

43 NN/09-10/43 60083 08.12.08 SS Electrodes NCR GSD JHS RK Saxena 16200 Kgs 55.08 08.06.09 Feb-09 C Upheld

44 NN/09-10/44 12823 16.07.08 NER Depot GKP RK Chhabra 1000 Nos. 1000 Nos. 3.21 18.06.09 29.06.09 05.03.09

45 NN/09-10/45 32982 17.09.08 Control Cable NER DSL GD 5348 Mtrs. 5348 Mtrs. 0.94 16.06.09 17.07.09 28.02.09

46 NN/09-10/46 00762 10.06.08 NWR BGC Ajmer Sudesh Jain 1606 Nos. 1606 Nos. 19.19 18.06.09 Apr-09 C Upheld

47 NN/09-10/47 20603 15.03.09 Battery Box RCF C&W KXH 6.16 19.06.09 08.07.09 Accepted

48 NN/09-10/48 72034 20.01.09 NWR GSD BKN 5050 Nos. 3600 Nos. 2.85 23.06.09 Apr-09 C Upheld

Halli Comet Electrodes, Brabanki

16200 Kgs

Welding cracks during fitment trials.

Joint inspection held on 23.06.09. The material of four sample from four batches were sent to Shriram Test House, Delhi for chemical analysis. The result of all samples from four batches do not conform to IRSM-28-2 ( Amd.1&2) in Cr. & Ni content does not confirm to description of PO. Material failed in testing and stands rejected.

23.06.09 July, 09

Minor Penalty C/sheet issued to IE dt. 15.03.10

Shiv Shakti Engg. Works, Yamunanager

FRP Wall Protector

Material delcared unsuitiable for workmanship and glass fibre content.

Joint inspection held on 29.06.09. Firm has submitted that they accepted the rejection as transit damage. Hence full qty of 1000 Nos. ( 944 Nos. actual & 56 Nos. consumed in workshop) stands finally rejected as transit damage on firm's account.

Transit damage

IMT Cables, New Delhi

Virender Singh

Inside conductor loose with the upper layer insulation slave of the cable. Insulation grade improper due to cable insulation very loose with the conductor during load condition at 5 Amp after 8 hrs.

Joint inspection held on 17.07.09. During JI, cable was found to be confirming to DLW specn which was agreed by AME/Dsl/GD. However, consignee refused to sign the JI report. In this case GGMI has already written to COS/GKP in this regard. Rejection is not on RITES A/c.

Not on RITES A/c

Rajmata Engineering Gorakhpur

Wearing Piece for side bearer

Failed in chemical composition i.e lead, Iron & Zinc

Joint inspection held on 26.06.09. Sample sent to NTH by consignee for testing. As per NTH/GZB's test report, samples failed in chemical analysis and finally rejected.

26.06.09 Aug'09

IE repatriated

Mohan Rail Components, Kapurthala

Nagesh Yadav

18 Nos. 25 Nos. 30 Nos.

18 Nos. 25 Nos. 30 Nos.

DFT of paint found 60 micron (Avg) against 100-125 micron

Joint inspection was scheduled for 08.07.09. R/note issued and material accepted before JI.

06.03.09 621/100

Chemical & Meachnical Engg. Industries, Mohali

Door Hinge Foot

Hemant Kumar

Failed in chemical composition i.e Carbon, Manganese, Chromium & Nickel

The joint inspection held on 30.06.09. During JI, samples were sent to Govt. approved lab for checking chemical composition. As NTH/GZB's test report, material failed in testing and finally rejected.

30.06.09 July'09

Page 11: COMPLNT. 2010-11

Complaint cases of the year 2009-10 Cumulative Statement

UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF IC CLASSIFICATIONCOM NO.

CONSI-GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

ACTION TAKEN

49 NN/09-10/49 Simba FRP, Noida 70126 20.09.07 RCF C&W KXH RK Jain 1 No. 1 No. 1.51 19.06.09 Surface mat not used. 22.07.09

50 NN/09-10/50 10268 15.10.08 RCF C&W KXH Iqbal Singh 570 Nos. 570 Nos. 0.93 19.06.09 25.03.09 Accepted

51 NN/09-10/51 00005 02.01.09 NWR BGC Ajmer RK Jain 11.6 01.07.09 15.07.09

52 NN/09-10/52 54975 18.09.08 DMW DSL PTA LS Cheema 3570 Kgs. 300 Kgs. 1.94 01.07.09 23.07.09

53 NN/09-10/53 00235 26.02.09 NWR DSL Ajmer 163 Nos. 163 Nos. 5.52 02.07.09 15.07.09

Set of Side Wall Panels for AC2T LHB

Joint inspection held on 22.07.09. The set is finally rejected. However, the rejection is not on RITES A/c, it could not have been detected carrying out acceptance test as per specification.

11.05.09 688/057

Not on RITES A/c

Plasto Power Engineers, Sangrur

Bracket Assembly for Lateral Shock absorber

Si observed 0.04% against 0.01 to 0.4% and Al. observed 0.001% against 0.01% Min.

Joint inspection held on 08.07.09. During JI, sample sent to third party lab to check required parameters. Material has passed the test.

08.07.09 Nov'09

Jagdamba Liquified Steels, Hathras

Face Plate to Buffer Plunger

1000 Nos. 676 Nos.

1000 Nos. 676 Nos.

Rejected due to Porosity, cracks & mixed supply.

Joint inspection held on 15.07.09. It has been observed that RITES stamp not found properly. Stamp diminished and not readable in some pieces. Hence rejection is not on RITES A/c.

06.04.09 645/076

Not on RITES A/c

Letter to IE to be more careful on 15.03.10

Synco Industries, Jodhpur

Liner Surface conditioner brown Al. oxide

As per lab report dated 24.04.09 ( Not attached) material is not satisfactory

Joint inspection held on 23.07.09. Out of 3570 Kgs supplied by the firm only 300 Kgs. available. Balance consumed. Firm to deal directly with the consignee. Hence rejection not on RITES A/c.

12.12.08 576/036

Not on RITES A/c

Basant Industries, Jodhpur

LP Exhauster Cylinder

Brijveer Singh

Bore dia of liner is found 196.83 to 196.89 at different position instead of 196.85 +0.025 - 0.000.

Joint inspection held on 15.07.09. Marking on product is visible and readable and found Ok. The calibration certificate of the instrument used by the consignee to check the bore dia were not produced despite repeated request by RITES & firm's Rep. during JI. Hence the authentication of the measurement of bore by the consignee & it's subsquent rejection could not be ascertained during JI. Therefore, the rejection is not on RITES A/c.

14.03.09 664/024

Not on RITES A/c

Page 12: COMPLNT. 2010-11

Complaint cases of the year 2009-10 Cumulative Statement

UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF IC CLASSIFICATIONCOM NO.

CONSI-GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

ACTION TAKEN

54 NN/09-10/54 04077 19.12.08 NCR GSD JHS 14.32 13.07.09 27.07.09

55 NN/09-10/55 55301 04.12.08 MS Pipe 20mm DMW DSL PTA RK Chhabra 8046 Nos. 8046 Nos. 19.08 13.07.09 24.07.09 Jun-09 D Upheld

56 NN/09-10/56 06589 13.03.09 NR WS JUDW RK Saxena 1000 Ltrs. 1000 Ltrs. 10.72 16.07.09 30.07.09 Accepted

57 NN/09-10/57 20012 06.04.09 RCF C&W KXH 6 Nos. 6 Nos. 26.78 16.07.09 No JI Accepted

58 NN/09-10/57A 30004 06.04.09 RCF C&W KXH 442 Nos. 442 Nos. 17.06.09 08.07.09 Apr-09 V Upheld

59 NN/09-10/58 14592 26.05.08 RE OHE Iqbal Singh 201.277 MT 16.07.09 06.08.09 28.05.09

60 NN/09-10/59 64692 03.11.08 RE OHE RK Chhabra 16.07.09 29.08.09 28.05.09 Accepted

Lord Krishna Electronic Industries, Delhi

Energy Efficient Box FL fittings complete

Anurag Yadav

2150 Nos. 1050 Nos.

2150 Nos. 1050 Nos.

Poor quality and performance. Not working cover heating in plastic bottom.

Joint inspection held on 27.07.09. During JI, 5 Nos. fittings were checked for operation and IR fittings are functional and . The material is failing in performance and temp rise test which is type test. Such tests are conducted before manufacturing . Therefore, the rejection is not on RITES A/c.

26.02.09 618/069

Not on RITES A/c

Jain Paint & Hardware Stores, Patiala

Material received in mixed condition. As per PO 20% supply should be between 5-5.25 meter, however supply received is not fulfilling this condition.

Joint inspection held on 24.07.09. Length of the pipes more than 6 mtrs are not required as per PO description. Material finally rejected during JI.

Pushker Paint Industries, Lucknow

Enamel synthetic sating blue

Low viscosity, more surface dry, more tack free, more hard dry and less gloss 60 deg.

Joint inspection held on 30.07.09. Samples were sent for testing by consignee has passed.

28.05.09 716/063

Amit Engineers, Baddi

Roof Mounted AC Package Unit

Bipin Sharma

Sleeve on the stiffners not provided on any of the stiffners. Electrical problems

Joint inspection was scheduled for 05.08.09. The material was accepted before joint inspection.

21.05.09 684/052

Rajasthan SPG & WVG Mills, Noida

Curtain Cloth, Fire retardent

Neeraj Singh

Not acceptable due to colour, shade and pattern not close match to Gr. No. PPA-57 of Indian Rayon and Industry Ltd

Joint inspection held on 08.07.09. During JI, the firm supplied material was compared with the firm's approved sample. It was found that the supplied material does not match with the RDSO approved sample. Hence material finally rejected.

Jain Steel Industries, Mandi Govindgarh

Fabricated and Galv. B series steel structure B-150 Masts

Pach-rukhi

125.00 MT

During stringing of OHE wire, one B-150 mast in km developed crack and got bent. The defective mast has been kept at Sample depot.

Joint inspection held on 06.08.09. Broken, cracked pcs will be replaced by the firm under manufacturing defect warrantee free of cost. Material cracked, twisted then broken during wiring. Hence rejection is not on RITES A/c.

Not on RITES A/c

Jain Steel Industries, Mandi Govindgarh

Fabricated and Galv. B series steel structure B-175 Masts

Agwan-pur

41.291 MT During stringing of OHE wire, one B-150 mast in km developed crack and got bent. The defective mast has been kept at Sample depot.

Joint inspection was scheduled for 16.08.09. Material accepted and rejection withdrawn vide SSE/MB's letter dated 29.08.09

Page 13: COMPLNT. 2010-11

Complaint cases of the year 2009-10 Cumulative Statement

UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF IC CLASSIFICATIONCOM NO.

CONSI-GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

ACTION TAKEN

61 NN/09-10/60 55099 03.10.08 DMW DSL PTA Roshan Lal 450 Nos. 450 Nos. 6.62 16.07.09 24.07.09

62 NN/09-10/61 Rail Fab, Kapurthala 20646 06.02.09 RCF C&W KXH 1166 Nos. 1166 Nos. 1.65 27.07.09 07.05.09

63 NN/09-10/62 70461 17.01.09 RCF C&W KXH 6.12 28.07.09 Accepted

64 NN/09-10/63 00861 24.06.08 NWR CWE Ajmer 70 Nos. 69 Nos. 1.65 16.07.09 12.08.09 O Sorting

65 NN/09-10/64 00247 04.03.09 NWR CWE Ajmer RK Chhabra 1200 Nos. 2.04 16.07.09 D Upheld

66 NN/09-10/65 20671 22.01.09 Liner Surface DMW DSL PTA 20671 Kgs. 11.82 27.07.09 10.09.09 D Upheld

67 NN/09-10/66 01495 11.11.08 NWR GSD Ajmer 5600 Ltrs. 5600 Ltr 4.03 29.07.09 12.08.09

National Engineering Industries, Jaipur

Rivetless Cage Cylinder Roller Bearing

RITES stamp found not visible

Joint inspection held on 24.07.09. Seal impression not found on material to match with as indicated facsimile on IC. From the above, it is understood that material supplied by the firm is not the same as inspected and sealed by RITES. Hence rejection is not on RITES A/c.

27.05.09 708/016

Not on RITES A/c

Aluminium Moulding

Nagesh Yadav

Non uniform finish of anodising coating due to lines observed throughout the length of the moulding.

Joint inspection was fixed for 06.08.09. Firm has lifted the rejected material before joint inspection.

No JI Aug'09

Lifted before JI

Asian Arc Electrodes, Noida

MMAW Electrodes Medium Coated

Pankaj Sood

349920 Nos.

279360 Nos.

Elongation observed 21.6% against 20% Min. Running performance test not satisfactory and unwanted extra spatter. Electrodes not fully used.

JI held on 28.07.09. Sample sent to third party lab for testing by consignee. As per IDMA Laboratories test report, material found acceptable.

28.07.09 Oct'09

03.03.09 627/063

Kohinoor Coach Industries, Mohali

Centre Stiffener seamless tube for head stock

Rajesh Sood

Due to mixed supply, whole lot rejected as per CMT lab test report

Joint inspection held on 12.08.09. During JI, samples are drawn and mixed lot found. Mfr'rs is ready for segregation few pcs are found mixed. Hence material accepted after segregation.

07.05.09 670/077

Ashoka Electronics, Yamunanagar

Connection for side filling of roof water tank

850 Nos. 350 Nos.

Thickness of strainer found 2.5mm instead of 1.4mm. Outer dia of strainer found 70mm instead of 76mm

Joint inspection held on 12.08.09. Sample sent to third party lab for testing by consignee failed in lab test.

12.08.09 Nov'09

19.05.09 683/078

Synco Industries, Jodhpur

Brijveer Singh

20671 Kgs

850 micron aperture size and 710 micron aperture size were found not matching during seive test in DMW lab.

Joint inspection held on 10.09.09. During JI, sample Sri Ram Test House by consigee has failed in testing. Hence material finally rejected.

27.04.09 694/030

Gupta Agencies, Jaipur

Thinner of Synthetic Enamel

Brijveer Singh

Material failed in lab test as per CMT report

Joint inspection held on 12.08.09. During JI, in all the 28 drums RITES seal not found on the material. Hence rejection not on RITES A/C.

18.03.09 664/032

Not on RITES A/c

Page 14: COMPLNT. 2010-11

Complaint cases of the year 2009-10 Cumulative Statement

UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF IC CLASSIFICATIONCOM NO.

CONSI-GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

ACTION TAKEN

68 NN/09-10/66A 05858 31.12.08 NR GSD AMV 1100 Ltrs. 1100 Ltrs. 1.11 03.08.09 03.09.09 S Rectification

69 NN/09-10/67 20502 15.02.08 RCF C&W KXH GS Chawla 6 Nos. 6 Nos. 23.39 03.08.09 19.08.09 Accepted

70 NN/09-10/68 10317 21.11.08 RF C&W KXH 960 Nos. 960 Nos. 03.08.09

71 NN/09-10/68A 56917 08.07.08 DMW DSL PTA RK Saxena 23 Nos. 19 Nos. 03.08.09 11.08.09

72 NN/09-10/69 01289 22.09.08 HP Piston NWR DSL Ajmer RK Jain 68 Nos. 68 Nos. 1.16 28.06.09 12.08.09

P.K. Industries, Jallandhar

Varnish Black Japan

Deepak Kumar

Scratch hardness, Volatile matter, ash content finish etc.

Joint inspection held on 03.09.09. Since material has been found non confirming to parameters i.e. scratch, hardness test and firm has requested that material can be rectified by adding hardness. Then it is jointly agreed that firm may be allowed to rectify the material.

04.05.09 682/050

Call for explanation thr. CM on 26.02.10

Amit Engineers, Baddi

AC Package Unit

Rotary switch fired on alumnium sheet of very thin gauge and holding the RSW nut not provided with screw. Busbar LT insulator M/s Everest make not mentioned.

Joint inspection held on 19.08.09. Material accepted during joint inspection.

Manoj Enterprises, Mohali

Wearing Plate for side bearer

Hemant Kumar

Out of 4 samples lair line crack observed on one sample and pitting is also observed on the another one sample.

Joint inspection was scheduled for 19.08.09 but the firm has already lifted the rejected material before joint inspection.

No JI Aug'09

26.06.09 09.06.09

Lifted before JI

Parag Polymers, Dehradun

Lube Oil Cooler ( Plate type)

Leakage has been found from the lube oil cooler during load testing.

Joint inspection held on 11.08.09. Since two units out of 6 Nos. installed on locomotive have failed. The material to be taken by the firm for verification of workmanship and quality of material and also suggested to rectify 100% pressure test on reoffered material as special case for this supply. Firm agreed to this. Hence rejection is not on RITES A/c.

27.04.09 16.05.09

Not on RITES A/c

Integral Pneumatic Co., New Delhi

The top size E from 139.30mm to 139.34mm which should be 138.34mm in RDSO drawing

Joint inspection held on 12.08.09. As per IS:2500/2000 sampling done and randomly 20 Nos. checked and size of top E observed 139.30 to 139.34 which is confirming to Integral Drg. No. 0214-IP-0490 & does not confirm to RDSO Drg. No. SKDP-3445. Hence material rejected but not on RITES A/c because material is confirm to Integral Drg.

30.01.09 611/038

Not on RITES A/c

Page 15: COMPLNT. 2010-11

Complaint cases of the year 2009-10 Cumulative Statement

UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF IC CLASSIFICATIONCOM NO.

CONSI-GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

ACTION TAKEN

73 NN/09-10/70 54650 07.09.08 DMW DSL PTA Iqbal Singh 7000 Nos. 2565 Nos. 1.82 03.08.09 Deleted

74 NN/09-10/71 54695 05.11.08 RSJ Masts RE OHE JUC RK Chhabra 236 Nos. 236 Nos. 10.08.09 26.08.09 06.07.09 Accepted

75 NN/09-10/72 12567 15.11.07 NER Depot IZN Sudesh Jain 750 Nos. 49 Nos. 10.06.09 13.10.09

76 NN/09-10/73 01480 13.05.09 NR WS JUDW 406 Mtr 406 Mtr 3.81 03.09.09 27.06.09 Accepted

77 NN/09-10/74 03508 13.02.09 NR DSL SSB Lalta Prasad 17 Nos. 2 Nos. 0.52 01.09.09 04.09.09 15.02.08

78 NN/09-10/75 70310 22.11.08 RCF C&W KXH Roshan Lal 1590 Nos. 1590 Nos. 01.09.09 20.07.09 Accepted

79 NN/09-10/76 20321 05.12.08 RCF C&W KXH VC Tiwari 269 Nos. 269 Nos. 1.61 01.09.09 Sep'09 27.06.09 Accepted

80 NN/09-10/77 50651 10.02.09 RCF C&W KXH 8 Nos. 8 Nos. 4.47 01.09.09 02.04.09

81 NN/09-10/78 12783 15.04.08 NER Depot GKP Sudesh Jain 350 Nos. 280 Nos. 01.09.09 No JI 24.01.09 Deleted

Aay Ess Forging Industries, Ludhiana

Nut (Main Connecting Rod Bolt) Forging

Material rejected due to hex head (Flet to Flet) size found 2565 Nos.with hex size/size by 0.015" to 0.035" from required value i.e. 1.187".

Joint inspection was scheduled for 10.09.09. It was a shopfloor rejection and was not taken for JI. Hence JI is not required.

NO JI Sep'09

23.05.09 711/014

Jain Steel Industries, Mandi Govindgarh

Galvanisation of these masts have some spot mark

Joint inspection held on 26.08.09. Material accepted during joint inspection.

JK Enterprises, Gorakhpur

Push Cock Chromium Plated

Material rejected due to leakage.

Joint inspection held on 13.10.09. The rejection is not on RITES A/c.

04.06.08 140/094

Not on RITES A/c

Premier Polyfilm, Ghaziabad

Flexible Poly vinyl Chloride Flooring

JP Srivastava

Failed in lab test i.e. more weight & more thickness than specified

Joint inspection held on 07.09.09. Sample sent for testing by consignee has passed in testing.

07.09.0Oct'09

Perfect Radiator & Oil Coolers, New Delhi

Water Cooling Element

Cooling element may have been damaged due to jerk and jolts during transit

Joint inspection held on 04.09.09. Rejection not on RITES A/c.

Not on RITES A/c

Kohinoor Rubber Industries, Faridabad

Rubber Hose 5mm thick

In lining elongation observed 110%, 137% against 250% Min.

Joint inspection held on 23.10.09. During JI, sample sent to NABL approved lab for testing. Material has pased the test.

23.10.09 Nov'09

Kaveri Industries, New Delhi

Wash Basin light fitting

Manufacturing name not given on rocker switch against name electr of other approved make. Thickness of diffuser found 2.62, 2.67, 2.71, 2.54 against 3mm

The material has been supplied as per the terms and condition of PO. Hence material accepted and no need of joint inspection.

Mohan Rail Components, Kapurthala

Body Side Door for LHB with air spring

Nagesh Yadav

Width of door found 100mm short as per drg. Accessries is incomplete

Joint inspection was scheduled for 09.09.09 but the firm has lifted the rejected material before joint inspection.

No JI Sep,09

Lifted before JI

Sengar Machinery Stores, Gorakhpur

Foot Plate arrangement

Material found unsuitable by CMT/GKP in lab test.

Joint inspection not required. As per Rly. Board's guidelines the rejection should be issued within 90 days to conduct any JI. Consignee may deal directly with the supplier under waranty clause.

Page 16: COMPLNT. 2010-11

Complaint cases of the year 2009-10 Cumulative Statement

UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF IC CLASSIFICATIONCOM NO.

CONSI-GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

ACTION TAKEN

82 NN/09-10/79 Rail Tech, Kaputhala 70071 04.05.09 RCF C&W KXH 88 Nos. 88 Nos. 01.09.09 09.09.09 17.07.09 Accepted

83 NN/09-10/80 55282 28.11.08 DMW DSL PTA 126 Nos. 25 Nos. 01.09.09 10.09.09

84 NN/09-10/81 04521 10.10.08 NR GSD AMV 30 Nos. 5 Nos. 01.09.09 26.09.09 13.06.09

85 NN/09-10/82 55049 27.09.08 DMW DSL PTA 40 Nos. 40 Nos. 13.46 01.09.09 04.09.09 Jun-09 D Upheld

86 NN/09-10/83 55231 11.11.08 DMW DSL PTA RK Jain 01.09.09 10.09.09 D Upheld

Emergency Openable Window

Balbir Chand

Aluminium spacer not found of dark anodised against dark anodised.

Joint inspection held on 09.09.09. The aluminium spacer was found anodised and colour in brawn against dark colour ( Brown/black preferably) which does not affect the functioning adversly. Hence material accepted.

Samrat Forgings, Mohali

Crank Shaft Gear Forgings

Rajesh Sood

Hardness either lower or higher than the specified limit C-232 to 364 BHN vary from 316 to 409 BHN.

Joint inspection held on 10.09.09. During JI, samples were suppose to be taken and send to outside lab as per RITES representative and as per CMT, it was to be sent to RDSO to which firm refused. Hence 25 Nos. of this supply stands rejected but not on RITES A/c.

20.04.09 670/036

Not on RITES A/c

Amit Engineers, Baddi

Scroll compressor

Bipin Sharma

Found in dead earth and taking high amp resulting non functioning

Joint inspection held on 26.09.09. Total qty inspected 407 Nos. which was further distributed to three consignee i.e SSB-332 Nos., AMV-30 Nos. & JUDW-45 Nos. respectively, in which only 5 Nos. rejected by AMV. The qty rejected less than 5% of total lot of 407 Nos.

Not on RITES A/c

Alka Forgings, Ghaziabad

Cam Shaft Gear forgings

JP Srivastava

Uncontrolled parameters of proof machining

Joint inspection held on 04.09.09. During JI, 5 samples were drawn out of a lot of 40 Nos. and checked dimensionally. The material not found suitable based on dimensional variation and stands rejected.

APS Cam-O-Matec, Bahadurgarh

Cam Shaft Modified

40 Sets 07 Sets

40 Sets 07 Sets

63.78 11.16

As per inspection report, material is not satisfactory

Joint inspection held on 10.09.09. During JI, it has been observed that some dimensions of FE cam shaft are not as per PO requirement also case depth is not found satisfactory in light of above material stands rejected.

29.07.09 25.07.09

Call for explanation thr. CM on 15.03.10

Page 17: COMPLNT. 2010-11

Complaint cases of the year 2009-10 Cumulative Statement

UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF IC CLASSIFICATIONCOM NO.

CONSI-GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

ACTION TAKEN

87 NN/09-10/84 72456 16.06.08 NWR GSD Ajmer 1000 Nos. 1000 Nos. 1.82 04.09.09 23.09.09 Apr-09 L Upheld

88 NN/09-10/85 20423 12.12.08 FRP Tray RCF C&W KXH KD Sharma 338 Nos. 130 Nos. 0.94 11.09.09 08.08.09

89 NN/09-10/86 PD Steels, Mohali 10238 17.09.08 RCF C&W KXH 40 Nos. 5 Nos. 4.05 11.09.09 30.09.09 03.05.09 V Sorting

90 NN/09-10/87 20615 30.01.09 RCF C&W KXH 100 Nos. 0.15 17.09.09 No JI 30.07.09

91 NN/09-10/88 70008 06.04.09 RCF C&W KXH 106 Nos. 106 Nos. 11.93 17.09.09 No JI 20.08.09

92 NN/09-10/89 70092 21.05.09 RCF C&W KXH 25 Nos. 25 Nos. 43.05 17.09.09 No JI 05.08.09 Accepted

Inventa Cleantec, NOIDA

Floor Scrubber cum drier

Pradeep Kumar

Not capable to clean greasy and oily hard. Floor like chequered

Joint inspection held on 23.09.09. During JI, performance of machine was checked as per PO condition. Machine was not capable to clean greasy and oily hard surface of shop floor (Chequared floor) leaving dirt and residue due to improper working of vacuum suction in machine. Hence machine stands rejected.

Rotatory Electricals, Hardwar

On paiter side at both end deep impression on throughout the lenth observed may be due to some external material, resulted uneven surface in both samples and lot also.

Joint inspection was scheduled for 30.09.09. Firm has lifted the rejected material before joint inspection.

No JI Sep'09

Lifted before JI

Bogie Bolster for 16T Coaches

Hemant Kumar

Rejected being pitting observed at end piece of web inner and outer side

Joint inspection held on 30.09.09. The visual examination on 46 Nos. of pcs were conducted and it was observed that 5 Nos. out of 40 Nos. were having pitting on outer as well as inner surface of end piece web. In view of above, it is concluded to accepted 35 Nos. of Bogie Bolster and reject the balance 5 Nos. defective pcs.

Ankur Fibre, Kapurthala

FRP Cover Moulding

Balbir Chand

100 Nos. 130 Nos.

Water obsorption observed 0.996% against 0.5%. Surface mat not used.

Joint inspection was scheduled for 30.09.09. Firm has lifted the rejected material before joint inspection.

Lifted before JI

Emprise Marketing, Lucknow

Lettering inside for LHB SCN

Deepak Kumar

Not acceptable due to colour not match with RAL9016, RAL7039 of dust bin item No. 8.

Joint inspection was scheduled for 30.09.09. Firm has lifted the rejected material before joint inspection.

Lifted before JI

Rubicon Steels, Mohali

Water Tank Assembly

Rajesh Sood

Failed in chemical composition

Joint inspection was scheduled for 22.10.09. Material accepted before joint inspection.

Page 18: COMPLNT. 2010-11

Complaint cases of the year 2009-10 Cumulative Statement

UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF IC CLASSIFICATIONCOM NO.

CONSI-GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

ACTION TAKEN

4 NN/09-10/90 05734 14.07.09 NR WS JUDW PP Gupta 5 Nos. 5 Nos. 3.71 18.09.09 15.10.09 08.05.09

5 NN/09-10/91 01480 13.05.09 NR WS JUDW PP Gupta 5 Nos. 5 Nos. 3.71 18.09.09 05.10.09 08.05.09 Accepted

95 NN/09-10/92 20664 16.02.09 RCF C&W KXH 1400 Nos. 1400 Nos. 2.09 18.09.09 No JI 24.07.09 Accepted

96 NN/09-10/93 20104 26.05.09 RCF C&W KXH 15000 Nos. 9.01 18.09.09 No JI 27.07.09

97 NN/09-10/94 20471 01.02.09 RCF C&W KXH AK Gupta 190 Nos. 190 Nos. 1.03 18.09.09 No JI 28.07.09 Accepted

98 NN/09-10/95 20200 12.09.08 RCF C&W KXH AK Gupta 15000 Kgs 6795 Kgs. 7.05 24.09.09 30.09.09 15.06.09 Accepted

Knorr Bremse, Faridabad

Disc for Brake IRY Coaches

Failed on the basis of dimensional variation

Joint inspection held on 15.10.09. It is concluded that the firm has supplied the material suitable for LHB as per PO, whereas the consginee's requirement for IRY coaches as per Rly . Both the drawings mentioned in PO. The firm was advised to kindly arrange to replace the material as per consginee's requirement. RITES has inspected the material only visually against OEM test certification as per PO. Rejection not on RITES A/c.

Not on RITES A/c

Premier Polyfilm, Ghaziabad

Flexible Poly vinyl Chloride Flooring

Failed on the basis of dimensional variation

Joint inspection held on 05.10.09. Material accepted during JI.

CSM Engineers, Faridabad

Destination Board for Exterior Garniture Satin Blue

Virender Singh

Fibre content found 18% against 35%. Tensile strength found 81 N/mm2 (Avg) against 100 N/mm2 (min)

Joint inspection fixed on 22.12.09. Material accepted by consignee before joint inspection.

Report Awaited

Gopal Engineering Works, Kapurthala

Bearing Bracket for Berth cum Backrest

Balbir Chand

15000 Nos.

P- observed 0.0797%, 0.080%, 0.067% against 0.050% max in pin and S- observed 0.056% against 0.050% in pin rozcp not applied.

Joint inspection was scheduled for 22.10.09. But firm has lifted the rejected material before joint inspection.

Lifted before JI

Dhingra Engineering Works, New Delhi

Emergency light with CFL

In reflector cut size 5x15 not provided. In CFL 5 wall 4 pin M/s OSRAM Dulex provided against 3 wall 4 pin.

Joint inspection was scheduled for 22.10.09. Material accepted before joint inspection.

Manohar Lal Hira Lal, Ghaziabad

Copper Coated Co2 Welding filler solid wire

Oxide foundation /mounting copper coating observed at few places on the wire resulting in non uniform coating which adversely effecting the operation of welding equipment.

Joint inspection held on 30.09.09. Sample sent to out side lab for testing by consignee has passed the test.

Page 19: COMPLNT. 2010-11

Complaint cases of the year 2009-10 Cumulative Statement

UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF IC CLASSIFICATIONCOM NO.

CONSI-GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

ACTION TAKEN

99 NN/09-10/96 57218 09.09.08 DMW DSL PTA Iqbal Singh 50 Nos. 12 Nos. 29.09.09 08.10.09 05.06.09 V Rectification

100 NN/09-10/97 54241 14.01.08 DMW DSL PTA Manoj Singh 122 Nos. 122 Nos. 4.02 29.09.09 No JI Deleted

101 NN/09-10/98 54295 11.02.08 DMW DSL PTA Vimal Arora 2153 Kgs 0.81 29.09.09 No JI 12.12.08 Deleted

102 NN/09-10/99 00335 30.03.07 NWR DSL ABR AK Dua 14 Nos. 10 Nos. 29.09.09 No JI Deleted

103 NN/09-10/100 01339 03.10.08 NWR GSD JU Roshan Lal 29397 Nos. 2.69 06.10.09 22.10.09 16.12.08

104 NN/09-10/101 NWR Dsl ABR 4.22 13.10.09 24.10.09 17.11.05 O Upheld

105 NN/09-10/102 19.08.09 RCF C&W KXH Iqbal Singh 1 No. 1 No. 10.21 27.10.09 30.10.09 10.10.09

106 NN/09-10/104 57290 23.09.08 DMW DSL PTA 40 Nos. 40 Nos. 1.05 29.10.09 04.11.09 30.05.09 P Rectification

2 NN/09-10/105 00367 08.04.09 NWR DSL BKN Rajiv Ahuja 2500 Kgs. 2500 Kgs. 1.25 03.11.09 19.11.09 31.07.09

108 NN/09-10/106 03629 12.03.09 NR ELS TKD 5 Nos. 5 Nos. 12.09 03.11.09 16.11.09 02.06.09

Jasbir Auto Enterprises, Ludhiana

Valve Lube Oil Relief

Spring found in the housing tight, it should be free. Cup fitted on it's seat disc is found tight.

Joint inspection held on 08.10.09. Material accepted after rectification.

Pahladrai Steel Forging Works, Kanpur

Bull Gear Forging

Hardness not achieved. Cracks on face.

JI not required since material rejected by consignee after 90 days of receipt of material. Hence case treated as deleted.

23.12.08 06.02.09

United Cable Industries, Delhi

Copper flexible shunt

197.880 Kgs.

Copper flexible shunt found blackish and broken at intermittent twisting of

JI not required since material rejected by consignee after 90 days of receipt of material. Hence case treated as deleted.

Universal Instruments. Ambala City

4" Duplex Vacuum Gauge

Material not found as per specification

Rejection issued after 90 days of recived of material. Hence case closed as deleted.

Bharat Industrial Corporation , Delhi

Insulation Pad for Fixed Fan

29397 Nos.

Material not as per drawing and not fitting to the fans.

Joint inspection held on 22.10.09. The original drawing was not available with consignee at the time of JI on the basis of which the material was rejected, hence the rejection is not on RITES A/c.

Not on RITES A/c

BL Health & Safety, New Delhi

72245 72431

21.06.05 14.11.05

Advance Fire Fighting Technology

V. Gopal AK Suri

1 No. 1 No.

1 No. 1 No.

Material not found as per PO requirement.

Joint inspection held on 24.10.09. Material finally rejected during joint inspection.

Technic Fabrications, Mohali

32360 IRCON

High Rise Hydraulic Plateform mounted on Truck

At the time of lifting of hydraulic arm the bracket keeps, oscillating like perdulum.

JI held on 30.10.09. The oscillation parameter is not specified in the PO. Hence the rejection is not on RITES A/c.

Not on RITES A/c

R.B. Industries, Faridabad

Radiator Compartment

PP Gupta RK Jain Pradeep Kumar

Opening of radiator compartment on bottom not made for easy removed

Joint inspection held on 04.11.09. Material accepted after rectification.

Letter written to firm on 02.03.10 reg. poor quality

Modi Industries Ltd, Modi Nagar

Putty Kiffing stopper Grey air drying

Less shelf life. As per PO material should have self life of min. 12 months instead of 6 months

Joint inspection held on 19.11.09. During JI, consignee was shown all the documents for self life of 12 months. Hence the rejection is not on RITES A/c.

Not on RITES A/c

Integrated Data Systems, Kolkata

Foot -cum-Flange Mounted 3 phase induction Motor

Virender Singh

Interturn of all the motors are found short in the surge test.

Joint inspection held on 16.11.09. During JI, it was brought out that surge test is a part of type test which is not in the scope of RITES inspection. Hence rejection is not on RITES A/c.

Not on RITES A/c

Page 20: COMPLNT. 2010-11

Complaint cases of the year 2009-10 Cumulative Statement

UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF IC CLASSIFICATIONCOM NO.

CONSI-GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

ACTION TAKEN

109 NN/09-10/107 01.10.09 DMW DSL PTA Lalta Prasad 1 No. 1 No. 91.02 03.11.09 07.12.09 29.05.09

3 NN/09-10/108 00267 08.04.09 NWR DSL JU Rajiv Ahuja 2500 Kgs. 2500 Kgs. 2.01 03.11.09 21.11.09 08.07.09

1 NN/09-10/109 NWR Dsl Phu-lera AK Suri 1 No. 1 No. 13.11.09 20.01.10 Pending

112 NN/09-10/110 20053 28.04.09 RCF C&W KXH KD Sharma 121 Nos. 121 Nos. 2.23 17.12.09 22.12.09 30.07.09 V Upheld

113 NN/09-10/111 00335 30.03.07 NWR DSL Ajmer AK Dua 14 Nos. 14 Nos. 08.12.09 31.07.07 Deleted

114 NN/09-10/112 32366 16.12.08 NER Depot GKP Sudesh Jain 3250 kgs 3250 Kgs 2.43 23.12.09 28.08.08 Deleted

1 NN/09-10/113 00609 12.06.09 NWR BGC JU RK Jain 41 Nos. 41 Nos. 0.81 11.01.10 28.01.10 18.09.09 O Upheld

2 NN/09-10/114 12402 23.06.09 NER Press GKP Manoj Singh 29500 Nos. 4.26 22.01.10 03.02.10 23.10.09 Accepted

Avon Cranes, Gurgaon

OP-1751

EOT Crane 30/5 Ton Capacity

Variation in the span of crane ( 19.00 Mtrs.) and gantry (19.15Mtrs.)

Joint inspection held on 07.12.09. The gantry inspection was not in the perview of RITES inspection. Hence rejection not on RITES A/c.

Not on RITES A/c

Modi Industries Ltd, Modi Nagar

Putty Kiffing stopper Grey air drying

Less shelf life. As per PO material should be self life of min. 12 months instead of 6 months

Joint inspection held on 19.11.09. During JI, consignee was shown all the documents for self life of 12 months. Hence the rejection is not on RITES A/c.

Not on RITES A/c

BL Health & Safety, New Delhi

72245 72431

21.06.05 14.11.05

Advance Fire Fighting Technology

The equipment was found unsuitable.

Joint inspection held on 20.01.10. During JI, the equipment to be tested once again at Govt. lab i.eERDA, Vadodara for electric suitability to establish authenticity as per pictorial diagram on the equipment.

17.11.05 785/02

Under Testing

Mayur Glass Industries, NOIDA

Sealed Door Window arrangement

Aluminium frame spacer found painted with black paint instead of dark anodizing / phosphating . Failed in candensation test, water leakage test as water entered inside the sealed window unit.

Joint inspection held on 22.12.09. The sample tested pased in leakage and condensation test. Aluminium Spacer found blacked painted instead of black/brown anodizing as per RDSO specn. No. SK-404 ev.1. Hence material finally rejected.

Call for explanation from IE thr. CM

Universal Instruments. Ambala City

Duplex Vacuum Gauge

Reason fo rejection not forwarded

Rejection after 90 days of receipt of material. JI not required.

Kasturi Chemicals, Gorakhpur

Orthophoshphoric Acid

Material declared unsuitable.

Rejection after 90 days of receipt of material. JI not required.

Jagdamba Liquified Steels, Hathras

Buffer Casing for Coaching Stock

Material not as per drawing, month and year of mfg. not available. Holes are not spot faced.

JI held on 28.01.10. Material finally rejected during JI as per reason of rejection.

Call for explanation thr. CM on 15.03.10

Tirupati System Forms & Packings, Kanpur

Ruled Register Bound

29500 Nos.

Size of Register is smaller then specification. No. of pages of register is 92 pages including in place of 96 pages. Printing of IR logo on inner page of register is not clear.

Joint inspection held on 03.02.10. Material accepted during JI.

Page 21: COMPLNT. 2010-11

Complaint cases of the year 2009-10 Cumulative Statement

UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF IC CLASSIFICATIONCOM NO.

CONSI-GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

ACTION TAKEN

117 NN/09-10/115 00943 18.08.09 NWR Insp JU RK Jain 100 Nos. 5.58 22.01.10 10.03.10 25.12.09

3 NN/09-10/116 05001 06.11.08 NR GSD SSB PK Bagga 17.16 01.02.10 Pending

119 NN/09-10/117 55049 27.09.08 DMW DSL PTA KD Sharma 35 Nos. 25 Nos. 7.61 01.02.10 18.02.10 22.04.09

120 NN/09-10/118 54582 29.07.08 DMW DSL PTA RK Chhabra 3126 Nos. 300 Nos. 0.31 05.02.10 No JI 06.06.09

121 NN/09-10/119 RH Industries, Mohali 57892 23.09.08 DMW DSL PTA 6 Nos. 1 No. 1.11 05.02.10 19.02.10 25.10.09

2 NN/09-10/120 Electromech, Delhi 57475 27.12.08 DMW DSL PTA 66 Nos. 31 Nos. 1.91 05.02.10 19.02.10 29.06.09 V Upheld

6 NN/09-10/121 57129 27.08.08 Pipe Lower DMW DSL PTA PP Gupta 108 Nos. 55 Nos. 0.95 05.02.10 NO JI 12.03.09

4 NN/09-10/122 23.10.09 PHE TPI 300 MT 300 MT 8.73 01.02.10 13.11.09 Pending

5 NN/09-10/123 23.10.09 PHE TPI 600 MT 600 MT 47.4 01.02.10 13.11.09 Pending

3 NN/09-10/124 30035 18.07.09 RCF C&W KXH Seshnath 242 Nos. 183 Nos. 31.47 16.02.10 19.02.10 P Upheld

6 NN/09-10/125 02573 17.07.09 NR GSD SSB 3276 Mtrs. 521 Mtrs. 3.87 16.02.10 26.02.10 30.09.09 Pending

Jagdamba Liquified Steels, Hathras

Axle Box Housing

100 Nos. 130 Nos.

Dimension and marking ar not as per drawing and spec.

Joint inspection held on 10.03.10.

Not on RITES A/c

Deep Chemical Industries, Sonepat

De-odourising cum Disinfactent Fluid

15000 Ltrs. 15000 Ltrs.

15000 Ltrs. 15000 Ltrs.

Material not confirming to IS specification

Joint inspection fixed on 11.02.2010 and refixed for 23.02.10

06.06.09 27.06.09

Alka Forgings, Ghaziabad

Cam Shaft Gear forgings

Excess material in profile area. Machining not proper.

Joint inspection held on 18.02.10.

Not on RITES A/c

Report Awaited

Jain Paint & Hardware Stores, Patiala

Bolt ( Crank Shaft Gear) Forging

Hex punch 3/4" total length over by .837" to 887" as required length .687"

Joint inspection fixed on 18.02.10

Lifted before JI

Report Awaited

Radiator Compartment

Hemant Kumar

Rear expansion tank ( door side) found water leakage from top near carline in critical position as space constrict which is fitted in Raidator compartment

Joint inspection held on 19.02.10.

Not on RITES A/c

Air Whistle Assembly

Hemant Kumar

S. No. 6,32 & 36 not properly blowing due to blow hole in bracket

Joint inspection fixed on 19.02.10

Call for explanation thr. CM

Murad International, Mohali

Hole alignment in ref. to centre line of L-pipe is out by 4-5mm approximate

Joint inspection fixed on 18.02.10

Lifted before JI

Report awaited

Kay Bee Alums, Chittaurgarh

PHEMISC35 of 09-10

Alumina Ferric for water purification

Sri-nagar

Neeraj Singh

Aluminum compound as AL2O3 as 12% as against the desired specification of 15%

Joint inspection fixed on 15.02.10 & refixed on 07.04.10

Kay Bee Alums, Chittaurgarh

PHEMISC37of 09-10

Alumina Ferric Gr.-II

Sri-nagar

Deepak Kumar

Aluminum compound as AL2O3 as 12% as against the desired specification of 15%

Joint inspection fixed on 15.02.10 & refixed on 07.04.10

Jagdamba Enterprises, Kapurthala

Fitment of double side laminated heat resistant

Tear strength of aluminium foil in machined direction found 63N against 90N ( Min)

Joint inspection held on 19.02.10. 183 sets stands finally rejected during joint inspection.

01.12.09 24.12.09

Minor Penalty C/Sheet issued to IE

Sri Shdershan Texmart, Delhi

Cloth All Wool serge Khaki

Pankaj Sood

Material rejected by GM (Vig.) after testing from lab

Joint inspection held on 26.02.10. Sample sent to test house by consignee for testing.

Under Testing

Page 22: COMPLNT. 2010-11

Complaint cases of the year 2009-10 Cumulative Statement

UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF IC CLASSIFICATIONCOM NO.

CONSI-GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

ACTION TAKEN

128 NN/09-10/126 01865 09.06.09 NR EMU GZB Vimal Arora 25 Nos. 6 Nos. 0.31 04.02.10 26.02.10 10.11.09

7 NN/09-10/127 06581 19.03.07 NTR DSL AMV 4484 Nos. 524 Nos. 4.12 01.02.10 19.03.10 16.03.09 Pending

130 NN/09-10/128 56497 05.11.09 DMW DSL PTA RK Chhabra 3.01 18.02.10 18.03.10 10.12.09 Accepted

131 NN/09-10/129 56008 10.08.09 DMW DSL PTA Consignee 80 Nos. 80 Nos. 08.03.10 Deleted

8 NN/09-10/130 04718 17.11.09 NR GSD AMV Manoj Singh 12600 Ltrs. 8.24 08.03.10 19.03.10 10.01.10 Accepted

9 NN/09-10/131 04766 19.11.09 NR GSD AMV RK Saxena 600 Ltrs. 600 Ltrs. 0.55 02.03.10 19.03.10 29.12.09 Pending

10 NN/09-10/132 78100 28.04.08 NCR TRD ALD RK Vamne 42.449 MT 5 drums 16.05 29.03.10 13.07.09 Pending

1 NS/09-10/01 04691 04.11.08 RE OHE SC Iqbal Singh 675 Nos. 430 Nos. 25.89 19.06.09 10.03.09 Accepted

Matusushi Power Technology, New Delhi

Twin beam sealed head light

The mounting plate dia should be 450mm but supplied twin beam head light dia is rectangle shap which is not suitable for EMU/GZB.

Joint inspection held on 26.02.10. Rejection is not on RITES A/c.

Not on RITES A/c

Punjab Laminates, Jallandhar City

Decorative Thermosetting Synthetic Resin

Nagesh Yadav

Material not found as per RDSO specification and drawing.

Joint inspection held on 19.03.10. Sample sent to NABL Govt. lab for testing by consignee.

Under Testing

Kasturba Sewa Mandir Trust, Rajpura

Long Cloth Cotton Khadi Colour

4020 Mtr 3479 Mtrs.

4020 Mtr 3479 Mtrs.

Variation in width, length.

Joint inspection was scheduled for 18.03.09. Rejection withdrawn vide R/Note dated 04.03.10.

Winkel Engineering Works, Mohali

Cam Roller FP Head Stiffer crownded

20 RMS in bore found up to 55 RMS. 8 RMS in OD found upto 61 RMS.

Case deleted since consignee inspection

Rahul Paints, Lucknow

R/M Paint Red Oxide Semi Gloss

12600 Ltrs.

Finish is semi gloss instead of glossy and gloss value found 48 to 50 instead of 71 (Min)

Joint inspection held on 19.03.10. Sample sent to NABL Govt. lab for testing by consignee. Rejection memo has been withdrawn vide AMM/AMV's letter dated 06.05.10

Pushker Paint Industries, Lucknow

R/M Paint Red Oxide Chrome Pirmary

The sample does not conform to IS:2074/92 Red oxide chrome found zinc chrome, % by mass 5.60 against 16.0 Min and volume solids % found 36.00 against 45+/-5.

Joint inspection held on 19.03.10. Sample sent to NABL Govt. lab for testing by consignee.

Under Testing

Veekay General Industries, Delhi

Jointless Grooved Copper Contact Wire 107 sq.mm

Improper reeling and twist in contact wire drums

Joint inspection fixed on 01.04.10

Jain Steel Industries, Mandi Govindgarh

Rolled Mild Steel Beams

430 Nos. not bearing the RITES rubber stamp

Joint inspection held on 14.04.09. During JI, it is found that all the materials were having the RITES rubber stamp as given on the Inspection Certificate.

14.04.09 June'09

Page 23: COMPLNT. 2010-11

Complaint cases of the year 2009-10 Cumulative Statement

UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF IC CLASSIFICATIONCOM NO.

CONSI-GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

ACTION TAKEN

2 NS/09-10/02 90521 17.03.08 SCR DSL KZJ PK Bagga 83 Nos. 83 Nos. 0.74 01.04.09 04.06.09 Accepted

3 NS/09-10/03 01991 11.10.06 SCR DSD HBL 518 Nos. 516 Nos. 1.03 06.05.09 18.06.09 Aug-08 S Upheld

4 NS/09-10/04 01338 17.07.08 SCR DSD HBL 1373 Nos. 1373 Nos. 3.32 06.05.09 18.06.09 Aug-08 S Upheld

5 NS/09-10/05 01730 20.10.08 SWR DSD KJM Sudesh Jain 62 Nos. 62 Nos. 4.82 14.05.09 V Accepted

Super Seal Flexible Hose, Noida

Air Hose Assembly

The component in gasket for hose coupling does not confirm o the specification and drawing

Joint inspection was held on 04.06.09. The gasket have been jointly tested, confirmed to drg stipulation in respect of tension test and polymer identification and found suitable as per the requirement of stores. After replacing the gaskets by the firm, 83 Nos. hose assembly is accepted and rejection memo hereby withdrawn vide SMM/Dsl/Kazipet's letter No. 11/0509 dated 08.06.09.

24.01.09 625/012

Kew Precision Parts, New Delhi

Screw Adjusting

Rajesh Sood

The head of the screw is having deep pitting marks and surface is not smooth The carrying hole dia are 5.57, 5.64mm against 6.35mm.

Joint inspection held on 18.06.09. During JI, it has been jointly decided that the supplier will rectify/replace the item duly inspection by RITES. It was ascertained from the IE who conducted the JI that the deep pitting marks on the bend of the screw is causing damage the button bridge. Hence the rejection is upheld. Since no mention is made that the defect be rectified the rejection is treated as case of upheld.

Kew Precision Parts, New Delhi

Screw Adjusting

Rajesh Sood

The head of the screw is having deep pitting marks and surface is not smooth The carrying hole dia are 5.57, 5.64mm against 6.35mm.

Joint inspection held on 18.06.09. During JI, it has been jointly decided that the supplier will rectify/replace the item duly inspection by RITES. It was ascertained from the IE who conducted the JI that the deep pitting marks on the bend of the screw is causing damage the button bridge. Hence the rejection is upheld. Since no mention is made that the defect be rectified the rejection is treated as case of upheld.

Banaras Engineering Company, Varanasi

Pedastal Bearing

Bearing roller chamfering are uneven and outer race rough markings, rough surfaces are noticed in rollers.

JI held on 18.06.09 and 01.07.09. During JI, samples were taken by OEM for investigation and report was submitted to consignee stating the bearings are acceptable.

18.06.09 Oct'09

10.02.09 630/006

Page 24: COMPLNT. 2010-11

Complaint cases of the year 2009-10 Cumulative Statement

UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF IC CLASSIFICATIONCOM NO.

CONSI-GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

ACTION TAKEN

7 NS/09-10/06 90076 15.01.09 SCR DSL KZJ PP Gupta 162 Nos. 162 Nos. 1.38 12.05.09 04.06.09 Accepted

7 NS/09-10/07 02081 30.12.08 SWR DSD KJM 50 Nos. 50 Nos. 0.59 01.06.09 18.06.09

8 NS/09-10/08 01230 17.06.08 SWR DSL KRJP AK Gupta 232 Nos. 180 Nos. 1.65 01.06.09 17.06.09 Feb-09 D Upheld

9 NS/09-10/09 1011F 20.01.09 ICF C&W PER 13 Sets 13 Sets 44.41 19.06.09 29.05.09 D Rectification

10 NS/09-10/10 1010F 20.01.09 ICF C&W PER 16 Sets 16 Sets 36.41 19.06.09 29.05.09 19.03.09 D Rectification

Super Seal Flexible Hose, Noida

Air Hose Assembly

The component in gasket for hose coupling does not confirm o the specification and drawing

Joint inspection was held on 04.06.09. The gasket have been jointly tested, confirmed to drg stipulation in respect of tension test and polymer identification and found suitable as per the requirement of stores. After replacing the gaskets by the firm, 162 Nos. hose assembly is accepted and rejection memo hereby withdrawn vide SMM/DSD/Kazipet's letter No. 11/0509 dated 08.06.09.

30.03.09 674/003

Rohit Engineering Works, Jalandhar

Cut out cock ball

Satish Kumar

Gasket has been grinded due to this ball valve is not moving freely and only the grinded part of gasket ball valve is seated gasket is grinded on one side to facilitate seaing of the ball valve.

Joint inspection held on 18.06.09. Since cutout cock opening /closing operation is very hard. The cutout cocks are not suitable for operation. Rejection upheld but not on RITES A/c.

26.03.09 633/052

Not on RITES A/c

Quadran EPP Surlon India, Sahibabad

Drive Gear for Technometer generator

Out of 232 Nos. 180 Nos. found Bush uneven size and balance 52 Nos. found suitable.

Joint inspection held on 17.06.09. 52 Nos. are suitable. Bush 1mm projection is not available in all drive gears. Key way is not proper on drive gears. Hence material finally rejected.

Escorts Limited, Faridabad

EP Brake Equipment

Pradeep Kumar

In brake cylinder distance of mounting hole from end found 24 to 27 mm as against 22mm as per escorts drg. In brake cylinder additional rib which is not shown in escorts drg is welded in the mounting bracket which causes difficulties while tightening mounting bolts.

Joint inspection held on 29.05.09. Out of 51 items consists of one set, brake cylinder alone is rejected and all other items are found suitable. RITES is of the view that sine the defects is minor nature it can be rectified.

25.03.09 838/088

Escorts Limited, Faridabad

EP Brake Equipment

Pradeep Kumar

In brake cylinder distance of mounting hole from end found 24 to 27 mm as against 22mm as per

Joint inspection held on 29.05.09. Out of 51 items consists of one set, brake cylinder alone is rejected and all other items are found

Page 25: COMPLNT. 2010-11

Complaint cases of the year 2009-10 Cumulative Statement

UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF IC CLASSIFICATIONCOM NO.

CONSI-GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

ACTION TAKEN

11 NS/09-10/11 92669 29.12.08 Cap Screw SCR DSD GY Roshan Lal 462 Nos. 462 Nos. 0.41 19.05.09 17.06.09 Feb-09 D Upheld

12 NS/09-10/12 05714 11.03.09 SR CWE MAS 16500 Ltrs. 01.07.09 08.06.09 D

1 NS/09-10/13 94588 21.05.08 RE OHE VKB 27.07.09 12.11.08 Accepted

14 NS/09-10/14 91824 27.08.08 SCR DSL GY RK Jain 62 Nos. 62 Nos. 1.61 01.06.09

2 NS/09-10/15 01465 18.08.08 SWR DSL HBL 111 Nos. 111 Nos. 2.65 27.07.09 Feb-09 D Upheld

Pooja Forge, Faridabad

The length of the screw cap is 61.16mm against 69.85mm as per the drawing.

Joint inspection held on 17.06.09. It is understood from the IE who attended the JI that though measurements were taken the same has not been G.S. Industries,

JallandharSmoke Grey Paint

Nagesh Yadav

16500 Ltrs.

All the drums received in broken leaking and damaged condition.

Joint inspection held on 08.06.09. After segregation of the drums, the balance qty which are found ok may be accepted by consignee.

20.04.09 679/06

Transit damage

Chandra Metals, Allahabad

Cadmium Copper Catenary Wire

Sanjiv Srivastava

1618.5 Mtr 1992.0 Mtr

1618.5 Mtr 1992.0 Mtr

Wires come out from the inner side, obstructing the stringling activity.

Joint inspection held on 25.05.09. Material accepted during joint inspection

25.05.09 July,09

Imperial Auto Industries, Faridabad

Assembly Fuel Injection Tube

42 Nos. have found excess length due to which fitment of fuel injection tube on loco is difficult.

Joint inspection held on 16.07.09. Firm agreed to replace the defective material before joint inspection.

16.07.09 Aug'09

18.02.09 611/072

Lifted before JI

Kaysons Electricals, Varanasi

Brush Silver Graphite

Sanjiv Srivastava

Dimension are not matching as per EMD make and not supplied with screw and washers

Joint inspection held on 23.07.09. As per MI 4334 of EMD, as the brush thickness reaches 5.5mm, the same should be condemned. Whereas, the brush supplied by the mfr'r is having thickness from 3.94 to 3.99mm and length is also noticed to be more than 9.36mm. Hence these brushes can not be used for practical application. Material finally rejected.

23.07.09 Aug'09

Page 26: COMPLNT. 2010-11

Analysis of rejections for 2009-2010Case No. Item Category Reason of rejection Corrective action

1 NN/09-10/43 Upheld

2 NN/09-10/46 Upheld

3 NN/09-10/51

4 NN/09-10/66A Rectification

5 NN/09-10/104 Radiator compartment Rectification

6 NN/09-10/113 Upheld

7 NN/09-10/124 Upheld

S. No.

Deficiency during inspection

Stainless Steel Electrodes

Welding cracks during fitment trials.

Cracks checked during inspection but failed in trial.

As far as possible fitment trial should be done

Wearing piecs for side bearer

Failed in chemical composition

Accepted on the basis of TC during inspection. Sample drawl should be from actual item inspected as far as possible.

Method od sample drawl needs to be streamlined.

Face plate for buffer plunger

Not on RITES A/c

Porosity, cracks and mixed supply

During JI, RITES stampl was not clearly legible and JI concluded not on RITES A/c due to mixed supply by supplier.

Stamping should be very clear and ensured in IE's presence.

Varnish black Japan type A

Failed due to snatches, hardness, volatile matter, ash content and finish etc.

Check sheet grossly insufficient and small internal check sheet of supplier not seen which had glaring mistake in specified viz & viz observed values.

Check sheet should be comprehensive covering all parameters of the item which are functionally important. Inspection should be done with eyes open.

Water level gauge holes out. Funnel cotter size 80mm instead of 108mm

Components not checked during inspection.

All fitment/assemy features must be made part of check sheet and if possible a fitment trial should be done.

Buffer Casing for coaching stock

Material not as per drawing, month and year of mfg. not available. Holes are not spot faced.

Overlooked during inspection.

Basic features must be checked viz. make, month/year of inspection and details of drg.

Supply and fitment of double sided laminated heat resistant aluminium foil insulation

Tear strength of Al. foil in machined direction found 63N against 90 N Min.

Not checked during inspection

All parameters must be checked during inspection.

Page 27: COMPLNT. 2010-11

Analysis of rejections for 2009-2010Case No. Item Category Reason of rejection Corrective actionS.

No.Deficiency during inspection

8 NS/09-1/03 Screw Adjusting Upheld

9 NS/09-10/19 Pin for WDG2 Locos Upheld

10 NS/09-10/20 Upheld

11 NS/09-10/22 Upheld

12 NS/09-10/25 Flexible Pipe Upheld

13 NS/09-10/26 Sorting

Head of screw is having deep pitting marks and surface is not smooth. Hole dia 5.57 against 6.35

Hole dia 6.35 not checked. Sampling seems to be done from one packing only

All functionally important parameters must be included in the check sheet. Sampling should be representative of all available lots/batches.

Dia of split cotter hole 9 mm against 7mm Min.

7mm dia hole not checked during inspection

All functionally important parameters must be included in the check sheet. Sampling should be representative of all available lots/batches.

Sealed window glass unit

Mfr's name, month/year should be indelibly marked on the upper right hand corner instead of sticker

Methos of making not checked and recorded in check sheet

In depth check and not cursory check should be done

Head Stock arrangement

Material failed in chemical composition as per IRS:M41/97

During inspection material got tested as per wrong specification i.e. 2062/92

Drg/Specn should be thorougly read before inspection

Failed in lab test. Microstructure reveals that housing top and bottom is not made of malleable cast iron as per IS:14329/95

Microstructure not get checked during inspection.

All cheks as per PO/ Specification/drawing must be carried out

Head Rest for upper berth

Shade of item found to be different brown colour in some pieces. Sporadic voids are observed in the rear side of item in some places.

Blue colour as per check sheet against specified blue or brown. PO qty is 4020 Nos. out of which 1200 Nos. were required brown and balance blue. IC does not show the colour of 500 Nos. passed.

Qty of material passed should be stamped in IE's presence and shown in IC with distinct feature like colour.

Page 28: COMPLNT. 2010-11

Analysis of rejections for 2009-2010Case No. Item Category Reason of rejection Corrective actionS.

No.Deficiency during inspection

14 NS/09-10/36 Upheld

15 NS/09-10/37 Upheld Recorded as specified

16 NW/09-10/09 EOT Crane Upheld

17 NW/09-10/15 Upheld

18 NW/09-10/17 Sorting

19 NW/09-10/18 Upheld

20 NW/09-10/19 Wash based light fitting Rectification

Traction Motor Bearings

Radial clearance more than maximum limits

Radial clearance check recorded in check sheet but not found correct in material

To ensure checks recorded are valid in material too.

Pugree Mulmul Red Colour

Ends 25.98, 26.0 against required 30+/-7% Picks 15.75, 5.8 against required 22+/-5% GSM 44.45 against required 105+5% -25%

To ensure checks recorded are valid in material too.

Main beams are bent. Alignment of wire rope drum disturbed and same grooves of drums are damaged which will damage the wire rope.

All parameters of AT not covered

Special attention should be paid and infrastructural items. Details of AT and GA drg need to be studied before inspection

Leather Gauntlet 350mm

Length found 290mm against 350mm

Length Ok as per check sheet

Inspected material should be stamped and sealed in IE's presence and valid as per check sheet.

Buffer Plunger 95 rejected out of 393 Nos.

Gap in face plate Radius is not proper. Spindle is bent/thin Porosity, slag and blow holes

The material was passed in visual inspection covering casting and other visual defects in check sheet.

Sample selection to be done to ensure better representation of the material

Rubber Stopper with bearing plate

Thickness found 3mm instead of 4mm

Thickness found ok as per check sheet

Inspected material should be stamped and sealed in IE's presence.

Size variations and lengend plate not found

All dimensions not covered in check sheet. Legend plate checked and found ok but not found in material supplied.

Inspected material should be stamped and sealed in IE's presence.

Page 29: COMPLNT. 2010-11

Analysis of rejections for 2009-2010Case No. Item Category Reason of rejection Corrective actionS.

No.Deficiency during inspection

21 NW/09-10/25 Rectification

22 NW/09-10/24 Axle Box housing Rectification

23 NW/09-10/28 Upheld All parameters not covered

24 NW/09-10/30 Upheld

25 NW/09-10/35 Upheld Dimensional variation No deficiency in documents Inspection to be more realistic

26 NW/09-10/45 Upheld

27 NE/09-10/06 Upheld

Buffer Casting for coaching

Dent on bottom surface. Bottom surface uneven. Blow holes.

Free from defects as per check sheet.

Inspected material should be stamped and sealed in IE's presence.

Hole in wing. Blow hole in bearing sheet, hole in spring sheet, wing crack, bore not ok and hole not ok.

Material found satisfactory as per check sheet

Inspected material should be stamped and sealed in IE's presence.

Mirror Assembly for CN coaches

FRP sheet thickness not as per drawing. Item found in four pieces and different colour instead of single pcs and uniform colour. Mirror frame found welded joint insptead of pressed width found 34.5 instead of 41mm

Check sheet should be exhaustive and visual inspection should be realistic.

Impeller for Traction Motor Blower assembly

Impeller height of hub found 52.2mm against 51+/-0.5mm

Hieght checked during inspection

Sampling from different production lots required.

Pugree Mulmul Red ColourSnack Table for Sleeper Coaches

Item No. 7 of PO support arm dimentions found 90mm instead of 70mm. Item No. 8 support dimension found 154 to 160mm instead of 140. Dimension 85mm found 77 to 86.7mm

Dimension not recorded in check sheet

Major dimension must be given in drg checked

Cloth All Wool Serge 140 cms

Name /trade mark of firm not available on selvedges of material as per purchase order

Feature not checked during inspection

All PO/Specn/Dgr must be studied before starting inspection.

Page 30: COMPLNT. 2010-11

Analysis of rejections for 2009-2010Case No. Item Category Reason of rejection Corrective actionS.

No.Deficiency during inspection

28 NE/09-10/07 UpheldCloth All Wool Serge 140 cms

Feel and finish of cloth not as per approved sample

Check sheet grossly insufficient. Material not compared with approved sample.

Wherever samples are approved they should be made available during inspection and check sheet should be exhaustive.

Page 31: COMPLNT. 2010-11

Cumulative statement of cases of complaints for the period 01.04.10 to 31.07.10S. No. UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF IC ACTION TAKENCONSI-

GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

CLASSIFICATION

20 NN/10-11/20 14564 14.11.09 RUIDP TPI ALWAR RK Jain 2 Nos. 2 Nos. 43.4 29.04.10 07.05.10 . Accepted

21 NN/10-11/21 55126 06.11.08 DMW DSL PTA 23 Nos. 30.04.10 12.05.10 03.11.09

22 NN/10-11/22 55160 24.10.09 DMW DSL PTA 16 Nos. 10.8 30.04.10 No JI 05.03.10

23 NN/10-11/23 20065 20.05.08 RCF C&W KXH 8 Nos. 8 Nos. 4.29 07.05.10 22.07.10 29.01.10 D Upheld

24 NN/10-11/24 80076 10.07.07 NWR DSL VC Tiwari 1 NO. 1 No. 05.05.10 01.06.10 04.08.07

25 NN/10-11/25 40109 26.03.10 RCF C&W KXH BK Kapur 3.65 25.05.10 04.06.10 31.03.10

26 NN/10-11/26 01691 10.12.09 NER DSL GD Sunil Panda 0.86 17.05.10 06.05.10 07.01.10 E

JCB India, Jaipur

Loade Backhoe Machine

Substandard material passed

JI held on 07.05.10. Material accepted during joint inspection.

Ganesh Foundary, Jodhpur

Kit for bearing cap outer

Neeraj Singh

141 Nos.

Step on dia 254.050 - 254.000 is not provided due to casting defect.

Joint inspection held on 12.05.10. It was a trial order and mould have been rectified by firm. Firm has agreed to replace the material.

Not on RITES A/c

Ganesh Foundary, Jodhpur

End shield PE for TM

Neeraj Singh

144 Nos.

Problem in fitment of box nut due to improper wall thickness

Joint inspection was scheduled for 02.06.10. As the firm has already lifted the material before Ji.

Lifted before JI

Gambhir Sons, Gurgaon

Chair Angle & Partition Frame set

Deepak Kumar

Dimension observed 255&254 against 239+/-2

JI held on 22.07.10. Material finally rejected during joint inspection.

Sachit Electronics, Delhi

Portable Hardness Tester

Phu-lera

Hardness tester measure work piece of 4 kg and above weight only instead of 2-5 kg on stable support as per PO.

JI held on 01.06.10. Consignee to send staff for training and confirm. The machine was used without proper training. Hence rejection is not on RITES A/c.

Not on RITES A/c

Atlas Adhesive, New Delhi

Fire Retardent Rubber based Adhesive

4000 Nos. 4895 Nos.

3180 Nos. 4895 Nos.

Brushing as congulation takes place while applying by brush. Weight per litre found 1.2kg/Ltr against 0.90+/-0.1 Kg.

Joint inspection held on 04.06.10. This material was accepted by RITES IE due to urgency of RCF without conducting any test on TC of the firm. Hence the rejection is not on RITES A/c.

Not on RITES A/c

Delco Switchgears, Jaipur

Miniature 15 Amp

100 Nos.

100 Nos.

Tripping time is less than specification standards time. Samples connection terminal bolt was broken during fitment.

JI held on 28.06.10. During JI, firm has agreed to replace the defective terminal bolts at consignee premises under warranty cluase.

Not on RITES A/c

GMI recate-gorized as Not on RITES A/c instead of Rectification.

Page 32: COMPLNT. 2010-11

Cumulative statement of cases of complaints for the period 01.04.10 to 25.08.10

UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF ICS. No.

CONSI-GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

CLASSIFICATION

ACTION TAKEN

9 EN/10-11/08 12451 27.03.09 NER Depot GKP 474 Nos. 474 Nos. 22.04.10 21.05.10 14.10.09

10 EN/10-11/10 03002 17.08.09 NR EMU GZB P Moitra 60 Nos. 60 Nos. 17.05.10 14.06.10 10.03.10 O Rectification

11 EN/10-11/11 01622 07.07.09 WCR GSD Kota Ajay Sharma 4246 Nos. 21.05.10 15.06.10 04.02.10

12 EN/10-11/12 00143 29.01.10 NWR GSD BKN Z. Anwar 750 Nos. 750 Nos. 24.05.10 14.06.10 09.04.10 Pending

13 EN/10-11/13 20430 24.02.10 RCF C&W KXH Z Mazeed 330 Nos. 30 Nos. 25.05.10 Found cracked 06.06.10 26.04.10 Accepted

14 EN/10-11/14 00164 12.02.10 NWR GSD JU 123 Nos. 123 Nos. 11.06.10 01.07.10 31.03.10 Accepted

15 EN/10-11/15 00168 03.02.10 NWR INSP. JU PK Biswas 1010 Nos. 11.06.10 28.06.10. 19.03.10

Ashoka Industries, Howrah

Push Cock complete

Gautam Dutta

Material failed in Chemical composition

JI held on 21.05.10. It has been observed that the consignee has consumed the total qty of 18486 Nos. and the balance i.e. 474 Nos. is within the range of 5% of inspection parameters. Hence Rejection not on RITES A/c.

Not on RITES A/c

Razzlaxmi Enterprises, Howrah

Gear Case top and bottom

Material not as per latest amended drawing.

Joint inspection held on 14.06.10. Material accepted after rectification.

Anand Sales Corporation, Kolkata

Gear Pin with Washer and Bulb Cotter

4246 Nos.

Cotter dimensions AG&E are found 64, 16&6mm which are nearly to item 1. Therefore, dimension of cotter does not exist with item No. 2 Some washers are very rusty and pitted.

JI held on 15.06.10.Consignee have received (4+2 bags) of the said material on 06.04.10. As declared and accepted by the vendor. Hence rejection is not on RITES A/c.

Not on RITES A/c

Fifa Enterprises, Howrah

Wearing Piece for Side Bearer

Sample failed in testing in CMT lab

JI held on 14.06.10. During JI, sample sent to an Govt approved lab for testing by consignee. Reminder sent to consignee on 30.07.10.

Under testing

AG Fibrotech, Kolkata

FRP Window Assembly

JI was scheduled on 15.06.10. Material accepted and rejection withdrawn vide R/Note No. 10161632 dated 06.06.10.

Die Metal Concern, Kolkata

Brake Beam Complete

Gautam Dutta

Marking not as per PO condition given in description

JI scheudled for 28.06.10. Rejection with and material has been accepted vide AMM/Ju's letter No. JU/RC-I/51-2010/RNA-06 dt. 01.07.10

Macedon Vinimay, Kolkata

HDPE Lavatory Chute

1020 Nos.

As per drg, item No. 12 not available

JI held on 28.06.10. During JI, mfr showed the amendment to IC for item No. 12 made by IE and also ensure consigee to despatch item No. 12 of PO. Consignee agreed to the commitment made by the mfr.

Not on RITES A/c

Page 33: COMPLNT. 2010-11

Disposal of total complaints during the month

Month/Year

1 April, 2010 29 88 58

2 May, 2010 58 43 34

S. No.

All Complaints with JI

Opening Balance

Received during the month

Dispossed during the month

Closing Balance

59 (including JI+No JI)

67 (including JI+No JI)

Page 34: COMPLNT. 2010-11

Name of Inspecting Engineers with Controlling Managers of Northern Region from 01.04.10 to 30.06.10

S. No. UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF IC CLASSIFICATION

1 NN/10-11/01 02858 05.08.09 NR ETD CNB Manoj Singh 90 Nos. 90 Nos. 1.48 12.04.10 16.04.10 13.11.09 V Upheld

2 NN/10-11/07 12768 21.12.09 NER Depot GKP Hemant Kumar 2000 Nos. 6.26 22.04.10 02.06.10 11.01.10 C Upheld

3 NN/10-11/14 32964 03.12.09 NER Depot GKP Deepak Kumar 1292 Nos. 133 Nos. 0.39 27.04.10 02.06.10 23.10.09 C Upheld

4 NN/10-11/17 12592 17.08.09 Gravity Cock NER Depot GKP Pradeep Kumar 5.45 27.04.10 02.06.10 29.01.10 C Upheld

5 NN/10-11/27 54653 07.08.08 DMW DSL PTA PK Bagga 400 Nos. 400 Nos. 0.48 19.05.10 02.06.10 05.04.09 V Upheld

6 NN/10-11/28 55898 18.07.09 DMW DSL PTA PK Bagga 1380 Nos. 1.48 19.05.10 02.06.10 30.04.10 C Upheld

7 NS/10-11/04 1908F 23.10.09 ICF C&W PER Rajesh Sood 2000 Nos. 2.32 28.04.10 04.05.10 25.03.10 D Upheld

8 NS/10-11/06 1010F 26.01.09 ICF C&W PER Anar Singh 42 Sets 42 Sets 95.5 04.06.10 14.05.10 30.10.09 P Upheld D.K. Bist

CONSI-GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

ACTION TAKEN

CMS S/Shri

Kanpur Expeller Company, Kanpur

Modified Equalizer Pin

The slot portion finishing is not proper.

Joint inspection held on 16.04.10. During JI, it is concluded that material is not suitable and is rejected. Vendor is directed to replace the material at the earliest.

Kuldeep Mathur

Gifval Industries, Mohali

Push Type Flushing Valve

1375 Nos.

Material failed in chemical composition

Joint inspection held on 02.06.10. Material finally rejected due to chemical composition.

IE has been repatriated

Satpal Singh

Sagar Valve Industries, Jallandhar

Push Type Flushing Valve

Material failed in chemical composition i.e. Body, press knob and spring.

Joint inspection held on 02.06.10. Material finally rejected on the basis of practical suitability and chemical compositon.

IE has been repatriated

C.B. Pandey

Zaam Tools, Raibareili

10000 Nos. 3100 Nos

10540 Nos.

Failed in chemical composition of body inlet and outlet.

Joint inspection held on 02.06.10. Material finally rejected on the basis of practical suitability and chemical compositon.

Minor Penalty C/sheet issued to IE

Kuldeep Mathur

Aay Ess Forging Industries, Ludhiana

Crank Shaft Coupling Bolt Forging

Raw material confirmed to specification D-87010

Joint inspection held on 02.06.10. Hardness found more than specified since material is having visual cracks. Hence 201 Nos. out of 400 Nos. stands rejected.

IE has been transferred to Eastern Region

C.B. Pandey

Aay Ess Forging Industries, Ludhiana

Crank Shaft Coupling Bolt Forging

1280 Nos.

Raw material confirmed to specification D-87010

Joint inspection held on 02.06.10. All the 1380 Nos. has been rejected as per lab report of DMW dt. 12.05.10.

IE has been transferred to Eastern Region

C.B. Pandey

Virendra Steel Enterprises, Chandigarh

Arrangement of Mug

2000 Nos.

Mug capacity 635 ml as against min. 750 ml as mentioned in drg. Thickness 0.8mm as against 1.6mm

Joint inspection held on 04.05.10. The mug capacity and handle thickness not being as per drawing. Hence material finally rejected.

Minor Penalty C/sheet issued to IE

Satpal Singh

Escorts Limited, Faridabad

EP Brake equipment

The manufacture of the hose pipe being a safety item is not in the approved mafg. List. Main reservoir (125) Ltrs. Angle inside welding with barrel is not done.

Joint inspection held on 14.05.10. Material finally rejected during JI.

Letter written to SR for review

Page 35: COMPLNT. 2010-11

Name of Inspecting Engineers with Controlling Managers of Northern Region from 01.04.10 to 30.06.10

S. No. UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF IC CLASSIFICATIONCONSI-GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

ACTION TAKEN

CMS S/Shri

9 NS/10-11/07 1016F 20.01.09 ICF C&W PER Anar Singh 23 Sets 23 Sets 78.54 04.06.10 18.05.10 20.10.09 P Upheld D.K. Bist

10 NS/10-11/08 1666F 31.10.09 ICF C&W PER PK Bagga 2.47 20.05.10 27.05.10 07.12.09 D Upheld

11 NW/10-11/02 02388 10.12.09 WCR CRWS BPL Rajesh Sood 2000 Nos. 9.96 01.04.10 20.04.10 11.03.10 O Upheld

12 NW/10-11/05 41364 23.09.09 WCR ELS ET Roshan Lal 1 Set 1 Set 3.91 26.04.10 03.06.10 30.12.09 D Upheld

13 NN/10-11/15 32499 07.08.09 NER Depot GKP Roshan Lal 3800 Nos. 0.85 27.04.10 21.05.10 23.10.09 C Rectification

14 NN/10-11/16 12481 11.05.09 NER Depot GKP Deepak Kumar 2500 Nos. 0.52 27.04.10 21.05.10 23.10.09 C Rectification

Escorts Limited, Faridabad

EP Brake equipment

The manufacture of the hose pipe being a safety item is not in the approved mafg. List. Main reservoir (125) lts. Angle inside welding with barrel is not done.

Joint inspection held on 14.05.10. Material finally rejected during JI.

Letter written to SR for review

Guneet Agro Industries, Ludhiana

Slotted pan Head Tapping

1648920 Nos.

1221320 Nos.

The screws are not satisfactory with respect to the thread dia 3.94, 3.75, 4.03, 4.01, 4.12, 4.16, 3.98 and 3.97 as against 4.04-4.22 specified as per 7173/89

Joint inspection held on 27.05.10. As the thread dia is not found as per the requirement in almost 30% of the samples. Hence material stands rejected.

IE has been transferred to ER

C.B. Pandey

Bharat Industries, Sangrur

Brake Head (Fabricated)

2000 Nos.

Item No. 4 ( Bushes) are not found in assembly

Joint inspection held on 20.04.10. Material is finally rejected since Bushes ( item No. 4 & 5 of assembly are not found with brake head assembly).

Satpal Singh

Asahi Ropes, Delhi

Set of Steel Wire Ropes and Slings

Variation in size. The wire rope sling of 10 tone and 15 tone are used to lift heavy goods of big sizes as under frame of loco bogies, where such small sizes of hooks supplied are failed to lift the same.

Joint inspection held on 03.06.10. Firm has not supplied all the sling with thimble as per IS:2762/82 and 2759/69. The wire rope sling hook of 10 tonnes and 15 tones were of small sizes as compared with IS:2759/69 Hence material finally rejected.

Minor Penalty C/sheet issued to IE

Kuldeep Mathur

Laxmi Iron & Hardware Stores, Kushinagar

Push Cock Chrome Plated

1949 Nos.

Material failed in chemical composition i.e Shell, Spindle and Washer

Joint inspection held on 21.05.10. Out of screw samples five found Ok and two leaking. Firm has agreed to rectify the material.

Minor Penalty C/sheet issued to IE

Kuldeep Mathur

MC Handa Brothers, Jallandhar

Push Cock complete

1010 Nos.

Failed in chemical composition

JI held on 21.05.10.Out of six samples five were found Ok and one having leakage. Firm has agreed to rectify the material.

IE has been repatriated

C.B. Pandey

Page 36: COMPLNT. 2010-11

Name of Inspecting Engineers with Controlling Managers of Northern Region from 01.04.10 to 30.06.10

S. No. UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF IC CLASSIFICATIONCONSI-GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

ACTION TAKEN

CMS S/Shri

15 NN/10-11/26 01691 10.12.09 NER DSL GD Sunil Panda 100 Nos. 100 Nos. 0.86 17.05.10 06.05.10 07.01.10 E Rectification

16 NN/10-11/30 03833 05.09.08 NR WS JUDW RK Saxena 3320 Nos. 4.17 24.05.10 17.06.10 28.12.08 V Rectification

17 NS/10-11/05 2047F 04.12.09 ICF C&W PER Jaspal Singh 2400 Nos. 5.40 04.06.10 04.05.10 23.03.10 V Rectification

18 NW/10-11/08 00074 07.01.10 WR GSD DHD Virender Singh 18 Nos. 18 Nos. 10.47 06.04.10 07.06.10 23.02.10 D Rectification RK Kalra

19 NW/10-11/03 02313 25.11.09 WCR CRWS BPL Manoj Singh 1200 Nos. 290 Nos. 0.54 10.05.10 11.01.10 P Sorting

20 NW/10-11/04 78225 25.11.09 Rivet WR EW SBI Deepak Kumar 3000 Kgs. 1.24 21.04.10 20.05.10 20.01.10 D Sorting

Delco Switchgears, Jaipur

Miniature 15 Amp

Tripping time is less than specification standards time. Samples connection terminal bolt was broken during fitment.

JI held on 28.06.10. During JI, firm has agreed to replace the defective terminal bolts at consignee premises under warranty cluase.

S.K. Basu

New Ratan Industries, Lucknow

Locking arrangement for emergency openable window

1462 Nos.

Rejected due to non confromity in colour shade

JI held on 17.06.10. Material accepted after rectification.

Kuldeep Mathur

Rail Fab, Kapurthala

Power Coated Al. Channel Mouldings

2400 Nos.

The colour of the samples were found to be not matching with the colour maini yellow shade No. 7587 of Marpol mentioned in the drawing.

Joint inspection held on 04.05.10. Case treated as rectification as the material is usable afte powder coating to the desired shade.

Warning letter issued to IE

MP Gupta

RSI Switchgear, Gurgaon

Punched Grid Permanent fixed diverter

Material checked as per drg, dimension 720mm found 700mm. CRS dimension 1105mm instead of 1086mm ( 19mm more)

Joint inspection held on 07.06.10. Out of 18 Nos. , 5 Nos. are rejected due to dimensional variation were observed. Firm has agreed to rectify the material.

Warning letter issued to IE

Tirupati Stationery, Kanpur

Paper white ruled

23.03.10 01.04.10

Mixed lot supplied amoungst 29 bundles in which some paper quality are not as per requirement. Packing is not made in accordance with the instructions indicated in PO

Joint inspection held on 10.05.10. Out of 120 bundles, 29 bundles are found mixed lot as it is found in two/three shades ana packing of material is also not found within the specified requirement. Hence case closed as sorting.

Kuldeep Mathur

Vijay Engineers, Jallandhar

3000 Kgs.

Height of rivet and width of head is not as per IS code. Head oblong and developed crown during riveting.

Joint inspection held on 20.05.10. As there were 2 Nos. with cracks and 5 Nos. with forging defects out of 100 Nos. checked. Firm has agreed to segregate the lot.

IE has been repatriated

C.B. Pandey

Page 37: COMPLNT. 2010-11

Pending cases statement for the year 2010-11

S. No. UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY STATUS DATE OF JI DATE OF ICCONSI-GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

REASON OF REJECTION

DEF-ECT CODE

CLASSIFICATION

1 SN/10-11/01 01239 12.10.09 NWR INSP. JU KB Jayan 1005 Mtrs. 07.06.10 28.06.10 29.01.10 O Upheld

2 SN/10-11/02 01048 08.04.09 NR W/shop JUDW 924 Nos. 91 Nos. 11.06.10 28.06.10 13.12.09 D Upheld

Alpha Polymers, Salem

Synthetic Thermoplastic Polymer Water Hose

1005 Mtrs.

Marking are not as per specification and inspection certificate

JI held on 28.06.10. During JI, bundles were checked for marking as per IS:2500/Pt-I and not found as per specn, hence finally rejected.

Ranka Trading Co., Chennai

Wash Hand Sink

S Perichi-yappan

Less weight i.e less than 2.120Kg.

JI held on 28.06.10. Material finally rejected during joint inspection.

Page 38: COMPLNT. 2010-11

Cumulative statement of cases of complaints for the year 2010-11 ( Position as on 31.05.10)

UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF ICS. No.

CONSI-GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

CLASSIFICATION

ACTION TAKEN

1 WN/10-11/01 57184 04.09.08 Liner Sleeve DMW DSL PTA 97 Nos. 01.04.10 No JI 17.12.08 Deleted

2 WN/10-11/02 02318 02.07.09 NR ETD GZB 18 Nos. 18 Nos. 27.04.10 Dimensional variation 17.05.10 04.01.10

3 WN/10-11/03 01692 27.05.09 NR GSD AMV SK T 29.04.10 Dimensional variation 20.05.10 10.08.09 Pending Under testing

4 WN/10-11/04 55473 25.02.09 DMW DSL PTA Arun Joshi 26.04.10 12.05.10 17.06.09 P Upheld

5 WN/10-11/05 20407 25.01.10 RCF C&W KXH 50 Nos. 50 Nos. 07.05.10 No JI 10.03.10 Accepted

Perfect engineering Products, Lonavla

SN Sadawarte

732 Nos.

Sleeve size are not OK

Rejection not on RITES A/c as reason of rejection is beyond the scope of specification.

Indore Nitriders, Indore

Suspension Tube

K Chandrashekhran

JI held on 17.05.10. Ovelty can be produce during transit /mishandling. Hence rejection not on RITES A/c.

Not on RITES A/c

Responsive Industries, Mumbai

Flexible Polyvinyl Chloride PVC Flooring Ash Grey

170 Nos.

170 Nos.

JI held on 20.05.10. Sample under testing

Techno Craft, Bhopal

Kit of bearing cap inner

150 Nos.

150 Nos.

Lab report is not satisfactory material obtained malleble cast iron instead of cast steel.

Joint inspection held on 12.05.10. Material stands rejected on account of material 'Malliable cast Iron is supplied instead of Cast steel.

Elastomer Lining Works, Thane

Vestibule arrangement

SN Sadawarte

Material not as per drg. As locking plate (top) having 9 Nos. hex head scerew instead of 10 Nos. Location hex head screws and CEK screws is interchanged. Material supplied loose, not packed as per packing condition of the PO.

JI was scheduled for 24.05.10. Consignee has withdrawn the rejection vide R/Note dated 25.04.10.

Page 39: COMPLNT. 2010-11

Cumulative statement of cases of complaints finalized after 31.03.10 ( Position as on 31.07.10).

UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF IC

1 NN/09-10/109 NWR Dsl AK Suri 1 No. 1 No. 13.11.09 20.01.10 Pending

2 NN/09-10/114 12402 23.06.09 NER Press GKP 4.26 22.01.10 03.02.10 23.10.09 Accepted

3 NN/09-10/116 05001 06.11.08 NR GSD SSB PK Bagga 17.2 01.02.10 23.02.10 Accepted

4 NN/09-10/122 23.10.09 PHE TPI 300 MT 300 MT 8.73 01.02.10 07.04.10 13.11.09 Accepted

5 NN/09-10/123 23.10.09 PHE TPI 600 MT 600 MT 47.4 01.02.10 07.04.10 13.11.09 Accepted

6 NN/09-10/125 02573 17.07.09 NR GSD SSB 3.87 16.02.10 26.02.10 30.09.09 Pending

7 NN/09-10/127 06581 19.03.07 NTR DSL AMV 4.12 01.02.10 19.03.10 16.03.09 Accepted

COM NO.

CONSI-GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

CLASSIFICATION

ACTION TAKEN

BL Health & Safety, New Delhi

72245 72431

21.06.05 14.11.05

Advance Fire Fighting Technology

Phu-lera

The equipment was found unsuitable.

Joint inspection held on 20.01.10. During JI, the equipment to be tested once again at Govt. lab i.eERDA, Vadodara for electric suitability to establish authenticity as per pictorial diagram on the equipment. Reminder sent on 26.07.10.

17.11.05 785/02

Under Testing

Tirupati System Forms & Packings, Kanpur

Ruled Register Bound

Manoj Singh

29500 Nos.

29500 Nos.

Size of Register is smaller then specification. No. of pages of register is 92 pages including in place of 96 pages. Printing of IR logo on inner page of register is not clear.

Joint inspection held on 03.02.10. Material accepted during JI.

Deep Chemical Industries, Sonepat

De-odourising cum Disinfactent Fluid

15000 Ltrs. 15000 Ltrs.

15000 Ltrs. 15000 Ltrs.

Material not confirming to IS specification

Joint inspection held on 23.02.10. Sample sent to NTH/GZB for testing by consignee found acceptable as per IS:10758/83.

06.06.09 27.06.09

Kay Bee Alums, Chittaurgarh

PHEMISC35 of 09-10

Alumina Ferric for water purification

Sri-nagar

Neeraj Singh

Aluminum compound as AL2O3 as 12% as against the desired specification of 15%

Joint inspection held on 07.04.10. Sample sent to Sprctro Analytical Labs for testing by consignee has passed the tests.

Kay Bee Alums, Chittaurgarh

PHEMISC37of 09-10

Alumina Ferric Gr.-II

Sri-nagar

Deepak Kumar

Aluminum compound as AL2O3 as 13.3% as against the desired specification of 15%

Joint inspection held on 07.04.10. Sample sent to Sprctro Analytical Labs for testing by consignee has passed the tests.

Sri Sudershan Texmart, Delhi

Cloth All Wool serge Khaki

Pankaj Sood

3276 Mtrs.

521 Mtrs.

Material rejected by GM (Vig.) after testing from lab

Joint inspection held on 26.02.10. Sample sent to test house by consignee for testing. Reminder sent on 30.07.10

Under Testing

Punjab Laminates, Jallandhar City

Decorative Thermosetting Synthetic Resin

Nagesh Yadav

4484 Nos.

524 Nos.

Resistance to surface wear is not according to specification.

Joint inspection held on 19.03.10. Sample sent to NABL Govt. lab for testing by consignee. Rejection withdrawn vide AMM/AMV's letter dated 27.04.10.

Page 40: COMPLNT. 2010-11

Cumulative statement of cases of complaints finalized after 31.03.10 ( Position as on 31.07.10).

UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF ICCOM NO.

CONSI-GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

CLASSIFICATION

ACTION TAKEN

8 NN/09-10/130 04718 17.11.09 NR GSD AMV 8.24 08.03.10 19.03.10 10.01.10 Accepted

9 NN/09-10/131 04766 19.11.09 NR GSD AMV RK Saxena 0.55 02.03.10 19.03.10 29.12.09 Pending

10 NN/09-10/132 78100 28.04.08 NCR TRD ALD RK Vamne 5 drums 16.1 29.03.10 01.04.10 13.07.09

11 NS/09-10/33 1163S 16.10.09 ICF C&W PER 9.15 15.12.09 08.12.09 Pending

12 NS/09-10/34 42449 26.03.08 SR DSL GOC 5 Sets 5 Sets 22.15 01.02.10 09.08.08 Pending

13 NS/09-10/36 01357 08.06.09 Cable SWR G&S HBL 2.43 01.03.10 13.07.09 Pending

14 NS/09-10/37 05371 19.03.10 Hose Clamp SR C&W MAS PK Bagga 1.11 01.03.10 07.04.10 07.01.10 P Upheld

Rahul Paints, Lucknow

R/M Paint Red Oxide Semi Gloss

Manoj Singh

12600 Ltrs.

12600 Ltrs.

Finish is semi gloss instead of glossy and gloss value found 48 to 50 instead of 71 (Min)

Joint inspection held on 19.03.10. Sample sent to NABL Govt. lab for testing by consignee. Rejection memo has been withdrawn vide AMM/AMV's letter dated 06.05.10

Pushker Paint Industries, Lucknow

R/M Paint Red Oxide Chrome Pirmary

600 Ltrs.

600 Ltrs.

The sample does not conform to IS:2074/92 Red oxide chrome found zinc chrome, % by mass 5.60 against 16.0 Min and volume solids % found 36.00 against 45+/-5.

Joint inspection held on 19.03.10. Sample sent to NABL Govt. lab for testing by consignee. Reminder sent on 30.07.10

Under Testing

Veekay General Industries, Delhi

Jointless Grooved Copper Contact Wire 107 sq.mm

42.449 MT

Improper reeling and twist in contact wire drums

Joint inspection held on 01.04.10. The defects observed in reason of rejection is not in the purview of RITES inspection.

Not on RITES A/c

Varun Electrodes, Panipat

Electrodes dia 2.5mmx350mm length

Pankaj Sood

717235 Nos.

50400 Nos.

Material does not confirm in respect of welding characteristics, while welding in over head position fusion of flux coating ( taper fusion) was observed in about 25.30% of electrodes in both batches.

Joint inspection fixed on 03.02.10 by Southern Region. Letter written to Southern Region on 18.06.10

Perfect Radiator & Oil Coolers, New Delhi

Modified Radiator Assembly

Lalta Prasad

Crack found on the bent position of the header.

Joint inspection fixed on 03.03.10. Reminder sent on 18.06.10 & 30.07.10

Insucon Cables, Jaipur

Sunil Panda

15690 Mtrs.

15690 Mtrs.

Cross section of wire being undersize and weight of coil being less.

Joint inspection fixed on 16.04.10 and refixed for 23.06.10. Reminder sent on 30.07.10.

Tamilnadu Engg. Enterprises, Chennai

18400 Nos.

18400 Nos.

the screw is slipping and rotating freely on the band without tightening the hose.

JI held on 07.04.10. As the screw of the hose clamp is found not to meet the specification the rejection is upheld.

Page 41: COMPLNT. 2010-11

Cumulative statement of cases of complaints finalized after 31.03.10 ( Position as on 31.07.10).

UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF ICCOM NO.

CONSI-GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

CLASSIFICATION

ACTION TAKEN

15 NW/09-10/11 03015 24.12.08 WCR CRWS BPL 2.16 08.06.09 23.06.09 C Upheld

16 NW/09-10/43 03284 31.07.09 WR DSL RTM RS Virk 30 Nos. 30 Nos. 3.67 01.02.10 19.04.10 31.10.09

17 NE/09-10/04 00709 14.07.09 V Belt Endless SER W&S KGP 20 Sets 4.72 03.11.09 18.12.09 13.08.09 Accepted

18 NE/09-10/05 00708 14.07.09 Endless V-Belt SER GSD KGP 50 Sets 7.08 01.12.09 23.12.09 08.09.09 Pending

19 NE/09-10/09 01712 19.12.08 ER DSL BWN RK Jain 30 Nos. 30 Nos. 0.71 03.11.09 11.03.10 25.05.09 Pending

20 NE/09-10/10 10336 23.11.07 ER DSL BWN RK Ahuja 26.02.10 23.03.10 14.12.07 Pending

21 WN/09-10/11 55426 03.02.09 DMW DSL PTA Anil Kumar 01.07.09 08.10.09 18.03.09 Pending

M. Harinath & Company, Kanpur

Cotton Waste White

Manoj Singh

2257 Kgs.

2257 Kgs.

Material does not conform the test result of Metallic impurities % ( Wire etc), Soft waste % & Man made fibres %.

Joint inspection held on 23.06.09. Sample sent for testing by consignee Material finally rejected in lab testing

06.03.09 635/036

National Engineering Industries, Jaipur

Roller Bearing NU-330

Roller found jamed, abnormal sound. Material not found as per specification

Joint inspection held on 19.04.10.The reason of rejection is not acceptable to RITES, hence rejection is not on RITES A/c.

Not on RITES A/c

Navyug India Ltd., Jallandhar

Nagesh Yadav

220 Sets

Sample fails to meet the requirement of % elongation of serial No. 4 (b) RDSO specn.

Joint inspection held on 18.12.09. Material accepted vide R/note dated 13.04.10.

Jyoti Rubber , New Delhi

JP Srivastava

330 Sets

Velts fails to meet the specified requirement

Joint inspection held on 23.12.09. Sample sent to NTH for testing by consignee Reminder sent on 18.06.10 & 30.07.10.

Under Testing

Imperial Auto Industries, Faridabad

Fuel Injection Tube assembly

The material does not conform to specn in respect of UTS testing ( obtained 363.78 N/sqmm specified min 940 N/sqmm)

Joint inspection held on 11.03.10. Final decision pending on the consignee. Reminder sent on 18.06.10 & 30.07.10.

Ferolite Jointings, Ghaziabad

HP Jointing Sheet

516 Kgs.

516 Kgs.

% age increase in thickness in ASTM oil No. 3 is more than specified limited. Obtained value 40% and sped. Value 25% max.

Joint inspection held on 23.03.10. Final decision will be taken on hearing from consignee. Reminder sent on 30.07.10

Nashik Insuations, Nashik

Polyglass banding tapes

56200 Mtrs.

56200 Mtrs.

Tape scatters in yarn during application. Dry patches in banding after curing.

Joint inspection held on 08.10.09. During JI, sample to be send to independent test house for testing. Reminder sent to consignee on 05.03.10, 18.06.10 & 30.07.10.

Under Testing

Page 42: COMPLNT. 2010-11

Cumulative statement of cases of complaints finalized after 31.03.10 ( Position as on 31.07.10).

UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF ICCOM NO.

CONSI-GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

CLASSIFICATION

ACTION TAKEN

22 WN/09-10/22 60043 17.07.09 RCF C&W KXH RJS 03.11.09 24.08.09 Pending Under trial

23 WN/09-10/27 10645 27.03.09 RCF Shell KXH K Suresh 04.01.10 03.08.09 Accepted

24 WN/09-10/36 01554 24.06.08 WCR ELS TKD 31.03.10 06.05.10 30.12.08

25 EN/09-10/12 00770 10.06.09 NWR DSL Ajmer 01.07.09 12.08.09 Pending

26 EN/09-10/21 30050 17.07.07 RCF C&W KXH MC Raju 18.09.09 Not found teak wood 23.10.09 08.08.08 Accepted

Associated Industries & Tdg Corporation, New Delhi

Copper Coated Co2 Welding filler solid wire

1750 Nos.

1750 Nos.

Oxide spot observed on the surface of wire of samples against smooth finish and free from surface imperfaction corrsion, grease, oxide or any other forein material shall have uniform on copper coating well bonded and finish.

Joint inspection fixed on 03.12.09 but RCF to conduct trial on machine before accepting/rejecting it. Letter written to RCF on 30.03.10 & 30.07.10.

Vijay Engineering, Ahmedabad

Axle Box Front Cover

488 Nos.

488 Nos.

Si found 18.5%, 17.7%, 17.8% against 10 to 13%. Fe found 0.843%, 0.765%, 0.828% against 0.6% Max.

Joint inspection held on 28.01.10. Sample sent to independent test house by consignee for testing chemical composition. Material found acceptable and rejection has been withdrawn videSMM/Shell/RCF letter No. RB/Shell/0645/09 dt. 09.07.10

28.01.10 July, 10

Kristeel Corporation, Mumabi

Pin for Brake Gear

NK Tawade

10 Sets

10 Sets

Material should be of mangnises steel but the supplier material is not of mangnise steel as per drg.

Joint inspection held on 06.05.10. Firm has agreed to free replacement of said pins inspite of ambiguity in the drawing. Hence rejection is treated as Not on RITES A/c.

Not on RITES A/c

Robin Industries, Howrah

Brake Shoe Key

RR Vasishth

1821 Nos.

1821 Nos.

Carbon % of brake shoe key i.e. 0.32% instead of 0.40 to 0.50%

Joint inspection fixed on 12.08.09. Case under consideration with NWR/Ajmer. Letter written to consignee on 08.10.09 and 18.06.10 & 30.07.10

05.08.08 1993/059

JN Forest Products, Howrah

Teak Wood Well seasoned

221 Nos.

221 Nos.

Joint inspection held on 23.10.09. During JI, sample to be send to independent test house by consignee has passed the test.

Page 43: COMPLNT. 2010-11

Cumulative statement of cases of complaints finalized after 31.03.10 ( Position as on 31.07.10).

UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF ICCOM NO.

CONSI-GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

CLASSIFICATION

ACTION TAKEN

27 EN/09-10/25 03938 05.11.07 NR DSL KLK 52 Nos. 52 Nos. 03.11.09 16.12.09 07.08.08 Pending

28 EN/09-10/35 12.10.04 NR ELS GZB RK Sharma 1 No. 1 No. 08.02.10 17.02.10 Pending

29 SN/09-10/9 30178 19.01.09 RCF C&W KXH 18.09.09 23.04.09 Accepted

Bhartia Mini Spring & Engg. Kolkata

Coil Spring C&D

Alok Guha Ray

Material does not conforms ti neet tge requirement of Drg and specification w.r.t. tests conducted as chromium, vanadium & molybdenum found nil against the requirement of 0.9-1.20, 0.07-0.12 & 0.15-0.25 and silicon is also found 1.54 against 0.15-0.40.

Joint inspection held on 16.12.09. Sample drawn and sent to independent lab for testing by consignee. Reminder sent on 18.06.10 & 30.07.10

Under Testing

Heavy Engg. Corporation, Ranchi

OP1397

Semi Automatic Wheel Lathe

The problem of shifting of wheel set is still persisting and the operator is always under fear that wheel can shift any time and the shifting of wheel reduces life fo wheel by 5 to 10mm

Joint inspection held on 17.02.10. Case under consideration. Reminder sent on 18.06.10 & 30.07.10

Vibgyor Paints & Chemicals, Chennai

High Perforamance Anticorrosion Epoxy Coating

Bipin Kumar Karan

1215 Nos.

1215 Nos.

Lifting of paint film observed against shall not show any sign of blistering, wrinkling of paint film upto 2000 hrs in resistance to chemical test.

Joint inspection held on 23.10.09. Sample drawn as per required specification and to be send to independent test house by consignee. The sample meets the requirements of RDSO specn hence accepted.

23.10.09 May'10

Page 44: COMPLNT. 2010-11

Info Item Name of Firm Info Phone No. Fax No. Mob. No. JI JIE Date Ext. Date JI result Remarks

1

2

3

4

5

6

7

8

9

10

11

12

13

S. No.

Consignee Info.

Page 45: COMPLNT. 2010-11

Info Item Name of Firm Info Phone No. Fax No. Mob. No. JI JIE Date Ext. Date JI result RemarksS. No.

Consignee Info.

14

15

16

17

18

19

20

21

22

23

24

25

26

Page 46: COMPLNT. 2010-11

Info Item Name of Firm Info Phone No. Fax No. Mob. No. JI JIE Date Ext. Date JI result RemarksS. No.

Consignee Info.

27

28

29

30

31

32

33

34

35

36

37

38

39

Page 47: COMPLNT. 2010-11

Info Item Name of Firm Info Phone No. Fax No. Mob. No. JI JIE Date Ext. Date JI result RemarksS. No.

Consignee Info.

40

41

42

43

44

45

46

47

48

49

50

51

52

Page 48: COMPLNT. 2010-11

Info Item Name of Firm Info Phone No. Fax No. Mob. No. JI JIE Date Ext. Date JI result RemarksS. No.

Consignee Info.

53

54

55

56

57

58

59

60

61

62

63

64

65

Page 49: COMPLNT. 2010-11

Info Item Name of Firm Info Phone No. Fax No. Mob. No. JI JIE Date Ext. Date JI result RemarksS. No.

Consignee Info.

66

67

68

69

70

Page 50: COMPLNT. 2010-11

Complaint cases of Shri Rajesh Kumar Sood for the year 2010-11 upto 31.05.10S. No. UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF IC

NWR BGC Ajmer 1 No. 01.04.10 Warranty failure No JI

NWR BGC Ajmer 9 Nos. 01.04.10 Warranty failure No JI

120AH Cell NWR BGC Ajmer 14 Nos. 01.04.10 No JI

4.5KW EWRRU NWR BGC Ajmer 1 No. 01.04.10 No JI

1100 AH Cell NWR BGC Ajmer 5 Nos. 01.04.10 No JI

NWR BGC Ajmer 3 Nos. 01.04.10 No JI

NWR BGC Ajmer 01.04.10 Warranty failure. No JI

NWR CS Ajmer 2 Nos. 2 Nos. 07.04.10 40% efficiency No JI

1 NS/10-11/01 03879 06.11.09 SR DSL GOC 49 Nos. 49 Nos. 08.04.10 15.02.10 Pending

04006 06.10.09 NR GSD SSB 4 Nos. 4 Nos. 08.04.10 No JI

05813 24.12.09 CR CWE MTN PK Lal 10 Ltrs. 08.04.10 19.01.10 No JI

CONSI-GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

CLASSIFICATION

Pearl Trading Co., New Delhi

Compressor Bearing

No JI since the warranty failure is not under the purview of RITES inspection

HMTD, Taloja ( Mah.)

4.5/25KW Capacity ERRUs

No JI since the warranty failure is not under the purview of RITES inspection

United Lead Oxide Products, Panji

Warranty failure High Voltage

No JI since the warranty failure is not under the purview of RITES inspection

Prestech India, Mumbai

Warranty failure. Transformer of power POB round heated

No JI since the warranty failure is not under the purview of RITES inspection

Amaraja Batteries, New Delhi

Warranty failure. 50% efficiency

No JI since the warranty failure is not under the purview of RITES inspection

Star Batteries, Kolkata

120AH/6V Batteries

Warranty failure. 50%, 20%, & 70% efficiency

No JI since the warranty failure is not under the purview of RITES inspection

JS Enterprises, Sonebhadra

Defective material ( item name not given)

No JI since the warranty failure is not under the purview of RITES inspection

HBL Power Systems, Hyderabad

VRLA type 1100 AH capacity

JI not required since failed under warranty clause.

Precision equipment Co., Varanasi

Fafnir sealed ball bearing

Pradeep Kumar

Material not found as per specification of PO

Joint inspection fixed on 13.05.10

Sai Electricals, Meerut

Single Pole Isolator

Material supplied by firm after validity of IC

JI not required as the reason of rejection is beyond the scope of quality of inspection.

Atlas Adhesive, Noida

Adhesive Rubber based

10545 Ltrs.

2 tin ( 10 Ltrs.) found leaky condition

JI not required as the rejected qty is less than 5% of passed lot.

Page 51: COMPLNT. 2010-11

Complaint cases of Shri Rajesh Kumar Sood for the year 2010-11 upto 31.05.10S. No. UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF ICCONSI-

GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

CLASSIFICATION

1 NN/10-11/01 02858 05.08.09 NR ETD CNB Manoj Singh 90 Nos. 90 Nos. 1.48 12.04.10 16.04.10 13.11.09 V Upheld

I1630 25.08.08 CSEB PE Daulat Ram 100 Nos. 100 Nos. 65.42 07.01.09 Pending

01496 06.03.10 Armature Shaft NWR DSL Ajmer 08.04.10 Failed in warranty No JI

12266 16.02.09 ER CD Belur 642 Nos. 642 Nos. 07.04.10 No JI

12230 11.02.09 ER CD Belur 60 Nos. 60 Nos. 07.04.10 No JI

541GJ 18.08.06 WCR TP JBL 08.04.10

02478 17.07.06 NR GSD SSB M B No JI

1 WN/10-11/01 57184 04.09.08 Liner Sleeve DMW DSL PTA 732 Nos. 97 Nos. 01.04.10 No JI 17.12.08 Deleted

2 NN/10-11/02 12238 11.11.08 NER Depot GKP RK Saxena 7900 Ltrs. 3920 Ltrs 2.14 29.04.10 25.05.09

1 NW/10-11/01 02350 01.01.08 CR INSP. PL Manoj Singh 15 Nos. 15 Nos. 0.78 12.04.10 20.04.10 16.06.08 Pending

Kanpur Expeller Company, Kanpur

Modified Equalizer Pin

The slot portion finishing is not proper.

Joint inspection held on 16.04.10. During JI, it is concluded that material is not suitable and is rejected. Vendor is directed to replace the material at the earliest.

East India Udyog, Ghaziabad

Aluminium Wound Oil Filled

Raipur 17.03.10 08.04.10

Poor quality inspection of distribution transformer

Case papers to be sent to Western Region to hold JI

Jalan Engineering, Kolkata

JI not required since failed under warranty clause.

Sarbasree Bholanath Enterpr. Dhanbad

Bolt GS with Nut

Incorrect GC submitted

JI not required as the reason of rejection is beyond the scope of quality of inspection.

Sarbasree Bholanath Enterpr. Dhanbad

Bolt GS with Nut

Incorrect GC submitted and also DP not received

JI not required as the reason of rejection is beyond the scope of quality of inspection.

Ganpati Industries, Kolkata

Glued Insulated Rail Joints

Reason of rejection not mentioned

Case papers to be sent WR

Case papers to WR

Rajdhani Enterprises, New Delhi

Capacitor for sealing Fan

25.03.10 01.04.10

Reason of rejection not mentioned

No JI required since a very old case

Perfect engineering Products, Lonavla

SN Sadawarte

Sleeve size are not OK

Rejection not on RITES A/c as reason of rejection is beyond the scope of specification.

Rako Mercantile Traders, Lucknow

Paint Enamel White

30.03.10 01.04.10

Material is very thick. Manual stirring is not feasible to produce product of uniform consistency suitable for brushing.

Joint inspection held on 29.04.10. Firm agreed to replace the material and not agreed to send the sample to an independent test house. Hence rejection is not on RITES A/c.

Not on RITES A/c

Chandralok, Varanasi

Oil Seal Extension shaft machining

Copper percentage Spec-value ( 1.0-2.0) resulta obtain (2.29). Magnesium % specified value ( 0.4-0.6) against 0.005)

Joint inspection fixed on 20.04.10 by Western Region

Page 52: COMPLNT. 2010-11

Complaint cases of Shri Rajesh Kumar Sood for the year 2010-11 upto 31.05.10S. No. UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF ICCONSI-

GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

CLASSIFICATION

2 NW/10-11/02 02388 10.12.09 WCR CRWS BPL RK Saxena 1759 Nos. 1759 Nos. 9.96 01.04.10 20.04.10 11.03.10 O Upheld

3 NN/10-11/03 57287 23.09.08 DMW DSL PTA PP Gupta 124 Nos. 10 Nos. 01.04.10 No JI 15.05.09 Deleted

ACASH, New Delhi 03020 14.08.06 NR GSD SSB 5000 Nos. 278 Nos. 01.04.10

120AH Cell NWR CS Ajmer 4 Nos. 4 Nos. 05.04.10 Warranty failure No JI

NWR CS Ajmer 1500 Nos. 1500 Nos. 05.04.10 Warranty failure No JI

120AH Cell NWR CS Ajmer 9 Nos. 05.04.10 Warranty failure No JI

120AH Cell NWR CS Ajmer 8 Nos. 05.04.10 Warranty failure No JI

3 NW/10-11/03 02313 25.11.09 WCR CRWS BPL Manoj Singh 1200 Nos. 290 Nos. 0.54 10.05.10 11.01.10 D Sorting

02218 06.11.09 WCR CRWS BPL Vimal Arora 282 Nos. 5 Nos. 06.04.10 20.02.10 No JI

57339 08.10.08 DMW DSL PTA S A 150 Nos. 7 Nos. 06.04.10 15.04.09 No JI

57183 04.09.08 Liner Sleeve DMW DSL PTA RS K 1372 Nos. 63 Nos. 19.03.09 No JI

Bharat Industries, Sangrur

Brake Head (Fabricated)

Item No. 4 ( Bushes) are not found in assembly

Joint inspection held on 20.04.10. Material is finally rejected since Bushes ( item No. 4 & 5 of assembly are not found with brake head assembly).

Jay Pee Corporation, Delhi

High Capacity 1/2" Regulating Valve

During load testing the piston of fuel regulating valve found sticking the pistion and lube oil pressure drop Loco No. 16430

Rejection not on RITES A/c as reason of rejection is beyond the scope of specification.

Blanket Woolen Superior

Defective being not as per specification

Letter to consignee to furnish reason of rejection in which material has been failed.

Letter to consignee

Bharat Batteries Mfg. Co., Kolkata

JI not required since failed under warranty clause.

Escorts Ltd., Faridabad

K Type Brake Block

JI not required since failed under warranty clause.

United Lead Oxide Products, Panji

JI not required since failed under warranty clause.

Chltek Batteries, Bangalore

JI not required since failed under warranty clause.

Tirupati Stationery, Kanpur

Paper white ruled

23.03.10 01.04.10

Mixed lot supplied amoungst 29 bundles in which some paper quality are not as per requirement. Packing is not made in accordance with the instructions indicated in PO

Joint inspection held on 10.05.10. Out of 120 bundles, 29 bundles are found mixed lot as it is found in two/three shades ana packing of material is also not found within the specified requirement. Hence case closed as sorting.

Oriental Insulators, Faridabad

Junction Box Assembly

Material found damaged (pressed and heavy dented on body)

JI not required as the rejected qty is less than 5% of passed lot.

Dinesh Engg. Corp Pune

Governor oil Pump

Governor pump serial No. 3748, 3765, 3679 jam.

JI not required as the rejected qty is less than 5% of passed lot.

Pefco Foundary, Pune

25.03.10 01.04.10

Sleeve size are not OK

JI not required as the rejected qty is less than 5% of passed lot.

Page 53: COMPLNT. 2010-11

Complaint cases of Shri Rajesh Kumar Sood for the year 2010-11 upto 31.05.10S. No. UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF ICCONSI-

GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

CLASSIFICATION

57993 02.06.09 DMW DSL PTA 176 Nos. 6 Nos. 06.04.10 09.09.09 No JI

02593 04.02.10 WCR GSD BPL 5000 Kgs. 5000 Kgs. 06.04.10 No JI

54032 16.11.07 DMW DSL PTA 54 Nos. 2 Nos. 06.04.10 No JI

04731 18.11.09 Hex Head Bolts NR GSD SSB 4955 Kgs. 4955 Kgs. 06.04.10

1 EN/10-11/01 55466 25.02.09 DMW DSL PTA SK Saha 299 Nos. 228 Nos. 27.03.10 22.04.10

4 NN/10-11/04 01691 10.12.09 NWR DSL Ajmer Sunil Panda 211 Nos. 211 Nos. 1.86 06.04.10 06.05.10 07.01.10 Pending

2 EN/10-11/02 53920 21.04.09 DMW DSL PTA Ajay Sharma 33 Nos. 33 Nos. 06.04.10 16.10.08 Pending

3 EN/10-11/03 32541 20.11.09 NER Depot IZN RB Singh 87 Nos. 87 Nos. 12.04.10 03.05.10 31.12.09

16.09.09 Ca JP 12.04.10

Rohit Engg. Works, Jallandhar

3/8" Check Valve

Deepak Kumar

Valve are not mulfunctioning and pressure leakage

JI not required as the rejected qty is less than 5% of passed lot.

Super Chem Industries, Jhansi

Liquid Cleaning composition

RITES IC not provided by the firm

The reason of rejection is beyond the scope of quality of inspection

Venus Engineering Works, Varanasi

Anode for chrome plating

Deep cut marks on anode surface area

JI not required as the rejected qty is less than 5% of passed lot.

Narendra Fasteners, Delhi

Being excess suuply to terms of PO condition

The reason of rejection is not mentioned in which the material has been rejected at your end.

Letter to consignee

Elco Enterprises, Kolkata

Brush Holder Assembly

M-10 thread under size. M-10 thread depth less. Bolts not provided

Joint inspection held on 22.04.10. 228 & 41 Nos. are damaged during transit/handling and firm has agreed to rectify the defects. Hence rejection not on RITES A/c.

27.06.09 27.10.09

Not on RITES A/c

Delco Switchgears, Jaipur

Miniature 15 Amp

Tripping time is less than specification standards time.

Joint inspection held on 06.05.10. Consignee could not supply pure DC for proper testing. Case is under consideration.

Bhagya Devi Factory, Howrah

Casting Lube Oil Pump

Blow holes, porocity in casting.

Joint inspection held on 22.04.10. Test for verification of blow holes could not be done due to non availability of test bench in DMW. JI to be refixed on 12.05.10.

B.K. Power Sonic, Kolkata

Lead Acid battery 210AH Capacity

Due to found in damaged condition of celing compound.

Joint inspection held on 03.05.10. Ceiling compound found damaged. Hence case closed as transit damage.

Transit damage

Nexo Industries, LDH

D22520

JVVNL

Verfication of documents

Capability assessment

Letter to consignee

Page 54: COMPLNT. 2010-11

Complaint cases of Shri Rajesh Kumar Sood for the year 2010-11 upto 31.05.10S. No. UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF ICCONSI-

GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

CLASSIFICATION

1 NE/10-11/01 74111 04.11.09 ECR C&W Iqbal Singh 2 Nos. 2 Nos. 2.81 27.04.10 21.12.09

1090S 05.02.09 ICF C&W PER 13.04.10

NWR CS Ajmer 110 Nos. 13.04.10 No JI

Hook NWR CS Ajmer 1 No. 13.04.10 No JI

NWR CS Ajmer 6 Nos. 13.04.10 No JI

Buffer Plunger NWR CS Ajmer 7 os. 13.04.10 No JI

Draw Hook NWR CS Ajmer 1 No. 13.04.10 No JI

NWR CS Ajmer 38 Nos. 13.04.10 No JI

Roller Bearing NWR CS Ajmer 20 Nos. 13.04.10 No JI

NWR CS Ajmer 71 Nos. 13.04.10 No JI

East Zone Trading, Bhubaneshwar

Romac Heavy Duty Remote Controlled two stage Hyd. Telescope jack Piston

Khurda Road

19.03.10 13.04.10

The weight of the material was 18 kg since it is portable equipment used for rescue operation at the time of passenger train accident. But after supply the material was found 130 kg of weight and min. 4 persons are required for it's transhipment from on

Joint inspection held on 27.04.10. The total weight of equipment was found to be 130kg but consignee insisted that it was too heavy to handle and should have weight around 18kg. The inspected material was as per the model No. RTC 2470 mentioned in the PO.

Not on RITES A/c

Rine Engineering , Baddi

Axle Box Housing

102 Nos. 17 Nos.

Bearing bore is under size as per PO

Case papers to be sent to Southern Region to hold joint inspection

Case papers to SR

Manoj Kumar Anil Kumar Engg., Kolkata

BG Coolar Roller Bearing

Failed under warranty period

JI not required since warranty failure is not under the purview of RITES inspection

Ramkrishan forging, Jamshedpur

Failed under warranty period

JI not required since warranty failure is not under the purview of RITES inspection

India Auto Industries, Gurgaon

Shock Absorber

Failed under warranty period

JI not required since warranty failure is not under the purview of RITES inspection

Shree Durga Iron & Steel, Hathras

Failed under warranty period

JI not required since warranty failure is not under the purview of RITES inspection

Emson tools Mfg. Ludhiana

Failed under warranty period

JI not required since warranty failure is not under the purview of RITES inspection

Bharat Rubber Industries, Barabanki

Rubber Hose Pipe

Failed under warranty period

JI not required since warranty failure is not under the purview of RITES inspection

National Engineering Industries, Jaipur

Failed under warranty period

JI not required since warranty failure is not under the purview of RITES inspection

Avadh Rubber, Lucknow

Rubber Buffer Spring

Failed under warranty period

JI not required since warranty failure is not under the purview of RITES inspection

Page 55: COMPLNT. 2010-11

Complaint cases of Shri Rajesh Kumar Sood for the year 2010-11 upto 31.05.10S. No. UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF ICCONSI-

GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

CLASSIFICATION

Helical Spring NWR CS Ajmer 15 Nos. 13.04.10 No JI

NWR CS Ajmer 14 Nos. 13.04.10 No JI

NWR CS Ajmer 47 Nos. 13.04.10 No JI

Brake Block NWR BGC Ajmer 1184 Nos. 13.04.10 No JI

NWR BGC Ajmer 16 Nos. 13.04.10 No JI

120AH Cell NWR BGC Ajmer 4 Nos. 13.04.10 No JI

57413 21.11.08 DMW DSL PTA Sudesh Jain 39 Nos. 4 Nos. 15.04.10 No JI

00612 06.02.08 WR DSL RTM 2 Nos. 2 Nos. 19.04.10

4 EN/10-11/04 56506 11.04.08 DMW DSL PTA PP Ghosh 15 Nos. 3 Nos. 20.04.10 13.07.09 Pending

2 NE/10-11/02 01321 05.11.08 ER Depot HWH Neeraj Singh 7718 Nos. 7718 Nos. 5.11 19.04.10 03.04.09 Pending

3 NS/10-11/03 1699F 22.10.08 ICF C&W PER 5 Nos. 5 Nos. 2.26 20.04.10 30.11.08

02100 02.12.09 SWR GSD HBL Vimal Arora 676 Nos. 14 Nos. 13.04.10 No JI

Rail Spring Karkhana, Gwalior

Failed under warranty period

JI not required since warranty failure is not under the purview of RITES inspection

Aryan Exporters, Lucknow

Rubber Buffer Spring

Failed under warranty period

JI not required since warranty failure is not under the purview of RITES inspection

Gujarat Smelting, Ahmedabad

Rear Cover Axle Box

Failed under warranty period

JI not required since warranty failure is not under the purview of RITES inspection

BIC Auto, Bahadurgarh

Failed under warranty period

JI not required since warranty failure is not under the purview of RITES inspection

Fag Bearing, Vadodara

Spherical Roller Bearing

Failed under warranty period

JI not required since warranty failure is not under the purview of RITES inspection

Kirloskar Batteries, Bangalore

Failed under warranty period

JI not required since warranty failure is not under the purview of RITES inspection

Banaras Engineering Co., Varanasi

Main Reservoir Assembly

Dent mark near 1"end connector side 3 Nos. . Dent mark 1" from side

JI not required as the reason of rejection not attributable to RITES due to transit and handling damage.

Perfect Radiators & Oil Coolers, New Delhi

Modified Radiator Assembly

Damage caused in transit

Letter written to consignee on 20.04.10

Letter to consignee

Eastern Equipment Enterprises, Kolkata

Turbo Support Modified Assembly

Air leakage from welding, qualityy of welding to poor and welding is puncture near flange.

Joint inspection fixed on 06.05.10

Khadi & Village Industries Commission, Kolkata

Poly Vastra Pillow Cover White

Material rejected being not at par with the specification

Joint inspection fixed on 28.04.10

Rail Tech, Kapurthala

S.S. Air Brake Pipes

Nagesh Yadav

Dimensional variation

JI held on 20.04.10. Rejection not on RITES A/c.

20.04.10 Aug,10

Not on RITES A/c

Flolite Electrical Industries, New Delhi

Compact Flourscent Fitting Twin Tube

14 Nos. received in broken condition

Ji not required as the reason of rejection is found broken.

Page 56: COMPLNT. 2010-11

Complaint cases of Shri Rajesh Kumar Sood for the year 2010-11 upto 31.05.10S. No. UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF ICCONSI-

GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

CLASSIFICATION

65046 09.12.09 SWR Shop MYSS 2 Nos. 2 Nos. 11.05 13.04.10 22.03.10

5 NN/10-11/05 00190 05.02.10 GI Pipes NWR Signal Ajmer RK Jain 3224 Nos. 530 Nos. 1.56 13.04.10 No JI 27.03.10 Deleted

00183 23.04.09 SER GSD BNDM 10 Sets 10 Sets 13.04.10 No JI

5 EN/10-11/05 04498 10.10.08 NR WS JUDW A Mukherjee 20 Nos. 20 Nos. 16.04.10 10.05.10 26.02.09 D Rectification

01057 09.04.09 NR W/shop JUDW 755 Kgs. 755 Kgs. 16.04.10 No JI

06337 11.02.09 NR W/shop JUDW 16.04.10 No JI

6 EN/10-11/06 06304 06.02.09 NR WS JUDW A Mukherjee 16.04.10 10.05.10 06.11.09 Pending

54261 21.01.08 Milling Cutter DMW DSL PTA 2 Sets 2 Sets 16.04.10 Pending

6 NN/10-11/06 57373 01.11.08 DMW DSL PTA 325 Nos. 20 Nos. 1.04 20.04.10 No JI 21.07.09 Deleted

Helical Spring NWR BGC Ajmer 4 Nos. 20.04.10 Warranty failure No JI

NWR BGC Ajmer 55 Nos. 20.04.10 Warranty failure No JI

SAIL, Durgapur Axle Bloom NWR BGC Ajmer 2 Nos. 20.04.10 Warranty failure No JI

Hytrel Washer NWR BGC Ajmer 9 Nos. 20.04.10 Warranty failure No JI

Mahendra Transformers, Ghaziabad

750 KVA Transformers

AK Srivastava

Serial No. mismatching

Case papers to be sent to Southern Region to hold joint inspection

Navaratan Pipes and Profile, New Delhi

RITES seal not found on the material

Unstamped material.

Matusushi Power Technologies, New Delhi

Twin Beam Head Light

Validity of IC has expired

JI not required as the valdity of IC has been expired.

Joy Tara Engineering Works, Kolkata

Modified Control Arm Top

Not matching on item length and redius.

JI held on 10.05.10. Material needs minor rectification and firm is ready for the same.

Bharat Wire Rope, Bhandup (W)

Rope Wire Steel

Validity of IC has expired

JI not required as the valdity of IC has been expired.

AD Electro Steel Co., Kolkata

Knuckle of CBC for LHB Coaches

14 Nos. 1 No.

14 Nos. 1 No.

Inadequate Inspection Certificate of RITES

The reason of rejection material not pre inspected by RITES

Joy Tara Engineering Works, Kolkata

Modified Control Arm Top

11700 Nos.

11700 Nos.

Failed in chemical composition of percentage of C, Phosphorus and Sulphuer.

JI held on 10.05.10. Sample sent to an idependent test house by consignee for chemical composition.

Voltas Ltd., New Delhi

Reason of rejection is not clear

Joint inspection fixed on 06.05.10

Bimal Engineering Works, Jallandhar

Flexible Coupling D Type

Deepak Kumar

One side thread missing during testing

Material rejected in practical fitment. Shop floor rejection.

Frontier Spring, Kanpur

No JI required since warranty failure is not under the scope of RITES Inspection

SF Forgings, Howrah

Brake Beam Hanger

No JI required since warranty failure is not under the scope of RITES Inspection

No JI required since warranty failure is not under the scope of RITES Inspection

Polyset Plastic, Daman

No JI required since warranty failure is not under the scope of RITES Inspection

Page 57: COMPLNT. 2010-11

Complaint cases of Shri Rajesh Kumar Sood for the year 2010-11 upto 31.05.10S. No. UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF ICCONSI-

GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

CLASSIFICATION

Buffer Plunger NWR BGC Ajmer 1 No. 20.04.10 Warranty failure No JI

120AH Cell NWR BGC Ajmer 9 Nos. 20.04.10 Warranty failure No JI

NWR BGC Ajmer 8 Nos. 20.04.10 Warranty failure No JI

NWR BGC Ajmer 1 No. 20.04.10 Warranty failure No JI

NWR BGC Ajmer 36 Nos. 20.04.10 Warranty failure No JI

Equalizing Stay NWR BGC Ajmer 2 Nos. 20.04.10 Warranty failure No JI

NWR BGC Ajmer 7 Nos. 20.04.10 Warranty failure No JI

NWR BGC Ajmer 5 Nos. 20.04.10 Warranty failure No JI

NWR BGC Ajmer 1 No. 20.04.10 Warranty failure No JI

1033F 16.01.10 ICF C&W PER 2 Nos. 2 Nos. 21.04.10 No JI

7 EN/10-11/07 04784 21.10.08 Shackle NR GSD KLK A Mukherjee 104 Nos. 104 Nos. 22.04.10 19.05.10 30.03.09 V Upheld

NWR BGC Ajmer 9 Nos. 23.04.10 Warranty failure No JI

Raneka Industries, Distt Dhar (MP)

No JI required since warranty failure is not under the scope of RITES Inspection

Lead Acid Battery, Kolkata

No JI required since warranty failure is not under the scope of RITES Inspection

Okay Industries, Mumbai

Lower Hytrel Washer

No JI required since warranty failure is not under the scope of RITES Inspection

Faridabad Bolt Lighting, Faridabad

Rubber Hose Pipe

No JI required since warranty failure is not under the scope of RITES Inspection

Responsive Industries, Mumbai

Leather Cloth Blue

No JI required since warranty failure is not under the scope of RITES Inspection

Sony Engg. Works, Kolkata

No JI required since warranty failure is not under the scope of RITES Inspection

Mandeep Industries, Lucknow

Rubber Hose Pipe

No JI required since warranty failure is not under the scope of RITES Inspection

Recon Engineering Co., Kolkata

Bogie mounted brake cylinder

No JI required since warranty failure is not under the scope of RITES Inspection

Bihani Precision Die Casting, Bangalore

Rear Cover Axle Box

No JI required since warranty failure is not under the scope of RITES Inspection

Nulook Engineers, Meerut

Sealed window glass

Found in damaged condition

JI not required material found damaged.

Joy Tara Engineering Works, Kolkata

Holes through which shackle pin passes is having cavities and welding has filled these cavities.

JI held on 19.05.10. The defect mentioned in the rejection memo is observed in the samples and also in the lot. Hence material finally rejected.

Pioneer Engineering Works

Bogie mounted brake cylinder

Material failed in warranty period

Page 58: COMPLNT. 2010-11

Complaint cases of Shri Rajesh Kumar Sood for the year 2010-11 upto 31.05.10S. No. UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF ICCONSI-

GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

CLASSIFICATION

4 NW/10-11/04 78225 25.11.09 WR EW SBI 3000 Kgs. 3000 Kgs. 1.24 21.04.10 20.05.10 20.01.10 D Sorting

5 NW/10-11/05 Asahi Ropes, Delhi 41364 23.09.09 WCR ELS ET Roshan Lal 1 Set 1 Set 3.91 26.04.10 Variation in size 30.12.09 Pending

7 NN/10-11/07 12768 21.12.09 NER Depot GKP 2000 Nos. 1375 Nos. 6.26 22.04.10 11.01.10 Upheld

8 NN/10-11/08 01842 08.06.09 NR W/shop JUDW RK Saxena 760 Ltrs. 760 Ltrs. 0.91 27.04.10 10.05.10 22.07.09 Pending

9 NN/10-11/09 06100 15.01.09 NR EMU GZB 110 Nos. 18 Nos. 0.24 21.04.10 05.05.10 21.04.09

10 NN/10-11/10 04928 31.10.09 NR EMU GZB KD Sharma 7 Nos. 7 Nos. 0.28 21.04.10 Pistion rod bent. 05.05.10 26.06.09

11 NN/10-11/11 06100 15.01.09 Angle Cock NR EMU GZB Anar Singh 150 Nos. 150 Nos. 1.25 21.04.10 05.05.10 19.02.10

12 NN/10-11/12 06100 15.01.09 Release Valve NR EMU GZB Anar Singh 50 Nos. 50 Nos. 0.52 21.04.10 05.05.10 20.01.10

8 EN/10-11/09 32140 13.05.09 DSL P Muzumdar 1000 Nos. 1000 Nos. 26.04.10 13.05.10 07.01.10 Pending

Vijay Engineers, Jallandhar

MS Snap Head Rivets

Deepak Kumar

Height of rivet and width of head is not as per IS code. Head oblong and developed crown during riveting.

Joint inspection held on 20.05.10. As there were 2 Nos. with cracks and 5 Nos. with forging defects out of 100 Nos. checked. Firm has agreed to segregate the lot.

Set of Steel Wire Ropes and Slings

Joint inspection fixed on 03.06.10 by Western Region

Gifval Industries, Mohali

Push Type Flushing Valve

Hemant Kumar

Material failed in chemical composition

Joint inspection fixed on 10.05.10 and refixed on 21.05.10 and again fixed for 02.06.10

Pushkar Paint Industries, Lucknow

Enamel Synthetic

Fail to meet the requirement of IS:8662/04

Joint inspection held on 10.05.10. Material sent to an indpendent test house by consignee.

Escorts Ltd, Faridabad

Piston Assembly

Pradeep Kumar

Hole in rubber sheet not clear

Joint inspection held on 05.05.10. Piston rod got bent during transit.

Transit damage

Escorts Ltd, Faridabad

Piston complete sub assembly

Joint inspection held on 05.05.10. Piston rod got bent during transit.

Transit damage

Escorts Ltd, Faridabad

Reversivle key required instead of handle.

Joint inspection held on 05.05.10. Firm agreed to replace the material as per consignee requirement.

Not on RITES A/c

Escorts Ltd, Faridabad

No mark of firm name/month and year on the material.

Joint inspection held on 05.05.10. Marking stickers were not properly etiching on the material and got displaced during transit.

Not on RITES A/c

MGM Rubber Company, Kolkata NEI/Jaipur

Conical Rubber Thrust Pad

NEI NWR

JP Ajmer

1000 Nos.

Failed in chemical composition of workmanship, polymer, hardness, and oil resistance test.

Joint inspection held on 13.05.10. Sample sent to M&C Lab, RDO, Lucknow by consignee for testing. Reply of vigilance letter sent on 10.06.10

Page 59: COMPLNT. 2010-11

Complaint cases of Shri Rajesh Kumar Sood for the year 2010-11 upto 31.05.10S. No. UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF ICCONSI-

GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

CLASSIFICATION

2 WN/10-11/02 02318 02.07.09 NR ETD GZB 18 Nos. 18 Nos. 27.04.10 17.05.10 04.01.10

NWR BGC Ajmer 34 Nos. 28.04.10 Warranty failure No JI

NWR BGC Ajmer 11 Nos. 28.04.10 Warranty failure No JI

NWR BGC Ajmer 4 Nos. 28.04.10 Warranty failure No JI

Stesalit, Solan 4.5KW EWRRU NWR BGC Ajmer 1 No. 28.04.10 Warranty failure No JI

4.5KW EWRRU NWR BGC Ajmer 1 No. 28.04.10 Warranty failure No JI

NWR BGC Ajmer 6 Nos. 28.04.10 Warranty failure No JI

NWR BGC Ajmer 2 Nos. 28.04.10 Warranty failure No JI

NWR BGC Ajmer 7 Nos. 28.04.10 Warranty failure No JI

RSWM ltd., NOIDA 10990 23.07.08 WCR GSD ET LS Cheema 2504 Nos. 2504 Nos. 21.04.10 24.09.08

14 NN/10-11/14 32964 03.12.09 NER Depot GKP 1292 Nos. 133 Nos. 0.39 27.04.10 23.10.09 Upheld

Indore Nitriders, Indore

Suspension Tube

K Chandrashekhran

Dimensional variation

JI held on 17.05.10. Ovelty can be produce during transit /mishandling. Hence rejection not on RITES A/c.

Not on RITES A/c

India Auto Industries, Gurgaon

Shock Absorber Cap

No JI since the warranty failure is not under the purview of RITES inspection

Best & Choice System, New Delhi

Electronic Ballast

No JI since the warranty failure is not under the purview of RITES inspection

DR Auto Industries, New Delhi

Electronic Ballast

No JI since the warranty failure is not under the purview of RITES inspection

No JI since the warranty failure is not under the purview of RITES inspection

HMTD, Taloja ( Mah.)

No JI since the warranty failure is not under the purview of RITES inspection

SD Technical Services, Gurgaon

Distributor Valve

No JI since the warranty failure is not under the purview of RITES inspection

Knorr Bremse, Faridabad

Distributor Valve

No JI since the warranty failure is not under the purview of RITES inspection

Stone India, Faridabad

Distributor Valve

No JI since the warranty failure is not under the purview of RITES inspection

Fire Retardent Curtain Cloth

Amend shade of the item as T-369B2/TCSCO802 in lieu of PPA-57 of Indian Rayon which was incorporated in the PO

Case papers sent to Western Region to hold JI

Case papers to WR

Sagar Valve Industries, Jallandhar

Push Type Flushing Valve

Deepak Kumar

Material failed in chemical composition i.e. Body, press knob and spring.

Joint inspection fixed on 10.05.10 and refixed for 21.05.10 and again refixed for 02.06.10

Page 60: COMPLNT. 2010-11

Complaint cases of Shri Rajesh Kumar Sood for the year 2010-11 upto 31.05.10S. No. UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF ICCONSI-

GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

CLASSIFICATION

15 NN/10-11/15 32499 07.08.09 NER Depot GKP Roshan Lal 3800 Nos. 1949 Nos. 0.85 27.04.10 21.05.10 23.10.09 V Rectification

9 EN/10-11/08 12451 27.03.09 NER Depot GKP G D 474 Nos. 474 Nos. 22.04.10 21.05.10 14.10.09

16 NN/10-11/16 12481 11.05.09 NER Depot GKP 2500 Nos. 1010 Nos. 0.52 27.04.10 21.05.10 23.10.09 V Rectification

17 NN/10-11/17 12592 17.08.09 Gravity Cock NER Depot GKP 27.04.10 29.01.10 Upheld

JP VS Yadav 29.04.10

3 WN/10-11/03 01692 27.05.09 NR GSD AMV SK T 170 Nos. 170 Nos. 29.04.10 20.05.10 10.08.09 Pending

18 NN/10-11/18 14560 14.11.08 RUIDP TPI 1 No. 1 No. 0.034 29.04.10 07.05.10 28.07.09 Accepted

19 NN/10-11/19 14546 14.11.08 Rickshaw Trolly RUIDP TPI Neeraj Singh 50 Nos. 50 Nos. 29.04.10 07.05.10 20.08.09 Accepted

20 NN/10-11/20 JCB India, Jaipur 14564 14.11.09 RUIDP TPI RK Jain 2 Nos. 2 Nos. 43.43 29.04.10 07.05.10 . Accepted

Laxmi Iron & Hardware Stores, Kushinagar

Push Cock Chrome Plated

Material failed in chemical composition i.e Shell, Spindle and Washer

Joint inspection held on 21.05.10. Out of screw samples five found Ok and two leaking. Firm has agreed to rectify the material.

Ashoka Industries, Howrah

Push Cock complete

Material failed in Chemical composition

JI held on 21.05.10. It has been observed that the consignee has consumed the total qty of 18486 Nos. and the balance i.e. 474 Nos. is within the range of 5% of inspection parameters. Hence Rejection not on RITES A/c.

Not on RITES A/c

MC Handa Brothers, Jallandhar

Push Cock complete

Deepak Kumar

Failed in chemical composition

JI held on 21.05.10.Out of six samples five were found Ok and one having leakage. Firm has agreed to

Zaam Tools, Raibareili

Pradeep Kumar

10000 Nos. 3100 Nos

10540 Nos.

Failed in chemical composition of body inlet and outlet.

Joint inspection fixed on 10.05.10 and refixed for 21.05.10 and again refixed for 02.06.10

Easteem Industries Inc.

GIN-77/PO-13 & PO-08

Steam Sterilizer

RUIDP

2046 Nos 284 Nos. 316 Nos.

Poor quality inspection of material

Letter written to GGM (QA)

Letter written to GGM (QA)

Responsive Industries, Mumbai

Flexible Polyvinyl Chloride PVC Flooring Ash Grey

Dimensional variation

JI held on 20.05.10. Sample under testing

Ensol Multiclean Equipment, Jaipur

Bin Carrier ( Capacity 1.1Cum)

ALWAR

Brijveer Singh

Substandard material passed

JI held on 07.05.10. Material accepted during joint inspection.

Nilkamal Ltd., Mumbai

ALWAR

Substandard material passed

JI held on 07.05.10. Material accepted during joint inspection.

Loade Backhoe Machine

ALWAR

Substandard material passed

JI held on 07.05.10. Material accepted during joint inspection.

Page 61: COMPLNT. 2010-11

Complaint cases of Shri Rajesh Kumar Sood for the year 2010-11 upto 31.05.10S. No. UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF ICCONSI-

GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

CLASSIFICATION

4 NS/10-11/04 1908F 23.10.09 ICF C&W PER Rajesh Sood 2000 Nos. 2000 Nos. 2.32 28.04.10 04.05.10 25.03.10 D Upheld

21 NN/10-11/21 55126 06.11.08 DMW DSL PTA Neeraj Singh 141 Nos. 23 Nos. 30.04.10 12.05.10 03.11.09

22 NN/10-11/22 55160 24.10.09 DMW DSL PTA Neeraj Singh 144 Nos. 16 Nos. 10.79 30.04.10 05.03.10 Pending

4 WN/10-11/04 55473 25.02.09 DMW DSL PTA Arun Joshi 150 Nos. 150 Nos. 26.04.10 12.05.10 17.06.09 P Upheld

02980 08.12.08 Metor CCC 682 sets 682 sets 27.04.10 No JI

NWR BGC Ajmer 2 Nos. 23.04.10 Warranty failure NO JI

NWR BGC Ajmer 1 No. 28.04.10 Warranty failure NO JI

03945 11.09.08 NR W/shop JUDW 83 Nos. 8 Nos. 23.05.10 NO JI

01048 08.04.09 NR W/shop JUDW 919 Ns. 91 Nos. 23.05.10 Less weight NO JI

KEL, Kerala NWR BGC Ajmer 4 Nos. 23.05.10 Warranty failure NO JI

Virendra Steel Enterprises, Chandigarh

Arrangement of Mug

Mug capacity 635 ml as against min. 750 ml as mentioned in drg. Thickness 0.8mm as against 1.6mm

Joint inspection held on 04.05.10. The mug capacity and handle thickness not being as per drawing. Hence material finally rejected.

Ganesh Foundary, Jodhpur

Kit for bearing cap outer

Step on dia 254.050 - 254.000 is not provided due to casting defect.

Joint inspection held on 12.05.10. It was a trial order and mould have been rectified by firm. Firm has agreed to replace the material.

Not on RITES A/c

Ganesh Foundary, Jodhpur

End shield PE for TM

Problem in fitment of box nut due to improper wall thickness

Joint inspection fixed on 12.05.10 and refixed for 02.06.10

Techno Craft, Bhopal

Kit of bearing cap inner

Lab report is not satisfactory material obtained malleble cast iron instead of cast steel.

Joint inspection held on 12.05.10. Material stands rejected on account of material 'Malliable cast Iron is supplied instead of Cast steel.

Escorts Ltd, Faridabad

Shock Absorber

Kulbhushan Gupta

Set of shock absorber found 600 kg instead of 900 kg

JI not required as the reason of rejection is beyond the scope of quality of inspection.

General Stores and Engg. Co., Kolkata

Bogie mounted brake cylinder

JI not required as the warranty claim is not under the purview of RITES inspection

Escorts Ltd, Faridabad

Distributor Valve

JI not required as the warranty claim is not under the purview of RITES inspection

Kiran Rubber Products, Thane

UIC Type Rubber Vestibule

Found in damaged condition

NO JI the reason of reason material found damaged

Ranka Trading Co., Chennai

Wash Hand Sink

No JI required . The reason of rejection not attributed to RITES inspection.

25 KW Capacity ERRU

JI not required as the warranty claim is not under the purview of RITES inspection

Page 62: COMPLNT. 2010-11

Complaint cases of Shri Rajesh Kumar Sood for the year 2010-11 upto 31.05.10S. No. UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF ICCONSI-

GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

CLASSIFICATION

Screw Coupling NWR BGC Ajmer 3 Nos. 13.05.10 Warranty failure NO JI

NWR BGC Ajmer 1 No. 13.05.10 Warranty failure NO JI

NWR BGC Ajmer 5 Nos. 28.04.10 Warranty failure NO JI

Bogie Bolster NWR BGC Ajmer 1 No. 28.04.10 Warranty failure NO JI

1 Draw Hook NWR BGC Ajmer 2 Nos. 04.05.10 Warranty failure NO JI

2 NWR BGC Ajmer 47 Nos. 04.05.10 Warranty failure NO JI

3 NWR BGC Ajmer 9 Nos. 04.05.10 Warranty failure NO JI

4 NWR BGC Ajmer 15 Nos. 04.05.10 Warranty failure NO JI

5 1100 AH Cell NWR BGC Ajmer 3 Nos. 04.05.10 Warranty failure NO JI

20491 14.02.09 RCF C&W KXH 365 Nos. 365 Nos. 4.51 07.05.10 NO JI

23 NN/10-11/23 20065 20.05.08 RCF C&W KXH 8 Nos. 8 Nos. 4.29 07.05.10 29.01.10 Pending

Hindustan Fibre 70305 09.11.09 Ceilling Angle RCF C&W KXH AK M 11 Nos. 11 Nos. 07.05.10 NO JI

Vivekananda Forgings, Howrah

JI not required as the warranty claim is not under the purview of RITES inspection

Rubicon Steels, Mohali

Over Head Water Tank

JI not required as the warranty claim is not under the purview of RITES inspection

Greysham & Co, Delhi

Distributor Valve

JI not required as the warranty claim is not under the purview of RITES inspection

Sarda Forgings, Ghaziabad

JI not required as the warranty claim is not under the purview of RITES inspection

Emson Tools Mfg. Ludhiana

JI not required as the warranty claim is not under the purview of RITES inspection

Avadh Rubber, Lucknow

Rubber Buffer Spring

JI not required as the warranty claim is not under the purview of RITES inspection

Intra Electronics, Ganesh Nagar, Pune

Electronic Ballast

JI not required as the warranty claim is not under the purview of RITES inspection

Aryan Exporters, Lucknow

Rubber Buffer Spring

JI not required as the warranty claim is not under the purview of RITES inspection

HBL Power Systems, Hyderabad

JI not required as the warranty claim is not under the purview of RITES inspection

Kaveri Industries, New Delhi

Ceiiling Light Fitting with NL

AK Srivastava

Rejected due to DP expired

No JI the reason of rejection is beyond the scope of inspection

Gambhir Sons, Gurgaon

Chair Angle & Partition Frame set

Deepak Kumar

Dimension observed 255&254 against 239+/-2

Joint inspection fixed on 24.05.10 and refixed for 04.06.10

Validity of IC has expired

No JI the reason of rejection is beyond the scope of inspection

Page 63: COMPLNT. 2010-11

Complaint cases of Shri Rajesh Kumar Sood for the year 2010-11 upto 31.05.10S. No. UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF ICCONSI-

GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

CLASSIFICATION

5 WN/10-11/05 20407 25.01.10 RCF C&W KXH 50 Nos. 50 Nos. 07.05.10 No JI 10.03.10 Accepted

ABOK Spring, Jaipur 04523 03.11.09 ER Depot KPA 3.72 07.05.10 25.03.10

05789 22.12.09 CR CWE MTN 6 sets 1 set 3.28 05.05.10 NO JI

91656 29.07.09 SCR DSD KZP 500 Nos. 500 Nos. 06.05.10 JI not required NO JI

54331 15.03.08 DMW DSL PTA 335 Nos. 2 Nos. 07.05.10 Black spot on flange NO JI

54521 08.07.08 DMW DSL PTA 249 Nos. 12 Nos. 07.05.10 NO JI

02702 25.02.10 WCR CRWS BPL RK Jain 15 Sets 15 Sets 3.28 07.05.10 23.03.10 No JI

80076 10.07.07 NWR DSL VC Tiwari 1 No. 1 No. 05.05.10 04.08.07

6 NW/10-11/06 04498 10.11.09 Toilet Soap WR GSD PL 05.05.10 11.03.10 Pending

31 NN/10-11/31 01728 14.12.09 NWR DSL Ajmer Manoj Kumar 1610 Nos. 1610 Nos. 1.45 12.05.10 25.02.10 Pending

Elastomer Lining Works, Thane

Vestibule arrangement

SN Sadawarte

Material not as per drg. As locking plate (top) having 9 Nos. hex head scerew instead of 10 Nos. Location hex head screws and CEK screws is interchanged. Material supplied loose, not packed as per packing condition of the PO.

JI was scheduled for 24.05.10. Consignee has withdrawn the rejection vide R/Note dated 25.04.10.

Inner Suspension Spring

Brijveer Singh

After checking of the material it is seen that the RITES facsimile as on the material differs from fascimile shown of IC

Case papers sent to Eastern Region for further n.a.

Case papers to ER

PPS International, Delhi

HSCB type UR 6-32TD Secheron

RITES inspection certifcate not received

The reason of rejection is beyond the scope of quality of inspection

PTC Industries, Lucknow

Valve Seat Insert

Minor variation in size

Raj Pattern Maker and founders, Agra

Frame bearing water pump casting

JI not required as the rejected qty is less than 5% of passed lot.

Krishna Foundary Works, Ambalacity

Spring Seat ( BG) Casting

Blow holes observed hence rejected

JI not required as the rejected qty is less than 5% of passed lot.

Flexo Foam, Gurgaon

Densified Thermal Bonded Polyster block

Amendement slip No. 1 of RDSO specified value of density given 60.23 kg/M but in RITES report specified value is 48 to 52.03 kg/M

Material has been tested to Spen. CK-607, amandment slip No. 1 which is not acceptable. Hence firm may deal directly in this regard.

Sachit Electronics, Delhi

Portable Hardness Tester

Phu-lera

Hardness tester ,easire wprls [oece pf 4 kg and above weight only instead of 2-5 kg on stable support

Joint inspection fixed on 01.06.10

Shree Nath Exports, Jaipur

Brijveer Singh

30338 Nos.

30338 Nos.

Reason of rejection not supplied

Joint inspection fixed on 17.05.10 by Western Region

Shri Sidhartha Enterprises, New Delhi

Double wire Hose Clamp Pull Type

Screw is not riveted or spun. Screw is not having retainer washer. Clamp bend is threaded to

Joint inspection fixed on 10.06.10

Page 64: COMPLNT. 2010-11

Complaint cases of Shri Rajesh Kumar Sood for the year 2010-11 upto 31.05.10S. No. UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF ICCONSI-

GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

CLASSIFICATION

01278 15.10.09 NWR INSP. JU 267 Nos. 267 Nos. 11.05.10 No JI

2 NS/10-11/08 1666F 31.10.09 ICF C&W PER PK Bagga 2.47 20.05.10 27.05.10 07.12.09 D Upheld

1 NS/10-11/09 01768 24.09.09 SWR DSL KJM Rajesh Sood 100 Nos. 100 Nos. 11.05.10 20.03.10 Pending

05605 11.01.10 Bearing Spring NR GSD KLK 198 Nos. 18 Nos. 11.05.10 No JI

60293 23.12.09 CR BCT 630 Ltrs. 630 Ltrs 11.05.10 Damage/leakage No JI

32 NN/10-11/32 12713 14.02.08 CP Lift Cock NER Depot GKP Sudesh Jain 306 Nos. 306 Nos. 0.15 12.05.10 11.06.10 26.09.08

7 NW/10-11/07 02550 22.10.08 WCR CRWS BPL Manoj Singh 500 Nos. 500 Nos. 12.05.10 12.05.10 29.05.09

Bharat Industrial Corporation, Delhi

Transparent Acrylic Cover cover cast sheet

Material received in broken condition

JI not required since material found broken.

Guneet Agro Industries, Ludhiana

Slotted pan Head Tapping

1648920 Nos.

1648920 Nos.

The screws are not satisfactory with respect to the thread dia 3.94, 3.75, 4.03, 4.01, 4.12, 4.16, 3.98 and 3.97 as against 4.04-4.22 specified as per 7173/89

Joint inspection held on 27.05.10. As the thread dia is not found as per the requirement in almost 30% of the samples. Hence material stands rejected.

Universal Instruments, Ambala

Cylinder Self Illuminated with Led Flush Mounted

As per drg gauge should have removable back plate for adjustment where as the design of the supplied item makes it impossible . Needle gets stuck up and on reseting it slackness.

Joint inspection fixed on 10.06.10

GB Spring, Dehradun

Material received without RITES holograms

JI not required case treated as uninspected by RITES

AVI-Oil-India, New Delhi

Polyster Oil Nyco Lube

Coach-ing

JI not required. Material found damaged

Zaam Tools, Raibareili

All lift cock found leakage condition

Joint inspection held on 11.06.10. Since the supplied material is apprx. 21 months old and qty rejected is 2.8% only (which is less than 5%) and no RITES identification is available on whole rejected qty. Material is rejected but rejection is not attribut

Not on RITES A/c

Raj Steel Corporation, Kanpur

Foot Step Assembly

Item No. 4 of PO chequred plate 5x200x780mm supplied by firm, is not inspected by RITES.

Joint inspection held on 12.05.10. Mix fascimile lot is found. Out of 500 Nos. 47 Nos. are found without proper stamps. Hence case closed as 'Not on RITES A/c.'

Not on RITES A/c

Page 65: COMPLNT. 2010-11

Complaint cases of Shri Rajesh Kumar Sood for the year 2010-11 upto 31.05.10S. No. UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF ICCONSI-

GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

CLASSIFICATION

58598 10.10.09 DMW DSL PTA 1 No. 18.05.10 No JI

24 NN/10-11/24 80076 10.07.07 NWR DSL VC Tiwari 1 NO. 1 No. 05.05.10 04.08.07 Pending

25 NN/10-11/25 40109 26.03.10 RCF C&W KXH BK Kapur 3.65 25.05.10 04.06.10 31.03.10

10 EN/10-11/10 03002 17.08.09 NR EMU GZB P Moitra 60 Nos. 60 Nos. 17.05.10 14.06.10 10.03.10 O Rectification

06772 02.09.09 SECR GSD NGP 100 os. 100 Nos. 14.05.10 No JI

26 NN/10-11/26 32632 27.10.09 NER DSL GD Sunil Panda 100 Nos. 100 Nos. 0.86 17.05.10 06.05.10 12.02.10 Pending

27 NN/10-11/27 54653 07.08.08 DMW DSL PTA PK Bagga 400 Nos. 400 Nos. 0.48 19.05.10 05.04.09 Pending

53638 11.09.07 DMW DSL PTA 99 Nos. 10 Nos. 18.05.10 No JI

28 NN/10-11/28 55898 18.07.09 DMW DSL PTA PK Bagga 1380 Nos. 1280 Nos. 1.48 19.05.10 30.04.10 Pending

Y1535 02.03.10 RE TPI SC 14.05.10 Letter to firm

EC Blades & Tools, Panchkula

Radiator Compartment

RITES Inspection certifcate and test report has not been received.

JI not required since the reason of rejection is not under the scope of RITES inspection.

Sachit Electronics, Delhi

Portable Hardness Tester

Phu-lera

Hardness tester ,easire wprls [oece pf 4 kg and above weight only instead of 2-5 kg on stable support

Joint inspection fixed on 01.06.10

Atlas Adhesive, New Delhi

Fire Retardent Rubber based Adhesive

4000 Nos. 4895 Nos.

3180 Nos. 4895 Nos.

Brushing as congulation takes place while applying by brush. Weight per litre found 1.2kg/Ltr against 0.90+/-0.1 Kg.

Joint inspection held on 04.06.10. This material was accepted by RITES IE due to urgency of RCF without conducting any test on TC of the firm. Hence rejection is not on RITES A/c.

Not on RITES A/c

Razzlaxmi Enterprises, Howrah

Gear Case top and bottom

Material not as per latest amended drawing.

Joint inspection held on 14.06.10. Material accepted after rectification.

RK Industries, Kolkata

Metal halide fitting

Out of 175 boxes 25 boxes of accessories are without RITES holograms

JI not required since holgram not available

Delco Switchgears, Jaipur

Miniature 15 Amp

Tripping time is less than specification standards time.

Joint inspection fixed on 07.06.10 and refixed for 14.06.10

Aay Ess Forging Industries, Ludhiana

Crank Shaft Coupling Bolt Forging

Raw material confirmed to specification D-87010

Joint inspection fixed on 02.06.10

Kumar Auto Cast, Ludhiana

Fuel Pump Support

At dimensional 5.34 material excess. Blow in lug hole

JI not required since the rejection memo issued after 90 days of receipt of material.

Aay Ess Forging Industries, Ludhiana

Crank Shaft Coupling Bolt Forging

Raw material confirmed to specification D-87010

Joint inspection fixed on 02.06.10

Jain Steel Industries, Mandi Govindgarh

Steel Structures

Rajesh Sharma

Letter written to firm urgently attend the matter.

Page 66: COMPLNT. 2010-11

Complaint cases of Shri Rajesh Kumar Sood for the year 2010-11 upto 31.05.10S. No. UNIQUE SL. NO. FIRM'S NAME P.O. NO. DATE ITEM RLY REASON OF REJECTION STATUS DATE OF JI DATE OF ICCONSI-

GNEE DISCI- PLINE

COSI- GNEE STAT- ION

INSPECTING ENGINEER

QTY. OFFE-RED

QTY REJ-ECTED

VALUE OF REJ STORES

DATE OF 1ST REFER-ENCE

DEF-ECT CODE

CLASSIFICATION

2 NS/10-11/10 01769 24.09.09 SWR DSL KJM Rajesh Sood 100 Nos. 100 Nos. 24.05.10 20.03.10 PendingUniversal Instruments, Ambala

MR & FP Gauge

Shaft portion threaded on both ends with opposite type of threads which results in slackening of gauge during gauge pipe. Convection/disconvection. Threads in the gauge case also get damaged due to this .

Joint inspection fixed on 10.06.10

Page 67: COMPLNT. 2010-11

Complaint cases of Shri Rajesh Kumar Sood for the year 2010-11 upto 31.05.10ACTION TAKEN

Page 68: COMPLNT. 2010-11

Complaint cases of Shri Rajesh Kumar Sood for the year 2010-11 upto 31.05.10ACTION TAKEN

Page 69: COMPLNT. 2010-11

Complaint cases of Shri Rajesh Kumar Sood for the year 2010-11 upto 31.05.10ACTION TAKEN

Page 70: COMPLNT. 2010-11

Complaint cases of Shri Rajesh Kumar Sood for the year 2010-11 upto 31.05.10ACTION TAKEN

Under testing

Page 71: COMPLNT. 2010-11

Complaint cases of Shri Rajesh Kumar Sood for the year 2010-11 upto 31.05.10ACTION TAKEN

Under testing

Vig. Case Under testing

Page 72: COMPLNT. 2010-11

Complaint cases of Shri Rajesh Kumar Sood for the year 2010-11 upto 31.05.10ACTION TAKEN

Under testing