Complete the Engineer-To-Order Process With Period-End Postings for Project Valuation

2
Complete the Engineer-to-Order Process with Period-End Postings for Project Valuation by Birgit Starmanns, Senior Director, Solution Marketing, EPM and Finance Solutions, SAP September 12, 2014 Share on facebook Share on twitter Share on email Share on print More Sharing Services In an engineer-to-order manufacturing environment, you iteratively design a product with your customer and then produce the product based on these newly developed specifications. These projects typically run over many financial periods. At the end of each period, you need to ensure that you correctly value the work in process, the cost of goods sold, and the project revenue on your financial statements. Learning Objectives By reading this article, you will: Understand how the results analysis (RA) calculation is used to determine the value of the project at each period-end, based on revenues and costs posted to the project See selected accounting entries made at period-end in the FI, Controlling (CO), and Project System (PS) modules to correctly value the engineer-to-order activities on your financial statements Understand at which points in the manufacturing process postings are made to the profitability analysis (CO-PA) module Key Concept Costs in an engineer-to-order manufacturing environment are captured using the Project System (PS) module, and reside on the profit and loss (P&L) statement. To correctly value the project at the end of each financial period, a results analysis (RA) process calculates the value of the project, based on the costs incurred and any revenue received from your customer. In an engineer-to-order (ETO) manufacturing environment, a product is designed specifically for a customer, which is often an iterative process. After the engineering design has been signed off, the product is manufactured based on

description

Complete the Engineer-to-Order Process with Period-End Postings for Project Valuation

Transcript of Complete the Engineer-To-Order Process With Period-End Postings for Project Valuation

Complete the Engineer-to-Order Process with Period-End Postings for Project Valuation by Birgit Starmanns, Senior Director, Solution Marketing, EPM and Finance Solutions, SAP September 12, 2014 Share on facebook Share on twitter Share on email Share on print More Sharing Services In an engineer-to-order manufacturing environment, you iteratively design a product with your customer and then produce the product based on these newly developed specifications. These projects typically run over many financial periods. At the end of each period, you need to ensure that you correctly value the work in process, the cost of goods sold, and the project revenue on your financial statements. Learning ObjectivesBy reading this article, you will: Understand how the results analysis (RA) calculation is used to determine the value of the project at each period-end, based on revenues and costs posted to the project See selected accounting entries made at period-end in the FI, Controlling (CO), and Project System (PS) modules to correctly value the engineer-to-order activities on your financial statements Understand at which points in the manufacturing process postings are made to the profitability analysis (CO-PA) module Key ConceptCosts in an engineer-to-order manufacturing environment are captured using the Project System (PS) module, and reside on the profit and loss (P&L) statement. To correctly value the project at the end of each financial period, a results analysis (RA) process calculates the value of the project, based on the costs incurred and any revenue received from your customer. In an engineer-to-order (ETO) manufacturing environment, a product is designed specifically for a customer, which is often an iterative process. After the engineering design has been signed off, the product is manufactured based on these specifications. These projects can last months or years, depending on the scope of the item that is being designed.In my prior article, Understand Your Project Costs in an Engineer-to-Order Manufacturing Environment, which was posted to the Financials Expert knowledgebase in February 2014, I covered the postings made in the first period of a project, using the example of designing and producing an airplane. I assumed that the engineered product was not completed at period-end. These same postings are made in subsequent periods as well, because costs continue to be incurred on the project. For a summary of these processes, refer to the sidebar Period Postings. The costs that are incurred throughout the period reside on the profit and loss (P&L) statement. As a result, at each period-end you must ensure that you correctly account for the work in process (WIP) and the cost of goods sold (COGS) of the project. In this article, I describe the calculations that are made in the Project System (PS) module, and the resulting entries in both the FI and Controlling (CO) modules at period-end.To demonstrate the period-end postings at the end of each of the three accounting periods as part of the financial close, I assume the following: In period 1, costs are incurred on the project, but no revenue is received from the customer. In period 2, costs are incurred, and the customer is invoiced based on a project milestone. In period 3, costs are incurred, the product is completed and delivered to the customer, and final invoicing of the customer takes place.