COMPLETE STREETS REDESIGN OF WASHINGTON STREET...COMPLETE STREETS REDESIGN OF WASHINGTON STREET...
Transcript of COMPLETE STREETS REDESIGN OF WASHINGTON STREET...COMPLETE STREETS REDESIGN OF WASHINGTON STREET...
Workshop #1 | 12.16.2013
COMPLETE STREETS REDESIGN OF
WASHINGTON STREET
HOBOKEN WASHINGTON STREET
124 Grand St
HOBOKEN WASHINGTON STREET
Workshop #1 | 12.16.2013 2
HOBOKEN WASHINGTON STREET
Workshop #1 | 12.16.2013 3
Project descrip4o
n,
extents
HOBOKEN WASHINGTON STREET
Workshop #1 | 12.16.2013 4
HOBOKEN WASHINGTON STREET
Workshop #1 | 12.16.2013 5 Environmental Impact/Green Streets Bicycle Parking
Senior Mobility/ADA Compliance/Ped Safety
Consistency with Existing Plans Enhance Aesthetic Value
TrafFic / Parking Solutions/Signals
Complete Streets
Maintenance and Operations
Historical Context
Purpose / Goals
HOBOKEN WASHINGTON STREET
Workshop #1 | 12.16.2013 6
HOBOKEN WASHINGTON STREET
Workshop #1 | 12.16.2013 7
HOBOKEN WASHINGTON STREET
Workshop #1 | 12.16.2013 8
Exis4ng Condi4ons • Traffic Signals • Crash Rates • Parking/Loading
• Ligh4ng • Complete Street • Streetscape/Green
HOBOKEN WASHINGTON STREET
Workshop #1 | 12.16.2013 9 Tonight
HOBOKEN WASHINGTON STREET
Workshop #1 | 12.16.2013 10
Tiffany Robinson BeHna Zimny Mark Keener Kevin Perry
Mike Dannemiller Charlie Cunion Gordon Meth Tim Krehel Randall Ide
HOBOKEN WASHINGTON STREET
Workshop #1 | 12.16.2013 11
✔ ✔ ✔
✔
✔
✔ ✔
✔
✔
✔ ✔
✔
✔ ✔
HOBOKEN WASHINGTON STREET
Workshop #1 | 12.16.2013 12
5:05 5:11 5:17 5:23 5:29 5:35 5:41 5:47 5:53 5:59
6:05 6:11 6:17 6:23 6:29 6:35 6:41 6:47 6:53 6:59
7:06 7:16 7:26 7:36 7:46 7:56
8:06 8:16 8:26 8:36 8:46 8:56
9:06 9:16 9:26 9:49
HOBOKEN WASHINGTON STREET
Workshop #1 | 12.16.2013 13
✔ ✔ ✔
✔
✔
✔ ✔
✔
✔
✔ ✔
✔
✔ ✔
HOBOKEN WASHINGTON STREET
Workshop #1 | 12.16.2013 14
HOBOKEN WASHINGTON STREET
Workshop #1 | 12.16.2013 15
Now What?
HOBOKEN WASHINGTON STREET
Workshop #1 | 12.16.2013 16
+80% (over)
85% Streetscape appearance 84% Pedestrian safety
Consulted Experts. You said:
HOBOKEN WASHINGTON STREET
Workshop #1 | 12.16.2013 17
+70% (over)
79% Mix of shops, restaurants, and entertainment 73% Appearance of shop fronts, windows and signs 73% NighHme ligh4ng 71% Trash collec4on
HOBOKEN WASHINGTON STREET
Workshop #1 | 12.16.2013 18
-‐70%(just less than)
69% Historic character 69% Appearance of buildings 68% Green Infrastructure/Stormwater 67% Traffic and parking
HOBOKEN WASHINGTON STREET
Workshop #1 | 12.16.2013 19
First: Do No Harm
First... do no harm ἐπὶ δηλήσει δὲ καὶ ἀδικίῃ εἴρξειν
....formulate things that fit Fit the purpose. Fit the place. Fit for future possibili4es.
Leon BaHsta Alber4 (1404– 1472)
Hippokrátēs 460 BC – 370 BC)
HOBOKEN WASHINGTON STREET
Workshop #1 | 12.16.2013 20
“nobody goes there anymore...its too crowded”
HOBOKEN WASHINGTON STREET
Workshop #1 | 12.16.2013 21
First... do no harm
....formulate things that fit Fit the purpose. Fit the place. Fit for future possibili4es.
Introductory Presenta:on (6:20pm-‐6:45pm) overview of the project: Be4nna preferences / priori:es for Washington Street. Mark, Gordon
Worksession 1 & 2 (6:45pm-‐7:15pm) Streetscape/Urban Design (street as a room) Charlie, Randy, Mark Transporta:on (street as a system) Mike, Gordon
Reporter’s Briefings (7:15-‐7:30pm) Workgroups report findings and recommenda:ons
Whats Next? (7:30pm-‐7:40pm) Project :meline, website, complete survey by Jan 1
Make your Mark (7:40pm-‐8:00pm) You on-‐camera Fill in the blank Best picture
preferences / priorities!
HOBOKEN WASHINGTON STREET
Workshop #1 | 12.16.2013 22
preferences / priorities!
Downtown!Uptown!
!
Downtown!
Downtown!Uptown!
!
Uptown!
HOBOKEN WASHINGTON STREET
Workshop #1 | 12.16.2013 25
HOBOKEN WASHINGTON STREET
Workshop #1 | 12.16.2013 26
HOBOKEN WASHINGTON STREET
Workshop #1 | 12.16.2013 27
UPTOWN à Upgrade Ligh4ng Improve and Maintain Landscape
HOBOKEN WASHINGTON STREET
Workshop #1 | 12.16.2013 28
S O U T H à Upgrade ligh4ng Refresh furnishings Rethink signs, clu}er Regulate dining and merchandising Maintain remove trash and gum Consider design, appearance Manage Parking, Loading
HOBOKEN WASHINGTON STREET
Workshop #1 | 12.16.2013 29
Upgrade Ligh4ng Refresh furnishings Rethink temporary signs and clu}er
HOBOKEN WASHINGTON STREET
Workshop #1 | 12.16.2013 30 W A T E R S T R E E T | D E S I G N E L E M E N T S 9 . 2 1 . 1 1 3 6
Privately owned public spaces
Ars Medendi (part one of two) by Jim Sanborn, 2009Thomas Jefferson University
Upgrade Ligh4ng Refresh furnishings Rethink temporary signs and clu}er
HOBOKEN WASHINGTON STREET
Workshop #1 | 12.16.2013 31
B R OWN&
K E E N E RW A T E R S T R E E T | D E S I G N E L E M E N T S 9 . 2 1 . 1 1 3 7
1AVENUE OF THE ARTS
PHILADELPHIA, PENNSLYVANIASOUTH BROAD STREET
EXISTING DAYTIME FAÇADESJANUARY 30, 2007
1AVENUE OF THE ARTS
PHILADELPHIA, PENNSLYVANIASOUTH BROAD STREET
EXISTING DAYTIME FAÇADESJANUARY 30, 2007
HOBOKEN WASHINGTON STREET
Workshop #1 | 12.16.2013 32
HOBOKEN WASHINGTON STREET
Workshop #1 | 12.16.2013 33
Upgrade Ligh4ng Refresh furnishings Rethink temporary signs and clu}er
HOBOKEN WASHINGTON STREET
Workshop #1 | 12.16.2013 34
HOBOKEN WASHINGTON STREET
Workshop #1 | 12.16.2013 35
HOBOKEN WASHINGTON STREET
Workshop #1 | 12.16.2013 36
HOBOKEN WASHINGTON STREET
Workshop #1 | 12.16.2013 37
HOBOKEN WASHINGTON STREET
Workshop #1 | 12.16.2013 38
HOBOKEN WASHINGTON STREET
Workshop #1 | 12.16.2013 39
HOBOKEN WASHINGTON STREET
Workshop #1 | 12.16.2013 40
HOBOKEN WASHINGTON STREET
Workshop #1 | 12.16.2013 41
Introductory Presenta:on (6:20pm-‐6:45pm) overview of the project: Be4nna preferences / priori:es for Washington Street. Mark, Gordon
Worksession 1 & 2 (6:45pm-‐7:15pm) Streetscape/Urban Design (street as a room) Charlie, Randy, Mark Transporta:on (street as a system) Mike, Gordon
Reporter Briefs (7:15-‐7:30pm) Workgroups report findings and recommenda:ons
Whats Next? (7:30pm-‐7:40pm) Project :meline, website, complete survey by Jan 1
Make your Mark (7:40pm-‐8:00pm) You on-‐camera Fill in the blank Best picture
B R OWN&
K E E N E RW A T E R S T R E E T | D E S I G N E L E M E N T S 9 . 2 1 . 1 1 3 9HOBOKEN WASHINGTON STREET
Workshop #1 | 12.16.2013 42
HOBOKEN WASHINGTON STREET
Workshop #1 | 12.16.2013 43
Streetscape/Urban Design (street as a room) Transporta:on (street as a system)
HOBOKEN WASHINGTON STREET
Workshop #1 | 12.16.2013 44
Art projected mapping .
VIDEO #2
HOBOKEN WASHINGTON STREET
Workshop #1 | 12.16.2013 50
Introductory Presenta:on overview of the project: Be4nna preferences / priori:es for Washington Street.
Worksession 1 & 2 Streetscape/Urban Design (street as a room) Transporta:on (street as a system)
Reporter’s Briefings Workgroups report findings and recommenda:ons
Whats Next? Project :meline, website, complete survey by Jan 1
Make your Mark You on-‐camera Fill in the blank Best picture