Complete Street Project (W Columbus Dr) - CUTR · Solid Waste Management (For 2040) Automatic...

17
Complete Street Project (W Columbus Dr) University of South Florida Department of Civil and Environmental Engineering CGN6933 Sustainable Transportation Spring 2018 Group 4: Shrut Shah, Abhinava Paul, Akhil Reddy, Sam Gibbons April 19 th , 2018

Transcript of Complete Street Project (W Columbus Dr) - CUTR · Solid Waste Management (For 2040) Automatic...

Page 1: Complete Street Project (W Columbus Dr) - CUTR · Solid Waste Management (For 2040) Automatic Collection, Transportation and Segregation System The waste is thrown into a disposal

Complete Street Project(W Columbus Dr)

University of South FloridaDepartment of Civil and Environmental EngineeringCGN6933 Sustainable Transportation Spring 2018

Group 4: Shrut Shah, Abhinava Paul, Akhil Reddy, Sam Gibbons

April 19th, 2018

Page 2: Complete Street Project (W Columbus Dr) - CUTR · Solid Waste Management (For 2040) Automatic Collection, Transportation and Segregation System The waste is thrown into a disposal

Goals and Objectives▪ 1st Goal: Increasing safety and reduce fatalities

1) Enhancing safety at intersections

2) Eliminating traffic fatalities and injuries

3) Introducing traffic calming and increase driver awareness

▪ 2nd Goal: Enhancing accessibility and mobility

1) Improve pedestrian and bicycle facilities

2) Accessible for all kinds of road users

▪ 3rd Goal: Increase environmental quality and promote alternate modes of transportation

1) Applying sustainable and energy harvesting infrastructure

2) Awareness about alternate modes of transportation

Page 3: Complete Street Project (W Columbus Dr) - CUTR · Solid Waste Management (For 2040) Automatic Collection, Transportation and Segregation System The waste is thrown into a disposal

Road Signs (For 2025)

Page 4: Complete Street Project (W Columbus Dr) - CUTR · Solid Waste Management (For 2040) Automatic Collection, Transportation and Segregation System The waste is thrown into a disposal

Signals/signs(For 2025)

• During nights, the use of LED lights commands driver’s attention hence reduces crash rate

• Implement solar LED lights

• Introduction of a roundabout helps in reduction of speed

• Reduce speeds from 40 to 25 East of Columbus and Himes

Page 5: Complete Street Project (W Columbus Dr) - CUTR · Solid Waste Management (For 2040) Automatic Collection, Transportation and Segregation System The waste is thrown into a disposal

Bike Lanes (For 2025)

Highlighted bike lanes on both sides of the West Columbus Drive where posted speed is 25 mph

Page 6: Complete Street Project (W Columbus Dr) - CUTR · Solid Waste Management (For 2040) Automatic Collection, Transportation and Segregation System The waste is thrown into a disposal

Intersection Design (For 2040 Design Concept)

Dale Mrby Highway

W Columbus DR

Page 7: Complete Street Project (W Columbus Dr) - CUTR · Solid Waste Management (For 2040) Automatic Collection, Transportation and Segregation System The waste is thrown into a disposal

Future pedestrian Crossover

Smart Zebra Crossing for Pedestrian Holographic Laser Pedestrian Crossing

Page 8: Complete Street Project (W Columbus Dr) - CUTR · Solid Waste Management (For 2040) Automatic Collection, Transportation and Segregation System The waste is thrown into a disposal

Intersection Design (For 2040 Design Concept)

Columbus Dr and Himes Ave ~ 210 feet/64 meters 40th and Hanna Ave

Page 9: Complete Street Project (W Columbus Dr) - CUTR · Solid Waste Management (For 2040) Automatic Collection, Transportation and Segregation System The waste is thrown into a disposal

2040 Intersection Design Columbus Ave and Himes Ave

Hovenring suspended bicycle path

220 feet/67 meters Eindoven, Netherlands

Page 10: Complete Street Project (W Columbus Dr) - CUTR · Solid Waste Management (For 2040) Automatic Collection, Transportation and Segregation System The waste is thrown into a disposal

Natural shade for bus stops or multimodal paths.< Confederate Jasmine

Smells wonderful

Crape Myrtle >

No root flair

Page 11: Complete Street Project (W Columbus Dr) - CUTR · Solid Waste Management (For 2040) Automatic Collection, Transportation and Segregation System The waste is thrown into a disposal

Natural Shade for bus stops or multimodal paths

< Oak Tree - Negative - Root Flare trees

Positives - erosion control and reduced heat island

effect

Grafted citrus tree - lemon, lime, oranges >

Page 12: Complete Street Project (W Columbus Dr) - CUTR · Solid Waste Management (For 2040) Automatic Collection, Transportation and Segregation System The waste is thrown into a disposal

Align street 2040 plan

Approximately 100 graves to be carefully moved to southern section of cemetery

Page 13: Complete Street Project (W Columbus Dr) - CUTR · Solid Waste Management (For 2040) Automatic Collection, Transportation and Segregation System The waste is thrown into a disposal

Solid Waste Management (For 2040)

▪ Automatic Collection, Transportation and Segregation System

▪ The waste is thrown into a disposal chute

▪ Computer controlled access

▪ Waste sucked through pipes at a speed of 90 km/hr

▪ Treatment through plasma gasification.

Page 14: Complete Street Project (W Columbus Dr) - CUTR · Solid Waste Management (For 2040) Automatic Collection, Transportation and Segregation System The waste is thrown into a disposal

Measures to reduce VMT

▪ Transit pass subsidy

• Employers, building managers, or developers can provide a subsidized transit pass to employees or residents.

▪ Rideshare program ( bikeshare & rideshare)

▪ Shuttle service

• Employment sites that are not close to transit service can benefit from an employer-sponsored shuttle service.

▪ Preferential & subsidize parking for rideshare vehicles ( For other vehicles we should charge market price)

Page 15: Complete Street Project (W Columbus Dr) - CUTR · Solid Waste Management (For 2040) Automatic Collection, Transportation and Segregation System The waste is thrown into a disposal

Next Steps Recommendations

▪ As the segment width is limited, ariel transportation for speeds exceeding 25 mph would be preferred (passive magnetic levitation)

• Require minimal footprint for support pillars, so require minimal space both horizontally and vertically.

• Improves pedestrian safety/prioritizes safe speeds on ground level

▪ Advanced Storm Water Harvesting system

▪ Solar pedestrian which runs on piezoelectric charging

• When pedestrian walks, it collect energy from the vibrations of pedestrian and traffic moving around.

Page 16: Complete Street Project (W Columbus Dr) - CUTR · Solid Waste Management (For 2040) Automatic Collection, Transportation and Segregation System The waste is thrown into a disposal

Photo sources

▪ Crape Myrtle: https://www.amazon.com/Muskogee-Lavender-Crape-Myrtle-Trees/dp/B00J9QF38U

▪ Confederate Jasmine: https://www.newlifenursery1.net/products/confederate-jasmine-fragrant-vine-1

▪ Grafted fruit trees: https://www.pinterest.com/pin/252060910364298240/

▪ Root Flare - https://preservationtree.com/blog/what-is-destroying-your-pipes-or-sidewalk-could-be-your-trees-roots

▪ Hovenring - http://ipvdelft.com/

▪ http://www.skyscrapercity.com/showthread.php?p=94811592

▪ http://www.stepvial.com/en/tag/flashing-zebra-crossing/

▪ https://www.tweaktown.com/news/35489/could-this-laser-hologram-concept-be-the-stoplight-of-the-future-/index.html

Page 17: Complete Street Project (W Columbus Dr) - CUTR · Solid Waste Management (For 2040) Automatic Collection, Transportation and Segregation System The waste is thrown into a disposal

Thank You!

Go Bulls

www.cutr.usf.edu