COMPLETE RICE PARBOILING AND MILLING - Alvan Blanch

2
E: [email protected] W: www.alvanblanch.co.uk T : 01666 577333 ZURU RICE MILL, KEBBI STATE, NIGERIA COMPLETE RICE PARBOILING AND MILLING PLANT – 4 TONNES/DAY 1 1952 2012 Alvan Blanch Processing the World’s Crops – for 60 years The overhead soaking and steaming tanks are conveniently accessed by a steel staircase. Inclined elevator delivers paddy to feed the tanks. Inclined elevator delivers paddy grain via aspirator to pre-cleaner on platform, feeding into existing de- stoner. The high capacity batching hopper on the right, allows rapid discharge of clean paddy into parboiling tanks.

Transcript of COMPLETE RICE PARBOILING AND MILLING - Alvan Blanch

Page 1: COMPLETE RICE PARBOILING AND MILLING - Alvan Blanch

E: [email protected] W: www.alvanblanch.co.uk T: 01666 577333

ZURU RICE MILL, KEBBI STATE, NIGERIA

COMPLETE RICE PARBOILING AND MILLING PLANT – 4 TONNES/DAY11952 2012

Alvan BlanchProcessing the World’s Crops – for 60 years

The overhead soaking and steaming tanks are conveniently accessed by a steel staircase. Inclined elevator delivers paddy to feed the tanks.

Inclined elevator delivers paddy grain via aspirator to pre-cleaner on platform, feeding into existing de-stoner. The high capacity batching hopper on the right, allows rapid discharge of clean paddy into parboiling tanks.

Page 2: COMPLETE RICE PARBOILING AND MILLING - Alvan Blanch

Complete rice mill in the foreground with the parboiling section in the distance. The multistage rice mill is mounted on a platform for convenient discharge, after sifting of brokens, directly into sacking hopper with automatic weigher.

E: [email protected] W: www.alvanblanch.co.uk T: 01666 577333

ZURU RICE MILL, KEBBI STATE, NIGERIA

COMPLETE RICE PARBOILING AND MILLING PLANT – 4 TONNES/DAY21952 2012

Alvan BlanchProcessing the World’s Crops – for 60 years

The rice mill with bucket elevated feed. Collection cyclones for bran.

The twin soaking and steaming tanks, positioned directly above the batch drier, allow rapid discharge and convenient operation. Drainage channels in floor are under construction.