Passphrases and YOU Mitch Parks, GSEC/GCWN ITS Desktop Security Analyst [email protected].
Complaints and Discoveries · staff and scheduled meeting. Met onsite with Mitch Peterson, Valley...
Transcript of Complaints and Discoveries · staff and scheduled meeting. Met onsite with Mitch Peterson, Valley...
![Page 1: Complaints and Discoveries · staff and scheduled meeting. Met onsite with Mitch Peterson, Valley Club maintenance on 10/8/09. Instructed to remove material from banks and channel](https://reader035.fdocuments.in/reader035/viewer/2022070915/5fb5cda6bfaea517bf32e718/html5/thumbnails/1.jpg)
Complaints and Discoveries: 2009-2010Case # 09-001
Date Received 7/9/2009
Date Response 7/9/2009
Source Complaint
Responder1 Garnand
Responder2
Creek Orcutt
Location 1850 S. Betteravia, Santa Maria
Discharge Alleged "dirty" operations.
Response/Action Contacted operations manager Russ Hicks 688-8358 and scheduled site visit and tour (7/23/09). Operations are consistent with NPDES permit SWPPP. No signif source offsite discharges. See email to E. Pritchett 7/24 for add'l detail on site ops.
Date(s) Follow-up NA
Follow-up Detail None required.
Responsible Business
Case # 09-002
Date Received 7/21/2009
Date Response 7/21/2009
Source Complaint
Responder1 Garnand
Responder2
Creek Atascadero
Location 404 S. San Marcos Santa Barbara
Discharge Chronic non-storm flows in gutter, originating from at-grade discharge point which conveys water from upslope residential development (new).
Response/Action Original complaint forwarded from Roads Division. 7/21/09 identified gated resid community as source via concrete lot drain adjacent to backyards. Problem: over-irrigation. Contacted Misty Lawrence of GWD who contacted property owner. Note: RP's address is 448 S. San Marcos.
Date(s) Follow-up 7/27/09 8/28/2009, 11/0/09 (phone), 2/25/10 (site)
Follow-up Detail PCW staff spoke to HOA Pres. She says broken irrig head was fixed on 7/ 24. PCW staff forwarded info to RP, requests that RP and HOA continue to monitor. RP called Garnand 8/26 "water in gutter today". I forwarded to HOA; spoke on 8/28 "nothing there" that she sees. She agreed to walk behind units nr Girls Inc, look for source(s). 11.10.09 RP reports "chronic"; talked to HOA as she saw source is likely condos. Reco'd reduced frequency, change sprinkler heads, get ET controller. 2/25/10 site visit with MB and DC. Source is entirely condos irrigation. All parties agreed no pollution. No further action from PCW - case closed.
Responsible Residential
Page 1 of 24
![Page 2: Complaints and Discoveries · staff and scheduled meeting. Met onsite with Mitch Peterson, Valley Club maintenance on 10/8/09. Instructed to remove material from banks and channel](https://reader035.fdocuments.in/reader035/viewer/2022070915/5fb5cda6bfaea517bf32e718/html5/thumbnails/2.jpg)
Complaints and Discoveries: 2009-2010Case # 09-003
Date Received 7/21/2009
Date Response 7/21/2009
Source complaint
Responder1 Garnand
Responder2
Creek Sycamore
Location Stanwood at Conejo Rd, Santa Barbara
Discharge Dirt near creek.
Response/Action Located in City of SB, forwarded to Jim Rumbley Creeks Div (897-2521) who contacted RP directly and made site visit on 7/21.
Date(s) Follow-up 7/22/2009
Follow-up Detail Contacted RP regarding City contact. No further follow-up.
Responsible Homeowner
Case # 09-004
Date Received 8/18/2009
Date Response 8/18/2009
Source Complaint
Responder1 Garnand
Responder2
Creek San Antonio
Location 570 Ronda Dr. Santa Barbara
Discharge Complaint of discharge into gutter. Evidence of of ponded water in gutter in front of RP's residence (584 Ronda) due to low point in elevation. Chronically collects storm and nuisance flow. Ponded water has leaf/flower organic material from street trees.
Response/Action Contacted Alex Rozhko (637-1369) owner of 570 Ronda.He had been testing his storm drains from backyard using hose on the prior evening. I explained the neighbor's concern and problem. He agreed to avoid contributing to their ponding problem.
Date(s) Follow-up 8/18/09
Follow-up Detail
Responsible Resident
Page 2 of 24
![Page 3: Complaints and Discoveries · staff and scheduled meeting. Met onsite with Mitch Peterson, Valley Club maintenance on 10/8/09. Instructed to remove material from banks and channel](https://reader035.fdocuments.in/reader035/viewer/2022070915/5fb5cda6bfaea517bf32e718/html5/thumbnails/3.jpg)
Complaints and Discoveries: 2009-2010Case # 09-005
Date Received 8/19/2009
Date Response 8/19/2009
Source Complaint
Responder1 Garnand
Responder2
Creek San Ysidro
Location 913 Park Lane
Discharge Swimming pool.
Response/Action Met RP at his house. Walked upslope to find source: pool was draining (for structural repair). Had been dechlorinated prior. Owners not living at home currently, but pool caretaker was responsible. Water had no chlorine added for weeks.
Date(s) Follow-up NA
Follow-up Detail
Responsible Resident
Case # 09-006
Date Received 8/20/2009
Date Response 8/20/2009
Source Complaint
Responder1 Garnand
Responder2
Creek Arroyo Burro
Location 963 La Senda
Discharge Mulch & greenwaste in channel.
Response/Action Met RP at house - greenwaste along banks, mostly mulch probably intended for erosion control. Channel would only have flow during significant rain following long period of wetness. Forward info to B&S for potential grading violation.
Date(s) Follow-up 8/28/2009
Follow-up Detail Met B&S on 8/28. No grading violation. As long as mulch will be disributed along banks, not clean water issue. See letter dated 8.31.09 to property owner.
Responsible Resident
Page 3 of 24
![Page 4: Complaints and Discoveries · staff and scheduled meeting. Met onsite with Mitch Peterson, Valley Club maintenance on 10/8/09. Instructed to remove material from banks and channel](https://reader035.fdocuments.in/reader035/viewer/2022070915/5fb5cda6bfaea517bf32e718/html5/thumbnails/4.jpg)
Complaints and Discoveries: 2009-2010Case # 09-007
Date Received 8/26/2009
Date Response 8/26/2009
Source Complaint
Responder1 pending
Responder2
Creek Montecito
Location 1401 Greenworth
Discharge Construction demo (wood planks, probably from decking) behind pipe&wire bank revetment. Same as 09-045.
Response/Action Left multiple messages, spoke to RP on 8/24. Informed that we've been to site and also have coordinated with FC maintenance staff. Not clean water issue nor maintenance issue. No correction letter warranted.
Date(s) Follow-up NA
Follow-up Detail Discussed another approach for two neighbors to contact property owner on Greenworth and make sure he knows, as it could be a construction contactor hiding material from owner. Their issue is it's an eyesore from their viewpoint on opposite side of bank.
Responsible Resident
Case # 09-008
Date Received 9/9/2009
Date Response 9/9/2009
Source Complaint
Responder1 Endsley
Responder2
Creek El Toro
Location ??
Discharge Water in creek, periodic.
Response/Action Alleged from 545 Toro Canyon Road Valleyheart Gardens. RP hears water "from a pipe at various times during the week, sometimes Saturdays". VHG not likely but possible. Normal over-irrig water flows to onsite detention pond, cannot physically discharge through either two CMP outfalls.
Date(s) Follow-up 9/10; 9/25/; 9/30
Follow-up Detail Site visit VHG 9/10/09 (Endsley); creek walk 9/25 (Garnand/Brummett); site visit VHG 9/30/09 (Garnand). Possible from VHG watering recently-planted Monterey Cypress along northern property line, but that doesn't explain "various during the week". RP doesn't want further contact from County staff. See follow-up ltr 9/30 to VHG - not a code violation.
Responsible UNDETERM
Page 4 of 24
![Page 5: Complaints and Discoveries · staff and scheduled meeting. Met onsite with Mitch Peterson, Valley Club maintenance on 10/8/09. Instructed to remove material from banks and channel](https://reader035.fdocuments.in/reader035/viewer/2022070915/5fb5cda6bfaea517bf32e718/html5/thumbnails/5.jpg)
Complaints and Discoveries: 2009-2010Case # 09-009
Date Received 9/9/2009
Date Response 9/9/2009
Source complaint
Responder1 Endsley
Responder2
Creek Montecito
Location 150 La Vereda
Discharge Greenwaste
Response/Action Upon investigation, it was actually one large branch cutting left in channel. PCW staff pulled branch from channel. Home was being remodeled. Spoke to contractor who didn't realize crews had tossed branch into channel. Contractor verbally corrected crews in front of PCW staff. No additioanl follow-up needed.
Date(s) Follow-up
Follow-up Detail
Responsible Resident
Case # 09-010
Date Received 9/11/2009
Date Response 9/11/2009
Source complaint
Responder1 Garnand
Responder2
Creek Atascadero
Location Debbie Lane, Goleta
Discharge Mobile car wash
Response/Action Contacted Greg Nordack (961-7556) Code Compliance for City of Goleta. He did not observe the detailer. RP said contractor had no identifying business name on vehicle. Further follow-up not possible.
Date(s) Follow-up
Follow-up Detail
Responsible Contractor
Page 5 of 24
![Page 6: Complaints and Discoveries · staff and scheduled meeting. Met onsite with Mitch Peterson, Valley Club maintenance on 10/8/09. Instructed to remove material from banks and channel](https://reader035.fdocuments.in/reader035/viewer/2022070915/5fb5cda6bfaea517bf32e718/html5/thumbnails/6.jpg)
Complaints and Discoveries: 2009-2010Case # 09-011
Date Received 9/23/2009
Date Response 9/23/2009
Source complaint
Responder1 Garnand
Responder2
Creek Mission
Location De La Guerra / Bath
Discharge Unknown from tank
Response/Action Forwarded to City SB (phone, email w pictures).
Date(s) Follow-up 9/24/2009
Follow-up Detail Tim Burgess (897-1912) wasn't able to find dischargers, but followed up with contact name from RPs observation and photo (CSLegacyConst under contract with City SB) Spoke to superintendent - was given "okay" to dispose excess clean water by City proj engr.
Responsible Contractor
Case # 09-012
Date Received 9/25/2009
Date Response 9/25/2009
Source discovery
Responder1 Garnand
Responder2
Creek Toro
Location 545 Toro Canyon Rd (Valleyheart Gardens)
Discharge Plastic plant labels (Valleyheart Nursery) and potting soil
Response/Action Contact Brian Tappeiner. Labels are picked up.
Date(s) Follow-up 10/30/09
Follow-up Detail Met onsite with Brian Tappeiner of Valleyheart. Second site visit (see complaint 09-008). Since there is evidence of nursery material in creek, there is occasional discharge through 30". At both times of visits, however, nursery was neat & orderly. Brian T. believes the labels and soil were washed into channel from either over-irrigation of recently-planted Montery cypress or moving hose across channel. Otherwise, nursery water would not exit this 30" CMP which conveys water from offsite/uphill.
Responsible Nursery
Page 6 of 24
![Page 7: Complaints and Discoveries · staff and scheduled meeting. Met onsite with Mitch Peterson, Valley Club maintenance on 10/8/09. Instructed to remove material from banks and channel](https://reader035.fdocuments.in/reader035/viewer/2022070915/5fb5cda6bfaea517bf32e718/html5/thumbnails/7.jpg)
Complaints and Discoveries: 2009-2010Case # 09-013
Date Received 9/25/2009
Date Response 9/25/2009
Source discovery
Responder1 Service Master
Responder2
Creek Toro
Location Toro Creek between Via Real and Padaro.
Discharge Paint spraycans, various miscellaneous trash.
Response/Action Scheduled cleanup by Service Master
Date(s) Follow-up 10/12/2009
Follow-up Detail Service Master cleans creek on Oct 12, 2009.
Responsible Graffiti artist, transient, wind-blown
Case # 09-014
Date Received 10/6/2009
Date Response 10/6/2009
Source discovery
Responder1 Service Master
Responder2
Creek Romero
Location Romero Creek between N Jameson and
Discharge Paint spraycans, syringe, urine bag, miscellaneous trash.
Response/Action Scheduled cleanup by Service Master
Date(s) Follow-up 10/12/2009
Follow-up Detail Service Master cleans creek on Oct 12, 2009.
Responsible Graffit artists, transients, windblown
Page 7 of 24
![Page 8: Complaints and Discoveries · staff and scheduled meeting. Met onsite with Mitch Peterson, Valley Club maintenance on 10/8/09. Instructed to remove material from banks and channel](https://reader035.fdocuments.in/reader035/viewer/2022070915/5fb5cda6bfaea517bf32e718/html5/thumbnails/8.jpg)
Complaints and Discoveries: 2009-2010Case # 09-015
Date Received 10/7/2009
Date Response 10/7/2009
Source discovery
Responder1 Garnand
Responder2 Endsley
Creek Romero
Location 1901 East Valley Road (Valley Club Montecito)
Discharge Grass, mulch, soil, branches.
Response/Action Discovered during creek walk 10/7/09. Contacted Valley Club staff and scheduled meeting. Met onsite with Mitch Peterson, Valley Club maintenance on 10/8/09. Instructed to remove material from banks and channel and place silt fence 10' from top of bank. Also, showed areas where trash (primarily about eight styrofoam coffee cups) were found in channel. Agreed to have staff regularly walk through channel and remove any trash. Will look into other methods.
Date(s) Follow-up 11/5/2009 and 12/14/2009
Follow-up Detail Abatement work confirmed complete by Nov5. Additional hydroseed completed on Nov24. Confirmed by PCW staff 12/14/2009.
Responsible Golf course
Case # 09-016
Date Received 10/28/2009
Date Response 10/28/2009
Source Complaint
Responder1 Endsley
Responder2
Creek Butterfly Beach
Location 1150 Hill Road
Discharge Tile grout
Response/Action Found source was from placing new tiles in a driveway. The discharge had occurred days and ago and was dried. Dried grout no significant pollutant.
Date(s) Follow-up
Follow-up Detail No additional follow-up needed.
Responsible Residential
Page 8 of 24
![Page 9: Complaints and Discoveries · staff and scheduled meeting. Met onsite with Mitch Peterson, Valley Club maintenance on 10/8/09. Instructed to remove material from banks and channel](https://reader035.fdocuments.in/reader035/viewer/2022070915/5fb5cda6bfaea517bf32e718/html5/thumbnails/9.jpg)
Complaints and Discoveries: 2009-2010Case # 09-017
Date Received 12/1/2009
Date Response 12/1/2009
Source Complaint
Responder1 Garnand
Responder2
Creek San Antonio
Location Tucker's Grove Park
Discharge Paint chips from pressure washing gate. Paint chips left on dirt.
Response/Action County Parks staff cleaned site carefully of all paint chips and disposed at Community Hazardous Recycling Center.
Date(s) Follow-up 12/2/2009
Follow-up Detail Spoke to Richard Lindley, Parks Operations Mgr. The host took upon himself to perform work, not following county parks procedures for waste management. Has since been told proper procedure for pressure washing and waste handling. Sue Spencer (Parks) handled the abatement, vacuumed site and removed soil. Also, Parks will properly clean the gate nr AZ crossing, as that gate is also chipping badly.
Responsible Park host
Case # 09-018
Date Received 12/2/2009
Date Response 12/2/2009
Source Complaint
Responder1 Endsley
Responder2
Creek Summerland
Location 2282 Banner Ave.
Discharge Concrete washout into street gutter. Improperly maintained erosion and sediment control measures..
Response/Action PCW staff met onsite manager, directed cleanup of dried concrete in roadway using brooms/shovel and repair of BMPs within 2 days (no rain forecast). Forwarded to Tony Bohnett (B&S Grading Permit) and Brad Crandell (B&S Bldg Permit).
Date(s) Follow-up 12/4/2009
Follow-up Detail Both PCW and B&S staff spoke to site manager on 12/4 to confirm BMPs repaired and excess concrete was cleaned up from roadway. Tony Bohnett at site 12/4 verified measures were successfully complete.
Responsible Contractor
Page 9 of 24
![Page 10: Complaints and Discoveries · staff and scheduled meeting. Met onsite with Mitch Peterson, Valley Club maintenance on 10/8/09. Instructed to remove material from banks and channel](https://reader035.fdocuments.in/reader035/viewer/2022070915/5fb5cda6bfaea517bf32e718/html5/thumbnails/10.jpg)
Complaints and Discoveries: 2009-2010Case # 09-020
Date Received 12/2/2009
Date Response 12/2/2009
Source Complaint
Responder1 Garnand
Responder2
Creek Las Palmas
Location 1500 Roble
Discharge Greenwaste
Response/Action Minor amount lawn clippings and other greenwaste nr. Las Palmas Crk.within roadway. Spoke to the caretaker / landscaper who agreed to collect material and dispose immediately.
Date(s) Follow-up 12/2/2009
Follow-up Detail Contractor collected material within hours. Confirmed.
Responsible Contractor
Case # 09-021
Date Received 12/3/2009
Date Response 12/4/2009
Source Complaint
Responder1 Garnand
Responder2
Creek Maria Ygnacio
Location 5067 Ella Lane
Discharge Sewage and a blue sudsy product (BioClean) released onto driveway and into street gutter during plumbing maintenance.
Response/Action Inadvertent blow-out from residential sewer clean-out port caused by pressure in system during maintenance. RP spoke to driver onsite and requested immediate clean-up, which occurred. Several gallons were wet-vac'd where it had pooled in gutter due to accumulated leaf litter. Outcome included immediate abatement. Incident was accidental.
Date(s) Follow-up 12/7/09
Follow-up Detail PCW called Roto Rooter and spoke to manager who was aware of incident. PCW staff suggested they use preventative measures in future. Manager says they would always contain and clean up any discharges. Manager contact: Glen Allen (dispatch: 617-0920).
Responsible Contractor
Page 10 of 24
![Page 11: Complaints and Discoveries · staff and scheduled meeting. Met onsite with Mitch Peterson, Valley Club maintenance on 10/8/09. Instructed to remove material from banks and channel](https://reader035.fdocuments.in/reader035/viewer/2022070915/5fb5cda6bfaea517bf32e718/html5/thumbnails/11.jpg)
Complaints and Discoveries: 2009-2010Case # 09-035
Date Received 1/30/2009
Date Response 1/30/2009
Source Complaint
Responder1 Garnand
Responder2 Autumn Malanca (City SB)
Creek San Roque
Location 420 Cannon Dr.nr Chuparosa, Santa Barbara
Discharge Clean water, high flows.
Response/Action Site in City of SB- forwarded to Autumn Malanca who confirmed via email that City crews had started up San Roque well.
Date(s) Follow-up NA
Follow-up Detail
Responsible City of SB
Case # 09-036
Date Received 2/2/2009
Date Response 2/2/2009
Source Complaint
Responder1 Garnand
Responder2 Luann Sullivan, GS
Creek Santa Ynez R
Location Vet's Hall 100 E. Locust, Lompoc
Discharge pressure washwater
Response/Action Numerous discussions with GS staff. Complaint alleges sandblasting, follow-up indicates light pressure wash of ground. Contractor barricaded water and reclaimed; complainent may have personal issues to escalate. Nonetheless, contractor returned with GS oversight and cleaned entire length of curb/gutter including complainents house.
Date(s) Follow-up 2/4/2008
Follow-up Detail Discussions with Stacy Lawson and Luann Sullivan verifying circumstances.
Responsible County Gen Services Contractor
Page 11 of 24
![Page 12: Complaints and Discoveries · staff and scheduled meeting. Met onsite with Mitch Peterson, Valley Club maintenance on 10/8/09. Instructed to remove material from banks and channel](https://reader035.fdocuments.in/reader035/viewer/2022070915/5fb5cda6bfaea517bf32e718/html5/thumbnails/12.jpg)
Complaints and Discoveries: 2009-2010Case # 09-037
Date Received 2/10/2009
Date Response 2/11/2009
Source Discovery
Responder1 Crease
Responder2 Endsley
Creek Palmer Creek
Location 6730 Palmer Rd. Santa Maria
Discharge Sediment tracked onto roadway
Response/Action Spoke with lease holder Conoco Phillips (Ed Ralston) and Greka (Jeanette Boyer). Note: CP not responsible for egress and sediment control on site, Greka is. Followed up with abatement email and photos to Greka Feb. 13.
Date(s) Follow-up 2/19/09
Follow-up Detail Site visit, Palmer Road was cleaned up as requested. New waddles installed for sediment control onsite..
Responsible Greka Energy
Case # 09-038
Date Received 2/12/2009
Date Response 2/13/2009
Source Complaint
Responder1 Brummett
Responder2
Creek San Pedro
Location 6145 Braeburn Dr. Santa Barbara
Discharge Paint washout
Response/Action Nobody at house. Confirmed location of painting job. Left doorhanger, brochure and phone message.
Date(s) Follow-up 2/17/2009
Follow-up Detail Spoke with homeowner. Explained that paint supplies must be washed in utility sink. Wastewater not permitted into storm drain. He agreed to properly dispose waste in the future.
Responsible Homeowner
Page 12 of 24
![Page 13: Complaints and Discoveries · staff and scheduled meeting. Met onsite with Mitch Peterson, Valley Club maintenance on 10/8/09. Instructed to remove material from banks and channel](https://reader035.fdocuments.in/reader035/viewer/2022070915/5fb5cda6bfaea517bf32e718/html5/thumbnails/13.jpg)
Complaints and Discoveries: 2009-2010Case # 09-039
Date Received 2/17/2009
Date Response 2/18/2009
Source Complaint
Responder1 Brummett
Responder2
Creek
Location 2643 Dorking Pl. Santa Barbara
Discharge Rancid, fishy odor
Response/Action Found source of smell to be an old abandoned fish pond in back yard. No discharges occuring. Contacted RP with observations, not a clean water violation.
Date(s) Follow-up NA
Follow-up Detail
Responsible Homeowner
Case # 09-040
Date Received 2/18/2009
Date Response 2/19/2009
Source Complaint
Responder1 Brummett
Responder2
Creek San Jose
Location 5459 Palace Ct. Santa Barbara
Discharge Pool backwash water
Response/Action Left doorhanger, brochure and phone message
Date(s) Follow-up 2/24/2009
Follow-up Detail Spoke with homeowner, explained that backwash water must be pumped into sanitary or onto a lawn or landscaped area. Not permitted to discharge into storm drain. She agrees to comply.
Responsible Homeowner
Page 13 of 24
![Page 14: Complaints and Discoveries · staff and scheduled meeting. Met onsite with Mitch Peterson, Valley Club maintenance on 10/8/09. Instructed to remove material from banks and channel](https://reader035.fdocuments.in/reader035/viewer/2022070915/5fb5cda6bfaea517bf32e718/html5/thumbnails/14.jpg)
Complaints and Discoveries: 2009-2010Case # 09-041
Date Received 2/19/2009
Date Response 2/20/2009
Source Complaint
Responder1 Crease
Responder2 Garnand
Creek San Jose
Location Merida & Hanna, Santa Barbara
Discharge Homeless Encampment
Response/Action Site visit. Very small "encampment" located well above channel. Probably one individual. No human waste observed at site or down near creek. Site clean. Contacted RP; explained no storm water code violation, to contact Sheriff if other concerns.
Date(s) Follow-up NA
Follow-up Detail
Responsible (No discharge)
Case # 09-042
Date Received 3/26/2009
Date Response 3/26/2009
Source Discovery
Responder1 Garnand
Responder2
Creek W. Main St. Ditch
Location 1400 block W. Main St. Santa Maria
Discharge Two 55-gal drums in Flood Control channel.. One is partially submerged.
Response/Action Service Master removed containers and other waste including tire, bumper, misc trash on 5/6/2009. Appears that drums have been there for many years.
Date(s) Follow-up 5/11/2009
Follow-up Detail FC staff confirmed removal.
Responsible Unknown, likely dumped
Page 14 of 24
![Page 15: Complaints and Discoveries · staff and scheduled meeting. Met onsite with Mitch Peterson, Valley Club maintenance on 10/8/09. Instructed to remove material from banks and channel](https://reader035.fdocuments.in/reader035/viewer/2022070915/5fb5cda6bfaea517bf32e718/html5/thumbnails/15.jpg)
Complaints and Discoveries: 2009-2010Case # 09-043
Date Received 4/8/2009
Date Response 4/8/2009
Source Complaint
Responder1 Miller
Responder2 Endsley
Creek Santa Ynez
Location 3872 Via Parte Mission Hills
Discharge Alleged power washing vehicles into street.Oil contamination on driveway and street in front.
Response/Action Fire Dept ((Juanita Miller) and PW (Eddie Ando) onsite 4/8/2009. Met property owner. Juanita Miller made initial call to PCW - 686-8166 or cell 896-6361 following their response on that date. Fire "ordered him to do no further power washing". Also, P&D (Kim Probert) sends notice "RV must be screened from public view". Recurring issue.
Date(s) Follow-up 4/13/2009 4/23/2009
Follow-up Detail 4/13 Pete Endlsey made follow-site visit and met resident- 22 vehicles at residence. Told resident illegal to power wash vehicle contaminants into storm drain. Resident agreed he will not discharge any wastewater or waste material into street or gutter. Resident insists no washwater has left site. Eddie Ando returns 4/23 observes 19 vehicles on property; 6 on street. No discharges. Note: 5 or 6 vehicles are acceptable.Since initial visit by Fire and PW on 4/8, resident has removed seven vehicles as per P&D.
Responsible Resident
Case # 09-044
Date Received 5/11/2009
Date Response 5/11/2009
Source Complaint
Responder1 Endsley
Responder2
Creek Atascadero
Location Blue Sky Mobile Park Santa Barbara
Discharge Residential car washing at mobile home park.
Response/Action Reconn 5/11. 5/12 met with manager. Property owner & manager cite area as problem and willing to eliminate car washing. Provided letter to property owner.
Date(s) Follow-up 5/12/2009 5/13/2009
Follow-up Detail Property owner distributes his own letter to residents on 6/1/09 noticing residents that car wash area is closed and instructing to stop all car washing onsite.
Responsible Residents
Page 15 of 24
![Page 16: Complaints and Discoveries · staff and scheduled meeting. Met onsite with Mitch Peterson, Valley Club maintenance on 10/8/09. Instructed to remove material from banks and channel](https://reader035.fdocuments.in/reader035/viewer/2022070915/5fb5cda6bfaea517bf32e718/html5/thumbnails/16.jpg)
Complaints and Discoveries: 2009-2010Case # 09-045
Date Received 6/1/2009
Date Response 6/1/2009
Source Complaint
Responder1 Endsley
Responder2
Creek Montecito
Location 1401 Greenworth PL. Santa Barbara
Discharge Construction demo (wood planks, probably from decking) behind pipe&wire bank revetment.
Response/Action Site visit same day, spoke to RP. Not a clean water issue because material is wood and located behind a Flood Control pipe-and-wire revetment. However could be a flow impediment if failure of revetment. Forwarded to Flood Control, as there were other issues of scouring at this location. R. Yescas says not maintenance issue as long as material is behind pipe and wire.
Date(s) Follow-up
Follow-up Detail No further inquiry.
Responsible Resident
Case # 09-046
Date Received 6/1/2009
Date Response 6/1/2009
Source Complaint
Responder1 Garnand
Responder2
Creek Orcutt
Location 1206 Bauer, Orcutt
Discharge Dry wall mud being hosed into roadway
Response/Action Station 22 fire crew respond. Ken Murray Cptn. Resident instructed to use kitty litter to absorb material, sweep clean. Mostly dry.
Date(s) Follow-up 6/1/2009
Follow-up Detail Ken Murray confirms cleanup is complete, 6/1/2009.
Responsible Resident
Page 16 of 24
![Page 17: Complaints and Discoveries · staff and scheduled meeting. Met onsite with Mitch Peterson, Valley Club maintenance on 10/8/09. Instructed to remove material from banks and channel](https://reader035.fdocuments.in/reader035/viewer/2022070915/5fb5cda6bfaea517bf32e718/html5/thumbnails/17.jpg)
Complaints and Discoveries: 2009-2010Case # 09-047
Date Received 6/12/2009
Date Response 6/12/2009
Source Complaint
Responder1 Garnand
Responder2
Creek Ocean
Location 145 Olive Mill Lane Santa Barbara
Discharge Alleged stucco washout from residential remodel project.
Response/Action Site visit. Roadway swept, material contained. Dirt residue in gutter and downstream OliveMillRd, likely from recent 0.5" rain. No indication of stucco residue. Good cleanout pits in use onsite.
Date(s) Follow-up 6/12/09
Follow-up Detail Spoke to Jesus and Marciel onsite. Good understanding that washout illegal. Spoke to Eric Olson, onsite mgr. He does not believe any stucco was discharged; understands practice is illegal; provides adequate location for disposal and oversee all subs.
Responsible Contracto
Case # 09-048
Date Received 6/18/2009
Date Response 6/18/2009
Source complaint
Responder1 Endsley
Responder2
Creek Atascadero
Location 4865 Calle Real In & Out Burger Santa Barbara
Discharge Crew washing floor mats outside
Response/Action Site visit 6/19. Manager (Erick Franzblau) says staff uses disinfecting soap outside (!). Forwarded to EHS.
Date(s) Follow-up 6/19/2009
Follow-up Detail Returned same day, one hour later. Crew was cleaning pavement with vacuum collection unit. PCW staff reco's using same for mats. Mgr agrees. Wet vac to be discharge to sanitary.
Responsible Business
Page 17 of 24
![Page 18: Complaints and Discoveries · staff and scheduled meeting. Met onsite with Mitch Peterson, Valley Club maintenance on 10/8/09. Instructed to remove material from banks and channel](https://reader035.fdocuments.in/reader035/viewer/2022070915/5fb5cda6bfaea517bf32e718/html5/thumbnails/18.jpg)
Complaints and Discoveries: 2009-2010Case # 09-049
Date Received 6/22/2009
Date Response 6/22/2009
Source Complaint
Responder1 Endsley
Responder2
Creek Ocean
Location Lilly at Olive St. Summerland
Discharge Alledged that antique shop hosing down furniture and sending paint chips into storm drain
Response/Action Site visit. Owner present, said they do not hose down furniture, no restoration of furniture onsite, no use of hoses, etc. Suggested possibly neighbnor (residential) but no evidence of any discharge or residue.
Date(s) Follow-up NA
Follow-up Detail None required.
Responsible Unknown
Case # 09-050
Date Received 6/29/2009
Date Response 6/29/2009
Source Complaint
Responder1 Endsley
Responder2
Creek Ocean
Location 6700 Block Del Playa Isla Vista
Discharge A number of pressure washers are discharging into street and storm drain.
Response/Action Uncertain when this occurred. Unable to confirm or corrobratey anonymous call.
Date(s) Follow-up Ongoing
Follow-up Detail PCW staff have been making regular (almost daily) routine reconn visits to IV during move-out period, 6/10 - 6/26.
Responsible Unknown
Page 18 of 24
![Page 19: Complaints and Discoveries · staff and scheduled meeting. Met onsite with Mitch Peterson, Valley Club maintenance on 10/8/09. Instructed to remove material from banks and channel](https://reader035.fdocuments.in/reader035/viewer/2022070915/5fb5cda6bfaea517bf32e718/html5/thumbnails/19.jpg)
Complaints and Discoveries: 2009-2010Case # 09-051
Date Received 6/30/2009
Date Response 6/30/2009
Source Complaint
Responder1 Endsley
Responder2
Creek Arroyo Burro
Location Las Positas at Modoc, Santa Barbara
Discharge No discharge. Stockpile of dirt and construction material including roll-offs.
Response/Action Site located in City SB limits. Contractor working for City of Santa Barbara, permitted for stockpile of overburden material on City projects.Explained scenario to RP. No further followup required.
Date(s) Follow-up NA
Follow-up Detail
Responsible City of SB
Case # 10-019
Date Received 12/2/2009
Date Response 12/2/2009
Source Complaint
Responder1 Endsley
Responder2 Brummett
Creek Mission
Location 2956 La Combadura
Discharge Unknown intermittent from 2" PVC line discharges onto street from under driveway.
Response/Action Met homeowner. He has no idea the source whatsoever. Discharges started about 2 mos ago from 3" drain located under driveway and discharging onto street. Varying intensity, but chronically wet unless he's not at home. Has had three plumbers inspect; no source found. Ran camera up the 3" line, did not find source. Homeowner is very motivated to abate. EHS performed dye test, confirmed sanitary connection.
Date(s) Follow-up 12/2/09, 1/4/10, various drive-bys
Follow-up Detail 1/5/09 still flowing. Sampled 1/5/09 during period of flow: nutrients were pH=7, DO=0 (!?), turb=0, TC>24,192, FC 816, Ent 181.. R.J. Carroll plumbing ultimately found broken clay sewer connection under the walkway which was making it’s way to the French drain and out to the street (resolved 3/26/10). Delay in resolution due to infrequent and very light flows, and frequent rain events during this period. No NOV b/c of effort to investigate, cooperation, and immediate correction by owner.
Responsible Residential
Page 19 of 24
![Page 20: Complaints and Discoveries · staff and scheduled meeting. Met onsite with Mitch Peterson, Valley Club maintenance on 10/8/09. Instructed to remove material from banks and channel](https://reader035.fdocuments.in/reader035/viewer/2022070915/5fb5cda6bfaea517bf32e718/html5/thumbnails/20.jpg)
Complaints and Discoveries: 2009-2010Case # 10-022
Date Received 1/4/2010
Date Response 1/4/2010
Source Complaint
Responder1 Garnand
Responder2 Brummett
Creek Buena Vista
Location Lilac neighborhood
Discharge Trash
Response/Action Entire neighborhood was inspected including all drainage crossings. No evidence trash. Very clean.
Date(s) Follow-up 1/8/2010
Follow-up Detail Entire creek was subsequently walked (routine) on 1/8/2010. Typical occasional trash, mostly near golf course. All was collected and disposed during creek walk. Follow-up with original RP indicates that msg was passed along from another party, and they actually meant Coast Village area which is in City of SB. Also, intended as a general comment.
Responsible Residential
Case # 10-023
Date Received 2/16/2010
Date Response 2/16/2010
Source Complaint
Responder1 Endsley
Responder2
Creek Orcutt
Location 805 'B' Union
Discharge Motor oil from a leaking vehicle
Response/Action Contacted Fire HazMat Matt Cherkopf. Matt C. and Pete Endsley (PCW) made visit on 2/18. Oil from old vehicle, chronic dripping. Overall relatively small amount of material on pavement. Spoke to landlord who will clean up and discuss issue with tenant.
Date(s) Follow-up 2/23/10
Follow-up Detail Landlord is retired County Flood Control maintenance mgr. who used a small bobcat to scrape contaminated soil and dispose properly (confirmed 2/23/10 by phone). He will also continue to keep an eye on site, make sure tenant protects soil from drips using drip pad. (Note: neighbor feud prompted the call)
Responsible Residential
Page 20 of 24
![Page 21: Complaints and Discoveries · staff and scheduled meeting. Met onsite with Mitch Peterson, Valley Club maintenance on 10/8/09. Instructed to remove material from banks and channel](https://reader035.fdocuments.in/reader035/viewer/2022070915/5fb5cda6bfaea517bf32e718/html5/thumbnails/21.jpg)
Complaints and Discoveries: 2009-2010Case # 10-024
Date Received 2/17/2010
Date Response 2/17/2010
Source Complaint
Responder1 Endsley
Responder2
Creek Santa Ynez R.
Location 257 Senior Circle
Discharge Standing water in ditch. RP claims chronic problem "for years".
Response/Action Site visit 2/18 confirmed standing water caused by poor site drainage. No evidence of pollutants in the standing water. Source of water = rainwater perched on soil.
Date(s) Follow-up
Follow-up Detail Spoke to RP same day. Wishes to remain anonymous.
Responsible Residential
Case # 10-025
Date Received 2/25/2010
Date Response 2/25/2010
Source Discovery
Responder1 Garnand
Responder2
Creek Atascadero
Location Hollister between Turnpike and Auhay
Discharge MTD bus leaks fuel or oil onto roadway, eventually breaks down on Hollister.
Response/Action Roads Division blocked the right lane while MTD used absorbant and brooms to collect the waste.
Date(s) Follow-up
Follow-up Detail Extensive clean-up operation, performed quickly and professionally within several hours following incident.
Responsible Business (MTD But)
Page 21 of 24
![Page 22: Complaints and Discoveries · staff and scheduled meeting. Met onsite with Mitch Peterson, Valley Club maintenance on 10/8/09. Instructed to remove material from banks and channel](https://reader035.fdocuments.in/reader035/viewer/2022070915/5fb5cda6bfaea517bf32e718/html5/thumbnails/22.jpg)
Complaints and Discoveries: 2009-2010Case # 10-026
Date Received 3/30/2010
Date Response 3/30/2010
Source Complaint
Responder1 Endsley
Responder2
Creek Zanja de Cota
Location 3460 Tivola St
Discharge Horse manure and greenwaste dumped into channel.
Response/Action Site visit 3/31. Met RP. Waste not present.
Date(s) Follow-up
Follow-up Detail Allegedly, property owner at 1157 Tyndall brings manure and greenwaste home from an offsite horse boarding facility and uses wheelbarrow to haul across street and dump into channel. Dumping has discontinued since RP spoke to owner. RP will notify staff if dumping occurs again.
Responsible Residential
Case # 10-027
Date Received 3/30/2010
Date Response 3/31/2010
Source Complaint
Responder1 Endsley
Responder2
Creek Zanja de Cota
Location 1518 Edison St
Discharge Alleged construction debris in creek
Response/Action Site visit 3/31. Unable to verify. Not visible from roadway. Would require permission to access private property. No compelling evidence to do so. RP wishes to remain anonymous which prevents us to contact owner. Residential area has properties large acreage and fully fenced, including creek. Creek is on private property.
Date(s) Follow-up
Follow-up Detail
Responsible Residential
Page 22 of 24
![Page 23: Complaints and Discoveries · staff and scheduled meeting. Met onsite with Mitch Peterson, Valley Club maintenance on 10/8/09. Instructed to remove material from banks and channel](https://reader035.fdocuments.in/reader035/viewer/2022070915/5fb5cda6bfaea517bf32e718/html5/thumbnails/23.jpg)
Complaints and Discoveries: 2009-2010Case # 10-028
Date Received 4/17/2010
Date Response 4/17/2010
Source Complaint
Responder1 Garnand
Responder2
Creek Ocean, 200 yd W of path at Loon
Location 2700 Via Real
Discharge Pond dewatering and muck.
Response/Action Site visit 4/17, tracked to source at Patrick Nesbitt property. A stream of black, anearobic sediment had discharged to ocean. At that time, pond dewatering effort mostly complete. Told ranch manager that in future, dewatering okay but solids from pond cannot be discharged.
Date(s) Follow-up 4/18/10 NOV
Follow-up Detail Staff verified work was completed later that day. Explained that dewatering at this time (recent rain) is a pollutant. In future, must dewater the solids and dispose properly. Preferable to discharge pond water to adjoining lawn, but storm drain okay in low velocities. Only clean, clear, chemical-free pond water could be discharged.
Responsible Residential
Case # 10-029
Date Received 5/14/2010
Date Response 5/14/2010
Source Complaint
Responder1 Brummett
Responder2
Creek Las Palmas
Location 4160 Mariposa
Discharge Clean groundwater from ag well.
Response/Action RP thought septic. It was an ag well under development. Water flowing crystal clear, no odor. No indication of well drilling muds or other pollutant. Contacted RP of findings; RP complained of noise. No follow-up warranted.
Date(s) Follow-up
Follow-up Detail
Responsible
Page 23 of 24
![Page 24: Complaints and Discoveries · staff and scheduled meeting. Met onsite with Mitch Peterson, Valley Club maintenance on 10/8/09. Instructed to remove material from banks and channel](https://reader035.fdocuments.in/reader035/viewer/2022070915/5fb5cda6bfaea517bf32e718/html5/thumbnails/24.jpg)
Complaints and Discoveries: 2009-2010Case # 10-030
Date Received 6/9/2010
Date Response 6/10/2010
Source Complaint
Responder1 Brummett
Responder2
Creek Ocean, Isla Vista
Location 6754 Abrego
Discharge Carpet cleaning wastewater
Response/Action RP spoke directly with contractor immediately following incident. Dicharge of carpet cleaning wastewater from operator's tanks into "Del Sol" park.
Date(s) Follow-up 6/10/2010
Follow-up Detail Follow-up contact by PCW staff by telephone with contractor, citing violation, potential penalty, need to obtain a County business license (incl detail on how to obtain license), and follow-up NOV letter. Photos, letter in case file.
Responsible Contractor
Case # 10-031
Date Received 6/12/2010
Date Response 6/12/2010
Source Complaint
Responder1 Hufschmid
Responder2
Creek San Jose
Location 67 Depot Road
Discharge Residual waste from truck yard
Response/Action Site is located in the City of Goleta. Forwarded to Everett King.
Date(s) Follow-up 6/23/2010. City Goleta begins investigation.
Follow-up Detail
Responsible Business
Page 24 of 24