42A10NW0034 Z16016 EVELYN 010 2.1601 6 COMPILATION REPORT PIPESTONE GOLD PROJECT for ARISTA RESOURCES INC EVELYN 6 DUNDONALD TOWNSHIPS PORCUPINE MINING DIVISION ONTARIO by: Gary Clayton Dunn,Mining Technologist date: November 06,1994 DECEIVED j MAY 2 6 199B i L^-'^'C-LANDSI

Transcript of COMPILATION RPT PIPESTONE GOLD PROJ€¦ · 42a10nw0034 z16016 evelyn 010 2.1601 6 compilation...

Page 1: COMPILATION RPT PIPESTONE GOLD PROJ€¦ · 42a10nw0034 z16016 evelyn 010 2.1601 6 compilation report pipestone gold project for arista resources inc evelyn 6 dundonald townships

42A10NW0034 Z16016 EVELYN 010

2.1601 6

COMPILATION REPORT PIPESTONE GOLD PROJECT

for ARISTA RESOURCES INC

EVELYN 6 DUNDONALD TOWNSHIPS PORCUPINE MINING DIVISION

ONTARIO

by: Gary Clayton Dunn,Mining Technologist

date: November 06,1994

DECEIVED

j MAY 2 6 199BiL^-'^'C-LANDSI

Page 2: COMPILATION RPT PIPESTONE GOLD PROJ€¦ · 42a10nw0034 z16016 evelyn 010 2.1601 6 compilation report pipestone gold project for arista resources inc evelyn 6 dundonald townships

42A10NWD034 2.16016 EVELYN

TABLE OF CONTENTS

INTRODUCTION. ............................page l

RESULTS. .................................page l

PROPERTY DESCRIPTION 6 LOCATION. .........page 2

and ACCESS

PROPERTY GEOLOGY.........................page 2

ARISTA RESOURCES LOCATION MAP............page 3

CLAIM MAPS...............................page 4

TOPO MAP. ................................page 5

GEOLOGY MAP..............................page 6

PREVIOUS WORK............................page 7

AIRBORNE SURVEY..........................page 8

CONCLUSIONS 4 RECOMMENDATIONS............page 9

APPENDIX

STATEMENT OF QUALIFICATIONS

BIBLIOGRAPHY

GEONEX AERODAT LOGISTICAL REPORT

COMPILATION REPORT.ROD SPOONER P/Eng

GROUND GEOPHYSICAL MAPS 6 GRID MAP

AIRBORNE MAPS IN POCKET

Page 3: COMPILATION RPT PIPESTONE GOLD PROJ€¦ · 42a10nw0034 z16016 evelyn 010 2.1601 6 compilation report pipestone gold project for arista resources inc evelyn 6 dundonald townships

page l

INTRODUCTION

This report covers six(6) mineral claims consisting of a total of 74 claim units in Evelyn and Dundonald Townships 20 miles northeast of the City of Timmins Ontario.Arista Resources Inc is the property holder and recently

had the property examined by a helicopter-borne magnetic and VLF-EM survey conducted by Geonex Aerodat Inc in July 1994.

The author has subsequently reviewed all available assessment files stored at the Timmins Resident Geologist.studied the airborne results,discussed the area with various knowledgable geologists and examined the reports of successful exploration work conducted by Canamax on the geologically similar Clavos Deposit 10 miles to the east.

RESULTS

The airborne survey clearly delineates two ultramafic intrusives along the mafic volcanic/sediment (pipestone fault) zone.In addition both the airborne survey and ground geophysics(Max-min EM) delineate a conductor running along the south side of an intrusive.(grid 2,lines 6 E to 14 East, about l South.This will be CONDUCTOR "A".

Another VLF conductor runs at about 6 South on the same lines.This conductor lines up with diamond drill holes just outside the claim block which intersected graphitic sediments, sertcite schist and quartz veining.(CONDUCTOR "B")

A reverse circulation overburden drill hole on conductor "A" intersected altered sediments and "heavy quartz veining".The Nickel Offsets Gold Deposit in Tully Twp 10 miles to

the NW and the Clavos Gold Deposit in Stock Twp 10 miles to the SE are indicated to be closely related to the ultramafic intrusions and quartz-sulphide graphitic zones occurring in the same structural stratigraphic setting as the"Arista Resources Pipestone Property".

Page 4: COMPILATION RPT PIPESTONE GOLD PROJ€¦ · 42a10nw0034 z16016 evelyn 010 2.1601 6 compilation report pipestone gold project for arista resources inc evelyn 6 dundonald townships

page 2

PROPERTY DESCRIPTION.LOCATION and ACCESS

The Pipestone Property covers 74 claim units as indicated on claim maps G-3940 and G-3240 consisting of claims numbered 1189685,1189686,1189687,1189854,1189855 &1190766.

The property holders Henry Hutteri,Ed Korba and Richard Sproule optioned the property to Arista Resources Inc.Access is gained from Timmins east on highway 101 to Hoyle

and north on highway 610 for 3 miles to Ice Chest Lake Road.Secondary logging roads provide access to the eastern portion

of the property.

The Property is found in Evelyn and Dundonald Twps, 20 miles northeast of the City of Timmins,within the Porcupine Mining Division of Ontario (NTS 42A/10).

PROPERTY GEOLOGY

The Arista Resources Pipestone Property is located in the northwest portion of the Abitibi Greenstone Belt 12 miles northeast of the gold mining camp of Timmins Ontario.

The property is overburden covered but it appears the claims are underlain by mafic volcanics to the north and sediments to the south.The Buskegau Fault (Pipestone Fault Extension) runs NW through the centre of the claim group and marks the Mafic volcanic/sedimentary contact.Ultramafic Intrusives occur along this structure.

10 miles to the SE the Clavos Gold Deposit is found within quartz-sulphide graphitic zones in the same stratigraphic setting.Reserves are 643,500 tons 00.22 oz/ton Au (calculated with a 0.10 oz/ton cut-off) or 1,160,000 tons @ 0.15 oz/ton Au.

10 miles to the NW the Nickel Offsets Gold Deposit is found in the same stratigraphic setting with reserves of 650,000 tons @ 0.23 oz/ton Au.

20 miles to the SW the Kinross properties host gols reserves as follows...Bell Creek 33,000 tons @ 0.27 oz/ton Au and Hoyle Pond 285,439 tons @ 0.44 oz/ton Au. (1993).

Page 5: COMPILATION RPT PIPESTONE GOLD PROJ€¦ · 42a10nw0034 z16016 evelyn 010 2.1601 6 compilation report pipestone gold project for arista resources inc evelyn 6 dundonald townships

D DD D

r r r r [

:n

D D

GOLD IN QUARTZ

•ESTA RESOURCES INC.l

PROPERTY LOCATION MAP

ONTARIOOPERATORS:

DRAWN BY: PRO-TECH DRAFTING

DATE: AUG 22, 1994

NTS:

GARY DUNN EXPLORATION

Page 6: COMPILATION RPT PIPESTONE GOLD PROJ€¦ · 42a10nw0034 z16016 evelyn 010 2.1601 6 compilation report pipestone gold project for arista resources inc evelyn 6 dundonald townships
Page 7: COMPILATION RPT PIPESTONE GOLD PROJ€¦ · 42a10nw0034 z16016 evelyn 010 2.1601 6 compilation report pipestone gold project for arista resources inc evelyn 6 dundonald townships

Adjoins Map 2161 Coral Rapids Cochrane

-Jl FREDERICK1^ h/5*

HOUSE '

Page 8: COMPILATION RPT PIPESTONE GOLD PROJ€¦ · 42a10nw0034 z16016 evelyn 010 2.1601 6 compilation report pipestone gold project for arista resources inc evelyn 6 dundonald townships

page 7

PREVIOUS WORK

1963-1971 Hollinger Mines Ltd carried out Nickel exploration in the area but no record of work on the 14 Arista Claims.

1964 Accra Exploration Ltd conducted Mag and VLF surveys on the south edge of the property. A 350 ft diamond drill hole 350 m south of the pipeston claims and lining up with Conductor "B" hit sheared pyrite and graphite in a wide serecite zone.No assays are available.

1983-1984 Cominco Ltd carried out an airborne input and magnetometer survey over most of Evelyn Twp.Numerous weak conductive zones were delineated.A systematic reverse circulation overburden drilling program was carried out with 5 holes being completed on the Pipestone Property.Heavy quartz veining was encountered in one hole in the vicinity of Conductor"A".

1985-1988 Kangeld Resources Ltd completed an airborne mag and VLF survey over a large area .covering the southern half of FrederickHouse Lake in Evelyn and Dundonald Twps. Six diamond drill holes and 38 reverse circulation drill holes were drilled to the south and east of the Arista Resources Pipestone property in Dundonald Twp.High gold and arsenic anomalies were encountered in the basal till.

1988 Noronto Resources carried out airborne and mag surveys on the west shore of Frederick House Lake covering a portion of the -subject claim group.No further work is reported.

1988.On the Allerston Property (present claim #1189685) MPH consulting conducted a magnetometer survey on NE trending lines gl00m spacing and 25m stations.The recommendations included that "emphasis should be directed at the area near the Buskegau Fault (Pipestone extension) and underying ultramafics for alteration zones and sulphide mineralization with which gold is associated".Drilling was recommended but not performed.

Feb 1994 Property Vendors Hutteri,Korba and Sproule cut and chained 3 separate grids and performed ground magnetometer and hrizontal loop EM surveys on the property.Ground EM conductors are defined.

Page 9: COMPILATION RPT PIPESTONE GOLD PROJ€¦ · 42a10nw0034 z16016 evelyn 010 2.1601 6 compilation report pipestone gold project for arista resources inc evelyn 6 dundonald townships

page 8

AIRBORNE SURVEY

105 km of line were surveyed on the pipestone property at a 100 m line spacing.Both VLF and Magnetometer readings were recorded.

The Logistic Report from Geonex Areodat is appended.

Lines were flown @ azimuth of 7O-250O .Navigation and flightpath recovery was conducted using a Global Positioning System(GPS).The Total Field VLF-EM contour data is presented in percent^multiples of G.5%,2.5% and 10.O*.The flight utilized CutlerMaine as the transmitting station measured by a Herz Totem 2Asensor at an average elevation of 45m.The average helicopterterrain clearance of 60m was monitored by radar and barometricaltimeters.The Total Field Magneticsare presented in map contours ofnanoTesias and are multiples of 2nt, lOnt, 50nt, 250nt, andlOOOnt.Measurements were taken by a cesium high sensitivity magnetometerat an average sensor elevation of 45m and corrected fordiurnal variation.The Vertical Gradientmagnetic data is calculated from the magnetictotal field by an FFT algorithim.Map contours are in nano Teslas/metreand are multiples of O.OSnT/m. 0.25nTXm,l.OOnT/m, S.OOnT/mand 25.0nT7m.

Page 10: COMPILATION RPT PIPESTONE GOLD PROJ€¦ · 42a10nw0034 z16016 evelyn 010 2.1601 6 compilation report pipestone gold project for arista resources inc evelyn 6 dundonald townships

page 9

CONCLUSIONS and RECOMMENDATIONS

The airborne survey has identified a couple of prospectiveareas where the mag high indicate an ultramafic intrusionin the vicinity of the projected extension of the PipestoneFault.As well flanking the one intrusion the airborne survey hasidentified a conductive zone which correlates with an EMconductor labelled Conductor "A" (Hutteri,Sproule,Korba '93)

Following a review of the available Canamax data at the assessment office relating to the "CIavos Gold Deposit" 7 miles to the East one can see the Pipestone Property sits in a similar geological setting.

Reverse Circulation Drilling in the vicinity of conductor"A" encountered massive quartz veining.Diamond drilling off the property on the extension ofconductor"B" encountered graphite.sulphides and quartzveining.

It is therefore recoomended that several lines of "Deep-EM" be run over the target areas on conductors "A" and "B" with the target being the Graphitic l sulphide zone similar to the CLavos Gold Deposit. Diamond drilling of these untested targets should then follow.

Page 11: COMPILATION RPT PIPESTONE GOLD PROJ€¦ · 42a10nw0034 z16016 evelyn 010 2.1601 6 compilation report pipestone gold project for arista resources inc evelyn 6 dundonald townships

STATEMENT OF QUALIFICATIONS

I Gary Clayton Dunn do hereby certify that.

1. I am a graduate of the three year mining technology program at the Haileybury School of Mines (1974) and have practised my profession continuously since graduating.

2. I have an office at 355 Elliot St, Haileybury Ontario,

This report is based on a review of all available date including assessment file searches, a discussion with the property vendors Rick Sproule and Ed Korba, discussions with the Cobalt Resident Geologist Jim Ireland,and a review of the airborne data.

I have no direct interest in the property nor do I expect to receive any.

date

signing Technologist

Page 12: COMPILATION RPT PIPESTONE GOLD PROJ€¦ · 42a10nw0034 z16016 evelyn 010 2.1601 6 compilation report pipestone gold project for arista resources inc evelyn 6 dundonald townships

APPENDIX

Page 13: COMPILATION RPT PIPESTONE GOLD PROJ€¦ · 42a10nw0034 z16016 evelyn 010 2.1601 6 compilation report pipestone gold project for arista resources inc evelyn 6 dundonald townships

BIBLIOGRAPHY

Nickel Sulphide Deposits OGS Study 20 PAUL COAD 1979

Report on Pipestone Project,Mag and EM Surveys Evelyn 6 Dundonald Twps HUTTERI.KOREA,SPROULE 1994

Compilation Report R SPOONER P/Eng 1994

Page 14: COMPILATION RPT PIPESTONE GOLD PROJ€¦ · 42a10nw0034 z16016 evelyn 010 2.1601 6 compilation report pipestone gold project for arista resources inc evelyn 6 dundonald townships

^ ICi ^y: ^c- *tC ^lu v^

*

-

tt.a 7vj •i

r?!i!l l

M

111 M 11 s i i \ H i i i H H i

Page 15: COMPILATION RPT PIPESTONE GOLD PROJ€¦ · 42a10nw0034 z16016 evelyn 010 2.1601 6 compilation report pipestone gold project for arista resources inc evelyn 6 dundonald townships

m?

Page 16: COMPILATION RPT PIPESTONE GOLD PROJ€¦ · 42a10nw0034 z16016 evelyn 010 2.1601 6 compilation report pipestone gold project for arista resources inc evelyn 6 dundonald townships

t* t o

O) o

o rn

D CO

T

-L 10

OD

O

O m

D CO

rsa

o

o

o rn 3D

CO

Page 17: COMPILATION RPT PIPESTONE GOLD PROJ€¦ · 42a10nw0034 z16016 evelyn 010 2.1601 6 compilation report pipestone gold project for arista resources inc evelyn 6 dundonald townships

42A10NW0034 2.16016 EVELYN 020

ON A HELICOPTER-BORNEMAGNETIC AND VLF-EM

SURVEY

EARLTON AREA ONTARIO

FOR

ARISTA RESOURCES INC.SUITE 1510

999 WEST HASTINGS STREETVANCOUVER, B.C.

V6C 2W2

BY

GEONEX AERODAT INC.3883 NASHUA DRIVE

MISSISSAUGA, ONTARIOL4V1R3

JULY 1994

J9435

Page 18: COMPILATION RPT PIPESTONE GOLD PROJ€¦ · 42a10nw0034 z16016 evelyn 010 2.1601 6 compilation report pipestone gold project for arista resources inc evelyn 6 dundonald townships

42A10NW0034 2.16016 EVELYN 020C

TABLE OF CONTENTS

1. INTRODUCTION ........................................... 1

2. SURVEY AREA LOCATION .................................. 2

3. AIRCRAFT AND EQUIPMENT ................................ 53.1 Magnetometer........................................ 53.2 Digital Recorder ...................................... 53.3 Analog Recorder ...................................... 53.4 Video Camera ........................................ 63.5 Global Positioning System ............................... 63.6 Altimeter ............................................ 63.7 Aircraft ................................ ............. 63.8 Magnetic Diurnal Monitor ................................ 73.9 VLF-EM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7

4. DATA PRESENTATION ..................................... 74.1 Total Field Magnetic Contours ............................ 84.2 Vertical Magnetic Gradient ............................... 84.3 VLF-EM Contours ....... ......... ..................... 8

APPENDIX l - PersonnelAPPENDIX II - General Interpretive Considerations

Page 19: COMPILATION RPT PIPESTONE GOLD PROJ€¦ · 42a10nw0034 z16016 evelyn 010 2.1601 6 compilation report pipestone gold project for arista resources inc evelyn 6 dundonald townships

L

INTRODUCTION

This report describes an airborne geophysical survey carried out on behalf of

Arista Resources Inc. by Geonex Aerodat Inc. Equipment operated included a

high sensitivity cesium vapour magnetometer, a video tracking camera, an

altimeter and an electronic positioning system. Magnetic and altimeter data were

recorded both in digital form and analogs were created post-flight. Global

positioning data were stored in digital form and encoded on VMS format video

tape.

The area and flight lines were flown at a nominal spacing of 100 m. Coverage and

quality were considered to be within the specifications described in the contract.

The survey covered six separate blocks located in Casey, Auld and Bryce with a

total of 1450 line km flown.

l ii-

Page 20: COMPILATION RPT PIPESTONE GOLD PROJ€¦ · 42a10nw0034 z16016 evelyn 010 2.1601 6 compilation report pipestone gold project for arista resources inc evelyn 6 dundonald townships

2. SURVEY AREA LOCATION

Page 21: COMPILATION RPT PIPESTONE GOLD PROJ€¦ · 42a10nw0034 z16016 evelyn 010 2.1601 6 compilation report pipestone gold project for arista resources inc evelyn 6 dundonald townships
Page 22: COMPILATION RPT PIPESTONE GOLD PROJ€¦ · 42a10nw0034 z16016 evelyn 010 2.1601 6 compilation report pipestone gold project for arista resources inc evelyn 6 dundonald townships
Page 23: COMPILATION RPT PIPESTONE GOLD PROJ€¦ · 42a10nw0034 z16016 evelyn 010 2.1601 6 compilation report pipestone gold project for arista resources inc evelyn 6 dundonald townships

3. AIRCRAFT AND EQUIPMENT

3.1 Magnetometer

Scintrex optically pumped/monitored, cesium vapour, high sensitivity H-8

magnetometer mounted in a Canagrad towed stabilized magnetometer bird

designed for single engine operations. A Picodas magnetometer processor

operated at a sample rate of 5 samples per second with a 2 Hz bandwidth was

employed. The magnetometer sensitivity is 0.001 nT.

3.2 Digital Recorder

A PDAS 1100 data acquisition system was used to collect the geophysical and

ancillary equipment outputs and display the data on an on-board screen. Digital

output is recorded on a cartridge cassette tape with full read after write checking.

The magnetometer and VLF channels are scanned at 0.2 second rate. In addition,

altimeter, satellite information and coordinates, camera, manual fiducials and time,

will be digitally recorded at appropriate times. The resolution of the VLF data is

1 percent and the altimeter data is 0.5 m. The magnetic readings are measured

to a 0.001 gamma resolution.

3.3 Analog Recorder

Analog records were generated post-flight. The recorder can automatically label

the channels, times and representative values for maximum record clarity.

Page 24: COMPILATION RPT PIPESTONE GOLD PROJ€¦ · 42a10nw0034 z16016 evelyn 010 2.1601 6 compilation report pipestone gold project for arista resources inc evelyn 6 dundonald townships

3.4 Video Camera

Aerodat operated a VMS video camera to record the aircraft's overland flight path.

The time as recorded on the digital record was displayed on the video image for

precise correlation of video image with geophysical response.

3.5 Global Positioning System

GPS receiver, model MX4200D by Magnavox Electronic Systems Company, with

antenna mounted at top of vertical stabilizer. Identical model of GPS base station

for post flight differential correction of flight path.

3.6 Altimeter

A King KRA-10 radar altimeter was used to record terrain clearance of the aircraft.

The response of the instrument is linear and the digital resolution is better than

2.507o with a departure of 3 m at 100 m altitude discernable. The output of the

instruments were recorded in digital form.

3.7 Aircraft

An Aerospatiale AS 350 B1 A-Star helicopter (C-GNIX), owned and operated by

Questral Helicopters was used for the survey. Installation of the geophysical and

ancillary equipment was carried out by Geonex Aerodat Inc. The survey aircraft

was flown at a mean terrain clearance of 60 metres.

Page 25: COMPILATION RPT PIPESTONE GOLD PROJ€¦ · 42a10nw0034 z16016 evelyn 010 2.1601 6 compilation report pipestone gold project for arista resources inc evelyn 6 dundonald townships

3.8 Magnetic Diurnal Monitor

Magnetic base station with an Overhauser sensor, model GSM-9 by Gem

Systems, with an accuracy of 0.1 nanoTeslas. Data logging will be made at one

second intervals by computer. The time stamp for the magnetic base station is

taken directly from the GPS ground receiver to ensure that it correlates with the

airborne equipment.

3.9 VLF-EM

Herz Totem 2A measuring the total field and the quadrature components from two

stations with full scale sensitivity of plus/minus 257o. The VLF antenna was

mounted on a boom projecting well forward of the leading edge of the aircraft and

positioned so as to be unaffected by the conductivity of the aircraft.

4. DATA PRESENTATION

A list of products are as follows:

Basic Products (Scale at 1:10,000)

1. Base Map - Topographic base map, prepared from 1:50,000 NTS maps.

2. Magnetics - Photocombination of Total Field Magnetic Contours with the

base map.

3. Magnetics - Photocombination of Calculated Vertical Magnetic Gradient

contours with the base map.

Page 26: COMPILATION RPT PIPESTONE GOLD PROJ€¦ · 42a10nw0034 z16016 evelyn 010 2.1601 6 compilation report pipestone gold project for arista resources inc evelyn 6 dundonald townships

4. VLF-EM - Photocombination of Total Field VLF-EM Contours and Profiles

of Quadrature @ 1 07o per m/m.

Colour Products (Scale at 1:10,000)

All colour products contain planimetry digitized from existing 1:50,000 scale NTS

topographic maps.

1. Magnetics - Colour of Total Magnetic Field with superimposed contours.

2. Magnetics - Colour of Calculated Vertical Magnetic Gradient with

superimposed contours.

3. VLF-EM - Colour of Total Field VLF-EM with superimposed contours and

quadrature profiles.

4.1 Total Field Magnetic Contours

The aeromagnetic data were corrected for diurnal variations by adjustment using

the digitally recorded base station magnetic values and tie lines. No correction for

regional variation was applied.

4.2 Vertical Magnetic Gradient

The vertical magnetic gradient was calculated from the gridded total field magnetic

data and contoured at a 0.05 nT/m interval.

4.3 VLF-EM Contours

VLF-EM Contours were done at 1 0Xo and .5Yo contour intervals.

8

Page 27: COMPILATION RPT PIPESTONE GOLD PROJ€¦ · 42a10nw0034 z16016 evelyn 010 2.1601 6 compilation report pipestone gold project for arista resources inc evelyn 6 dundonald townships

APPENDIX l

PERSONNEL

OFFICE

Processing E. Hamilton

G. McDonald

Report E. Hamilton

FIELD

Pilot R. Morrow

Operator M. Barry

Page 28: COMPILATION RPT PIPESTONE GOLD PROJ€¦ · 42a10nw0034 z16016 evelyn 010 2.1601 6 compilation report pipestone gold project for arista resources inc evelyn 6 dundonald townships

APPENDIX II

GENERAL INTERPRETIVE CONSIDERATIONS

Magnetics

A digital base station magnetometer was used to detect fluctuations in the magnetic field

during flight times. The airborne magnetic data was levelled by removing these diurnal

changes. The Total Field Magnetic map shows the levelled magnetic contours,

uncorrected for regional variation.

The Calculated Vertical Gradient map shows contours of the magnetic gradient as

calculated from the total field magnetic data. The zero conductor shows changes in the

magnetic lithologies and will coincide closely with geologic contacts assuming a steeply

dipping interface. Thus this data may be used as a pseudo-geologic map.

Page 29: COMPILATION RPT PIPESTONE GOLD PROJ€¦ · 42a10nw0034 z16016 evelyn 010 2.1601 6 compilation report pipestone gold project for arista resources inc evelyn 6 dundonald townships

Ministry ofNorthern Developmentand Mines

Ontario

Report off Work Conducted After Recording Claim

Mining Act

Transaction Number

Personal Information ooftected on this form is obtained under the authority ot this coBectton should be directed to the Provincial Manager. Mining Lands Sudbury. Ontario. P3E 6A5. telephone (705) 670-7264.

42A10NW0034 2.16016 EVELYN 900 {^Momenta vi iniiijf aaaaaoiiioiii *wiK UI VUIKHJIl UW MllllfKI

Instructions: - Ptoase type or print and submit in duplicate- Refer to the Mining Act and Regulations for .^

Recorder.- A separate copy of this form must be completed for each Work Group.- Technical reports and maps must accompany this form in duplicate.- A sketch, showing the claims the work is assigned to, must accompany this form.

Work Performed (Check One Work Group Only)WorkGroup Jype.

^ 'Geotechnical SurveyPhysical Work. Including Drifing

Rehabilitation.-*-f ; /--"! l

Other Authorized Work

Assays

Assignment fromrlOSOfVO

Total Assessment Work Claimed on the Attached Statement of CostsNote: The Minister may reject for assessment work credit all or part of the assessment work submitted if the recorded

holder cannot verify expenditures claimed in the statement of costs within 30 days of a request for verification.

Persons and Survey Company Who Performed the Work (Give Name and Address of Author of Report)

41 sciMQUto Iff

Certification of Beneficial Interest * See Note No. 1 on reverse sidel certify that at the time the work was performed, the claims covered in this work report were recorded In the current hoMefs name or held under a beneficial Interest by the current recorded holder.

Certification of Work Reportl certify that l have a personal knowledge of the facts set Us completion and annexed report Is true.

in this Work report, having performed the work or witnessed same during and/or after

^.-lifaj mm rfnrjofwv OT

TeteponeNoT Date Certified By (Signature)

For Office Use Only^^^^^Total Value Gr. Recorded Date Recorded

0941 (03*1)

Page 30: COMPILATION RPT PIPESTONE GOLD PROJ€¦ · 42a10nw0034 z16016 evelyn 010 2.1601 6 compilation report pipestone gold project for arista resources inc evelyn 6 dundonald townships

Total Number Total Value Work Total Value Total Assigned Total Reserve ofCtamw Done Work Applied From

-P

lo

8-H

*

8

4

2 9 '

.

16•o

-o

S

?

OJBO"

pr^

- (

iS15

*

•" i.ioo IAA

oo

Work Report Number for Applying Reserve

II

si•3^

11*1

-

-• :.:.'-.-.-" ~ i- t

l

~~ —

4

i

*

t

18

iS

S*'00

l

0^B

m

S

1

*

8

-*fcf8

S*

S

Value of Assessment Work Done on this Claim

*-.. -fc - i v^-i . " n^ ' '. ' ~--' i

Siii3 a

iff? jis|

Credits you are claiming in this report may be cut back. In order to minimize the adverse effects of such deletions, please indicate from which claims you wish to priorize the deletion of credits. Please mark (s) one of the following:1. D Credits are to be cut back starting with the claim listed last, working backwards. 2. D Credits are to be cut back equally over all claims contained in this report of work. 3. D Credits are to be cut back as priorized on the attached appendix.

In the event that you have not specified your choice of priority, option one will be implemented.

Note 1: Examples of beneficial Interest are unrecorded transfers, option agreements, memorandum of agreements, etc., with respect to the mining claims.

Note 2: If work has been performed on patented or leased land, please complete the following:

l certify that the recorded holder had a beneficial interest in Ihe patented or leased land at the time the work was performed.

Signature Date

Page 31: COMPILATION RPT PIPESTONE GOLD PROJ€¦ · 42a10nw0034 z16016 evelyn 010 2.1601 6 compilation report pipestone gold project for arista resources inc evelyn 6 dundonald townships

'Ontario

Ministry ofNorthern Developmentand Mines

Ministere du Developpement du Nord et des mines

Statement of Costs for Assessment Credit

Etat des coQts aux fins du credit devaluation

Mining Act/Lot sur les mines

Transaction No./N" de transaction

;t. - 5i? ' J JL

Personal information collected on this form is obtained under the authority of the Mining Act. This information will be used to maintain a record and ongoing status of the mining claim(s). Questions about this collection should be directed to the Provincial Manager, Minings Lands, Ministry of Northern Development and Mines, 4th Floor, 159 Cedar Street, Sudbury, Ontario P3E 6A5, telephone (705) 670-7264.

Les renseignements personnels contenus dans la presente formule sont recueillis en vertu de la Lol stir lea mines ei sen/iron! d lenir A (our un registre des concessions minieres. Adresser toute queslton sur la collece de ces renseignements au chef provincial des terrains minlers, mlnlstere du Developpement du Nord et des Mines, 159, rue Cedar, 4e etage, Sudbury (Ontario) P3E 6A5, telephone (705) 670-7264.

1. Direct Costs/CoQts directs

Type

Wages Salalres

Contractor's and Consultant's Fees Orolts d* ('entrepreneur et de I'expert- consell

Supplies Used Fournltures utilises*

Equipment Rental Location de materiel

Description

Labour Main-d'oeuvreField Supervision Supervision sur le terrain

VrKx^n^ is.pitq

l^lrWurrt^S^OJtU\

Type

Type

Amount Montan!

S.-xn10"-' 1

^A? 1*"

Total Direct Costs Total des coOts directs

Totals Total global

*

ftti*f

^tn*

2. Indirect Costs/CoOts Indlrects* * Note: When claiming Rehabilitation work Indirect costs are not

allowable as assessment work.Pour le remboursement des travaux de rehabilitation, les coOts indirects ne sont pas admissibles en (ant que travaux d'evaluation.

Type

Transportation Transport

Food and ' Lodging Nourrlture et hebergementMobilization and Demobilization Mobilisation et demobilisation

Description

Type

pu . *"~ "™^ •™*-w. .-onamfcii | ,l. -.-t- .; ' (~n -'-— ,-|' ' -,.. \*.f L, S 5: -.- - Jl

: y,/-.. y -, ; j,; O p

- - - - - -- ~,. J

Amount Montan!

*^^BTi

1

t

t

1

Sub Total of Indirect Costs Total partlel des coOts Indlrects

Amount Allowable (not greater than 20H of Direct Costs) Montan! admissible (n'excedant pas 20 H des coOts directs)

Total Value of Assessment Credit Valeur totale du credit (Total of Direct and Allowable d'evaluation Indirect costa) (Total dM coOti rflmeti

Totals Total global

4 -- - i

n HMlfACU Ad (Bf WIDIM

Note: The recorded holder will be required to verify expenditures claimed in this statement of costs within 30 days of a request for verification. If verification is not made, the Minister may reject for assessment work all or part of the assessment work submitted.

Note : Le titulaire enregistre sera tenu de verifier les depenses demandees dans le present etat des coOts dans les 30 jours suivant une demande a cet effet. Si la verification n'est pas effectuee, le ministre pout rejeter tout ou une partie des travaux devaluation presentes.

Filing Discounts

1. Work filed within two years of completion is claimed at 10007o or the above Total Value of Assessment Credit.

Remises pour depot

1. Les travaux deposes dans les deux ans suivant leur achevement sont rembourses a 100 "A de la valeur totale susmentionnee du credit d'evaluation.

2. Work filed three, four or five years after completion is claimed at SO'M) of the above Total Value of Assessment Credit. See calculations below:

Total Value of Assessment Credit Total Assessment Claimedx 0.50 =

2. Les travaux deposes trois, quatre ou cinq ans apres leur achevement sont rembourses a 50 "/b de la valeur totale du credit d'evaluation susmentionne. Voir les calculs ci-dessous.

Valeur totale du credit d'evaluation

x 0,50

Evaluation totale demandee

Certification Verifying Statement of Costs Attestation de l'etat des coQts

l hereby certify:that the amounts shown are as accurate as possible and these costs were incurred while conducting assessment work on the lands shown on the accompanying Report of Work form.

that as fe ( or? O B Q tOLJ) fi /C.(Recorded Holder, Agent, Position in Company)

t t

J'atteste par la presente :que les montants indiques sont le plus exact possible et que ces depenses ont et6 engagees pour effectuer les travaux d'evaluation sur les terrains indiques dans la formule de rapport de travail ci-joint.

l am authorized Et qu'a litre de je suis autoris6(titulaire enregistr6, representant, posts occup4 dans la compagnle)

to make this certification a faire cette attestation.

Signature

S* "f- 'Y/C^Date

MIX 4IK0212 (04/91) Nola : Dans cette formule, lorsqu'il d6slgne des personnes, le masculin est utills6 au sens neutre.

Page 32: COMPILATION RPT PIPESTONE GOLD PROJ€¦ · 42a10nw0034 z16016 evelyn 010 2.1601 6 compilation report pipestone gold project for arista resources inc evelyn 6 dundonald townships

OntarioMinistry ofNorthern Developmentand Mines

Ministere duDeveloppement du Nord et des Mines

June l, 1995

Geoscience Approvals Officp 933 Ramsey Lake Road 6th Floor Sudbury, Ontario P3E 6B5

Telephone: (705) 670-5853 Fax: (705) 670-5863

Our File: 2.16016 Transaction #: W9560.00116

Mining RecorderMinistry of NorthernDevelopment fi Mines60 Wilson Avenue, 1st FloorTimmins, OntarioP4N 2S7

Dear Sir:

Subject: APPROVAL OF ASSESSMENT WORK CREDITS ON MINING CLAIMS P.1189854 ET AL IN EVELYN TOWNSHIP

Assessment work credits have been approved as outlined on the original report of work. The credits have been approved under Section 15, Airborne Geophysics, Mining Act Regulations.

The approval date is June l, 1995.

If you have any questions regarding this correspondence, please contact Lucille Jerome at (705) 670-5855.

ORIGINAL SIGNED BY: Yours sincerely,

Ron C. GashinskiSenior Manager, Mining Lands Section Mining and Land Management Branch Mines and Minerals.Division

LJ/dl

cc: Resident Geologist Timmins, Ontario

Assessment Files Library Sudbury, Ontario

Page 33: COMPILATION RPT PIPESTONE GOLD PROJ€¦ · 42a10nw0034 z16016 evelyn 010 2.1601 6 compilation report pipestone gold project for arista resources inc evelyn 6 dundonald townships

•rtgjjfc-^r-V

* t TP*

li)

aZD

O

XQ

J-

4. 3-

T

~

T. C

in

-i-.5U)

3.

Ui

-'-J

rf g uj

l z t

5

CD "^

o * i 2

^

.u .-

u.-"

'^

2

L^

^

' *

-*

y** t^

4/1 * ^

?

— ^

-^ as o

-. ^. ~

i JxO

O

2

Oc

2*

0*

0-

f o s -:*

-r?5

:*s^j

^x-r^^-r^5(E

?

oco

Q.

COioUJ-lH

H-

zD

H—

— ^

C, s

J) -

~: <

l-3_l^

Lua:<

ZD

Zu-iC

CtC

5

O2LU

U

Icr

II

iae ooCO

Cfl

Xg xazz z

uiZu

Oaiu. OU

J'a.,

oW)

Igac

K J

Xoogi

?i?22

T

X

i—

k—

U

,n

L

U

trl/)

.

o: s 5 s x * j~

~ ac o 2j — z " " S u f

liiisl

^ w

5

iu -

ci

tv

O ...3 ^

2"

^J

-o

z o

li-m

QO

COz ^

la

-i O

z

o

w

i!

eo

o

ii

l3u

* l rScti

s.(

ct

Siz>5g irCO

OUJ^^^

UJoUJGC

LOCD

O1* ™ea03fitS

uzttffiwo-l02S

0*

MO

UJ

i UJ f|M

^^. ^e CO

-

Q.

0 3

a O

UJ5

Ol-

S Q

.OO

3**i S

±s * 5E

il

Oroiox

atcu- (E

DUNDONALD

TOW

NSHIP

;__k_-T

—_

..—J—

.

O.

COoCOUJ

CM

dIHSN

MO

l N

VM

09

5 *

SZ

2

2

8 lQ(CIL

.

Ca

z o

OCOXa

x a

to. X

U

Ja

o

lotu Oa

crui

I

o

ouU

)

ill

' l

l

BC *.

J

3 By *

H

i*l

t a.w

II

H

f

OoCM

Page 34: COMPILATION RPT PIPESTONE GOLD PROJ€¦ · 42a10nw0034 z16016 evelyn 010 2.1601 6 compilation report pipestone gold project for arista resources inc evelyn 6 dundonald townships

Lake

Square: Grid NorthStar: True North

Arrow: Magnetic North

Angles presented are approximate meandeviations for centre of NTS sheet.

Use diagram for reference only.

Grid North - True North : -0.8"Grid North - Magnetic North: -10 J*

Annual change - -0.02*

ECEIVF

ARISTA RESOURCES INC

BASE MAPPORQUIS JUNCnON/PAMOUR

ONTARIO

Date Flown: JULY 21994

GEONEXAERODATEVEL NTS : 42M/10-42A/11 (AREA-E)

Map Ret: 1Project : J9435

42A10NW0034 2 18016 EVELYN 210

Page 35: COMPILATION RPT PIPESTONE GOLD PROJ€¦ · 42a10nw0034 z16016 evelyn 010 2.1601 6 compilation report pipestone gold project for arista resources inc evelyn 6 dundonald townships

rltioMbhD eieupfirtfioMeuiT

rlJioH oirenoaM woiiA

naem etemixoiqqa ew beJneaeiq eelQnA.leerte 8TH to eitneo lot anoiteiveb

.ylno eaneietei lot mBigaib eel)

•8.0- : rttioM auiT - rtnoM bhOoe.or-. rttioH oiwngaM rttioH bhO

"SO O- egnerlo leunnA

JATOT

beiudfiam ,6t6b luotnoo M3-HJV blait leloT egeievB na JB loenaa AS meloT siaH B yd

nottavele

:nottaJ8 basllitu \ ,r0.*S A8U.3HIAM R3JTUO ,AAM

mm\ieq #r elftoiq eiuJeibsuO

aia bna Jneoieq ni aifi eiuotnoo :woled betail eaorlJ to eelqiHum

HTA*J THOIJ1

betoubnoo aaw yiavooei rlteq trlQift bns noitBQiveM (3SO) meteyS Qninoitiso^ ladolO B Qnieu

.meteya noitagivan

.aoas - Ot to fltumixB HB tfi nwoR aiaw eanU .mOOC to QnioBqa anil eQBievs ne rlriw

mOd to eoneiBelo niBiiet-ietqooilah egaievA eietemiJlB oiiJemoisd bnfi iBbBi yd baiotlnom

? ' fir i) S YAM

AT2IHA

OBR JATOT

00001:1 3JAD8

:nwoRet6Q

TAQOHHA X3HOHO

r: tefl qeM

iV

Page 36: COMPILATION RPT PIPESTONE GOLD PROJ€¦ · 42a10nw0034 z16016 evelyn 010 2.1601 6 compilation report pipestone gold project for arista resources inc evelyn 6 dundonald townships

oCO CM

Square: Grid NorthSlar: True North

Arrow Magnetic North

Angles presented are approximate meandeviations for centre of NTS sheet.

Use diagram for reference only.

QrM North -True Nw* Gnd North - Magnetic North -10.9"

Annual change : -0.02"

TOTAL FIELD MAGNETICSTotal field magnetic intensity contour data,

measured by a cesium high sensitivity magnetometerat an average sensor elevation of 45m, and

corrected for diurnal variation.

Map contours are in nanoTeslas, and are multiples of those listed below:

2nT 10 nT 50 nT 250 nT 1000 nT

FLIGHT PATHNavigation and flight path recovery was conducted

using a Global Positioning System (GPS)satellite navigation system.

Lines were flown at an azimuth of 70 - 2500, with an average line spacing of 100m.

Average helicopter-terrain clearance of 60m was monitored by radar and barometric altimeters.

MINING LANDS BRANCHARISTA RESOURCES INC TOTAL FIELD MAGNETICSPORQUIS JUNCnON/PAMOUR

ONTARIO

SCALE 1:10000

250 O IDD 200 son 1000 metres

GEONEX AERODATDate Flown: JULY 2 1994

NTS : 42M/10-42A/11 (AREA-E)

Project : J9435 Map Ret: 1 - 2503000 E 504000 E

Page 37: COMPILATION RPT PIPESTONE GOLD PROJ€¦ · 42a10nw0034 z16016 evelyn 010 2.1601 6 compilation report pipestone gold project for arista resources inc evelyn 6 dundonald townships

Square. Grid North9ar True North

Arrow: Magnetic North

Angles presented are approximate meandeviations for centre of NTS sheet

Use diagram for reference only.

Grid North - True North : -0.6*Gnd North - Magnetic North -10.9"

Annual change: -0.02*

VERTICAL GRADIENTVertical magnetic gradient contour data,

calculated from the gridded total field magnetics data by an FFI algorithm.

Map contours are in nanoTeslas/rnetre, and are multiples of those listed below:

0.06 nT/m 0.25 nT/m 1.00 nT/m 5.00 nT/m 25.0 nT/m

FLIGHT PATHNavigation and flight path recovery was conducted

using a Global Positioning System (GPS)satellite navigation system.

Lines were flown at an azimuth of 70 - 2500, with an average line spacing of 100m.

Average helicopter-terrain clearance of 60m was monitored by radar and barometric altimeters.

ARISTA RESOURCES INC VERTICAL MAGNETIC GRADIENT

PORQUIS JUNCnON/PAMOURONTARIO

SCALE 1:10000

250 O 100 MO 100 1000 metre*

GEONEXAERODATDate Flown: JULY 21994

NTS : 42M/10-42A/11 (AREA-E)

Project : J9435 Map Ref: 1 - 3

f T