COMPARISON OF 3PHASE AND SINGLE PHASE POWER PLANTS REMOTE SENSING IN BTS STATION.
-
Upload
jocelyn-underwood -
Category
Documents
-
view
216 -
download
4
Transcript of COMPARISON OF 3PHASE AND SINGLE PHASE POWER PLANTS REMOTE SENSING IN BTS STATION.
COMPARISON OF 3PHASE COMPARISON OF 3PHASE AND SINGLE PHASE POWER AND SINGLE PHASE POWER PLANTSPLANTS
REMOTE SENSING IN BTS REMOTE SENSING IN BTS STATION STATION
POWER PLANT POWER PLANT 3 ph. Vs 1 ph.3 ph. Vs 1 ph.
DATA COLLECTIONDATA COLLECTION
• EB TARIFF: Rs. 5.50/UNITEB TARIFF: Rs. 5.50/UNIT• DIESEL : Rs.35/ LTR.DIESEL : Rs.35/ LTR.• POWER DISRUPTION: 12 POWER DISRUPTION: 12
HOURS PER DAYHOURS PER DAY
EQUIPMENTS
• R PHASE: 1.5 TR S/T AC UNITS- 1NoR PHASE: 1.5 TR S/T AC UNITS- 1No
• Y PHASE : POWER PLANT- 35 A DCY PHASE : POWER PLANT- 35 A DC
• B PHASE: LIGHT AND FANSB PHASE: LIGHT AND FANS
• POWER PLANT: 150 A, SINGLE PHASEPOWER PLANT: 150 A, SINGLE PHASE
EA SET
• 1No. 15 KVA 3PHASE1No. 15 KVA 3PHASE
• GIVEN WORKING LOAD OF 1NO AC GIVEN WORKING LOAD OF 1NO AC UNIT AND 35 A DC CURRENTUNIT AND 35 A DC CURRENT
• AVERAGE DIESEL CONSUMPTION -AVERAGE DIESEL CONSUMPTION -1.65 LTR/HR.1.65 LTR/HR.
SINGLE PHASE POWER PLANTSINGLE PHASE POWER PLANT
• AC VOLTAGE: 230, CURRENT: 10 AAC VOLTAGE: 230, CURRENT: 10 A
• DC VOLTAGE: 55 DC VOLTAGE: 55
• DC CURRENT: 35DC CURRENT: 35
• EFFICIENCY: 55 X35 / 230 X 10EFFICIENCY: 55 X35 / 230 X 10
= 83%= 83%
THREE PHASE POWER PLANT (200 AMPS)
• AC VOLTAGE: 400AC VOLTAGE: 400• AC INPUT CURRENT:5.5 AMPSAC INPUT CURRENT:5.5 AMPS• DC VOLTAGE: 55DC VOLTAGE: 55• DC CURRENT: 35DC CURRENT: 35• EFFICIENCY: 55 X35 / 400 X 5.5EFFICIENCY: 55 X35 / 400 X 5.5
= 87.5%= 87.5%
ENERGY COST PER YEAR (EB)
•3.35 X 12 HOURS X 30 DAYS= 1206 kwh
•1206 x 5.5 = Rs.6633/- per month
•Rs.79596/- per year
EXPENDITURE ON EA SET
• COST OF FUEL : Rs.35/ LTR
• RUNNING HOURS : 12 HOUR/DAY • CONSUMPTION: 1.6 LTR /HOUR
• EXPENDITURE PER MONTH: 1.6 X12 X 35 X 30 = Rs.20160
• EXPENDITURE = 2,41,920/- PER YEAR
• COST OF PHASE SELECTOR SWITCH AND INSTALLATION CHARGE = Rs. 12,000/-
EXPENDITURE ON EA SET
• 12 HOURS WORKING PER DAY• FUEL CHARGES =Rs.2,41,920/-
• EB CHARGES = RS. 79596/-
• SAVING PER YEAR= Rs.241920 –( 79596+12000/-)=Rs.1,60,324/-
• FUEL SAVING : RS.1,60,324/- PER YEAR.
EXPENDITURE ON EA SET
RECOMMENDATIONS
• SINGLE PHASE POWER PLANT WITH SINGLE PHASE POWER PLANT WITH PHASE CHANGER IS ECONOMICAL PHASE CHANGER IS ECONOMICAL WHERE DISRUPTION OF ONE PHASE WHERE DISRUPTION OF ONE PHASE BY EB IN PRACTICE BY EB IN PRACTICE
• EB METER CAPACITY SHALL BE EB METER CAPACITY SHALL BE 20AMPS PER PHASE20AMPS PER PHASE
• COST OF PHASE SELECTOR SWITCH COST OF PHASE SELECTOR SWITCH CAN BE RETRIEVED WITHIN ONE CAN BE RETRIEVED WITHIN ONE MONTHMONTH
RECOMMENDATIONS
• THREE PHASE POWER PLANT IS ECONOMICAL IN URBAN AREAS WHERE CONTINUOUS 3PHASE POWER SUPPLY IS AVAILABLE.
REMOTE SENSING IN BTS STATION - LOCATION
• DB ROAD COIMBATORE
• OTHER BTS STATION
REMOTE SENSING IN BTS STATION• DB ROAD: PRESEVI MAKE SENSOR• FOLLOWING TRIP INDICATIONS EXTENDED
TO TRICHY FROM COIMBATORE• AC FAILURE• LLOP• LOW FUEL• POWER PLANT TRIP• FIRE ALARM• DOOR OPEN• COST : 11000/-
OTHER BTS STATION
• FOLLOWING TRIP INDICATIONS EXTENDED
• MAKE: PRESEVI• FIRE ALARM• ENGINE FAIL• EB SUPPLY FAIL• COST: 5000/-
• THANK YOU
• EE COIMBATORE