Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

109
CHAPTER – 1 INDUSTRY PROFILE

Transcript of Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 1: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

CHAPTER – 1

INDUSTRY

PROFILE

Page 2: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 1

CHAPTER 1

INDUSTRY PROFILE

1.1 INTRODUCTION

Energy has been universally recognized as one of the most important inputs for economic growth

and human development. There is a strong two-way relationship between economic development

and energy consumption. On one hand, growth of an economy, with its global competitiveness,

hinges on the availability of cost-effective and environmentally benign energy sources, and on

the other hand, the level of economic development has been observed to be reliant on the energy

demand.

Energy intensity is an indicator to show how efficiently energy is used in the economy. The

energy intensity of India is over twice that of the matured economies, which are represented by

the OECD (Organization of Economic Co-operation and Development) member countries.

India’s energy intensity is also much higher than the emerging economies—the Asian countries,

which include the ASEAN member countries as well as China. However, since 1999, India’s

energy intensity has been decreasing and is expected to continue to decrease.

The indicator of energy–GDP (gross domestic product) elasticity, that is, the ratio of growth rate

of energy to the growth rate GDP, captures both the structure of the economy as well as the

efficiency. The energy–GDP elasticity during 1953–2001 has been above unity. However, the

elasticity for primary commercial energy consumption for 1991–2000 was less than unity

(Planning Commission 2002). This could be attributed to several factors, some of them being

demographic shifts from rural to urban areas, structural economic changes towards lesser energy

industry, impressive growth of services, improvement in efficiency of energy use, and inter-fuel

substitution.

The energy sector in India has been receiving high priority in the planning process. The total

outlay on energy in the Tenth Five-year Plan has been projected to be 4.03 trillion rupees at

2001/02 prices, which is 26.7% of the total outlay. An increase of 84.2% is projected over the

Ninth Five-year Plan in terms of the total plan outlay on energy sector. The Government of India

in the mid-term review of the Tenth Plan recognized the fact that under-performance of the

Page 3: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 2

energy sector can be a major constraint in delivering a growth rate of 8% GDP during the plan

period. It has, therefore, called for acceleration of the reforms process and adoption of an

integrated energy policy.

In the recent years, the government has rightly recognized the energy security concerns of the

nation and more importance is being placed on energy independence. On the eve of the 59th

Independence Day (on 14 August 2005), the President of India emphasized that energy

independence has to be the nation’s first and highest priority, and India must be determined to

achieve this within the next 25 years.

1.2 DEMAND AND SUPPLY SCENARIO

In the recent years, India’s energy consumption has been increasing at one of the fastest rates in

the world due to population growth and economic development. Primary commercial energy

demand grew at the rate of six per cent between 1981 and 2001 (Planning Commission 2002).

India ranks fifth in the world in terms of primary energy consumption), accounting for about

3.5% of the world commercial energy demand in the year 2003. Despite the overall increase in

energy demand, per capita energy consumption in India is still very low compared to other

developing countries.

India is well-endowed with both exhaustible and renewable energy resources. Coal, oil, and

natural gas are the three primary commercial energy sources. India’s energy policy, till the end

of the 1980s, was mainly based on availability of indigenous resources. Coal was by far the

largest source of energy. However, India’s primary energy mix has been changing over a period

of time.

Despite increasing dependency on commercial fuels, a sizeable quantum of energy requirements

(40% of total energy requirement), especially in the rural household sector, is met by non-

commercial energy sources, which include fuel wood, crop residue, and animal waste, including

human and draught animal power. However, other forms of commercial energy of a much higher

quality and efficiency are steadily replacing the traditional energy resources being consumed in

the rural sector.

Page 4: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 3

Resource augmentation and growth in energy supply has not kept pace with increasing demand

and, therefore, India continues to face serious energy shortages. This has led to increased

reliance on imports to meet the energy demand.

1.2.1 COAL

India now ranks third amongst the coal producing countries in the world. Being the most

abundant fossil fuel in India till date, it continues to be one of the most important sources for

meeting the domestic energy needs. It accounts for 55% of the country’s total energy supplies.

Through sustained increase in investment, production of coal increased from about 70 MT

(million tons) (MoC 2005) in early 1970s to 382 MT in 2004/05. Most of the coal production in

India comes from open pit mines contributing to over 81% of the total production while

underground mining accounts for rest of the national output (MoC 2005). Despite this increase in

production, the existing demand exceeds the supply. India currently faces coal shortage of 23.96

MT. This shortage is likely to be met through imports mainly by steel, power, and cement sector

(MoC 2005). India exports insignificant quantity of coal to the neighboring countries. The

traditional buyers of Indian coal are Bangladesh, Bhutan, and Nepal.

The development of core infrastructure sectors like power, steel, and cement are dependent on

coal. About 75% of the coal in the country is consumed in the power sector (MoC 2005).

1.2.2 POWER

Access to affordable and reliable electricity is critical to a country’s growth and prosperity. The

country has made significant progress towards the augmentation of its power infrastructure. In

absolute terms, the installed power capacity has increased from only 1713 MW (megawatts) as

on 31 December 1950 to 118 419 MW as on March 2005 (CEA 2005). The all India gross

electricity generation, excluding that from the captive generating plants, was 5107 GWh (gig

watt-hours) in 1950 and increased to 565 102 GWh in 2003/04 (CEA 2005).

Energy requirement increased from 390 BkWh (billion kilowatt-hours) during 1995/96 to 591

BkWh (energy) by the year 2004/05, and peak demand increased from 61 GW (gigawatts) to 88

Page 5: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 4

GW over the same time period. The country experienced energy shortage of 7.3% and peak

shortage of 11.7% during 2003/04. Though, the growth in electricity consumption over the past

decade has been slower than the GDP’s growth, this increase could be due to high growth of the

service sector and efficient use of electricity.

Per capita electricity consumption rose from merely 15.6 kWh (kilowatt-hours) in 1950 to 592

kWh in 2003/04 (CEA 2005). However, it is a matter of concern that per capita consumption of

electricity is among the lowest in the world. Moreover, poor quality of power supply and

frequent power cuts and shortages impose a heavy burden on India’s fast-growing trade and

industry.

1.2.3 OIL AND NATURAL GAS

The latest estimates indicate that India has around 0.4% of the world’s proven reserves of crude

oil. The production of crude oil in the country has increased from 6.82 MT in 1970/71 to 33.38

MT in 2003/04 (MoPNG 2004b). The production of natural gas increased from 1.4 BCM (billion

cubic meters) to 31.96 BCM during the same period. The quantity of crude oil imported

increased from 11.66 MT during 1970/71 to 81 MT by 2003/04. Besides, imports of other

petroleum products increased from 1 MT to 7.3 MT during the same period. The exports of

petroleum products went up from around 0.5 MT during 1970/71 to 14 MT by 2003/04. The

refining capacity, as on 1 April 2004, was 125.97 MTPA (million tons per annum). The

production of petroleum products increased from 5.7 MT during 1970/71 to 110 MT in 2003/04.

India’s consumption of natural gas has risen faster than any other fuel in the recent years. Natural

gas demand has been growing at the rate of about 6.5% during the last 10 years. Industries such

as power generation, fertilizer, and petrochemical production are shifting towards natural gas.

India’s natural gas consumption has been met entirely through domestic production in the past.

However, in the last 4/5 years, there has been a huge unmet demand of natural gas in the country,

mainly required for the core sectors of the economy. To bridge this gap, apart from encouraging

domestic production, the import of LNG (liquefied natural gas) is being considered as one of the

possible solutions for India’s expected gas shortages. Several LNG terminals have been planned

in the country. Two LNG terminals have already been commissioned: (1) Petro net LNG

Page 6: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 5

Terminal of 5 MTPA (million tons per annum) at Dahej, and (2) LNG import terminal at Hazira.

In addition, an in-principle agreement has been reached with Iran for import of 5 MTPA of LNG.

1.2.4 RENEWABLE ENERGY SOURCES

Renewable energy sources offer viable option to address the energy security concerns of a

country. Today, India has one of the highest potentials for the effective use of renewable energy.

India is the world’s fifth largest producer of wind power after Denmark, Germany, Spain, and the

USA. There is a significant potential in India for generation of power from renewable energy

sources—, small hydro, biomass, and solar energy. The country has an estimated SHP (small-

hydro power) potential of about 15 000 MW. Installed combined electricity generation capacity

of hydro and wind has increased from 19 194 MW in 1991/92 to 31 995 MW in 2003/04, with a

compound growth rate of 4.35% during this period (MoF 2005). Other renewable energy

technologies, including solar photovoltaic, solar thermal, small hydro and biomass power are

also spreading. Greater reliance on renewable energy sources offers enormous economic, social,

and environmental benefits.

The potential for power production from captive and field-based biomass resources, using

technologies for distributed power generation, is currently assessed at 19 500 MW including

3500 MW of exportable surplus power from bagasse-based cogeneration in sugar mills (MNES

2005).

1.2.4 FUTURE SCENARIO

Increasing pressure of population and increasing use of energy in different sectors of the

economy is an area of concern for India. With a targeted GDP growth rate of 8% during the

Tenth Five-year Plan, the energy demand is expected to grow at 5.2%. Driven by the rising

population, expanding economy, and a quest for improved quality of life, the total primary

energy consumption is expected to about 412 MTOE (million tones oil equivalent) and 554

MTOE in the terminal years of the Tenth and Eleventh Plans, respectively (Planning

Commission 1999).

Page 7: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 6

The International Energy Outlook 2005 (EIA 2005b) projects India’s gas consumption to grow at

an average annual rate of 5.1%, thereby reaching 2.8 trillion cubic feet by 2025 with the share of

electric power sector being of 71% by that time. Coal consumption is expected to increase to 315

MT over the forecast period. In India, slightly less than 60% of the projected growth in coal

consumption is attributed to the increased demand of coal in the electricity sector while the

industrial sector accounts for most of the remaining increase. The use of coal for electricity

generation in India is expected to increase by 2.2% per annum during 2002–25, thus requiring an

additional 59 000 MW of coal-fired capacity. Oil demand in India is expected to increase by

3.5% per annum during the same time.

It is quite apparent that coal will continue to be the predominant form of energy in future.

However, imports of petroleum and gas would continue to increase substantially in absolute

terms, involving a large energy import bill. There is, therefore, an urgent need to conserve

energy and reduce energy requirements by demand-side management and by adopting more

efficient technologies in all sectors.

1.3INDIAN POWER INDUSTRY BEFORE INDEPENDENCE &

POST INDEPENDENCE

The British controlled the Indian power industry firmly before Independence. The then legal and

policy framework was conducive to private ownership, with not much regulation with regard to

operational safety.

Immediately after Independence, the country was faced with capacity restraint. India adopted a

socialist structure for economic growth and all the major industries were controlled by public

sector enterprises. By 1970's India had nationalized most of its energy assets, due to its

commitment to social goals. By the late 1980's the Indian economy felt the strain of the socialist

agenda followed since independence. Faced with a serious deterioration in public finance and

balance of payment crisis, the Union government as part of its policy of economic liberalization

allowed greater investment by private sector in the power industry.

Page 8: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 7

1.4 OVERVIEW OF INDIA’S POWER SECTOR

1.4.1 BACKGROUND

India's power market is the fifth largest in the world. The power sector is high on India's priority

as it offers tremendous potential for investing companies based on the sheer size of the market

and the returns available on investment capital.

Contribution from different sources of power generation

(Source - Source: Ministry of Power, Government of India)

Almost 55 per cent of this capacity is based on coal, about 10 per cent on gas, 26 per cent on

hydro, approximately 5 per cent on renewable sources, about 3 per cent on nuclear and 1 per

cent on diesel.

In the past five years, there has been a much greater emphasis on transmission and distribution

reforms.

The government aims to provide "power to all" by 2012. To achieve that promise, it will have to

add as much as 1,00,000 MW of generation capacity, cut AT&C losses substantially to below

20 per cent, rationalize tariffs and ensure that average revenue realization is greater than the

cost of production. It will have to continue to push the process of reform and restructuring and

ensure greater private participation, in every segment.

In the past few years, there has been considerable growth in power plants based on

renewable sources of energy. The Plant Load Factor (PLF) of generating plants has improved

consistently over the last 10 years. The share of thermal power as a proportion of total power

generated has decreased from 71 per cent to 66.3 per cent in the last decade. The share of hydro

Page 9: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 8

has increased to 26 per cent from 25.7 per cent of the fossil fuel supplies; there is delivery

constraint with respect to gas. A number of gas plants today are running at sub-optimal plant

load factor (PLF) levels due to shortages. The government has decided not to embark on new

projects that rely on gas. It is feared that supply shortages can disturb the capacity addition

plans, reduce PLFs, as the rising crude prices have led to firmer naphtha and natural gas

prices.Emerging environmental concerns have led to an increasing interest in renewable.

Captive power plants (CPPs) also make a major contribution, which is more than one-fifth of

the total installed capacity. In the last three years, captive capacity has grown at an average of

1,600 MW per year. The introduction of ABTs (Availability Based Tariffs) has changed the

thinking of discoms. They have to pay huge prices as they have to source power from the grid

during low frequency periods. During this time the CPP power comes in handy at a much lower

tariff. The reform process in the power sector continues. Thirteen states have unbundled

SEBs into separate entities for transmission, distribution and generation. Two states have

privatized distribution. Regulatory authorities have been set up in 24 states. These authorities

are applying commercial principles to tariff setting, monitoring the performance of state utilities

and paying attention to areas such as demand side management and grid discipline.

1.4.2 GENERATION

Over the years, the fuel mix has changed. Growing environmental concerns have led to an

interest in renewable sources of energy (comprising wind energy, solar photovoltaic energy,

biomass power and mini hydro plants). But despite great potential, renewable sources

contribute only a little over 6,000 MW at present.

The PLF of generating plants has improved consistently over the last few years.

1.4.3 CONTRIBUTION IN INDIAN GROWTH DOMESTIC

PRODUCT (GDP)

With the world population nearly doubling in the past three decades, the present surge in

Page 10: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 9

electricity demand, and the projected increase of the global population, the importance of

available energy cannot be underestimated.

In India, the burning of coal accounts for approximately one half of all electricity generation,

nuclear energy approximately one fourth of all electricity generation, and hydro, and gas

roughly ten percent of the total electricity generation. Globally, India is presently positioned as

the eleventh largest manufacturer of energy, representing roughly 2.4% of the overall energy

output per annum.

Usually energy, especially electricity, has a major contribution in speeding up the economic

development of the country. The existing production of per capita electricity in India is around

600 kWh per annum. Ever since 1990s, India’s gross domestic product (GDP) has been

increasing very rapidly and it is estimated that it will maintain the pace in the next couple of

decades. As per CEA (Central Electricity Authority) contribution of power sector in GDP is

6.25% to 6.65%. The rise in GDP should be followed by an increase in the expenditure of key

energy other than electricity.

1.5 FUTURE PLANS OF CAPACITY ADDITION

1.5.1 PLAN FOR CAPACITY ADDITION DURING XITH FIVE

YEAR PLAN (2007-2012)

The power generation capacity added during the last five years is a lowly 21,280 Mw, which is

about half the original target of 41,110 MW set for the Tenth Plan. This is also 2000 Mw

less than the 23,250 Mw capacity addition projected by the government in last few days of fifth

five year plan. (March 2007).

An ambitious target of 78,577 Mw has been set by the government for the eleventh plan

period (2007 -2012). Of this, the hydropower’s share would be 16,553 MW, the thermal power

would constitute 58,644 MW and the nuclear power’s share would be 3,380 MW. Capacity

addition plan from different sources during Sixth five year plan (2007-2012).

Page 11: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 10

Plan for capacity addition from various sources during 11th plan

Year wise Capacity addition plan during Sixth five year plan

(2007-2012)

Year Capacity addition (Mw)

2007-08 16,785

2008-09 7272

2009-2010 15,198

2010 -2011 16,970

2011-2012 22,352

Total capacity addition 78577

The orders for these capacity additions are likely to be placed by December 2007 so that

they can be implemented during the Plan itself.

Page 12: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 11

1.5.2 POLICY FOR ADDITIONAL CAPACITY GENERATION

Following is the policy for future power generation under the National Electricity Plan:

Inadequacy of generation has characterized power sector operation in India. To provide

availability of over 1000 units of per capita electricity by year 2012 it had been estimated

that need based capacity addition of more than 1,00,000 MW would be required during

the period 2002-12.

Government of India has initiated several reform measures to create a favorable

environment for addition of new generating capacity in the country. The Electricity Act

2003 has put in place a highly liberal framework for generation. There is no requirement

of licensing for generation. The requirement of techno-economic clearance of CEA for

thermal generation project is no longer there. For hydroelectric generation also, the limit of

capital expenditure, above which concurrence of CEA is required, would be raised suitably

from the present level. Captive generation has been freed from all controls.

In order to fully meet both energy and peak demand by 2012, there is a need to

create adequate reserve capacity margin. In addition to enhancing the overall availability of

installed capacity to 85per cent, a spinning reserve of at least 5per cent, at national level,

would need to be created to ensure grid security and quality and reliability of power supply.

1.5.2.1 NON-CONVENTIONAL ENERGY GENERATION

The Ministry of Non-conventional Energy Sources is promoting development of small/mini

hydro power projects. The potential of generation of power from small and mini hide

projects is estimated to be about 10,000 MW in the country.

Feasible potential of non-conventional energy resources, mainly small hydro, wind and

biomass would also need to be exploited fully to create additional power generation capacity.

With a view to increase the overall share of non-conventional energy sources in the electricity

mix, efforts will be made to encourage private sector participation through suitable

promotional measures.

Page 13: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 12

1.5.2.2 HYDRO ELECTRICITY GENERATION

Hydroelectricity is a clean and renewable source of energy. Maximum emphasis would be laid

on the full development of the feasible hydro potential in the country. The 50,000 MW hydro

initiatives have been already launched and are being vigorously pursued with DPRs for projects

of 33,000 MW capacities already under preparation.

Harnessing hydro potential speedily will also facilitate economic development of States,

particularly North-Eastern States, Sikkim, Uttaranchal, Himachal Pradesh and J&K, since a

large proportion of our hydro power potential is located in these States. The States with hydro

potential need to focus on the full development of these potentials at the earliest.

Hyde projects call for comparatively larger capital investment. Therefore, debt financing of

longer tenure would need to be made available for hydro projects. Central Government is

committed to policies that ensure financing of viable hydro projects.

State Governments need to review procedures for land acquisition, and other

approvals/clearances for speedy implementation of hydroelectric projects.

The Central Government will support the State Governments for expeditious development of

their hydroelectric projects by offering services of Central Public Sector Undertakings like

National Hydroelectric Power Corporation (NHPC).

Proper implementation of National Policy on Rehabilitation and Resettlement (R&R) would

be essential in this regard so as to ensure that the concerns of project-affected families are

addressed adequately.

Adequate safeguards for environmental protection with suitable mechanism for monitoring of

implementation of Environmental Action Plan and R&R Schemes will be put in place.

1.5.2.3 SMALL HYDROPOWER PLANTS

The Electricity Act 2003 is the catalyzing and facilitating factor for the Power revolution in

India. The concern that no households be left out from being electrified, is being aptly

Page 14: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 13

addressed by the Union and state Governments. Impetus is being given to Rural Electrification.

In order to achieve this objective, synergy is to be evolved where distributed Power Generation

supplements (or makes up for the limitation) of electric supply through grid. Besides this

mission, initiatives for environmental conservation are propelling utilities to generate more of

Green Power.

Decentralized Power Generation and Distribution has the power to adequately make up for

the limitation of the Electric supply through Grid, and is considered a potential means to provide

“Power to all by 2012” DPG technologies such as Small Hydro Power help in producing power

at the point of consumption.

In India, small hydro schemes are further classified by the Central Electric Authority as

follows:

Type Station Capacity Unit rating

Micro Up to 100 KW Up to 100 KW

Mini 101 KW to 2000 KW 101 KW to 1000 KW

Small 2001 KW to 25000 KW 1001 KW to 5000 KW

1.5.2.4 THERMAL GENERATION

Even with full development of the feasible hydro potential in the country, coal would necessarily

continue to remain the primary fuel for meeting future electricity demand.

Imported coal based thermal power stations, particularly at coastal locations, would be

encouraged based on their economic viability. Use of low ash content coal would also help in

reducing the problem of fly ash emissions.

Significant Lignite resources in the country are located in Tamil Nadu, Gujarat and Rajasthan

and these should be increasingly utilized for power generation. Lignite mining technology

needs to be improved to reduce costs.

Use of gas as a fuel for power generation would depend upon its availability at reasonable prices.

Natural gas is being used in Gas Turbine /Combined Cycle Gas Turbine (GT/CCGT) stations,

Page 15: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 14

which currently accounts for about 10 per cent of total capacity. Power sector consumes about

40per cent of the total gas in the country. New power generation capacity could come up based

on indigenous gas findings, which can emerge as a major source of power generation if

prices are reasonable. A national gas grid covering various parts of the country could facilitate

development of such capacities.

Imported LNG based power plants are also a potential source of electricity and the pace of their

development would depend on their commercial viability. The existing power plants using

liquid fuels should shift to use of Natural Gas/LNG at the earliest to reduce the cost of

generation.

For thermal power, economics of generation and supply of electricity should be the basis for

choice of fuel from among the options available. It would be economical for new generating

stations to be located either near the fuel sources e.g. pithead locations or load centers.

Generating companies may enter into medium to long-term fuel supply agreements especially

with respect to imported fuels for commercial viability and security of supply.

1.5.2.5 NUCLEAR POWER

Nuclear power is an established source of energy to meet base load demand. Nuclear power

plants are being set up at locations away from coalmines. Share of nuclear power in the overall

capacity profile will need to be increased significantly. Economics of generation and resultant

tariff will be, among others, important considerations. Public sector investments to create nuclear

generation capacity will need to be stepped up. Private sector partnership would also be

facilitated to see that not only targets are achieved but exceeded.

Nuclear Power Capacity Addition Plan:

Nuclear power is seeing a renaissance. Power-starved India, which has the largest number of

reactors under construction, is at the forefront of this revival of interest in nuclear power.

India is building seven of the 30 reactors under construction around the world. This is likely to

increase significantly once the India-US agreement on nuclear cooperation is accepted by the rest

of the world. India has been commissioning nuclear reactors in record time of less than five

Page 16: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 15

years. The capital cost per megawatt in the case of nuclear plant is Rs 50 million, which is higher

than the average cost of the thermal plants (Rs 40 million or less). However, with the fuel cost

being much lower than the thermal plants, nuclear power becomes an appealing option.

1.5.2.6 CAPTIVE GENERATION

The liberal provision in the Electricity Act, 2003 with respect to setting up of captive power

plant has been made with a view to not only securing reliable, quality and cost effective power

but also to facilitate creation of employment opportunities through speedy and efficient

growth of industry. The provision relating to captive power plants to be set up by group of

consumers is primarily aimed at enabling small and medium industries or other consumers that

may not individually be in a position to set up plant of optimal size in a cost effective manner.

It needs to be noted that efficient expansion of small and medium industries across the

country would lead to creation of enormous employment opportunities.

A large number of captive and standby generating stations in India have surplus capacity that

could be supplied to the grid continuously or during certain time periods. These plants offer a

sizeable and potentially competitive capacity that could be harnessed for meeting demand for

power. Under the Act, captive generators have access to licensees and would get access to

consumers who are allowed open access. Grid inter-connections for captive generators shall be

facilitated as per section 30 of the Act. This should be done on priority basis to enable captive

generation to become available as distributed generate ion along the grid. Towards this

end, non- conventional energy sources including co-generation could also play a role.

Appropriate commercial arrangements would need to be instituted between licensees and the

captive generators for harnessing of spare capacity energy from captive power plants. The

appropriate Regulatory Commission shall exercise regulatory oversight on such commercial

arrangements between captive generators and licensees and determine tariffs when a licensee is

the off-taker of power from captive plant.

Page 17: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 16

1.6 PROSPECTS OF RENEWABLE ENERGY

1.6.1 CURRENT SCENARIO

The Progress of renewable energy generation has been encouraging as the country is today one

among the top rankers in grid-interactive renewable power installations Adverse local

environmental impacts (SOx, NOx, SPM) and global environmental impacts (greenhouse gas

emissions mainly due to carbon dioxide) associated with fossil fuel use have resulted in an

increased emphasis on renewable.

1.7 REGULATORY ENVIRONMENT

1.7.1 INSTITUTIONAL FRAMEWORK

The Ministry of Power is primarily responsible for the development of the Indian power sector.

It is concerned with perspective planning and policy formulation in the sector.

The Central Electricity Authority (CEA) is a body constituted under the Electricity Supply Act,

which is responsible for developing a sound, adequate, and uniform policy for the control and

utilization of national power resources. It is also responsible for the techno-economic appraisal

of the project reports for the proposed power plants, including those in the private sector.

Page 18: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 17

Subsequent to enactment of the Legislation on establishment of a regulatory authority, an

institution called the Central Electricity Regulatory Commission (CERC) has been set up for

rationalization of bulk and retail tariff for generation and transmission utilities involved in inter-

state operations. It also regulates at intra-state level. Each state has set up a State Electricity

Regulatory Commission.

1.7.2 THE ELECTRICITY ACT

The Electricity Act 2003 has been enacted by the Parliament in June, 2003. The salient positive

features of this legislation are:

o Removal of a number of restrictive barriers to the flow of power in a competitive market

scenario by opening access to transmission (from the outset) and distribution.

o Freeing up of generation and captive power plants from licenses and techno- economic

approvals.

o The recognition to trading as a distinct activity that would help ushering in a market

environment.

o The formation of an expert Appellate Tribunal to hear appeals against State and Central

Electricity Regulatory Commission orders.

o Transferring the full range of regulatory and licensing functions to the Central and State

Regulatory Commissions.

o Deregulating tariffs in certain situations e.g. in case of agreements between consumers and

generating companies.

o The distancing of Government from the functioning of the sector after giving broad

directions via the National Electricity Policy and the National Tariff Policy.

o The conversion of the remaining State Electricity Boards into State Transmission Utilities

and deemed licensees with the freedom (but not compulsion) to restructure and progress

down the road to corporatization and privatization.

o The Energy Conservation Act, 2001 has been enacted and consequently Bureau of Energy

Efficiency (BEE) has already been set up.

Page 19: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 18

1.7.3 REFORMS SO FAR

o 26 states have signed Memorandum of Understanding (MoU) with the Government of India

to undertake reforms.

o 20 states have constituted State Electricity Regulatory Commissions and are functional.

Tripura and Jharkhand have notified the constitution of SERC.

o 18 State Electricity Regulatory Commissions have issued tariff orders.

o 11 States have unbundled/corporatized.

o State of Orissa and Delhi have privatized distribution of electricity.

1.7.4 MAJOR POLICIES NOTIFIED UNDER THE

ELECTRICITY ACT DURING 2006

1.7.4.1 TARIFF POLICY

The Tariff Policy has been notified by Government of India on6 January, 2006 under the

provisions of section 3 of the Electricity Act, 2003.

The objectives of the tariff policy are to:

o Ensure availability of electricity to consumers at reasonable and Competitive rates

o Ensure financial viability of the sector and attract investments

o Promote transparency, consistency and predictability in regulatory approaches across

jurisdictions and minimize perceptions of regulatory risks

1.7.4.2 GUIDELINES FOR PROCUREMENT OF ELECTRICITY

In compliance with section 63 of the Electricity Act, 2003, the Central Government had notified

guidelines for procurement of power by Distribution Licensees through competitive bidding.

Central Government has also issued the standard bid documents containing RFQ, RFP and

Page 20: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 19

model PPA for long term procurement of power from projects having specified site and

location.

1.7.4.3 RURAL ELECTRIFICATION POLICY

Rural Electrification Policy, in compliance with section 4 and 5 of the Electricity Act 2003, was

notified on 23 August, 2006.

Overall approach enunciated in the Policy highlights grid connectivity to be normal way of

electrification of villages. For villages / habitations where grid connectivity is not feasible or

not cost effective of grid solutions based on stand-alone systems may be taken up. De-

centralized distribution generation facilities together with local distribution network may be

based on either conventional or non-conventional method of electricity generation. The State

Governments should within six months prepare and notify a Rural Electricity Plan to achieve

the goal of providing access to all households.

1.7.4.4 NEW HYDRO-POLICY

Section 63 of the Electricity Act provides for development of projects on the basis of

competitive bidding for tariff. Sections 61 and 62 allow such projects developed on the basis

of tariff to be fixed by the Regulator on the basis of capital cost and norms. In fact, the

Electricity Tariff Policy notified in January 2006 also allows a special dispensation for project

development by State and Central PSUs on the basis of capital cost and norm-based tariff to

be determined by the Regulatory Commission. This dispensation, allowed for PSUs, is now

proposed to be made available for the same period of 5 years to promote hydro-power

development even through the private sector route. The State would be required to follow a

transparent process for selection of the developer.

This arrangement would have several advantages. While the initiative for allocation of the

project would remain with the State Government (subject to the requirement of transparency

in the allocation), the scrutiny of the regulator and the CEA would ensure that the project is

being designed and built in the most optimal and economic manner, and that the interest of

the consumers is adequately protected. From the point of view of the developer, this

Page 21: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 20

procedure would reduce numerous risks associated with the construction and operation and

maintenance (O&M) of hydro projects.

New Hydel Policy announced with an objective of making investment in hydro projects more

attractive. The government has prepared plan for creation of National Grid by 2012 and

infrastructure to facilitate inter-regional exchange of 30,000 MW of electricity by 2012.

1.7.4.5 ULTRA-MEGA POWER PROJECTS (UMPPS)

The Ministry of Power, Government of India has launched an initiative for development of coal-

based Ultra-Mega Power Projects (UMPPs) in India, each with a capacity of 4,000 MW or

above. These projects will be awarded to developers on the basis of tariff-based competitive

bidding. To facilitate tie-ups of inputs and clearances, project-specific shell companies have

been set up as wholly owned subsidiaries of the Power Finance Corporation (PFC) Ltd. These

companies will undertake preliminary studies and obtain necessary clearances including water,

land, fuel, power selling tie-up etc. prior to award of the project to the successful bidder.

Nine sites have been identified by CEA in nine States for the proposed UMPPs. These include

four pithead sites, one each in Chhattisgarh, Jharkhand, Madhya Pradesh and Orissa, and five

coastal sites, one each in Andhra Pradesh, Gujarat, Karnataka, Maharashtra and Tamil Nadu. It

is proposed to set up pithead projects as integrated proposals with corresponding captive coal

mines. On the request of Ministry of Power, Ministry of Coal has already allocated captive coal

mining block for Sasan UMPP in Madhya Pradesh and earmarked captive coal mining block

for Orissa UMPP. For the coastal projects, imported coal shall be used. The projects are to be

developed with a view to lower the cost of power to the consumers. These projects, adopting

supercritical technology to reduce emissions, would be environment-friendly.

Page 22: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 21

1.7.4.6 DEVELOPMENT OF MERCHANT POWER PLANTS

To facilitate the development of the electricity market, the Ministry of Power has issued the

approach and guidelines on development of merchant power plants (MPPs). Unlike traditional

utilities, MPPs compete for customers and absorb the full market risk. There is no guarantee

regarding minimum off-take of their output. Typically the risk of a MPP is carried on the

balance sheet of the promoter. MPPs can provide the additional generating reserves that India

needs now and will need in the future. They are a modern, market-based answer – at least in part

– to the energy challenges faced by the country. MPPs are a product of the restructuring of the

electricity industry and they fill different niches in the market; some provide steady supplies to

a power grid, while others fire up only when demand is at the highest and meet peak loads.

Merchant power plants operating competitively help assure that power is produced with

efficiency and supplied to locations where it is needed most.

MPPs up to a capacity of 1,000 MW would be provided coal linkage, and captive coal blocks

may also be provided to merchant power plants in the range of 500–1000 MW.

It would be essential that certain normative criteria are laid down for eligibility for coal blocks

allotment, particularly to IPPs and merchant plans. These criteria could relate to net worth of the

company, their internal resource generation and annual turn-over. The agencies being allotted

the coal blocks may also be required to put in place bank guarantee of a reasonable amount

which should be liable to be encased if important milestones for development of coal mines are

not achieved. The intermediate milestones may also include indicators concerning the

development of power projects, such as award of Engineering Procurement and Construction

(EPC) contracts, and commencement of construction. Success of this scheme would, to a great

extent, depend on availability of reliable data and information for plant sites and other inputs in

this capacity range so that developers then can take further appropriate action.

Page 23: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 22

1.7.4.7 PRIVATE PARTICIPATION IN TRANSMISSION

Private investment has been allowed in power transmission either through 100per cent equity

or joint venture with PGCIL. In case of latter, the PGCIL will hold only 26per cent stake and

private party would hold the rest.

Private sector participation in transmission has been limited to construction and maintenance

of transmission lines on BOOT (build-own-operate-transfer) basis under the control of

PGCIL.

o Policy initiatives for encouraging competition in development of transmission projects

Promote competitive procurement of transmission services

o Encourage private investment in transmission lines

o Facilitate transparency and fairness in procurement processes

o Facilitate reduction ‘of information asymmetries for various bidders’. Protect consumer

interests by facilitating competitive conditions in procurement of transmission services of

electricity.

o Enhance standardization and reduce ambiguity and hence time for materialization of

projects

o Ensure compliance with standards, norms and codes for transmission lines while

allowing flexibility in operation to the transmission service providers.

1.8 PROFILE OF MAJOR PLAYERS

1.8.1 TATA POWER

A pioneer in the Indian power sector, Tata Power (TPL) is one of India’s largest energy utilities.

Started as the Tata Hydroelectric Power Supply Company in 1911, it is an amalgamation of two

entities: Tata Hydroelectric Power Supply Company, Andhra Valley Power Supply Company

(1916).

TPL provides services in power generation, distribution and transmission; oil and gas; and

broadband and communications. The company has big overseas power projects in a number of

Page 24: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 23

countries, including the UAE, Malaysia, Saudi Arabia, Kuwait and Algeria. It has also

undertaken projects in power plant / utility operations and management in Saudi Arabia,

Liberia, Iran, Sierra Leone and Algeria.

o Setting up independent power plants (lPPs) and captive power plants (CPPs), and

executing power transmission and distribution projects

o Operation and maintenance services

o Remnant life assessment’ and ‘performance evaluation services’ of power plant equ

o In overseas projects, erection, testing, commissioning and trial operations.

o In power plant / utility operations, management and plant operators’ training projects.

1.8.2 RELIANCE ENERGY LTD. (REL)

Reliance Energy Ltd is India's leading integrated power utility company in the private sector. It

has a significant presence in generation, transmission and distribution of power in Maharashtra,

Goa and Andhra Pradesh. Reliance's gas finds in KG-D6 block in Krishna Godavari basin

constitutes 60 per cent of India's present total gas production.

REL and its affiliate power companies rank among the top 25 listed private sector companies on

major financial parameters. REL is part of the Reliance industries-India's private sector

company ranked among the world's 175 largest companies in terms of net profit and the 500

largest companies in terms of sales.

o EPC Division (Engineering., Procurement and Construction

Division)

REL has significant presence in the field of execution of the Power projects on EPC basis with a

strong track record of the execution and commissioning of projects on time. REL has received

wide acclaim for the initiatives in corporate governance. These awards and recognition's greatly

motivates and encourage the REL team to set fresh benchmarks in corporate governance,

particularly in the Indian Power Sector.

Page 25: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 24

1.8.3 NATIONAL THERMAL POWER CORPORATION (NTPC)

NTPC Limited is the largest thermal power generating company of India. A public sector

company, it was incorporated in the year 1975 to accelerate power development in the

country as a wholly owned company of the Government of India. At present, Government

of India holds 89.5per cent of the total equity shares of the company and the balance 10.5per

cent is held by FIIs, Domestic Banks, Public and others. Within a span of 31 years, NTPC has

emerged as a truly national power company, with power generating facilities in all the major

regions of the country

o Business Activities

NTPC’s core business is engineering, construction and operation of power generating plants. It

also provides consultancy in the area of power plant constructions and power generation to

companies in India and abroad. As on date the installed capacity of NTPC is 27,404

MW through its 14 coal based (22,395 MW), 7 gas based (3,955 MW) and 4 Joint Venture

Projects (1,054 MW). NTPC acquired 50per cent equity of the SAIL Power Supply Corporation

Ltd. (SPSCL). This JV company operates the captive power plants of Durgapur (120 MW),

Rourkela (120 MW) and Bhilai (74 MW). NTPC also has 28.33per cent stake in Ratnagiri Gas

& Power Private Limited (RGPPL) a joint venture company between NTPC, GAIL, Indian

Financial Institutions and Maharashtra SEB Holding Co. Ltd.

1.8.4 ANDHRA PRADESH POWER GENERATION

CORPORATION LIMITED (APGENCO)

Andhra Pradesh Power Generation Corporation Limited is one of the pivotal organizations of

Andhra Pradesh, engaged in the business of Power generation. Apart from operation &

Maintenance of the power plants it has undertaken the execution of the on Government of India

ng & new power projects scheduled under capacity addition programmed and are taking up

renovation & modernization works of the old power stations. APGENCO started operations in

Page 26: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 25

1999.

This was a sequel to Government’s reforms in Power Sector to unbundle the activities relating

to Generation, Transmission and Distribution of Power. All the Generating Stations owned by

erstwhile Andhra Pradesh State electricity Board (APSEB) were transferred to the control of

APGENCO.

1.8.5 NATIONAL HYDROELECTRIC POWER CORPORATION

LIMITED (NHPC)

National Hydroelectric Power Corporation Limited, A Govt. of India Enterprise, was

incorporated in the year 1975 with an authorized capital of Rs. 2000 million and with

an objective to plan, promote and organize an integrated and efficient development of

hydroelectric power in all aspects. Later on NHPC expanded its objects to include other

sources of energy like Geothermal, Tidal, and Wind etc. At present, NHPC is a schedule 'A'

Enterprise of the Govt. of India with an authorized share capital of Rs. 1,50,000 Million . With

an investment base of over Rs. 2.2 Lakh Million approx. and NHPC is among the TOP TEN

companies in the country in terms of investment.

1.8.6 SUZLON ENERGY

Established in 1995, Suzlon Energy began its journey to the forefront of the wind energy

industry with a small but significant project to supply wind turbine generators for a 3.34 MW

wind farm project in Gujarat, India. In little over a decade, Suzlon has grown to rank as one

of the world's leading manufacturers, and India’s and Asia’s leading manufacturer of

wind turbines.

Page 27: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

CHAPTER – 2

COMPANY

PROFILE

Page 28: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 26

CHAPTER 2

COMPANY PROFILE

2.1 DAKSHIN GUJARAT VIJ COMPANY LTD. SURAT, GUJARAT

2.1.1 EXECUTIVE SUMMARY

DGVCL is company registered under the Companies Act 1956, with the objectives of

distribution of electricity in the southern parts of the State of Gujarat. The Commission is in the

process of formulation of revised Multi Year Tariff Regulations for the Control Period from FY

2011-12 to FY 2015-16, and as part of that process has directed DGVCL to submit a Business

Plan which would cover the Strategic and Operational Plan for the Company.

DGVCL has prepared the Business Plan taking cognizance of the existing internal factors and

external business environment affecting the business. It is submitted that the Business plan being

a dynamic document may need to be updated at periodic intervals taking into account the

changes in the internal and external environment and these changes would be intimated to the

Hon’ble Commission from time to time.

2.1.2 INTRODUCTION

The Business Plan is initiated based on a review of “what is” on the Company’s current

operations, operational performance and organization structure. The formulation of strategies is

driven by the consideration of the vision, mission and values that the Company holds and

cherishes. The existing profile of the Company, its strengths and weaknesses, its policies, and the

emerging legal and business environment plays an important role in the formulation of the plan.

The approach and methodology adopted for preparation of Business plan of DGVCL is as

follows:

The business plan is prepared for the projection period FY 2012 to FY 2016.

Page 29: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 27

The assumptions like investment plan, load forecast, loss reduction plan, power procurement

plan etc. are maintained as provided in MYT petition for second control period FY 2011-12

to 2015-16

2.1.3 OBJECTIVE OF BUSINESS PLAN

As per the Forum of Regulators recommendation “Distribution licensees should submit the

business plan and power purchase plan, for approval of the Commission, at least six months prior

to submission of MYT petitions”. Also as directed by the Hon'ble commission Business Plan for

the second Control Period is to be filed along with the MYT filings for the second Control

Period. DGVCL has developed a comprehensive business plan for the company for the period

FY 2011-12 to FY 2015- 16. The business plan in following sections intends to cover the above

issues from the strategic, competitive, financial, commercial and organizational perspectives.

2.1.4 COMPANY PROFILE

Dakshina Gujarat Vij Company Limited (DGVCL) is given the responsibility of distribution of

electricity in Southern parts of the State of Gujarat. DGVCL operates through the network spread

over 23, 307 Sq. Kms covering seven districts namely Bharuch, Narmada, Surat (except part of

Surat City), Tapi, Dangs, Navsari and Valsad. The company has become operational effective

from 1st April, 2005.

2.1.5 VISION AND MISSION OF DGVCL

Based on the changing environment, both internal and external, DGVCL has framed its Vision

and Mission and tried to align it with its future Business Plan. DGVCL hopes to achieve its goals

and take advantage of the opportunities available in the Power sector.

2.1.5.1 VISION

“Customer satisfaction through service excellence”

Page 30: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 28

2.1.5.2 MISSION

1. To provide reliable and quality power at competitive cost

2. To reach global standards in reducing distribution losses

2.1.5.3 THE CORE VALUES

Customer satisfaction

Pride of belongingness

Excellence

Participative work culture

Being ethically and socially responsive

2.1.6 CATEGORY WISE CONSUMERS AND SALES

Following Table shows the category wise No of Consumers and Sales for the FY 2009- 10:

Category No. of

Consumers

%age-

Consumers

Sales (Mus) %age- Sales

Residential 1653882 80.91% 1436 16.03%

Commercial 233697 11.43% 554 6.18%

Industrial LT 51756 2.53% 2563 28.61%

PWW 9733 0.48% 97 1.08%

Agriculture 88625 4.36% 570 6.36%

Street Light 4300 0.21% 30 0.33%

Industrial HT 2221 0.11% 3437 38.36%

Railway 5 0.0002% 272 3.04%

Total 2044219 100.00% 8959 100.00%

(Source: CEA report on Monthly power supply position)

Page 31: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 29

DGVCL has a consumer base of 20 lacs; Residential category consists of the largest consumer

base followed by Commercial & then Agriculture. The industrial consumption is around 66%

which is a source of revenue for DGVCL and 6% is agriculture consumption which is the

subsidized category.

2.1.7 INFORMATION TECHNOLOGY INITIATIVES

DGVCL has undertaken many initiatives to become the IT enable power Distribution Company

which is the need of the hour at present. The activities which have been implemented are as

follows:

E- Urja an ERP solution is being implemented as an end to end ERP solution whereby

several processes will be computerized.

E-Gram Panchayats, (E-GPs) whereby 2391 E-GPs under 7 districts have been assigned as

the agency for collection of energy bills.

There is also E-Payment facility from anywhere across the world.

Deployment of Automatic Meter Reading (AMR) System to HT consumers

In June, 2009 Rs 23.38 Crores have been sanctioned for DGVCL for implementation of R-

APDRP Part-A for 11 towns covering 33 Sub Divisions and Approximately 7 Lacs

Consumers within the span of two years.

Under this project, various IT based applications will be implemented like Consumer Indexing,

GIS Mapping, SCADA-DMS system, Centralized Consumer Care Centre.

2.1.8 HUMAN RESOURCE DEPARTMENT

DGVCL’s HR Management System in association with GETRI has organized many need based

training & development programs. Further DGVCL also provides training at its GEKC (Gujarat

Energy Knowledge Centre), Surat.

The total number of employees in DGVCL as on 31st Mar, 2010 was 4495.

Page 32: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 30

2.1.9 ENERGY CONSERVATION MEASURES

Creating awareness among the consumers by distributing pamphlets

Regular and periodical maintenance of line and equipment’s, technical loss reduction activities &

equipment’s in use to save energy

In the entire Below Poverty Line (BPL) category Consumers, it is planned to provide CFL lamp

instead of conventional incandescent lamp.

Scheme for providing energy-efficient motors and pump sets to farmers in the Company’s is

under active consideration.

2.1.10 CONSUMER SERVICE

The basic objective of the Company is to serve the consumers and provide the quality power

supply. To achieve the objective, DGVCL has undertaken many consumer service related

activities which includes

1. 24x7 customer care call center for better consumer service.

2. Any Time Payment (ATP) machine which is a touch screen multimedia based system

has been installed to facilitate consumers to pay their energy bills at any time.

3. Mobile Van has been started in some tribal years to collect energy bill from consumer’s

door step.

4. The company has launched the E-payment facility so as to enable the consumers to make

payment through internet

5. Complaints Redressed Committees (CRC) formed for redressing consumer

grievance.

6. Providing Quality services to the consumers.

Page 33: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 31

2.1.11 OTHER ACTIVITIES

Other Activities carried out by DGVCL are: HVDS, Anti-theft drive, Various schemes- Primitive

tribe, Micro irrigation scheme, Petapara non-tribal scheme, Tribal area sub plan wells, special

project for agriculture, Kutir jyoti, Zupadpatti, Sagar khedu yojana.

2.1.12 MAJOR ACHIEVEMENT

DGVCL has been adjudged as the winner of the “Best Public Sector Utility for adoption of best

performance: Consumer friendly practices, Reforms & E-Governance Award- T&D” of the

Prestigious National Awards “ENERTIA AWARDS 2008”- India’s Awards for sustainable

Energy & Power for reducing distribution losses to 15.45% in the F.Y. 2007-08 and transmission

losses to 3.85% in the F.Y. 2007-08.

2.1.13 OPERATIONAL PERFORMANCE ANALYSIS

A comparative analysis of the operational performance of past years in relation to Sales, T&D

Loss, Reliability indices, DTR failure rate, etc. is discussed here. In spite of the fact that DGVCL

is inherited with an old distribution infrastructure from the erstwhile GEB, DGVCL is making all

out efforts to improve / sustain the performance as well as to supply quality power to the

consumers.

The Demand-Supply for electricity in DGVCL has increased manifold; despite significant

overall progress in the power sector, there had been a significant gap between demand and

supply.

Various practices regarding distribution loss reduction adopted by the utility has made it

possible to achieve a low distribution loss level of around 15.2% in FY 2009-10 from

distribution loss level of 19.9% in 2005-06. In FY 2009-10 the losses increased due to poor

monsoons which lead to higher supply to the agricultural category.

Page 34: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 32

Past 5 Years’ Distribution Loss

(Source: CEA report on Monthly power supply position)

Power Purchase cost: The Power Purchase cost has been showing an increasing trend in last

five years, however there was a decrease in the power purchase cost per unit in FY 09-10 due

to reduction in gas prices which were too high in FY 08- 09.

Past 5 Years’ Power purchase cost of Power Purchase Cost/ Unit

(Source: CEA report on Monthly power supply position)

Page 35: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 33

The total amount of agricultural subsidy released each year by GoG is capped at Rs 1100 Cr.

It is allocated to each Discom in proportion to its respective percentage share in agricultural

consumption to compensate for the revenue loss due to subsidized category of consumers as

well as for unmetered consumption.

The reliability of the distribution system on the basis of number and duration of sustained

interruptions in a year, using the indices such as SAIFI, SAIDI & MAIFI indicates that

system reliability has improved a lot in the past 3 years.

Reliability Indices FY 2007-08 FY 2008-09 FY 2009-10

SAIFI 20.31 7.87 7.80

SAIDI 33.07 7.19 7.12

MAIFI 17.61 18.35 17.34

(Source: CEA report on Monthly power supply position)

There is a reduction in the distribution transformer failure rate over the last 5 years and it has

reduced to 12.90% for the year 2009-10. This is mainly due to vigorous transformer

maintenance.

Past 5 years’ DTR Failure Rate

(Source: CEA report on Monthly power supply position)

Page 36: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 34

Employee expense is around 3.8% of the total revenue earned and is Rs 0.19/unit sold; which

is quiet under control & rational.

Revenue realized from sale of power is slowly coming closer to the average cost of supply.

For FY 2009-10, revenue realized from sale of power has increased to 97% of the average

cost of supply from 92% in FY 2005-06.

(Source: CEA report on Monthly power supply position)

Under Demand Side Management (DSM) measures DGVCL has taken tremendous and

remarkable steps to reduce energy consumption by increasing end use efficiency. Load

forecasting along with load management is done by the DSM cell, generation control and

load control measures are also in place.

Page 37: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 35

2.1.14 FINANCIAL PERFORMANCE ANALYSIS

After analysis of the revenue statement and the Balance Sheet of DGVCL, it can be analyzed that

the dependence on the government subsidy as well as the income from other sources has been

decreasing and revenue from tariff is increasing at a 5 year CAGR of 12%. Though there is a

major increase in Employee expenses due to sixth pay commission & also an increase in other

debits, there has been a profit due to power purchase cost under control due to steps undertaken

by GUVNL & DGVCL including measures relating to reduction in T&D losses.

The fixed Assets and CWIP has been increasing by 14% and 34% respectively due to frequent

augmentation and expansion of distribution system to cater the load growth in the area. The

CAPEX plan undertaken includes re-enforcement of the system to provide quality, security and

availability of power supply to the consumers, to undertake system development to meet the load

growth, achieving the targeted reduction in system losses, undertake automation and other

Improvement works to enhance customer service.

Also, the debt: Equity ratio of 0.51 is considered to be in favorable position due to low gearing

ratio and therefore is having a sound financial position to get additional fund to carry out their

additional CAPEX. However, the Current Asset Ratio is lower than 2:1 which is considered to be

efficient industry standard ratio as such. This is due to increase in current liabilities compare to

current assets.

Also the summary of the CAPEX planned by the Company for FY 2009-10 is as outlined below:

Sr.

No.

Schemes FY 2009-10

(Approved)

FY 2009-10

(Actual)

Deviation

A Distribution Schemes 78 114 36

B Rural Electrification

Schemes

103 63 40

C Energy Conservation 2 - 2

D Non Plan Schemes 54 3 51

E Other New Schemes 61 10 51

Capital Expenditure

Total

298 190 108

(Source: CEA report on Monthly power supply position)

Page 38: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 36

2.1.15 FINANCIAL PERFORMANCE ANALYSIS

The Indian economy has been witnessing more than 9% growth rate in last three years resulting

in major dependent on power to carry out the activities related to production and service

affecting the economy. The developing economy has resulted into increase in demand of power

whereas the capacity available within the country is not suffice enough to meet such demand

resulting into peak and energy deficit. The growth in demand of electricity and National plan to

have a per capita consumption of 1000 units, Indian government has set ambitious goals in the

11th

plan to add around 100,000 MW capacities.

However, the Western region accounts for ~32% of the total generation in the country and also

has the highest deficit in the country. The Western region is facing a shortage of nearly 18% in

FY 2009-10. The region wise demand supply scenario is shown below:

Regions Energy Requirement

(MU)

%

deficit

Peak Demand

(MW)

%

deficit

North 254231 12% 37159 15%

West 258528 14% 39609 18%

South 220576 6% 32178 10%

East 87927 4% 13220 6%

N. East 9332 11% 1760 18%

All

India

830596 10% 123916 13%

(Source: CEA report on Monthly power supply position)

In the past, there has been a consistent gap in the peak demand and peak met as well as in energy

terms in the State. Considering the performance in past few years, Gujarat Power Sector has

improved a lot with no energy deficit within the State and having a per capital consumption of

more than 1000 units which is the target of Indian Government to achieve it by 2012 for India as

a whole. The following table shows the actual power supply situation in the state for the past few

years.

Page 39: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 37

Period Peak

Demand

Peak

Met

Peak

Deficit/

Surplus

Peak

Deficit/

Surplus

Energy

Requirement

Energy

Availability

Peak

Deficit/

Surplus

Peak

Deficit/

Surplus

(MW) (MW) (MW) (%) (MU) (MU) (MU) (%)

2002-03 8641 7336 -1305 -15.1 60175 53316 -6859 -11.4

2003-04 9820 7204 -2616 -26.6 57171 50292 -6879 -12

2004-05 10162 7578 -2584 -25.4 59681 52724 -6957 -11.7

2005-06 9783 7610 -2173 -22.2 57137 52436 -4701 -8.2

2006-07 11619 8110 -3509 -30.2 62464 54083 -8381 -13.4

2007-08 12119 8885 -3234 -26.7 68747 57614 -11133 -16.2

2008-09 11841 8960 -2881 -24.3 67516 60885 -6631 -9.8

2009-10 10406 9515 -891 -8.6 70412 67263 -3149 -4.5

(Source: CEA report on Monthly power supply position)

The negligible deficit in the State will be eliminated within the immediate future by contracting

the additional capacity for the Company by GUVNL.

2.1.16 REGULATORY FRAMEWORK

2.1.16.1 National Level

The implementation of the Electricity Act, 2003 (EA 2003) has effected considerable changes

the electricity market. The major changes relevant to working of a distribution company are as

under:

DE licensing of generation;

Thrust to complete the rural electrification and provide for management of rural distribution

by Panchayats, Cooperative Societies, non-Government organizations, franchisees etc.

Provision for license free generation and distribution in the rural areas;

Introduction of open access in transmission and distribution;

Introduction of parallel license – exclusivity of distribution license removed;

SERC is a mandatory requirement ;

Provision for payment of subsidy through budget by State Government;

Issues concerning theft and losses in the system;

Page 40: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 38

The provisions of the EA2003 mentioned above, have far reaching implications for the power

sector. It is evident from the above provisions that the EA2003 intends to create a competitive

power sector in the long term and has left no choice for the state utilities but to improve their

performance to face the competition from other players entering into the market.

Also, in line with Electricity Act 2003, the National Electricity Policy outlines a plan for rural

electrification, increased generation capacity, generation mix to be adopted for clean

environment, improvement in grid for better transmission and distribution of power. India also

seeks to create a more competitive energy sector to increase private sector participation. Finally,

the Policy emphasizes the need for conservation and demand-side management including a

national awareness campaign. In line with the above policy, the distribution company has to

undertake activities to be more competitive as well as to abide by the policy guidelines. The

policy aims at improving efficiency, financial availability of the sector, availability of power and

protection of customer interest.

Also, the National Tariff Policy deals with various parameters with respect to the fixation of

tariffs, like providing adequate return on investment to the power generator and supplier and

ensuring reasonable user charges for the consumers. It provides uniform guidelines to the SERC

for the fixation of tariffs for their respective entities. The policy states that the distribution

licensee should, in future, procure power solely through competitive bidding which as per the

recent guidelines from Ministry of Power will be in effect from 5th January 2011.

At the National level, many initiatives have been considered by MoP, GoI and CERC with a

view to develop the power sector. The initiatives described in the report are as follows:

Rural Electrification Policy, 2006

R-APDRP (Restructured Accelerated Power Development & Reform Program)

Renewable Purchase obligation with Renewable Energy Certificate Mechanism

National Action Plan for Climate Change (NAPCC)

National Solar Mission

National Mission for Enhanced Energy Efficiency

Page 41: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 39

2.1.16.2 State Level

The regulatory framework in the State of Gujarat is well established. The Gujarat Electricity

Regulatory Commission (GERC) has already defined most of the regulations and is monitoring

performance with a positive approach of improving efficiency and overall development of the

sector. Multi-year tariff principles have already been implemented in the State. Benchmark-

based performance monitoring has become the practice. Current Regulations relevant to DGVCL

are as follows:

Terms and Conditions of Tariff Regulations, 2005

Standards of Performance of Distribution Licensee Regulations, 2005

Procurement of Energy from Renewable sources Regulation

Power System Management Standards, 2005 – Distribution

Intra-State ABT implementation

Provisions of Intra – State Open access regulations

Licensee’s Power to Recover Expenditure incurred in providing Supply and other

Miscellaneous Charges (First Amendment) Regulations, 2010

Different Orders on determination of tariff for renewable sources of energy

Designating State Nodal Agency for REC Regulations

2.1.17 REGULATORY FRAMEWORK

The power distribution business environment would throw up a number of market related issues

and challenges which needs to be evaluated by DGVCL. Some of these issues and challenges are

as follows:

1. Open Access Regulation – mandated to provide non-discriminatory open access which may

result in loss of subsidizing consumers;

Page 42: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 40

2. Parallel License – As per the Act, a parallel licensee is possible to be operated whereby two

licensees are supplying power in the same specified area. Currently, due to recent

clarification from MoP and Ministry of Commerce, SEZ became the Distribution Licensee

for the SEZ area whereby Discom is supplying power. Also, other companies may get an

approval of being a distribution licensee to supply power in the specified area of DGVCL

which is more prevalent in urban areas due to low losses and are marked by the non-

existence of agriculture consumers.

3. ABT implementation – UI at intra-state level due to deviation in schedule and actual will

make each DISCOM accountable. A proper planning and scheduling of power along with

implementation of SCADA is required to have efficient distribution system;

4. Regulatory provisions – Being into a regulated environment, have to follow the regulatory

framework and directions by the appropriate commission.

5. Industry Risk and Competition – A competition from the other private sector player due to

opening of power sector will result into a risk of losing of subsiding consumers.

6. Renewable Power Purchase Obligation – SERC mandates the distribution licensee to

purchase of electricity from renewable sources, a percentage of the total consumption of

electricity in the area of a distribution licensee. This step is considered to promote the

generation from such renewable sources and can have a minimum impact on the

environment.

7. Impact of DSM measures - Demand Side Management (DSM) is described as the planning,

implementation and monitoring of utilities activities designed to encourage customers to

amend their electricity consumption patterns, both with respect to timing and level of

electricity demand so as to help the customers to use electricity more efficiently. Every

Distribution Licensee has to implement the DSM measures as an integral part of their day-to-

day operations. Many SERCs and Discoms have already introduced some DSM programs.

Experience suggests that the skills of discom staff, and the priority accorded to it by discom

management, are important for its success. DSM incentives need to be carefully designed and

targeted so that the appropriate load curve changes are realized.

Page 43: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 41

8. Universal Service Obligation – DGVCL is obliged to supply power to each consumer under

USO. New connections to remote areas are expensive and maintaining reliable supply levels

are difficult. These features tend to increase technical losses and the costs of O&M.

9. Power Purchase Responsibility – To meet RPO and get a low cost power, DGVCL may go

for direct procurement of power from the generator.

10. Market Penetration and Service Area - The widespread distribution network and the retail

reach of such infrastructure would be key discriminators of a licensee’s market position.

11. Cost to Serve against realization – The tariff of the consumers’ needs to progressively move

towards the cost of supply of electricity and reduces the cross subsidies within the category

of consumers. This has to be achieved by all the Distribution Utilities in India which is

considered to be a major challenge for SERC and Utilities.

12. Rationalization of Tariffs to retain HT and Large consumers – Currently, the Tariff is

calculated based on cost of the supply at consumer end, the capacity of the consumer to pay

and the socio economic policy of the government. The rationalization of tariffs is required

simplify the structure and introducing cost reflective tariff by way of retaining the high end

customers.

Understanding these core issues & risks of the power sector help in identifying the opportunities

that lie ahead

Page 44: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 42

2.1.18 SWOT ANALYSIS

Before outlining the Business Plan for any company, it is very important for the organization to

introspect to identify its strength and weaknesses and assess the external environment to outline

opportunities and threats. Accordingly, it is very important to evaluate the environment – both

internal and external while charting out its growth path and the same has been outlined below.

Page 45: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 43

2.1.19 RISK ANALYSIS

It is necessary to understand that how the risks are perceived by the business. Virtually all

organizations strive to survive. They strive to create value for their stakeholders including State

Government, SERC, Consumers, Financial institutions, etc. The risk can be identified as a

financial risk, regulatory risk, operating risk, technology risk, etc.

Improve Efficiency: In order to be competitive on the distribution segment, DGVCL has to

improve operational efficiency. The efficiency can be achieved through reduction of losses,

quality power supply and up gradation of network.

Improvement in Consumer Services: Due to inclusion of Open Access and Parallel License

under the amended Electricity Act 2003, a consumer of DGVCL will always have a choice to

avail supply of electricity from any other Distribution licenses other than DGVCL in case of

proper service, continuous power supply or cheap power. Therefore, a constant improvement

in Consumer service will be required to avoid chances of losing the consumers.

Project Management and Execution: A key element of the implementation of infrastructure

plan is to execute project on a timely manner and is managed in a judicious way. To meet the

investment objectives & improving the existing infrastructure of Distribution System,

DGVCL needs to review the timely implementation and completion of Infrastructure plan.

Recovery of Arrears: Even though DGVCL has a collection efficiency of 100%, still there

are some arrears which need to be targeted and collected.

Regulatory awareness: Regulatory risks will have to proactively deal with to minimize the

impact on Company as well as Consumer Interest and therefore a capacity building is

required to provide training to the employees for creating awareness related to regulatory

provisions.

Anti-theft measures: for reducing commercial losses it is quite necessary to go for anti-theft

measures.

Page 46: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 44

2.1.20 FUTURE BUSINESS OPPORTUNITIES

While the SWOT analysis has revealed a number of opportunities, DGVCL may be targeting

some of the opportunities in the near future. The key opportunities which could be targeted are:

1. Joint Ventures / Public Private Partnership

2. Non-Conventional Energy

3. Providing Ancillary Services to other power sector players

4. Distribution Franchisee route

5. Technical Consultancy

To avail opportunities for the future, DGVCL has to rapidly ramp up its existing technical staff

to meet the objectives and gain advantage from the business opportunities. The Discom is

making arrangements for Training of the existing staff to undertake future responsibilities as

well. Organization Development & Institutional Strengthening hence has to be the key focus

areas. Apart from Human Resources Development, DGVCL has to focus on the Environment

related aspects to adhere to pollution control norms. However, the key aspect would be being

operationally efficient to be able to match the efficiencies of private sector players. Commercial

efficiency would be the focus.

Thus, the short term outlook for DGVCL would be primarily to focus on improvement of its

operational performance and have an efficient consumer. With the additional generation capacity

being planned in the system, DGVCL can look at fulfilling the ever growing demand for the

State. Also, while DGVCL has started looking at diversification by considering renewable

energy, ancillary services, etc., this could be looked at contributing in a significant manner in the

future business of the Discom.

DGVCL has prepared the Business / Operational Plan taking cognizance of the existing internal

factors and external business environment affecting the business. It is submitted that the Business

plan being a dynamic document may need to be updated at periodic intervals taking into account

the changes in the internal and external environment and these changes would be intimated to the

Hon’ble Commission from time to time.

Page 47: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 45

2.1.21 OPERATIONAL PLAN

The operational plan includes the estimate of each cost of DGVCL for the second control period

(from FY 2011-12 to FY 2015-16) and is in line with the MYT petition. The costs are estimated

based on certain assumptions, past trend and extrapolated for future period.

2.1.21.1 Sales Projections: It has been observed from past experience that the

historical trend method has proved to be a reasonably accurate and well accepted method for

estimating the load, number of consumers and energy consumption. In light of the above,

DGVCL has estimated the above for various customer categories primarily based on the CAGR

trends during past years. Following table shows the 5 year as well as 3 year CAGR for the

category wise sales:

CAGR of Sales

Sales (MU) 5 years CAGR

FY 10 over 06

3 years CAGR

FY 10 over 08

FY 10 over

FY 09

Low Tension Consumers

Residential 9.83% 7.66% 6.7%

Commercial 11.69% 10.96% 13.8%

Industrial LT 6.72% 5.27% 12.4%

Public Water Works 9.29% 7.46% 9.0%

Agriculture 2.22% 3.70% 6.9%

Street Light 6.87% 5.41% 3.4%

LT Total 7.49% 6.34% 10.2%

High Tension Consumers

Industrial HT 4.26% 5.57% 4.8%

Railway Traction 4.97% 3.89% 4.6%

HT Total 4.31% 5.44% 4.7%

TOTAL 6.12% 5.96% 7.9%

(Source: CEA report on Monthly power supply position)

Page 48: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 46

Considering the above growth rates annually the category wise sales have been projected as

shown on the following table:

Sales Projection FY 2011-12 to 2015-16

Sales (MU) Projection

FY 11-

12

FY 12-

13

FY 13-

14

FY 14-

15

FY 15-

16

Low Tension

Consumers

Residential 1881 2088 2317 2572 2855

Commercial 683 758 841 934 1036

Industrial LT 2880 3024 3175 3334 3500

Public Water Works 115 126 137 149 136

Agriculture 774 834 893 903 903

Street Light 34 36 38 4 43

LT Total 6367 6864 7401 7932 8501

High Tension

Consumers

Industrial HT 3789 3979 4178 4387 4606

Railway Traction 294 306 318 331 344

HT Total 4083 4285 4496 4718 4950

TOTAL 10450 11149 11897 12650 13451

(Source: CEA report on Monthly power supply position)

2.1.21.2 Distribution Losses:

The company has achieved a significant reduction in distribution losses, during recent years.

However, loss reduction is a slow process and becomes increasingly difficult as the loss levels

come down. Projection of distribution losses for second control period FY 2011-12 to 2015-16

are as shown below:

Distribution Loss Level FY 2011-12 to 2015-16

Particular FY 11-12 FY 12-13 FY 13-14 FY 14-15 FY 15-16

Distribution Loss 13.20% 12.95% 12.70% 12.45% 12.20%

Page 49: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 47

2.1.21.3 Distribution Losses:

The energy requirement for DGVCL will be met by supply from GUVNL. Based on the sales

and distribution provided above, Energy Balance of DGVCL for the second control period

FY12-FY16 is as shown below:

Energy Balance FY 2011-12 to 2015-16

S.

No

Particular Unit FY 11-

12

FY 12-

13

FY 13-

14

FY 14-

15

FY 15-

16

1 Energy Sales MUs 10450 11149 11897 12650 13451

2 Distribution Losses MUs 1589 1659 1731 1799 1869

% 13.20% 12.95% 12.70% 12.45% 12.20%

3 Energy Requirement MUs 12039 12808 13628 1449 15320

4 Transmission Losses MUs 561 589 620 649 688

% 4.45% 4.40% 4.35% 4.30% 4.30%

5 Total Energy to be input

to Transmission System

MUs 12600 13397 14248 15098 16008

6 Pooled Losses in PGCIL

System

MUs 149 275 281 325 372

7 Total Energy

Requirement

MUs 12747 13672 14529 15423 16380

(Source: CEA report on Monthly power supply position)

Page 50: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 48

2.1.21.4 Total Power Purchase Cost

A bulk supply tariff has been envisaged for the state. The total power purchase cost for GUVNL

for the second control period FY 2011-12 to 2015- 16 comes to the power purchase cost through

merit order, transmission charges, GUVNL charges and SLDC Fees & charges, as shown below:

Power Purchase Cost FY 2011-12 to 2015-16

S. No Discom

Fixed

Cost

Discom

Variable

Cost

Total

Power

Purchase

Cost

Trading

Fixed

Cost

Trading

Variable

Cost

Profit

&

trading

Margin

Total

Trading

Revenue

Net

Cost

FY 11-

12

8125 11348 19473 798 1115 600 2513 18075

FY 12-

13

11126 11793 22919 1203 1275 700 3177 21016

FY 13-

14

12473 13233 25705 1451 1540 800 3791 23454

FY 14-

15

13902 13850 27752 1713 1706 900 4319 25139

FY 15-

16

18356 13702 21059 2358 1760 100 5119 28700

(Source: CEA report on Monthly power supply position)

Page 51: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 49

2.2 2.2 TORRENT POWER LTD.

2.2.1 INTRDUCTION

Torrent Power Ltd is one of the leading brands in the Indian power sector. The company is

engaged in generation, transmission and distribution of power. The company has a generation

capacity of 1647.5 MW and distributes power to more than 3 million customers annually in

Ahmedabad, Gandhinagar, Surat, Bhiwandi and Agra. The company's subsidiaries include

Torrent Power Grid Ltd, Torrent Energy Ltd, Torrent Pipavav Generation Ltd and Torrent Power

Bhiwandi Ltd. Torrent Power Ltd was incorporated on April 29, 2004 as a private limited

company with the name Torrent Power Trading Pvt. Ltd. In January 25, 2006, the name of the

company was changed to Torrent Power Private Ltd. In February 8, 2006, the company was

converted into public limited company and the name was changed to Torrent Power Ltd. In the

year 2006, as per the scheme of amalgamation, Torrent Power AEC Ltd, Torrent Power SEC Ltd

and Torrent Power Generation Ltd were amalgamated with the company with effect from April

1, 2005. In July 28, 2006, the company divested their stake partially in AEC Cements &

Constructions Ltd, a non-material and non-listed subsidiary and hence AEC Cements &

Constructions Ltd ceased to be a subsidiary company. In October 19, 2006, Torrent Power Grid

Ltd (erstwhile Torrent Power Transmission PVT Ltd), a joint venture company with Power Grid

Corporation of India Ltd became a subsidiary of the company. In December 20, 2006, the

company signed a distribution franchise agreement with Maharashtra State Electricity

Distribution Company Ltd for the Bhiwandi circle in Maharashtra for a period of ten years. In

January 26, 2007, the company commenced Distribution Franchise for Bhiwandi circle of

Maharashtra State Electricity Distribution Company Ltd catering to 1.4 lakh customers with an

unrestricted demand of about 700 MW. In May 2007, the company signed a memorandum of

understanding (MoU) with Gujarat Power Corporation for setting up over 1000-MW coal based

power project at Pipavav, Amreli Dist. in Gujarat. During the year 2007-08, the company added

321 Distribution Transformers of 11 kV at Ahmedabad, Gandhinagar and Surat. They also

commissioned the first phase of 220 kV Transmission Lines project at Surat. In September 25,

2007, the company formed a subsidiary company, namely Torrent Pipavav Generation Ltd for

the development of coal based thermal project. During the year 2008-09, the company added 352

Page 52: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 50

Distribution Transformers of 11 km at Ahmedabad, Gandhinagar and Surat. The company's

subsidiary, Torrent Power Grid Ltd, a joint venture with PGCIL, commissioned the first phase of

evacuation arrangement by construction of 26 km Jhanor-Vapi LILO line. The company also

installed and commissioned transmission lines to connect SUGEN plant with 220 km Kim sub-

station of GETCO. During the year, the company was awarded the Distribution Franchise to

Agra and Kanpur Distribution Circles for a period of 20 years. In September 2008, the company

formed Torrent Power Bhiwandi Ltd (formerly known as Torrent Power Distribution Services

Ltd) as a subsidiary company for providing infrastructural and manpower support for Bhiwandi

operations of the company. In October 2008, the company entered into a Power Purchase

Agreement with Gujarat Paguthan Energy Corporation PVT Ltd for supply of 49.6 MW wind

power. Simultaneously, the company is also evaluating the establishment of their own wind and

solar power generation. In March 2009, Torrent Energy Ltd became a subsidiary of the company,

which is formed for setting up a 1500 MW gas based combined cycle power plant in Dahej SEZ.

The company signed Fuel Supply Agreement (FSA) with South Eastern Coalfields Ltd; a

subsidiary of Coal India Ltd, for meeting requirements of their coal based generating station at

Sabarmati. The FSA is effective for a period of 5 years from April 1, 2009. In May 2009, the

Uttar Pradesh Power Corporation Ltd (UPPCL) has entered into an agreement with the company

for power distribution in Kanpur and Agra. During the year 2009-10, the company signed the

shareholders' agreement with Gujarat Power Corporation Ltd for implementation of the 1000+

MW Coal-Based Power Project at Pipavav, Dist. Amreli, and Gujarat. Torrent Power Grid Ltd, a

subsidiary company commissioned the second phase of power transmission line (80 km. double

circuit 400 kV transmission lines) i.e. Gandhar-Dehgam Loop in Loop out (LILO) at SUGEN to

facilitate power supply from SUGEN to Ahmedabad. In August 15, 2009, the company fully

commissioned their ambitious SUGEN Mega Power Project. In September 30, 2009, the

company commissioned 1147.5 MW SUGEN Mega Power Project and was dedicated to the

nation. The company was awarded the distribution franchise for Agra and Kanpur distribution

circles for a period of 20 years. They commenced distribution operations at Agra from April 1,

2010.Torrent Energy Limited (TEL) became the Distribution Licensee for Dahej SEZ and in

April 4, 2010, they commenced the distribution of power. The company is in the process of

setting up a 400 KV transmission system for evacuating power generated at their SUGEN plant

Page 53: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 51

to the various off take centers. The project being implemented in a phased manner is nearing

completion and is expected to be fully functional during the financial year 2010-11. The

company is currently implementing a 1200 MW gas based power project at Dahej in South

Gujarat. The project, called the DGEN Power Project, is being implemented in a phased manner

starting with a 400 MW first phase. They are also considering addition of one more unit of 382.5

MW at SUGEN. The EPC contract is on the verge of being finalized.

2.2.2 HISTORY

Torrent Power Limited was originally incorporated on April 29, 2004 under the Companies Act,

1956 as “Torrent Power Trading Private Limited”. The name of the Company was, thereafter,

changed to Torrent Power Private Limited on January 25, 2006. The Company was converted

into Public Limited Company on February 08, 2006 and the name of the Company was thus

changed to its present name Torrent Power Limited.

Pursuant to the Composite Scheme of Arrangement including Amalgamation sanctioned by the

order of the Hon’ble High Court of Gujarat at Ahmedabad dated July 12, 2006, the undertakings

of Torrent Power AEC Limited, Torrent Power SEC Limited and Torrent Power Generation

Limited as a going concern are transferred to and vested in TPL on and from the Appointed Date,

i.e., April 1, 2005. Thus, TPL shall undertake the consolidated operations of the transferor

companies of the Torrent Group in the power sector.

The main object for which the Company has been established is set out in its Memorandum of

Association as hereunder:

“To generate, transmit, distribute, purchase, procure, sell, trade, import, export or accumulate or

otherwise deal in all forms of electrical power in all aspects, to own, promote, set up, establish,

develop, maintain, run, operate, manage and acquire generating company, generating station or

stations of every kind and description, and to own, promote, set up, establish, develop, maintain,

run, operate and manage transmission and distribution networks or systems and to acquire, in any

manner, these networks or systems and to act as agent or representative of any person engaged in

the planning, development, generation, transmission, distribution, supply, trading or financing of

Page 54: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 52

power and to investigate, research, design and prepare feasibility, appraisal or project reports and

to build and execute projects for generation, transmission, distribution, supply, purchase, sale,

trading, import, export, storage and accumulation of all forms of electrical power and to engage

in all activities incidental thereto.”

2.2.3 OPERATION

2.2.3.1 Generation

Torrent Power has an aggregate generating capacity of 1647.5MW comprising:

1147.5 MW SUGEN gas based megs combined cycle power plant near Surat

400 MW coal based thermal power station at Sabarmati, Ahmedabad

100 MW gas based combined cycle power plant at Vatva, Ahmedabad

It is in the process of adding a standalone unit of 382.5 MW named UNOSUGEN at the

existing SUGEN site and setting up a 1200 Mw Greenfield DGEN Mega power project based

on gas at Dahej SEZ, near Bharuch.

2.2.3.2 Transmission

Torrent Power is in the process of setting up a 400 KV transmission system for evacuating power

generated at its SUGEN plant to the various off take centers. The project being implemented in a

phased manner is nearing completion and is expected to be fully functional during FY 2010-11.

Page 55: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 53

2.2.3.3 Distribution

Torrent Power transmits and distributes more than 12 billion units of power to around 2.2 million

customers in the cities of Ahmedabad, Gandhinagar, Surat and Bhiwandi spanning an area of 408

Sq. Km. and franchise area of 721 sq. km. These cities are major industrial and commercial hubs.

The T&D losses in Gujarat at 7.6% are amongst the lowest in the country. A testimony of

Torrent Power’s operational efficiency is the drastic reduction in T&D losses in Bhiwandi from

48% in January 2007 to the present 19.33%.

2.2.4 SUBSIDIARY COMPANIES

2.2.4.1 Torrent Private Limited

Torrent Private Limited is the apex company of the Rs. 82 billion Torrent Group. Synergizing

the group activities, it spearheads the group’s investments in different investee companies, which

are managed by their respective Board of Directors and professional CEOs.

Besides monitoring and managing the group’s investments, Torrent Private Limited is also

involved in promoting the corporate image of Torrent and provides specialized services to the

group.

The company acts as a catalyst and developer of new ventures by providing strategic, financial,

corporate and managerial inputs to enhance the group’s predominant position in healthcare and

power. The latest initiative in this direction is the 1147.5 MW mega power plants near Surat.

2.2.4.2 Torrent Pharmaceuticals Limited

Torrent Pharmaceuticals Limited, the flagship company of the Torrent Group, was conceived to

rapidly make and market new formulations in niche therapeutic areas at affordable prices.

Torrent Pharmaceuticals Limited is a dominant player in the therapeutic areas of cardiovascular

(CVS) and central nervous system (CNS) and has achieved significant presence in Gastro-

Intestinal, Dialectology, Anti-infective and Pain management segments.

Page 56: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 54

In terms of prescription share, Torrent Pharmaceuticals Ltd. is the sixth largest company in the

Indian pharmaceuticals arena and growing 3 times faster than the prescription share market.

With 1000 product registrations and exports to more than 50 countries, Torrent is already in the

big league of global branded generic products business.

2.2.4.3 Torrent Cables Limited (TCL)

The ISO 9002 accredited Torrent Cables Limited (TCL) is on a winning streak. Against the sales

of Rs. 71.98 crore in 2002-03, TCL clocked sales figures of Rs. 116.91 crore in 2003-04. Net

profit also jumped from Rs. 7.48 crore in 2002-03 to Rs. 11.78 crore in 2003-04. The company

which was referred to the Board for Industrial & Financial Reconstruction (BIFR) and declared a

sick unit in 1999 has improved its performance continuously and got out of the purview of BIFR

in March 2004. In fact, TCL today is among the very few profit making power cable companies

in India and an established market leader in HT Power Cable segment.

TCL’s revival and turning around can be attributed to the QII (Quantum Initiative Improvement)

drive and the reengineering initiatives. And above all, to the team work of its people who have

displayed unmatched levels of perseverance and commitment.

2.2.5 FUTURE PROSPECT

The Electricity Act 03 has ushered in a new era of long overdue reforms in the Indian power

sector. The enactment of this Act can be said to be a step towards initiation of various measures

to change India’s status of suffering from a chronic power deficit to a power surplus state. The

Act seeks to bring about a qualitative transformation of the electricity sector through a new

paradigm; it seeks to create a liberal framework of development of the power sector by

distancing government from regulation. The Electricity Act 2003 will lead the power sector from

a single buyer model to multiple buyers, multi seller market structure. The Act will bring about

deregulation in a phased manner in generation, transmission and distribution in the country

The provisions of the Act present new opportunities for growth for the group such as

Page 57: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 55

Possibility of taking up new distribution areas

Undertaking franchisee from existing SEB’s/ New Discom’s

The group may also venture as second licensee in urban areas

Explore alternative source of procuring reliable and cheap power from other generating

companies

2.2.6 MILESTONES

1) 1989-90

Mahendra Electricals taken over and renamed as ‘Torrent Cables Ltd.' - Torrent’s initial

foray into power

2) 1996-97

Foundation stone for GTEC laid and Zero date announced

Torrent acquires management control of Surat Electricity Company

3) 1998-99

Torrent acquires management control of The Ahmedabad Electricity Company

Combined Cycle operations of GTEC commissioned in mid-December 1998

4) 1999-00

Sale of equity stake in GTEC to Powergen India Pvt. Ltd. (India’s largest M & A

transaction of the 20th century)

The Ahmedabad Electricity Company’s customer base crosses 1 million mark

5) 2001-02

The Ahmedabad Electricity Company's turnover crosses the Rs. 10 billion mark

Page 58: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 56

6) 2002-03

Work on 1147.5 MW combined cycle mega power project near Surat commenced

7) 2004-05

Torrent brings together three of its group companies Torrent Power AEC Limited,

Torrent Power SEC Limited and Torrent Power Generation Limited under a single,

unified brand – Torrent Power

Torrent Power Generation Limited achieves financial closure

8) 2005-06

Torrent Power Generation Ltd. awards EPC contract for its upcoming SUGEN 1147.5

MW CCPP to a consortium of Siemens AG and Siemens Ltd. India; commences

construction of its first power block

Torrent Power Generation Ltd. and Siemens creates a 50:50 JV to provide O&M services

to its SUGEN 1147.5 MW CCPP

9) 2006-07

Torrent Power bags MoP’s Gold Shield award for two years for outstanding performance

in power distribution

Torrent Power commences distribution operations in Bhiwandi, Maharashtra

10) 2007-08

Torrent Power Grid Ltd. obtains license from CERC to setup the 400kV transmission line

Torrent Power signs MOU with GPCL for setting up the 1000+ MW coal based power

project at Pipavav in Gujarat

11) 2008-09

Page 59: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 57

Phase I of Torrent Power Grid Ltd.’s transmission system commissioned i.e. LILO of

Vapi-Jhanor

12) 2009-10

All three units of SUGEN Power Plant commissioned; commences commercial

production

Phase II of Torrent Power Grid Ltd.’s transmission system commissioned i.e. LILO of

Dehgam-Jhanor

Torrent Power signs distribution franchise agreement with UPPCL for Agra and Kanpur

Torrent Power signs SHA with GPCL for setting up 1000+ MW coal based plant at

Pipavav, district Amreli, Gujarat

13) 2010-11

Phase III of Torrent Power Grid Ltd.’s transmission system commissioned i.e. 141 km

line connecting phase II with the Pirana substation of PGCIL

Torrent Power commences distribution operations in Agra, Uttar Pradesh effective from

1st April, 2010

Torrent Power and its subsidiary, Torrent Energy Ltd., awards EPC contract to Siemens

for implementing UNOSUGEN (stand-alone 382.5 MW generation plant at its existing

SUGEN plant location) and DGEN (1200 MW generation plant at Dahej SEZ) projects

Torrent Energy Ltd., subsidiary of Torrent Power Ltd., commenced distribution

operations in Dahej SEZ effective from 4th April, 2010.

Page 60: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 58

2.2.6 SWOT ANALYSIS

2.2.6.1 Strengths

The integrated player in India across the entire value chain –generation, transmission and

distribution

The only successful player in the private distribution franchisee business

The only power utility company with positive FCFF in FY10

Zero reliance on Chinese equipment

Stellar operational efficiency (FY10 average PLF was 90%+ and T&D losses were sub-10%

compared to the national average of 78% and 25%+ respectively)

One of the strongest balance sheets in the sector with FY10net debt: equity of 0.6 as compared

with ~1.5x for peers

Strong Board of Directors with a high profile of independent directors such as Keki Mistry and

Kiran Karnik

2.2.6.2 Weakness

Lack of disclosure in the annual report on key items. For example, there is no break up of

revenues between generation, transmission and distribution

The Kanpur franchisee has still not started functioning as the local state electricity board is

creating issues in the light of

Torrent having won the distribution contract Fuel ties up and financial closure for the near-term

pipeline (1.5GW or ~96% of current installed capacity) is yet to take place

Page 61: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 59

2.2.6.3 Opportunities

There is a huge opportunity for private sector power utilities in India (particularly for those

utilities that have Torrent’s battle hardened execution capabilities)

Private distribution franchisees is a big (and relatively untapped) opportunity in India given the

poor financial position of the state electricity boards

Given Torrent’s presence in the T&D segment, the growing scope for private sector participation

in this space offers a huge opportunity particularly as the Government’s focus switches from

power generation to power T&D

2.2.6.4 Threats

The 5x increase in private sector generation capacity by FY13 could result in merchant power

rates getting compressed.

Difficult to replicate the success of Bhiwandi in other private distribution franchisees as

opposition from the local SEBs (who do not want to see private sector distributors in their area)

is very strong

Given that the KG Basin gas does not seem to be ramping up and infrastructure bottlenecks in

the transportation of imported LNG (and the resultant crunch in the supply of gas) can be a

negative for Torrent as 75% of its incremental capacity is gas based, which does not have fuel

tie-up.

Any delays in the construction of the Dahej SEZ will also delay the upcoming 1.2GW project in

Dahej (will account for 37% of Torrent’s total capacity)

Page 62: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

CHAPTER – 3

CONCEPTUAL

FRAMWORK

Page 63: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 60

CHAPTER 3

CONCEPTUAL FRAMWORK

3.1 WHAT IS COMPARATIVE RESEARCH?

3.1.1 DEFINITION

Comparative research is a research methodology in the social sciences that aims to make

comparisons across different countries or cultures. A major problem in comparative research is

that the data sets in different countries may not use the same categories, or define categories

differently (for example by using different definitions of poverty).

3.1.2 DEVELOPMENT OF THE TRADITION

When the practice of comparative research began is a matter of debate. Karl Deutsch has

suggested we have been using this form of investigation for over 2,000 years. Comparing things

is essential to basic scientific and philosophic inquiry, which has been done for a long time. Most

authors are more conservative in their estimate of how long comparative research has been with

us. It is largely an empty debate over the definition of the tradition with those questioning

whether comparing things counts as comparative research.

Textbooks on this form of study were beginning to appear by the 1880s, but its rise to extreme

popularity began after World War II. There are numerous reasons that comparative research has

come to take a place of honors in the toolbox of the social scientist. Globalization has been a

major factor, increasing the desire and possibility for educational exchanges and intellectual

curiosity about other cultures. Information technology has enabled greater production of

quantitative data for comparison, and international communications technology has facilitated

this information to be easily spread.

Page 64: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 61

3.1.3 COMPARATIVE RESEARCH DEFINEDOBJECTIVE

Comparative research, simply put, is the act of comparing two or more things with a view to

discovering something about one or all of the things being compared. This technique often

utilizes multiple disciplines in one study. When it comes to method, the majority agreement is

that there is no methodology peculiar to comparative research. The multidisciplinary approach is

good for the flexibility it offers, yet comparative programs do have a case to answer against the

call that their research lacks a "seamless whole".

There are certainly methods far more common than others in comparative studies, however.

Quantitative analysis is much more frequently pursued than qualitative, and this is seen in the

majority of comparative studies which use quantitative data. The general method of comparing

things is the same for comparative research as it is in our everyday practice of comparison. Like

cases are treated alike, and different cases are treated differently; the extent of difference

determines how differently cases are to be treated. If one is able to sufficiently distinguish two

cases, comparative research conclusions will not be very helpful.

Secondary analysis of quantitative data is relatively widespread in comparative research,

undoubtedly in part because of the cost of obtaining primary data for such large things as a

country's policy environment. This study is generally aggregate data analysis. Comparing large

quantities of data (especially government sourced) is prevalent. A typical method of comparing

welfare states is to take balance of their levels of spending on social welfare.

In line with how a lot of theorizing has gone in the last century, comparative research does not

tend to investigate 'grand theories', such as Marxism. It instead occupies itself with middle-range

theories that do not purport to describe our social system in its entirety, but a subset of it. A good

example of this is the common research program that looks for differences between two or more

social systems, then looks at these differences in relation to some other variable coexisting in

those societies to see if it is related. The classic case of this is Esping-Andersen's research on

social welfare systems. He noticed there was a difference in types of social welfare systems, and

compared them based on their level of de commodification of social welfare goods. He found

that he was able to class welfare states into three types, based on their level of de

commodification. He further theorized from this that de commodification was based on a

Page 65: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 62

combination of class coalitions and mobilization, and regime legacy. Here, Esping-Andersen is

using comparative research: he takes many western countries and compares their level of de

commodification, then develops a theory of the divergence based on his findings.

Comparative research can take many forms. Two key factors are space and time. Spatially, cross-

national comparisons are by far the most common, although comparisons within countries,

contrasting different areas, cultures or governments also subsist and are very constructive,

especially in a country like New Zealand, where policy often changes depending on which race it

pertains to. Recurrent interregional studies include comparing similar or different countries or

sets of countries, comparing one's own country to others or to the whole world.

The historical comparative research involves comparing different time-frames. The two main

choices within this model are comparing two stages in time (either snapshots or time-series), or

just comparing the same thing over time, to see if a policy's effects differ over a stretch of time.[7]

When it comes to subject matter of comparative inquiries, many contend there is none unique to

it. This may indeed be true, but a brief perusal of comparative endeavors reveals there are some

topics more recurrent than others. Determining whether socioeconomic or political factors are

more important in explaining government action is a familiar theme. In general, however, the

only thing that is certain in comparative research issues is the existence of differences to be

analyzed.

Page 66: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 63

3.2 WHAT IS CUSTOMERS SATISFACTION LEVEL?

3.2.1 WHAT IS CUSTOMER?

DEFINITION

“A person, company, or other entity which buys goods and services produced by another person,

company, or other entity.”

In general terms, a customer is a person or organization that a marketer believes will benefit

from the goods and services offered by the marketer’s organization. As this definition suggests, a

customer is not necessarily someone who is currently purchasing from the marketer. In fact,

customers may fall into one of three customer groups:

1) Existing Customers – Consists of customers who have purchased or otherwise used an

organization’s goods or services, typically within a designated period of time. For some

organizations the time frame may be short, for instance, a coffee shop may only consider

someone to be an Existing Customer if they have purchased within the last three months.

Other organizations may view someone as an Existing Customer even though they have not

purchased in the last few years (e.g., television manufacturer). Existing Customers are by far

the most important of the three customer groups since they have a current relationship with a

company and, consequently, they give a company a reason to remain in contact with them.

Additionally, Existing Customers also represent the best market for future sales, especially if

they are satisfied with the relationship they presently have with the marketer. Getting these

Existing Customers to purchase more is significantly less expensive and time consuming than

finding new customers mainly because they know and hopefully trust the marketer and, if

managed correctly, are easy to reach with promotional appeals (i.e., emailing a special

discount for new product).

2) Former Customers – This group consists of those who have formerly had relations with

the marketing organization typically through a previous purchase. However, the marketer no

longer feels the customer is an Existing Customer either because they have not purchased

from the marketer within a certain time frame or through other indications (e.g., a Former

Customer just purchased a similar product from the marketer’s competitor). The value of this

Page 67: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 64

group to a marketer will depend on whether the customer’s previous relationship was

considered satisfactory to the customer or the marketer. For instance, a Former Customer

who felt they were not treated well by the marketer will be more difficult to persuade to buy

again compared to a Former Customer who liked the marketer but decided to buy from

someone else who had a similar product that was priced lower.

3) Potential Customers – The third category of customers includes those who have yet to

purchase but possess what the marketer believes are the requirements to eventually become

Existing Customers. As we will see in the Targeting Markets Tutorial, the requirements to

become a customer include such issues as having a need for a product, possessing the

financial means to buy, and having the authority to make a buying decision. Locating

Potential Customers is an ongoing process for two reasons. First, Existing Customers may

become Former Customers (e.g., decide to buy from a competitor) and, thus, must be

replaced by new customers. Second, while we noted above that Existing Customers are the

best source for future sales, it is new customers that are needed in order for a business to

significantly expand. For example, a company that sells only in its own country may see less

room for sales growth if a high percentage of people in the country are already Existing

Customers. In order to realize stronger growth the company may seek to sell their products in

other countries where Potential Customers may be quite high.

3.2.1 CUSTOMER SATISFACTION LEVEL

Customer satisfaction, a term frequently used in marketing, is a measure of how products and

services supplied by a company meet or surpass customer expectation. Customer satisfaction is

defined as "the number of customers, or percentage of total customers, whose reported

experience with a firm, its products, or its services (ratings) exceeds specified satisfaction goals."

In a survey of nearly 200 senior marketing managers, 71 percent responded that they found a

customer satisfaction metric very useful in managing and monitoring their businesses.

It is seen as a key performance indicator within business and is often part of a Balanced

Scorecard. In a competitive marketplace where businesses compete for customers, customer

Page 68: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 65

satisfaction is seen as a key differentiator and increasingly has become a key element of business

strategy.

"Within organizations, customer satisfaction ratings can have powerful effects. They focus

employees on the importance of fulfilling customers’ expectations. Furthermore, when these

ratings dip, they warn of problems that can affect sales and profitability. . . . These metrics

quantify an important dynamic. When a brand has loyal customers, it gains positive word-of-

mouth marketing, which is both free and highly effective."

Therefore, it is essential for businesses to effectively manage customer satisfaction. To be able

do this, firms need reliable and representative measures of satisfaction.

"In researching satisfaction, firms generally ask customers whether their product or service has

met or exceeded expectations. Thus, expectations are a key factor behind satisfaction. When

customers have high expectations and the reality falls short, they will be disappointed and will

likely rate their experience as less than satisfying. For this reason, a luxury resort, for example,

might receive a lower satisfaction rating than a budget motel—even though its facilities and

service would be deemed superior in 'absolute' terms."

The importance of customer satisfaction diminishes when a firm has increased bargaining power.

For example, cell phone plan providers, such as AT&T and Verizon, participate in an industry

that is an oligopoly, where only a few suppliers of a certain product or service exist. As such,

many cell phone plan contracts have a lot of fine print with provisions that they would never get

away if there were, say, a hundred cell phone plan providers, because customer satisfaction

would be way too low, and customers would easily have the option of leaving for a better

contract offer.

There is a substantial body of empirical literature that establishes the benefits of customer

satisfaction for firms.

Page 69: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 66

3.2.1.1 PURPOSE

Customer satisfaction provides a leading indicator of consumer purchase intentions and loyalty."

"Customer satisfaction data are among the most frequently collected indicators of market

perceptions. Their principal use is twofold:"

"Within organizations, the collection, analysis and dissemination of these data send a message

about the importance of tending to customers and ensuring that they have a positive experience

with the company’s goods and services."

"Although sales or market share can indicate how well a firm is performing currently,

satisfaction is perhaps the best indicator of how likely it is that the firm’s customers will make

further purchases in the future. Much research has focused on the relationship between customer

satisfaction and retention. Studies indicate that the ramifications of satisfaction are most strongly

realized at the extremes." On a five-point scale, "individuals who rate their satisfaction level as

'5' are likely to become return customers and might even evangelize for the firm. (A second

important metric related to satisfaction is willingness to recommend. This metric is defined as

"The percentage of surveyed customers who indicate that they would recommend a brand to

friends." When a customer is satisfied with a product, he or she might recommend it to friends,

relatives and colleagues. This can be a powerful marketing advantage.) "Individuals who rate

their satisfaction level as '1,' by contrast, are unlikely to return. Further, they can hurt the firm by

making negative comments about it to prospective customers. Willingness to recommend is a

key metric relating to customer satisfaction."

3.2.1.2 CONSTRUCTION

Organizations need to retain existing customers while targeting non-customers. Measuring

customer satisfaction provides an indication of how successful the organization is at providing

products and/or services to the marketplace.

"Customer satisfaction is measured at the individual level, but it is almost always reported at an

aggregate level. It can be, and often is, measured along various dimensions. A hotel, for

example, might ask customers to rate their experience with its front desk and check-in service,

Page 70: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 67

with the room, with the amenities in the room, with the restaurants, and so on. Additionally, in a

holistic sense, the hotel might ask about overall satisfaction 'with your stay.'"

As research on consumption experiences grows, evidence suggests that consumers purchase

goods and services for a combination of two types of benefits: hedonic and utilitarian. Hedonic

benefits are associated with the sensory and experiential attributes of the product. Utilitarian

benefits of a product are associated with the more instrumental and functional attributes of the

product (Batra and Athola 1990).

Customer satisfaction is an ambiguous and abstract concept and the actual manifestation of the

state of satisfaction will vary from person to person and product/service to product/service. The

state of satisfaction depends on a number of both psychological and physical variables which

correlate with satisfaction behaviors such as return and recommend rate. The level of satisfaction

can also vary depending on other options the customer may have and other products against

which the customer can compare the organization's products.

Work done by Parasuraman, Zeithaml and Berry (Leonard L) between 1985 and 1988 provides

the basis for the measurement of customer satisfaction with a service by using the gap between

the customer's expectation of performance and their perceived experience of performance. This

provides the measurer with a satisfaction "gap" which is objective and quantitative in nature.

Work done by Cronin and Taylor propose the "confirmation/disconfirmation" theory of

combining the "gap" described by Parasuraman, Zeithaml and Berry as two different measures

(perception and expectation of performance) into a single measurement of performance

according to expectation.

The usual measures of customer satisfaction involve a survey with a set of statements using a

Likert Technique or scale. The customer is asked to evaluate each statement and in term of their

perception and expectation of performance of the organization being measured. Their satisfaction

is generally measured on a five-point scale.

Page 71: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 68

"Customer satisfaction data can also be collected on a 10-point scale."

"Regardless of the scale used, the objective is to measure customers’ perceived satisfaction with

their experience of a firm’s offerings." It is essential for firms to effectively manage customer

satisfaction. To be able do this, we need accurate measurement of satisfaction.

Good quality measures need to have high satisfaction loadings, good reliability, and low error

variances. In an empirical study comparing commonly used satisfaction measures it was found

that two multi-item semantic differential scales performed best across both hedonic and

utilitarian service consumption contexts. According to studies by Wirtz & Lee (2003), they

identified a six-item 7-point semantic differential scale (e.g., Oliver and Swan 1983), which is a

six-item 7-point bipolar scale, that consistently performed best across both hedonic and

utilitarian services. It loaded most highly on satisfaction, had the highest item reliability, and had

by far the lowest error variance across both studies. In the study, the six items asked respondents’

evaluation of their most recent experience with ATM services and ice cream restaurant, along

seven points within these six items: “please me to displeased me”, “contented with to disgusted

with”, “very satisfied with to very dissatisfied with”, “did a good job for me to did a poor job for

me”, “wise choice to poor choice” and “happy with to unhappy with”.

A semantic differential (4 items) scale (e.g., Eroglu and Machleit 1990), which is a four-item 7-

point bipolar scale, was the second best performing measure, which was again consistent across

both contexts. In the study, respondents were asked to evaluate their experience with both

products, along seven points within these four items: “satisfied to dissatisfied”, “favorable to

unfavorable”, “pleasant to unpleasant” and “I like it very much to I didn’t like it at all”

The third best scale was single-item percentage measure, a one-item 7-point bipolar scale (e.g.,

Westbrook 1980). Again, the respondents were asked to evaluate their experience on both ATM

services and ice cream restaurants, along seven points within “delighted to terrible”.

It seems that dependent on a trade-off between length of the questionnaire and quality of

satisfaction measure, these scales seem to be good options for measuring customer satisfaction in

academic and applied studies research alike. All other measures tested consistently performed

worse than the top three measures, and/or their performance varied significantly across the two

Page 72: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 69

service contexts in their study. These results suggest that more careful pretesting would be

prudent should these measures be used.

Finally, all measures captured both affective and cognitive aspects of satisfaction, independent of

their scale anchors. Affective measures capture a consumer’s attitude (liking/disliking) towards a

product, which can result from any product information or experience. On the other hand,

cognitive element is defined as an appraisal or conclusion on how the product’s performance

compared against expectations (or exceeded or fell short of expectations), was useful (or not

useful), fit the situation (or did not fit), exceeded the requirements of the situation (or did not

exceed).

3.2.1.3 METHODOLOGIES

American Customer Satisfaction Index (ACSI) is a scientific standard of customer satisfaction.

Academic research has shown that the national ACSI score is a strong predictor of Gross

Domestic Product (GDP) growth, and an even stronger predictor of Personal Consumption

Expenditure (PCE) growth. On the microeconomic level, academic studies have shown that

ACSI data is related to a firm's financial performance in terms of return on investment (ROI),

sales, long-term firm value (Tobin's q), cash flow, cash flow volatility, human capital

performance, portfolio returns, debt financing, risk, and consumer spending. Increasing ACSI

scores has been shown to predict loyalty, word-of-mouth recommendations, and purchase

behavior. The ACSI measures customer satisfaction annually for more than 200 companies in 43

industries and 10 economic sectors. In addition to quarterly reports, the ACSI methodology can

be applied to private sector companies and government agencies in order to improve loyalty and

purchase intent. Two companies have been licensed to apply the methodology of the ACSI for

both the private and public sector: CFI Group, Inc. and Foresee Results apply the ACSI to

websites and other online initiatives. ASCI scores have also been calculated by independent

researchers, for example, for the mobile phones sector, higher education, and electronic mail.

The Kano model is a theory of product development and customer satisfaction developed in the

1980s by Professor Noriaki Kano that classifies customer preferences into five categories:

Page 73: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 70

Attractive, One-Dimensional, Must-Be, Indifferent, Reverse. The Kano model offers some

insight into the product attributes which are perceived to be important to customers.

SERVQUAL or RATER is a service-quality framework that has been incorporated into

customer-satisfaction surveys (e.g., the revised Norwegian Customer Satisfaction Barometer) to

indicate the gap between customer expectations and experience.

J.D. Power and Associates provides another measure of customer satisfaction, known for its top-

box approach and automotive industry rankings. J.D. Power and Associates' marketing research

consists primarily of consumer surveys and is publicly known for the value of its product awards.

Other research and consulting firms have customer satisfaction solutions as well. These include

A.T. Kearney's Customer Satisfaction Audit process, which incorporates the Stages of

Excellence framework and which helps define a company’s status against eight critically

identified dimensions.

For Business to Business (B2B) surveys there is the InfoQuest box. This has been used

internationally since 1989 on more than 110,000 surveys (Nov '09) with an average response rate

of 72.74%. The box is targeted at "the most important" customers and avoids the need for a

blanket survey.

In the European Union member states, many methods for measuring impact and satisfaction of e-

government services are in use, which the eGovMoNet project sought to compare and

harmonize.

These customer satisfaction methodologies have not been independently audited by the

Marketing Accountability Standards Board (MASB) according to MMAP (Marketing Metric

Audit Protocol).

Page 74: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

CHAPTER 4

RESEARCH

METHODOLOGY

Page 75: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 70

CHAPTER 4

RESEARCH METHODOLOGY

4.1 OBJECTIVE OF THE RESEARCH

To know the residential & industrial areas in which DGVCL and Torrent power Ltd. are

serving.

To study the different charges of electricity in DGVCL and Torrent power Ltd.

To study the billing facility and payment system of DGVCL and Torrent power Ltd.

To study the issues related to service and power cuts in DGVCL and Torrent power Ltd.

To know the satisfaction level of the customers towards their power supplier either DGVCL

or Torrent power Ltd.

4.2 THE RESEARCH PROCESS

Following are the research process which can be useful to determine the project and project title

also. There are mainly eight steps of the following charts:-

PREPARING THE RESEARCH REPORT

ORGANIZING AND CONDUCTING THE FIELD SURVEY

DETERMINING SAMPLING DESIGN AND SAMPLING SIZE

DESIGNING DATA COLLECTION FORMS

DETERMINING SOURCES OF DATA

CHOICE OF RESEARCH DESIGN

FORMULATING THE RESEARCH PROBLEM

Page 76: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 71

4.2.1 Formulating the Research Problem

It is very first and most important step in the applied research process because, poorly defined

problem will not yield useful results. It is rightly said “A problem well defined is half solved.”

Poorly defined problem cause confusion and do not allow to develop a good research design.

In this study researcher set problem of “Comparative study between DGVCL (Dakshin Gujarat

Vij Company Limited) and Torrent power Ltd.”.

4.2.1.1 Sampling Unit

The individuals or objects whose characteristics are to be measures are called sampling unit. The

sampling units always identify the objects to be studies. It is necessary that the universe is well

defined.

The researcher want to study on Comparison between Dakshin Gujarat Vij Company Limited

and Torrent power Ltd., so the researcher may consider all population of Surat city, as sampling

unit.

4.2.1.2 Time and Space Boundaries

As regard time and boundaries, we find that the two universes are again different. In the first

instance, a precise date, viz. 30th

January, 1990 is given while in the second instance the entire

month of January is given. Similarly, two universes are different in terms of space-the ‘buyer’

universe specifies stores located in Delhi while the ‘shoppers’ universe specifies the Delhi

metropolitan area which should be a larger territory than the former.

The researcher set time and space boundaries as Comparative study between DGVCL (Dakshin

Gujarat Vij Company Limited) and Torrent power Ltd. with respect to Surat city in November-

December 2011.”

Page 77: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 72

4.2.2 Choice of Research Design

The research design is the blue print of the study. A research design is a logical and systematical

planning and it helps directing a piece of research.

Types of research design are following:

Descriptive research - Cross Sectional research design was taken by the researcher

for “The Study on Retailer Attitude towards CFL of the Ajanta Quartz With Reference To Surat

City” Because this, research design is focused on accurate descriptive of the variable present in

the problem. A descriptive study is undertaken when the researcher wants to know the

characteristics of certain groups such as age, sex, education level, income, occupations, etc.

4.2.3 Determining Sources of Data

After research design has been selected, the other important step is to collect the required data.

There are two types of data:

1) Primary Data,

2) Secondary Data.

Research Design

Exploratorystudy

Litrature Search

Experince Survey

Focus Group Analysis of

Selected Cases

Descriptive Study

Longitudinal

True Panel Omnibus

Panel

Cross Section

Sample Surver

Causal Study

Natural Ex.

Time Series Cross

Sectional Designs

Combination of These Two

Design

Controlled Ex.

Page 78: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 73

For the purpose of the study, primary data is collected by directly personal interview of the

respondents to collect their view about DGVCL and Torrent power Ltd... This was flat necessary

because people in gravel have a tendency in answering question.

There are some secondary data collected from Internet, websites, magazine to collect the

proper information and the industry details about DGVCL and Torrent power Ltd. And also

power sector of India.

4.2.4 Designing Data Collection Forms

Once the decision in favor of collection or sources of data, one has to decide the mode of

collection. The two methods are available:

1) Observation Method

o This method suggests that data are collect through one’s observation. If the researcher is

a keen observer, with integrity he would be in a position to observe and record data

faithfully and accurately. While the observational method may be suitable in the case of

some studies, several things of interest such as attitudes, opinions, motivations and other

intangible states of mind cannot be observed.

2) Survey Method

o In marketing research, field surveys are commonly used to collect primary data from the

respondents. Surveys can be 1) Personal, 2) Telephonic, 3) Mail, 4) Diary.

The researcher decided to collect data through primary data collection; the researcher was

selecting the survey method for collection of primary data. In the survey method, the researcher

selects personal survey for data collection. For the collection of required primary data, the

researcher prepared the questionnaire, which is enclosed at the end of the topic. The

questionnaire includes two types of question that is single choice, multi-choice and rank

question.

Page 79: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 74

4.2.5 Determining Sampling Design and Sampling Size

When the researcher had decided to carry out a filed survey, he had to decide whether it is to be a

census survey or sample survey. The researcher was select a sample survey for his research as

it has an overwhelming advantages over a senses survey and it is not possible for researcher to

meet every and each retailer of Surat city as it has population something around 9 Lakh.

Sampling method: The researcher was selected Surat city of Gujarat state as his sample site

and area sampling, convenience sampling and snow-ball sampling as sampling method.

Sample size: In sample size the researcher have taken 128 samples as a sample size which

include 128 as a personal interview.

4.2.6 Organizing and conducting The Field Survey

After selection of sample size and sample method, the researcher was went for a field survey.

The researcher was collected required data by filing up the questionnaire from various

respondents.

4.2.7 Processing and Analyzing the Collected Data

When the researcher was complete his field survey, the researcher processed the collected data

and analyze it in a systematic manner so as the researcher derived results from it. In order to

derive meaningful outcomes from the data, the researcher formed the data in tables and then uses

various statistical tools and interprets the data as it shown in the chapter of findings and analysis

of data.

4.2.8 Preparing the Research Report

After data had been tabulated, interpreted and analyzed, the researcher prepared his report

embodying the findings of his research study and his recommendations

Page 80: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

CHAPTER 5

DATA ANALYSIS

&

INTERPRETATION

Page 81: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 75

CHAPTER 5 DATA ANALYSIS & INTERPRETATION

1) Which power connection do you have?

Option Responses

DGVCL 33

Torrent 95

Total 128

Interpretation: - 26% have DGVCL and 74% Torrent Power Ltd...

26%

74%

DGVCL

Torrent

Page 82: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 76

2) What is your type of area? Option Responses

Industrial 60

Residential 68

Total 128

Interpretation: - 47% from industrial area and 53 % from residential area.

47%

53%

Industrial

Residential

Page 83: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 77

3) What is your average amount of electricity bill per month? Option Responses

<1000 29

1000 - 5000 39

5000 - 10000 11

10000 - 25000 7

>25000 42

Total 128

Interpretation: - 23% get < 1000 ₹; 30% 1000 ₹ to 5000 ₹; 9% 5000 ₹ to 10000 ₹; 5%

10000 ₹ to 25000 ₹; 33% > 25000 ₹.

23%

30%

9%

5%

33% <1000

1000 - 5000

5000 - 10000

10000 - 25000

>25000

Page 84: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 78

4) What is the rate of power cuts of electricity in a week? Option Responses

No Cut 93

1 - 2 Times 19

2 - 4 Times 12

>4 Times 4

Total 128

Interpretation: - 73% people don’t have power cut.

73%

15%

9%

3%

No Cut

1 - 2 Times

2 - 4 Times

>4 Times

Page 85: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 79

5) If there is a power cut then, how much is the time period of power cut in a day? Option Responses

< 1 Hour 10

1 - 2 Hours 13

2 - 3 Hours 11

>3 Hour 2

Total 36

Interpretation: - 28% people have power cut for < 1 hour; 36% for 1- 2 hours; 31% for 2 –

hours; 5% for > 3 ours.

28%

36%

31%

5%

< 1 Hour

1 - 2 Hours

2 - 3 Hours

>3 Hour

Page 86: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 80

6) Rate the following features of your power connection meter.

6.1) High rate

Response (Fi) Wi Fi × Wi

36 5 180

62 4 248

16 3 48

8 2 16

6 1 6

Total = 128 498

WAM

Interpretation: - 28% people are rate excellent; 48.44% to good; 12.50% to average; 6.25% to

poor; 4.96 to very poor.

28.13%

48.44%

12.50% 6.25% 4.69%

0.00%

10.00%

20.00%

30.00%

40.00%

50.00%

60.00%

Excellent Good Average Poor Very Poor

Page 87: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 81

6.2) Failures

Response (Fi) Wi Fi × Wi

15 5 75

32 4 128

25 3 75

29 2 58

27 1 27

Total = 128 363

WAM

Interpretation: - 11.72% people are rate excellent; 25.00% to good; 19.53% to average;

22.66% to poor; 21.09% to very poor.

11.72%

25.00%

19.53% 22.66% 21.09%

0.00%

5.00%

10.00%

15.00%

20.00%

25.00%

30.00%

Excellent Good Average Poor Very Poor

Page 88: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 82

6.3) High maintenance required

Response (Fi) Wi Fi × Wi

12 5 60

23 4 92

33 3 99

38 2 76

22 1 22

Total = 128 349

WAM

Interpretation: - 9.38% people are rate excellent; 17.97% to good; 25.78% to average; 29.69%

to poor; 17.19% to very poor.

9.38%

17.97%

25.78% 29.69%

17.19%

0.00%

5.00%

10.00%

15.00%

20.00%

25.00%

30.00%

35.00%

Excellent Good Average Poor Very Poor

Page 89: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 83

6.4) Quality of meter

Response (Fi) Wi Fi × Wi

31 5 155

44 4 176

35 3 105

13 2 26

5 1 5

Total = 128 467

WAM

Interpretation: - 24.22% people are rate excellent; 34.38% to good; 27.34% to average;

10.16% to poor; 3.91% to very poor.

24.22%

34.38%

27.34%

10.16%

3.91% 0.00%

5.00%

10.00%

15.00%

20.00%

25.00%

30.00%

35.00%

40.00%

Excellent Good Average Poor Very Poor

Page 90: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 84

6.5) Incorrect reading of the meter

Response (Fi) Wi Fi × Wi

5 5 25

24 4 96

23 3 69

47 2 94

29 1 29

Total = 128 313

WAM

Interpretation: - 3.91% people are rate excellent; 18.75% to good; 17.97% to average; 36.72%

to poor; 22.66% to very poor.

3.91%

18.75% 17.97%

36.72%

22.66%

0.00%

5.00%

10.00%

15.00%

20.00%

25.00%

30.00%

35.00%

40.00%

Excellent Good Average Poor Very Poor

Page 91: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 85

6.6) Weighted Average Mean

High rate 3.89

Failures 2.84

High maintenance required 2.73

Quality of meter 3.65

Incorrect reading of the meter 2.45

Interpretation: - High rate and quality of meter are most affective features.

3.89

2.84 2.73

3.65

2.45 2.25

2.45

2.65

2.85

3.05

3.25

3.45

3.65

3.85

4.05

High rate Failures Highmaintenance

required

Quality ofmeter

Incorrectreading of the

meter

Page 92: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 86

7) Rate the following statements about your power supplier. 7.1) The charges of electricity are very high.

Response (Fi) Wi Fi × Wi

55 5 275

55 4 220

13 3 39

0 2 0

5 1 5

Total = 128 539

WAM

Interpretation: - 42.97% people are rate excellent; 42.97% to good; 10.16% to average; 3.91%

to very poor.

42.97% 42.97%

10.16%

0.00% 3.91%

0.00%

5.00%

10.00%

15.00%

20.00%

25.00%

30.00%

35.00%

40.00%

45.00%

50.00%

Excellent Good Average Poor Very Poor

Page 93: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 87

7.2) The taxes imposed by government are very high

Response (Fi) Wi Fi × Wi

53 5 265

54 4 216

15 3 45

2 2 4

4 1 4

Total = 128 534

WAM

Interpretation: - 41.41% people are rate excellent; 42.19% to good; 11.72% to average; 3.13%

to very poor.

41.41% 42.19%

11.72%

1.56% 3.13% 0.00%

5.00%

10.00%

15.00%

20.00%

25.00%

30.00%

35.00%

40.00%

45.00%

Excellent Good Average Poor Very Poor

Page 94: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 88

7.3) The bill paying facility is not proper.

Response (Fi) Wi Fi × Wi

15 5 75

15 4 60

44 3 132

32 2 64

22 1 22

Total = 128 353

WAM

Interpretation: - 11.72% people are rate excellent; 11.72% to good; 34.38% to average;

25.00% to poor: 17.19% to very poor.

11.72% 11.72%

34.38%

25.00%

17.19%

0.00%

5.00%

10.00%

15.00%

20.00%

25.00%

30.00%

35.00%

40.00%

Excellent Good Average Poor Very Poor

Page 95: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 89

7.4) The complaints are not taken care.

Response (Fi) Wi Fi × Wi

13 5 65

22 4 88

19 3 57

46 2 92

28 1 28

Total = 128 330

WAM

Interpretation: - 10.16% people are rate excellent; 17.19% to good; 14.84% to average;

35.94% to poor: 21.88% to very poor.

10.16%

17.19% 14.84%

35.94%

21.88%

0.00%

5.00%

10.00%

15.00%

20.00%

25.00%

30.00%

35.00%

40.00%

Excellent Good Average Poor Very Poor

Page 96: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 90

7.5) After due date billing charges are very high.

Response (Fi) Wi Fi × Wi

15 5 75

21 4 84

21 3 63

38 2 76

33 1 33

Total = 128 331

WAM

Interpretation: - 11.72% people are rate excellent; 16.41% to good; 16.41% to average;

29.69% to poor: 25.78% to very poor.

11.72% 16.41% 16.41%

29.69% 25.78%

0.00%

5.00%

10.00%

15.00%

20.00%

25.00%

30.00%

35.00%

Excellent Good Average Poor Very Poor

Page 97: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 91

7.6) Weighted Average Mean

The charges of electricity are very high. 4.21

The taxes imposed by government are very high 4.17

The bill paying facility is not proper. 2.76

The complaints are not taken care. 2.58

After due date billing charges are very high. 2.59

Interpretation: - The charges of electricity and the taxes imposed by government are most

affective features.

4.21 4.17

2.76 2.58 2.59

2.40

2.60

2.80

3.00

3.20

3.40

3.60

3.80

4.00

4.20

4.40

The charges ofelectricity are

very high.

The taxesimposed bygovernmentare very high

The bill payingfacility is not

proper.

The complaintsare not taken

care.

After due datebilling chargesare very high.

Page 98: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 92

8) Are you satisfied with the paper quality of your electricity bill? Option Responses

Yes 96

No 32

Total 128

Interpretation: - 75% are satisfied with paper quality of bill.

75%

25%

Yes

No

Page 99: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 93

9) Have you ever called to DGVCL or Torrent power? Option Responses

Yes 31

No 97

Total 128

Interpretation: -Only 24% are called to visit office.

24%

76%

Yes

No

Page 100: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 94

10) Is it safe to use your power connection?

Option Responses

Yes 118

No 10

Total 128

Interpretation: - 92% are saying that use of electric power connection is safe.

92%

8%

Yes

No

Page 101: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

CHAPTER 6

FINDING

&

CONCLUSION

Page 102: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 95

CHAPTER 6

FINDING & CONCLUSION

6.1 FINDING

26% have connection of DGVCL and 74% have connection of Torrent Power Ltd...

47% respondent from industrial area and 53 % from residential area

23% respondent get < 1000 ₹; 30% 1000 ₹ to 5000 ₹; 9% 5000 ₹ to 10000 ₹; 5% 10000 ₹

to 25000 ₹; 33% > 25000 ₹.

73% respondent doesn’t have power cut.

28% respondent have power cut for < 1 hour; 36% for 1- 2 hours; 31% for 2 – hours; 5% for

> 3 ours.

High rate and quality of meter are most affective features; because their mean are 3.89 and

3.65 respectively.

The charges of electricity and the taxes imposed by government are most affective features.;

because their mean are 4.21 and 4.17 respectively.

75% respondents are satisfied with paper quality of bill.

Only 24% respondents are called to visit office.

92% respondents are saying that use of electric power connection is safe.

Page 103: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 96

6.2 CONCLUSION

Page 104: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

CHAPTER 7

SUGGESTION

Page 105: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 97

CHAPTER 7

SUGGESTION

Page 106: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 98

BIBLIOGRAPHY

o Books:

Name Author Publication

Marketing Research:

Research Design G.C. Beri Tata McGraw-Hill

Business Research

Method

Donald R. Cooper & Pamela

S. Schindler Tata McGraw-Hill

Statist ical Methods S P Gupta Sultan Chand & Sons

Publishers

o Websites:

www.en.wikipedia.org

http://www.dgvcl.com/

www.torrentpower.com

http://www.torrentlimited.com/milestones_power.htm

www.sebi.gov.in

Page 107: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 99

QUESTIONNAIRE

I, Alpesh Maniya, student of SPB College of Management (BBA), Surat, is

conducting a survey “Comparative study between DGVCL (Dakshin Gujarat Vij

Company Limited) and Torrent power Ltd. with reference to Surat City”. I will be

thankful, if you give proper response to the questions. The information you

share with me is only used for academic purpose. Your personal details will be

kept secret.

Thank you for spending your valuable time. Alpesh Maniya

1) Which power connection do you have?

DGVCL Torrent power Ltd.

2) What is your type of area?

Industrial Residential

3) What is your average amount of electricity bill per month?

Less than 1000 1000 to 5000

5000 to 10,000 10,000 to 25,000

More than 25,000

4) What is the rate of power cuts of electricity in a week?

No Power cut 1 to 2 Times

3 to 4 Times More than 4 Times

5) If there is a power cut then, how much is the time period of power cut in a day?

Less than an hour 1 to 2 hours

2 to 3 hours More than 3 hours

Page 108: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 100

6) Rate the following features of your power connection meter.

Excellent Good Average Poor Very Poor

High Rate

Failures

High Maintenance

Required

Quality of Meter

Incorrect reading

of the meter

7) Rate the following statements about your power supplier.

Strongly

Agree

Agree Neutral Disagree Strongly

Disagree

The charges of electricity are very high.

The taxes imposed by government are

very high.

The bill paying facility is not proper.

The complaints are not taken care.

After due date billing charges are very

high.

8) Are you satisfied with the paper quality of your electricity bill?

Yes No

9) Have you ever called to DGVCL or Torrent power?

Yes No

10) If yes, then why do you call to DGVCL or Torrent power?

________________________________________________________________

Page 109: Comparative Study Between DGVCL (Dakshin Gujarat Vij Company Limited) and Torrent Power Ltd

Page 101

11) Is it safe to use your power connection?

Yes No

12) If no then please specify why?

________________________________________________________________

________________________________________________________________

13) Give your suggestions.

________________________________________________________________

________________________________________________________________

________________________________________________________________

Personal Details

Name:- ______________________________________________

Age: ___

Phone No:- ___________________________

Address:- ______________________________________________________

E-mail ID:- ___________________________

Occupation:

Employed

Self employed

Student

Household

__________THANK YOU_________