Transcript of Comparative Statement Chap. 6 to 7_2
7/27/2019 Comparative Statement Chap. 6 to 7_2
http://slidepdf.com/reader/full/comparative-statement-chap-6-to-72 1/44
B-40
NOTE :
1 Rates provided are for the complete
finisheditems inclusive of cost of water and
materials with all leads labour, all
type of taxes, royalty, scaffolding,
curing, laying, fixing finishing etc.
hire charges for tools and plants,
templates and other appliances,
required for the puropose of
execution of the items work as per
specification.
2 In case of non-availability of stone
header of proper size cementconcrete header of mix 1 : 3 : 6 (M-
100) with 25 mm graded stone
aggregate with smooth finish may
be provided by the contractor at no
extra cost.
Chapter
Code No.
Description Unit Rate (Rs.)
6.1 Random Rubble stone masonry for
foundation and plinth in Cement
Sand mortar above 30 cm thick wallin :
6.1.1 Mud Mortar. Cum 660.00
6.1.2 Dry Masonry. Cum 400.00
6.1.3 Lime Sand Mortar 1 : 3 (1-Lime
putty : 3-Sand). Cum 780.00
6.1.4 Cement Mortar 1 : 3 (1-Cement : 3-
Sand). Cum 1750.00
6.1.5 Cement Mortar 1 : 4 (1-Cement : 4-Sand). Cum 1550.00
6.1.6 Cement Mortar 1 : 5 (1-Cement : 5-
Sand). Cum 1450.00
6.1.7 Cement Mortar 1 : 6 (1-Cement : 6-
Sand). Cum 1400.00
CHAPTER B-6
STONE MASONRY
PART - A : GENERAL STONE WORK
7/27/2019 Comparative Statement Chap. 6 to 7_2
http://slidepdf.com/reader/full/comparative-statement-chap-6-to-72 2/44
B-41
Chapter
Code No.
Description Unit Rate (Rs.)
6.2 Random Rubble stone masonry for
superstructure above plinth level
one storey height above 30 cm.
thick walls in :
6.2.1 Mud Mortar. Cum 748.00
6.2.2 Dry Masonry. Cum 688.00
6.2.3 Lime Sand Mortar 1 : 3 (1-Lime
putty : 3-Sand). Cum 1150.00
6.2.4 Cement Mortar 1 : 3 (1-Cement : 3-
Sand). Cum 1850.00
6.2.5 Cement Mortar 1 : 4 (1-Cement : 4-
Sand). Cum 1650.00
6.2.6 Cement Mortar 1 : 5 (1-Cement : 5-
Sand). Cum 1550.00
6.2.7 Cement Mortar 1 : 6 (1-Cement : 6-
Sand). Cum 1500.00
6.2.8 Cement Mortar 1 : 8 (1-Cement : 8-
Sand). Cum 1400.00
6.3 Extra over item No. 6.1 & 6.2 for :
6.3.1 Wall curved in plan to mean radiusnot exceeding 6 Mtr. Cum 125.00
6.3.2 Wall upto 30 cm. and less
thickness. Cum 80.00
6.3.3 Pillar masonry including bed plates
as per specifications. Bed plates to
be paid separately. Cum 160.00
6.4 Extra for facing as per design and
detailed specifications including
additional cost of stones over item
No. 6.1 & 6.2 for :
6.4.1 Course rubble facing First Sort. Sqm 225.00
6.4.2 Course rubble facing Second Sort.
Sqm 200.00
6.4.3 Ashlar fine tooled facing. Sqm 260.00
7/27/2019 Comparative Statement Chap. 6 to 7_2
http://slidepdf.com/reader/full/comparative-statement-chap-6-to-72 3/44
B-42
Chapter
Code No.
Description Unit Rate (Rs.)
6.4.4 Ashlar rough tooled facing. Sqm 160.00
6.4.5 Ashlar pitched facing. Sqm 145.00
6.4.6 R.R. stone decoration facing. Sqm 55.00
6.4.7 Workshop pattern masonry. Sqm 70.00
VENEERING WORK
6.5 Providing stone veneer facing in
cement mortar 1 : 4 including
cement pointing 1 : 3 in white
cement with admixture of pigment
matching the stone shade, upto onestorey height above plinth level, in :
6.5.1 Red Karauli sand stone rough
dressed 25 to 35 mm thick. Sqm 650.00
6.5.2 Extra over item No. 6.6.1 for fine
grinded stone used instead of rough
dressed. Sqm 55.00
6.5.3 White Dholpur sand stone rough
dressed 25 to 35 mm thick. Sqm 700.00
6.5.4 Extra item no. 6.5.3 for fine grinded
stone used instead of rough
dressed. Sqm 55.00
6.5.5 Modak or similar stone rough
dressed 30 to 40 mm thick. Sqm 600.00
6.5.6 Extra for fine grinded stone used
instead of rough dressed. Sqm 55.00
6.5.7 Marble facing abardari (white and
pink) polished, 18 to 25 mm thick.
Sqm 900.00
6.5.8 Chittor / Nimbahera or similar stone
facing polished 18 to 25 mm thick.
Sqm 600.00
7/27/2019 Comparative Statement Chap. 6 to 7_2
http://slidepdf.com/reader/full/comparative-statement-chap-6-to-72 4/44
B-43
Chapter
Code No.
Description Unit Rate (Rs.)
6.6 Providing stone veneer facing in
strips upto 125 mm width and upto
20 mm thick in cement mortar 1 : 4
including cement pointing 1 : 2 with
and admixture of pigment matching
the stone shade upto 4.5 Mtr. height
above plinth level, in :
6.6.1 White / Red / other stone rough
dressed. Sqm 600.00
6.6.2 Extra over item No. 6.6.1 for fine
grinded stone used instead of rough
dressed. Sqm 50.00
ARCH MASONRY :6.7 Stone masonry for arches in cement
sand mortar 1 : 3 including
centering shuttering and pointing
etc. upto 4.5 Mtr. height from plinth
level :
6.7.1 With hammer dressed stone (to be
plastered). Cum 2800.00
6.7.2 With coursed rubble stone (to be
pointed). Cum 3000.00
6.7.3 Block-in-Course chisel dressed,arch span upto 1.5 Mtr. Cum 3500.00
6.7.4 Block-in-Course chisel dressed,
arch span above 1.5 Mtr. Cum 3700.00
6.7.5 Cut stone fine dressed with fine
joints, arch span upto 1.5 Mtr. Cum 4200.00
6.7.6 Cut stone fine dressed with fine
joints, arch span above 1.5 Mtr. Cum 4500.00
6.7.7 Relieving arch stone masonry. Cum 2200.00
6.8 Extra over item No. 6.7 for dome
masonry, Shuttering and Form work
if required to be paid separately.
Cum 450.00
7/27/2019 Comparative Statement Chap. 6 to 7_2
http://slidepdf.com/reader/full/comparative-statement-chap-6-to-72 5/44
B-44
Chapter
Code No.
Description Unit Rate (Rs.)
6.9 Deduct if arch masonry is done in
lime sand mortar 1 : 2. Cum 330.00
6.10 Pardi Wall in Katla stone in cement
mortar 1 : 6, 75 mm to 150 mm
thick excluding plaster. Sqm 340.00
6.11 Dry stone pitching including
preparing the surface etc. complete.
6.11.1 Random Rubble with stone
weighing 30 to 40 Kg. each. Cum 500.00
6.11.2 Coursed rubble. Cum 550.00
MISCELLANEOUS :6.12 Providing and fixing clamps of
required size shape for anchoring
stone wall lining (veneer) to the
backing of securing adjacent stone
in stone wall lining (veneer) in
cement mortar 1 : 2 including
making the necessary chases made
of :
6.12.1 Copper Kg. 500.00
6.12.2 Gun metal (casted). Kg. 350.00
DASA, SILLS, COPING, LINTELS,
CHAJJA ETC. :
6.13 Supplying and fixing in cement sand
mortar 1 : 4 sand or other approved
stone dasa or coping of thickness
75 to 100 mm (fine dressed) :
6.13.1 Plain or Bull nosed. Sqm 1420.00
6.13.2 Goladar. Sqm 1575.00
6.13.3 Plain Tikaridar. Sqm 2300.00
6.13.4 Plain ornamental. Sqm 2800.00
7/27/2019 Comparative Statement Chap. 6 to 7_2
http://slidepdf.com/reader/full/comparative-statement-chap-6-to-72 6/44
B-45
Chapter
Code No.
Description Unit Rate (Rs.)
6.14 Supplying and fixing rough dressed
stone sills, dasa, coping, cornices
sriwan, string courses etc. in
cement mortar 1 : 4 including
pointing with admixture of pigment
matching with the stone shade :
6.14.1 50 mm thick. Sqm 542.00
6.14.2 75 mm thick. Sqm 657.00
6.14.3 100 mm thick. Sqm 815.00
6.15 Supplying and fixing dressed sand
or other approved stone shelves,
tands in cement mortar 1 : 3 withfine dressed edges :
6.15.1 25 mm thick. Sqm 220.00
6.15.2 35 mm thick. Sqm 271.00
6.15.3 50 mm thick. Sqm 364.00
6.15.4 75 mm thick. Sqm 527.00
6.16 Supplying and fixing in walls
machine cut and polished stone
shelves, tands and sills in CM 1 : 3with machine cut edges :
6.16.1 Sand or other approved stone 25
mm thick. Sqm 400.00
6.16.2 Sand or other approved stone 35
mm thick. Sqm 410.00
6.16.3 Sand or other approved stone 50
mm thick. Sqm 420.00
6.16.4 Kota stone 25 to 30 mm thick. Sqm 372.00
6.16.5 Madras Stone 25 to 30 mm thick. Sqm 525.00
6.16.6 Chittor / Nimbahera 25 to 30 mm
thick. Sqm 430.00
7/27/2019 Comparative Statement Chap. 6 to 7_2
http://slidepdf.com/reader/full/comparative-statement-chap-6-to-72 7/44
B-46
Chapter
Code No.
Description Unit Rate (Rs.)
6.16.7 Extra over item 6.16.1 to 6.16.6 for
machine cut both side polished
stone is used. Sqm 40.00
6.17 Supplying and fixing stone lintels /
bed plates of approved quarry rough
dressed in cement mortar 1 : 4 :
6.17.1 Upto 15 cm. thick. Cum 5100.00
6.17.2 Above 15 cm. thick. Cum 5300.00
6.18 Providing and fixing 30 to 40 mm
thick stone chajjas in cement sand
mortar 1 : 4 including making gola
at junction with wall in cementconcrete M-15 grade (1 : 2 : 4
nominal mix), drip course :
6.18.1 Pointing both faces in CM 1 : 3 with
an admixture of pigment matching
the stone shade. Sqm 510.00
6.18.2 20 mm thick plastering in CM 1 : 6
on both faces. Sqm 603.00
6.19 Deduct from item No. 6.18 for fixing
done in lime sand mortar 1 : 2instead of CM 1 : 3. Sqm 37.00
6.20 Providing dab stone over Chajjas
duly fixed in cement sand mortar 1 :
6 complete :
6.20.1 80 mm thick. Sqm 550.00
6.20.2 50 mm thick. Sqm 480.00
6.21 Providing and fixing fine dressed
machine cut approved sand stone
steps (risers and treads) in CM 1 : 4
including pointing the joints with
white cement mortar 1 : 2 with
admixture of matching the stone
shade with width of steps 1200 mm
:
6.21.1 35 to 40 mm thick. Sqm 525.00
7/27/2019 Comparative Statement Chap. 6 to 7_2
http://slidepdf.com/reader/full/comparative-statement-chap-6-to-72 8/44
B-47
Chapter
Code No.
Description Unit Rate (Rs.)
6.21.2 50 mm thick. Sqm 550.00
6.22 Providing and fixing stone jali 40
mm thick through out (without
sinking or moulding in jali slab) in
CM 1 : 3 including pointing in white
cement marble mortar 1 : 2 (1
cement : 2 marble dust) with an
admixture of pigment matching the
stone shade, jali patterns to be cut
square to jali slab without any
chamfers etc. :
6.22.1 Red Sand stone. Sqm 3400.00
6.22.2 White Sand stone. Sqm 3600.00
6.23 Add extra for doing masonry work in
or under water and or liquid mud
including cost of pumping or bailing
out water and removing and slush
etc. complete.
Cum P.Mtr.
Depth 52.00
6.24 Extra for subsequent storey or
height of 4.5 Mtr. or part thereof for
all masonry work :
6.24.1 Quantity in Sqm. Sqm 16.00
6.24.2 Quantity in Cum. Cum 55.00
6.25 Making groove of approved design
upto 20 x 20 mm size in the joints of
stone veneering work for walls,
columns, offsets etc. including
finishing in white cement marble
mortar 1 : 2 (1 cement : 2 marble
dust) with an admixture of pigment
matching the stone shade,
complete. Mtr. 10.00
Note : - Recover cost of useful stone @
2/3rd of masonry work dismantalled
or actual quantity, which ever is
more. Cum 350.00
7/27/2019 Comparative Statement Chap. 6 to 7_2
http://slidepdf.com/reader/full/comparative-statement-chap-6-to-72 9/44
B-48
NOTE :
1 Rate are for complete work including fixing,all
pointing in cement mortar 1 : 3 / lime mortar 1: 2 / gypsum.
2 Exposed surface is to be measured only for
chajjas, parapets, shelves and cantilever
steps.
3 Add / Deduct difference of cost of dressing if
otherwise mentioned.
4. (a) Add extra on G.F. rates for S & F item for first
floor / subsequent floor per floor @ Rs. 22/-
per Cum. / @ Rs. 1.50 per Sqm. Except item
No. 16 to 23.
(b) Deduct for Dasa of lintel of vents for plinth and
basement @ Rs. 20/- per Cum.
5 Rough dressing is included in items of S/F
and thereof rates of item 16 to 18 and 20 to
22 are over rough dressing.
6 Soorsagar white or equivalent and red or
equivalent is to be used only for exposed
surfaces and all other internal ashlar may be
paid for rate of Bhura or equivalent ashlar.
7 For the item of ashlar work 3 - lime stone
dressed, full rate should be allowed on test
check of Executive Engineer.
Unit Red
Ashlar
Soorsagar or
eqvt. White
Ashlar
6.26 Supplying and fixing ashlar sills, jambs,
skirting, steps etc. rough dressed :
6.26.1 Upto 15 cm. thick Cum 2080.00 2426.00
6.26.2 Above 15 cm. and upto 20 cm. thick Cum 2134.00 2468.00
Rate (Rs.)
ASHLAR STONE WORK :
CHAPTER B-6
STONE MASONRY
PART - B : ASHLAR WORK
Chapter
Code No.
Description
7/27/2019 Comparative Statement Chap. 6 to 7_2
http://slidepdf.com/reader/full/comparative-statement-chap-6-to-72 10/44
B-49
Unit Red
Ashlar
Soorsagar or
eqvt. White
Ashlar
Rate (Rs.)Chapter
Code No.
Description
6.26.3 Above 20 cm. thick and upto 2.15 m length(Pats). Cum 2178.00 2552.00
6.26.4 Above 20 cm. thick & above 2.15 m length.
Cum 2979.00 2630.00
6.27 Supplying and fixing Soorsagar Bhura or
equivalent ashlar sills, lintels and dassa,
bearing, bed & top surface made perfectly
even, jambs, skirting steps etc. rough dressed
:
6.27.1 Upto 15 cm. thick. Cum 1940.00
6.27.2 Above 15 cm & upto 20 cm. thick. Cum 1994.00
6.27.3 Above 20 cm thick (Pats) and upto 2.15 m
length. Cum 2080.00
6.27.4 Above 20 cm thick (Pats) and above 2.15 m.
length. Cum 2156.00
6.28 Supply and fixing ashlar lintels and Dassa
exposed horizontal and vertical faces 3 - lines
fine dressed (bearing bed & top surface made
perfectly even) :
6.28.1 Upto 15 cm. thick. Cum 2587.00 3557.00
6.28.2 Above 15 cm. & upto 20 cm. thick. Cum 2695.00 3687.00
6.28.3 Above 20 cm. thick and above 2.15 m. length.
Cum 2781.00 3795.00
6.28.4 Above 20 cm. thick & above 2.15 m. length.
Cum 2559.00 3946.00
6.29 Supplying and fixing ashlar solid block pillars
fully fine (3 lines) dressed.Cum 4065.00 6213.00
6.30 Supplying and fixing ashlar stone arches fully
fine (3 lines) dressed for 1.5 to 5 m. span (Net
content payable). Cum 2996.00 4528.00
6.31 Supplying and fixing ashlar face stone 10 cm.
thick fine (3 lines) dressed. Cum 409.00 604.00
7/27/2019 Comparative Statement Chap. 6 to 7_2
http://slidepdf.com/reader/full/comparative-statement-chap-6-to-72 11/44
B-50
Unit Red
Ashlar
Soorsagar or
eqvt. White
Ashlar
Rate (Rs.)Chapter
Code No.
Description
6.32 Supplying and fixing ashlar coping ordinary 7
to 10 cm. thick 2 - line dressed (normal lengthof single piece not less than 0.90 m).
Sqm 345.00 496.00
6.33 Supplying and fixing ashlar coping moulded
and counter slopped 7 to 10 cm. thick (2-line
dressed) (-- do --). Sqm 442.00 582.00
6.34 Supplying and fixing ashlar shrivan (Kharpa
grooved) rough dressed (-- do --). Cum 1703.00
6.35 Fine dressing of ashlar stone work (payable
on Executive Engineer's test checking) :
6.35.1 Three line dressed Sqm 272.00 571.00
6.35.2 Two line dressed Sqm 216.00 342.00
6.35.3 One line dressed Sqm 108.00 158.00
6.36 Rough dressing ashlar stone work (payable
only for departmental work). Sqm 39.00 65.00
6.37 Supplying and fixing ashlar cantilever stepsfine (3 lines) dressed (triangular exposed
surface is to be measured). Cum 10617.00 13452.00
6.38 (-- do --) (2 lines) (triangular exposed surface
is to be measured). Cum 9475.00 12031.00
6.39 Deduct if the shape of cantilever and landing
steps is rectangular :
6.39.1 From item No. 6.37 Cum 5132.00 6490.00
6.39.2 From item No. 6.38 Cum 4765.00 6026.00
6.40 Supplying and fixing ashlar rain water spoutsfine (3 lines) dressed as per approved design
of size :
6.40.1 60 x 26 x 18 cm. Each 238.00 334.00
6.40.2 60 x 30 x 25 cm. Each 355.00 517.00
7/27/2019 Comparative Statement Chap. 6 to 7_2
http://slidepdf.com/reader/full/comparative-statement-chap-6-to-72 12/44
B-51
Unit Red
Ashlar
Soorsagar or
eqvt. White
Ashlar
Rate (Rs.)Chapter
Code No.
Description
6.41 Supplying and fixing ashlar stone chajja 5 to 7
cm. thick all exposed surface fully finedressed, weather dripped including 75 x 75
mm. cement batta (1 : 2 : 4) between chajja &
wall (single piece upto 1 : 2 m length) :
6.41.1 Three line dressed Sqm 905.00 1305.00
6.41.2 Two line dressed Sqm 820.00 990.00
6.41.3 One line dressed Sqm 744.00 862.00
6.42 Supplying and fixing Red ashlar railing
ordinary with takia and thambli complete fine
dressed :
6.42.1 Three line dressed. Sqm 840.00
6.42.2 Two line dressed. Sqm 798.00
6.42.3 One line dressed. Sqm 712.00
6.43 Supplying and fixing Red ashlar stone jali 5 to
7 cm. thick curved :
6.43.1 Upto half depth. Sqm 1246.00
6.43.2 Upto full depth. Sqm 1887.00
6.44 Re-fixing old ashlar stone w/o dressing. Cum 323.00 345.00
6.45 (-- do --) stone slab. Sqm 45.00 46.00
4.46 Supplying and fixing Red ashlar shelves 5 to 7
cm. thick exposed surface rough dressed.
Sqm 212.00
4.47 (-- do --) exposed surface (3 lines) dressed.
Sqm 388.00
6.48 Red ashlar todies for verandah (pillar and pat)
fine (3 lines) dressed. Sqm 232.00
6.49 Supplying and fixing ashlar todies for chajjas
and shelves fine (3 lines) dressed 30 x 30 x
10 cm. Each 162.00
7/27/2019 Comparative Statement Chap. 6 to 7_2
http://slidepdf.com/reader/full/comparative-statement-chap-6-to-72 13/44
B-52
Unit Red
Ashlar
Soorsagar or
eqvt. White
Ashlar
Rate (Rs.)Chapter
Code No.
Description
6.50 Supplying and fixing chittar or equivalent
stone slab perchits with making edges andtop surface level in cement mortar 1 : 3
complete finished :
6.50.1 Upto 2.15 m. span. Sqm 248.00
6.50.2 Add extra for span more than 2.15 m Sqm 69.00
6.51 Supplying and fixing 7 to 10 cm. Soorsagar or
equivalent stone chaps in lime mortar or
gypsum rough dressed more than 0.60 m.
length.Sqm 134.00
6.52 Supplying and fixing 2.5 to 5 cm. thick Darba
Darbi wall of red (Ros) stone rough dressed
fixed in lime mortar or gypsum. Sqm 216.00
6.53 Supplying and fixing soorsagar or equivalent
white stone slab steps 75 to 100 mm thick fine
(3 lines) dressed for tread & riser upto 2 m.
length, simply supported or centrally fixed with
both ends free (projection to be paid only).
Sqm 905.00
6.54 Deduct if Soorsagar or equivalent Bhura
Ashlar stone is used in place of white ashlar.Sqm 22.00
6.55 Supplying and fixing Soorsagar or equivalent
35 cm. height ashlar face stone (3 lines) fine
dressing with 3.5 cm. gola / groove complete
including cutting and moulding (excluding
supply of Ashlar and fixing).
R.Mtr. 178.00
6.56 Supplying and fixing 13 cm. thick Soorsagar
face stone over vent lintel complete including
cutting & moulding (3 line fine dressed).
R.Mtr. 369.00
ORNAMENTAL WORK (AS PER EXISTING PATTERN OF UMED
HOSPITAL, M.G. HOSPITAL OR RAJASTHAN HIGH COURT
BUILDINGS AT JODHPUR) :
7/27/2019 Comparative Statement Chap. 6 to 7_2
http://slidepdf.com/reader/full/comparative-statement-chap-6-to-72 14/44
B-53
Unit Red
Ashlar
Soorsagar or
eqvt. White
Ashlar
Rate (Rs.)Chapter
Code No.
Description
6.57 Supplying and fixing 7 to 8 cm. thick
Soorsagar stone chajja in slope (3 lines finedressed) -- do -- weather dropped. (both side
dressed).Sqm
6.58 Supplying and fixing (-- do --) outer and inner
corners complete (-- do --).Each 581.00
6.59 Supplying and fixing 17 cm. thick Soorsagar
dab stone (face 3 line dressed) complete
including cutting & moulding. Mtr. 580.00
6.60 Supplying and fixing Flat rain water spouts 25
cum. wide in Soorsagar stone slopped chajja (--do--). Each 391.00
6.61 Supplying and fixing Red Ashlar 17 cm. thick
vent sill with required slope (face & sill 3 line
fine dressed) (-- do --). Mtr. 259.00
6.62 Supplying and fixing Red Ashlar 17 cm. thick
exposed width todies under sloped chajja with
alternate projection and cutting complete (- do
-). R.Mtr. 959.00
6.63 (-do-) F.F. type design 22 x 22 cm. projection
(all 0.60 x 0.95 x 0.25 m.). Each 292.00
6.64 Supplying and fixing 22 cm. thick Red Ashlar
bed plate (pillar cap) 35 cm. wide x 135 cm.
long (3 lines dressed) all exposed sides
complete including cutting, moulding and
chaffering etc. Each 1067.00
6.65 Supplying and fixing Soorsagar stone coping
13 cm. thick & 4.5 cm. wide with 3 set back
groove & one projection with slopped to edge
(--do--). Sqm 1174.00 703.00
6.66 Labour charges for Animar dressing (old
M.G.H. pattern) over Soorsagar or equivalent
white ashlar over already two line dressed
surface by using special tools i.e. toothed
chisel etc. Sqm 458.00
7/27/2019 Comparative Statement Chap. 6 to 7_2
http://slidepdf.com/reader/full/comparative-statement-chap-6-to-72 15/44
B-54
Unit Red
Ashlar
Soorsagar or
eqvt. White
Ashlar
Rate (Rs.)Chapter
Code No.
Description
6.67 Labour charges for Soorsagar or equivalent
white ashlar stone cornice of approved shapeand design 18 cm. thick 38 to 40 cm. wide
with Animar dressing of M.G.H. pattern
(including cutting and moulding).
R.Mtr. 513.00
6.68 Labour charges for providing 8 to 10 cm. gola
with animar dressing as per old M.G.H.
pattern. R.Mtr. 134.00
6.69 Labour charges for Soorsagar or equivalent
white ashlar stone copping 15 cm. thick with
cutting, moulding and dressing as per old
M.G.H. pattern. R.Mtr. 391.00
6.70 Labour charges for fixing of stone chajja and
making good the same (exposed surface to
be measured). Sqm 189.00
7/27/2019 Comparative Statement Chap. 6 to 7_2
http://slidepdf.com/reader/full/comparative-statement-chap-6-to-72 16/44
B-55
Chapter
Code No.
Description Unit Rate (Rs.)
7.1 Marble stone flooring table rubbed,
18-20 mm thick over 20 mm (Av.) thick base
of CM 1 : 4 (1 cement : 4 coarse sand)
jointing with white cement mortar 1 : 2 (1
white cement : 2 marble dust) with pigment
to match the shade of the marble slab
including grinding, rubbing and polishing
complete.
OR
Providing and fixing stone slabs table
rubbed, 18-20 mm thick in Walls, Steps,Pillars, Counters, Jambs, Shelves, Sills etc.
laid on 12 mm (Av.) thick base of CM 1 : 3 (1
cement : 3 coarse sand) jointing with white
cement mortar 1 : 2 (1 white cement : 2
marble dust) with pigment to match the
shade of the marble slab complete including
grinding, rubbing and polishing.
WHITE MARBLE :
7.1.1 Makrana second quality plain.
Upto 800 Cm2 Tiles Sqm. 1116.00
801 Cm2 to 1500 Cm2 Tiles Sqm. 1399.00
1501 Cm2 to 3600 Cm2 Tiles Sqm. 1833.00
Above 3601 Cm2 Slabs Sqm. 2391.00
7.1.2 Makrana Superior quality having light
spots.Upto 800 Cm2 Tiles Sqm. 804.00
801 Cm2 to 1500 Cm2 Tiles Sqm. 965.00
1501 Cm2 to 3600 Cm2 Tiles Sqm. 1213.00
Above 3601 Cm2 Slabs Sqm. 1399.00
7.1.3 Makrana 'Adanga'.
Upto 800 Cm2 Tiles Sqm. 593.00
801 Cm2 to 1500 Cm2 Tiles Sqm. 680.00
1501 Cm2 to 3600 Cm2 Tiles Sqm. 841.00
Above 3601 Cm2 Slabs Sqm. 990.00
CHAPTER B-7
MARBLE, GRANITE AND TILE WORKS
7/27/2019 Comparative Statement Chap. 6 to 7_2
http://slidepdf.com/reader/full/comparative-statement-chap-6-to-72 17/44
B-56
Chapter
Code No.
Description Unit Rate (Rs.)
7.1.4 Rajnagar 1st quality with light spots.
Upto 800 Cm2 Tiles Sqm. 574.00
801 Cm2 to 1500 Cm2 Tiles Sqm. 655.001501 Cm2 to 3600 Cm2 Tiles Sqm. 717.00
Above 3601 Cm2 Slabs Sqm. 816.00
7.1.5 Rajnagar 2nd quality with light spots and
streaks.Upto 800 Cm2 Tiles Sqm. 432.00
801 Cm2 to 1500 Cm2 Tiles Sqm. 500.00
1501 Cm2 to 3600 Cm2 Tiles Sqm. 621.00
Above 3601 Cm2 Slabs Sqm. 680.00
7.1.6 Ambaji (Abu) with green shadow.
Upto 800 Cm2 Tiles Sqm. 705.00
801 Cm2 to 1500 Cm2 Tiles Sqm. 798.00
1501 Cm2 to 3600 Cm2 Tiles Sqm. 1027.00
Above 3601 Cm2 Slabs Sqm. 1492.00
7.1.7 Ambaji (Abu) Panther.
Upto 800 Cm2 Tiles Sqm. 562.00
801 Cm2 to 1500 Cm2 Tiles Sqm. 655.00
1501 Cm2 to 3600 Cm2 Tiles Sqm. 748.00
Above 3601 Cm2 Slabs Sqm. 898.00
7.1.8 Andhi Pista and Jhiri.
Upto 800 Cm2 Tiles Sqm. 526.00
801 Cm2 to 1500 Cm2 Tiles Sqm. 619.001501 Cm2 to 3600 Cm2 Tiles Sqm. 712.00
Above 3601 Cm2 Slabs Sqm. 836.00
7.1.9 Andhi Indo - Italian and baldevgarh.
Upto 800 Cm2 Tiles Sqm. 588.00
801 Cm2 to 1500 Cm2 Tiles Sqm. 712.00
1501 Cm2 to 3600 Cm2 Tiles Sqm. 836.00
Above 3601 Cm2 Slabs Sqm. 1084.00
7.1.10 Banswara.
Upto 800 Cm2 Tiles Sqm. 464.00
801 Cm2 to 1500 Cm2 Tiles Sqm. 557.001501 Cm2 to 3600 Cm2 Tiles Sqm. 712.00
Above 3601 Cm2 Slabs Sqm. 960.00
PINK MARBLE :
7.1.11 Udaipur (Babarmal).
Upto 800 Cm2 Tiles Sqm. 575.00
7/27/2019 Comparative Statement Chap. 6 to 7_2
http://slidepdf.com/reader/full/comparative-statement-chap-6-to-72 18/44
B-57
Chapter
Code No.
Description Unit Rate (Rs.)
801 Cm2 to 1500 Cm2 Tiles Sqm. 650.00
1501 Cm2 to 3600 Cm2 Tiles Sqm. 681.00
Above 3601 Cm2 Slabs Sqm. 836.00
7.1.12 Makrana Adanga.
Upto 800 Cm2 Tiles Sqm. 526.00
801 Cm2 to 1500 Cm2 Tiles Sqm. 588.00
1501 Cm2 to 3600 Cm2 Tiles Sqm. 681.00
Above 3601 Cm2 Slabs Sqm. 836.00
7.1.13 Bundi
Upto 800 Cm2 Tiles Sqm. 500.00
801 Cm2 to 1500 Cm2 Tiles Sqm. 547.00
1501 Cm2 to 3600 Cm2 Tiles Sqm. 635.00
Above 3601 Cm2 Slabs Sqm. 765.00
GREEN MARBLE :
7.1.14 Kesriaji (Rikhabdeo).
Upto 800 Cm2 Tiles Sqm. 579.00
801 Cm2 to 1500 Cm2 Tiles Sqm. 641.00
1501 Cm2 to 3600 Cm2 Tiles Sqm. 765.00
Above 3601 Cm2 Slabs Sqm. 1000.00
7.1.15 Abu.
Upto 800 Cm2 Tiles Sqm. 579.00
801 Cm2 to 1500 Cm2 Tiles Sqm. 703.00
1501 Cm2 to 3600 Cm2 Tiles Sqm. 827.00
Above 3601 Cm2 Slabs Sqm. 1075.00
BLACK MARBLE :
7.1.16 Bhaislana, Abu, Kishangarh Zebra.
Upto 800 Cm2 Tiles Sqm. 486.00
801 Cm2 to 1500 Cm2 Tiles Sqm. 579.00
1501 Cm2 to 3600 Cm2 Tiles Sqm. 641.00
Above 3601 Cm2 Slabs Sqm. 765.00
GREY MARBLE :
7.1.17 Bundi
Upto 800 Cm2 Tiles Sqm. 579.00
801 Cm2 to 1500 Cm2 Tiles Sqm. 641.00
1501 Cm2 to 3600 Cm2 Tiles Sqm. 765.00
Above 3601 Cm2 Slabs Sqm. 952.00
7/27/2019 Comparative Statement Chap. 6 to 7_2
http://slidepdf.com/reader/full/comparative-statement-chap-6-to-72 19/44
B-58
Chapter
Code No.
Description Unit Rate (Rs.)
Note :1 Add extra for doing mirror
polishing. Sqm. 65.51
2 Add extra for marble cladding work in plain
arches and domes including all scaffolding
etc. complete.
Sqm
25%
of
respective
marble item
7.2 Providing and fixing Granite stone slab
mirror polished and machine edge cut in
walls, pillars, steps, Shelves, Sills Counters,
Floors etc. laid on 12 mm (Av.) thick base of
cement mortar 1 : 3 (1 cement : 3 coarse
sand) jointing with white cement mortar 1 : 2(1 white cement : 2 marble dust) with
pigment to match the shade of the granite
slab complete including rubbing and
polishing of :
7.2.1 Jhunjhunu / Jalore (Red / Choclate
Colour)Upto 800 Cm2 Tiles Sqm. 962.00
801 Cm2 to 1500 Cm2 Tiles Sqm. 1231.00
1501 Cm2 to 3600 Cm2 Tiles Sqm. 1770.00
Above 3601 Cm2 Slabs Sqm. 2239.00
7.2.2 Jhanshi (Red / Choclate Colour)
Upto 800 Cm2 Tiles Sqm. 1096.00
801 Cm2 to 1500 Cm2 Tiles Sqm. 1366.00
1501 Cm2 to 3600 Cm2 Tiles Sqm. 1841.00
Above 3601 Cm2 Slabs Sqm. 2579.00
7.2.3 South (Red / Choclate Colour)
Upto 800 Cm2 Tiles Sqm. 1231.00
801 Cm2 to 1500 Cm2 Tiles Sqm. 1433.00
1501 Cm2 to 3600 Cm2 Tiles Sqm. 2040.00
Above 3601 Cm2 Slabs Sqm. 3119.00
7.2.4 Green / Black / Other granite.
Upto 800 Cm2 Tiles Sqm. 1231.00
801 Cm2 to 1500 Cm2 Tiles Sqm. 1366.00
1501 Cm2 to 3600 Cm2 Tiles Sqm. 1905.00
Above 3601 Cm2 Slabs Sqm. 2445.00
7/27/2019 Comparative Statement Chap. 6 to 7_2
http://slidepdf.com/reader/full/comparative-statement-chap-6-to-72 20/44
B-59
7.3 Providing and fixing 1st quality standard
White / Ivory Glazed Tiles ISI marked [IS :
13753] of size 300 mm x 200 mm in walls,
floors, steps, pillars etc. laid on a bed of neat
cement slurry finished with flush pointing in
white cement mixed with pigment to match
the shade of tile complete (excluding the cost
of cement plaster on walls and pillar).
7.3.1 Catgory-I : Kajaria, Johnson, , Somani make
etc. Sqm 571.00
7.3.2 Category-II : Bell, Orient, Thar make etc.Sqm 500.00
7.3.3 Add extra over item no. 7.3.1 and 7.3.2 for Marble printed, Granite shade tiles. Sqm 15%
7.3.4 Add extra over 7.3.1 and 7.3.2 for using
coloured dark shade tiles instead of
white/lvory/ light grey/ light green/ sky blue/
light brown and other light shade coloures.Sqm 50.00
7.4 Providing and fixing 1st quality MAT finished
ceremic tile size 300 x 300 mm confirming to
IS : 13753 colour such as white, grey, ivory,
fume red brown in walls, floors, steps, pillars
etc. laid on a bed of neat cement slurryincluding nicely finished joints using water
proof joint filler powder (Untile of Roffe make)
and finishing with flush pointing in white
cement mixed with pigment to match the
shade of the complete (including the cost of
cement mortor bed 1:4).
7.4.1 Category -A : Kajaria, Jhonson, Somani
make Sqm 618.00
Rate (Rs.)DescriptionChapter
Code No.
Unit
7/27/2019 Comparative Statement Chap. 6 to 7_2
http://slidepdf.com/reader/full/comparative-statement-chap-6-to-72 21/44
B-60
Rate (Rs.)DescriptionChapter
Code No.
Unit
7.5 Providing and fixing 1st quality MAT finished
ceremic tile size 300 x 300 mm confirming to
IS : 13755 coloured tile except white, grey,
ivory, fume red brown in walls, floors, steps,
pillars etc. laid on a bed of neat cement slurry
including nicely finish joints using water proof
joint filler powder (Untile or Roffe make) and
finishing with flush pointing in white cement
mixed with pigment to match the shade of tile
complete (Excluding the cost of cement
mortor bed 1:4 ).Sqm 588.00
Note :
(1) Add extra over item No. 7.3, 7.4 & 7.5 for
floor work due to extra cost of cement mortar
1 : 4 (1 cement : 4 fine sand) 20 mm
thick.Sqm 50.00
(2) Add extra over item No. 7.3 for using
coloured glazed tiles instead of White / Ivory.
Sqm 50.00
(3) Deduct on item No. 7.3, 7.4 & 7.5 for using
tiles of approved make second quality tiles.
Sqm 10%
(4) Add extra over item No. 7.3, 7.4 & 7.5 for
Marble printed, granite shade tiles. Sqm 20%
(5) Add extra over item No. 7.4 & 7.5 for using
400 x 400 mm size tiles. Sqm 50.00
7.6 Providing and fixing marble mirror polished 7
mm thick tiles of approved make and size in
walls, floors, steps, pillars etc. laid on a bed
of neat cement slurry including nicely finished
joints using water proof joint filler powder and
finished with flush pointing in white cement
mixed with pigment to match the shade of tile
complete (excluding cost of cement plaster) :
7.6.1 Banswara white tiles. Sqm 536.00
7.6.2 Andhi white tiles. Sqm 595.00
7.6.3 Rajnagar white tiles. Sqm 712.00
7.6.4 Ambaji white tiles. Sqm 770.00
7/27/2019 Comparative Statement Chap. 6 to 7_2
http://slidepdf.com/reader/full/comparative-statement-chap-6-to-72 22/44
B-61
Rate (Rs.)DescriptionChapter
Code No.
Unit
7.6.5 Kesriaji green & Bhaislana black tiles. Sqm 624.00
7.7 Providing and fixing gun metal clamps as per
design in cement sand mortar 1 : 3 (1 cement
: 3 fine sand) including of making necessary
chases.
7.7.1 25 x 6 mm x 30 cm. long. Each 101.00
7.7.2 15 x 6 mm x 16.5 cm long. Each 35.00
7.8 Providing and fixing copper pipe 7.5 cm. long
of 6 mm external diameter in cement sand
mortar 1 : 3 (1 cement : 3 fine sand) including
making necessary chases. Each 15.00
7.9 Providing and fixing stone dowel 10 x 5 x 2.5cm cut to double wedge shape as per design
in cement sand mortar 1 : 3 (1 cement : 3 fine
sand) including making necessary chases.
Each 8.00
7.10 Extra for providing edge moulding to 18 mm
thick marble stone counters, vantities etc.
over item No. 7.1 & 7.2 including machine
polishing to edge to give high gloss finish etc.
complete as per design approved by
Engineer-in-Charge.
7.10.1 Marble work Metre 99.007.10.2 Granite work Metre 143.00
7.11 Extra for providing opening of required size &
shape for wash basin / kitchen sink in kitchen
platform, vanit counters and similar location
in marble / stone work including necessary
holes for pillars taps etc. including rubbing
and polishing of cut edge etc. complete.Each
Opening 22.00
7.12 Providing & fixing vitrified paving tiles size
600 mm × 600 mm × 12 mm thick fix with
cement mortar over 20 mm thich (1 Cement 4
Sand) laid on a bed of neat cement slurry
including nicely finished joints using water proof joint filler powder (Untile or Roffe make)
and finishing with flush pointing in white
cement mixed with pigment to match the
shade of tile complete (including the cost of
cement mortor 1:4) Per Sqm
7.12.1 Category -A : Kajaria, Jhonson, Somani
make 723.00
7/27/2019 Comparative Statement Chap. 6 to 7_2
http://slidepdf.com/reader/full/comparative-statement-chap-6-to-72 23/44
B-34
NOTE :
1 Rates provided are for the
complete finished
items inclusive of cost of water
and materials with all leads
labour, all type of taxes, royalty,
scaffolding, curing, laying, fixing
finishing etc. hire charges for
tools and plants, templates and
other appliances, required for the
puropose of execution of the
items work as per specification.
2 In case of non-availability of stone
header of proper size cement
concrete header of mix 1 : 3 : 6(M-100) with 25 mm graded stone
aggregate with smooth finish may
be provided by the contractor at
no extra cost.
Chapter
Code
No.
Description Unit Rate (Rs)
2008
Analysed
Rate (Rs.)
2009
Proposed
Rate (Rs.)
2009
%
Variation
1 2 3 4 5 6 7
6.1 Random Rubble stone masonry
for foundation and plinth in
Cement Sand mortar above 30
cm thick wall in :
6.1.1 Mud Mortar. Cum 600.00 1099.00 660.00 10.00
6.1.2 Dry Masonry. Cum 263.00 1047.00 400.00 52.09
6.1.3 Lime Sand Mortar 1 : 3 (1-Lime
putty : 3-Sand). Cum 650.00 1342.00 780.00 20.00
6.1.4 Cement Mortar 1 : 3 (1-Cement :
3-Sand). Cum 1350.00 1905.00 1750.00 29.63
6.1.5 Cement Mortar 1 : 4 (1-Cement :
4-Sand). Cum 1175.00 1786.00 1550.00 31.91
6.1.6 Cement Mortar 1 : 5 (1-Cement :
5-Sand). Cum 1100.00 1700.00 1450.00 31.82
6.1.7 Cement Mortar 1 : 6 (1-Cement :
6-Sand). Cum 1060.00 1626.00 1400.00 32.08
CHAPTER B-6
STONE MASONRY
PART - A : GENERAL STONE WORK
AAO
PWD Circle Baran TA cum Ex. En.
PWD Circle Baran Superintending Engineer
PWD Circle Baran
7/27/2019 Comparative Statement Chap. 6 to 7_2
http://slidepdf.com/reader/full/comparative-statement-chap-6-to-72 24/44
B-35
Chapter
Code
No.
Description Unit Rate (Rs)
2008
Analysed
Rate (Rs.)
2009
Proposed
Rate (Rs.)
2009
%
Variation
1 2 3 4 5 6 7
6.2 Random Rubble stone masonry
for superstructure above plinth
level one storey height above 30
cm. thick walls in :
6.2.1 Mud Mortar. Cum 680.00 1459.00 748.00 10.00
6.2.2 Dry Masonry. Cum 625.00 1407.00 688.00 10.08
6.2.3 Lime Sand Mortar 1 : 3 (1-Lime
putty : 3-Sand). Cum 925.00 1701.00 1150.00 24.32
6.2.4 Cement Mortar 1 : 3 (1-Cement :
3-Sand). Cum 1230.00 2264.00 1850.00 50.41
6.2.5 Cement Mortar 1 : 4 (1-Cement :
4-Sand). Cum 1300.00 2145.00 1650.00 26.92
6.2.6 Cement Mortar 1 : 5 (1-Cement :5-Sand). Cum 1200.00 2059.00 1550.00 29.17
6.2.7 Cement Mortar 1 : 6 (1-Cement :
6-Sand). Cum 1030.00 1986.00 1500.00 45.63
6.2.8 Cement Mortar 1 : 8 (1-Cement :
8-Sand). Cum 1080.00 1906.00 1400.00 29.63
6.3 Extra over item No. 6.1 & 6.2 for :
6.3.1 Wall curved in plan to mean
radius not exceeding 6 Mtr. Cum 100.00 194.00 125.00 25.00
6.3.2 Wall upto 30 cm. and less
thickness. Cum 60.00 122.00 80.00 33.33
6.3.3 Pillar masonry including bed
plates as per specifications. Bed
plates to be paid separately.
Cum 125.00 172.00 160.00 28.00
6.4 Extra for facing as per design and
detailed specifications including
additional cost of stones over
item No. 6.1 & 6.2 for :
6.4.1 Course rubble facing First Sort. Sqm 185.00 247.00 225.00 21.62
6.4.2 Course rubble facing Second
Sort. Sqm 165.00 238.00 200.00 21.21
6.4.3 Ashlar fine tooled facing. Sqm 225.00 295.00 260.00 15.56
6.4.4 Ashlar rough tooled facing. Sqm 125.00 160.00 160.00 28.00
AAO
PWD Circle Baran TA cum Ex. En.
PWD Circle Baran Superintending Engineer
PWD Circle Baran
7/27/2019 Comparative Statement Chap. 6 to 7_2
http://slidepdf.com/reader/full/comparative-statement-chap-6-to-72 25/44
B-36
Chapter
Code
No.
Description Unit Rate (Rs)
2008
Analysed
Rate (Rs.)
2009
Proposed
Rate (Rs.)
2009
%
Variation
1 2 3 4 5 6 7
6.4.5 Ashlar pitched facing. Sqm 120.00 149.00 145.00 20.83
6.4.6 R.R. stone decoration facing. Sqm 55.00 55.00 55.00 0.00
6.4.7 Workshop pattern masonry. Sqm 70.00 73.00 70.00 0.00
VENEERING WORK
6.5 Providing stone veneer facing in
cement mortar 1 : 4 including
cement pointing 1 : 3 in white
cement with admixture of pigment
matching the stone shade, upto
one storey height above plinth
level, in :
6.5.1 Red Karauli sand stone rough
dressed 25 to 35 mm thick. Sqm 565.00 666.00 650.00 15.04
6.5.2 Extra over item No. 6.6.1 for fine
grinded stone used instead of
rough dressed. Sqm 50.00 55.00 55.00 10.00
6.5.3 White Dholpur sand stone rough
dressed 25 to 35 mm thick.
Sqm 590.00 730.00 700.00 18.64
6.5.4 Extra item no. 6.5.3 for fine
grinded stone used instead of
rough dressed. Sqm 50.00 55.00 55.00 10.00
6.5.5 Modak or similar stone rough
dressed 30 to 40 mm thick. Sqm 520.00 680.00 600.00 15.38
6.5.6 Extra for fine grinded stone used
instead of rough dressed. Sqm 50.00 55.00 55.00 10.00
6.5.7 Marble facing abardari (white and
pink) polished, 18 to 25 mm thick.
Sqm 790.00 912.00 900.00 13.92
6.5.8 Chittor / Nimbahera or similar
stone facing polished 18 to 25
mm thick. Sqm 490.00 659.00 600.00 22.45
6.6 Providing stone veneer facing in
strips upto 125 mm width and
upto 20 mm thick in cement
mortar 1 : 4 including cement
pointing 1 : 2 with and admixture
of pigment matching the stone
shade upto 4.5 Mtr. height above
plinth level, in :
AAO
PWD Circle Baran TA cum Ex. En.
PWD Circle Baran Superintending Engineer
PWD Circle Baran
7/27/2019 Comparative Statement Chap. 6 to 7_2
http://slidepdf.com/reader/full/comparative-statement-chap-6-to-72 26/44
B-37
Chapter
Code
No.
Description Unit Rate (Rs)
2008
Analysed
Rate (Rs.)
2009
Proposed
Rate (Rs.)
2009
%
Variation
1 2 3 4 5 6 7
6.6.1 White / Red / other stone rough
dressed. Sqm 510.00 659.00 600.00 17.65
6.6.2 Extra over item No. 6.6.1 for fine
grinded stone used instead of
rough dressed. Sqm 45.00 50.00 50.00 11.11
ARCH MASONRY :
6.7 Stone masonry for arches in
cement sand mortar 1 : 3
including centering shuttering and
pointing etc. upto 4.5 Mtr. height
from plinth level :
6.7.1 With hammer dressed stone (to
be plastered). Cum 2350.00 3248.00 2800.00 19.15
6.7.2 With coursed rubble stone (to bepointed). Cum 2530.00 3178.00 3000.00 18.58
6.7.3 Block-in-Course chisel dressed,
arch span upto 1.5 Mtr. Cum 3090.00 4274.00 3500.00 13.27
6.7.4 Block-in-Course chisel dressed,
arch span above 1.5 Mtr. Cum 3210.00 4440.00 3700.00 15.26
6.7.5 Cut stone fine dressed with fine
joints, arch span upto 1.5 Mtr. Cum 3700.00 5043.00 4200.00 13.51
6.7.6 Cut stone fine dressed with fine
joints, arch span above 1.5 Mtr. Cum 3950.00 5209.00 4500.00 13.92
6.7.7 Relieving arch stone masonry. Cum 1810.00 2773.00 2200.00 21.55
6.8 Extra over item No. 6.7 for dome
masonry, Shuttering and Form
work if required to be paid
separately. Cum 450.00 450.00 450.00 0.00
6.9 Deduct if arch masonry is done in
lime sand mortar 1 : 2. Cum 330.00 330.00 330.00 0.00
6.10 Pardi Wall in Katla stone in
cement mortar 1 : 6, 75 mm to
150 mm thick excluding plaster. Sqm 265.00 375.00 340.00 28.30
6.11 Dry stone pitching including
preparing the surface etc.
complete.
6.11.1 Random Rubble with stone
weighing 30 to 40 Kg. each. Cum 360.00 636.00 500.00 38.89
6.11.2 Coursed rubble. Cum 440.00 674.00 550.00 25.00
AAO
PWD Circle Baran TA cum Ex. En.
PWD Circle Baran Superintending Engineer
PWD Circle Baran
7/27/2019 Comparative Statement Chap. 6 to 7_2
http://slidepdf.com/reader/full/comparative-statement-chap-6-to-72 27/44
B-38
Chapter
Code
No.
Description Unit Rate (Rs)
2008
Analysed
Rate (Rs.)
2009
Proposed
Rate (Rs.)
2009
%
Variation
1 2 3 4 5 6 7
MISCELLANEOUS :
6.12 Providing and fixing clamps of
required size shape for anchoring
stone wall lining (veneer) to the
backing of securing adjacent
stone in stone wall lining (veneer)
in cement mortar 1 : 2 including
making the necessary chases
made of :
6.12.1 Copper Kg. 430.00 518.00 500.00 16.28
6.12.2 Gun metal (casted). Kg. 320.00 350.00 350.00 9.38
DASA, SILLS, COPING,
LINTELS, CHAJJA ETC. :6.13 Supplying and fixing in cement
sand mortar 1 : 4 sand or other
approved stone dasa or coping of
thickness 75 to 100 mm (fine
dressed) :
6.13.1 Plain or Bull nosed. Sqm 1270.00 1424.00 1420.00 11.81
6.13.2 Goladar. Sqm 1385.00 1575.00 1575.00 13.72
6.13.3 Plain Tikaridar. Sqm 2000.00 2391.00 2300.00 15.00
6.13.4 Plain ornamental. Sqm 2485.00 3033.00 2800.00 12.68
6.14 Supplying and fixing rough
dressed stone sills, dasa, coping,
cornices sriwan, string courses
etc. in cement mortar 1 : 4
including pointing with admixture
of pigment matching with the
stone shade :
6.14.1 50 mm thick. Sqm 480.00 542.00 542.00 12.92
6.14.2 75 mm thick. Sqm 600.00 657.00 657.00 9.50
6.14.3 100 mm thick. Sqm 760.00 815.00 815.00 7.24
6.15 Supplying and fixing dressedsand or other approved stone
shelves, tands in cement mortar 1
: 3 with fine dressed edges :
6.15.1 25 mm thick. Sqm 200.00 220.00 220.00 10.00
6.15.2 35 mm thick. Sqm 250.00 271.00 271.00 8.40
6.15.3 50 mm thick. Sqm 345.00 364.00 364.00 5.51
AAO
PWD Circle Baran TA cum Ex. En.
PWD Circle Baran Superintending Engineer
PWD Circle Baran
7/27/2019 Comparative Statement Chap. 6 to 7_2
http://slidepdf.com/reader/full/comparative-statement-chap-6-to-72 28/44
B-39
Chapter
Code
No.
Description Unit Rate (Rs)
2008
Analysed
Rate (Rs.)
2009
Proposed
Rate (Rs.)
2009
%
Variation
1 2 3 4 5 6 7
6.15.4 75 mm thick. Sqm 505.00 527.00 527.00 4.36
6.16 Supplying and fixing in walls
machine cut and polished stone
shelves, tands and sills in CM 1 :
3 with machine cut edges :
6.16.1 Sand or other approved stone 25
mm thick. Sqm 330.00 431.00 400.00 21.21
6.16.2 Sand or other approved stone 35
mm thick. Sqm 340.00 460.00 410.00 20.59
6.16.3 Sand or other approved stone 50
mm thick. Sqm 350.00 496.00 420.00 20.00
6.16.4 Kota stone 25 to 30 mm thick. Sqm 340.00 372.00 372.00 9.41
6.16.5 Madras Stone 25 to 30 mm thick.
Sqm 475.00 525.00 525.00 10.53
6.16.6 Chittor / Nimbahera 25 to 30 mm
thick. Sqm 380.00 431.00 430.00 13.16
6.16.7 Extra over item 6.16.1 to 6.16.6
for machine cut both side
polished stone is used. Sqm 40.00 40.00 40.00 0.00
6.17 Supplying and fixing stone lintels /
bed plates of approved quarry
rough dressed in cement mortar 1
: 4 :
6.17.1 Upto 15 cm. thick. Cum 3900.00 6062.00 5100.00 30.77
6.17.2 Above 15 cm. thick. Cum 4100.00 5954.00 5300.00 29.27
6.18 Providing and fixing 30 to 40 mm
thick stone chajjas in cement
sand mortar 1 : 4 including
making gola at junction with wall
in cement concrete M-15 grade (1
: 2 : 4 nominal mix), drip course :
6.18.1 Pointing both faces in CM 1 : 3
with an admixture of pigment
matching the stone shade. Sqm 400.00 510.00 510.00 27.50
6.18.2 20 mm thick plastering in CM 1 :
6 on both faces. Sqm 450.00 603.00 603.00 34.00
AAO
PWD Circle Baran TA cum Ex. En.
PWD Circle Baran Superintending Engineer
PWD Circle Baran
7/27/2019 Comparative Statement Chap. 6 to 7_2
http://slidepdf.com/reader/full/comparative-statement-chap-6-to-72 29/44
B-40
Chapter
Code
No.
Description Unit Rate (Rs)
2008
Analysed
Rate (Rs.)
2009
Proposed
Rate (Rs.)
2009
%
Variation
1 2 3 4 5 6 7
6.19 Deduct from item No. 6.18 for
fixing done in lime sand mortar 1 :
2 instead of CM 1 : 3. Sqm 37.00 32.00 37.00 0.00
6.20 Providing dab stone over Chajjas
duly fixed in cement sand mortar
1 : 6 complete :
6.20.1 80 mm thick. Sqm 430.00 604.00 550.00 27.91
6.20.2 50 mm thick. Sqm 360.00 576.00 480.00 33.33
6.21 Providing and fixing fine dressed
machine cut approved sand stone
steps (risers and treads) in CM 1 :
4 including pointing the joints with
white cement mortar 1 : 2 with
admixture of matching the stoneshade with width of steps 1200
mm :
6.21.1 35 to 40 mm thick. Sqm 400.00 593.00 525.00 31.25
6.21.2 50 mm thick. Sqm 415.00 631.00 550.00 32.53
6.22 Providing and fixing stone jali 40
mm thick through out (without
sinking or moulding in jali slab) in
CM 1 : 3 including pointing in
white cement marble mortar 1 : 2
(1 cement : 2 marble dust) with an
admixture of pigment matching
the stone shade, jali patterns to
be cut square to jali slab without
any chamfers etc. :
6.22.1 Red Sand stone. Sqm 2770.00 3451.00 3400.00 22.74
6.22.2 White Sand stone. Sqm 2980.00 3664.00 3600.00 20.81
6.23 Add extra for doing masonry work
in or under water and or liquid
mud including cost of pumping or
bailing out water and removing
and slush etc. complete.
Cum
P.Mtr.Depth 52.00 52.00 52.00 0.00
6.24 Extra for subsequent storey or
height of 4.5 Mtr. or part thereof
for all masonry work :
6.24.1 Quantity in Sqm. Sqm 12.00 22.00 16.00 33.33
AAO
PWD Circle Baran TA cum Ex. En.
PWD Circle Baran Superintending Engineer
PWD Circle Baran
7/27/2019 Comparative Statement Chap. 6 to 7_2
http://slidepdf.com/reader/full/comparative-statement-chap-6-to-72 30/44
B-41
Chapter
Code
No.
Description Unit Rate (Rs)
2008
Analysed
Rate (Rs.)
2009
Proposed
Rate (Rs.)
2009
%
Variation
1 2 3 4 5 6 7
6.24.2 Quantity in Cum. Cum 43.00 73.00 55.00 27.91
6.25 Making groove of approved
design upto 20 x 20 mm size in
the joints of stone veneering work
for walls, columns, offsets etc.
including finishing in white cement
marble mortar 1 : 2 (1 cement : 2
marble dust) with an admixture of
pigment matching the stone
shade, complete. Mtr. 8.00 11.00 10.00 25.00
Note : - Recover cost of useful stone @
2/3rd of masonry work
dismantalled or actual quantity,
which ever is more. Cum 300.00 350.00 350.00 16.67
AAO
PWD Circle Baran TA cum Ex. En.
PWD Circle Baran Superintending Engineer
PWD Circle Baran
7/27/2019 Comparative Statement Chap. 6 to 7_2
http://slidepdf.com/reader/full/comparative-statement-chap-6-to-72 31/44
NOTE :
1 Rate are for complete work including
fixing,all pointing in cement mortar 1 : 3 /
lime mortar 1 : 2 / gypsum.
2 Exposed surface is to be measured only
for chajjas, parapets, shelves and
cantilever steps.
3 Add / Deduct difference of cost of dressing
if otherwise mentioned.
4. (a) Add extra on G.F. rates for S & F item for
first floor / subsequent floor per floor @
Rs. 22/- per Cum. / @ Rs. 1.50 per Sqm.
Except item No. 16 to 23.
(b) Deduct for Dasa of lintel of vents for plinth
and basement @ Rs. 20/- per Cum.
5 Rough dressing is included in items of S/F
and thereof rates of item 16 to 18 and 20
to 22 are over rough dressing.
6 Soorsagar white or equivalent and red or
equivalent is to be used only for exposed
surfaces and all other internal ashlar may
be paid for rate of Bhura or equivalent
ashlar.
7 For the item of ashlar work 3 - l ime stone
dressed, full rate should be allowed on test
check of Executive Engineer.
Unit Red
Ashlar
Soorsagar
or eqvt.
White
Ashlar
Red
Ashlar
Soorsaga
r or eqvt.
White
Ashlar
Red
Ashlar
Soorsagar or
eqvt. White
Ashlar
Red
Ashlar
1 2 3 4 5 6 7 8 9 10
6.26 Supplying and fixing ashlar sills, jambs,
skirting, steps etc. rough dressed :
6.26.1 Upto 15 cm. thick Cum 1891.00 2205.00 2080.00 2426.00 2080.00 2426.00 9.99
6.26.2 Above 15 cm. and upto 20 cm. thick Cum 1940.00 2244.00 2134.00 2468.00 2134.00 2468.00 10.00
6.26.3 Above 20 cm. thick and upto 2.15 m length
(Pats). Cum 1980.00 2320.00 2178.00 2552.00 2178.00 2552.00 10.00
6.26.4 Above 20 cm. thick & above 2.15 m length.
Cum 2708.00 2391.00 2979.00 2630.00 2979.00 2630.00 10.01
ASHLAR STONE WORK :
% VRate 2008 BSR Analysed Rate (Rs.)
2009
CHAPTER B-6
STONE MASONRY
PART - B : ASHLAR WORK
Chapter
Code No.
Description Proposed Rate2009
7/27/2019 Comparative Statement Chap. 6 to 7_2
http://slidepdf.com/reader/full/comparative-statement-chap-6-to-72 32/44
Unit Red
Ashlar
Soorsagar
or eqvt.
WhiteAshlar
Red
Ashlar
Soorsaga
r or eqvt.
WhiteAshlar
Red
Ashlar
Soorsagar or
eqvt. White
Ashlar
Red
Ash
1 2 3 4 5 6 7 8 9 1
Rate 2008 BSR Analysed Rate (Rs.)
2009
Chapter
Code No.
Description Proposed Rate2009
6.27 Supplying and fixing Soorsagar Bhura or
equivalent ashlar sills, lintels and dassa,
bearing, bed & top surface made perfectly
even, jambs, skirting steps etc. rough
dressed :
6.27.1 Upto 15 cm. thick. Cum 1764.00 1940.00 1940.00
6.27.2 Above 15 cm & upto 20 cm. thick. Cum 1813.00 1994.00 1994.00
6.27.3 Above 20 cm thick (Pats) and upto 2.15 m
length. Cum 1891.00 2080.00 2080.00
6.27.4 Above 20 cm thick (Pats) and above 2.15
m. length. Cum 1960.00 2156.00 2156.00
6.28 Supply and fixing ashlar lintels and Dassa
exposed horizontal and vertical faces 3 -
lines fine dressed (bearing bed & top
surface made perfectly even) :
6.28.1 Upto 15 cm. thick. Cum 2352.00 3234.00 2587.00 3557.00 2587.00 3557.00 9
6.28.2 Above 15 cm. & upto 20 cm. thick. Cum 2450.00 3352.00 2695.00 3687.00 2695.00 3687.00 10
6.28.3 Above 20 cm. thick and above 2.15 m.
length. Cum 2528.00 3450.00 2781.00 3795.00 2781.00 3795.00 10
6.28.4 Above 20 cm. thick & above 2.15 m.
length. Cum 2326.00 3587.00 2559.00 3946.00 2559.00 3946.00 10
6.29 Supplying and fixing ashlar solid block
pillars fully fine (3 lines) dressed. Cum 3695.00 5648.00 4065.00 6213.00 4065.00 6213.00 10
6.30 Supplying and fixing ashlar stone arches
fully fine (3 lines) dressed for 1.5 to 5 m.
span (Net content payable). Cum 2724.00 4116.00 2996.00 4528.00 2996.00 4528.00 9
6.31 Supplying and fixing ashlar face stone 10
cm. thick fine (3 lines) dressed. Cum 372.00 549.00 409.00 604.00 409.00 604.00 9
6.32 Supplying and fixing ashlar coping ordinary
7 to 10 cm. thick 2 - line dressed (normal
length of single piece not less than 0.90
m). Sqm 314.00 451.00 345.00 496.00 345.00 496.00 9
6.33 Supplying and fixing ashlar coping
moulded and counter slopped 7 to 10 cm.
thick (2-line dressed) (-- do --). Sqm 402.00 529.00 442.00 582.00 442.00 582.00 9
6.34 Supplying and fixing ashlar shrivan
7/27/2019 Comparative Statement Chap. 6 to 7_2
http://slidepdf.com/reader/full/comparative-statement-chap-6-to-72 33/44
Unit Red
Ashlar
Soorsagar
or eqvt.
WhiteAshlar
Red
Ashlar
Soorsaga
r or eqvt.
WhiteAshlar
Red
Ashlar
Soorsagar or
eqvt. White
Ashlar
Re
As
1 2 3 4 5 6 7 8 9
Rate 2008 BSR Analysed Rate (Rs.)
2009
Chapter
Code No.
Description Proposed Rate2009
6.35 Fine dressing of ashlar stone work
(payable on Executive Engineer's test
checking) :
6.35.1 Three line dressed Sqm 247.00 519.00 272.00 571.00 272.00 571.00 1
6.35.2 Two line dressed Sqm 196.00 311.00 216.00 342.00 216.00 342.00 1
6.35.3 One line dressed Sqm 98.00 144.00 108.00 158.00 108.00 158.00 1
6.36 Rough dressing ashlar stone work
(payable only for departmental work). Sqm 35.00 59.00 39.00 65.00 39.00 65.00 1
6.37 Supplying and fixing ashlar cantilever
steps fine (3 lines) dressed (triangular
exposed surface is to be measured). Cum 9652.00 12229.00 10617.00 13452.00 10617.00 13452.00 1
6.38 (-- do --) (2 lines) (triangular exposed
surface is to be measured). Cum 8614.00 10937.00 9475.00 12031.00 9475.00 12031.00 1
6.39 Deduct if the shape of cantilever and
landing steps is rectangular :
6.39.1 From item No. 6.37 Cum 4665.00 5900.00 5132.00 6490.00 5132.00 6490.00 1
6.39.2 From item No. 6.38 Cum 4332.00 5478.00 4765.00 6026.00 4765.00 6026.00 1
6.40 Supplying and fixing ashlar rain water
spouts fine (3 lines) dressed as per
approved design of size :
6.40.1 60 x 26 x 18 cm. Each 216.00 304.00 238.00 334.00 238.00 334.00 1
6.40.2 60 x 30 x 25 cm. Each 323.00 470.00 355.00 517.00 355.00 517.00 9
6.41 Supplying and fixing ashlar stone chajja 5
to 7 cm. thick all exposed surface fully fine
dressed, weather dripped including 75 x 75
mm. cement batta (1 : 2 : 4) between
chajja & wall (single piece upto 1 : 2 m
length) :
6.41.1 Three line dressed Sqm 823.00 1186.00 905.00 1305.00 905.00 1305.00 9
6.41.2 Two line dressed Sqm 745.00 900.00 820.00 990.00 820.00 990.00 1
6.41.3 One line dressed Sqm 676.00 784.00 744.00 862.00 744.00 862.00 1
6.42 Supplying and fixing Red ashlar railing
ordinary with takia and thambli complete
fine dressed :6.42.1 Three line dressed. Sqm 764.00 840.00 840.00 9
6 42 2 T li d d
7/27/2019 Comparative Statement Chap. 6 to 7_2
http://slidepdf.com/reader/full/comparative-statement-chap-6-to-72 34/44
Unit Red
Ashlar
Soorsagar
or eqvt.
White
Ashlar
Red
Ashlar
Soorsaga
r or eqvt.
White
Ashlar
Red
Ashlar
Soorsagar or
eqvt. White
Ashlar
Red
Ashl
1 2 3 4 5 6 7 8 9 10
%Rate 2008 BSR Analysed Rate (Rs.)
2009
Chapter
Code No.
Description Proposed Rate2009
6.43 Supplying and fixing Red ashlar stone jali 5
to 7 cm. thick curved :
6.43.1 Upto half depth. Sqm 1133.00 1246.00 1246.00 9.9
6.43.2 Upto full depth. Sqm 1715.00 1887.00 1887.00 10.
6.44 Re-fixing old ashlar stone w/o dressing.
Cum 294.00 314.00 323.00 345.00 323.00 345.00 9.8
6.45 (-- do --) stone slab. Sqm 41.00 42.00 45.00 46.00 45.00 46.00 9.7
4.46 Supplying and fixing Red ashlar shelves 5
to 7 cm. thick exposed surface rough
dressed. Sqm 193.00 212.00 212.00 9.8
4.47 (-- do --) exposed surface (3 lines)
dressed. Sqm 353.00 388.00 388.00 9.9
6.48 Red ashlar todies for verandah (pillar and
pat) fine (3 lines) dressed. Sqm 211.00 232.00 232.00 9.9
6.49 Supplying and fixing ashlar todies for
chajjas and shelves fine (3 lines) dressed30 x 30 x 10 cm. Each 147.00 162.00 162.00 10.
6.50 Supplying and fixing chittar or equivalent
stone slab perchits with making edges and
top surface level in cement mortar 1 : 3
complete finished :
6.50.1 Upto 2.15 m. span. Sqm 225.00 248.00 248.00
6.50.2 Add extra for span more than 2.15 m Sqm 63.00 69.00 69.00
6.51 Supplying and fixing 7 to 10 cm. Soorsagar
or equivalent stone chaps in lime mortar or
gypsum rough dressed more than 0.60 m.
length. Sqm 122.00 134.00 134.00
6.52 Supplying and fixing 2.5 to 5 cm. thick
Darba Darbi wall of red (Ros) stone rough
dressed fixed in lime mortar or gypsum. Sqm 196.00 216.00 216.00 10.
6.53 Supplying and fixing soorsagar or
equivalent white stone slab steps 75 to
100 mm thick fine (3 lines) dressed for
tread & riser upto 2 m. length, simply
supported or centrally fixed with both ends
7/27/2019 Comparative Statement Chap. 6 to 7_2
http://slidepdf.com/reader/full/comparative-statement-chap-6-to-72 35/44
Unit Red
Ashlar
Soorsagar
or eqvt.
White
Ashlar
Red
Ashlar
Soorsaga
r or eqvt.
White
Ashlar
Red
Ashlar
Soorsagar or
eqvt. White
Ashlar
Red
Ashlar
1 2 3 4 5 6 7 8 9 10
% VarRate 2008 BSR Analysed Rate (Rs.)
2009
Chapter
Code No.
Description Proposed Rate2009
6.54 Deduct if Soorsagar or equivalent Bhura
Ashlar stone is used in place of white
ashlar. Sqm 20.00 22.00 22.00
6.55 Supplying and fixing Soorsagar or
equivalent 35 cm. height ashlar face stone
(3 lines) f ine dressing with 3.5 cm. gola /
groove complete including cutting and
moulding (excluding supply of Ashlar and
fixing). R.Mtr. 162.00 178.00 178.00
6.56 Supplying and fixing 13 cm. thick
Soorsagar face stone over vent lintel
complete including cutting & moulding (3
line fine dressed). R.Mtr. 335.00 369.00 369.00
6.57 Supplying and fixing 7 to 8 cm. thickSoorsagar stone chajja in slope (3 lines
fine dressed) -- do -- weather dropped.
(both side dressed). Sqm
6.58 Supplying and fixing (-- do --) outer and
inner corners complete (-- do --). Each 528.00 581.00 581.00
6.59 Supplying and fixing 17 cm. thick
Soorsagar dab stone (face 3 line dressed)
complete including cutting & moulding. Mtr. 527.00 580.00 580.00
6.60 Supplying and fixing Flat rain water spouts25 cum. wide in Soorsagar stone slopped
chajja (--do--). Each 355.00 391.00 391.00
6.61 Supplying and fixing Red Ashlar 17 cm.
thick vent sill with required slope (face &
sill 3 line fine dressed) (-- do --) . Mtr. 235.00 259.00 259.00 10.21
6.62 Supplying and fixing Red Ashlar 17 cm.
thick exposed width todies under sloped
chajja with alternate projection and cutting
complete (- do -). R.Mtr. 872.00 959.00 959.00 9.98
6.63 (-do-) F.F. type design 22 x 22 cm.
projection (all 0.60 x 0.95 x 0.25 m.). Each 265.00 292.00 292.00 10.19
ORNAMENTAL WORK (AS PER EXISTING
PATTERN OF UMED HOSPITAL, M.G.
HOSPITAL OR RAJASTHAN HIGH COURT
BUILDINGS AT JODHPUR) :
7/27/2019 Comparative Statement Chap. 6 to 7_2
http://slidepdf.com/reader/full/comparative-statement-chap-6-to-72 36/44
Unit Red
Ashlar
Soorsagar
or eqvt.
White
Ashlar
Red
Ashlar
Soorsaga
r or eqvt.
White
Ashlar
Red
Ashlar
Soorsagar or
eqvt. White
Ashlar
Red
Ashla
1 2 3 4 5 6 7 8 9 10
%Rate 2008 BSR Analysed Rate (Rs.)
2009
Chapter
Code No.
Description Proposed Rate2009
6.64 Supplying and fixing 22 cm. thick Red
Ashlar bed plate (pillar cap) 35 cm. wide x
135 cm. long (3 lines dressed) all exposed
sides complete including cutting, moulding
and chaffering etc. Each 970.00 1067.00 1067.00 10.0
6.65 Supplying and fixing Soorsagar stone
coping 13 cm. thick & 4.5 cm. wide with 3
set back groove & one projection with
slopped to edge (--do--). Sqm 1067.00 639.00 1174.00 703.00 1174.00 703.00 10.0
6.66 Labour charges for Animar dressing (old
M.G.H. pattern) over Soorsagar or
equivalent white ashlar over already two
line dressed surface by using special tools
i.e. toothed chisel etc. Sqm 416.00 458.00 458.00
6.67 Labour charges for Soorsagar or
equivalent white ashlar stone cornice of
approved shape and design 18 cm. thick
38 to 40 cm. wide with Animar dressing of
M.G.H. pattern (including cutting and
moulding). R.Mtr. 466.00 513.00 513.00
6.68 Labour charges for providing 8 to 10 cm.
gola with animar dressing as per old
M.G.H. pattern. R.Mtr. 122.00 134.00 134.00
6.69 Labour charges for Soorsagar or
equivalent white ashlar stone copping 15
cm. thick with cutting, moulding and
dressing as per old M.G.H. pattern. R.Mtr. 355.00 391.00 391.00
6.70 Labour charges for fixing of stone chajja
and making good the same (exposedsurface to be measured). Sqm 172.00 189.00 189.00
7/27/2019 Comparative Statement Chap. 6 to 7_2
http://slidepdf.com/reader/full/comparative-statement-chap-6-to-72 37/44
B-48
Chapter
Code No.
Description Unit Rate
(Rs.)
2008
Analysed
Rate (Rs.)
2009
Proposed
Rate 2009
%
Variation
1 2 3 4 5 6 7
7.1 Marble stone flooring table rubbed,
18-20 mm thick over 20 mm (Av.) thick base
of CM 1 : 4 (1 cement : 4 coarse sand)
jointing with white cement mortar 1 : 2 (1
white cement : 2 marble dust) with pigment
to match the shade of the marble slab
including grinding, rubbing and polishing
complete.
OR
Providing and fixing stone slabs tablerubbed, 18-20 mm thick in Walls, Steps,
Pillars, Counters, Jambs, Shelves, Sills etc.
laid on 12 mm (Av.) thick base of CM 1 : 3 (1
cement : 3 coarse sand) jointing with white
cement mortar 1 : 2 (1 white cement : 2
marble dust) with pigment to match the
shade of the marble slab complete including
grinding, rubbing and polishing.
WHITE MARBLE :
7.1.1 Makrana second quality plain.
Upto 800 Cm2 Tiles Sqm. 1054.00 1116.00 1116.00 5.88
801 Cm2 to 1500 Cm2 Tiles Sqm. 1302.00 1399.00 1399.00 7.45
1501 Cm2 to 3600 Cm2 Tiles Sqm. 1736.00 1833.00 1833.00 5.59
Above 3601 Cm2 Slabs Sqm. 2294.00 2391.00 2391.00 4.23
7.1.2 Makrana Superior quality having light
spots.Upto 800 Cm2 Tiles Sqm. 744.00 804.00 804.00 8.06
801 Cm2 to 1500 Cm2 Tiles Sqm. 868.00 965.00 965.00 11.18
1501 Cm2 to 3600 Cm2 Tiles Sqm. 1116.00 1213.00 1213.00 8.69
Above 3601 Cm2 Slabs Sqm. 1302.00 1399.00 1399.00 7.45
7.1.3 Makrana 'Adanga'.Upto 800 Cm2 Tiles Sqm. 494.00 593.00 593.00 20.04
801 Cm2 to 1500 Cm2 Tiles Sqm. 620.00 680.00 680.00 9.68
1501 Cm2 to 3600 Cm2 Tiles Sqm. 744.00 841.00 841.00 13.04
Above 3601 Cm2 Slabs Sqm. 930.00 990.00 990.00 6.45
7.1.4 Rajnagar 1st quality with light spots.
Upto 800 Cm2 Tiles Sqm. 477.00 574.00 574.00 20.34
801 Cm2 to 1500 Cm2 Tiles Sqm. 558.00 655.00 655.00 17.38
CHAPTER B-7
MARBLE, GRANITE AND TILE WORKS
AAO
PWD Circle Baran TA cum Ex. En.
PWD Circle Baran Superintending Engineer
PWD Circle Baran
7/27/2019 Comparative Statement Chap. 6 to 7_2
http://slidepdf.com/reader/full/comparative-statement-chap-6-to-72 38/44
B-49
Chapter
Code No.
Description Unit Rate
(Rs.)
2008
Analysed
Rate (Rs.)
2009
Proposed
Rate 2009
%
Variation
1 2 3 4 5 6 7
1501 Cm2 to 3600 Cm2 Tiles Sqm. 620.00 717.00 717.00 15.65
Above 3601 Cm2 Slabs Sqm. 719.00 816.00 816.00 13.49
7.1.5 Rajnagar 2nd quality with light spots and
streaks.Upto 800 Cm2 Tiles Sqm. 334.00 432.00 432.00 29.34
801 Cm2 to 1500 Cm2 Tiles Sqm. 403.00 500.00 500.00 24.07
1501 Cm2 to 3600 Cm2 Tiles Sqm. 527.00 621.00 621.00 17.84
Above 3601 Cm2 Slabs Sqm. 620.00 680.00 680.00 9.68
7.1.6 Ambaji (Abu) with green shadow.
Upto 800 Cm2 Tiles Sqm. 607.00 705.00 705.00 16.14
801 Cm2 to 1500 Cm2 Tiles Sqm. 700.00 798.00 798.00 14.00
1501 Cm2 to 3600 Cm2 Tiles Sqm. 930.00 1027.00 1027.00 10.43
Above 3601 Cm2 Slabs Sqm. 1395.00 1492.00 1492.00 6.95
7.1.7 Ambaji (Abu) Panther.
Upto 800 Cm2 Tiles Sqm. 465.00 562.00 562.00 20.86
801 Cm2 to 1500 Cm2 Tiles Sqm. 568.00 655.00 655.00 15.32
1501 Cm2 to 3600 Cm2 Tiles Sqm. 651.00 748.00 748.00 14.90
Above 3601 Cm2 Slabs Sqm. 806.00 898.00 898.00 11.41
7.1.8 Andhi Pista and Jhiri.
Upto 800 Cm2 Tiles Sqm. 434.00 526.00 526.00 21.20
801 Cm2 to 1500 Cm2 Tiles Sqm. 527.00 619.00 619.00 17.46
1501 Cm2 to 3600 Cm2 Tiles Sqm. 620.00 712.00 712.00 14.84
Above 3601 Cm2 Slabs Sqm. 744.00 836.00 836.00 12.37
7.1.9 Andhi Indo - Italian and baldevgarh.Upto 800 Cm2 Tiles Sqm. 496.00 588.00 588.00 18.55
801 Cm2 to 1500 Cm2 Tiles Sqm. 620.00 712.00 712.00 14.84
1501 Cm2 to 3600 Cm2 Tiles Sqm. 744.00 836.00 836.00 12.37
Above 3601 Cm2 Slabs Sqm. 992.00 1084.00 1084.00 9.27
7.1.10 Banswara.
Upto 800 Cm2 Tiles Sqm. 372.00 464.00 464.00 24.73
801 Cm2 to 1500 Cm2 Tiles Sqm. 465.00 557.00 557.00 19.78
1501 Cm2 to 3600 Cm2 Tiles Sqm. 620.00 712.00 712.00 14.84
Above 3601 Cm2 Slabs Sqm. 868.00 960.00 960.00 10.60
PINK MARBLE :
7.1.11 Udaipur (Babarmal).
Upto 800 Cm2 Tiles Sqm. 483.00 575.00 575.00 19.05
801 Cm2 to 1500 Cm2 Tiles Sqm. 558.00 650.00 650.00 16.49
1501 Cm2 to 3600 Cm2 Tiles Sqm. 589.00 681.00 681.00 15.62
Above 3601 Cm2 Slabs Sqm. 744.00 836.00 836.00 12.37
7.1.12 Makrana Adanga.
Upto 800 Cm2 Tiles Sqm. 434.00 526.00 526.00 21.20
AAO
PWD Circle Baran TA cum Ex. En.
PWD Circle Baran Superintending Engineer
PWD Circle Baran
7/27/2019 Comparative Statement Chap. 6 to 7_2
http://slidepdf.com/reader/full/comparative-statement-chap-6-to-72 39/44
B-50
Chapter
Code No.
Description Unit Rate
(Rs.)
2008
Analysed
Rate (Rs.)
2009
Proposed
Rate 2009
%
Variation
1 2 3 4 5 6 7
801 Cm2 to 1500 Cm2 Tiles Sqm. 496.00 588.00 588.00 18.55
1501 Cm2 to 3600 Cm2 Tiles Sqm. 589.00 681.00 681.00 15.62 Above 3601 Cm2 Slabs Sqm. 744.00 836.00 836.00 12.37
7.1.13 Bundi
Upto 800 Cm2 Tiles Sqm. 403.00 500.00 500.00 24.07
801 Cm2 to 1500 Cm2 Tiles Sqm. 465.00 547.00 547.00 17.63
1501 Cm2 to 3600 Cm2 Tiles Sqm. 552.00 635.00 635.00 15.04
Above 3601 Cm2 Slabs Sqm. 682.00 765.00 765.00 12.17
GREEN MARBLE :
7.1.14 Kesriaji (Rikhabdeo).
Upto 800 Cm2 Tiles Sqm. 496.00 579.00 579.00 16.73
801 Cm2 to 1500 Cm2 Tiles Sqm. 558.00 641.00 641.00 14.871501 Cm2 to 3600 Cm2 Tiles Sqm. 682.00 765.00 765.00 12.17
Above 3601 Cm2 Slabs Sqm. 917.00 1000.00 1000.00 9.05
7.1.15 Abu.
Upto 800 Cm2 Tiles Sqm. 496.00 579.00 579.00 16.73
801 Cm2 to 1500 Cm2 Tiles Sqm. 620.00 703.00 703.00 13.39
1501 Cm2 to 3600 Cm2 Tiles Sqm. 744.00 827.00 827.00 11.16
Above 3601 Cm2 Slabs Sqm. 992.00 1075.00 1075.00 8.37
BLACK MARBLE :
7.1.16 Bhaislana, Abu, Kishangarh Zebra.
Upto 800 Cm2 Tiles Sqm. 403.00 486.00 486.00 20.60
801 Cm2 to 1500 Cm2 Tiles Sqm. 496.00 579.00 579.00 16.73
1501 Cm2 to 3600 Cm2 Tiles Sqm. 558.00 641.00 641.00 14.87
Above 3601 Cm2 Slabs Sqm. 682.00 765.00 765.00 12.17
GREY MARBLE :
7.1.17 Bundi
Upto 800 Cm2 Tiles Sqm. 496.00 579.00 579.00 16.73
801 Cm2 to 1500 Cm2 Tiles Sqm. 558.00 641.00 641.00 14.87
1501 Cm2 to 3600 Cm2 Tiles Sqm. 682.00 765.00 765.00 12.17
Above 3601 Cm2 Slabs Sqm. 806.00 952.00 952.00 18.11
Note :
1 Add extra for doing mirror
polishing. Sqm. 55.00 65.51 65.51 19.10
AAO
PWD Circle Baran TA cum Ex. En.
PWD Circle Baran Superintending Engineer
PWD Circle Baran
7/27/2019 Comparative Statement Chap. 6 to 7_2
http://slidepdf.com/reader/full/comparative-statement-chap-6-to-72 40/44
B-51
Chapter
Code No.
Description Unit Rate
(Rs.)
2008
Analysed
Rate (Rs.)
2009
Proposed
Rate 2009
%
Variation
1 2 3 4 5 6 7
2 Add extra for marble cladding work in plain
arches and domes including all scaffoldingetc. complete.
Sqm
25%
ofrespecti
ve
marble
item
25% of
respective
marble
item
25% of
respective
marble
item
7.2 Providing and fixing Granite stone slab
mirror polished and machine edge cut in
walls, pillars, steps, Shelves, Sills Counters,
Floors etc. laid on 12 mm (Av.) thick base of
cement mortar 1 : 3 (1 cement : 3 coarse
sand) jointing with white cement mortar 1 : 2
(1 white cement : 2 marble dust) with
pigment to match the shade of the granite
slab complete including rubbing andpolishing of :
7.2.1 Jhunjhunu / Jalore (Red / Choclate
Colour)Upto 800 Cm2 Tiles Sqm. 756.00 962.00 962.00 27.25
801 Cm2 to 1500 Cm2 Tiles Sqm. 991.00 1231.00 1231.00 24.22
1501 Cm2 to 3600 Cm2 Tiles Sqm. 1460.00 1770.00 1770.00 21.23
Above 3601 Cm2 Slabs Sqm. 1870.00 2239.00 2239.00 19.73
7.2.2 Jhanshi (Red / Choclate Colour)
Upto 800 Cm2 Tiles Sqm. 873.00 1096.00 1096.00 25.54
801 Cm2 to 1500 Cm2 Tiles Sqm. 1108.00 1366.00 1366.00 23.291501 Cm2 to 3600 Cm2 Tiles Sqm. 1518.00 1841.00 1841.00 21.28
Above 3601 Cm2 Slabs Sqm. 2163.00 2579.00 2579.00 19.23
7.2.3 South (Red / Choclate Colour)
Upto 800 Cm2 Tiles Sqm. 991.00 1231.00 1231.00 24.22
801 Cm2 to 1500 Cm2 Tiles Sqm. 1167.00 1433.00 1433.00 22.79
1501 Cm2 to 3600 Cm2 Tiles Sqm. 1694.00 2040.00 2040.00 20.43
Above 3601 Cm2 Slabs Sqm. 2632.00 3119.00 3119.00 18.50
7.2.4 Green / Black / Other granite.
Upto 800 Cm2 Tiles Sqm. 991.00 1231.00 1231.00 24.22
801 Cm2 to 1500 Cm2 Tiles Sqm. 1108.00 1366.00 1366.00 23.29
1501 Cm2 to 3600 Cm2 Tiles Sqm. 1577.00 1905.00 1905.00 20.80
Above 3601 Cm2 Slabs Sqm. 2046.00 2445.00 2445.00 19.50
AAO
PWD Circle Baran TA cum Ex. En.
PWD Circle Baran Superintending Engineer
PWD Circle Baran
7/27/2019 Comparative Statement Chap. 6 to 7_2
http://slidepdf.com/reader/full/comparative-statement-chap-6-to-72 41/44
B-52
1 2 3 4 5 6 7
7.3 Providing and fixing 1st quality standard
White / Ivory Glazed Tiles ISI marked [IS :13753] of size 300 mm x 200 mm in walls,
floors, steps, pillars etc. laid on a bed of neat
cement slurry finished with flush pointing in
white cement mixed with pigment to match
the shade of tile complete (excluding the
cost of cement plaster on walls and pillar).
7.3.1 Catgory-I : Kajaria, Johnson, , Somani make
etc. Sqm 495.00 571.00 571.00 15.35
7.3.2 Category-II : Bell, Orient, Thar make etc.
Sqm 395.00 500.00 500.00 26.58
7.3.3 Add extra over item no. 7.3.1 and 7.3.2 for
Marble printed, Granite shade tiles. Sqm 15% 15% 15% 0.00
7.3.4 Add extra over 7.3.1 and 7.3.2 for using
coloured dark shade tiles instead of
white/lvory/ light grey/ light green/ sky blue/
light brown and other light shade coloures.Sqm 50.00 50.00 50.00 0.00
7.4 Providing and fixing 1st quality MAT finished
ceremic tile size 300 x 300 mm confirming toIS : 13753 colour such as white, grey, ivory,
fume red brown in walls, floors, steps, pillars
etc. laid on a bed of neat cement slurry
including nicely finished joints using water
proof joint filler powder (Untile of Roffe
make) and finishing with flush pointing in
white cement mixed with pigment to match
the shade of the complete (including the cost
of cement mortor bed 1:4).
7.4.1 Category -A : Kajaria, Jhonson, Somani
make Sqm 525.00 618.00 618.00 17.71
Proposed
Rate (Rs.)
2009
%
Variation
DescriptionChapter
Code
No.
Unit Rate
(Rs)
2008
Analysed
Rate (Rs.)
2009
AAO
PWD Circle Baran
TA cum Ex. En.
PWD Circle Baran
Superintending Engineer
PWD Circle Baran
7/27/2019 Comparative Statement Chap. 6 to 7_2
http://slidepdf.com/reader/full/comparative-statement-chap-6-to-72 42/44
B-53
1 2 3 4 5 6 7
Proposed
Rate (Rs.)
2009
%
Variation
DescriptionChapter
Code
No.
Unit Rate
(Rs)
2008
Analysed
Rate (Rs.)
2009
7.5 Providing and fixing 1st quality MAT finished
ceremic tile size 300 x 300 mm confirming toIS : 13755 coloured tile except white, grey,
ivory, fume red brown in walls, floors, steps,
pillars etc. laid on a bed of neat cement
slurry including nicely finished joints using
water proof joint filler powder (Untile or Roffe
make) and finishing with flush pointing in
white cement mixed with pigment to match
the shade of tile complete (Excluding the
cost of cement mortor bed 1:4 ).
Sqm 478.00 588.00 588.00 23.01
Note :
(1) Add extra over item No. 7.3, 7.4 & 7.5 for floor work due to extra cost of cement mortar
1 : 4 (1 cement : 4 fine sand) 20 mm
thick.Sqm 50.00 50.00 50.00 0.00
(2) Add extra over item No. 7.3 for using
coloured glazed tiles instead of White / Ivory.
Sqm 50.00 50.00 50.00 0.00
(3) Deduct on item No. 7.3, 7.4 & 7.5 for using
tiles of approved make second quality tiles.
Sqm 10% 10% 10% 0.00
(4) Add extra over item No. 7.3, 7.4 & 7.5 for
Marble printed, granite shade tiles. Sqm 20% 20% 20% 0.00
(5) Add extra over item No. 7.4 & 7.5 for using
400 x 400 mm size tiles.
Sqm 50.00 50.00 50.00 0.00
7.6 Providing and fixing marble mirror polished 7
mm thick tiles of approved make and size in
walls, floors, steps, pillars etc. laid on a bed
of neat cement slurry including nicely
finished joints using water proof joint fil ler
powder and finished with flush pointing in
white cement mixed with pigment to match
the shade of tile complete (excluding cost of
cement plaster) :
7.6.1 Banswara white tiles. Sqm 470.00 536.00 536.00 14.04
7.6.2 Andhi white tiles. Sqm 525.00 595.00 595.00 13.33
AAO
PWD Circle Baran
TA cum Ex. En.
PWD Circle Baran
Superintending Engineer
PWD Circle Baran
7/27/2019 Comparative Statement Chap. 6 to 7_2
http://slidepdf.com/reader/full/comparative-statement-chap-6-to-72 43/44
B-54
1 2 3 4 5 6 7
Proposed
Rate (Rs.)
2009
%
Variation
DescriptionChapter
Code
No.
Unit Rate
(Rs)
2008
Analysed
Rate (Rs.)
2009
7.6.3 Rajnagar white tiles. Sqm 645.00 712.00 712.00 10.39
7.6.4 Ambaji white tiles. Sqm 700.00 770.00 770.00 10.00
7.6.5 Kesriaji green & Bhaislana black tiles. Sqm 555.00 624.00 624.00 12.43
7.7 Providing and fixing gun metal clamps as per
design in cement sand mortar 1 : 3 (1
cement : 3 fine sand) including of making
necessary chases.
7.7.1 25 x 6 mm x 30 cm. long. Each 65.00 101.00 101.00 55.38
7.7.2 15 x 6 mm x 16.5 cm long. Each 25.00 35.00 35.00 40.00
7.8 Providing and fixing copper pipe 7.5 cm.long of 6 mm external diameter in cement
sand mortar 1 : 3 (1 cement : 3 fine sand)
including making necessary chases.
Each 14.00 15.00 15.00 7.14
7.9 Providing and fixing stone dowel 10 x 5 x 2.5
cm cut to double wedge shape as per design
in cement sand mortar 1 : 3 (1 cement : 3
fine sand) including making necessary
chases.Each 7.00 8.00 8.00 14.29
7.10 Extra for providing edge moulding to 18 mm
thick marble stone counters, vantities etc.
over item No. 7.1 & 7.2 including machine
polishing to edge to give high gloss finish
etc. complete as per design approved by
Engineer-in-Charge.
7.10.1 Marble work Metre 85.00 99.00 99.00 16.47
7.10.2 Granite work Metre 135.00 143.00 143.00 5.93
7.11 Extra for providing opening of required size
& shape for wash basin / kitchen sink in
kitchen platform, vanit counters and similar
location in marble / stone work including
necessary holes for pillars taps etc. including
rubbing and polishing of cut edge etc.
complete.Each
Opening 20.00 22.00 22.00 10.00
AAO
PWD Circle Baran
TA cum Ex. En.
PWD Circle Baran
Superintending Engineer
PWD Circle Baran
7/27/2019 Comparative Statement Chap. 6 to 7_2
http://slidepdf.com/reader/full/comparative-statement-chap-6-to-72 44/44
B-55
1 2 3 4 5 6 7
Proposed
Rate (Rs.)
2009
%
Variation
DescriptionChapter
Code
No.
Unit Rate
(Rs)
2008
Analysed
Rate (Rs.)
2009
7.12 Providing & fixing vitrified paving tiles size
600 mm × 600 mm × 12 mm thick fix withcement mortar over 20 mm thich (1 Cement
4 Sand) laid on a bed of neat cement slurry
including nicely finished joints using water
proof joint filler powder (Untile or Roffe
make) and finishing with flush pointing in
white cement mixed with pigment to match
the shade of tile complete (including the cost
of cement mortor 1:4) Per
Sqm
7.12.1 Category -A : Kajaria, Jhonson, Somani
make 711.00 723.00 723.00 1.69