Company Profile - VGI Consulting€¦ · VGI CONSULTING (PTY) LTD – COMPANY PROFILE VGI...

63
VGI Consulting (Pty) Ltd COMPANY PROFILE

Transcript of Company Profile - VGI Consulting€¦ · VGI CONSULTING (PTY) LTD – COMPANY PROFILE VGI...

  • VGI Consulting (Pty) Ltd

    COMPANY PROFILE

  • 2018

    VGI CONSULTING (PTY) LTD – COMPANY PROFILE

    VGI Consulting (Pty) Ltd. is one of the leading multidisciplinary consulting engineering

    companies in South Africa specializing in the engineering, construction and project

    management of Petrochemical, Civil and Structural projects. VGI Consulting is the

    successor of a consulting engineering practice established in 1965. Our company has more

    than 45 years of experience in the Engineering, Procurement and Construction

    Management (EPCM) of petrochemical, civil and structural projects.

    VGI Consulting is a member firm of Consulting Engineers South Africa (CESA). To protect the

    interests of our clients we are insured under a Professional Indemnity Policy. VGI has an IRCA

    5-star safety rating and is a ISO 9001:2008 registered company.

    VGI Consulting (Pty) Ltd

    Multidisciplinary Engineers & Project Managers

    Highgrove Office Park Building 4

    Corner of Tegel & Olievenhoutbosch Avenue

    Highveld

    Centurion

    0157

    012 682 9140

    [email protected]

    mailto:[email protected]

  • 3

    MANAGEMENT

    Our directors include our 6 most senior staff:

    Ian Grobler Pr Eng BSc Eng (Civil), UP 39 years

    Jan Venter Pr Eng BEng (Hons) (Civil), UP (Managing) 26 years

    Leon van Wyk Pr Eng BEng (Civil), UP 23 years

    Johan Pretorius Pr Eng BEng (Civil), UP 20 years

    Stefan Grové Pr Eng BEng (Civil), UP 20 years

    Mothusi Motsilanyane Pr Tech Eng BTech (Mech), TUT 13 years

    BSc (Hons) Applied Science Mechanics, UP

    Samantha Chetty BCompt (Non-Executive) -

    Our management team includes:

    Charl van den Berg Pr Eng, IWE Engineering Manager,

    Pipelines and Flow Analysis

    Chris Saxby Engineering Manager,

    Depots and Facilities

    Leslie Strauch Engineering Manager, Civil

    Mia Moolman Commercial Manager

    Elsa van Dyk Financial Manager

    Matthys Geyser HSE and HR Manager

    Ian Grobler receives a certificate of recognition

    on behalf of VGI from Sasol Technology for

    ‘Delivery of services during project execution

    2004/5’

  • 4

    SCOPE OF SERVICES

    VGI Consulting provides the following multidisciplinary engineering,

    procurement and construction management (EPCM) services in the

    petrochemical, civil and structural environment:

    • Professional Engineering services

    • Management services

    • Procurement services

    Normally the projects are carried out in a phased approach, for example:

    • Pre-Feasibility

    • Feasibility

    • Basic Engineering

    • Detailed Engineering and procurement of long lead material

    • Execution

    • Commissioning and hand over

    We utilize a team of dedicated professional engineers, technologists,

    technicians and other support staff specializing in the petrochemical oil and

    gas fields, to provide a one stop service to our clients.

    We are willing to contract in various ways with our clients utilizing various

    forms of contracts, for example NEC 3, FIDIC, General Conditions of

    Contract, JBCC or similar contracts.

  • 5

    Professional Engineering Services

    VGI provides the following Engineering services, with our specialized sub

    consultants:

    Process Engineering

    Hydraulic Analyses for Petrochemical

    fluids and gasses

    Process Flow Diagrams

    Mass and Energy Balance

    HAZOP Studies

    Potential Deviation Analyses

    Process Data sheets

    Utility demand calculations

    Effluent determination

    Mechanical Engineering

    Pipeline Engineering (Above and below

    ground)

    Material selection

    Equipment sizing

    Strength calculations

    Mechanical Flow Diagrams

    Mechanical Data sheets

    Stress Analyses

    Three-dimensional modelling

    Civil Engineering

    Site Selection

    Overland pipe route engineering

    Sewer reticulation services

    Water reticulation services

    Storm water systems

    Water purification works

    Sewer purification works

    Streets

    Roads

    Road rehabilitation

    Structural Engineering

    Steel structures

    Reinforced concrete structures

    Wooden structures

    Pipe supports

    Bridges

    Reservoirs

    Geotechnical Engineering

    Geotechnical investigations

    Problematic Soil / Dolomite

    investigations

    Soil analyses

    Foundation design

    Electrical Engineering

    Utility demand calculations

    Power supply

    Earthing systems

    Instrumentation Engineering

    SCADA Systems

    Tank Gauging systems

    Control philosophy

    Instrument data sheets

    Piping and Instrument Diagrams

    Emergency Shutdown systems

    Firefighting systems design

    Determining of the critical event

    Design of fire water reservoir

    Piping and pump designs

    Design of firefighting equipment

    Control philosophy

    Foaming systems

  • 6

    Management services

    Project Management

    The following is carried out during the

    entire project schedule to ensure our

    projects are delivered on time, within

    budget and per the latest

    international quality standards:

    • Schedule Management

    • Cost, Change and Scope

    Management

    • Quality Management

    • Risk Management

    Construction Management

    and Monitoring

    • Quality management during

    construction

    • Compilation of Quality Plans and

    identification of hold points

    • Safety Management (OHS Act)

    • Conducting risk assessment sessions

    with contractors and designers.

    • Reviewing and approval of Safety

    Health and Environment (SHE) Plans

    • Safety audits on construction sites

    Procurement

    Procurement of long lead material for

    and on behalf of client:

    • Compile bidder’s lists

    • Compile Request for Quotation

    documents

    • Commercial terms and conditions

    • Technical specifications, data

    sheets etc.

    • Obtain quotes

    • Bid clarification meetings

    • Appoint suppliers for and on

    behalf of clients

    • Tracking of manufacturing and

    delivery progress

    • Receipt of material in our own

    stores

    • Review data packs to ensure it

    complies with the required

    specifications

    • Issue material to contractors on a

    controlled basis

    Commercial

    Appointment of contractors for and on

    behalf of the client, using any of the

    following forms of contract:

    NEC 3 suite

    FIDIC suite of contracts

    General Conditions of Contract.

    JBCC

    • Compile bidder’s lists

    • Compile Request for Quotation

    documents

    • Commercial terms and conditions

    • Technical specifications, data

    sheets etc.

    • Obtain quotes

    • Bid clarification meetings

    • Appoint suppliers for and on

    behalf of clients

    • Tracking of manufacturing and

    delivery progress

    • Receipt of material in our own

    stores

    • Review data packs to ensure it

    complies with the required

    specifications

    • Issue material to contractors on a

    controlled basis

  • 7

    PROJECTS

    Petrochemical bulk storage facilities

    Airport fuelling systems

    Overland pipelines

    Multi product lines

    Natural Gas pipelines

    Water Pipelines

    Natural Gas Pressure Reducing stations

    Natural Gas Customer Metering Stations

    Low pressure natural gas distribution systems

    LPG distribution networks

    Firefighting systems

    Roads and streets

    Water reticulation networks

    Sewer reticulation networks

    Water and sewer purification works

    Geotechnical studies

    Reinforced concrete, steel and wooden structures

    Audits and Peer reviews

    Due diligence studies

    Planning and scheduling

    Cost estimating and control

    Economic modelling

  • 8

    SPECIALIST PARTNERS

    VGI provides a complete, one stop service for our clients through formal

    association with specialist companies. Together with our partners, we have

    completed numerous continuously welded, high-pressure steel pipelines in

    South Africa and Mozambique.

    VGI has in-house capabilities in terms of civil, mechanical and structural

    engineering. Our personnel also have extensive experience in project and

    construction management and procurement for and on behalf of our clients.

    Our partners:

    Added Value Engineering Consultants (Pty)

    Limited (“AVEC”) – Process Engineering

    AVEC delivers a range of services to the oil & gas, hydrocarbons,

    petrochemical, minerals & metals, general chemical and other

    industries that are tailored to meet individual client requirements.

    The services, which are available together or separately, or in combination, include the

    following:

    Pre-Feasibility and Feasibility Studies

    Audits and Peer Reviews

    Due Diligence Studies

    Various Risk Management Solutions (Technical and Process Only)

    Process Design

    Conceptual and Basic Engineering

    Planning and Scheduling

    Cost Estimating

    Economic Modelling

    Project Management

    Owner’s Team Technical & Project Support

    AVEC’s highly qualified engineers have experience in a great number of industries, ranging

    from hydrocarbons to metallurgical processes and food production & processing.

  • 9

    IPES Performance Technologies (“IPES”) -

    Electrical and Control & Instrumentation

    IPES provides professional engineering services in the electrical and

    control & instrumentation field. Their design services include

    pressure instrumentation, temperature instrumentation, orifice plate

    flow calculations, valve sizing and calculations, supervisory control

    and data acquisition systems, radio based telemetry networks,

    satellite based remote monitoring solutions, fibre-optic

    communication systems and networks, emergency generators and UPS’s.

    IPES has been involved with various control and Instrumentation installations in

    South Africa. The responsibility of IPES included SCADA basic design, distributed

    control system topology and design, radio frequency propagation analysis,

    hazardous area classification, flow calculations, intrinsic safe calculation sheets,

    loop drawings and diagrams, human machine interface definition and

    reliability and availability calculations.

    Corrosion & Technology Consultants (“CTC”) –

    Cathodic Protection

    CTC consults in the fields of Cathodic Protection, Pipeline Integrity

    Management and Coating Consultancy. CTC’s services include Soil

    Corrositivity Surveys, Stray Current Surveys, Current Drainage Surveys, DCVG

    and Pipeline Current Mapping (PCM) Surveys. In addition to the field work, are all aspects

    relating to the Conceptual and Final Design, Mathematical Modelling of CP Systems, the

    Preparation, Issuing and Adjudication of Cathodic Protection and Pipeline Protective Coating

    System Tender documents. The Project Management and/or the Inspection of Cathodic

    Protection Installations and Protective Coating applications.

    AAM Geomatics (Pty) Ltd – Land Survey

    AAM Geomatics provides land surveying services for the route selection, profiling, setting out

    and as-built of pipelines, power lines, roads, sewer lines and railway lines. AAM also execute

    bathymetric surveys and the full spectrum of GIS services including data capture, consulting,

    training of personnel, setting up of GIS systems.

  • 10

    PIPELINE EXPERIENCE

    DESIGN, PROCUREMENT, PROJECT AND CONSTRUCTION MANAGEMENT

    VGI has extensive experience for the design, procurement, expediting, project

    management and construction supervision up to hand-over and

    commissioning of overland transmission and distribution pipelines. The following

    major pipeline projects have been completed over the past 10 years:

  • 11

    ROMPCO Loop Line Phase 2

    SGS, for and on behalf of Republic of Mozambique Pipeline Investments Company

    (Pty) Ltd

    Description:

    Procurement and Construction

    management services as part of the

    ROMPCO Loop Line Phase 2 project

    VGI’s Scope: Review and the completion of the Detail Engineering for new loop line between

    the Scraper station-1 (STS-1) and Scraper station-2 (STS-2). The tie-ins, cathodic protection

    (CP), pig launching and pig receiving stations where included in the scope.

    Procurement of some of the long lead materials (valves, fittings, flanges, etc.)

    Construction management of the installation of the new 26” steel pipeline. Establishment of

    a temporary self-sustaining camp for 80 people as well as the specification and management

    of the construction of a 600 people permanent camp for construction. VGI assisted the Client

    with the commissioning of the pipeline as well as the baseline pigging.

    Value of Services:

    $ 11 million USD

    Project completed:

    Planned for March 2017

    (RFC was achieved in October 2016)

    Resources:

    VGI Project Director: Ian Grobler

    VGI Senior Pipeline Engineer and Project Manager: Stefan Grové

    VGI Senior Mechanical & Welding Engineer: Charl van den Berg

    VGI Senior Civil Engineer: Leslie Strauch

    VGI Resident Engineer: Martin Volschenk

    VGI Construction Manager: Kobus van Niekerk

    VGI Group Safety Manager: Matthys Geyser

    Partners:

    ● CTC ● Pipetech ● AAM

  • 12

    Gauteng Network Pipeline Project, South Africa

    (Sasol Technology (Pty) Ltd)

    Description:

    Engineering (feasibility, basic and detail),

    Procurement and Construction

    Management of a 150 kilometre, high

    pressure, 26” welded steel, natural gas

    pipeline between Secunda and

    Sasolburg, South Africa, including gas

    odourisation station, gas pressure

    protection Station and high pressure

    client metering station.

    VGI’s Scope:

    Project Management, Procurement, Construction Management, Mechanical

    Engineering, Electrical & Instrumentation Engineering, Structural Engineering, Civil

    Engineering, Process Engineering, Geotechnical Studies, Land Surveying, Wetland

    delineation

    Value of Services:

    R 114 million

    Project completed:

    June 2013

    Resources:

    VGI Project Director: Ian Grobler

    VGI Senior Pipeline Engineer and Project Manager: Stefan Grové

    VGI Senior Civil Engineer : Johan Pretorius

    VGI Senior Mechanical Engineer (Odourisation station and pipeline): Charl van den

    Berg

    VGI Senior Mechanical Engineer (Stations): Mothusi Motsilanyane

    VGI GIS Specialist: Anita Naude

    VGI Safety Manager: Matthys Geyser

    Partners:

    ● IPES ● AVEC ● Global Geomatics ● CTC ● Pipetech

  • 13

    Secunda Natref Integration Pipeline Project, South Africa

    (Sasol Technology (Pty) Ltd)

    Description:

    Engineering (feasibility, basic and

    detail), Procurement and Construction

    Management of a 145 kilometer, high

    pressure, 10” welded steel, pumped,

    multi-product pipeline between

    Secunda and Sasolburg, South Africa,

    including pump stations, process control

    flow metering stations and leak

    detection system.

    VGI’s Scope:

    Project Management, Procurement, Construction Management, Mechanical

    Engineering, Electrical & Instrumentation Engineering, Structural Engineering, Civil

    Engineering, Process Engineering, Geotechnical Studies, Land Surveying and Wetland

    delineation.

    Value of Services:

    R 123 million

    Project completed:

    October 2012

    Resources:

    VGI Project Director: Ian Grobler

    VGI Senior Pipeline Engineer and Project Manager: Stefan Grové

    VGI Senior Civil Engineer: Johan Pretorius

    VGI Mechanical Engineer (Pump Stations & Transient Flow Analysis): Charl van den Berg

    VGI GIS Specialist: Anita Naude

    VGI Safety Manager: Matthys Geyser

    Partners:

    ● IPES ● AVEC ● Global Geomatics ● CTC ● Pipetech

  • 14

    Secunda Tank Farm Own Pipeline Replacement Project, South Africa

    (Sasol Technology (Pty) Ltd)

    Description:

    The project consisted of two new 5,2 km

    12” fuel pipelines between the Sasol Oil

    Secunda Fuel Depot and the Transnet

    Pipelines Pump Station in Secunda. A

    new above ground PIG launcher and

    surge protection station was

    constructed adjacent to the Transnet

    Pipelines Pump Station.

    VGI’s Scope:

    Project Management, Procurement, Construction Management, Mechanical

    Engineering, Electrical & Instrumentation Engineering, Structural Engineering, Civil

    Engineering, Process Engineering, Hydraulic Analysis, Land Surveying.

    Value of Services:

    R 15.4 million

    Project completed:

    July 2013

    Resources:

    VGI Senior Pipeline Engineer and Project Manager: Johan Pretorius

    VGI Mechanical Engineer: Louis Ferreira

    VGI Safety Manager: Matthys Geyser

    Partners:

    ● IPES ● Global Geomatics ● CTC ● Pipetech

  • 15

    Fuel Line Upgrade Bloemfontein Airport, South Africa

    (Airports Company South Africa)

    Description:

    Engineering services for the upgrade of the existing Jet A1 fuel pipeline to the apron,

    including the expansion of the pipeline to a fourth standing bay at the Bloemfontein

    Airport.

    VGI’s Scope:

    Responsible for the design of the fuel lines, compile a scope of work and drawings.

    Project management, procurement and site supervision.

    Value of Services:

    R 9.8 million

    Project completed:

    May 2011

    Resources:

    VGI Senior Pipeline Engineer and Project Manager: Johan Pretorius

  • 16

    Replacement of 7 Transfer Pipelines for SAPREFF, South Africa (LPG,

    Diesel, AVGAS etc.)

    (WBHO)

    Description:

    The project entailed the design and

    construction of a 6 inch and an 8 inch

    pipeline, with lengths of approximately

    1500 m and 650 m respectively. The oil

    pipeline transports product at 150 ᵒC. The

    other pipeline transports LPG. The project

    also included aboveground pipelines with

    expansion loops and new pipe bridges

    and 7 underground pipelines located in

    the same servitude as the existing 7

    pipelines which remained in operation

    during construction. Existing structures

    such as pipe bridges had to be re-

    enforced and re-habilitated.

    VGI’s Scope:

    VGI was the responsible Engineering Consultancy for the detailed civil, structural and

    mechanical design of the underground replacement lines for WBHO.

    Value of Services:

    R 7.9 million

    Project completed:

    June 2008

    Resources:

    VGI Senior Pipeline Engineer and Project Manager: Jan Venter

    VGI Senior Structural Engineer: Leon van Wyk

  • 17

    The Ressano-Garcia to Matola Natural Gas Pipeline Project,

    Mozambique

    (Matola Gas Company)

    Description:

    Engineering, Procurement and

    Construction management services for

    the construction of a 70 kilometre

    welded steel natural gas pipeline and

    distribution network from Ressano-

    Garcia to Matola, Mozambique.

    VGI’s Scope:

    Project Management, Procurement, Construction Management, Mechanical

    Engineering, Electrical & Instrumentation Engineering, Structural Engineering, Civil

    Engineering, Process Engineering, Land Surveying

    Value of Services:

    R 10.4 million

    Project completed:

    2004

    Resources:

    VGI Project Director: Ian Grobler

    VGI Senior Pipeline Engineer and Project Manager: Stefan Grové

    Partners:

    ● IPES ● Global Geomatics ● CTC ● Pipetech

  • 18

    Gas Pipeline for Standard Bank Rosebank Office Development, South

    Africa

    (WBHO)

    Description:

    Design and supervision of the gas supply

    pipeline to the new offices for Standard

    Bank in Rosebank. The gas is used for

    generating power with gas-powered

    trigeneration plants, as well as access

    gas during off peaks to heat water with

    gas-powered boilers.

    VGI’s Scope:

    VGI Consulting was responsible for the design of the supply line from the Egoli Gas

    supply point next to Craddock Avenue down to basement level -5 of the building

    where the gas-powered trigeneration plants and boilers warehouse are situated.

    The pipeline was designed and modelled in Plant 3D to determine that the pipe will fit

    into the service corridor provided by the Architect, which house several services for the

    building as well as HVAC.

    Value of Services:

    R 150 000

    Project completed:

    January 2013

    Resources:

    VGI Project Engineer: Johan Pretorius

  • 19

    Sasolburg to Egoli Pipeline Project

    (Sasol Technology (Pty) Ltd)

    Description:

    Engineering (feasibility, basic and detail), Procurement and Construction

    Management of a 45 kilometre, high pressure, 10” welded steel, natural gas pipeline

    between Sasolburg and Johannesburg, South Africa

    VGI’s Scope:

    Project Management, Procurement, Construction Management, Mechanical

    Engineering, Electrical & Instrumentation Engineering, Structural Engineering, Civil

    Engineering, Process Engineering, Hydraulic Analysis, Geotechnical Studies, Land

    Surveying, Wetland delineation

    Value of Services:

    R 40 million

    Project completed:

    January 2004

    Resources:

    VGI Project Director: Jan Venter

    VGI Senior Pipeline Engineer: Stefan Grové

    Partners:

    ● IPES ● Global Geomatics ● CTC ● AVEC ● Pipetech

  • 20

    Gas pipeline between Randfontein and Tarlton as well as from Lenasia

    to Driefontein

    (Sasol Gas Ltd)

    Description:

    Engineering (feasibility, basic and detail), Procurement and Construction

    Management of a 18 kilometre and a 35 kilometre, class 300, 6" natural gas pipelines.

    Including pig launching and receiving facilities and a pressure reducing station and

    supply pipeline to clients.

    VGI’s Scope:

    Project Management, Procurement, Construction Management, Mechanical

    Engineering, Electrical & Instrumentation Engineering, Structural Engineering, Civil

    Engineering, Process Engineering, Geotechnical Studies, Land Surveying

    Value of Services:

    R 40 million

    Project completed:

    October 2008

    Resources:

    VGI Project Director: Jan Venter

    VGI Senior Pipeline Engineer and Project Manager: Stefan Grové

    Partners:

    ● IPES ● Global Geomatics ● CTC ● Pipetech

  • 21

    Roodekop Network Upgrade

    (Sasol Gas Ltd)

    Description:

    Engineering (feasibility, basic and detail), Procurement and Construction

    Management of a new 3,8 kilometre natural gas network including a PRS and 8 CMS’s

    for the Roodekop industrial area, South Africa

    VGI’s Scope:

    Project Management, Procurement, Construction Management, Mechanical

    Engineering, Electrical & Instrumentation Engineering, Structural Engineering, Civil

    Engineering, Process Engineering, Geotechnical Studies, Land Surveying

    Value of Services:

    R 16.5 million

    Project completed:

    April 2008

    Resources:

    VGI Project Director: Jan Venter

    VGI Senior Pipeline Engineer: Stefan Grové

    VGI Project Manager: Johan Pretorius

    Partners:

    ● IPES ● Global Geomatics ● CTC

  • 22

    Egoli Gas Network Conversion

    (Egoli Gas)

    Description:

    Convert the Egoli gas network (Johannesburg gas network) from hydrogen rich gas

    to natural gas. The gas network consists of 15000 clients.

    VGI’s Scope:

    Scope included the engineering of different conversion scenarios by choosing the best

    possible supply points and quantity thereof using gas network simulation software.

    Design of different, workable phases subdivided into 41 different workable sectors to

    be converted within 41 weeks. Prepare conversion plan indicating the exact steps to

    be followed throughout the conversion. Preparing drawings to be used, in conjunction

    with the conversion plan, indicating all required valves.

    Value of Services:

    R 10 million

    Project completed:

    April 2002

    Resources:

    VGI Project Manager: Jan Venter

    VGI Design Engineer: Stefan Grové

  • 23

    Engineering of the Petroline from Maputo via Nelspruit to Kendal

    including Fuel Depot.

    (Petroline Holdings)

    Description:

    Conceptual Design and Route

    Engineering of the multi-product

    petroleum pipeline between Matola

    Harbour, Mozambique and Kendal in

    Mpumalanga, South Africa. The scope

    included the engineering required at

    the existing oil terminal and Tank Farm at

    Matola Harbour as well as the new Tank

    Farm at Nelspruit and the main and

    booster pump stations.

    VGI’s Scope:

    Route Engineering, Mechanical Engineering, Electrical & Instrumentation Engineering,

    Civil Engineering, Process Engineering, Geotechnical Studies, Land Surveying

    Value of Services:

    R 6.7 million

    Project completed:

    November 2007

    Resources:

    VGI Project Manager: Ian Grobler

    VGI Senior Pipeline Engineer: Stefan Grové

    VGI Mechanical Engineer (Hydraulic Analysis): Charl van den Berg

  • 24

    Feasibility Study for the Moamba Gas Pipeline, Mozambique

    (Sasol Technology (Pty) Ltd)

    Description:

    Conduct a feasibility study for a new 35 kilometre gas pipeline from Komatipoort to

    Moamba in Mozambique

    VGI’s Scope:

    Pipe hydraulic design, route engineering, conceptual route engineering, conceptual

    mechanical and control &instrumentation design, geotechnical desk top study,

    environmental risks, cost estimate

    Value of Services:

    R 1.3 million

    Project completed:

    May 2009

    Resources:

    VGI Project Engineer: Johan Pretorius

    Pre-Feasibility for Multi-Product Pipeline to South Africa from Coal-to-

    Hydrocarbons Complex in Botswana

    (CIC Energy)

    Description:

    Pre-Feasibility study for a proposed 335 kilometre multi-products pipeline from

    Botswana to Gauteng, South Africa.

    VGI’s Scope:

    Conceptual Mechanical and Control & Instrumentation Design, Geotechnical Desk

    Top Study, Environmental Risks, Cost Estimate

    Value of Services:

    R 1 million

    Project completed:

    June 2008

    Resources:

    VGI Project Engineer: Johan Pretorius

  • 25

    Feasibility Study for Saber Gas Pipeline, Botswana

    (Saber)

    Description:

    Conduct a feasibility study for a new 40 kilometre gas pipeline in the south of

    Botswana.

    VGI’s Scope:

    Pipe hydraulic design, route engineering, conceptual route engineering, conceptual

    mechanical and control &instrumentation design, geotechnical desk top study,

    environmental risks, cost estimate

    Value of Services:

    R 255 000

    Project completed:

    March 2009

    Resources:

    VGI Project Engineer: Johan Pretorius

    Feasibility Study for the Hulimin Gas Pipeline

    (Sasol Gas Ltd)

    Description:

    Feasibility study for a new 85 kilometre gas pipeline from Durban to Hulimin in

    Pietermaritzburg, South Africa.

    VGI’s Scope:

    Route Engineering and Project Management of other client appointed consultants.

    Value of Services:

    R 1.2 million

    Project completed:

    August 2006

    Resources:

    VGI Project Manager: Jan Venter

    VGI Design Engineer: Stefan Grové

  • 26

    REMEDIAL WORK ON EXISTING PETROCHEMICAL

    PIPELINES

    VGI often assists our Clients to design and manage upgrades or repairs

    on existing in-service pipelines.

    Detail Engineering, Procurement and Construction Management for the

    MSP KP92 Sinkhole Project

    (Sasol Group Technology)

    VGI’s Scope:

    Due to shallow undermining, sinkholes started forming underneath the 660 mm MSP

    gas pipeline from Temane (Mozambique) to Secunda (South Africa). VGI designed a

    methodology to fill the contours underneath the pipe in the mine without taking the

    pipeline out of service.

    Value of Services:

    R 3,0 million

    Project completed:

    15 December 2016

    Resources:

    VGI Project Director: Jan Venter

    VGI Project Manager: Johan Pretorius

  • 27

    Engineering, Procurement and Construction Management for the SWM

    Matla Deviation Project

    (Sasol Group Technology)

    VGI’s Scope:

    After the construction of the 400 mm SWM gas pipeline from Secunda to Middelburg,

    it became apparent that a section of the pipeline is on undermined areas showing

    early signs of subsidence. A temporary bypass was built in the event of a failure of the

    main pipeline. This however, rendered the main pipeline unpiggable and in any event

    the bypass could never be used for any length of time. VGI was appointed to design

    a solution that will make the mainline piggable again and safe against subsidence.

    Value of Services:

    R 2,5 million

    Project completed:

    November 2016

    Resources:

    VGI Project Director: Jan Venter

    VGI Project Manager: Johan Pretorius

    Pressure Test of 14” Nitrogen Pipeline for Sasol

    (Sasol Technology (Pty) Ltd)

    Description:

    Pressure testing of the existing 145

    kilometre, 14” nitrogen pipeline

    between Sasolburg and Secunda to

    verify the integrity of the pipeline.

    Main line was tested pneumatically

    and the two in plant sections were

    hydrostatically tested to 60 barg.

    VGI’s Scope:

    Project Management, Procurement, Construction Management and Engineering

    Services

    Value of Services: Project completed:

    R 10 million August 2006

    Resources:

    VGI Project Manager : Ian Grobler

    VGI Design Engineer : Stefan Grové

  • 28

    FUEL DEPOTS

    DESIGN, PROCUREMENT, PROJECT AND CONSTRUCTION MANAGEMENT

    VGI has extensive experience for the design, procurement, expediting, project

    management and construction supervision up to commissioning. The following

    major fuel depot projects have been completed over the past 5 years:

    Alrode Fuel Depot Project, South Africa

    (Sasol Technology (Pty) Ltd) – Construction

  • 29

    Description:

    The project entails the Engineering,

    Procurement and construction

    management of the wholesale logistics

    for Sasol Oil in Alrode.

    The fuel depot was designed for a

    capacity of 1 436 022 m³/yr of petrol (3

    grades) and 884 443 m³/yr of diesel (2

    grades). Additive handling, vapour

    recovery, loading and off-loading

    facilities formed part of the project.

    VGI’s Scope:

    Project Management, Procurement, Construction Management, Mechanical

    Engineering, Electrical & Instrumentation Engineering, Structural Engineering, Civil

    Engineering, Process Engineering, Hydraulic Analysis, Land Surveying

    Value of Services:

    R 60 million

    Project completed:

    Phase 1a : January 2013

    Phase 1b : February 2014

    Resources:

    VGI Project Director: Ian Grobler

    VGI Project Manager and Senior Civil / Structural Engineer: Leon van Wyk

    VGI Senior Mechanical Engineer: Chris Saxby

    VGI Mechanical Engineers: Matthew Fannin, Quintin Maartens, Martin Cloete

    VGI Fire Water Engineer: Quintin Maartens

    VGI Safety Manager: Matthys Geyser

    Partners:

    ● IPES ● AVEC ● Global Geomatics ● Pipetech

  • 30

    Expansion of bulk storage facility at OR Tambo International Airport

    (Airports Company South Africa)

    Description:

    The project entails the engineering,

    procurement and construction

    management of the OR Tambo fuel

    storage facility. The facility consists of

    two 6 300 m³ double steel skin tanks, 30”

    suction feeder line, 10” supply pipeline,

    upgrading of existing pumps, upgrading

    of existing SCADA and Telemetry and

    upgrading of fire water system

    VGI’s Scope:

    Project Management, Procurement, Construction Management, Mechanical

    Engineering, Electrical & Instrumentation Engineering, Structural Engineering, Civil

    Engineering, Process Engineering, Hydraulic Analysis, Land Surveying

    Value of Services:

    R 15 million

    Project completed:

    June 2010

    Resources:

    VGI Project Director: Jan Venter

    VGI Senior Mechanical Engineer : Mothusi Motsilanyane

    VGI Civil Engineer : Leslie Strauch

    VGI Structural Engineer : Leon van Wyk

    Partners:

    ● IPES ● AVEC ● Global Geomatics ● Pipetech

  • 31

    Upgrade of the Transnet Pipelines Kendal Depot

    (Siemens)

    Description:

    Contract Administration Services for the Mechanical, Civil and Approved Inspection

    Authority subcontractors for the upgrade of the Transnet Pipelines Kendal Depot

    VGI’s Scope:

    Contract administration, management and site supervision during the execution

    phase of the depot.

    Value of Services:

    R 9.8 million

    Project completed:

    December 2014

    Resources:

    VGI Project Manager: Jan Venter

    VGI Civil Engineer: Leslie Strauch

    Upgrade of the Transnet pipelines Waltloo Depot

    (Siemens)

    Description:

    Engineering, Design, and Professional Services for the Waltloo Depot Buildings

    Upgrade Project and Fire Water System Design.

    VGI’s Scope:

    Engineering

    Value of Services:

    R 5.6 million

    Project completed:

    March 2014

    Resources:

    VGI Project Manager: Jan Venter

    VGI Civil Engineer: Leslie Strauch

  • 32

    Assistance to Siemens for BP LPG Depot in Waltloo

    (BP)

    Description:

    Engineering solution to improve the performance of the existing firefighting system's

    performance at the BP LPG depot in Waltloo, Pretoria.

    VGI’s Scope:

    Engineering

    Value of Services:

    R 5.6 million

    Project completed:

    November 2014

    Resources:

    VGI Project Manager : Jan Venter

    VGI Civil Engineer : Leslie Strauch

    Feasibility study for a Fuels Distribution Depot and Loading Facility in

    Polokwane for Sasol Oil

    (Sasol Oil (Pty) Ltd)

    Description:

    Feasibility Engineering for a new Sasol Oil fuel distribution depot in Polokwane,

    Northern Province to handle a range of annual throughput, for ULP 93 and 95 as well

    as Diesel 500 and Ultra Low Sulpher diesel.

    VGI’s Scope:

    Mechanical Engineering, Electrical & Instrumentation Engineering, Structural

    Engineering, Civil Engineering, Process Engineering, Hydraulic Analysis

    Value of Services:

    R 3.4 million

    Project completed:

    July 2009

    Resources:

    VGI Project Director: Ian Grobler

    VGI Project Manager and Civil Engineer: Leon van Wyk

    VGI Mechanical Engineer: Charl van den Berg

  • 33

    Conceptual Engineering of a range of generic sizes for Fuels Depot and

    Loading Facility for Sasol Oil

    (Sasol Technology (Pty) Ltd)

    Description:

    The conceptual design of 5 x generic fuel depots to handle a range of annual

    throughput, for ULP 93 and 95 as well as Diesel 500 and Ultra Low Sulpher diesel.

    VGI’s Scope:

    Mechanical Engineering, Electrical & Instrumentation Engineering, Structural

    Engineering, Civil Engineering, Process Engineering, Hydraulic Analysis

    Value of Services:

    R 101 000-00

    Project completed:

    May 2008

    Resources:

    VGI Project Director: Ian Grobler

    VGI Project Manager and Civil Engineer: Leon van Wyk

    VGI Senior Mechanical Engineer: Chris Saxby

  • 34

    Pretoria West Depot Upgrade

    (Sasol Oil (Pty) Ltd)

    Description:

    The project entails the upgrade of the Pretoria West Fuel Depot to a burning fuel depot.

    The project entails engineering, procurement and construction management services.

    The depot will cater for future off-loading, storage and loading demands.

    VGI’s Scope:

    Project Management, Procurement, Construction Management, Mechanical Engineering,

    Electrical & Instrumentation Engineering, Structural Engineering, Civil Engineering, Process

    Engineering, Hydraulic Analysis, 3D scanning

    Value of Services:

    R 15 million

    Project completed:

    Completion: August 2015

    Resources:

    VGI Project Director: Ian Grobler

    VGI Project Manager: Johan L Pretorius

    VGI Senior Mechanical Engineer : Chris Saxby

    VGI Civil Engineer : Leslie Strauch

    VGI Fire Water Engineer : Quintin Maartens

    VGI Mechanical Engineer : Matthew Fannin

    Partners:

    ● IPES ● AVEC ● Global Geomatics ● Pipetech

  • 35

    Fuels Additive Dosing Facility at Shell Witbank

    (Sasol Oil (Pty) Ltd)

    Description:

    The project entails the basic and detail engineering of a new additive dosing facility

    for Sasol Oil at the Shell Witbank Depot.

    VGI’s Scope:

    Mechanical Engineering, Electrical & Instrumentation Engineering, Structural

    Engineering, Civil Engineering, Process Engineering, Hydraulic Analysis, 3D scanning

    Value of Services:

    R 450 000.00

    Project completed:

    Completion: Sept 2015

    Resources:

    VGI Project Manager: Johan L Pretorius

    VGI Mechanical Engineer : Louis Ferreira

    Partners:

    ● IPES ● Global Geomatics

  • 36

    Replacement of the underground fuel tanks at BMW, Rosslyn

    (BMW South Africa (Pty) Ltd)

    Tank at Plant 9.2

    Description:

    The project entails the Design Development of the new fuel tank installations for the

    replacement of the Plant 9.2 & 9.3 Fuel tanks at BMW plant (Plant 9.2) and Vehicle

    Distribution Centre (VDC – Plant 9.3) in Rosslyn. Management of the EIA approval,

    tender documentation and procurement and the contract administrations and

    inspections.

    VGI’s Scope:

    Mechanical Engineering, Electrical & Instrumentation Engineering, Structural

    Engineering, Civil Engineering, Process Engineering, Hydraulic Analysis and

    construction supervision and project management

    Value of Services:

    R 1 373 000.00

    Project completed:

    Estimated completion: Dec 2016

    Resources:

    VGI Project Manager: Leon van Wyk

    VGI Mechanical Engineer: Quintin Maartens

    Partners:

    ● IPES

  • 37

    FIREFIGHTING SYSTEMS

    Pretoria West Burning Fuels Depot Firefighting

    (Sasol Oil (Pty) Ltd)

    Description:

    Included in the scope for refurbishing the old fuels depot (see section on tanks) to a

    burning fuels depot meant that the entire firefighting system needed to be redesigned to

    meet new code requirements and specifications.

    This lead to the replacement of the firefighting pump stations, foam proportioners and

    most of the supply piping. It also required the refurbishing of the steel water reservoir

    including the replacement of the roof.

    VGI’s Scope:

    Project Management, Procurement, Construction Management, Mechanical Engineering,

    Electrical & Instrumentation Engineering, Structural Engineering, Civil Engineering, Process

    Engineering, Geotechnical Studies

    Value of Project:

    Included in main project

    Project completed:

    May 2016

    Resources:

    VGI Project Manager: Johan Pretorius

    VGI Mechanical Engineering Manager: Chris Saxby

    VGI Firefighting Engineer: Quintin Maartens

  • 38

    OR Tambo Jet A1 bulk storage facility firefighting system upgrade

    (ACSA (Pty) Ltd)

    Description:

    Engineering (feasibility, basic and detail), Procurement and Construction Management of a

    new fire fighting system for two new 6 500 m3 Jet A1 tanks, as well as the upgrading of the

    fire fighting system of the entire Jet A1 bulk storage facility at the airport.

    VGI’s Scope:

    Project Management, Procurement, Construction Management, Mechanical Engineering,

    Electrical & Instrumentation Engineering, Structural Engineering, Civil Engineering, Process

    Engineering, Geotechnical Studies

    Value of Project:

    R 30 million

    Project completed:

    June 2010

    Resources:

    VGI Project Director: Jan Venter

    VGI Senior Civil Engineer : Leslie Strauch

    VGI Senior Mechanical Engineer : Mothusi Motsilanyane

    Partners:

    ● IPES ● AVEC ● Global Geomatics

  • 39

    Alrode Depot Firefighting System

    (Sasol Oil (Pty) Ltd)

    Description:

    As part of the larger complete depot project (previously mentioned in section on depots)

    the total firefighting system was included.

    This system consisted of a 2,6 megaliter concrete reservoir feeding water to the pump station

    consisting of 2 electrical and 2 diesel pumps, each able to deliver 890 m3/h at a head of 121

    meter. The pump station delivers cooling water to the main product tanks, 6 additional

    tanks, pump stations, vapour recovery unit, loading bays and the foam generative system.

    The firefighting system also include early warning devices connected to the ESD system.

    Resources:

    VGI Project Manager: Leon van Wyk

    VGI Mechanical Engineering Manager: Chris Saxby

    VGI Firefighting Engineer: Quintin Maartens

    Partners:

    ● IPES ● AVEC

  • 40

    TPL Waltloo depot firefighting system

    (Transnet Pipelines (Pty) Ltd)

    Description:

    Engineering (feasibility, basic

    and detail), of a fire fighting

    system for the Transnet

    Pipelines Waltloo depot,

    including the following:

    Calculation of the critical

    event, specifications for the

    pumps, firefighting

    equipment, tanker cooling

    rings, bund foam pourers etc.

    VGI’s Scope:

    The complete design and engineering of a new firefighting system for the existing depot,

    including the following engineering disciplines, Process, Mechanical, Civil and Structural

    Engineering.

    Estimated Project Value:

    R 92 million

    Project completed:

    November 2013

    Resources:

    VGI Project Director: Jan Venter

    VGI Senior Civil Engineer : Leslie Strauch

    VGI Senior Mechanical Engineer: Charl van den Berg

    Partners:

    ● IPES ● AVEC ● Global Geomatics

  • 41

    NATURAL GAS HIGH PRESSURE METERING STATIONS

    VGI Consulting has extensive experience in the design and execution of

    natural gas high pressure customer metering stations (HPCMS) for Sasol Gas

    Ltd as well as other clients.

    HPCMS for Kpone Power Plant in Ghana

    Energas Technologies (Pty) Limited

    Description:

    Basic and Detail Engineering Design for skid-mounted High Pressure Customer Metering

    Station for Kpone Power Plant located in Tema, Ghana. The station is designed to supply

    natural gas at a pressure between 2400kPa and 270kPa to the power plant. The station is

    designed to filter, heat, reduce pressure and measure the gas supply to the power station.

    VGI’s Scope: Engineering Management, Process Engineering, Mechanical and Piping

    Engineering and Detailing, Structural Design and Detailing, Inspections during fabrication.

    Value of Services:

    R 852 000.00

    Project completed:

    August 2016

    Resources:

    VGI Project Director & Project Manager: Mothusi Motsilanyane

    VGI Senior Mechanical Engineer: Matthew Fannin

    VGI Senior Civil Engineer: Leon van Wyk

    VGI Civil Engineer: Rirhandzu Maluleke

    Partners:

    ● AVEC

  • 42

    Basic and Detail Engineering of a High Pressure Reducing Station, Gas Relay

    and Gas Transport Pipeline

    (Nampak Glass)

    Description:

    The project was for detail design and construction contract documentation of a new HPCMS

    and a high-pressure pipeline of 1 kilometre to replace the existing low pressure installation.

    Apart from the pressure reduction and flow measurement, a heater system was also designed

    due to the Joule Thompson effect of the gas.

    Value of Project:

    R 1,875 million

    Project started:

    May 2016

    Project completion:

    October 2016

    Resources:

    VGI Project Director: Mothusi Motsilanyane

    VGI Mechanical Engineer: Matthew Fannin

    VGI Civil and Pipeline Engineer: Franscois van Vuuren

  • 43

    Ressano Garcia HPCMS

    (Sasol Technology (Pty) Ltd)

    Description:

    The purpose of the station is to supply

    natural gas at 750 kPa to the Central

    Termica de Ressano Garcia (CTRG) in

    Ressano Garcia, Mozambique. The

    station is designed to filter, heat, reduce

    pressure and measure the gas supply to

    CTRG.

    VGI’s Scope:

    Project Management, Procurement, Mechanical Engineering, Electrical &

    Instrumentation Engineering, Structural Engineering, Civil Engineering, Process

    Engineering, Hydraulic Analysis

    Value of Services:

    R 4 million

    Project completed:

    March 2014

    Resources:

    VGI Project Director: Ian Grobler

    VGI Project Manager: Stefan Grové

    VGI Engineering Manager : Charl van den Berg

    VGI Senior Mechanical Engineer : Mothusi Motsilanyane

    VGI Civil Engineer : Martin Volschenk

    Partners:

    ● IPES ● AVEC ● CTC

  • 44

    Pressure Reducing Station and Internal Pipeline at PFG Sprints

    (PFG Building Glass (Pty) Ltd)

    Description:

    VGI was appointed for the detail design, procurement and construction management of

    the PRS and internal pipeline. The maximum flow for the station is 10 962 m3n/h at a maximum

    design pressure of 4 900 kPa.

    Value of Project:

    R 39,6 million

    Project completed:

    May 2015

    Resources:

    VGI Project Director: Jan Venter

    VGI Senior Mechanical Engineer: Charl van den Berg / Mothusi Motsilanyane

    VGI Senior Civil Engineer: Leslie Strauch

  • 45

    Gigawatt HPCMS

    (Energas Technologies (Pty) Ltd)

    Description:

    A new High Pressure Customer Metering Station (HPCMS) was required to supply

    natural gas at a pressure of 600 kPa to a Power Station located at Ressano Garcia in

    Mozambique.

    VGI’s Scope:

    Process, Mechanical and Civil Engineering

    Value of Services:

    R 850 000.00

    Project completed:

    April 2015

    Resources:

    VGI Project Manager: Stefan Grové

    VGI Engineering Manager : Mothusi Motsilanyane

    VGI Civil Engineer : Martin Volschenk

    Partners:

    ● AVEC

  • 46

    Others stations include:

    NESCO – High Pressure Customer Metering Station (Sasol Gas Ltd)

    Petronet – High Pressure Customer Metering Station (Sasol Gas Ltd)

    Corobrik – High Pressure Customer Metering Station (Sasol Gas Ltd)

    Roodekop – Pressure Reducing and Customer Metering Stations (Sasol

    Gas Ltd)

    Dav Steel – High Pressure Customer Metering Station (Sasol Gas Ltd)

    Meydustria – PRS and Customer Metering Stations (Sasol Gas Ltd)

    Powerville – LP PRS and Jumpover PRS (Sasol Gas Ltd)

    Cimentos – Customer Metering Station (Matola Gas Company SARL)

    Two Pressure Reducing Stations in Mozambique (Matola Gas Company

    SARL)

  • 47

    COMPRESSOR STATIONS

    Compressed Natural Gas (CNG) Station for Novo Energy

    Novo Energy (Pty) Ltd

    Description:

    Piping Design and Construction Monitoring for Compressed Natural Gas (CNG) Station for

    Novo Energy in Kew, Johannesburg.

    VGI’s Scope: Engineering Management, Process Engineering, Piping Engineering and Detailing,

    Electrical Engineering, Instrumentation Engineering and Construction Phase Supervision.

    Value of Services:

    R 850 360.00

    Project completed:

    December 2016

    Resources:

    VGI Project Director & Project Manager: Mothusi Motsilanyane

    AVEC Process Engineer: Stanley Batzofin

    VGI Mechanical Engineer: Louis Ferreira

    IPES Electrical Engineer: Gerrit Human

    Partners:

    ● AVEC ● IPES

  • 48

    CONCRETE AND STEEL STRUCTURES

    Engineering and Site Supervision for Ericsson – High Masts and Rooftop

    Installations

    (Ericsson SA (Pty) Ltd)

    VGI’s Scope:

    Ericsson contracted with MTN to install several hundred new high mast towers and rooftop

    installations in several areas in South Africa. Ericsson appointed VGI to assist them with the

    site engineering and construction monitoring of approximately 330 sites up to end 2016.

    VGI’s scope included the geotechnical survey, site survey, construction drawings, site

    supervision and final approval of the erection of the towers.

    It appears that new sites will be added to the VGI scope early in 2017.

    Value of Services:

    R 9,2 million

    Project completed:

    (Ongoing)

    Resources:

    VGI Project Directors : Stefan Grové / Johan Pretorius

    VGI Lead Civil Engineer : Franscois van Vuuren

    VGI Civil Engineers : Kgotatso Masea / Rirhandzu Maluleke

  • 49

    REINFORCED CONCRETE, STEEL & WOODEN STRUCTURES

    Buddhist Temple, Bronkhorstspruit

    (International Buddhist Association of SA)

    Description:

    The International Buddhist Association wanted to construct a Buddhist temple in Africa and

    they decided to build it in South Africa. VGI Consulting did the structural design of the

    reinforced concrete structures.

    VGI’s Scope:

    Structural and Civil Engineering

    Value of Services:

    R 2 000 000

    Project completed:

    March 2003

    Resources:

    VGI Project Director: Ian Grobler

    VGI Structural and Civil Engineer : Leon van Wyk

    Other consultants:

    ● BSSC Architects ● Van Schalkwyk and Blake Quantity surveyors

  • 50

    Multi Purpose Hall, Soshanguve

    (Department of Public Works)

    Description:

    The Department of Public Works project asked for a multipurpose hall at the Jabulani

    Centre in Soshanguve. VGI Consulting did the structural design of the steel and

    reinforced concrete structures.

    VGI’s Scope:

    Structural Engineering

    Value of Services:

    R 144 000

    Project completed:

    February 2005

    Resources:

    VGI Structural Engineer : Leon van Wyk

    Other consultants:

    ● Hovey Sithole Architects

  • 51

    Others building project include:

    Magistrate’s office – Ekangala (Department of Public Work)

    Police stations – Kwamhlanga, Mabopane and Elandskraal (Department of Public Work)

    Prison Buildings – Modderbee Prison – Extension and Witbank Prison – Repair and

    maintenance (Department of Public Work)

    Industrial buildings and warehouses – Ekandustria (Sasol Nitro and Sasol Dyno Nobel)

    Fire Stations – Dobsonville, Diepkloof & Orangefarm (Johannesburg Municipality)

  • 52

    School Projects: (Gauteng Department of Education)

    • Lethulwazi Secondary school – Voslorus

    • Prospectus Novus School – Pretoria

    • Windmill Park Primary School – East Rand

    • Bhukulani Secondary School – Soweto

    • Boschkop Primary School – Bochkop

    • Bekekayo Primary School - Babsfontein

  • 53

    WATER RETICULATION NETWORKS

    Upgrade Water Network Mashimong & Moriting, Tembisa.

    This project is in Tembisa and involves the design and construction of a 900 m long 250

    mm Ø uPVC water pipeline. This project forms part of the water network upgraded in

    Tembisa.

    SEWER RETICULATION NETWORKS

    Sali-Zuma Relief Sewer Pipeline. The project is in the Sali & Zuma areas of Katlehong. The purpose of the project was to

    reroute the outfall sewer from Alberton and to eliminate the pump station previously

    used. VGI Consulting was appointed to design and monitor the construction of the

    pipeline. The project consisted of the following: 470 m long 150 mm Ø clay pipes, 50

    m long 300 mm Ø clay pipes, 2 750 m 400 mm Ø clay pipes and 500 m long 500 mm

    Ø clay pipes.

    All of the above projects were awarded to Emerging Contractors. VGI Consulting was

    actively involved in training the Contractors in matters related to construction

    management. VGI Consulting assisted the Contractors with the compiling of their

    payments certificates and construction programs.

    Replacement of a Portion of the Existing Bulk Outfall Sewer, Germiston, Phase 1

    & 2. The existing outfall sewer line reached its design capacity and design life. Due to this

    reason the Ekurhuleni Metropolitan Municipality started to upgrade the existing sewer

    line. VGI Consulting was appointed to design and monitor construction of 1 300 m of

    the sewer line that had to be replaced. The new sewer line varied in size between a

    600 mm and 750 mm Ø concrete pipe.

  • 54

    WATER AND SEWER PURIFICATION WORKS

  • 55

    OUR CLIENTS

    VGI has long standing relationships with our current clients under which the

    following companies can be counted:

    Sasol Gas, Sasol Oil, Sasol Group Technology, iGas, Matola Gas

    Company, GigaJoule, Siemens, Eriscsson

    References:

    Sasol Group Technology (Pty) Ltd

    Dr Charl van Schalkwyk, 016 960 4647

    Mr Johannes Mavuso, 071 675 7512

    Mr Uys Grundling, 083 637 9841

    Sasol Oil (Pty)Ltd

    Mr Pieter Kitching, 082 373 8568

    Sasol Gas Ltd

    Mr Nhlanhla Mhlali, 082 573 7094

    ROMPCO

    Dr Jaap Smit, 083 633 8791

    GigaJoule

    Mr Johan de Vos, 012 682 9124

    Mr Dieter Klingenberg, 012 682 9122

    Siemens

    Mr Heinz Hauck, 011 652 3925

    iGas

    Mr Neville Ephraim, 079 890 8272

    Ericsson

    Mr Ferdi Meyer, 011 8442400

  • 56

    QUALITY

  • 57

    VGI is an ISO 9001:2008 registered company. Quality control during the design

    phase of a project includes the following key steps:

    A senior member of VGI management is responsible for each

    project executed by VGI.

    At the outset of each project a design bases is drawn up and signed

    off by the client to ensure the correct design parameters are used

    as well as the correct design codes.

    All designs are checked and signed off by a professional engineer.

    All reports, designs and final deliverables are checked and signed

    off by a senior engineer before the reports are submitted to the

    client.

    The design team attends the HAZOP and PDA meetings to ensure

    that the changes are fully understood by all disciplines.

    Regular design reviews by the responsible professional engineer

    and VGI peers are held.

    A detailed drawing checklist are used to ensure the correctness of

    drawings.

    Quality control during the execution phase

    A senior member of VGI management is responsible for each

    project executed by VGI

    The specifications applicable to the project is worked through with

    the site supervision team by the senior professional engineer

    responsible for the project.

    Daily construction checklists are completed by the supervision

    team

    Regular audits are carried out by the responsible professional

    engineer as well as senior management on site to ensure that the

    required quality is achieved during the construction phase and that

    all specifications are adhered to.

    Non Conformance Records and Corrective Action Requests are

    used to manage the quality on site.

  • 58

    SAFETY HEALTH AND ENVIRONMENT DURING THE

    EXECUTION PHASE

  • 59

    VGI has a 5 star IRCA rating. Health and Safety management during the

    execution phase of a project includes the following key steps:

    VGI carries out a risk assessment at the end of detailed engineering

    to identify any project specific risks which the construction

    contractor needs to adhere to.

    This risk assessment is included, with the client SHERQ specifications,

    in the Works Information of the construction contractor’s contract.

    After the award of the construction contract, VGI carries out a

    detailed risk assessment with the construction contractor to identify

    all risks associated with this contract.

    The construction contractor compiles his SHE plan to address all the

    risks identified during the risk meeting.

    The SHE plan is submitted to VGI for approval.

    After approval from VGI, the SHE file is submitted to the client for

    final sign off before the site I handed over to the contractor.

    Regular site audits are carried out by the VGI safety officer to ensure

    that the construction contractor adheres to his SHE plan and all

    regulations and laws.

    ENVIRONMENTAL MANAGEMENT DURING THE

    PROJECT

    VGI supports the Environmental Consultant to obtain a record of

    assessment.

    Both the record of assessment and the Environmental Management

    Plan is included in the works information of the construction

    contractor.

    The site supervision team enforces the requirements from the

    Record of Assessment and the Environmental Management Plan.

    The Environmental Control Officer carries out regular audits on site.

    All findings are corrected by the construction contractor and

    signed off by the VGI Supervision team.

  • 60

    PROCUREMENT & CONTRACTING

    VGI has extensive experience in the procurement of materials and

    equipment, in particular long lead items, for and on behalf of its

    clients. VGI also contracts on behalf of its clients.

    From July 2010 until recently, VGI has placed 125 material and

    equipment orders for its clients to a total value of R 350 million.

    During the same period, VGI has placed 30 contracts to a total

    value of R 1.6 billion.

    VGI’s responsibilities includes the following for purchase orders:

    • design and compilation of the technical scope of supply;

    • the tender activities;

    • expediting;

    • change control and management;

    • certification of payment and;

    • close-out of the orders.

    VGI’s technical team is closely involved in ensuring compliance of

    the materials and equipment with the technical requirements. For

    this purpose supplier drawings and designs undergo an approval

    process and in some instances, factory acceptance tests are

  • 61

    conducted at the supplier’s premises. Pre-manufacturing meetings

    are held for complex mechanical equipment. VGI’s technical team

    also inspects materials and equipment prior to delivery to site.

    VGI utilises the NEC3 suit of contracts in most instances when

    contracting on behalf of its clients. VGI’s commercial and project

    management team receives advanced traning in the use of the

    NEC3. Most recent training includes training in terms of the

    programme and compensation events, and the adjudication

    process.

    VGI’s responsibilities includes the following for contracts:

    • design and compilation of the Works and Site Information;

    • the tender activities;

    • contract execution management;

    • change control and management;

    • certification of payment and;

    • close-out of the contracts.

    VGI’s technical team has extensive knowledge in terms of the roles

    of the Parties, the Supervisor and the Project Manager. This

    knowledge ensures that cost and time is monitored closely.

  • 62

    AWARDS

    VGI has received the following awards:

    Certificate of Recognition : ‘Delivery of services during project

    execution 2004/5’, Sasol

    Certificate of Recognition : EPCM: Secunda Natref Integration

    Project for ‘Managing WBHO (Pipeline Construction Company) to

    achieve 1133533 man-hours without a lost time injury’, Sasol, July

    2007

    Services Excellence Award : ‘Service Reliability: Continuous

    delivery of high standard service ’, Sasol, September 2007

    Sasol Safety Award for achieving the Sasol Construction Safety

    target, 2011

    Sasol Safety Award for best recovered project (Alrode), 2012

    Sasol Safety Award for VGI Head Office for achieving zero incident

    rate, 2012

    Sasol Safety Award for the top 10 projects, 2013