Company Profile

CSG

February 2011

Contents

Head Office: Queensland Office: www.fabtech.com.au 53 South Tce, Wingfield SA 5013 Lot 9 Cooper St, Dalby QLD 4405 ABN 21 060 001 765 Ph: (08) 8347 3111 Ph: (07) 3889 9732 email: [email protected]

Page 2

1. Company Profile

2. Operational Strategy Focus

3. Services and Segment

4. Commercial Details

5. Directors and Ownership

6. Group Companies

7. Coal Seam Gas Recent Projects 8. Project Summary

9. Photos

10. Company Policies

Operational Strategy Focus

Head Office: Queensland Office: www.fabtech.com.au 53 South Tce, Wingfield SA 5013 Lot 9 Cooper St, Dalby QLD 4405 ABN 21 060 001 765 Ph: (08) 8347 3111 Ph: (07) 3889 9732 email: [email protected] Page 3

Geomembrane Applications for Liquid and Waste Containment

Introduction Fabtech has over 24 years of experience as a leading Geomembrane Converter with an extensive National and International presence. A proven leader in the multi-disciplined technology that encompasses the lining and covering of dams, reservoirs, landfills, effluent lagoons, tunnels irrigation channels and tanks. Fabtech’s technical capability is supported with an international network of industry experts and material suppliers. Always at the forefront of its industry, Fabtech has installed over 7 million square metres of geomembrane liners and covers in Australia, the Pacific Rim, UAE, Eastern Europe and New Zealand. Owned by an ASX listed industrial Group, E&A Limited, Fabtech’s onsite installations are backed by an engineering and technical organisation reflective of Fabtech’s experience within the synthetic lining industry. Certified to ISO 9001, Fabtech’s achievements include the design and construction of the largest flexible geomembrane liner and floating cover in Australia, totalling 180,000m² (Potts Hill Reservoir, Sydney Water Board). Company Précis

• Head Office, Administration and Fabrication facilities located in South Australia

• Founded in 1986, acquired by E&A Ltd in 2007, an ASX Listed Industrial Group

• National and International projects base.

• Specialising in the design, supply and installation of the entire range of flexible liners and cover

systems for containment applications.

• Australian leaders in Geomembrane Technology.

• Formal Alliance agreements with Global Partners.

• 1 million m2 of floating covers installed in the last 4 years

• Blue Chip Client Base

Services and Segments

Head Office: Queensland Office: www.fabtech.com.au 53 South Tce, Wingfield SA 5013 Lot 9 Cooper St, Dalby QLD 4405 ABN 21 060 001 765 Ph: (08) 8347 3111 Ph: (07) 3889 9732 email: [email protected] Page 4

Engineering Services

Geomembrane selection Evaporation Cover Design Gas Cover Design Containment Systems Design Baffle Curtain Design Containment Design

Construction Services

Material Supply Geomembrane Supply Factory Fabrication and supply

Design and Construct

Turn-key Project Management Containment Systems Evaporation Covers Gas Covers Baffle Curtain Holding Tanks

Construction (Supply and Install)

Containment Systems Evaporation Covers Gas Covers

Maintenance Services

Floating Cover maintenance and repair Liner inspection and maintenance Asset life assessment Leak Testing

Product Applications

Potable water storage liners and evaporation covers Effluent storages and reactors liners and gas collection covers Minerals operations process and storm water storages Tailings dams and leach pads Evaporation covers Irrigation storages Evaporation ponds Landfill containment systems and capping Irrigation Channel Liners Tank liners Bund Liners Special fabrications

Commercial Details

Head Office: Queensland Office: www.fabtech.com.au 53 South Tce, Wingfield SA 5013 Lot 9 Cooper St, Dalby QLD 4405 ABN 21 060 001 765 Ph: (08) 8347 3111 Ph: (07) 3889 9732 email: [email protected] Page 5

Company Trading Name: Fabtech SA Pty Ltd

Business Address: 53 South Terrace, Wingfield SA 5013 Regional Address: Lot 9 Cooper Street, Dalby QLD 4405

Australian Business No: 21 060 001 765

Australian Company No: 060 001 765

Bus. Registration No: 0234028r

Telephone: +61 8 8347 3111 (free call 1300 664 776)

Fax: +61 8 8347 3729

Email: [email protected]

Bankers Details: National Australia Bank 22 – 28 King William Street, Adelaide SA 5000 Robert Prime (13 22 65)

Accountant Details: KPMG 151 Pirie Street, Adelaide SA 5000 Tel: +61 8 8236 3111 Fax:+61 8 8236 3299

Workers Compensation: WorkCover South Australia, 11526604

Professional Indemnity

Products/Public Liability

Commercial Motor Vehicle

Insurer Axis Speciality Europe Limited

SRS Underwriting Agency

Zurich Australian Insurance Ltd

Limit of Cover $5,000,000 $50,000,000 $20,000,000

Expiry Date 30 September 2011 30 September 2011 30 September 2011

Policy Number 00083210 MCIA 090000311 & 312 53 297 3142 VFT

Directors and Ownership

Head Office: Queensland Office: www.fabtech.com.au 53 South Tce, Wingfield SA 5013 Lot 9 Cooper St, Dalby QLD 4405 ABN 21 060 001 765 Ph: (08) 8347 3111 Ph: (07) 3889 9732 email: [email protected] Page 6

Executive Chairman: Stephen Young Director: Mark Vartuli Managing Director: Graham Fairhead Fabtech is a wholly owned subsidiary of E&A limited. An ASX listed based Industrial Group. E&A Limited is focused on Mining, Industrial, Defence, Water, Gas, Petrochemicals and Corporate Advisory business sectors. Group turnover is in excess of $160m per annum with more than 450 skilled engineers, design and draftsmen and tradespersons. The strengths and capabilities of the companies within the EAL Group enable it to position itself as a low cost, low risk, total solution provider for large multi discipline projects in the oil and gas, mining , power defence and process industries. Since acquisition by E&A Limited in July 2008 Fabtech has invested in strengthening and growing the business. This includes expansion of installation capacity, significant and on-going training of installation technicians and recruitment of engineers and project managers. OH&S and Quality process have been reviewed and up-dated. Over $2.5m invested in new equipment. Fabtech is able to deploy Group resources to complement internal skills enhancing Fabtech’s capability to deliver complex projects. A brief introduction to the E&A Group of companies is attached.

Group Companies

Head Office: Queensland Office: www.fabtech.com.au 53 South Tce, Wingfield SA 5013 Lot 9 Cooper St, Dalby QLD 4405 ABN 21 060 001 765 Ph: (08) 8347 3111 Ph: (07) 3889 9732 email: [email protected] Page 7

EAL is an investment and industrial engineering services company listed on the Australian Stock Exchange (ASX code EAL)

The EAL Group includes: Equity and Advisory Ltd Provides a range of corporate advisory services including sales and divestments, mergers and acquisitions including private equity, financial evaluations, corporate and project advisory, property transactional advice, valuations and expert opinions, family business consulting, turnaround consulting and debt and equity procurement as well as a wide array accounting services. Ottoway Engineering Pty Ltd Provides process pipe fabrication and installation involving all aspects of project delivery from project management, design, engineering, procurement, pipe spooling and specialist steel fabrication manufacture, installation commissioning and maintenance. The fabrication facility supports a large installation workforce for the petro-chemical, oil and gas, mining, water, defence, infrastructure and process industries. Heavymech Pty Ltd Provides quality machining services and is a lead supplier of breakdown and repair services to the heavy industrial, mining and power generation industries. Fabtech SA Pty Ltd Provides flexible geomembrane liners and floating covers, material supply, construction, installation and repairs, geomembrane consultancy services, civil projects and project management services. Blucher (Australia) Pty Ltd Supplies high quality stainless steel products for both drainage and supply systems for industrial, commercial and residential applications. Quarry and Mining Manufacture Pty Ltd Provides superior technical and customer focused services in the supply and construction of processing plants, spare parts, repair and onsite maintenance to the quarry, waste to energy recycling and mining sectors. ICE Engineering & Construction Is an innovative company with more than 50years of combined experience in the Electrical & Instrumentation industry. The company performs a broad range of services including design, project management, installation & commissioning. We work closely with our customers to design, manufacture & install products that meet all specifications.

E&A Contractors Pty Ltd Integrated service solutions including engineering, design, drafting, procurement, machining, fabrication, construction and project management services to heavy industrial, energy, mining and resources industries of Australia.

Project Summary

Head Office: Queensland Office: www.fabtech.com.au 53 South Tce, Wingfield SA 5013 Lot 9 Cooper St, Dalby QLD 4405 ABN 21 060 001 765 Ph: (08) 8347 3111 Ph: (07) 3889 9732 email: [email protected]

Page 8

Principal: SANTOS Head Contractor: Bardrill Project: Raslie, Pickanjinnie & Coxon Creek Holding Dam Liners Location: Nr Roma, Qld Date: November 2009 to March 2010

Project Scope Three dams requiring the installation of HDPE liners with a total area of approximately 150,000m2. Materials were contracted by Santos and supplied by Fabtech, the installation was contracted by Bardrill to Fabtech. The dams are of composite liner design using 1.5mm HDPE liner material. In addition to on site QC protocols third party NATA lab testing of destructive weld samples was also undertaken. Additional Issues Team members were qualified to Santos’s Gas test atmospheres and working in accordance with permits training, as well as Santos 4WD vehicle training requirements. Fabtech have passed Santos’s contractor prior approval qualifications and are currently finalizing blanket contract arrangements. Fabtech are advised that they are the only geomembrane installer who has successfully met this stringent criteria, particularly with respect to EH&S standards. Fabtech were audited by Santos during the works with an excellent safety assessment.

Project Summary

Head Office: Queensland Office: www.fabtech.com.au 53 South Tce, Wingfield SA 5013 Lot 9 Cooper St, Dalby QLD 4405 ABN 21 060 001 765 Ph: (08) 8347 3111 Ph: (07) 3889 9732 email: [email protected]

Page 9

Principal: AGL Head Contractor: Ostwald Civil Project: Glenaras Water Holding Pond Location: Nr Longreach, Qld Date: October 2009 Project Scope Prior to contract award Fabtech provided specification and design advice to AGL. Fabtech were contracted by Ostwald Bros who were the head contractor for this remote area holding pond. The project was for supply and installation of a geotextile cushion layer under an HDPE liner system. The surface area lined was approximately 100,000m2. The project was completed at night to avoid high daytime temperatures and solar loading compromising weld integrity and to assist in managing employee fatigue. Additional Issues Fatigue management and road safety was a special consideration as accommodation was a significant travel time from the works, on unsealed roads with abundant wildlife.

Project Summary

Head Office: Queensland Office: www.fabtech.com.au 53 South Tce, Wingfield SA 5013 Lot 9 Cooper St, Dalby QLD 4405 ABN 21 060 001 765 Ph: (08) 8347 3111 Ph: (07) 3889 9732 email: [email protected]

Page 10

Principal: Origin Energy Head Contractor: Watpac Project: Turinga Water Treatment Plant Lagoons Location: Nr Condamine, Qld Date: October 2009 Project Scope Supply and installation of geotextile cushion layer and a 2mm HDPE primary liner for the feed water lagoon system and effluent pond at the clients’ water treatment plant. The surface area of the system was approximately 170,000m2. The installation included spillways, causeways and other structures with the primary liner secured and sealed with HDPE plate (Fablock) cast into the concrete structures. The lagoon system design included a longitudinal truncated berm to facilitate solids retention and management within the system. This required specific and detailed material handling and deployment strategies combined with a comprehensive traffic management plan to enable safe and efficient installation of materials. Additional Issues The supplied material was supported with a 25 year material warranty in this application.

Project Summary

Head Office: Queensland Office: www.fabtech.com.au 53 South Tce, Wingfield SA 5013 Lot 9 Cooper St, Dalby QLD 4405 ABN 21 060 001 765 Ph: (08) 8347 3111 Ph: (07) 3889 9732 email: [email protected]

Page 11

Principal: Arrow Energy Head Contractor: Fabtech Project: Dam 10 & 11 Supply and installation of lining systems Location: Moranbah, Qld Date: November 2009 & March 2010

Project Scope Supply and installation of 1.5mm HDPE liner with a partial geotextile cushion layer to two ponds totaling approximately 120,000m2 of surface area in two discrete mobilisations. The client required a high installation rate necessitating allocation of a large installation team accommodated in the clients adjacent camp facilities. Due to the local ambient conditions the installation was completed at night to avoid weld integrity and installed material stresses being compromised by daytime elevated temperatures/solar loading. Night time working was also a significant factor in the projects fatigue management strategy. Additional Issues The Principal places high importance on safety and environmental performance. Fabtech provided installation staff trained in Arrow’s 2 day Coal Seam Gas induction programme in addition to the on-site client induction processes and Fabtech’s own site specific inductions.

Project Summary

Head Office: Queensland Office: www.fabtech.com.au 53 South Tce, Wingfield SA 5013 Lot 9 Cooper St, Dalby QLD 4405 ABN 21 060 001 765 Ph: (08) 8347 3111 Ph: (07) 3889 9732 email: [email protected]

Page 12

Principal: Origin Energy Head Contractor: Shamrock Civil Project: Talinga Pond B Location: Nr Condimine, Qld Date: September 2009 Project Scope Installation of lining systems to 500,000m2 of surface configured as four discrete ponds with connecting spillways, HDPE plate sumps, and HDPE plate mounting systems for inlet and outlet pipework. This required in excess of 150km of fusion seam welding to strict QC requirements. The lining system comprised a geotextile Cushion layer under a 2mm HDPE primary liner. In addition to the on-site QC protocols all weld seam destructive tests were verified by a third party NATA test lab. Additional Issues The Principal places high importance on safety and environmental performance. Fabtech were complimented on numerous occasions for their achievement in these areas, as well as the quality of Fabtech’s workmanship. Fabtech responded to project acceleration requests and deployed additional resources, maintaining efficiency targets and achieving and maintaining exceptionally high daily coverage rates. This included 5 welding teams operating simultaneously on the same weld front.

Project Summary

Head Office: Queensland Office: www.fabtech.com.au 53 South Tce, Wingfield SA 5013 Lot 9 Cooper St, Dalby QLD 4405 ABN 21 060 001 765 Ph: (08) 8347 3111 Ph: (07) 3889 9732 email: [email protected]

Page 13

Principal: Origin Energy Head Contractor: Fabtech SA Pty Ltd Project: High Volume Holding Tanks Location: Miles, QLD Date: February – October 2010 Project Scope Supply and installation of Fabtech designed and certified high volume low aspect ratio holding tanks configured both individually and combined in a tank farm configuration. The selected holding capacities were 2.5 and 3.4 ML’s. The contract currently comprises 27 units. Additional Issues The use of holding tanks provide reduced project lead time, cost effective site remediation and re-use compared with alternative solutions. Fabtech have taken a turn-key project leadership role managing all activities for the project including site preparation, construction and safety management.

Project Summary

Head Office: Queensland Office: www.fabtech.com.au 53 South Tce, Wingfield SA 5013 Lot 9 Cooper St, Dalby QLD 4405 ABN 21 060 001 765 Ph: (08) 8347 3111 Ph: (07) 3889 9732 email: [email protected]

Page 14

Recent Projects Include:

PHOENIX COPPER – LEACH PAD, SA

Installation of a small leach pad using HDPE geomembrane for this remote site mine.

BHP B OLYPMIC DAM – STORAGE COVER, SA Design and construction of a 10ML potable water storage cover using a specialist white alloyed polyethylene membrane in 1mm grade.

OSTWALD BROS. CONDABRI SOUTH LAGOON, QLD Supply and install of HDPE liner and geotextile to Origin’s Condabri Lagoon. The QA regime included third party destruction weld seam testing. The dam was 55,000 m2 in area with textured membrane on the batters and smooth material on the floor.

ORIGIN ENERGY - STORAGE TANKS, QLD Fabtech provide a turnkey solution for the installation of Fabtech’s patented 3 ML tanks. This includes project safety management on multiple remote sites simultaneously with multiple earthworks, steel and geomembrane teams on multiple sites.

BARDRILL (SANTOS) – STORAGE LINERS, QLD Supply and Installation of 1.5mm HDPE lining system to a wastewater storage lagoon. Approximately 50,000m2 of material.

ORIGIN ENERGY – ZIG ZAG DAM, QLD Build and lining of a waste water storage lagoon. The project included construction of the dam and lining with cushion layer geofabric and 2.0mm HDPR liner. Approximately 50,000m2 of liner surface.

HEATHGATE RESOURCES Uranium Mine - BEVERLEY, SA Design, supply and install 3x storage lagoons for Beverley Mines. To assure environmental performance the process lagoons have a double linier system with leak detection systems.

URANIUM ONE - HONEYMOON MINE, SA Design, supply and installation of double lined process water ponds including leak detection, monitoring and automatic pumping system with the entire system being fabricated and installed by Fabtech. 2.00mm HDPE primary liners, M5 flow net, 1.00mm HDPE secondary liners, precast concrete wells and automatic pump systems.

AUSENCO (URANIUM ONE) – HONEYMOON MINE PROCESS STORAGES, SA Design and Construction of 5 storage lagoons in HDPE with 2.00mm HDPE primary liners and 1.5mm secondary membranes with automatic leak detection systems for Uranium One’s Honeymoon ISL Operations.

WATPAC CIVIL (ORIGIN ENERGY) – WASTE WATER TREATMENT POND, QLD Supply and Install 180,000m2 of 2.0mm HDPE with geotextile underlay for a waste water treatment lagoon system.

POLYMETALS – WHITE DAM GOLD MINE, SA

Project Summary

Head Office: Queensland Office: www.fabtech.com.au 53 South Tce, Wingfield SA 5013 Lot 9 Cooper St, Dalby QLD 4405 ABN 21 060 001 765 Ph: (08) 8347 3111 Ph: (07) 3889 9732 email: [email protected]

Page 15

Supply and Installation of 240,000m2 of HDPE membrane to heap leach pads, W drains, process ponds and storm water ponds for the White Dam Gold mine in Northeast SA.

HEATHGATE RESOURCES – BEVERLEY URANIUM MINE, SA Supply and Installation of HDPE primary and secondary lining systems and leak detection system.

BARDRILL (SANTOS) – STORAGE LINERS, QLD Supply and Installation of 1.5mm HDPE lining system to 3x waste water storage lagoons. Approximately 100,000m2.

ARROW ENERGY – WATER STORAGE LINERS, QLD Supply and installation of HDPE lining systems with geotextile cushion layer to a brine storage and a chemical waste water storage. Approximately 130,000m2.

OSTWALD CIVIL (AGL) – WATER STORAGE LAGOON, QLD Supply and Installation of HDPE lining system with geotextile cushion layer to an earthern storage lagoon. Approximately 100,000m2.

LEED ENGINEERING – EVAPORATION POND LIFT, BHP, OLYMPIC DAM, SA Supply and Install HDPE for wall raise to an operational evaporation pond.

SHAMROCK CIVIL (ORIGIN ENERGY) - TALINGA POND B, QLD Installation of 500,000m2 of 2mm HDPE and Geotextile for a cellular evaporation pond system.

LEED ENGINEERING - BHP ROXBY STORMWATER PONDS, SA Supply and Installation of a 1.5-mm thick HDPE geomembrane liner in the East and West Storm Water Dams at BHP-Billiton Olympic Dam.

LUCAS EARTHMOVERS - WATER STORAGE LAGOON (ILKUA MINES), SA Supply and Installation of a 1.0-mm thick HDPE geomembrane liner for the dam located at Jacinth-Ambrosia Mine totalling 3,000m2.

LUCAS EARTHMOVERS - WATER STORAGE LAGOON (ILKUA MINES), SA Supply and Installation of a 1.5mm HDPE and AYY geomembrane liner and stockpile Pad 14,500m2. 2x Storage Dams – 33,800m2 and 6.500m2.

COPPERCO – LADY ANNIE COPPER MINE – QLD Design and Construction of an LLDPE cover for a 200ML water storage.

EXACT MIX – ANGAS ZINC MINE, SA Tailings dam liner including double liner leak detection system comprising 240,000m2 of surface. ABESQUE – ANGAS ZINC MINE, SA

Supply and Installation of 3 process water ponds including leak detection systems in HDPE.

CDEC (COPPER CO) – LADY ANNIE COPPER MINE, QLD Supply and Install 330,000m2 of 1.5mm HDPE for heap leach pads and storage ponds. YORK CIVIL – BHP, SA HDPE liner to sewage lagoon

Project Summary

Head Office: Queensland Office: www.fabtech.com.au 53 South Tce, Wingfield SA 5013 Lot 9 Cooper St, Dalby QLD 4405 ABN 21 060 001 765 Ph: (08) 8347 3111 Ph: (07) 3889 9732 email: [email protected]

Page 16

WESTERN MINING CORPORATION – ROXBY DOWNS, SA Supply and install HDPE liner to effluent sump

STOCKPORT CIVIL – ROXBY DOWNS, SA Supply and install HDPE liner for retention of contaminated waste

CAIRNS REGIONAL COUNCIL – PORTSMITH LANDFIL CAP, QLD Supply and installation of LLDPE cap with GCD including material functional testing and certification. 340,000 m2 of materials and 75 gas penetrations were included in the project.

BAKER & GIBBONS – WWTP, SA Lining of WWTP lagoons for Ceduna Council using HDPE including design and construction of an under-liner gas release system.

RENMARK COUNCIL – WWTP, SA Supply and installation of 1.5mm HDPE to a waste water storage lagoon of 25,000 m2.

T&R PASTORAL – WASTE WATER STORAGE LAGOONS – SA

Installation of 1.5 mm HDPE geomembrane liner with leak detection systems to five waste water storage lagoons totalling 112,000 m2

BARDAVCOL - WATER TREATMENT PLANT– MT PLEASANT, SA

Design, supply, construct and install liner and floating cover system for Mt Pleasant Water Storage Pond. The design comprises Enviroliner lining systems with Reinforced Polypropylene defined sump cover systems.

L.R & M CONSTRUCTIONS - DUBLIN, SA Supply and installation of Geonet, Geomembrane and Geotextile for a landfill application in Dublin, including rigrous QA specifications. Approx. 60,000m2 of materials.

L.R & M CONSTRUCTIONS - PT HUGHES, SA Supply and installation of 1.5mm thick HDPE Geomembrane Liner approx. 24,000m2 for a Stormwater Lagoon.

TRICE - TWO WELLS, SA Supply and installation of geomembrane liners in 3 ponds for Como Glasshouse Stage 2 Project. Approx. 60,000m2 of 1.5mm HDPE lining materials

LINKE CONTRACTING - LYNDOCH, SA Supply and installation of 1.5mm HDPE geomembrane liner for a waste water dam located at Lyndoch, Approx. 12,000m2 of 1.5mm HDPE material.

CITYGREEN ALLIANCE (SA WATER) - RECYCLED WATER PROJECT, SA Design, Supply, Installation and Testing of 2 x 4 ML and 2 x 7 ML membrane lined and covered earthen water storages including leak detection systems processing waste water. The liner systems were constructed in Polypropylene and the pre-fabricated covers in reinforced Polypropylene.

Project Summary

Head Office: Queensland Office: www.fabtech.com.au 53 South Tce, Wingfield SA 5013 Lot 9 Cooper St, Dalby QLD 4405 ABN 21 060 001 765 Ph: (08) 8347 3111 Ph: (07) 3889 9732 email: [email protected]

Page 17

GOLDSMITH CONSTRUCTIONS (CITY OF CASEY, MELBOURNE) – LANDFILL CAP, VIC

Supply and Installation of a landfill cap in LLDPE, approx 90,000m2, with cushion geotextile and multiple gas pipe penetration sealing.

LEED ENGINEERNIG – ALDINGA WWTP (SA WATER), SA Design, supply and installation of three lined and covered WWT storage lagoons with Polypropylene liners and RPP defined sump floating covers. Approximate value $900k.

FULTON HOGAN – KOORLONG WWTP, VIC Supply and Install HDPE liners to 4x waste water storage lagoons. The project included multipule concrete structures and penetrations requiring complex sealing systems. Approximately 23,000m2

of material.

SWIFT – EFFLUENT LAGOONS, QLD Supply and Install HDPE lining systems to 2x abattoir effluent lagoons. Approximately 10,000m2.

YORK CIVIL – WASTE WATER STORAGE LINER (SA WATER) Supply and Installation of HDPE geomembrane lining systems for a waste water storage lagoon. Approximately 21,000m2.

McKAY CASINGS – ANAEROBIC REACOTR COVER REPLACEMENT, VIC Design and Construct Project for removal of existing PP cover, design of new HDPE cover, gas collection and rain water disposal system for a HRAL. Installation was performed over the full but decommissioned lagoon.

MITCHELL WATER - WIMMERA MALLEE SS6, VIC Supply and Installation of a 1.5-mm thick HDPE geomembrane liner in the storages included in the Wimmera Mallee Pipeline Project - 45,498m2.

MITCHELL WATER - WIMMERA MALLEE PIPELINE STORAGES PPS SS 3 and 4

Water storage Lagoons approximately 60,000m2 of HDPE supplied and installed.

ALANO WATER - GREENOCK WWTP 5 X LAGOONS, SA Supply and Installation of 1.5mm smooth HDPE for waste water storage dams total 20,000m2.

ALANO WATER - BALAKLAVA WASTE WATER TREATMENT PLANT, SA Supply and Installation of a 1.5-mm thick HDPE geomembrane liner totalling 11,000m2.

ALANO WATER - WATER STORAGE DAM, SA

8,100m2 1.5mm HDPE

AKRON ROADS - HYLAND LANDFILL, VIC Latrobe City Hyland Highway Landfill for the supply and installation of HDPE geomembrane including gusset to leachate pipe.

BAKER AND GIBBONS - 2 x WASTE WATER STORAGE LAGOONS KANGAROO ISLAND Supply and installation of a 1.5-mm HDPE Geo-membrane totalling 22,000m2.

Project Summary

Head Office: Queensland Office: www.fabtech.com.au 53 South Tce, Wingfield SA 5013 Lot 9 Cooper St, Dalby QLD 4405 ABN 21 060 001 765 Ph: (08) 8347 3111 Ph: (07) 3889 9732 email: [email protected]

Page 18

GIPPSLAND WATER FACTORY ALLIANCE, VICTORIA Design and Construction of HDPE liner and RPP gas extraction cover for a 4ML effluent storage

basin and HDPE liner and RPP gas cover and pipework systems for two 21ML anaerobic reactors.

BARWON WATER – MONTPELIER BASIN NUMBER 4, VIC Design and Construction PP lining and RPP cover systems for a 180ML potable water storage

basin including civil works, pipe systems and security.

BARWON WATER – ALVIE BASIN, VIC Design and Construction PP lining and RPP cover systems for a 50ML Potable water storage basin

including civil works and pipe systems.

MELBOURNE WATER CORPORATION, VIC Design, Supply and Installation of biogas collection cover for the Werribee Farm Treatment Works.

The cover is a three layered collection cover which incorporates a bottom layer of HDPE to act as a scum control device, a layer of polyethylene foam providing odour control and an upper layer of 45 mil reinforced polypropylene. This project totals approximately 90,000 square metres of cover material. The size of the project dictated a complex installation design incorporating purpose designed installation pontoons. Fabtech subcontracted and project managed all the pipework, electricals, flaring and concrete ring beam. This project is the largest constructed in the world

GOULBURN VALLEY WATER, VIC Design, Supply and Installation of biogas collection cover for Goulburn Valley Water’s Shepparton

High Rate Anaerobic Lagoon (HRAL). The biogas collection is at present to be flared off with capacity for power generation at a later date. The total area covered was 54,000 square metres

CIVDEC – INGHAM’S MURARRIE PLANT, BRISBANE Design, Supply and Installation of liner and anaerobic floating cover for Ingham’s Murarrie

treatment plant MAUNSELL – WY YUNG, VIC 50,000m2 Design, Supply and Install of polypropylene liner and reinforced polypropylene cover for

potable water supply for East Gippsland Water including associated concrete structures.

NORTH EAST WATER – BENALLA STORAGE, VIC 60,000m2 of 1.5mm HDPE for reclaimed water storage lagoon.

BAXTER GROUP – REGIONAL WASTE, CLAYTON, VIC Supply and install Geotextile and GCL to landfill BURRANGONG MEATS – ABATTOIR, NSW Supply and install effluent gas cover. This incorporates a 2mm HDPE cover installed over an

effluent lagoon, and bio-gas flare. A co-generation system is incorporated to allow use of gas produced

AUSTIN EARTHMOVING – EAGLE HAWK CELL , NSW Supply and installation of 2mm smooth and textured HDPE, two layers of GCL and geotextile to

landfill BAXTER GROUP – DEALS ROAD LANDFILL, NSW Supply and install 1.5mm HDPE, GCL and geotextile to landfill

Project Summary

Head Office: Queensland Office: www.fabtech.com.au 53 South Tce, Wingfield SA 5013 Lot 9 Cooper St, Dalby QLD 4405 ABN 21 060 001 765 Ph: (08) 8347 3111 Ph: (07) 3889 9732 email: [email protected]

Page 19

BARWON WATER – MONTPELLIER BASIN, No 2 VIC Design, Supply and installation of 25,000m2 PP liner and RPP cover for potable water supply including civil works and pipe work.

SA WATER – STANSBURY, SA Construction, lining and covering of 6.5ML potable water storage dam, 8,000m2 of reinforced

polypropylene ROBSON CIVIL – BUTTONDERRY LANDFILL, NSW Supply and installation of 50,000m2 of 1.5mm HDPE, GCL and two grades of geotextile for

leachate collection at Wyong Shire Landfill MASTER FOODS – WYONG, NSW Supply and installation of 1.5mm HDPE liners and 1mm EL6000 gas collection cover FREEHOLDING CONSULTANTS – SPRINGTON STEDS, SA Supply and installation of 7,200m2 1.5mm HDPE liner to STEDS scheme SA WATER - WANNON WATER, SA Reinforced polypropylene baffle curtain to waste water treatment plant SOUTH WEST WATER - Camperdown Wastewater Treatment Plant CAMPERDOWN, VIC Design, supply and install two reinforced polypropylene baffle curtains

PORTLAND COAST WATER – PORT FAIRY, VIC Design, supply and installation of liners and floating covers for Effluent Anaerobic Lagoons CLEANAWAY – NURIOOTPA , SA Design, supply and installation of liners and floating covers for effluent anaerobic lagoons (5) for

winery applications

KRAFT FOODS – STRATHMERTON, VIC Design, supply and installation of 1.5mm HDPE liners for effluent lagoons for processing plant VAN DER DRIFT FARMING – COHUNA, VIC Design, supply and installation of liner and floating cover and bio gas collection system for effluent

anaerobic lagoon

RHODES CONTRACTING – ALICE SPRINGS, NT Supply and install 1.0mm HDPE liner to dam at Santa Teresa Sewerage upgrade RHODES CONTRACTING – PALM VALLEY, NT Supply and install 1.5mm HDPE liner to two dams for Jilkminggan Sewerage upgrade

O’DONNELL GRIFFIN – BOLIVAR, SA Supply and install 2.0mm HDPE liner for Bolivar treatment Plant for effluent containment

CONCRETE CONSTRUCTIONS – APOLLO BAY, VIC Supply and install wastewater/effluent tank liners to treatment plant

Project Summary

Head Office: Queensland Office: www.fabtech.com.au 53 South Tce, Wingfield SA 5013 Lot 9 Cooper St, Dalby QLD 4405 ABN 21 060 001 765 Ph: (08) 8347 3111 Ph: (07) 3889 9732 email: [email protected]

Page 20

CONCRETE CONSTRUCTIONS – LORNE, VIC Supply and install wastewater/effluent tank liners to treatment plant STEPLEN CONSTRUCTIONS – KALANGADOO, VIC Supply and install HDPE liner for CCA treatment sump area LUCAS EARTHMOVERS – MASLIN BEACH, SA Supply and install geotextile and 1.5mm HDPE liner for solid containment GAMBIER EARTHMOVING/AUSPINE – MT GAMBIER, SA Supply and install PVC liner for effluent containment MACKAY CASINGS – WANGARATTA, VIC Design, supply and install polypropylene bio gas collection floating cover for co-generation MUIRFIELD AGROCHEMICAL – GLENELG, SA Supply and install HDPE methane gas prevention liners EMRS MT BARKER STED SCHEME – MT BARKER, SA Supply and install polypropylene baffle curtain for STEDS Scheme HCM CONSTRUCTIONS/APM PAPER MILLS – MARYVALE, VIC Supply and install polypropylene baffle curtains to wastewater lagoons BRAMBLES INDUSTRIAL SERVICES – WHYALLA, SA Supply and install HDPE liners for Reed Bed Effluent Treatment SA WATER – MYPONGA, SA Design, supply and install polypropylene effluent curtain BARDAVCOL – MILE END, SA Supply and install 1.0mm HDPE liners for bio-remediation pads SITZLER BROS – AYERS ROCK, NT Supply and install polypropylene liner to effluent system MALCOLM MCLURE/SAFRIES – PENOLA, SA Supply and install PVC liners to holding lagoons MOBIL REFINERY – PORT STANVAC, SA Supply and install HDPE liner for effluent containment MERIMUBLA STP PONDLINERS – BEGA VALLEY SEWERAGE PROGRAM

Lining of a wet weather pond and catchment pond HDPE 2mm 16,600sqm

GLEN ROWAN VINEYARDS - WASTE WATER STORAGE DAM X 2 Supply and installation of a 1.5-mm thick HDPE geomembrane liner also including drainage flow-net leakage detection for the water storage dams

Project Summary

Head Office: Queensland Office: www.fabtech.com.au 53 South Tce, Wingfield SA 5013 Lot 9 Cooper St, Dalby QLD 4405 ABN 21 060 001 765 Ph: (08) 8347 3111 Ph: (07) 3889 9732 email: [email protected]

Page 21

CEDUNA BULK HAULIERS - BORE SITE 23 AND 24 Supply and installation of a 1.0-mm Smooth HDPE Geomembrane totally 4,025m2

Photos

Head Office: Queensland Office: www.fabtech.com.au 53 South Tce, Wingfield SA 5013 Lot 9 Cooper St, Dalby QLD 4405 ABN 21 060 001 765 Ph: (08) 8347 3111 Ph: (07) 3889 9732 email: [email protected] Page 22

Photos

Head Office: Queensland Office: www.fabtech.com.au 53 South Tce, Wingfield SA 5013 Lot 9 Cooper St, Dalby QLD 4405 ABN 21 060 001 765 Ph: (08) 8347 3111 Ph: (07) 3889 9732 email: [email protected] Page 23

Company Policies

Head Office: Queensland Office: www.fabtech.com.au 53 South Tce, Wingfield SA 5013 Lot 9 Cooper St, Dalby QLD 4405 ABN 21 060 001 765 Ph: (08) 8347 3111 Ph: (07) 3889 9732 email: [email protected] Page 24

Quality Assurance An Australian owned company, FABTECH is the national leader in geomembrane liners and floating covers for dams, reservoirs, channels and tunnels in such industries as mining, resources, potable and waste water containment, waste management and agriculture. FABTECH is part of E&A group of companies. E&A Limited is a South Australian based investment company with a diversified investment portfolio of industrial businesses that provide services to the mining, resources, defence petrochemical and water industries.

FABTECH’s major activities include: the design, fabrication and installation of geomembrane liners and covers for the containment of

waste water, toxic wastes (both solid and liquid), and landfills. the design, fabrication and installation of geomembrane liners and covers for potable water. the design, fabrication and installation of bio-gas recovery systems; and project management.

Fabtech staff has a wealth of experience and expertise that is used to design, produce and promote continual development of their products and services with the aim of always meeting the customer’s expectations in producing quality products on time and at competitive prices with a focus on client satisfaction.

Personnel at every level of the Company are made aware of this commitment and are involved in the implementation of, and accept responsibility for, their role in this quality system.

Our company understands quality to be Conformance to Requirements and satisfying the needs of our customers. Our goal is to generate business growth through continuous improvement initiatives, including technical expertise, staff development, and system and product evaluation, whilst simultaneously monitoring market requirements making FABTECH the first choice in the industry.

We believe that for long term success the provision of quality products and services are essential. To ensure quality products and services are provided; FABTECH has implemented a Quality Management System in accordance with AS/NZS ISO 9001 2000.

This Quality Management System establishes the responsibilities and documented procedures necessary to ensure our customers have complete confidence in FABTECH ability to meet their specific requirements for the conformance of quality products, supplies and services provided by FABTECH workshop and sites.

This policy is issued to clearly indicate the strong commitment by management towards the achievement of quality in all our activities. The support of every employee to the Quality Management System and continuous improvement is sought, to ensure the quality of our products and services is maintained.

Company Policies

Head Office: Queensland Office: www.fabtech.com.au 53 South Tce, Wingfield SA 5013 Lot 9 Cooper St, Dalby QLD 4405 ABN 21 060 001 765 Ph: (08) 8347 3111 Ph: (07) 3889 9732 email: [email protected] Page 25

Occupational Health and Safety FABTECH is committed to providing and maintaining a healthy and safe work environment for employees, subcontractors, visitors and the community.

FABTECH believes that the effective management of health and safety is a shared responsibility between all personnel at all organisational levels and takes priority over other operational considerations.

Managers and Supervisors will provide leadership and support, be accountable for implementation of healthy and safe work practices and recognise good safety performance.

FABTECH is committed to compliance with the relevant legislative requirements applicable to each area of our operations and has adopted AS/NZS 4801 as our minimum standard to ensure a planned and systematic approach to health and safety management.

FABTECH will:

provide and maintain so far as is reasonably practicable a safe working environment, safe systems of work, plant and substances in a safe condition and adequate facilities for the welfare of employees at each workplace under the control and management of FABTECH;

ensure hazards and risks to health and safety are identified, assessed and effectively controlled;

provide appropriate information, instruction, training and supervision as are reasonably necessary to ensure that personnel are safe from injury and risks to health while at work;

provide mechanisms to enable personnel and their representatives to be consulted on matters that may affect health and safety;

ensure incidents and accidents are reported, investigated and followed up to prevent recurrence.

Continuous improvement will be achieved by the ongoing development, implementation, maintenance and monitoring of appropriate policies and systems of work that provide guidance and instruction to all company personnel and subcontractors in accordance with legislative requirements and industry, customer and community standards and expectations.

This policy statement shall be prominently displayed at all company worksites and is endorsed by myself as the authorised representative of FABTECH.

Company Policies

Head Office: Queensland Office: www.fabtech.com.au 53 South Tce, Wingfield SA 5013 Lot 9 Cooper St, Dalby QLD 4405 ABN 21 060 001 765 Ph: (08) 8347 3111 Ph: (07) 3889 9732 email: [email protected] Page 26

Environmental FABTECH is committed to responsible environmental management and believes that potential environmental impacts of our business activities can be effectively managed.

FABTECH believes that responsible environmental management is a shared responsibility between all personnel at all organisational levels and ranks equally with other operational considerations.

FABTECH is committed to compliance with the relevant legislative requirements applicable to each area of our operations and has adopted AS/NZS 14001 as our minimum standard to ensure a planned and systematic approach to responsible environmental management

FABTECH is committed to:

promotion of responsible environmental management;

informing all personnel of their environmental responsibilities through consultation, training and distribution of appropriate information;

identification of environmental hazards, the assessment of risks and the implementation of risk control measures;

controlling waste producing activities based on the principles of reduce, re-use, re-cycle and appropriate disposal;

promotion of energy efficiency and conservation of resources;

avoiding the pollution of land, water and air;

avoiding disturbance to known sites of archaeological, historical and natural significance;

protection of native flora and fauna.

Continuous improvement will be achieved by the ongoing development, implementation, maintenance and monitoring of appropriate policies and systems of work that provide guidance and instruction to all company personnel and subcontractors in accordance with legislative requirements and industry, customer and community standards and expectations

This policy statement shall be prominently displayed at all company worksites and is endorsed by myself as the authorised representative of FABTECH.