October, 2015

316 D, OPF Housing Colony Raiwind Road, Lahore-53700 Phone:+92-42-35230628-9 +92-42-35230660 E-mail: [email protected] Web http://www.berkeley.com

 

Page 2: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

 

Berkeley Associates (Pvt.) Ltd.

CONTENTS INTRODUCTION

OUR DOMAIN

ORGANIZATION

TURNOVER

SPECTRUM OF SERVICES

COMPLETED PROJECTS

CLIENTS

TOPOGRAPHIC SURVEY EQUIPMENT

DRILLING EQUIPMENT

LABORATORY TESTING EQUIPMENT

KEY PERSONNEL

FIELD STAFF

REGISTRATION

QUALITY & SAFETY POLICY

 

 

 

 

 

 

Page 3: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Introduction  

 Berkeley Associates (Pvt) Ltd (Pvt.) Ltd.

Berkeley Associates (Pvt.) Ltd. Consulting Engineers

Berkeley Associates (Pvt.) Ltd. is an engineering firm providing highly professional services in various disciplines of Civil Engineering. We provide project management, design, supervision, planning and drafting services in the fields of Construction, Geotechnical, Groundwater and Structural Engineering for various infrastructure and development Projects including Buildings, Highways, Motorways, Hydropower, Dams, Power Transmission Lines, and Airfields. Main areas of our Engineering Services include Topographic and Bathymetric Surveys, Project Management, Value Engineering, Geotechnical Investigations and Design, Foundation Engineering, Site Evaluation, Site Improvement, Pavement Design and Evaluation, Material Engineering, Construction Supervision of Earthworks and Foundations and Ground Water Studies. The project planning services are provided for all project stages including inception, feasibility, design, construction, and operation. Computer aided drafting facilities are provided for all kinds of engineering drawings.

INTRODUCTION 

Page 4: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Our Domain  

 Berkeley Associates (Pvt) Ltd (Pvt.) Ltd.

For Civil Engineering Projects we provide services in the following engineering disciplines;

1. Project/ Construction Management

2. Hydropower Engineering

3. Value Engineering

4. Geotechnical Engineering

5. Pile Foundation and Construction of Fills

6. Groundwater Engineering

7. Structural Engineering

8. Transmission Line / Grid Station & Power Plants

9. Highways & Bridges

10. Detailed Engineering & Drafting

11. Dewatering Design / Supervision

12. Topographic and Bathymetric Surveys

OUR DOMAIN

Page 5: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Organization Chart  

  Berkeley Associates (Pvt.) Ltd. 

BERKELEY ASSOCIATES (PVT.) LTD. ORGANIZATION

Page 6: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Organization Chart  

  Berkeley Associates (Pvt.) Ltd. 

Page 7: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Spectrum of Services  

   Berkeley Associates (Pvt.) Ltd.

For Civil Engineering Projects we provide services in the following engineering fields

The Geotechnical Engineering services include planning and execution of field investigations,

preparation of geotechnical investigation reports, evaluation of geotechnical design parameters,

analyses and design of foundations, slopes, embankments. Evaluation of existing foundations,

and earth retaining structures are also carried out.

Carrying out field investigations including drilling of boreholes, sampling, field tests,

installation of piezometers, monitoring of ground water table, etc., using our in-

house facilities.

Planning of comprehensive Geotechnical investigation program tailored to specific

needs of the Project with particular aim of obtaining safety and economy in the design

of foundations and earth structures. Planning includes establishing drilling

requirements, extent of drilling, method of drilling, method of soil sampling etc.

Prepare cost estimates and specifications for the geotechnical investigations.

Supervision and monitoring the progress of field investigations ensuring

that investigations are being carried out in accordance with the internationally

recognized standard practice.

Carrying out initial analyses of the field data and modifying (if required) the field

investigation program.

Inspection of soil samples and preparation of most efficient laboratory testing

Program.

Carryout the laboratory testing under technical supervision.

Carryout geophysical surveys.

Evaluation of physical and engineering characteristics of soils/ rocks on the basis of

field and laboratory test results.

Determination of foundation design parameters.

Design of shallow and deep foundations i.e. spread foundations, rafts, piles etc.

Preparation of geotechnical investigation reports.

Design of earthen embankments for roads and water retaining structures.

SPECTRUM OF SERVICES

Soil Investigations

Analyses & Design of Foundations & Embankments

Geotechnical Engineering

Page 8: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Spectrum of Services  

   Berkeley Associates (Pvt.) Ltd.

Slope stability analyses

Design of cut slopes and slope stabilization systems.

Design of excavation support systems.

Design of dikes and coffer dams.

Design of under-ground water cut-off systems.

Seepage analyses of water retaining structures.

Liquefaction analyses.

Evaluation of dynamic design parameters for design of foundations.

Evaluation and remediation of problematic soil conditions.

Design of site improvement systems.

Design, performance and analyses of pile load tests.

Design and construction supervision of cast in-situ piles.

Design and construction of contiguous pile system.

Preparation of technical specifications for earthworks.

Quality control of large earthworks.

Assessment of engineering characteristics of earthworks.

Supervision of construction of foundations, earthwork and soil improvement works.

Pile load tests and evaluation.

In order to assess the groundwater potential for various projects, we plan and execute field

investigations, computer modelling, assessment of aquifer parameters, prediction of availability

of groundwater, ground water quality analyses. Design of tube wells and influence of exiting

water facilities on pumping of new wells is also carried out. Groundwater Engineering services

include;

Design of dewatering systems.

Design and installation of piezometers.

Performance of electrical resistivity surveys for initial assessment of ground water quality.

Groundwater monitoring.

Groundwater quality assessment.

Planning and execution of pump out tests.

Interpretation of pump out test data and evaluation of aquifer parameters.

Installation and development of tube wells.

Piling and Construction of Fills

Groundwater Engineering

Page 9: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Spectrum of Services  

   Berkeley Associates (Pvt.) Ltd.

Topographic surveys are carried out for all types of projects for developing the surface

contours, area assessments, project planning and layout studies. Underwater surveys

(Bathymetric Survey) are carried out to develop underwater bed profiles required for

placement of intake and outfall structures. The services include;

Performance of Topographic Surveys of land for infrastructures projects.

Preparation of topographic maps at desired contour intervals.

Establishment of Benchmarks.

Performance of underwater (Bathymetric) survey of canals and offshore sites.

Feasibility stage structural designs are carried out for development of cost estimates.

Detailed analyses and design of structures are carried out using computer aided tools for all

type of projects. Construction drawings are prepared for material take-offs and

implementation. Design review services are also provided. Other service include;

Planning stage design of various structures.

Analyses of structural elements of all types of projects.

Detailed design of structures.

Preparation of tender drawings and construction drawings.

Preparation of bar bending schedules.

Preparation of as-built drawings.

Review of Civil works Design prepared by EPC contractors.

Optimization of design and Value Engineering.

Design for strengthening and rehabilitation of structures

Project Management services are provided for optimizing the available resource. Resident

construction supervision services are provided for ensuring quality construction and

adherence to agreed time line. The services include;

Preparation and monitoring of project implementation schedules.

Preparation and implementation of quality control/ quality assurance plans.

Providing resident supervision and monitoring progress of works.

Maintaining construction and QA/QC records.

Preparation of as built drawing.

Verify construction quantities and progress payment invoices.

Topographic and Bathymetric Surveys

Structural Engineering

Project Management & Construction Supervision

Page 10: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Spectrum of Services  

   Berkeley Associates (Pvt.) Ltd.

Contract management, issuance of variation orders.

Preparation of detailed Bill of Quantities (BOQ) for construction projects.

Page 11: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Completed Projects  

   Berkeley Associates (Pvt.) Ltd.

COMPLETED PROJECTS

Page 12: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Completed Projects  

   Berkeley Associates (Pvt.) Ltd.

150 MW Patrint Hydropower Project, AJK

22 MW Jabban Hydropower Project, KPK

90 MW Batakundi Hydropower Project, KPK

180 MW Naran Hydropower Project, KPK

300 MW Balakot Hydropower Project, KPK

100 MW Solar Power Project, Bahawalpur

Cooling Tower for AES Lal Pir Power Project, Muzaffargarh

120 MW Shushghai Zhendoli Hydropower Project, Chitral

100 MW Kotli Hydropower Project, AJK

100 MW Shogo Sin Hydropower Project, Chitral

762 MW AES Power Project, Muzaffarabad

232 MW Karkey Rental Power Project, Karachi

120 MW Rajdhani Hydropower Project, AJK

Engro Rice Plant Extensions, Bhikki

Engro Food Plant Floor Rehabilitation

New Ammonia / Urea Plants Project of Engro Dharki

Machai Hydropower Project, AJK

Fire Water Tanks in UAE

Khari Hydropower Project, AJK

Sind Engro Coal Mining Project, Thar

Foundation Piling for Mabarak Center, Lahore

Hub Water Treatment Plant, Hub, Karachi

Effluent Treatment Plant for Tanneries, Kasur

Additional Cooling Towers for AES Power Project , Mahmood Kot, Muzaffargarh

Water Supply & Sewerage System and Sewage Treatment Plant for New Mir Pur City

FEASIBILITY STUDIES DESIGN & PROJECT MANAGEMENT SERVICES

CONTRACT MANAGEMENT, CONSTRUCTION SUPERVISION & QUALITY CONTROL SERVICES

Page 13: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Completed Projects  

   Berkeley Associates (Pvt.) Ltd.

Project, AJK

Water Supply & Sewerage System for Defense Housing Scheme, Islamabad New

Ammonia/ Urea Plants Project at Engro Chemicals Pakistan, Daharki Commercial

Complex at G-4, Clifton Road Karachi

Commercial Complex at F-99, Clifton Road Karachi

Page 14: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Dewatering Design / Supervision Projects  

   Berkeley Associates (Pvt.) Ltd.

DEWATERING DESIGN / SUPERVISION PROJECTS

Page 15: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Dewatering Design / Supervision Projects  

   Berkeley Associates (Pvt.) Ltd.

Estimation of drainage requirements and design of dewatering system for Lusai Underground Railway Construction Project, Qatar Estimation of drainable surplus using available data on aquifer parameters.

Doha Conventional Centre and Tower Project, Doha, Qatar Aquifer testing and data analysis, estimation of dewatering requirements, design of dewatering system and dewatering wells for construction below water table.

Site B-201 Nawabshah, Sindh, Pakistan - Conducted aquifer tests (pump out tests), analysis of test data, estimation of aquifer parameters, design and construction of dewatering systems for pumping drainable surplus to lower water table below foundation (50 ft. below NSL) of the buildings.

Site B-109, Sargodha, Punjab, Pakistan - Conducted aquifer tests (pump out tests), analysis of test data, estimation of aquifer parameters, design and construction of dewatering systems for pumping drainable surplus to lower water table below foundation (50 ft. below NSL) of the buildings.

Study causes of rise of water table and proposed remedial measures - Industrial and ResidentialAreas in Dammam, Saudi Arabia.

Chashma Hydropower Project Member of panel of experts for dewatering. Analysis of aquifer test data, estimation of dewatering requirements to lower water table about 15 m to facilitate construction of power plant.

CHASNUPP - Evaluation of pumping requirements and design of dewatering system to facilitate construction of intake structure.

Supervision of 26 numbers dewatering tubewells installation at CHASNUPP Assuring installation in accordance with the design specifications

Dewatering Design / Supervision Projects

Page 16: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Geotechnical Investigations  

   Berkeley Associates (Pvt.) Ltd.

GEOTECHNICAL INVESTIGATIONS

Page 17: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Geotechnical Investigations  

   Berkeley Associates (Pvt.) Ltd.

Army Officers Housing Scheme ASKARI-II, Gujranwala Cant.

Army Officers Housing Scheme ASKARI-III, Sargodha Cant.

Army Officers Housing Scheme ASKARI-VII, Rawalpindi.

Prime Minister Housing Scheme Peshawar.

Prime Minister Housing Scheme Faisalabad.

Prime Minister Housing Scheme Gujranwala.

Commercial Plaza at Army Welfare Housing Society Morgah Rawalpindi.

Park View Housing Society, Lahore Cant.

Punjab Housing Scheme Satiana Road Faisalabad.

Eden Canal Villas, Lahore.

High rising building at DHA Morgah-II Islamabad.

Sport Complex DHA Morgah-II Islamabad.

Sukh Chayn Gardens Housing Society Multan road Lahore.

WAPDA Finance Housing Scheme Raiwind Road Lahore.

WAPDA Finance Subsistence Farm Homes Lahore.

Mosque at Defense Housing Islamabad.

Crescent Bay Project, Karachi

Mabarak Center, A Mixed Use Project, Lahore

Crescent Bay Project, Karachi

Faletti's Hotel Development Project, Lahore

Kalu Khan Girls High School Building at Swabi

District Headquarter Complex at Swabi

Regency Plaza at Mini Market Gulberg Lahore

Aslam Arcade Mcleod Road Lahore

Pakistan Air Force Complex at Abbott Road Lahore

Police Club Complex at Race Course Road Lahore

Mosque at Rinala Kurd

Rahber Center at Jail Road Lahore

Tax Free Plaza on Lawrance Road Lahore

Extension Unit for Pakistan Air Force Complex at Abbott Road Lahore

Shopping Complex at Main Market Gulberg Lahore

Extension Units for Tax Free Plaza on Lawrance Road Lahore

Pakistan Bait-ul-Maal Complex on Dev Smaj Road Lahore

Leeds Center Main Boulevard Gulberg Lahore

Ibrahim Mosque at Ferozepur Road Lahore

Housing Schemes

High-Rise Buildings

Page 18: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Geotechnical Investigations  

   Berkeley Associates (Pvt.) Ltd.

Big City Plaza Building at Liberty Chowk Lahore

Multi storey building at Narang Mandi

Multi-storey building at Bhatta Chowk Lahore

Benevolent Fund Building at Peshawar

Residential Villas Saudi Embassy Islamabad

NHA Building at Thokar Niaz Baig, Lahore

MCB Building, Jail Road Lahore

Aitchison College, Lahore

McDonald's Allama Iqbal Town , Lahore

Jamia Mosque, Kala Shah Kaku, Lahore

Descon ES Building, Lahore

Zohra Heights, Gulberg Lahore

Garrison Academy for Girls, Lahore Cantt.

Garrison Degree College, Lahore Cantt.

McDonalds, Faisalabad

Fauji Foudation Medical College, Rawalpindi

Honda Building Ferozpur Road, Lahore

IT Building, Raiwind Road, Lahore

A.D. Palace Rahim Yar Khan

Aitchison College, Junior Wing, Lahore

Babul Islam, Sargodha

Bank Alhabib, Gulberg Lahore

PSO Retail Stations at Lahore, D.G. Khan and Sargodha

Law Chambers at Fan Road Lahore

Neighbourhood G-11/4 Islamabad

Detatched Houses at I-8 Islamabad

New Auriga Shopping Plaza, Gulberg Lahore

International Islamic Center, Johar Town Lahore

PIA Facilities at New Terminal Lahore Airport

Aligarh college, Gulberg Lahore

Aitchison College Staff Housing Lahore

River Side Hotel Jhelum

FFC Tower The Mall Rawalpindi

PC Hotel Muzzaffarabad

PIA Engineering Transportation Site

PIA Cargo Complex Site

Shaheen Airport Services SAPS Cargo Complex site

Sheikh Zayyed Complex at Ferozpur road Lahore

Expo Center Johar Town Lahore

Page 19: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Geotechnical Investigations  

   Berkeley Associates (Pvt.) Ltd.

Kohat University of Science and Technology Kohat

Schlumberger offices and workshop at Sukkur

Plaza at Liberty Market

Bahria Town Lahore

PSO Zoom Logo Sign Tower Pattoki Bypass

Plaza at Abbott Road Lahore

Plaza at 37-P, Gulberg Lahore

Plaza at Davis Road Lahore

Plaza at Mcleod Road Lahore

Commercial plaza at Bedian Road Lahore

Eden Palace Villas

Mediacom Faisalaba

Comsat Complex Islamabad

PACE complex Gujrat

Decent Plaza Gujranwala

Government College Lahore

Al-Nafah Tower Gujranwala

Commercial Plaza Faisalabad

Historical Structural at Shalimar Garden Lahore

Enplan Plaza Garden Town Lahore

IT Park Ferozepur Lahore

Suzuki Motors Showroom Sargodha

Mian Tyre Office at Jail Road Lahore

Sterling Plaza at M M Alam Road Lahore

North East Hospital Complex, Peshawar

Ammar Medical Complex at Jail Road, near bypass, Lahore

Rahmat-ul-Alameen Trust Hospital Pak Patten

Muhammad Nawaz Sharif Kidney Institute at Shaikh Zayed Hospital Lahore

Alkhidmat Hospital, Sialkot

Hospital at Ferozpur road Lahore

Federal Hospital Rawalpindi

Hospitals

Page 20: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Geotechnical Investigations  

   Berkeley Associates (Pvt.) Ltd.

Cherished Pharmaceutical Industry at Raiwind

MSB Industries on Ferozepur Road Lahore

Cholistan Sugar Mill Liaquatpur

ICI go down near Kala Shah Kaku

Rawat Switchyard

FJFC Complex Bin Qasim Karachi

Merino Textile Mill on Faisalabad Shahkot Road Shahkot

International Juice Factory Azad Jammu & Kashmir

Sapphire Textile at Bhai Pharu

Pharmagen Beximco on Ferozpur Road Lahore

CCL extension unit at Kot Lakhpat Industrial Area Lahore

ProDiesal Services on Firozpur Road Lahore

Genesis Pharmaceutical Complex on Sheikhupura Faisalabad Road

Tower Crane Foundation at Fauji Cement, Jhang Bhatar

Ammar Textiles on Defence Road near Multan Road Lahore

Gas Treatment Plant at Liberty Power Project Ghotki Sind

CCL Godowns at Industrial Area Kot Lahkpat Lahore

Maria Balal Garment Factory and its Extension Units at Raiwind Road Lahore

Zuchini Industries Raiwind Road Lahore

Expansion of Caustic Soda Plant at Sitara Chemicals Limited on Faisalabad Sheikhupura Road

Carpet Processing Unit at Defence - Raiwind Road Lahore for Abbas Corporation (Pvt) Ltd

Expansion Unit for Dynamic Sportswear (Pvt) Ltd Canal Road Lahore

New Processing Unit for Vision Technologies (Pvt) Ltd Sialkot

Burhan Flour Mill at Gujrat Bypass

Kohat Cement Factory at Kohat

Coca Cola Plant, Gugranawala

Millac Foods, Manga Raiwind Road, Lahore

Merit Pharmaceutical, 34 km Ferozpur Road Lahore

Pepsi Cola International, Hattar

Pakistan Gloves Manufacturers & Export, Building, Sialkot

Shangai Chemicals, Sheikhupura Road

Nishat Dying and Finishing, Lahore

Ramey Textile Mills, Lahore

Forest Sweaters Pvt Limited

SKB Milk Plant, Raiwind Road, Lahore

Sitara Chemicals, Faisalabad

Rizwan Textile, Lahore

Industrial Buildings

Page 21: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Geotechnical Investigations  

   Berkeley Associates (Pvt.) Ltd.

SKB Factory at Raiwind Road, Lahore

Tandlianwala Suger Mill

CSK Distilleries Palia

Kohat Cement Plant Kohat

ICI extension for polyester plant Sheikhupura

Infra-structural for DHA Phase-VI Lahore

Packages Pulp and Paper Factory Kasur

Shed for Pepsi Cola Hattar

Export Processing Zone Gujranwala

Waste water treatment plant Rawalpindi

Madina Cold Storage Sillanwali Road Faisalabad

Food Processing Plant at Export Promotion Zone Gujranwala

Pepsi cola Manga Road Lahore

Rest House Building at Packages Kasur

Hitech Feeds Rawalpindi, Sheikhupura, Sharakpur and Fatehjang

Snack Green Field Factory at Sunder Industrial Estate for Pepsi.

Faisal Asad Textile Mill Muzaffargarh

Sitara Agriculture Research Centre Gutwala Faisalabad

Sitara Hydrogen peroxide Plant Faisalabad

Sitara Chemicals Faisalabad

Underpasses at Committee Chowk and Rawalpindi General Hospital Chowk on

Murree Road Rawalpindi

Sub-soil Investigation for Internal Roads for Rupafab at Raiwind

Sub-soil Investigation for Internal Roads for District Headquarter at Swabi

Sub-soil Investigation for Lahore Bypass (sub-contract)

Sub-soil Investigation for Rawalpindi Ring Road Project Rawalpindi

Road Side Soil Investigation & Borrow Material Exploration/Testing For ADB

Assisted Rural Access Roads Project Phase - I in District Mandi Bahauddin,

Jhelum, Khushab, Kasur and Okara.

Road Side Soil Investigation & Borrow Material Exploration & Existing Road

Condition Survey for Dualization of Sheikhupura Faisalabad Road

Soil Investigation for Seven Nos. Of Bridges For Sheikhupura Faisalabad Dual Carriage

Way

Flyover bridge at Sherpao bridge Lahore

Flyover bridge at Katchary Chowk Multan

Underpass bridge at Jail Road Lahore

Roads and Bridges

Page 22: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Geotechnical Investigations  

   Berkeley Associates (Pvt.) Ltd.

Additional Carriage Way (N-5) Section: TMP-Bahawalpur.

Road Side Soil Investigation & Borrow Material Exploration/Testing & Existing Condition

Survey for Khwaza Khela Besham Road Malakand Division.

Road Side Soil Investigation & Borrow Material Exploration/Testing & Existing Condition

Survey for Three Roads in Malakand Division.

Bridge Over Sutlej River

Soil Investigation and Testing at Ferozpur Road Lahore

Quetta Chamman Road

200 km Roads in Wanna

200 km Roads in MRDP

Sibbi Much Road

Internal and Main Boulevard for Bahria Town Lahore M3

Confirmatory Investigations

Lahore Ring Road Project Package VIII, IX, XI, VII and VIII

Chukiatian Barawal Road

Feasibility study for 1.2 Mw Marchai Hydropower Project.

Feasibility Study for 1.5 MW Khari II Hydropower Project.

Feasibility Study for 120 MW Shushghai Zhendoli Hydropower Project.

EPC Bid Preparation for 100 MW Kotli Hydropower Project.

Feasibility Study for 100 MW Shogo Sin Hydropower Project.

Detail Civil Design for 22 MW Jabban Hydropower Project.

EPC Bid Preparation for 120 Mw Rajdhani Hydropower Project.

Periodic Inspection of 1450 Mw Ghazi Brotha Hydropower Project.

Feasibility Study for 300 MW Naran Hydropower Project.

Feasibility Study for 98 MW Batakundi Hydropower Project.

Feasibility Study for 180 MW Balakot Hydropower Project.

Bid Preparation for Small Hydropower Project on Canal in Punjab.

Engineering Services for Lucky Hydropower Project, Marala

Engineering Services for LBDC Hydropower Project, Chichawatni.

Engineering Services for JBC Hydropower Project.

Engineering Services for 130 MW Sehra Hydropower Project.

Hydropower Projects

Page 23: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Geotechnical Investigations  

   Berkeley Associates (Pvt.) Ltd.

1180 MW RLNG Bhikki Power Project

230 MW LNG Based Engro Power Project Port Qasim

300 MW Coal Based Power Project of Siddique Sons, Port Qasim

2 x 330 MW coal Fired Power Project in Thar, Engro Energy.

100 MW Charbon Coal Power Project.

2 x 60 MW Coal Fired Power Project, Fatima Energy.

50 MW Coal Power Project near Johar Abad, Orient Power.

11 MW Biomass Based Project in Faisalabad.

1 x 46 MW Coal Based captive power plant of Nishat Chunian Ltd., Pakistan

425 MW Combined Cycle Nandipur Power Plant

152 MW Combined Cycle Diesel Engine Power Project Pasrur Sialkot

225 MW Shahpur Power Plant, Sargodha

135 MW Bhiki Power Project

225 MW Combined Cycle Balloki Power Plant

225 MW Combined Cycle Saif Power Plant, Sahiwal

AES Power Plant; Design of Cooling Towers and Construction Supervision

Preliminary sub-soil Investigation for 481 MW Thermal Power Plant on Sheikhupura

Faisalabad Road

Preliminary sub-soil Investigation for proposed Thermal Power Plant near Kot Addu

Detail Design stage sub-soil Investigation for 481 MW Thermal Power Plant on

Sheikhupura Faisalabad Road

Confirmatory sub-soil investigation for Olympia Power Project on Sheikhupura

Faisalabad Road

1 x 46 MW Coal Based captive power plant of Nishat Chunian Ltd., Pakistan

425 MW Combined Cycle Nandipur Power Plant

152 MW Combined Cycle Diesel Engine Power Project Pasrur Sialkot

225 MW Shahpur Power Plant, Sargodha

225 MW Combined Cycle Balloki Power Plant

225 MW Combined Cycle Saif Power Plant, Sahiwal

Engro Chemicals Pakistan; Design of Pile Foundations and Supervision of Piling Works

AES Power Plant; Design of Cooling Towers and Construction Supervision

Preliminary sub-soil Investigation for 481 MW Thermal Power Plant on Sheikhupura

Faisalabad Road (Main contract with M/s Mirza Associates (pvt) Ltd

Preliminary sub-soil Investigation for proposed Thermal Power Plant near Kot Addu

Power Plant and Fertilizer Plants

Thermal Power Plants

Page 24: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Geotechnical Investigations  

   Berkeley Associates (Pvt.) Ltd.

(Main contract with M/s Habib Rafiq (pvt) Ltd)

Detail Design stage sub-soil Investigation for 481 MW Thermal Power Plant on

Sheikhupura Faisalabad Road (Main contract with M/s Progressive Consultants (pvt) Ltd

PAK and M/s Black & Veatch USA)

Confirmatory sub-soil investigation for Olympia Power Project on Sheikhupura

Faisalabad Road (Main contract with M/s Olympia Group)

135 MW Bhiki Power Project (Main contract M/s Pakistan Power Resources LLC)

Engro Chemicals Pakistan; Design of Pile Foundations and Supervision of Piling Works

Preliminary Geotechnical Investigation for New Processing Units at Attock Refinery

Morgah Rawalpindi (Main contract with M/s ARL Rawalpindi Pakistan)

Detail design Geotechnical Investigation for New Processing Units at Attock Refinery

Morgah Rawalpindi (sub-contract with M/s Mitsui Japan)

Geotechnical Investigation for New tank area sites at Attock Refinery Morgah

Rawalpindi (Main contract with M/s ARL Rawalpindi Pakistan)

Preliminary Geotechnical Investigation for Pak Arab Refinery (PARCO) Mahmood Kot

(sub-contract with M/s Habib Rafiq (pvt) Ltd).

Geotechnical Investigation for Flare Stack Structure at Attock Refinery Rawalpindi (sub-

contract with M/s Descon Engineering (pvt) Ltd)

Detail design Geotechnical Investigation for Central Processing Plant for REHMAT-1

Gas Field at Sardar Garh near Gotki (Main contract with M/s Presson International of

Canada)

Detail design Geotechnical Investigation for Central Processing Plant for MOL Gas Plant

at GURGURI (Main contract with M/s Presson International of Canada)

Soil Survey Along 6” Dia. Oil Pipeline From Turkwal to ARL Via Pindori (for K.F.

Corporation (Pvt.) Ltd

New Grey 6700 TPD Cement Plant for M/s Kohat Cement Company Ltd at Kohat

New Grey 7600 TPD Cement Plant for M/s Fauji Cement Company Ltd at Fatehjang

Oil & Gas Sector

Cement Industry

Oil Refinery & Fertilizer Plants

Page 25: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Geotechnical Investigations  

   Berkeley Associates (Pvt.) Ltd.

28 Nos. of 30 m to 60 m High GF Towers in Lahore for Nortel Networks

18 Nos. of 30 m to 60 m High GF Towers in Sialkot for Nortel Networks

18 Nos. of 30 m to 60 m High GF Towers in Gujrat for Nortel Networks

18 Nos. of 30 m to 60 m High GF Towers in Gujranwala for Nortel Networks

18 Nos. of 30 m to 60 m High GF Towers in Faisalabad for Nortel Networks

14 No. of 30 m to 60 m High GF Towers in Sheikhupura for Nortel Networks

18 Nos. of 30 m to 60 m High GF Towers in Multan for Nortel Networks

3 Nos. of 30 m to 60 m High GF Towers in Attock for Nortel Networks

8 Nos. of 30 m to 60 m High GF Towers in Islamabad and Rawalpindi

45 Nos. of 30 m to 60 m High GF Towers in Lahore for Ericsson Pakistan

8 Nos. of 30 m to 60 m High GF Towers in wazirabad for Ericsson Pakistan

7 Nos. of 30 m to 60 m High GF Towers in Gujrat for Ericsson Pakistan

9 Nos. of 30 m to 60 m High GF Towers in Gujranwala for Ericsson Pakistan

21 Nos. of 30 m to 60 m High GF Towers in Faisalabad for Ericsson Pakistan

14 No. of 30 m to 60 m High GF Towers in sialkot for Ericsson Pakistan

12 Nos. of 30 m to 60 m High GF Towers in Multan for Ericsson Pakistan

8 Nos. of 30 m to 60 m High GF Towers in sargodha for Ericsson Pakistan

5 Nos. of 30 m to 60 m High GF Towers in sheikhupura for Ericsson Pakistan

8 Nos. of 30 m to 60 m High GF Towers in phalia for Ericsson Pakistan

5 Nos. of 30 m to 60 m High GF Towers in tandianlwala for Ericsson Pakistan

3 Nos. of 30 m to 60 m High GF Towers in Okara for Ericsson Pakistan

8 Nos. of 30 m to 60 m High GF Towers in Gujrat for Alandick Pakistan

4 Nos. of 30 m to 60 m High GF Towers in Gujranwala for Alandick Pakistan

8 Nos. of 30 m to 60 m High GF Towers in Faisalabad for Alandick Pakistan

11 No. of 30 m to 60 m High GF Towers in sialkot for Alandick Pakistan

17 Nos. of 30 m to 60 m High GF Towers in Multan for Alandick Pakistan

18 Nos. of 30 m to 60 m High GF Towers in sargodha for Alandick Pakistan

15 Nos. of 30 m to 60 m High GF Towers in sheikhupura for Alandick Pakistan

5 Nos. of 30 m to 60 m High GF Towers in phalia for Alandick Pakistan

8 Nos. of 30 m to 60 m High GF Towers in tandianlwala for Alandick Pakistan

Tele Communication Towers

Page 26: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Geotechnical Investigations  

   Berkeley Associates (Pvt.) Ltd.

Tarbela Lahore 500 kv in-out arrangement for M/s ICC (Pvt) Ltd

Rewat Islamabad 220 kv transmission line towers for M/s ICC (Pvt) Ltd

Shahibagh - Peshawar 220 kv transmission line towers for M/s ICC (Pvt) Ltd

Barotha Nowshera Shahibagh 220 kv transmission line towers for M/s ICC (Pvt) Ltd

Rahim Yar Khan - Jamshoro 500 Kv Transmission Line, 3rd Circuit

Zahir Pir - Guddu 500 Kv Transmission Line

Jamshoro - Dadu 500 Kv Transmission Line (partial)

Ghazi Barotha 500 kV Transmission Line

132/11.5 kV GIS Station at Lahore Airport

500 kV Grid station at Sahiwal for Siemens

Ghatti-Muzzaffargarh 500 kv Transmission Line Project

Thal Canal Project

PSO Petrol Pump

Sewerage Treatment Plant Rahim Yar Khan

Mazar at Chalay Sharif Gujrat

Weather Radar Station Islamabad

Swimming Pool at Aitchison College Lahore

Beacon House Complex Raiwing Road Lahore

Bridge at Abdullahpur Faisalabad

Office building for DESCON Ferozepur Road Lahore

Sethi Motor Showroom Ferozpur Road Lahore

Beacon House School Walton Road Lahore

Magic park Motorway

State Bank of Pakistan

Suzuki Motors Sargodha Road Lahore

Schlumberger S.A. offices and workshop at Sukkur

Lahore Rapid Mass Transit Project, Lahore

Orange Line Metro Train Project, Lahore

Miscellaneous

Power Transmission Lines

Mass Transit Projects

Page 27: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Piling Projects  

   Berkeley Associates (Pvt.) Ltd.

PILING PROJECTS

Page 28: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Piling Projects  

   Berkeley Associates (Pvt.) Ltd.

Construction and Load Testing of 14 test piles for Orange Line Metro Train Project, Lahore

Construction of 40 pile foundations for Barotha Nowshera Industrial Shahi Bagh D/C Twin Bundle 220 kV Transmission Line (Diameter of pile 900 mm each 20 m deep, Diameter of piles 1220 mm each 30 m deep, using Percussion Method) in year 2003  

Construction of 32 pile foundations for Peshawer Shahi Bagh D/C Twin Bundle 220 kV Transmission Line (Diameter of pile 900 mm each 20 m deep, Diameter of piles 1220 mm each 30 m deep, using Percussion Method) in year 2003

Construction of 28 pile foundations for Rewat Islamabad D/C Twin Bundle 220 kV Transmission Line (Diameter of pile 900 mm each 20 m deep, Diameter of piles 1220 mm each 30 m deep, using Percussion Method) in year 2003

Construction of 1500 nos of 760 mm each of 40 m deep diameter piles for New Grey Cement Plant for Kohat Cement (Pvt) Ltd at Kohat.

Construction of pile foundation for Highway Bridge near Muridkay. (Diameter of pile = 760 mm, Nos. of piles = 36, Using reverse rotary method)

Construction of pile foundation for Highway Bridge over B.S. Link Canal near Chunian. (Diameter of pile = 760 mm, Nos. of piles = 26, Using percussion method)

Construction of pile foundation for railway overhead bridge Ghari Shahu. (Diameter of pile = 840 mm, Nos. of piles = 126, Using reverse rotary method)

Construction of pile foundation for nullah at kharian Cantt. (Diameter of pile = 610 mm, Nos. of piles = 6, Using reverse rotary method)

Construction of pile foundations for 25 m high Mobilink Tower at Chung. (Diameter of pile = 760 mm, Nos. of piles = 4, Using reverse rotary method)

Construction of pile foundations for 25 m high Mobilink Tower at Muridkay.(Diameter of pile = 760 mm, Nos. of piles = 4, Using reverse rotary method)

Construction of 1220 mm dia piles for towers for 220 KV Transmission Lines (76 nos. of towers)

Construction of 1000 mm diameter piles for bridge at Bahria Town Rawalpindi

Piling Projects

Page 29: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Well Drilling Projects  

   Berkeley Associates (Pvt.) Ltd.

WELL DRILLING PROJECTS

Page 30: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Well Drilling Projects  

   Berkeley Associates (Pvt.) Ltd.

Design and Construction of Four (4) tubewells having 3.2 cusec discharge capacity at

425 MW CCPP Nandipur for M/s DEC China

Design and Construction of six (6) tubewells having 3 cusec discharge capacity at

PARCO Mid-Country Refinery Project Mahmood Kot for M/s Marubeni

Corporation (MC / JJC) Japan.

Construction of one (1) tubewell at Rehmat Oil and Gas Processing Plant for Presson /

Petronas Canada.

Construction of one (1) tubewell for Wapda at Gujrat

Construction of one (1) tubewell at Liberty Power Project Ghotki Sind.

Construction of one (1) tube well having 2 cusec discharge capacity at Sunny

View Housing Scheme Lahore for M/s Habib Rafiq (pvt) Ltd.

Construction of seven (7) tube wells having 3 cusec discharge capacity for

construction of Lahore Islamabad Motorway on Section - I.

Construction of five (5) tube wells for water supply in Islamabad.

Construction of two (2) tube wells for water supply at Bhimber and Mirpur.

Construction of two (2) tube wells for L.D.A. in under construction Gujarpura Scheme as

sub-contract.

Construction of seven (7) tube wells for WASA Faisalabad as sub-contract.

Construction of three (3) tube wells for agriculture purpose in Kasur.

Construction of one no. of tubewell at Labour Colony Gujrat for M/s Ghulam Habib

Construction.

Construction of one no. of tubewell at Gujrat for WAPDA Colony.

Construction of one tubewell at Rehmat Gas Treatment Plant Gothki.

Page 31: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Project Sheets  

   Berkeley Associates (Pvt.) Ltd.

PROJECT SHEETS

Page 32: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Project Sheets  

   Berkeley Associates (Pvt.) Ltd.

Project: 1180 MW CCPP at Bhikki

Location: Bhikki, District Shekhupura, Pakistan

Client: Quaid-e-Azam Thermal Power (Pvt.) Ltd., Govt. of Punjab

Scope of Services:

Geotechnical  Investigations  for  Power  Plant  and  Access  Road  comprising 

3,500  m  drilling  of  investigation  boreholes,  down‐hole  seismic  survey, 

electrical resistivity survey, and laboratory testing     

Topographic Survey and Bathymetric Survey of canal 

Groundwater Studies comprising site survey, groundwater modeling, design of 

pumping wells 

Construction of test piles, pile load testing, evaluation of pile load tests 

Construction of 1300 cast in‐situ concrete piles        

Start date: October 2015

End date: Dec. 2015

Page 33: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Project Sheets  

   Berkeley Associates (Pvt.) Ltd.

Project: 350 MW Coal Fired Power Plant

Location: Port Qasim

Client: Siddique Sons Energy

Scope of Services:

Geotechnical Investigations 

Topographic Survey & Bathymetric Survey 

Groundwater Studies    

Resistivity Survey  

Start date: Jan, 2015

End date: Mar, 2015 

B k l A i tB k l A i tB k l A i tB k l A i t

Page 34: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Project Sheets  

   Berkeley Associates (Pvt.) Ltd.

Project: Orange Line Metro Train, Project

Location: Lahore, Pakistan

Client: Punjab Metro bus Authority

Scope of Services:

Geotechnical Investigations along the alignment of the Orange Line 

Execution of 14 Test Piles and Pile Load Tests up to 12000 tons, interpretation of pile load tests, and design recommendations for working piles 

   

Start date: July 2015

End date: September 2015

 

Page 35: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Project Sheets  

   Berkeley Associates (Pvt.) Ltd.

Project: 150 MW Patrind Hydropower Project

Location: Muzaffarabad, AJK

Client:  Daewoo Engineering & Construction 

 

 

 

 

 

Scope of Services:

Preparation of Construction Drawings for Power House, Weir, Excavation, Retaining System.

Detailed Design and preparation of Construction Drawings for Access Roads

Page 36: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Project Sheets  

   Berkeley Associates (Pvt.) Ltd.

Project: Feasibility Study of 12 MW Biomass Based IPP Project

Location: Faisalabad, Punjab

Client: Masood Textile Mills

Scope of Services:

Sitting Studies

Topographic survey

Geotechnical investigations

Initial Environmental Examination

Grid interconnection studies

Completion Time: 9 Months

Completion Date: March 2013

Page 37: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Project Sheets  

   Berkeley Associates (Pvt.) Ltd.

Project: Feasibility Study for 180 MW Naran Hydropower Project

Location: Naran, Khyber Pakhtunkhwa

Client: Sarhad Hydel Development Organization (SHYDO)

Scope of Services: Preparation of Geotechnical investigations program and tender documents

Top supervision of Geotechnical investigations

Preparation of laboratory testing program

Geotechnical analysis and design for feasibility study

Preparation of geotechnical investigations report

Feasibility level design of all hydraulic structures

Preparation of drawings for feasibility level design

Financial and economic analyses of the project

Seismological studies and geological mapping

Environmental studies

Completion Time: 18 Months

Completion Date: December, 2013

Page 38: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Project Sheets  

   Berkeley Associates (Pvt.) Ltd.

Project: Feasibility Study for 300 MW Balakot Hydropower Project

Location: Balakot, Khyber Pakhtunkhwa

Client: Sarhad Hydel Development Organization (SHYDO)

Scope of Services: Preparation of Geotechnical investigations program and tender documents

Top supervision of Geotechnical investigations

Preparation of laboratory testing program

Geotechnical analysis and design for feasibility study

Preparation of geotechnical investigations report

Feasibility level design of all hydraulic structures

Preparation of drawings for feasibility level design

Financial and economic analyses of the project

Seismological studies and geological mapping

Environmental studies

Completion Time: 18 Months

Completion Date: December, 2013

Page 39: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Project Sheets  

   Berkeley Associates (Pvt.) Ltd.

Project: Feasibility Study for 98 MW Batakundi Hydropower Project

Location: Batakundi, Khyber Pakhtunkhwa

Client: Sarhad Hydel Development Organization (SHYDO)

Scope of Services: Preparation of Geotechnical investigations program and tender documents

Top supervision of Geotechnical investigations

Preparation of laboratory testing program

Geotechnical analysis and design for feasibility study

Preparation of geotechnical investigations report

Feasibility level design of all hydraulic structures

Preparation of drawings for feasibility level design

Financial and economic analyses of the project

Seismological studies and geological mapping

Environmental studies

Completion Time: 18 Months

Completion Date: December, 2013

Page 40: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Project Sheets  

   Berkeley Associates (Pvt.) Ltd.

Project: Shogo – Sin Hydropower Project

Location: Chitral

Client: Private Power Infrastructure Board (PPIB)

Scope of Services: Preparation of Geotechnical investigations program

Preparation of Tender documents for Geotechnical investigations

Top supervision of Geotechnical investigations

Preparation of Laboratory testing program

Geotechnical analysis and design for feasibility study

Preparation of geotechnical investigations report

Feasibility level design of all structures

Preparation of drawings for feasibility level design

Completion Time: 15 Months

Completion Date: April, 2010

Page 41: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Project Sheets  

   Berkeley Associates (Pvt.) Ltd.

Project: Shushghai - Zhendoli Hydropower Project

Location: Chitral

Client: Private Power Infrastructure Board (PPIB)

Scope of Services: Preparation of Geotechnical investigations program

Preparation of Tender documents for Geotechnical investigations

Top supervision of Geotechnical investigations

Preparation of Laboratory testing program

Geotechnical analysis and design for feasibility study

Preparation of geotechnical investigations report

Feasibility level design of all structures

Preparation of drawings for feasibility level design

Completion Time: 15 Months

Completion Date: April, 2010

Page 42: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Project Sheets  

   Berkeley Associates (Pvt.) Ltd.

Project: 548 MW Kaigah Hydropower Project

Location: Kandian River

Client: Kaigah Power Pvt Ltd

Scope of Services: Preparation of Geotechnical investigations program

Preparation of Tender documents for Geotechnical investigations

Top supervision of Geotechnical investigations

Preparation of Laboratory testing program

Geotechnical analysis and design for feasibility study

Preparation of geotechnical investigations report

Feasibility level design of all structures

Preparation of drawings for feasibility level design

Completion Time: 15 Months

Completion Date: February, 2011

Page 43: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Project Sheets  

   Berkeley Associates (Pvt.) Ltd.

Project: 22 MW Jabban Hydroelectric Power Station Rehabilitation Project

Location: Jabban – District Malakand

Client: WAPDA

EPC Contractor: HRL – CCPG JV

Scope of Services: Preparation of Geotechnical investigations program

Carrying out geotechnical investigation at site

Preparation of geotechnical investigations report

Geotechnical analysis and design for various components of

Project (i.e. power house, substation, and penstock)

Structural design of powerhouse, penstocks and 132 kV substation

Rehabilitation design for Forebay structure

Preparation of civil work construction drawings

Page 44: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Project Sheets  

   Berkeley Associates (Pvt.) Ltd.

Project: JBC Hydropower Project, Sukheke

Location: Sukheke, (50km from Lahore)

Client: JBC Powr Ltd.

Consultants: Pakistan Consulting Services

Scope of Services: Drilling of 4 boreholes ranging in depth from 30m to 50m along with SPT and undisturbed soil sampling

Total exploratory drilling – 130m

Laboratory testing including PSD, consolidation, direct shear, unconfined compression, triaxial compression tests

Factual and Interpretative Reports

Completion Time: Eight (04) weeks

No. of Drill Rigs: One straight rotary drilling rigs along with necessary crew and

accessories

Completion Date: August 30th 2008

Page 45: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Project Sheets  

   Berkeley Associates (Pvt.) Ltd.

Project: LBDC Hydropower Project, Chichawatni

Location: Chichawatni, (180km from Lahore)

Client: LBOD Power Ltd.

Consultants: Pakistan Consulting Services

Scope of Services: Drilling of 4 boreholes ranging in depth from 30m to 50m along with SPT and undisturbed soil sampling

Total exploratory drilling – 130m

Field permeability tests in boreholes

Laboratory testing including PSD, consolidation, direct shear, unconfined compression, triaxial compression tests

Factual and Interpretative Reports

Completion Time: Eight (04) weeks

No. of Drill Rigs: One straight rotary drilling rigs along with necessary crew and

accessories

Completion Date: September 10th 2008

Page 46: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Project Sheets  

   Berkeley Associates (Pvt.) Ltd.

Project: Lucky Hydropower Project

Location: Sialkot

Client: Olympus Energy (Pvt.) Ltd.

Consultants: Barqab

Scope of Services: Drilling of 5 boreholes ranging in depth from 20m to 30m along with SPT and undisturbed soil sampling

Total exploratory drilling – 155m

Field permeability tests in boreholes

Laboratory testing including PSD, consolidation, direct shear, unconfined compression, triaxial compression tests

Factual and Interpretative Reports

Completion Time: Eight (04) weeks

No. of Drill Rigs: One straight rotary drilling rigs along with necessary crew and

accessories

Completion Date: August 30th 2008

Page 47: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Project Sheets  

   Berkeley Associates (Pvt.) Ltd.

Project: 100 MW Fatima Energy Cogen Power Project

Location: Sanawan - Pakistan

Client: Fatima Energy Limited (FEL)

Scope of Services:

Sitting Studies

Topographic survey

Groundwater studies

Material studies

Coal Transportation studies

Geotechnical investigations

Initial Environmental Examination

Preliminary design of civil structures

Completion Time: 10 Months

Completion Date: May 2011

Page 48: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Project Sheets  

   Berkeley Associates (Pvt.) Ltd.

COOLING TOWERS FOR AES THERMAL POWER PLANT

 

 

 

 

Scope of Work:

 

o Preparation of detailed design of all civil and mechanical works, and preparation

of technical specifications, drawings, and Bill of Quantities

o Preparation of tender documents

o Prequalification of Contractors and Invitation of Bids

o Evaluation of Bids

o Award of construction contract

o Construction Supervision for all site works

o Quality Control and Quality Assurance audits

o Verification of contractors running bills

o Preparation of completion reports

o Preparation of progress reports

o Preparation of as-built drawings

Page 49: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Project Sheets  

   Berkeley Associates (Pvt.) Ltd.

Project: Fatima Energy Cogen Power Project

Location: Sanawan, Pakistan

Client: Fatima Energy Limited

 

 

 

 

 

 

 

 

 

 

 

Scope of Services:

 

Geotechnical Investigation (Drilling of 5 boreholes ranging from 15m to 30 m depth along with SPT and undisturbed soil sampling, 4 testpits, laboratory testing including PSD, consolidation, direct shear, unconfined compression and Factual and Interpretative Reports)

Electrical Resistivity Survey Geologic al Hazard Assessment

 

Completion Date: May 2011 (4 Weeks)

 

 

 

 

 

 

 

 

 

 

 

Page 50: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Project Sheets  

   Berkeley Associates (Pvt.) Ltd.

Project: 234 MW Combined Cycle Power Plant

Location: Muridke, Lahore

Client: Albario Engineering (Pvt) Ltd.

Project Consultants: Skoda Export

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Scope of Services: Geotechnical Investigation (Drilling of 3 boreholes each down to 15m

depth along with SPT and undisturbed soil sampling, laboratory testing including PSD, consolidation, direct shear, unconfined compression and Factual and Interpretative Reports)

Pile Integrity Test (Total Tested Piles = 23 Piles)  

Completion Time: April 2008 (02 Weeks)

Page 51: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Project Sheets  

   Berkeley Associates (Pvt.) Ltd.

Project: Feasibility Studies for 11 MW Biomass Based Power Plant

Location: Jhang, Punjab

Client: Lumen Energia (Private) Limited

Scope of Services:

Sitting Studies

Topographic survey

Geotechnical investigations

Initial Environmental Examination

Grid interconnection studies

Completion Time: 9 Months

Completion Date: July 2011

Page 52: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Project Sheets  

   Berkeley Associates (Pvt.) Ltd.

Project: Feasibility Study of 100 MW Charbon Coal Power Project

Location: Chakwal, Punjab

Client: Habib Rafiq (Pvt.) Limited

Scope of Services:

Sitting Studies

Topographic survey

Groundwater studies

Material studies

Coal Transportation studies

Geotechnical investigations

Initial Environmental Examination

Preliminary design of civil structures

Completion Time: 12 Months

Completion Date: June 2013

Page 53: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Project Sheets  

   Berkeley Associates (Pvt.) Ltd.

Project: 100 MW Solar Power Project

Location: Quaid-e-Azam Solar Park, Bahawalpur, Pakistan

Client: TBEA, China

Scope of Services:

Review of Geotechnical Data 

Review Design of foundations for the Solar Panels and Buildings 

Evaluation of the load test results of the screw piles used for panels   

Start date: June 2014

End date: Nov. 2014

Page 54: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Project Sheets  

   Berkeley Associates (Pvt.) Ltd.

Project: 50 MW Coal Fired Khushab Power Plant

Location: Khushab - Pakistan

Client: Shahpur Energy (Pvt.) Limited

Scope of Services:

Sitting Studies

Topographic survey

Groundwater studies

Material studies

Coal Transportation studies

Geotechnical investigations

Initial Environmental Examination

Preliminary design of civil structures

Completion Time: 12 Months

Completion Date: April 2011

Page 55: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Project Sheets  

   Berkeley Associates (Pvt.) Ltd.

Project: Lahore Rapid Mass Transit System Project

Location: Lahore

Client: Metro Associates, Lahore

Consultants: Systra Group, France

Scope of Services: Drilling of 78 boreholes ranging in depth from 28m to 50m along with SPT and undisturbed soil sampling along the 27km long alignment

Total exploratory drilling – 2,622m

Field permeability tests in boreholes

Installation of fourteen piezometer

Thirty shallow test pits along with field density tests

Five Plate Load tests

Laboratory testing including PSD, consolidation, direct shear, unconfined compression, triaxial compression tests

Factual and Interpretative Reports

Completion Time: Eight (08) weeks

No. of Drill Rigs: Six straight rotary

drilling rigs along

with necessary

crew and

accessories; and

seven crews of

hand auger cum

light percussion

Page 56: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Project Sheets  

   Berkeley Associates (Pvt.) Ltd.

Project: 425 MW CCPP Nandipur, Pakistan

Location: Nandipur (160 km from Lahore)

Client: Dongfang Electric Corporation Limited (DEC), China

EPC Contractor: DEC, China

Scope of Survey: Topographic Survey

on Land and under

water for Canal

Preparation of

Survey Maps and

Report

Scope of Services: Drilling of 137 boreholes ranging in depth from 15m to 50m along with SPT and undisturbed soil sampling

Total exploratory drilling = 4,200 m

Down hole shear wave velocity tests in six boreholes 50 m deep

Cone Penetration Tests (CPT) at 23 locations

Field permeability test

Six Plate load tests

Electrical resistivity tests at 83 locations

Laboratory testing including PSD, consolidation, direct shear, unconfined compression

Factual and Interpretative Reports on the basis of Chinese Code

- Construction of a 120 m deep well, and five piezometers Performance of pump out test, analyses of data and design of pumping wells.

- Tubewell

- Ground water studies

- Surface water studies

Page 57: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Project Sheets  

   Berkeley Associates (Pvt.) Ltd.

Project: 225 MW CCPP Saif Power Project Sahiwal

Location: Sahiwal (150 km from Lahore)

Client: Saif Power Limited, Islamabad

EPC Contractor: CMEC, China

Scope of Services: Drilling of 112 boreholes ranging in depth from 30m to 40m along with SPT and undisturbed soil sampling

Total exploratory drilling – 2,800m

Down hole shear wave velocity tests in three boreholes 80m deep

Six Plate load tests

Electrical resistivity tests at 20 locations

Laboratory testing including PSD, consolidation, direct shear, unconfined compression

Factual and Interpretative Reports

Completion Time: Ten (10) weeks

No. of Drill Rigs: Nine straight rotary drilling rigs along with necessary crew and

accessories

Page 58: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Project Sheets  

   Berkeley Associates (Pvt.) Ltd.

Project: 152 Combined Cycle Diesel Engine Power Plant, Pasrur

Location: Eastern Power Company (EPCO), Islamabad

Client: Eastern Power Company (EPCO), Islamabad

EPC Contractor: Gama Power, Turkey

Scope of Services: Drilling of 20 boreholes ranging in depth from 30m to 50m along with SPT and undisturbed soil sampling

Total exploratory drilling – 920m

Five shallow test pits along with field density test

Installation of piezimeters

Aquifer Pump out test

Electrical resistivity tests at 12 locations

Laboratory testing including PSD, consolidation, direct shear, unconfined compression

Factual and Interpretative Reports

Completion Time: Eight (08) weeks

No. of Drill Rigs: Three straight rotary drilling rigs along with necessary crew and

accessories

Page 59: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Project Sheets  

   Berkeley Associates (Pvt.) Ltd.

Project: New Urea / Amonia Plants Project, Engro Dharki

Location: Dharki, Dist. Ghotki, Sindh

Client: Engro Chemicals Pakistan Ltd

EPC Contractor: Snamprogatti, Italy

Descon, Pakistan

Scope of Services:

- Geotechnical Investigation and foundation design

- Design coordination with EPC contractor

- Supervision of piling constructions

- Design of dewatering system

- Design of parameters for PMS buildings

- Design review of ammonia storage tanks

- Quality control and quality assurance of all civil works through

resident team of engineers

- Trouble shooting and assistance in design and construction

bottle necks

Completion Time: Three (03) Years

Page 60: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Project Sheets  

   Berkeley Associates (Pvt.) Ltd.

Project: Design of Cofferdam for Construction of Intake Structure

Location: Guddu, Sindh

Client: Habib Rafiq (Pvt.) Ltd.

 

Scope of Services:

- Development of design of cofferdam including stability analysis,

seepage analysis

- Preparation of construction drawings

- Preparation of detailed method statement

- Analysis to find out impact of construction of cofferdam on the

following canal and development of remedial measures

Page 61: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Project Sheets  

   Berkeley Associates (Pvt.) Ltd.

Project: PARCO Refinery

Location: Mahmood Kot, Near Multan

Client: Marubeni Corporation of Japan

Consultants: NA

Scope of Services: Design, Construction, and Commissioning of 6 deep wells of 2 cusec (ft3/sec) capacity each. The scope included drilling of wells, procurement of all materials and machinery required for the works.

Completion Time: Eight (08) weeks

No. of Drill Rigs: Two (reverse rotary type)

Page 62: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Project Sheets  

   Berkeley Associates (Pvt.) Ltd.

Project: Flattie’s Hotel Development Project

Location: Lahore

Client: Gulf Commercial Bank, Abu Dhabi

Consultants: Meinhardt, Singapore

Scope of Services: Drilling of 25 boreholes ranging in depth from 65m to 80m along with SPT and undisturbed soil sampling

Total exploratory drilling – 1925m

12 CPT probes to 30m depth each

Field permeability tests in boreholes

Installation of piezometers

Laboratory testing including PSD, consolidation, direct shear, unconfined compression, triaxial compression tests

Factual and Interpretative Reports

Completion Time: Eight (08) weeks

No. of Drill Rigs: Nine straight rotary

drilling rigs along with

necessary crew and

accessories

 

Page 63: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Project Sheets  

   Berkeley Associates (Pvt.) Ltd.

Project: Mobilink Office Building at Quaid-e-Azam Industrial Estate

Location: Lahore, Punjab

Client: Progressive Consultants (Pvt.) Ltd.

Scope of Services:

Comparison of different layout of shoring systems

Finalizing the layout of shoring system

Evaluation of lateral loading at different support levels

Design of different structural components of shoring system

Design of in-situ tangent concrete piles

Preparation of detailed construction drawings

Preparation of Tender Documents for the construction of shoring system

Page 64: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Project Sheets  

   Berkeley Associates (Pvt.) Ltd.

Project: Safety Assessment of Existing Shoring System and Design of Rehabilitation/ Strengthening Measures at Mubarak Center, Ferozepur Road, Lahore

Location: Lahore, Punjab

Client: M/s Taavun (Pvt.) Ltd.

Scope of Services:

Stage – I Assessment of existing retaining system and establish the need for remedial/ strengthening measures, which included;

a) Condition survey/ physical inspection of entire shoring system

b) In-situ Testing; Anchor lift-off tests; Integrity of concrete piles and bracing beams using Schmidt hammer and PUNDIT

c) Evaluation of existing shoring system by incorporating results of in-situ testing

 

Stage – II Suggesting the most appropriate and economical strengthening measures to ensure safety of the shoring system and adjacent buildings

Page 65: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Project Sheets  

   Berkeley Associates (Pvt.) Ltd.

Project: Pindi Bhattian Faisalabad Motorway (M-3)

Location: Pindi Bhattian -Faisalabad

Client: National Highway Authorities (NHA)  

 

 

 

 

 

 

 

 

 

 

 

 

Scope of Work: Drilling of 40 boreholes ranging in depth from 05m to 10m along with SPT and undisturbed soil sampling along the 60km long alignment Forty (40) test pits along with field density tests Laboratory testing including PSD, consolidation, direct shear, unconfined compression, triaxial compression tests Factual and Interpretative Reports

Preparation of comprehensive evaluation rep 

 

 

 

 

 

 

 

 

 

Page 66: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Project Sheets  

   Berkeley Associates (Pvt.) Ltd.

Project: Bridge on Sutlej River, Bahawalpur.

Location: Bahawalpur

Client: SKB Pvt. Ltd.

 

 

 

 

 

 

 

 

 

 

 

 

 

Scope of Work: Drilling of 2 boreholes to maximum depth of 50.0m along with SPT and undisturbed soil sampling Laboratory testing including PSD, consolidation, direct shear, unconfined compression, triaxial compression tests

 

Preparation of geotechnical

investigation report Design of bridge

foundations

 

Start Date: July 01, 2003

 

End Date: July 20, 2003

Page 67: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Project Sheets  

   Berkeley Associates (Pvt.) Ltd.

Project: Naran Jalkhan Road

Location: Naran to Jakkhad

Consultants: Republic Engineering Corporation (REC), Lahore

 

 

 

 

 

 

 

 

 

 

 

 

Scope of Work: Eighty (80) test pits along with field density tests along the 60km long alignment

 

Laboratory testing including PSD, Liquid Limit, Plastic Limit, consolidation, direct shear, CBR tests

 

Preparation of geotechnical investigation reports for the road and all the structures along the road including bridges, culverts, and cross drainage structures

 

Design of pavement  

Design of foundations for all the structures along the road

 

Date of Work Started: July 5, 2000

Page 68: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Project Sheets  

   Berkeley Associates (Pvt.) Ltd.

Project: Lai Nullah Road Project, Rawalpindi Package-1)

Location: Rawalpindi

Client: National Engineering Services Pakistan (Pvt.) Limited

 

 

 

 

 

 

 

 

 

 

 

 

Scope of Work: Drilling of 20 boreholes ranging in depth from 20m to 40m along

with SPT and undisturbed soil sampling.  

Thirty Two shallow test pits along with field density tests  

Laboratory testing including PSD, consolidation, direct shear,

unconfined compression, triaxial compression tests  

Preparation of factual reports for geotechnical investigations  

Start Date: March 21, 2007

 

End Date: April 21, 2007

 

 

Completion Time: Eight (04) weeks

Page 69: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Project Sheets  

   Berkeley Associates (Pvt.) Ltd.

Project: Lukpass Tunnel Quetta

Location: Quetta, Baluchistan

Client: Associated Consulting Engineers (ACE) Pvt. Ltd.  

 

 

 

 

 

   

 

   

 

   

 

 

Scope of Work: Drilling of 2 boreholes to maximum depth of 120m along with SPT and undisturbed soil sampling

 

Laboratory testing including PSD, consolidation, direct shear, unconfined compression, triaxial compression tests

 

Preparation of geotechnical

investigation reports Initial design of

tunnels support system

Design of slope stabilization near portals  

Start Date: February 15, 2006

 

End Date: March 30, 2006

Page 70: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Project Sheets  

   Berkeley Associates (Pvt.) Ltd.

Project: Improvement/Renovation of Existing Multan Road from Thokar Niaz Baig to Chauburji, Lahore Location: Lahore

Client: National Engineering Services Pakistan (Pvt.) Limited  

 

 

 

 

 

 

 

 

 

 

 

 

Scope of Work: Drilling of 4 boreholes to maximum depth of 06m along with SPT and undisturbed soil sampling

 

Laboratory testing including PSD, consolidation, direct shear, unconfined compression, triaxial compression tests

 

Fourteen (14) test pits along with field density tests  

Start Date: October 01, 2009

 

End Date: November 01, 2009

Page 71: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Project Sheets  

   Berkeley Associates (Pvt.) Ltd.

EFFLUENT TREATMENT PLANT FOR TANNERIES, KASUR  

 

Scope of Work:

 

Detailed design of Treatment Ponds, Screen House, Equalization Tanks, Settling tanks, Pump House, Embankments, Sludge Disposal Lagoons

 

Construction supervision for all site works  

Quality Control and Quality Assurance audits  

Page 72: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Project Sheets  

   Berkeley Associates (Pvt.) Ltd.

HUBB WATER TREATMENT PLANT 

 

 

Scope of Work:

Detailed design of civil works of entire treatment plant including building, roads, and tanks

 

Construction Supervision for all site works  

Quality Control and Quality Assurance audits  

Preparation of progress report  

Page 73: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Project Sheets  

   Berkeley Associates (Pvt.) Ltd.

Project: Design, Construction and commissioning of six (6) tubewells having 1.0 cusec discharge capacity  

Location: PARCO Mid-Country Refinery Project Mahmood Kot, Pakistan

 

Client: M/s Marubeni Corporation (MC) JGC Japan

 

 

 

 

 

 

 

 

 

 

 

 

 

Scope of Work:

Design of wells, procurement of well material and pump / motor units, construction of wells, development and testing of wells

Completion Time: Two Months

 

Completion Date: November 1997

Page 74: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Clients  

   Berkeley Associates (Pvt.) Ltd.

CLIENTS

Page 75: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Clients  

   Berkeley Associates (Pvt.) Ltd.

Habib Electric International, China Dong Fong Electric Corporation, China CMEC, China CHINT, China TBEA, China Deawoo Corporation, Koria Karkey International, Turkey Sinogy, China Vestas, Australia M/s Mitsui Engineering & Shipbuilding Co Ltd Japan M/s Marubeni Corporation (JGC) Japan M/s Petrosin Pakistan Ltd M/s Presson Pakistan Ltd M/s Habib Rafiq (Pvt) Ltd M/s General Construction Company (Pvt) Ltd M/s Al-Wasay Construction Company (Pvt) Ltd M/s Walee Builders (Pvt) Ltd M/s Nowshera Engineering Services NENSER (Pvt) Ltd M/s Hisar Corporation (Pvt) Ltd M/s Ghulam Habib Construction (Pvt) Ltd M/s Nazir & Company (Pvt) Ltd

Engro Pakistan Pepsicola, Pakistan Siddique Sons Energy, (Pvt.) Ltd. Tetra Pack, Pakistan Packages Pakistan Nishat Group Shareef Group M/s Align Technologies (pvt) Ltd USA M/s Fauji Fertilizer Rawalpindi M/s Pakistan Services Limited PSL Karachi M/s Regency Developer Group (Pvt) Ltd M/s Rupali Group (Pvt) Ltd M/s Crescent Services (Pvt) Ltd M/s Attock Refinery Ltd M/s Four Brothers (Pvt) Ltd M/s Global Marketing (Pvt) Ltd M/s Zafar Sons (Pvt) Ltd M/s Rahmat-ul-Alameen Trust M/s Cherished Pharmaceuticals (Pvt) Ltd M/s MSB Industries (Pvt) Ltd M/s Cholistan Sugar Mills (Pvt) Ltd M/s ICI Group Ltd M/s Merino Textile (Pvt) Ltd M/s International Juices (Pvt) Ltd M/s Sapphire Textile Group (Pvt) Ltd M/s Pharmagen Beximco (Pvt) Ltd M/s ProDiesal Services (Pvt) Ltd M/s Genesis Pharmaceuticals (Pvt) Ltd M/s Olympia Power Ltd M/s Hoechst Ravi Chemical Ltd M/s Sitara Chemicals Limited M/s Zuchini Industries Limited M/s Kohat Cement Limited

Private Agencies

Contractors

Page 76: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Clients  

   Berkeley Associates (Pvt.) Ltd.

National Highway Authority Building Division Swabi Pakistan Air Force Police Club Pakistan Bait-ul-Maal Rawalpindi Metropolitan Corporation Pakistan Television Corporation (Headquarter) Islamabad Assistant Director Housing Gujranwala Cantt General Headquarter AG's Branch Rawalpindi National Engineering Services Pakistan (NESPAK) Lahore Development Authority Engineering Consultancy Services Punjab (ECSP) Public Health Engineering Department, Punjab

Government Agencies

Page 77: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Topographic Survey Equipment  

   Berkeley Associates (Pvt.) Ltd.

TOPOGRAPHIC SURVEY EQUIPMENT

Page 78: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Topographic Survey Equipment  

   Berkeley Associates (Pvt.) Ltd.

Sr. No. Description Quantity

A. ELECTRONIC TOTAL STATIONS 1 Total Station Set 5E (SOKKIA) 1

2

Total Station Set 2CII (SOKKIA) 1 Sokkia Pakistan Services With card reader SCR 2 and Department Karachi Memory cards SDC4 64 K

1

3

Total Station GTS 303 With data collector FC-48 and multi memory TDS RAM CARDS 256K&512 K 2

i) DATA COLLECTOR SDR 33 1

ii) DATA COLLECTOR SDR 31 8

iii) HP-48 data loggers iv) PSION DATA

ORGANISER 1

with PSION COMMUNICATION 6 LINK

v) GPS NAV MAGELLAN

1

2 1 8 1

6

B.EDMs 1 Distomate D13 S (WILD) 3 2 Distomate D14 (WILD) 2

C. THEODOLITES 1 WILD T2 5

D. LEVELLING INSTRUMENTS WITH STAVES

1 WILD Automatic NAK 2 for Precise Leveling 6

E. PARALLEL PLATE MICROMETERS 1 GPM1 Attachment for precise levling 1 2 GPM3 Attachment for precise levling 1

F. ILLUMINATION TARGETS & BATTERIES

1 Batteries for Theodolite illumination for

Polaris observation at night 3

G. COMPUTER/ PLOTER SYSTEMS 1 PENTIUM III PC 2

2

PENTIUM I, supported by surveying and mapping software packages, TRAVERSE

PC+ACAD+SDR MAP+EAGLE POINT SOFTWARE

1

3 Plotter HP (A-1 Size) 1 4 HP Laser Jet (4L Printer) 2 5 HP Laser Jet (4MV Printer) 1 6 HP Scanner Scanjet 5100 C 1

Page 79: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Drilling Equipment  

   Berkeley Associates (Pvt.) Ltd.

DRILLING EQUIPMENT

Page 80: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Drilling Equipment  

   Berkeley Associates (Pvt.) Ltd.

DESCRIPTION QTY MAKE Rotary Boring Rig for Soil Investigations 12 No. Pakistan

Wash Boring Rig for Soil Investigation 2 No. Pakistan

CPT Rig (Manual) 1 No. Pakistan

Percussion Rig for Soil Investigation 4 No. Pakistan

Percussion Rig for Piling 15 No. Pakistan

Reverse Rotary for Tube well & Piling 6 No. Pakistan

Auger Bucket Dry Drilling Rigs for Piling 3 No. Pakistan

Auger boring for Soil Investigation 8 No. Pakistan

Tremie, Funnel, Bucket and Pipes 5 No. Pakistan

Core Extraction Machine 1 No. Pakistan

Hydraulic Jack 2 No. Pakistan

Casing 100mm Diameter Sufficient Pakistan

Shelby Tubes Sufficient Pakistan

Speedy Moisture Tester 2 No. USA

Pitcher Sampler 5 No. Pakistan

Denison Sampler 5 No. Pakistan

SPT Rods (AW) 800 m USA

SPT Apparatus 3 No. USA

Sand Cone Apparatus 3 No. Pakistan

Drive Cylinder 10 No. Pakistan

Page 81: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Laboratory Testing Equipment  

   Berkeley Associates (Pvt.) Ltd.

LABORATORY TESTING EQUIPMENT

Page 82: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Laboratory Testing Equipment  

   Berkeley Associates (Pvt.) Ltd.

DESCRIPTION QTY MAKE Electric Oven 2 Nos. Germany

Triple Beam Balance 2 Nos. USA

Digital Balance 4 Nos. USA

Analytical Balance 1 Nos. China

Field Balance 2 Nos. China

US Standard Sieve 4 Sets Imported Mesh

US Standard Sieve (Coarse) 2 Sets Pakistan

Liquid Limit Device 3 Sets China

Unconfined Compression Machine 2 Nos. Imported Ring

Direct Shear Machine 1 Nos. Imported Ring

Consolidation Machine 4 Nos. Pakistan

Standard Proctor Apparatus 2 Nos. Pakistan

Modified Proctor Apparatus 2 Nos. Pakistan

CBR Molds 12 Nos. Pakistan

CBR Machine 1 Nos. Pakistan

Sample Extruder 1 Nos. Pakistan

AASHTO Compaction Test 2 Sets Pakistan

Cylinder 1000 ml 12 Nos. China

Cylinder 500 ml 2 Nos. China

Beaker 250 ml 12 Nos. China

Pycnometers 50 ml 6 Nos. China

Moisture Can Sufficient

Allied Accessories Sufficient

Page 83: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Key Personnel  

   Berkeley Associates (Pvt.) Ltd.

KEY PERSONNEL

Page 84: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Key Personnel  

   Berkeley Associates (Pvt.) Ltd.

NAME AND DESIGNATION QUALIFICATION EXPERIENCE Dr. Tahir Masood Ph.D. in Geotechnical 34 years experience Chief Executive Engineering in design of various

Geotechnical Projects and Construction Management

Khalid Ayyub M.Sc. in 24 years in Director/ Geotechnical Geotechnical Head Geotechnical Engineering Engineering, field work, Engineering Laboratory work, Analyses and design. Sheikh Ilyas Ahmed B.Sc. Civil 41 years experience of Chief Structural Engineer Engineering Structural Design of Head Project Manager Building, hydropower Project. Ijaz Shafi B.Sc. Civil 38 years experience Head Structural Engineering Ahmad Nawaz M.Sc. Geology 46 years experience in Groundwater Expert ground water Hydrology Syed Azhar Maqsood M.Sc. in Public Health 36 year experience Head Public Health Engineering Environmental Engineering Engineering Dr. Muhammad Irfan Ph. D in Geotechnical 07 years experience of Geotechnical Engineer Engineering research and work on Geotechnical Projects. Ali Amjad Gill M.Sc. Civil 7 years in Geotechnical Geotechnical Engineer Engineering Engineering M. Shoaib M.Sc. Civil 6 years in Geotechnical Geotechnical Engineer Engineering Engineering Imran Farooq M.Sc. Civil 5 years in Geotechnical Geotechnical Engineer Engineering Engineering

Page 85: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Key Personnel  

   Berkeley Associates (Pvt.) Ltd.

NAME AND DESIGNATION QUALIFICATION EXPERIENCE Farooq Naveed M. Sc. Civil 7 years in Geotechnical Geotechnical Engineer Engineering Engineering

Jamal Yousaf M.Sc. Soil Mechanics & 15 Years Experience Project Engineer Foundation Engineering Naeem Ullah Khan Diploma in Civil 12 Year Experience in QA/ QC Supervisor Technology QA/ QC Supervision Manzar Mumtaz M.Sc. in Civil 41 years experience of Structural Engineering Structural Design of Building, hydropower Projects Shujjat Rabbani B.Sc. in Electrical 43 years experience in Engineering Transmission Line / Substation Expert Manzur Ahmad M.Sc. in Civil 41 years experience in Engineering different dam Engg Discipline including Geotechnical field exploration, lab testing and design work. Ahmed Pervez Khan B.Sc. in Electrical 43 years experience in Engineering Transmission Line / Substation Expert Raja Naeem Diploma in Civil 35 Year Experience in Chief Surveyor Technology Surveying, BOQs, Bar Bending Schedule and rate analyses Muhammad Akram Diploma in material 21 years in material Project Co-coordinator testing testing M.R.Qureshi Diploma in material 26 years in material Project Co-coordinator testing testing Mazhar Altaf M.Sc Physics 19 years in execution Material Engineer Diploma in soil of major projects. Mechanics

Page 86: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Key Personnel  

   Berkeley Associates (Pvt.) Ltd.

NAME AND DESIGNATION QUALIFICATION EXPERIENCE Muhammad Zubair Jan Diploma in Civil 16 year experience in Quality Control Engineer Technology construction

Supervision and quality control, surveying, BOQs, Bar

Bending Schedule and Rate analyses Muhammad Haneef Diploma in AutoCAD 35 years experience Head Drafting in preparation of Drawing and quantities

Page 87: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Field Staff  

   Berkeley Associates (Pvt.) Ltd.

FIELD STAFF

Page 88: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Field Staff  

   Berkeley Associates (Pvt.) Ltd.

NAME AND DESIGNATION QUALIFICATION EXPERIENCE Abdur Razzaque M. Sc. Applied 5 years experience Site Geologist Geology

Asif Ali M. Phil Applied 2 years experience Site Supervisor Geology

Muhammad Ali Chughtai B. Sc. Geology 30 years experience Site Supervisor

Saddam Ali B. Sc. Geology 1 year experience Site Supervisor Engineering

Usman Majeed B. Sc. Geology 1 year experience Site Supervisor Engineering

Muhammad Ishaq F. Sc. 5 years in field and Site Supervisor Laboratory Testing

Muhammad Tariq Matric 15 years in piling and Site Supervisor well drilling works

Muhammad Naeem Matric 15 years in piling and Site Supervisor well drilling works

Muhammad Saeed F.A 30 years in laboratory Laboratory Technician testing at UET Lahore Ajmal Hahat B. A 25 years experience in Laboratory Technician material testing lab. Sikandar Hayat F.A 5 years experience in Laboratory Assistant laboratory testing Abdul Hameed Middle 15 years experience in Driller drilling

Abdur Razzaque Middle 13 year experience in Driller drilling

Muhammad Imtiaz Middle 13 year experience in Driller drilling

Page 89: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Registration  

   Berkeley Associates (Pvt.) Ltd.

Page 90: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Registration  

   Berkeley Associates (Pvt.) Ltd.

Page 91: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Registration  

   Berkeley Associates (Pvt.) Ltd.

Page 92: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Registration  

   Berkeley Associates (Pvt.) Ltd.

Page 93: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Quality and Safety Policy  

   Berkeley Associates (Pvt.) Ltd.

Page 94: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Quality and Safety Policy  

   Berkeley Associates (Pvt.) Ltd.

Page 95: Company Profile 2015 (19-10-2015) - Berkeley · PDF fileHub Water Treatment Plant, Hub, Karachi Effluent Treatment Plant for Tanneries, Kasur ... Descon ES Building, Lahore Zohra Heights,

Quality and Safety Policy  

   Berkeley Associates (Pvt.) Ltd.