Company Profile - 15 Dec 2014
-
Upload
mak-chew-ming -
Category
Documents
-
view
353 -
download
0
Transcript of Company Profile - 15 Dec 2014
![Page 1: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/1.jpg)
Hiap Seng Engineering (thailand) co ltdHiap Seng Engineering (thailand) co.,ltd.Corporate Presentation
![Page 2: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/2.jpg)
BUSINESSBUSINESSPresentationPresentation
Keynote
![Page 3: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/3.jpg)
Our FactoryOur Factory
![Page 4: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/4.jpg)
Formed 30 january 2003Formed 30 january 2003Hiap Seng Engineering from Singapore own 48%Hiap Seng Engineering from Singapore own 48%
Thai Partners own 52% | Capital injection of 125m THB
Restructure 16 May 2012Hiap Seng Engineering increase shares to 85%
Thai Partners reduce shares to 15%Thai Partners reduce shares to 15%
Capital increase to 175m THB
CHANGE NAME1December 2014CHANGE COMPANY NAME TO HIAP SENG ENGINEERING (THAILAND) CO.,LTD.
![Page 5: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/5.jpg)
Our PhilosophyOur Philosophy
T t i f ti i t th h ffi i t ff tTo strive for continuous improvement through efficient effort and business processes to meet client requirements
with safety, quality and schedule as key drivers.
![Page 6: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/6.jpg)
Key DirectorsKey DirectorsThe Directors at Hiap Seng Engineering (Thailand) Co.,Ltd.
Richard TanManaging Director
Mak Chew MingExecutive Director
Tan Hak JinFinance Director
Song TanDirector
Surat Kham-ngernSafety Quality Environment Director
![Page 7: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/7.jpg)
ORGANIZATIONAL Chart
M iManaging Director
Richard Tan
Finance Director
Executive DirectorM k C M
DirectorTan Hak Jin
FinanceChatchai W.
Mak C.M.
SQSQE DirectorSurat Kham-
ngern
Factory Manager
Natthanat J.
LogisticHSE QA/QCProduction Tendering Engineering PurchasingHR
![Page 8: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/8.jpg)
Factory Map & FacilitiesFactory Map & FacilitiesOur Interactive and Informative Map
![Page 9: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/9.jpg)
Interactive Factory Map**Please double click on the area you would like to view
![Page 10: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/10.jpg)
CORPORATE OFFICE:
AREA: 400m2 over two levelsAREA: 400m2 over two levels.
OCCUPANTS: The purchasing, tendering, engineering, accounting, and management teams.
MAP EXIT
![Page 11: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/11.jpg)
WORKSHOP 1:
AREA: 7 200m2AREA: 7,200m2.
DESCRIPTION: Consisting of three bays each 20m x 120m.
EQUIPMENT: 4 x gantry cranes SWL 7.5 tonnes, 6 x gantry cranes SWL 5 tonnesgantry cranes SWL 5 tonnes, 20 x gantry cranes SWL, 1 tonne, 1 x profile pipe cutter, and 70 x welding machines.
MAP EXIT
![Page 12: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/12.jpg)
WORKSHOP 2:
AREA: 7 200m2AREA: 7,200m2.
DESCRIPTION: Consisting of three bays each 20m x 120m.
EQUIPMENT: 2 x gantry cranes SWL 10 tonnes, 4 x gantry cranes SWL 7 5gantry cranes SWL 7.5 tonnes, and 70 x welding machines.
MAP EXIT
![Page 13: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/13.jpg)
WORKSHOP 3:
AREA: 4 535m2AREA: 4,535m2.
DESCRIPTION: Consisting of three bays with a current configuration of one bay being used for an automatic cutting line, one bay being used for a built-up beam line and one baybuilt up beam line, and one bay being used for pro-arc cutting and fabrication.
EQUIPMENT: 12 x gantry cranes SWL 5 tonnes, 2 x high-speed band saws, 1 x CNC punch machine 1 x CNCpunch machine, 1 x CNC drilling machine, 1 x robot coupling cutting machine, 1 x CNC plate pro-arc cutting
hi 1 imachine, 1 x gas cutting machine, and 30 x welding machines.
MAP EXIT
![Page 14: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/14.jpg)
WORKSHOP 4:
AREA: 1 500m2AREA: 1,500m2.
DESCRIPTION: This workshop is used for the fabrication of small components.
EQUIPMENT: 2 x gantry cranes SWL 5 tonnes and 4 xcranes SWL 5 tonnes and 4 x gantry cranes SWL 3 tonnes.
MAP EXIT
![Page 15: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/15.jpg)
LAYDOWN AREA 1:
AREA: 3 850m2AREA: 3,850m2.
EQUIPMENT: 1 x gantry crane SWL 10 tonnes and 1 x gantry crane SWL 5 tonnes.
MAP EXIT
![Page 16: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/16.jpg)
LAYDOWN AREA 2:
AREA: 1 500m2AREA: 1,500m2.
MAP EXIT
![Page 17: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/17.jpg)
LAYDOWN AREA 3:
AREA: 7 973m2AREA: 7,973m2.
MAP EXIT
![Page 18: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/18.jpg)
LAYDOWN AREA 4 / PAINTING AREA:
AREA: 14,136m2.
DESCRIPTION: A dedicated painting area with a permanent paint shop together with 5 x movable paint sheds and a laydown area for paintedlaydown area for painted products.
MAP EXIT
![Page 19: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/19.jpg)
LAYDOWN AREA 5:
AREA: 12 160 m2AREA: 12,160 m2
DESCRIPTION: A general purpose laydown area that can be used as an extension to the painting yard, for storage of raw materials, or as a pre-assembly areaassembly area.
MAP EXIT
![Page 20: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/20.jpg)
BLASTING CHAMBER AREA:
AREA: 1 200m2AREA: 1,200m2.
EQUIPMENT: 2 x gantry cranes SWL 5 tonnes.
MAP EXIT
![Page 21: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/21.jpg)
BEAM LINE BLASTING AREA:
AREA: 1,200m2.
EQUIPMENT: 2 x gantry cranes SWL 5 tonnes.
MAP EXIT
![Page 22: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/22.jpg)
WELDER QUALIFICATION TEST AREA:
AREA: 500m2.
DESCRIPTION: A dedicated area where our welders are tested and qualified for each project.
EQUIPMENT: 1 x gantry crane SWL 2.5 tonnes.
MAP EXIT
![Page 23: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/23.jpg)
PRODUCTION OFFICE:
AREA: 720m2AREA: 720m2.
OCCUPANTS: The production, Human Resources, Safety, Logistics, and Quality Control teams.
MAP EXIT
![Page 24: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/24.jpg)
CANTEEN BUILDING & CLIENT OFFICES:
AREA: 960m2.
OCCUPANTS: Canteen facilities and spare offices for client use.
MAP EXIT
![Page 25: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/25.jpg)
WAREHOUSE:
AREA: 1 536m2AREA: 1,536m2.
EQUIPMENT: 2 x gantry cranes SWL 2.5 tonnes.
MAP EXIT
![Page 26: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/26.jpg)
Our ServicesOur ServicesThe Range of Services Available
![Page 27: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/27.jpg)
Services PipingServices Piping
Hiap Seng - Thailand has a large and experienced labour force qualified to undertake all kinds of labour force qualified to undertake all kinds of welding to carbon steel, stainless steel, and alloy pipe systems.
We employ all available management tools including QR di t l titi QR coding to process large quantities of components. We have produced up to 90,000 weld diameter inches per month in previous projects weld diameter inches per month in previous projects including export packing into 40’ sea containers for shipping from the nearby Laem ChabangInternational Port.
![Page 28: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/28.jpg)
Services PipingServices Piping
![Page 29: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/29.jpg)
Services PlateServices Plate
Hiap Seng - Thailand’s versatility means that our plate work products range from bodies for tipperplate work products range from bodies for tipper trucks to pressure rated process and utility equipment.q p
![Page 30: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/30.jpg)
Services PlateServices Plate
![Page 31: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/31.jpg)
Services StructureServices Structure
Hiap Seng - Thailand’s large workshops and laydown areas together with our extensive array oflaydown areas together with our extensive array of automatic profile cutting and other machines makes us one of the premier structural steel fabrications in pthe region.
![Page 32: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/32.jpg)
Services StructureServices Structure
![Page 33: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/33.jpg)
Services PaintingServices Painting
Hiap Seng - Thailand has extensive blasting and painting facilities Our auto-blasting chamber canpainting facilities. Our auto-blasting chamber can accommodate sizes up to 30m x 7m and many of our painting sheds are rail mounted to provide p g poptimum versatility.
![Page 34: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/34.jpg)
Services PaintingServices Painting
![Page 35: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/35.jpg)
Case StudiesCase StudiesFour Major Case Studies Revealed
![Page 36: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/36.jpg)
Project Case Studies
Tokuyama Malaysia Piping Fabrication for Chiyoda Sarawak
Steel Structure Fabrication and Modularisation for CUEL Limited
Steel Structure Fabrication of Access Jetty &Wharf for John Holland
Power Diverter Fabrication for NEM Power-Systems
![Page 37: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/37.jpg)
Case Study 1Steel Structure Fabrication and Modularisation for CUEL LimitedSteel Structure Fabrication and Modularisation for CUEL Limited
Project DetailsProject DetailsScope:Fabrication of Steel StructuresPre-Assembly of Modules
Output:Output:1,000 Tonnes per month
EXIT
![Page 38: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/38.jpg)
Case Study 1Steel Structure Fabrication and Modularisation for CUEL LimitedSteel Structure Fabrication and Modularisation for CUEL Limited
Project DetailsProject DetailsScope:Fabrication of Steel StructuresPre-Assembly of Modules
Output:Output:1,000 Tonnes per month
EXIT
![Page 39: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/39.jpg)
Case Study 1Steel Structure Fabrication and Modularisation for CUEL LimitedSteel Structure Fabrication and Modularisation for CUEL Limited
Project DetailsProject DetailsScope:Fabrication of Steel StructuresPre-Assembly of Modules
Output:Output:1,000 Tonnes per month
EXIT
![Page 40: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/40.jpg)
Case Study 1Steel Structure Fabrication and Modularisation for CUEL LimitedSteel Structure Fabrication and Modularisation for CUEL Limited
Project DetailsProject DetailsScope:Fabrication of Steel StructuresPre-Assembly of Modules
Output:Output:1,000 Tonnes per month
EXIT
![Page 41: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/41.jpg)
Case Study 1Steel Structure Fabrication and Modularisation for CUEL LimitedSteel Structure Fabrication and Modularisation for CUEL Limited
Project DetailsProject DetailsScope:Fabrication of Steel StructuresPre-Assembly of Modules
Output:Output:1,000 Tonnes per month
EXIT
![Page 42: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/42.jpg)
Case Study 1Steel Structure Fabrication and Modularisation for CUEL LimitedSteel Structure Fabrication and Modularisation for CUEL Limited
Project DetailsProject DetailsScope:Fabrication of Steel StructuresPre-Assembly of Modules
Output:Output:1,000 Tonnes per month
EXIT
![Page 43: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/43.jpg)
Case Study 1Steel Structure Fabrication and Modularisation for CUEL LimitedSteel Structure Fabrication and Modularisation for CUEL Limited
Project DetailsProject DetailsScope:Fabrication of Steel StructuresPre-Assembly of Modules
Output:Output:1,000 Tonnes per month
EXIT
![Page 44: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/44.jpg)
Case Study 1Steel Structure Fabrication and Modularisation for CUEL LimitedSteel Structure Fabrication and Modularisation for CUEL Limited
Project DetailsProject DetailsScope:Fabrication of Steel StructuresPre-Assembly of Modules
Output:Output:1,000 Tonnes per month
EXIT
![Page 45: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/45.jpg)
Case Study 1Steel Structure Fabrication and Modularisation for CUEL LimitedSteel Structure Fabrication and Modularisation for CUEL Limited
Project DetailsProject DetailsScope:Fabrication of Steel StructuresPre-Assembly of Modules
Output:Output:1,000 Tonnes per month
EXIT
![Page 46: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/46.jpg)
Case Study 1Steel Structure Fabrication and Modularisation for CUEL LimitedSteel Structure Fabrication and Modularisation for CUEL Limited
Project DetailsProject DetailsScope:Fabrication of Steel StructuresPre-Assembly of Modules
Output:Output:1,000 Tonnes per month
EXIT
![Page 47: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/47.jpg)
Case Study 1Steel Structure Fabrication and Modularisation for CUEL LimitedSteel Structure Fabrication and Modularisation for CUEL Limited
Project DetailsProject DetailsScope:Fabrication of Steel StructuresPre-Assembly of Modules
Output:Output:1,000 Tonnes per month
EXIT
![Page 48: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/48.jpg)
Case Study 1Steel Structure Fabrication and Modularisation for CUEL LimitedSteel Structure Fabrication and Modularisation for CUEL Limited
Project DetailsProject DetailsScope:Fabrication of Steel StructuresPre-Assembly of Modules
Output:Output:1,000 Tonnes per month
EXIT
![Page 49: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/49.jpg)
Case Study 2Tokuyama Malaysia Piping Fabrication for Chiyoda Sarawak Sdn BhdTokuyama Malaysia Piping Fabrication for Chiyoda Sarawak Sdn. Bhd.
Project DetailsProject DetailsFeature 1:Administration of the importation of raw material and re-exportation of fabrication pipe spools in accordance with the Thailand Boardaccordance with the Thailand Board of Investment rules allowing exemption from export tax
Feature 2:The use of a QR Code (‘barcode’)The use of a QR Code ( barcode ) labeling system to administer the fabrication, testing, packing, shipment, warehousing, and installation (by others) of the pipe spools.
Scope:Receiving of free issued materials, fabrication, testing, grit blasting, painting, export packing, and shipping.
Output:60,000 weld diameter inches per month.
EXIT
![Page 50: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/50.jpg)
Case Study 2Tokuyama Malaysia Piping Fabrication for Chiyoda Sarawak Sdn BhdTokuyama Malaysia Piping Fabrication for Chiyoda Sarawak Sdn. Bhd.
Project DetailsProject DetailsFeature 1:Administration of the importation of raw material and re-exportation of fabrication pipe spools in accordance with the Thailand Boardaccordance with the Thailand Board of Investment rules allowing exemption from export tax
Feature 2:The use of a QR Code (‘barcode’)The use of a QR Code ( barcode ) labeling system to administer the fabrication, testing, packing, shipment, warehousing, and installation (by others) of the pipe spools.
Scope:Receiving of free issued materials, fabrication, testing, grit blasting, painting, export packing, and shipping.
Output:60,000 weld diameter inches per month.
EXIT
![Page 51: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/51.jpg)
Case Study 2Tokuyama Malaysia Piping Fabrication for Chiyoda Sarawak Sdn BhdTokuyama Malaysia Piping Fabrication for Chiyoda Sarawak Sdn. Bhd.
Project DetailsProject DetailsFeature 1:Administration of the importation of raw material and re-exportation of fabrication pipe spools in accordance with the Thailand Boardaccordance with the Thailand Board of Investment rules allowing exemption from export tax
Feature 2:The use of a QR Code (‘barcode’)The use of a QR Code ( barcode ) labeling system to administer the fabrication, testing, packing, shipment, warehousing, and installation (by others) of the pipe spools.
Scope:Receiving of free issued materials, fabrication, testing, grit blasting, painting, export packing, and shipping.
Output:60,000 weld diameter inches per month.
EXIT
![Page 52: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/52.jpg)
Case Study 2Tokuyama Malaysia Piping Fabrication for Chiyoda Sarawak Sdn BhdTokuyama Malaysia Piping Fabrication for Chiyoda Sarawak Sdn. Bhd.
Project DetailsProject DetailsFeature 1:Administration of the importation of raw material and re-exportation of fabrication pipe spools in accordance with the Thailand Boardaccordance with the Thailand Board of Investment rules allowing exemption from export tax
Feature 2:The use of a QR Code (‘barcode’)The use of a QR Code ( barcode ) labeling system to administer the fabrication, testing, packing, shipment, warehousing, and installation (by others) of the pipe spools.
Scope:Receiving of free issued materials, fabrication, testing, grit blasting, painting, export packing, and shipping.
Output:60,000 weld diameter inches per month.
EXIT
![Page 53: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/53.jpg)
Case Study 2Tokuyama Malaysia Piping Fabrication for Chiyoda Sarawak Sdn BhdTokuyama Malaysia Piping Fabrication for Chiyoda Sarawak Sdn. Bhd.
Project DetailsProject DetailsFeature 1:Administration of the importation of raw material and re-exportation of fabrication pipe spools in accordance with the Thailand Boardaccordance with the Thailand Board of Investment rules allowing exemption from export tax
Feature 2:The use of a QR Code (‘barcode’)The use of a QR Code ( barcode ) labeling system to administer the fabrication, testing, packing, shipment, warehousing, and installation (by others) of the pipe spools.
Scope:Receiving of free issued materials, fabrication, testing, grit blasting, painting, export packing, and shipping.
Output:60,000 weld diameter inches per month.
EXIT
![Page 54: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/54.jpg)
Case Study 2Tokuyama Malaysia Piping Fabrication for Chiyoda Sarawak Sdn BhdTokuyama Malaysia Piping Fabrication for Chiyoda Sarawak Sdn. Bhd.
Project DetailsProject DetailsFeature 1:Administration of the importation of raw material and re-exportation of fabrication pipe spools in accordance with the Thailand Boardaccordance with the Thailand Board of Investment rules allowing exemption from export tax
Feature 2:The use of a QR Code (‘barcode’)The use of a QR Code ( barcode ) labeling system to administer the fabrication, testing, packing, shipment, warehousing, and installation (by others) of the pipe spools.
Scope:Receiving of free issued materials, fabrication, testing, grit blasting, painting, export packing, and shipping.
Output:60,000 weld diameter inches per month.
EXIT
![Page 55: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/55.jpg)
Case Study 2Tokuyama Malaysia Piping Fabrication for Chiyoda Sarawak Sdn BhdTokuyama Malaysia Piping Fabrication for Chiyoda Sarawak Sdn. Bhd.
Project DetailsProject DetailsFeature 1:Administration of the importation of raw material and re-exportation of fabrication pipe spools in accordance with the Thailand Boardaccordance with the Thailand Board of Investment rules allowing exemption from export tax
Feature 2:The use of a QR Code (‘barcode’)The use of a QR Code ( barcode ) labeling system to administer the fabrication, testing, packing, shipment, warehousing, and installation (by others) of the pipe spools.
Scope:Receiving of free issued materials, fabrication, testing, grit blasting, painting, export packing, and shipping.
Output:60,000 weld diameter inches per month.
EXIT
![Page 56: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/56.jpg)
Case Study 2Tokuyama Malaysia Piping Fabrication for Chiyoda Sarawak Sdn BhdTokuyama Malaysia Piping Fabrication for Chiyoda Sarawak Sdn. Bhd.
Project DetailsProject DetailsFeature 1:Administration of the importation of raw material and re-exportation of fabrication pipe spools in accordance with the Thailand Boardaccordance with the Thailand Board of Investment rules allowing exemption from export tax
Feature 2:The use of a QR Code (‘barcode’)The use of a QR Code ( barcode ) labeling system to administer the fabrication, testing, packing, shipment, warehousing, and installation (by others) of the pipe spools.
Scope:Receiving of free issued materials, fabrication, testing, grit blasting, painting, export packing, and shipping.
Output:60,000 weld diameter inches per month.
EXIT
![Page 57: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/57.jpg)
Case Study 2Tokuyama Malaysia Piping Fabrication for Chiyoda Sarawak Sdn BhdTokuyama Malaysia Piping Fabrication for Chiyoda Sarawak Sdn. Bhd.
Project DetailsProject DetailsFeature 1:Administration of the importation of raw material and re-exportation of fabrication pipe spools in accordance with the Thailand Boardaccordance with the Thailand Board of Investment rules allowing exemption from export tax
Feature 2:The use of a QR Code (‘barcode’)The use of a QR Code ( barcode ) labeling system to administer the fabrication, testing, packing, shipment, warehousing, and installation (by others) of the pipe spools.
Scope:Receiving of free issued materials, fabrication, testing, grit blasting, painting, export packing, and shipping.
Output:60,000 weld diameter inches per month.
EXIT
![Page 58: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/58.jpg)
Case Study 2Tokuyama Malaysia Piping Fabrication for Chiyoda Sarawak Sdn BhdTokuyama Malaysia Piping Fabrication for Chiyoda Sarawak Sdn. Bhd.
Project DetailsProject DetailsFeature 1:Administration of the importation of raw material and re-exportation of fabrication pipe spools in accordance with the Thailand Boardaccordance with the Thailand Board of Investment rules allowing exemption from export tax
Feature 2:The use of a QR Code (‘barcode’)The use of a QR Code ( barcode ) labeling system to administer the fabrication, testing, packing, shipment, warehousing, and installation (by others) of the pipe spools.
Scope:Receiving of free issued materials, fabrication, testing, grit blasting, painting, export packing, and shipping.
Output:60,000 weld diameter inches per month.
EXIT
![Page 59: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/59.jpg)
Case Study 2Tokuyama Malaysia Piping Fabrication for Chiyoda Sarawak Sdn BhdTokuyama Malaysia Piping Fabrication for Chiyoda Sarawak Sdn. Bhd.
Project DetailsProject DetailsFeature 1:Administration of the importation of raw material and re-exportation of fabrication pipe spools in accordance with the Thailand Boardaccordance with the Thailand Board of Investment rules allowing exemption from export tax
Feature 2:The use of a QR Code (‘barcode’)The use of a QR Code ( barcode ) labeling system to administer the fabrication, testing, packing, shipment, warehousing, and installation (by others) of the pipe spools.
Scope:Receiving of free issued materials, fabrication, testing, grit blasting, painting, export packing, and shipping.
Output:60,000 weld diameter inches per month.
EXIT
![Page 60: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/60.jpg)
Case Study 2Tokuyama Malaysia Piping Fabrication for Chiyoda Sarawak Sdn BhdTokuyama Malaysia Piping Fabrication for Chiyoda Sarawak Sdn. Bhd.
Project DetailsProject DetailsFeature 1:Administration of the importation of raw material and re-exportation of fabrication pipe spools in accordance with the Thailand Boardaccordance with the Thailand Board of Investment rules allowing exemption from export tax
Feature 2:The use of a QR Code (‘barcode’)The use of a QR Code ( barcode ) labeling system to administer the fabrication, testing, packing, shipment, warehousing, and installation (by others) of the pipe spools.
Scope:Receiving of free issued materials, fabrication, testing, grit blasting, painting, export packing, and shipping.
Output:60,000 weld diameter inches per month.
EXIT
![Page 61: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/61.jpg)
Case Study 3Steel Structure Fabrication of Access Jetty & Wharf for John HollandSteel Structure Fabrication of Access Jetty & Wharf for John Holland
Project DetailsProject DetailsScope:•Material Supply•Fabrication of Steel Structures•Pre-Assembly of Structures•Blasting and PaintingBlasting and Painting•Export Packing
Output:•1,800 Tonnes per month
EXIT
![Page 62: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/62.jpg)
Case Study 3Steel Structure Fabrication of Access Jetty & Wharf for John HollandSteel Structure Fabrication of Access Jetty & Wharf for John Holland
Project DetailsProject DetailsScope:•Material Supply•Fabrication of Steel Structures•Pre-Assembly of Structures•Blasting and PaintingBlasting and Painting•Export Packing
Output:•1,800 Tonnes per month
EXIT
![Page 63: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/63.jpg)
Case Study 3Steel Structure Fabrication of Access Jetty & Wharf for John HollandSteel Structure Fabrication of Access Jetty & Wharf for John Holland
Project DetailsProject DetailsScope:•Material Supply•Fabrication of Steel Structures•Pre-Assembly of Structures•Blasting and PaintingBlasting and Painting•Export Packing
Output:•1,800 Tonnes per month
EXIT
![Page 64: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/64.jpg)
Case Study 3Steel Structure Fabrication of Access Jetty & Wharf for John HollandSteel Structure Fabrication of Access Jetty & Wharf for John Holland
Project DetailsProject DetailsScope:•Material Supply•Fabrication of Steel Structures•Pre-Assembly of Structures•Blasting and PaintingBlasting and Painting•Export Packing
Output:•1,800 Tonnes per month
EXIT
![Page 65: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/65.jpg)
Case Study 3Steel Structure Fabrication of Access Jetty & Wharf for John HollandSteel Structure Fabrication of Access Jetty & Wharf for John Holland
Project DetailsProject DetailsScope:•Material Supply•Fabrication of Steel Structures•Pre-Assembly of Structures•Blasting and PaintingBlasting and Painting•Export Packing
Output:•1,800 Tonnes per month
EXIT
![Page 66: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/66.jpg)
Case Study 3Steel Structure Fabrication of Access Jetty & Wharf for John HollandSteel Structure Fabrication of Access Jetty & Wharf for John Holland
Project DetailsProject DetailsScope:•Material Supply•Fabrication of Steel Structures•Pre-Assembly of Structures•Blasting and PaintingBlasting and Painting•Export Packing
Output:•1,800 Tonnes per month
EXIT
![Page 67: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/67.jpg)
Case Study 3Steel Structure Fabrication of Access Jetty & Wharf for John HollandSteel Structure Fabrication of Access Jetty & Wharf for John Holland
Project DetailsProject DetailsScope:•Material Supply•Fabrication of Steel Structures•Pre-Assembly of Structures•Blasting and PaintingBlasting and Painting•Export Packing
Output:•1,800 Tonnes per month
EXIT
![Page 68: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/68.jpg)
Case Study 3Steel Structure Fabrication of Access Jetty & Wharf for John HollandSteel Structure Fabrication of Access Jetty & Wharf for John Holland
Project DetailsProject DetailsScope:•Material Supply•Fabrication of Steel Structures•Pre-Assembly of Structures•Blasting and PaintingBlasting and Painting•Export Packing
Output:•1,800 Tonnes per month
EXIT
![Page 69: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/69.jpg)
Case Study 3Steel Structure Fabrication of Access Jetty & Wharf for John HollandSteel Structure Fabrication of Access Jetty & Wharf for John Holland
Project DetailsProject DetailsScope:•Material Supply•Fabrication of Steel Structures•Pre-Assembly of Structures•Blasting and PaintingBlasting and Painting•Export Packing
Output:•1,800 Tonnes per month
EXIT
![Page 70: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/70.jpg)
Case Study 3Steel Structure Fabrication of Access Jetty & Wharf for John HollandSteel Structure Fabrication of Access Jetty & Wharf for John Holland
Project DetailsProject DetailsScope:•Material Supply•Fabrication of Steel Structures•Pre-Assembly of Structures•Blasting and PaintingBlasting and Painting•Export Packing
Output:•1,800 Tonnes per month
EXIT
![Page 71: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/71.jpg)
Case Study 3Steel Structure Fabrication of Access Jetty & Wharf for John HollandSteel Structure Fabrication of Access Jetty & Wharf for John Holland
Project DetailsProject DetailsScope:•Material Supply•Fabrication of Steel Structures•Pre-Assembly of Structures•Blasting and PaintingBlasting and Painting•Export Packing
Output:•1,800 Tonnes per month
EXIT
![Page 72: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/72.jpg)
Case Study 3Steel Structure Fabrication of Access Jetty & Wharf for John HollandSteel Structure Fabrication of Access Jetty & Wharf for John Holland
Project DetailsProject DetailsScope:•Material Supply•Fabrication of Steel Structures•Pre-Assembly of Structures•Blasting and PaintingBlasting and Painting•Export Packing
Output:•1,800 Tonnes per month
EXIT
![Page 73: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/73.jpg)
Case Study 4Power Diverter Fabrication for NEM Power SystemsPower Diverter Fabrication for NEM Power-Systems
Project DetailsProject DetailsScope:•Material Supply•Fabrication of Casings/ Blades/ Seal Air Ducts/ Shafts and Toggle Arms/ Cladding PlateArms/ Cladding Plate•Assembly of Diverters•Blasting and Painting•Functional Testing•Export Packing and Shipping
Output:•One Diverter Every 6 weeks•400 Tonnes per month
EXIT
![Page 74: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/74.jpg)
Case Study 4Power Diverter Fabrication for NEM Power SystemsPower Diverter Fabrication for NEM Power-Systems
Project DetailsProject DetailsScope:•Material Supply•Fabrication of Casings/ Blades/ Seal Air Ducts/ Shafts and Toggle Arms/ Cladding PlateArms/ Cladding Plate•Assembly of Diverters•Blasting and Painting•Functional Testing•Export Packing and Shipping
Output:•One Diverter Every 6 weeks•400 Tonnes per month
EXIT
![Page 75: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/75.jpg)
Case Study 4Power Diverter Fabrication for NEM Power SystemsPower Diverter Fabrication for NEM Power-Systems
Project DetailsProject DetailsScope:•Material Supply•Fabrication of Casings/ Blades/ Seal Air Ducts/ Shafts and Toggle Arms/ Cladding PlateArms/ Cladding Plate•Assembly of Diverters•Blasting and Painting•Functional Testing•Export Packing and Shipping
Output:•One Diverter Every 6 weeks•400 Tonnes per month
EXIT
![Page 76: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/76.jpg)
Case Study 4Power Diverter Fabrication for NEM Power SystemsPower Diverter Fabrication for NEM Power-Systems
Project DetailsProject DetailsScope:•Material Supply•Fabrication of Casings/ Blades/ Seal Air Ducts/ Shafts and Toggle Arms/ Cladding PlateArms/ Cladding Plate•Assembly of Diverters•Blasting and Painting•Functional Testing•Export Packing and Shipping
Output:•One Diverter Every 6 weeks•400 Tonnes per month
EXIT
![Page 77: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/77.jpg)
Case Study 4Power Diverter Fabrication for NEM Power SystemsPower Diverter Fabrication for NEM Power-Systems
Project DetailsProject DetailsScope:•Material Supply•Fabrication of Casings/ Blades/ Seal Air Ducts/ Shafts and Toggle Arms/ Cladding PlateArms/ Cladding Plate•Assembly of Diverters•Blasting and Painting•Functional Testing•Export Packing and Shipping
Output:•One Diverter Every 6 weeks•400 Tonnes per month
EXIT
![Page 78: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/78.jpg)
Case Study 4Power Diverter Fabrication for NEM Power SystemsPower Diverter Fabrication for NEM Power-Systems
Project DetailsProject DetailsScope:•Material Supply•Fabrication of Casings/ Blades/ Seal Air Ducts/ Shafts and Toggle Arms/ Cladding PlateArms/ Cladding Plate•Assembly of Diverters•Blasting and Painting•Functional Testing•Export Packing and Shipping
Output:•One Diverter Every 6 weeks•400 Tonnes per month
EXIT
![Page 79: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/79.jpg)
Case Study 4Power Diverter Fabrication for NEM Power SystemsPower Diverter Fabrication for NEM Power-Systems
Project DetailsProject DetailsScope:•Material Supply•Fabrication of Casings/ Blades/ Seal Air Ducts/ Shafts and Toggle Arms/ Cladding PlateArms/ Cladding Plate•Assembly of Diverters•Blasting and Painting•Functional Testing•Export Packing and Shipping
Output:•One Diverter Every 6 weeks•400 Tonnes per month
EXIT
![Page 80: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/80.jpg)
Case Study 4Power Diverter Fabrication for NEM Power SystemsPower Diverter Fabrication for NEM Power-Systems
Project DetailsProject DetailsScope:•Material Supply•Fabrication of Casings/ Blades/ Seal Air Ducts/ Shafts and Toggle Arms/ Cladding PlateArms/ Cladding Plate•Assembly of Diverters•Blasting and Painting•Functional Testing•Export Packing and Shipping
Output:•One Diverter Every 6 weeks•400 Tonnes per month
EXIT
![Page 81: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/81.jpg)
Case Study 4Power Diverter Fabrication for NEM Power SystemsPower Diverter Fabrication for NEM Power-Systems
Project DetailsProject DetailsScope:•Material Supply•Fabrication of Casings/ Blades/ Seal Air Ducts/ Shafts and Toggle Arms/ Cladding PlateArms/ Cladding Plate•Assembly of Diverters•Blasting and Painting•Functional Testing•Export Packing and Shipping
Output:•One Diverter Every 6 weeks•400 Tonnes per month
EXIT
![Page 82: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/82.jpg)
Case Study 4Power Diverter Fabrication for NEM Power SystemsPower Diverter Fabrication for NEM Power-Systems
Project DetailsProject DetailsScope:•Material Supply•Fabrication of Casings/ Blades/ Seal Air Ducts/ Shafts and Toggle Arms/ Cladding PlateArms/ Cladding Plate•Assembly of Diverters•Blasting and Painting•Functional Testing•Export Packing and Shipping
Output:•One Diverter Every 6 weeks•400 Tonnes per month
EXIT
![Page 83: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/83.jpg)
Case Study 4Power Diverter Fabrication for NEM Power SystemsPower Diverter Fabrication for NEM Power-Systems
Project DetailsProject DetailsScope:•Material Supply•Fabrication of Casings/ Blades/ Seal Air Ducts/ Shafts and Toggle Arms/ Cladding PlateArms/ Cladding Plate•Assembly of Diverters•Blasting and Painting•Functional Testing•Export Packing and Shipping
Output:•One Diverter Every 6 weeks•400 Tonnes per month
EXIT
![Page 84: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/84.jpg)
Case Study 4Power Diverter Fabrication for NEM Power SystemsPower Diverter Fabrication for NEM Power-Systems
Project DetailsProject DetailsScope:•Material Supply•Fabrication of Casings/ Blades/ Seal Air Ducts/ Shafts and Toggle Arms/ Cladding PlateArms/ Cladding Plate•Assembly of Diverters•Blasting and Painting•Functional Testing•Export Packing and Shipping
Output:•One Diverter Every 6 weeks•400 Tonnes per month
EXIT
![Page 85: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/85.jpg)
Our RevenueOur RevenueSubstantial and Continual Growth
![Page 86: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/86.jpg)
Turnover history
552m508m345m
332m445m
332m
2008508
2009332
2010345
2011445
2012332
2013508m 332m 345m 445m 332m 552m
Revenue since 2008 2,500m THB
![Page 87: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/87.jpg)
Sales DistributionSales DistributionInternational & National Performance
![Page 88: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/88.jpg)
Sales Distribution
25% Average overseas sales for the past 5 years25%
85% Overseas sales Increase since 201285% Overseas sales Increase since 2012
![Page 89: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/89.jpg)
Our WorkforceOur WorkforceThe Cornerstone to our Success
![Page 90: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/90.jpg)
Overall Workforce
Direct Workforce 1000+ Office Staff 100+
250+ Indirect Supervision
1 76 Office1
200+ Welders2 35 QC2
480+ Other Trade
3 20 Safety3
90% 10%
![Page 91: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/91.jpg)
Special MachinerySpecial MachineryCutting-Edge Hardware
![Page 92: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/92.jpg)
Machinery That Delivers results
1 Daito CNC Coping Robot1
2
p g
Automatic H-Beam Drilling Machine2 Automatic H-Beam Drilling Machine
H B B d S P i Li3 H-Beam Band Saw Processing Line
4 Built Up Beam Fabrication Line
5 Plasma Plate Cutting Machine
6 Pipe Coaster Profile Cutting Machine
![Page 93: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/93.jpg)
Our ClientsOur ClientsDelivering Beyond Expectations
![Page 94: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/94.jpg)
Our Clients
Client Name
Theiss
John Holland
Country
Australia
Australia
Nature of Work
Module Structure / Piping
False works - Cape LambertJohn Holland
United Group
Nems Power Systems
Chiyoda
Australia
Germany
Japan
False works Cape Lambert
Piping
Diverter / Damper / Plate Work
PipingChiyoda
JGC Corporation
Samsung Engineering
GS Engineering & Construction
Japan
Japan
Korea
Korea
Piping
Diverter / Damper / Plate Work
Structure
StructureGS Engineering & Construction
CTCI
CUEL
UOP LLC
Korea
Taiwan
Thailand
USA
Structure
Structure / Piping
Structure / Piping
Module Structure / Piping
Experience working with global and regional clients
UOP LLC USA Module Structure / Piping
![Page 95: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/95.jpg)
Safety recordSafety recordOutstanding Statistics
![Page 96: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/96.jpg)
Past 5 years accumulated Man hours 8.1m
LTI 0LTI = 0
![Page 97: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/97.jpg)
Our CertificatesOur CertificatesStandards, Certificates & Awards
![Page 98: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/98.jpg)
Our CertificatesThe company achieved ISO 9001 Registered certification in 2008. The company
holds Thailand Board of Investment Certification and is registered with the Department of Foreign Trade.
![Page 99: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/99.jpg)
Our LocationOur LocationOnly 15km from Laem Chabang International Port
![Page 100: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/100.jpg)
Our LocationOur LocationWe are located 15km from Laem Chabang International Port
allowing easy export of fabricated metals
![Page 101: Company Profile - 15 Dec 2014](https://reader031.fdocuments.in/reader031/viewer/2022022817/588135d11a28ab00438b7971/html5/thumbnails/101.jpg)
THANK YOUTHANK YOUPresentationPresentation
Concluded