Company Overview
Basrah Eurolane Company (BECO) was established in Basrah, Iraq in 2003 and is the Engineering ,Procurement and
Construction (EPC) Contracting division of Mesopotamia Group of Companies with head office in Basrah and branch offices
in Baghdad, London and Dubai .
BECO is an ISO 9001:2015 (Quality Management System), ISO 14001:2015 (Environmental Management System) and an
OHSAS 18001:2007 (Occupational Health and Safety) certified organization.
BECO delivers client satisfaction on the strength of a first-class construction arm of Mesopotamia Group. We value our
professional staff, quality of work, exceptional work safety record, good reputation and high environmental standards.
With over a decade of experience in the region, our continued expansion and fast growth is attributed to our high standards
in the delivery of our work and good reputation built up over the years with effective allocation of resources via our high
profile companies, partners and clients including Shell, British Petroleum (BP), Eni, Ministry of Oil, NGOs including United
Nations UNDP, CPA, NCA and various Governmental institutions.
Vision
• To be a world class construction contractor, offering performance without compromise to services.
• To continue to serve Iraq in execution of their respective missions and contribute towards building a Prosperous future for
Iraq and its people.
Mission
• To satisfy the expectations of our shareholders, customers, employees and the world society.
• To assist and continue to build strong working partnerships with NGOs, we are particularly proud of our charitable arm of
Mesopotamia Group comprising of Iraq University College, Mesopotamian Cultural Association and Basrah Society for
Social & Civic Development.
• To continue to benefit and utilize the Group’s training and education arm via the University of Iraq College, its Consultancy
Bureau and ‘Engineering & Management Service Centers' and to build strong links with other academic institutions for the
creation of highly professional strategic studies and expertise.
• To continue to strengthen our competitiveness by continuously improving our cost effectiveness.
• To continue to adopt a “one big family” business philosophy and a shared sense of purpose.
• To continue to focus our value on trust, dedication and performance.
Achievements We have successfully and consistently achieved the highest quality of work in Commercial, Government and Investment contracts in the following fields: 1. EPC Turnkey Projects 2. Heavy Civil works 3. Water System networks/plants, Sewage & Sanitation 4. Power Generation 5. Infrastructure Projects 6. Mechanical maintenance and provisions
Strategic Alliances & Partnerships
BECO has steadily evolved from a project-specific company in Iraq to a full turnkey service operation provider.
BECO has formed several strategic alliances and partnerships with internationally renowned architectural design,
construction and project management teams based in Ireland, Jordan, Turkey, United Kingdom, UAE, China and USA
giving us a dynamic international network and extensive global experience in often highly demanding and complex projects.
Financial capacity
A statement of overall turnover during the last five (6) financial years in USD$:
2010 $ 89,505,000.00 USD
2011 $ 92,550,000.00 USD
2012 $154,600,000.00 USD
2013 $160,113,000.00 USD
2014 $196,130,000.00 USD
2015 $186,170,000.00 USD
Projects Reference List
Work Period
Value
Number
of workers
Location
Work
Description
Client
Item No.
60 days (June 2005 –
August 2005)
360,700,000.00 Iraqi Dinars
18 Basra Rehabilitating Al Qurna
sewage system General Directorate for Basra Sewerage 1
45 days (Dec 2004 – Feb
2005)
800,000,000.00 Dinars
25 Basra Rehabilitating hay Al Husain+
Al jamiyat sewage system General Directorate for Basra Sewerage 2
95 days (Mar 2005 – June
2005) 2,500,000.00 USD 15 Basra
Rehabilitating Ashar sector sewage system
General Directorate for Basra sewerage 3
280 days (May 2004 –
Feb 2005)
1,750,402,250.00 Iraqi Dinars
35 Basra Installing 7 water distribution
plants Coalition Provisional Authority (CPA) 4
120 days ( Aug 2004 – Dec 2004)
2,850,000,000.00 Iraqi Dinars
60 Basrah Rehabilitating Fao water
system Mott Macdonald + Coalition Provisional
Authority (CPA) 5
5 years construction since 2004
6,300,000,000.00 Iraqi Dinars
58 Basra Supply & Installation of 6 R.O
Plants Basrah water Authority 6
90 days (2005)
1,800,000.00 USD 29 Basra Installing R.O plants CPA 7
180 days (2005)
660,000.00 USD 65 Basra Basrah sewer jetting,
cleaning, repairing for sector 1 &2
CPA 8
90 days (2006)
3,770,033,000.00 Iraqi Dinars
22 Basra EPC Sewage Treatment Plant Basrah Municipality 9
90 days (2005)
183,015.00 USD 21 Basra R.O. Water distribution
through tanking Norwegian Church Aid (NCA) 10
70 days (2007)
192,000.00 USD 12 Basra Al khalij district streets
paving Basra reconstruction Unit 11
60 days (2007)
184,000.00 USD 11 Basra Al Abbas distract streets
paving Basra reconstruction Unit 12
120 days (2007)
284,650.00 USD 34 Basra Inspecting, clearing &
repairing of Area 5 sewer system
FLUOR A Y C 13
180 days (2008)
3,730,705.00 USD 87 Baghdad
Installing diesel generator sets, Electricity Supply, O&M
and Capacity Building at Health Care facility
United Nations Development Program (UNDP) 14
180 days (2008)
3,730,705.00 USD 62 Samara, Iraq
Installing diesel generator sets, Electricity Supply, O&M
and Capacity Building at Health Care facility
United Nations Development Program (UNDP) 15
185 days (2006-2007)
508,216 .00 USD 85 Basra Rehabilitating electrical
distribution network in Um Qaser
UNDP 15
180 days (2007)
800,000.00 USD 63 Basra EPC Housing Al Kefah Co. 16
300 days (2008)
500,000.00 USD 15 Missan EPC School construction Missan Governorate 17
April 2011 – April 2012
11,400,000,000 Iraqi Dinars
92 Basrah
Building and executing underground piping & sewer system for (Hay Al Qaem in
Qibla district) in Basra
Basra Reconstruction Unit 18
March 2010 – Feb 2013
1,670,000,000 Iraqi dinars
50 Basrah Youth and Sport Directorate
Building & Infrastructure Ministry of Youth and sport 19
Jan 2011 – Feb 2012
1,339,500 USD 65 Basrah EPC Police station building -
Asmaee United Nations Development Program (UNDP) 20
Dec 2010 – Feb 2012
1,439,000 USD 71 Basrah EPC Police station building-
Ashar UNDP 21
Mar 2012 – Mar 2014
Call Off 55 Zubair Piping Maintenance Eni Iraq B.V 22
Apr 12 – Apr 14
Call Off 30 Zubair Fire Fighting System Network Eni Iraq B.V 23
Feb 2012 – Dec 2013
2,500,000.00 USD 126 Majnoon Well Pad Construction, Auger
Boring & Piping works Shell Iraq B.V 24
Feb 2012 – Jan 2014
1,083,000.00 USD 68 Majnoon Road Maintenance, Crossing
& HDD works Shell Iraq B.V 25
May 2012 – August 2013
79,310.00 USD 35 Majnoon Building & Sewage
Improvement Works Shell Iraq B.V 26
Sep 2012 – June 2013
1,197,487.00 USD 136 Majnoon, CPF
Erection of 6 Buildings
including piping infrastructure works
Shell Iraq B.V 27
March 2010 – March 2013
5,600,000.00 USD 98 Rumailla Well Pad Construction & Pipe
sleeves British Petroleum (BP Iraq/ROO) 28
June 2006 – April 2008
1,330,000.00 USD 46 Kubbaisa,
Basrah
Design, Construction of 12KM Water Pipeline -
Size 10” Council of the governorate of Basra 29
Jan 2010 - Present
25,000,000.00 USD
212 Basrah
Residential housing units &
Infrastructure including pipeline works
Council of the governorate of Basra 30
April 2011 - `Mar 2013
11,000,000.00 USD
89 Basrah
Reconstruction of town of Al-Jamhoorea including sewer &
water system network underground piping
Council of the governorate of Basra 31
June 2010 – Feb 2012
7,000,000.00 USD 112 Basrah
Olympic Building in Hakimiya region including piping works
for infrastructure Council of the governorate of Basra 32
June 2011 - `Mar 2012
1,000,000.00 USD 45 Basrah Construction of Al-Bader tourism complex Council of the governorate of Basra 33
Sep 2011 - `Jan 2013
580,000,000.00 Iraqi Dinars
62 Basrah Reconstruction of the Shatt
Al Arab College Faculty Council of the governorate of Basra 34
Aug 2013 – Present
3,600,000.00 USD 51 Basrah
Design, Procurement and Construction of 8 km fuel oil pipeline for Khor Al-Zubair
Port
Ministry of Oil 35
Jan 2010 – June 212
164,000,000.00 Iraqi Dinars
32 Basrah
Construction of a two-storey building including
underground utilities & pipeline services
South Oil Company 36
Jul 2011 – Feb 2012
250,000.00 USD 43 Basrah
Repair & Maintenance of
waterworks for Altoesa area
RTI Organization 37
Mar 2013 – Present
7,350,000.00 USD 169 Basrah
Design, Procurement and Construction of University
building including underground utilities &
infrastructure
Iraq University College 83
July 2013 – Present
00,000.05,6 0 USD 85 Basrah
Design, Procurement and Construction of 10 km gas
pipe for Musseib Power Station
Ministry of Electricity 39
December 2014 -
Present
21,650,000.00 USD
121 Basrah
Construction and procurement of 1000
residential housing units in Qibla region, Basrah, Iraq
Ministry of Housing 40
December 2014 -
Present
10,000,000.00
USD 64
Rumailla Oil
Field, Basrah, Iraq
Well Pad Construction BP Iraq/ Rumaila Operating Organisation
(ROO) 14
Examples of Completed Projects
Client: Basra Reconstruction Unit Project Description: Building and executing underground piping & sewer system for (Hay Al Qaem in Qibla district) in Basra Project Value: 11,400,000,000 Iraqi Dinars Completion Date: April 2012
Client : Ministry of Youth and sport
Project Description: Youth and Sport Directorate Building &
complete Infrastructure (EPC)
Project Value: 1,670,000,000 Iraqi dinars
Completion Date: February 2013
Client : British Petroleum / Rumaila Operating Organization (ROO)
Project Description: Well Pad Construction
Project Value: $5,600,000.00 US Dollars
Completion Date: March 2013
Client: Council of Governorate of Basrah Project Description: Complete Reconstruction of town of Al-Jamhoorea i.e Infrastructure including sewer & water system network and underground piping Project Value: $11,000,000.00 US Dollars Completion Date: March 2013
Client: Ministry of Oil Project Description: Design, Procurement and Construction (EPC) of 8 km fuel oil pipeline for Khor Al-Zubair Port Project Value: $3,600,000.00 US Dollars Completion Date: June 2015 (phase 1)
HEADQUARTERS IN IRAQ:
BASRAH:
Basrah –Bradia, Near the Talimi Hospital
Tel: +964 618077
+964 7801077851
+964 7801398527
E-mail: [email protected]
BRANCH OFFICE IN THE UNITED KINGDOM:
UNITED KINGDOM - LONDON:
Wembley – London
Tel: +44 (0) 7957383233
Fax: +44 (0) 2089085288
E-mail: [email protected]