Crenshaw-South Bay Line Community Organizing Meeting Meeting of: Crenshaw Subway Coalition Citizens’ Campaign to Fix the Expo Rail Line Joint Committee of South L.A. Neighborhood Councils on Rail Transit November 23, 2009

Transcript of Community Mtg 091123

Page 1: Community Mtg 091123

8/14/2019 Community Mtg 091123

http://slidepdf.com/reader/full/community-mtg-091123 1/10

Crenshaw-South Bay LineCommunity Organizing

Meeting

Meeting of: Crenshaw Subway Coalition

Citizens’ Campaign to Fix the Expo Rail Line

Joint Committee of South L.A. Neighborhood Councils on Rail Transit

November 23, 2009

Page 2: Community Mtg 091123

8/14/2019 Community Mtg 091123

http://slidepdf.com/reader/full/community-mtg-091123 2/10

Joint Committee on Rail Transit

West Adams Neighborhood CouncilWest Area Neighborhood Development

Council

North Area Neighborhood DevelopmentCouncil

Organized for the purpose of collaborating onrail issues in our community

Page 3: Community Mtg 091123

8/14/2019 Community Mtg 091123

http://slidepdf.com/reader/full/community-mtg-091123 3/10

The Long Term Vision:Hollywood-to-South Bay Line

A high-speed regional railalternative that would have amonopoly on rapid

transportation along thecorridor due to the absence of highway alternative north of 

Inglewood

Providing connections to allfour east-west rail lines

100K/day ridership project

Funded Green Line Extension toSouth Bay Galleria (or beyond)

Metro Pink Line by way of the

Grove/CBS Studios (possibly all LRT or dual mode HRT & LRT)

Page 4: Community Mtg 091123

8/14/2019 Community Mtg 091123

http://slidepdf.com/reader/full/community-mtg-091123 4/10

Crenshaw Line Alignment

Page 5: Community Mtg 091123

8/14/2019 Community Mtg 091123

http://slidepdf.com/reader/full/community-mtg-091123 5/10

Crenshaw Blvd Subway

Crenshaw Blvd is the African-American community’s Champs-Elysees

Among the long-term benefits: improve the corridor’s development prospects, eliminate the safetyhazards (several schools directly adjacent or within a block of at-grade crossings), need for parking reductions, and adverse traffic impacts, address environmental justice implications, andincrease operating speed of line

Among the construction benefits: capture the economies of scale of bored tunneling, and reduceconstruction time frame, air quality impacts and other adverse construction impacts

Comply with community request and local agency policies and recommendations:

CPUC: evaluate grade separation of all at-grade crossings, and grade separate 57th Streetsand Slauson Ave

LA City Council: the entire Crenshaw Blvd portion of the project should be built underground

Crenshaw Specific Plan: Prohibition on overhead utility lines

Leimert Park Village Mixed-use Park & Ride:Paris’ Champs-Elysees

Page 6: Community Mtg 091123

8/14/2019 Community Mtg 091123

http://slidepdf.com/reader/full/community-mtg-091123 6/10

LRT Subway Costs Comparisons

Raw construction cost of underground Mariachi Plaza and Soto Stations: ~$35M and ~$29Mrespectively

Comparatively staff assumes that just one underground Crenshaw LRT station will be $96M per the DEIR/S

Staff’s Crenshaw Line underground costs are wildly off the mark

Eastside Extension Construction Costs from Pg. 5-2 of the FEIR/S

(final cost 7% higher than assumed)

Page 7: Community Mtg 091123

8/14/2019 Community Mtg 091123

http://slidepdf.com/reader/full/community-mtg-091123 7/10

Problem: Harbor SubdivisionCapacity Limitations & Funding

Section should be builtwith the capacity to fitat least two lines.

Grade separationrequired

48-60 trains per hour:

Crenshaw (24)

Harbor Local (24)

Express (12)

Express service couldinclude pass-throughtracks at local stationsand modified light railvehicles (configured

for large baggage) Despite good cost-

effectiveness, highridership and a transitdependent areaHarbor Subdivisionproject lacks funding

Page 8: Community Mtg 091123

8/14/2019 Community Mtg 091123

http://slidepdf.com/reader/full/community-mtg-091123 8/10

Solution: Extend Grade SeparationsHyde Park Tunnel Extension:

Extended I-405-La Cienega-

Manchester Overcrossing:

Key:

- Green = elevated 

- Blue = at-grade

- Red = below grade

-Hazard symbol =

at-grade crossing 

Also neededbut not shown:

-Arbor Vitae

grade sep

-Cedar closure

Current MTA Staff Report:

Current MTA Staff Report:

Page 9: Community Mtg 091123

8/14/2019 Community Mtg 091123

http://slidepdf.com/reader/full/community-mtg-091123 9/10

Alt. Yard Site: Imperial/Aviation Site is large enough to fit a consolidated maintenance facility for both the Green &

Crenshaw Lines, and possibly an additional mode (bus division or LAX people mover)

Among other benefits: Reduced operational cost and may make the maintenancefacility eligible for stimulus funds and/or a LAWA partnership

:Site today 

Site shown to

scale with two

Green Line yards:

Page 10: Community Mtg 091123

8/14/2019 Community Mtg 091123

http://slidepdf.com/reader/full/community-mtg-091123 10/10

Stages

Conceptual PlanningDraft EIR

Final Planning

Final EIR ApprovalConstruction Begins

PUC Approval