30% Design Community Meeting
Please sign in on your mobile device: http://communitymeeting.ocps.net/
Thursday, January 16, 2020
Site 43-E-SE-2
Site 43-E-SE-2Meeting AgendaJanuary 16, 2020, 6:00PM
• Welcome – School Board Member, Johanna Lopez
• Introductions – Lauren Roth
• Project Update Architect: Rhodes+Brito ArchitectsConstruction Manager: Pirtle Construction
• Questions and Answers
• Adjournment
Aerial Map
New Campus on vacant site to meet District Standards for elementary schools: • Prototypical Core Spaces
Enhanced Learning Environment: • Latest Technology • Planned Site Circulation• Safety • Community Asset
Independence Elementary School
Project SiteSite 85-E-W-4
Orange CountyNational
SR 429
Orange CountyNational
Bridgewater Middle School
4Site 43-E-SE-2
Vicinity Map
New Campus on vacant site to meet District Standards for elementary schools: • Prototypical Core Spaces
Enhanced Learning Environment: • Latest Technology • Planned Site Circulation• Safety • Community Asset
SR 429
Porter Road
Porter Road
Sum
mer
lake
Blv
d
Project SiteSite 85-E-W-4
5Site 43-E-SE-2
Project Site
Vicinity Map
New Campus on vacant site to meet District Standards for elementary schools: • Prototypical Core Spaces
Enhanced Learning Environment: • Latest Technology • Planned Site Circulation• Safety • Community Asset
Porter Road
Project SiteSite 85-E-W-4
6Site 43-E-SE-2
Woo
d Sa
ge D
r
Blue
jack
Oak
Dr
Rock
Dov
e Dr
Lake
Han
cock
Blv
d
Wood Sage Dr
Future Park
Site 43-E-SE-2 7
Site Plan
Site• 18.3 Acres• Separate Bus and
Parent Drives• Separate Bus and
Parent Loading• Queuing for 163 Cars• 15 bus capacity• Service Loop• 123 Parking Spaces• Play Fields / Courts• Future Expansion
Site 20-E-SW-4 ES Relief
Site 43-E-SE-2 10
Example – Classroom
Classroom
General Classrooms will include:
• Storage Cubbies• Markerboard / Tack
boards• Audio Enhancement• Interactive Flat Panel• Student and teacher
computers • Millwork with sink and
storage cabinets
Site 20-E-SW-4 ES Relief
Site 43-E-SE-2 11
Example – Technology
Technology : Campus
The technology package will include:
• Student and teacher computers
• Interactive Flat Panel• White boards• Skills labs (Computer &
Science)• Wireless Access• Audio Enhancement
Site 20-E-SW-4 ES Relief
Site 43-E-SE-2 12
Example – Media Center
Media Center
The Media Center will include:
• Genius bar• Library tables for an
entire class• Story-telling area• CCTV studio• Audio Enhancement
Site 43-E-SE-2
Example – Multi-Purpose Room
Cafeteria
The Cafeteria will include:
• Kitchen• Two Serving Lines• Teacher Dining• Elevated Stage• Extended Day Office• Restrooms
13
Site 20-E-SW-4 ES Relief
Site 43-E-SE-2
Example – Music Room
Specialty Classrooms
• Art Classroom with kiln• Science Classroom• Music Classroom
14
Site 20-E-SW-4 ES Relief
Site 43-E-SE-2
Example – Administration / Lobby
Administration
The administrative area includes:
• Single point of entry during school hours
• Lobby • Administrative offices,
workroom & storage• Large conference
room• Clinic• Teacher planning
15
Site 20-E-SW-4 ES Relief
Site 43-E-SE-2 16
Example – Play Equipment
Physical Education
Physical Education will include:• PE Office and storage• Covered play canopy• Basketball Courts• Tot lot play structure• Youth lot play structure• Playfields
Site 20-E-SW-4 ES Relief
Site 43-E-SE-2
Example – Bus Drop-off
Site Circulation
• On-site car stacking• On-site parking• Bus loop• Covered walkways• Safe pedestrian paths• Bike racks
17
Previous OCPS Schools using the same/similar prototype
15
Millennia Gardens Elementary School
Clay Springs Elementary School
Lovell Elementary School
Engelwood Elementary School
Mollie Ray Elementary School
Dover Shores Elementary School
Site 20-E-SW-4 Elementary School
Site 83-E-SE-3 Elementary School
Site 85-E-W-4 Elementary School
Site 43-E-SE-2
Site 20-E-SW-4 ES Relief
Site 43-E-SE-2 18
Design & Construction Schedule
20212019Nov
Guaranteed Maximum Price
Completed Design
Building Construction
Move-in
Jan
2020
Mar May Apr
2021
JunAprFebDec Jul Jun JulMayAug
2020
Sustainability
Site:•Low Impact Design (LID) stormwater design•Native/low water plants – reduce water consumption
Building:•High Efficiency Chillers (8% energy reduction)•Light colored roof to reduce heat gain and improves energy performance•Energy Star rated equipment•Water saving toilets, faucets, and fixtures•All general classrooms have daylighting•Over 75% of ALL spaces have daylighting•Thermal efficient windows/glazing•Fully automated building controls system 10% more energy
19
Questions & Answers
18