Community Information Sessions Questions and Answers National Landcare Program Phase Two and Regional Land Partnerships Updated 12 December 2017 Program administration Q. Why is the government considering changing the funding model? A. The government is exploring ways to improve the effectiveness of the Australian Government’s investment and to respond to previous feedback, including that received during the Review of the current National Landcare Program published earlier this year (www.nrm.gov.au ). Proposed changes include: o more targeted outcomes that can be clearly monitored; o encouraging new partnerships; and o an open and competitive tender. Q. Is there a limit to administrative costs under the proposed procurement model? Will this be assessed or is it a decision for organisations? A. 20 per cent has been proposed as an indicative national funding allocation for core services, however, this will be 1

Transcript of Community Information Sessions Questions and Answers ...  · Web viewRegional Land Partnerships ....

Community Information Sessions Questions and Answers

National Landcare Program Phase Two and Regional Land Partnerships Updated 12 December 2017

Program administration

Q. Why is the government considering changing the funding model?

A. The government is exploring ways to improve the effectiveness of the Australian Government’s investment and to respond to previous feedback, including that received during the Review of the current National Landcare Program published earlier this year (www.nrm.gov.au). Proposed changes include:

o more targeted outcomes that can be clearly monitored;

o encouraging new partnerships; and

o an open and competitive tender.

Q. Is there a limit to administrative costs under the proposed procurement model? Will this be assessed or is it a decision for organisations?

A. 20 per cent has been proposed as an indicative national funding allocation for core services, however, this will be tested through the anticipated competitive assessment process and the Departments would expect administrative costs to be kept relatively low.

1

Q. 20 per cent has been proposed as an indicative split for core services, how do you avoid cost shifting by states for natural resource management regional bodies that receive statutory support?

A. It is reasonable for the Australian Government to share an appropriate proportion of the cost of core services, as regional service providers will be delivering the National Landcare Program for the Australian Government.

Q. How do the proposed indicative splits compare with the current funding weightings?

A. The proposed indicative splits for the National Landcare Program Phase Two will be much more targeted than the current National Landcare Program which has four broad objectives. Indicative splits for National Landcare Program Phase Two do not compare directly against the current National Landcare Program objectives.

Q. How will the payment structure differ from a grants model?

A. Under the proposed procurement model, payment will be on delivery of services.

Q. Will there be a change to the way funding is administered to States?

A. It is anticipated that successful Tenderers will nominate their preferred payment arrangements (i.e. bank account details), which may include payment through States.

Q. Will the Regional Land Partnerships approach apply in all States and Territories?

A. Yes, it is proposed that Regional Land Partnerships will operate Australia wide.

Q. Is the Government looking for projects of a particular size and length; will there be preferences for projects that deliver against multiple outcomes, target higher threat areas, or leverage other investment?

A. Criteria for the assessment of projects will be outlined in any tender documentation. Value for money and clear connection to the outcomes being sought are expected to be considerations. We expect to select a range of different sized projects to fit into the available budget ($450 million over five years) and the indicative split. The indicative split for each category of services at a national level is as follows:

Category of services Indicative split (%)

Core services 20

Regional Agriculture Landcare Facilitator Services 8

Threatened Species Services 30

Ramsar Services 10

Threatened Ecological Communities Services 10

World Heritage Services 5

2

Soil, Biodiversity and Vegetation Services 12

Supporting Agriculture Systems to Adapt to Change Services 5

Q. Will there be a template for tenderers to use?

A. Yes, we propose to have a tender response form.

Management Units

Q. What is a Management Unit?

A. A Management Unit is the geographical scale at which tenders will be sought in any open approach to market. It is proposed that Management Unit boundaries will match the current Natural Resource Management regional boundaries.

Q. How much funding will each Management Unit receive?

A. It is proposed that there will not be a notional allocation of funding by Management Unit. The level of funding provided will be determined through a competitive process based upon the priorities in each Management Unit and value for money presented.

The Government will be looking to maintain national coverage that is viable for the next five years.

Program Outcomes

Q. Four environment outcomes were tested during consultation. Will they change in light of feedback during consultation?

A. The Government will consider feedback from the consultation process in determining final outcomes, and this will be reflected in any open tender documentation in any approach to market.

There was feedback that activities in relation to threatened ecological communities should not be restricted to private land. In relation to threatened species, there were suggestions to broaden the scope of eligible species beyond those in the Threatened Species Strategy. Questions were also raised regarding:

o Non-Ramsar wetlands o activities in relation to invasive species outside world heritage sites and;o cultural heritage.

Q. Are there links between the Smart Farms program and Regional Land Partnerships considering the similar outcomes? Is there going to be links with tenders?

A. The outcomes are similar as they both contribute to the five overarching National Landcare Program Phase Two outcomes. The programs are otherwise separate, each

3

with their own eligibility criteria and assessment processes.

Tenderers are welcome to consider applying for funding under both programs. There is further information on eligibility criteria for Smart Farms available in the guidelines at www.nrm.gov.au.

Agriculture Outcomes

Important note on the agricultural priorities interactive maps

The soil priorities information in the interactive map, available through the Regional Land Partnerships App, was updated on 1 November 2017. We suggest that stakeholders who have previously accessed these maps revisit the maps.

Q. Would improving soil biodiversity be considered an eligible outcome under the proposed soil investment priorities?

A. No, soil biodiversity is not a priority on its own but could be considered if related to other identified soil priorities such as soil acidification, building soil carbon and reducing soil lost by wind and water erosion.

Q. In Outcome 6 for Regional Land Partnerships, what does the reference to market changes mean?

A. Market changes broadly refer to changes in what consumers are interested in and what international markets are looking for. For example, consumers are increasingly interested in where their food and fibre comes from and how it is produced. They want to know that farmers are using land management practices that protect and improve the condition of soils, vegetation and biodiversity on their farms. International markets are also looking for agricultural products with sustainability credentials; the ability to demonstrate good farm management practices and alignment with international obligations will influence how Australian products are received in some markets.

Q. Are the colour scales shown on the soil maps intended to demonstrate the level of risk?

A. Yes. The maps identify the level of risk (high or medium) to soil condition associated with soil priorities of wind erosion, hillslope (water) erosion, soil acidification and soil carbon decline. The soil priorities are also listed for each management unit on the interactive map, available through the Regional Land Partnerships App.

Q. Is the data used to develop the soil investment priorities maps available to potential applicants?

A. The soil maps were developed by CSIRO (acidification, soil carbon, hillslope erosion) and the NSW Office of Environment and Heritage/ABARES (wind erosion). The reports

4

associated with the soil maps can be downloaded via the interactive map application on the Regional Land Partnerships App. The high resolution data used to produce the maps will also be available for download soon. We note that there may be other publicly available information not represented on these maps. Reference to this information will be required in your proposal if you are planning to invest in one or more of the soil issues in areas not identified as high or medium priority. This is a requirement in the Request for Tender.

Q. Are ecosystem services included in Outcome 5 for Regional Land Partnerships?

A. Yes. More than half of Australia is used for agriculture. Improving the condition of soils, vegetation and biodiversity on farm will deliver ecosystem services benefits to the broader community. These include more sustainable food and fibre production, regulation of climate, water flows and water quality, improved air quality, pollination and pest management services; and cultural services such as recreation, ecotourism, aesthetic and heritage values.

Q. How do the environment outcomes link to Outcome 6 for Regional Land Partnerships?

A. If there is an environmental aspect to adapting to change, projects should link to outcomes 1-4. Outcomes 6 is specifically about supporting farmers to adapt to climate change and markets. This includes changes in rainfall which is expected to have a major impact on agricultural productivity. Building soil carbon, managing soil acidification and reducing soil and nutrient lost via erosion can help mitigate some of these impacts by increasing the amount of rainfall stored in the soil as well as increasing productivity. Improving pollination and pest management through better vegetation and biodiversity management can also improve productivity from more resilient agricultural systems. Factors such as the traceability, provenance and sustainability credentials (being able to demonstrate good farm management practices) are expected to increasingly influence how agricultural products are received by consumers and many international markets.

Community Engagement

Q. Community engagement has been a focus for the Regional Delivery; is this expected to continue under the next phase of the National Landcare Program?

A. Yes. We have included a number of measures that will encourage community engagement at different levels through the National Landcare Program Phase Two. In the Regional Land Partnership Consultation Paper, it is proposed that tenderers will be expected to have the involvement and support of their communities, and work with Indigenous, community and landcare groups to achieve the outcomes under Regional Land Partnerships.

The departments are also considering that at least 20 per cent of the budget in each Management Unit be used for projects supporting small, on-ground projects and

5

related activities that are delivered by, or directly engage with the local landcare community.

Under Regional Land Partnerships, Regional Landcare Facilitators will now be referred to as Regional Agriculture Landcare Facilitators. It is also expected that projects with community engagement and participation elements will include required personnel to support these activities. A fact sheet on community engagement is available at www.nrm.gov.au.

Q. How will community engagement be assessed?

A. Criteria for the assessment process is still under development and will be outlined in any tender documentation. It is currently proposed that tenderers will be expected to demonstrate that they have the involvement and support of their communities, and are committed to work with Indigenous, community, industry and landcare groups to achieve the outcomes under Regional Land Partnerships. Evidence could include letters of support and partnership agreements.

Q. What other opportunities are there for communities?

A. There will be a number of ways for community and landcare groups to access funding under the National Landcare Program Phase Two. For example, Smart Farms program funding is available for a range of entities, including communities, to support the adoption of best practice natural resource management. An Environment Small Grants program will also be available for activities that improve the local environment.

Community groups are also able to partner with other entities under Regional Land Partnerships.

A fact sheet on community engagement is available at www.nrm.gov.au.

Q. Will focussing on biophysical outcomes with this funding jeopardise community engagement and social licence?

A. We recognise biophysical outcomes and community engagement are intrinsically linked. It is proposed that tenderers in any open approach to market will have to demonstrate how they will engage communities to deliver the biophysical outcomes. The focus on partnerships is also part of that process.

Indigenous issues

Q. How will service providers demonstrate that they have genuinely engaged Indigenous stakeholders?

A. Criteria for the assessment process will be outlined in any tender documentation. Indigenous engagement will be assessed in any tender process. Evidence could include letters of support and partnership arrangements.

6

Q. How is the Indigenous Procurement Policy being implemented? Will the policy apply across both core services and project budgets?

A. The Commonwealth Indigenous Procurement Policy will apply to the procurement process.

Further detail will be reflected in any tender documentation in any open approach to market.

Q. You have a Regional Agriculture Landcare Facilitator, why not have an Indigenous Landcare Facilitator?

A. Maintaining Regional Agriculture Landcare Facilitators builds on past investment in Regional Landcare Facilitators under the current National Landcare Program. Their role focuses on supporting landcare and production groups to adopt sustainable farm and land management practices and to protect and improve natural resources on-farm. We expect that projects with community engagement with Indigenous communities will include funding for personnel to support these activities.

Regional Agricultural Landcare Facilitators

Q. Has the role of the Regional Landcare Facilitators (RLFs) changed? If so, how?

A. No. The job title is changing to include the word ‘Agriculture’ to reflect its focus on supporting agriculture. Regional Agriculture Landcare Facilitators (RALFs) are expected to be involved in the delivery of funded projects and core services.

Q. Does the name change of Regional Landcare Facilitators (RLF) to Regional Agriculture Landcare Facilitator (RALF) have any implications for Bushcare and Coastcare?

A. No. The change to include ‘Agriculture’ in the title is about clarifying that the focus of the RALF is about protecting and improving the condition of natural resources on agricultural lands, including coastal and marine environments.

Q. Will RALFs have less autonomy to focus on local community priorities under National Landcare Program phase two than RLFs do under the current program?

A. No. The RALFs are expected to help to deliver national and regional priorities at the local scale.

Q. Will the RALFs be part of the Management Unit core services?

A. RALF services are grouped under the Management Unit core services but will have a separate indicative investment estimate of 8% of the total national Regional Land

7

Partnerships funds. This is separate from the overall core services for the Management Unit (20% of funds).

Q. Will there be a RALF in each region?

A. There is expected to be a designated RALF position/ positions for each Management Unit. This may be more or less than one Full Time Equivalent position depending on the number of sustainable agriculture priorities and projects within the Management Unit. This may be delivered by a few designated people.

Monitoring and Reporting

Q. What will the monitoring and reporting requirements be under Regional Land Partnerships?

A. We have released the draft Monitoring, Evaluation, Reporting and Improvement (MERI) Framework for Regional Land Partnerships. In summary, the proposal is that service providers will be required to report to the government on the services delivered. In addition, the government proposes to contract service providers to monitor, and report on, the impact of the natural resource management projects, as a service itself. It is expected that further details on the monitoring and reporting requirements will be provided in any tender documentation and draft service provider contract in any approach to market. The government will also separately undertake long term monitoring of the program’s impact.

Q. How will the Monitoring, Evaluation, Reporting and Improvement (MERI) framework focus on long-term outcomes?

A. We are looking to build upon the MERI framework. The new program logic will guide changes to the Monitoring, Evaluation, Reporting and Improvement Tool (MERIT) and the associated MERI plans and subsequent reporting.

MERI will be focused on three levels:

1. Service provider output reporting to facilitate payment.2. Service provider reporting on monitoring results including baselines and at

specific points in a project to assess progress in achieving outcomes.3. Long term monitoring outside the program cycle to determine enduring

outcomes of the program.

Q. What measures are in place to address service providers that are not performing well?

A. Performance reporting remains important. Further information will be released with any tender documentation.

8

Q. How can a tenderer meet performance reporting requirements?

A. The government will be looking for a demonstrated track record and capability to deliver natural resource management services. Applicants to any open approach to market will be able to use a wide range of methods to demonstrate their capability. Further information about how a tenderer can meet performance reporting requirements may be included in any tender documentation.

Q. What is the process of appeal for unsuccessful organisations?

A. Information on review options in relation to procurement can be obtained in the publication ‘Selling to the Australian Government’, available here: http://sellingtogov.finance.gov.au/guide/if-you-dont-win-a-contract

Partnerships, consortiums and co-investment

Q. How do you see partnerships and co-investment working?

A. The Regional Land Partnership Consultation Paper contains details about proposals for partnerships and co-investment. The final requirements for Regional Land Partnerships will be published in any tender documentation associated with any approach to market.

Groups of organisations are encouraged to tender together, as a consortium. Where a tender is submitted by a consortium, it will be required to nominate a single lead legal entity.

The government also intends to encourage tenderers to identify how they will use new and existing collaborative partnership arrangements.

It will be up to potential tenderers to choose suitable partners including:

Non-Government Organisations land councils community groups farming systems groups local and state governments industry.

Assessment criteria will be outlined in any tender documentation.

9

Q. Can organisations other than the existing Natural Resource Management bodies bid directly for Regional Land Partnerships, or do they need to partner with an existing Natural Resource Management body?

A. It is proposed that any organisation or consortia can tender directly to deliver services in a Management Unit if they are able to demonstrate the capability and capacity to deliver all of the core services and projects.

Q. Can a consortium submit a tender to deliver some elements in more than one region, and submit separate tenders for remaining services in individual Management Units?

A. No. In any proposed open approach to market, it is proposed that a tenderer can submit project proposals that demonstrate partnerships across Management Units, however, we are looking to contract one lead service provider for each Management Unit.

Q. What sort of organisations are expected to apply for Regional Land Partnerships above and beyond existing service providers? Are international consortia eligible to apply?

A. In any open approach to market, any organisation or consortium that meets the minimum eligible requirements will be able to submit a tender. This will be made clear in any tender documentation in any open approach to market.

Q. Can state governments participate and deliver the National Landcare Program phase two?

A. Yes, in some instances. The eligibility requirements will be contained in the relevant program guidelines and/or tender documentation.

Q. Will it be possible for lead organisations to subcontract some services to another entity? Does that organisation need to be named in the tender?

A. Subcontracting is standard practice in procurement. Criteria for the assessment process and approach to subcontracting is still under development and will be outlined in any tender documentation in any approach to market.

Q. Are there any programs under the National Landcare Program Phase Two that Natural Resource Management bodies will not be eligible to apply for?

A. The eligibility requirements for each grant program will be contained in the relevant program guidelines. All interested parties, including National Resource Management bodies, should refer to these for confirmation of eligibility. Smart Farms guidelines are available now at www.nrm.gov.au. The Environment Small Grants program will open for applications before June 2018. More information will be available on www.nrm.gov.au soon.

10

Consultation

Q. How will the departments consider responses from consultation?

A. The departments received 129 responses to the consultation survey. All feedback has been collated and summarised. This is being considered as the government finalises the design and delivery of Regional Land Partnerships. In addition, this FAQ document is providing answers to questions asked during the information sessions. These are available online at www.nrm.gov.au for all stakeholders. A fact sheet on consultation is available at nrm.gov.au

Timing

Q. When will a decision on the proposed procurement approach be made?

A. It is proposed that tenders will open in December 2017 or January 2018 and will be open for at least six weeks, with additional time if necessary to account for the Christmas holiday period.

Q. Is there more detail available about the one-year and five-year projects and how they will be funded?

A. Criteria for the assessment process is still under development and will be outlined in any tender documentation.

It is anticipated that there will be a two-stage process to roll out projects to allow adequate time to ensure the larger and longer projects are the best available and that there are opportunities to develop cooperative projects across Management Units.

Stage 1. By June 2018, contract a full five years of core services and for projects running in the first year.

Stage 2. By December 2018, the departments expect to enter into contracts with the successful service providers for the remaining four years of projects.

Q. What is the timetable for the roll out of the National Landcare Program Phase Two? How long will the tender for Regional Land Partnerships be open for?

A. Consultation on Regional Land Partnerships closed on 23 October 2017. A summary of feedback received through consultation will be available soon at www.nrm.gov.au. The proposed next steps for delivery of the Regional Land Partnerships program is to open tenders in December 2017 or January 2018. We plan on the tender being open for at least six weeks.

Smart Farms Grants program information can be found on Grant Connect at www.grants.gov.au .

11

What will be funded?

Q. Are threat abatement plan actions acceptable investment activities for funding under the National Landcare Program?

A. There are a range of funding sources under National Landcare Program and Threat Abatement Plan Actions are likely to be acceptable in some cases where part of a larger project delivering on-ground actions that are linked to National Landcare Program outcomes.

The Regional Land Partnerships component of the National Landcare Program Phase Two is still in the design phase. Under the proposed approach for Regional Land Partnerships, six outcomes have been identified and once outcomes are finalised, these will provide the basis for investment under the National Landcare Program. Examples of the services proposed to be delivered under each of these outcomes are provided on pages 14-16 of the Consultation Paper. These services may also include actions identified under approved Threat Abatement Plans if they align with or are relevant to these outcomes. Details will be available in any tender documentation in any open approach to market.

Q. Is any funding available for new research?

A. The proposed Regional Land Partnerships program is about taking already available proof-of-concept activities to on-ground delivery leading to practice change. Details of what constitutes research under the Smart Farms program is contained in the questions and answers at the Community Grant Hub at www.communitygrants.gov.au/grants.

Q. Will natural resource management plans under Regional Land Partnerships influence the tender process?

A. Strategic planning is important. The government proposes to require that service providers maintain or develop strategic natural resource management plans in their Management Units. This will ensure that natural resource management planning continues to facilitate strategic investment under the programs.

Q. Will there be a requirement for local grant proposals under programs such as Smart Farms or Environment Small Grants to fit within the larger regional natural resource management plans?

A. Program logics have been developed for Smart Farms Small Grants and are available at www.nrm.gov.au. Under Smart Farms, projects need to demonstrate that they contribute to the overall program objectives and outcomes. Applications for Environment Small Grants will open in the first half of 2018. More information will be available on nrm.gov.au soon.

12

Q. Where does biosecurity fit into the proposed categories of services?

A. While biosecurity is not explicitly mentioned under the proposed outcomes for Regional Land Partnerships, it is expected that it may be considered where it relates to Regional Land Partnerships outcomes. For example, biosecurity may be considered in the context of reducing threats to priority threatened species, or threats to productive agriculture systems.

Q. Can projects to improve water quality be funded through Regional Land Partnerships?

A. Where projects to improve water quality contribute to proposed outcomes under Regional Land Partnerships, it is expected that they could be included in project proposals. For example, this could include activities to improve water quality entering a Ramsar wetland. The government will consider feedback in determining final outcomes, and this will be reflected in any open tender documentation in any approach to market.

Q. How will the investment in Threatened Species under the Threatened Species Strategy be linked to recovery plans?

A. Under the proposed Threatened Species outcome, we are seeking actions that support the stabilisation or improvement of the trajectory of threatened species. Recovery plans will be important considerations.

Q. What is the relationship between funding for World Heritage Areas under the broader National Landcare Program and Regional Land Partnerships?

A. The Regional Land Partnerships funding will be provided to help with the management of our treasured World Heritage sites with natural heritage values. It is proposed that there will be a particular focus on on-ground actions that reduce threats from invasive species.

In addition, $47.4 million in funding will be provided to the State Government agencies responsible for the day to day management of World Heritage properties listed for their natural values. This includes:

Funding for the Wet Tropics and Tasmanian Wilderness World Heritage areas; and

Provision for World Heritage Executive Officers and Advisory Committees for World Heritage properties such as the Greater Blue Mountains, Purnululu National Park and Gondwana Rainforests.

More information is available at http://www.environment.gov.au/heritage/places/world-heritage-list

13

Q. How will issues that span across Management Units be addressed?

A. It is proposed to encourage organisations with interests in adjacent Management Units to work together, through consortiums and partnerships, to address cross-region issues where it is feasible. We would like to see projects coordinated across Management Unit boundaries and communities engaged to help achieve desired outcomes. In the proposed tender process, allowing more time to contract five-year projects should allow some negotiation of projects once service providers are known. It is proposed that project proposals for a Management Unit can identify where there is an intention to partner with the successful service provider in another Management Unit to deliver a project.

More Information

Q. I have more questions about the tender; when will they be answered?

A. Tender documentation for the proposed open approach to market is still under development. It is expected to provide answers to outstanding questions. These include questions about Key Performance Indicators, public benefits, transparency requirements, prequalification, whether there will be a come-back period with successful tenders, how to demonstrate value for money, details on the make-up of the assessment panel and eligibility criteria.

It is anticipated that a tender briefing will be available online once the request for tender opens.

Any outstanding questions that prospective tenderers may have after consulting this information can be directed in writing to [email protected]. Questions and answers may be made publicly available.

Q. Is there more information available about the Environment Small Grants Program?

A. The Environment Small Grants program will be open for applications in early 2018. More information will be available on www.nrm.gov.au soon.