Community Impacts of Mariner East Pipeline Prepared for Delmont Public Library Meeting Delmont, PA...

34
Community Impacts of Mariner East Pipeline Prepared for Delmont Public Library Meeting Delmont, PA July 30, 2014 Presented by Sam Koplinka-Loehr, Clean Air Council

Transcript of Community Impacts of Mariner East Pipeline Prepared for Delmont Public Library Meeting Delmont, PA...

Page 1: Community Impacts of Mariner East Pipeline Prepared for Delmont Public Library Meeting Delmont, PA July 30, 2014 Presented by Sam Koplinka-Loehr, Clean.

Community Impacts ofMariner East Pipeline

Prepared for Delmont Public Library MeetingDelmont, PAJuly 30, 2014

Presented by Sam Koplinka-Loehr, Clean Air Council

Page 2: Community Impacts of Mariner East Pipeline Prepared for Delmont Public Library Meeting Delmont, PA July 30, 2014 Presented by Sam Koplinka-Loehr, Clean.

Presentation Overview

• Introduction• Mariner East Background• Pumping Station Specifics• Air Pollutants and Public Health• Jobs Revisited

Photo Source: Bob Donnan: http://www.donnan.com/EPA_Air-Quality_92711.htm

Page 3: Community Impacts of Mariner East Pipeline Prepared for Delmont Public Library Meeting Delmont, PA July 30, 2014 Presented by Sam Koplinka-Loehr, Clean.

Clean Air Council Marcellus Shale Program

• Track current rulemaking and write comments on regulations• Work with residents to comment and testify on natural gas infrastructure• Lawsuits against polluters or agencies• Community actions to achieve goals outside of regulatory pathways

Page 4: Community Impacts of Mariner East Pipeline Prepared for Delmont Public Library Meeting Delmont, PA July 30, 2014 Presented by Sam Koplinka-Loehr, Clean.

64% of PA is above Marcellus Shale. In 2013, PA had over 6,000 wells with 3 trillion cubic feet of gas production. These gas products have flooded

regional markets and companies are trying to build pipelines to sell overseas.

Page 5: Community Impacts of Mariner East Pipeline Prepared for Delmont Public Library Meeting Delmont, PA July 30, 2014 Presented by Sam Koplinka-Loehr, Clean.

Mariner East 1

Page 6: Community Impacts of Mariner East Pipeline Prepared for Delmont Public Library Meeting Delmont, PA July 30, 2014 Presented by Sam Koplinka-Loehr, Clean.

• New Pipeline50 milesWestern PA

• Existing Pipeline 300 milesOver 80 years oldOldest pipelines 4%

Mariner East 1 Basics

Source: 4% of US gas transmission pipelines were built before 1940Canary LLC CEO Dan Eberhart http://canaryusa.com/aging-us-pipelines/

Page 7: Community Impacts of Mariner East Pipeline Prepared for Delmont Public Library Meeting Delmont, PA July 30, 2014 Presented by Sam Koplinka-Loehr, Clean.

• Switch the pipeline direction to pump natural gas liquids from wells near Houston, PA to the Marcus Hook Refinery near Philadelphia

• Increase pressure from 800 pounds per square inch (PSI) to 1400 PSI

• 18 new pumping stations and 17 new valve control stations

• 70,000 barrels per day, as of 2015 all will be destined for export to gulf coast and overseas

Sunoco Logistics’ Plan

Page 8: Community Impacts of Mariner East Pipeline Prepared for Delmont Public Library Meeting Delmont, PA July 30, 2014 Presented by Sam Koplinka-Loehr, Clean.

Natural Gas Liquids - Ethane

• Mariner East will transport 100% ethane as of 2015

• Extracted as gas, but under pressure becomes a liquid

• Used industrially for plastics, anti-freeze, and detergents

• Extremely flammable

Page 9: Community Impacts of Mariner East Pipeline Prepared for Delmont Public Library Meeting Delmont, PA July 30, 2014 Presented by Sam Koplinka-Loehr, Clean.

• Sunoco Logistics has been a “public utility” since 2002

• Two simultaneous issues– Western PA: Eminent Domain to construct new pipeline– Eastern PA: Exemption from local zoning laws for stations

• Current PUC process will determine whether or not pumping stations are “reasonably necessary for the convenience and welfare of the public”

Public Utility Commission (PUC)

Page 10: Community Impacts of Mariner East Pipeline Prepared for Delmont Public Library Meeting Delmont, PA July 30, 2014 Presented by Sam Koplinka-Loehr, Clean.

Source: PHMSA, Pipeline and Hazardous Materials Safety Administration. http://primis.phmsa.dot.gov/comm/ reports/operator/OperatorIM_opid_18718.html?nocache=259#_OuterPanel_tab_2

Sunoco Logistics Pipeline Incidents

Page 11: Community Impacts of Mariner East Pipeline Prepared for Delmont Public Library Meeting Delmont, PA July 30, 2014 Presented by Sam Koplinka-Loehr, Clean.

Sunoco Logistics Claims:• Mariner East 1 will be operational by Fall 2014• Mariner East 2 will be operational by 2016,

capacity of at least 50,000 barrels/day• Mariner East 3 will follow thereafter

This is Just the Beginning: Mariner East 2 and 3

Page 12: Community Impacts of Mariner East Pipeline Prepared for Delmont Public Library Meeting Delmont, PA July 30, 2014 Presented by Sam Koplinka-Loehr, Clean.

Pumping Stations

Page 13: Community Impacts of Mariner East Pipeline Prepared for Delmont Public Library Meeting Delmont, PA July 30, 2014 Presented by Sam Koplinka-Loehr, Clean.

Pumping Stations

Page 14: Community Impacts of Mariner East Pipeline Prepared for Delmont Public Library Meeting Delmont, PA July 30, 2014 Presented by Sam Koplinka-Loehr, Clean.

Emission Sources at Pumping Stations

• Electric Pump Motors• Flaring of gas during maintenance operations

and constant flaring of fugitive emissionsSource: Data and images from State-only operating permit filed with DEP

Page 15: Community Impacts of Mariner East Pipeline Prepared for Delmont Public Library Meeting Delmont, PA July 30, 2014 Presented by Sam Koplinka-Loehr, Clean.

Flare Design

Page 16: Community Impacts of Mariner East Pipeline Prepared for Delmont Public Library Meeting Delmont, PA July 30, 2014 Presented by Sam Koplinka-Loehr, Clean.

Fugitive Emissions/Leakages

Leakage from Compressor Stations. Source: EPA

Page 17: Community Impacts of Mariner East Pipeline Prepared for Delmont Public Library Meeting Delmont, PA July 30, 2014 Presented by Sam Koplinka-Loehr, Clean.

• Maximum expected annual flaring: – 312,800 standard cubic feet– Equivalent to 8,696 gallons– 23 gallons daily

• Could be more if there are maintenance issues

Flare Volume

Page 18: Community Impacts of Mariner East Pipeline Prepared for Delmont Public Library Meeting Delmont, PA July 30, 2014 Presented by Sam Koplinka-Loehr, Clean.

• Flare will operate 24/7, igniting fugitive emissions from the motor and pipeline seals

Flare Frequency

Page 19: Community Impacts of Mariner East Pipeline Prepared for Delmont Public Library Meeting Delmont, PA July 30, 2014 Presented by Sam Koplinka-Loehr, Clean.

• Equal to 5 constantly idling school buses

Fugitive Emissions: Volatile Organic Compounds (VOCs)

Page 20: Community Impacts of Mariner East Pipeline Prepared for Delmont Public Library Meeting Delmont, PA July 30, 2014 Presented by Sam Koplinka-Loehr, Clean.

• 35.8 tons of carbon annually, equal to:– Annual carbon sequestration from 26 acres of forest– Burning 34,884 pounds of coal

Carbon Emissions

Page 21: Community Impacts of Mariner East Pipeline Prepared for Delmont Public Library Meeting Delmont, PA July 30, 2014 Presented by Sam Koplinka-Loehr, Clean.

Health Impacts from Pollutants

Page 22: Community Impacts of Mariner East Pipeline Prepared for Delmont Public Library Meeting Delmont, PA July 30, 2014 Presented by Sam Koplinka-Loehr, Clean.
Page 23: Community Impacts of Mariner East Pipeline Prepared for Delmont Public Library Meeting Delmont, PA July 30, 2014 Presented by Sam Koplinka-Loehr, Clean.

Pollutants from Shale Gas Infrastructure

Page 24: Community Impacts of Mariner East Pipeline Prepared for Delmont Public Library Meeting Delmont, PA July 30, 2014 Presented by Sam Koplinka-Loehr, Clean.

In 2009, the gas industry released more smog-forming emissions than all cars and trucks in the Dallas metro area

– New York Times article citing Armendariz’s 2009 report, supported by Texas Commission on Environmental Qualityhttp://www.nytimes.com/gwire/2011/05/27/27greenwire-could-smog-shroud-the-marcellus-shales-natural-3397.html?pagewanted=all

Dallas Fort Worth

Page 25: Community Impacts of Mariner East Pipeline Prepared for Delmont Public Library Meeting Delmont, PA July 30, 2014 Presented by Sam Koplinka-Loehr, Clean.

RAND 2013 Air Pollution Study

• Research and Development finds shale gas air pollution damages already between $7.2 and $30 million in PA.– Health damages: increased asthma, hospitalization,

premature death.– Physical damages: agriculture and infrastructure.

Source: http://www.rand.org/pubs/external_publications/EP50160.html

Page 26: Community Impacts of Mariner East Pipeline Prepared for Delmont Public Library Meeting Delmont, PA July 30, 2014 Presented by Sam Koplinka-Loehr, Clean.

Potential Health Impacts from Ozone

• Ozone forms from VOC and NOx in the present of sunlight

• Aggravation of asthma, bronchitis & emphysema and increased susceptibility to pneumonia & bronchitis

• Linked to bladder, breast, and lung cancers, stroke, diabetes, lung damage, and premature death

• Throat irritation, congestion, coughing, and chest pain

Source: http://www.epa.gov/air/ozonepollution/health.html American Lung Association, “Health Effects of Ozone and Particle Pollution,” State of the Air, 2011; President’s Cancer Panel, Reducing Environmental Cancer Risk: What We Can Do Now, 2008-2009 Annual Report (National Cancer Institute, May 2010).

Page 27: Community Impacts of Mariner East Pipeline Prepared for Delmont Public Library Meeting Delmont, PA July 30, 2014 Presented by Sam Koplinka-Loehr, Clean.

Cumulative Health Impacts

• Taken together, emissions from shale gas infrastructure have substantial public health ramifications.– In their 2013 study, Lisa McKenzie et al. found

elevated risk of birth defects in populations residing within ten-miles of gas wells.

– Pennsylvania Auditor General July report says DEP “unprepared” to monitor gas from fracking

– DOH Employee silencing using list of “codewords” including “Marcellus Shale,” “fracking”

Source: L. McKenzie http://ehp.niehs.nih.gov/1306722/#tab2

Page 28: Community Impacts of Mariner East Pipeline Prepared for Delmont Public Library Meeting Delmont, PA July 30, 2014 Presented by Sam Koplinka-Loehr, Clean.

Jobs & Alternative Energy

Page 29: Community Impacts of Mariner East Pipeline Prepared for Delmont Public Library Meeting Delmont, PA July 30, 2014 Presented by Sam Koplinka-Loehr, Clean.

• Standard dictates8 percent of Pennsylvania Energy to comefrom renewablesby 2021

Source: http://cleanenergywins.org/wp-content/uploads/2014/03/CleanEnergyWins_PolicyRoadmap.pdf

Pennsylvania Alternative Energy Portfolio Standards

Page 30: Community Impacts of Mariner East Pipeline Prepared for Delmont Public Library Meeting Delmont, PA July 30, 2014 Presented by Sam Koplinka-Loehr, Clean.

US Solar

Source: http://www.thesolarfoundation.org/sites/thesolarfoundation.org/files/TSF%20Solar%20Jobs%20Census%202013.pdf

Page 31: Community Impacts of Mariner East Pipeline Prepared for Delmont Public Library Meeting Delmont, PA July 30, 2014 Presented by Sam Koplinka-Loehr, Clean.

• Out of state credits• Market glut• Fossil fuel industry

lobbying

PA Solar

Page 32: Community Impacts of Mariner East Pipeline Prepared for Delmont Public Library Meeting Delmont, PA July 30, 2014 Presented by Sam Koplinka-Loehr, Clean.
Page 33: Community Impacts of Mariner East Pipeline Prepared for Delmont Public Library Meeting Delmont, PA July 30, 2014 Presented by Sam Koplinka-Loehr, Clean.

Contact Info

• Sam Koplinka-Loehr, CAC Shale Gas [email protected]

Page 34: Community Impacts of Mariner East Pipeline Prepared for Delmont Public Library Meeting Delmont, PA July 30, 2014 Presented by Sam Koplinka-Loehr, Clean.

Questions?