COMMUNITY ENERGY EFFICIENCY PROJECT FUNDING 2013
NORTH SYDNEY COUNCIL
Final Report
28th January 2014
Prepared by: Andy Nyce – Ecosave – on behalf of North Sydney Council
![Page 2: COMMUNITY ENERGY EFFICIENCY PROJECT FUNDING 2013€¦ · O I understard, and acknoyvledge that givirq false or misleading hfurmation in this Milestone Report is an offence under the](https://reader036.fdocuments.in/reader036/viewer/2022070720/5ee0fcfead6a402d666c0874/html5/thumbnails/2.jpg)
Introduction
As part of North Sydney Council’s ongoing commitment to reduce its greenhouse gas emissions by
50% below 1996 levels by 2020, the Council has utilised a grant from the federal Department of
Climate Change, totalling $82,732, to implement energy efficiency savings across the Councils largest
and busiest sites. The grant was awarded as part of the Community Energy Efficiency Program
(CEEP), designed to contribute $112 million to energy efficiency improvements in Council and
community buildings across Australia.
Ecosave, Australia’s largest independent energy services company, initially assessed four of the
Council’s buildings – North Sydney’s iconic Olympic Pool, Stanton Library, the Council’s Chambers
and the Council’s Depot. After a competitive tender process, Ecosave was awarded the contract to
implement solutions at these sites.
Department of Climate Change Funding
The DCCEE Funding was in accordance with the initial Budget – the funding was allocated towards
the 4 sites and the energy efficiency measures at those sites.
Additional energy efficiency measures were added to the project scope for these 4 sites for which
DCCEE funding has been received. This increased the Council contribution from $341,819 to
$472,344. The DCCEE funding amount remained at $82,732. The North Sydney Council elected to
add further energy efficiency measures and further reduce their energy usage across these four sites
during the tender process for the works, as further energy savings measures were identified that had
not been picked up on during the initial design and CEEP Funding application. These additional works
met the Council payback requirements and further deliver towards the Councils strong targets of
Greenhouse Gas reduction and long term sustainability.
Of further interest to DCCEE may be the fact that a number of other sites in the region are also
having energy efficiency measures installed and project managed by Ecosave. DCCEE Funding was
not applied for nor used for these additional sites.
Activity Benefits and Outcomes
The CEEP funding allowed North Sydney Council to expand the overall energy efficiency project,
achieving savings at three additional community facilities – the Neutral Bay Community Centre, St
Leonards Park and the Bradfield Wellbeing Centre.
The seven sites received extensive lighting upgrades – including a variety of lighting controls and the
installation of energy efficient lighting. Other highlights include improvements to the pumping
systems and control strategy at the Olympic Pool and air conditioning optimisation at the Council
Chambers and Library. Solar hot water upgrades, and a voltage power optimisation system were also
installed at the Central Depot.
The total investment for the project was $561,083 which will be repaid in just over five years,
providing an ongoing annual return on investment of 19%. This funding includes the federal CEEP
grant, Council’s Environmental Levy and Waste and Sustainability Improvement Payment funds.
As part of Ecosave’s ongoing commitment to long term sustainability, the company donates one
native seedling to Greening Australia for every tonne of CO2e and 100 kilolitres of water saved.
483 seedlings were planted at a Council organised community event in Boorowa from 6th – 8th
September 2013 – this event is part of the Councils ongoing 2020 Vision for Sustainability.
![Page 3: COMMUNITY ENERGY EFFICIENCY PROJECT FUNDING 2013€¦ · O I understard, and acknoyvledge that givirq false or misleading hfurmation in this Milestone Report is an offence under the](https://reader036.fdocuments.in/reader036/viewer/2022070720/5ee0fcfead6a402d666c0874/html5/thumbnails/3.jpg)
Overall, the project was a very successful one for North Sydney Council – with wide reaching and
verified results.
Project Management
Throughout the project, there were regular meetings between representatives of North Sydney
Council and Ecosave. This ensured that the various milestones laid out by Ecosave and agreed upon
by the Council were met, and that the project was tracking to schedule. It also ensured that high
standards of work were maintained at all times, and that if there had been any modifications to the
project, the Council was made aware of them immediately.
Updated Energy Usage Information
PROJECT TITLE Energy Efficiency
Project
PROJECT ID CEEP1156
FUNDING RECIPIENT North Sydney Council DATE 28th January 2014
Building Facility or Site 1
Name of Building, Facility or Site Council Chambers
Location (address) 200 Miller St. North Sydney, NSW 2060
Type of Building, Facility or Site Office Administration Building
Activity Type and Measure Lighting Improvements, HVAC Upgrades,
Energy Management
Energy Efficiency Estimate Method Detailed in Methodology
Baseline Energy Usage 495622 kWh
Baseline Energy Efficiency 108 kWh/m2
Verified Energy Efficiency Improvement 90,170 kWh
Reporting Data (Measuring Energy Efficiency
and Additional Data)
A total area of 4570 m2
NABERS Rating of 4.5 Stars
Cost of Activity $185,188
Verified Cost Savings $24,223
Additional Energy Management Savings ($) $6154
Additional Energy Management Savings (kWh) 23,746kWh
Building Facility or Site 2
Name of Building, Facility or Site Central Depot
Location (address) 187 Ernest St. North Sydney, NSW 2060
Type of Building, Facility or Site Works Depot
Activity Type and Measure Lighting Improvements, Voltage Optimisation,
Solar Hot Water Installation
Energy Efficiency Estimate Method Detailed in Methodology
Updated Baseline Energy Usage 178287 kWh
Updated Baseline Energy Efficiency 80 kWh/m2
Energy Efficiency Improvement 42,580 kWh
Reporting Data (Measuring Energy Efficiency
and Additional Data)
A total area of 2220 m2
Cost of Activity $58,223
Verified Cost Savings $10,205
![Page 4: COMMUNITY ENERGY EFFICIENCY PROJECT FUNDING 2013€¦ · O I understard, and acknoyvledge that givirq false or misleading hfurmation in this Milestone Report is an offence under the](https://reader036.fdocuments.in/reader036/viewer/2022070720/5ee0fcfead6a402d666c0874/html5/thumbnails/4.jpg)
Building Facility or Site 3
Name of Building, Facility or Site Stanton Library
Location (address) 234 Miller St. North Sydney, NSW 2060
Type of Building, Facility or Site Public Library
Activity Type and Measure Lighting Improvements, HVAC Upgrades,
Energy Management
Energy Efficiency Estimate Method Detailed in Methodology
Updated Baseline Energy Usage 299974 kWh
Updated Baseline Energy Efficiency 108 kWh/m2
Energy Efficiency Improvement 36,540 kWh
Reporting Data (Measuring Energy Efficiency
and Additional Data)
A total area of 2780 m2
Cost of Activity $107,000
Verified Cost Savings $10,115
Additional Energy Management Savings ($) $13,937
Additional Energy Management Savings (kWh) 60,941 kWh
Building Facility or Site 4
Name of Building, Facility or Site Olympic Pool
Location (address) 4 Alfred St South, North Sydney NSW 2060
Type of Building, Facility or Site Public Swimming Pool
Activity Type and Measure Lighting Upgrades, HVAC Upgrades,
Pump/Controls Improvement, Energy
Management
Energy Efficiency Estimate Method Detailed in Methodology
Updated Baseline Energy Usage 1429721 kWh
Updated Baseline Energy Efficiency 10 kWh/visitor (annual)
Energy Efficiency Improvement 116,500 kWh
Reporting Data (Measuring Energy Efficiency
and Additional Data)
Annual Visitors of 140,000
Cost of Activity $161,166
Verified Cost Savings $22,334
Additional Energy Management Savings ($) $12,065
Additional Energy Management Savings (kWh) 58,911 kWh
*Energy, maintenance and total annual savings costs for each energy efficiency measure are based
on the actual savings report presented to the Council at project completion (and appendiced in
previous CEEP reports). In addition, the whole of site baseline energy consumption and energy
efficiency has been determined by analysing energy bills for a 12 month period. The baseline energy
efficiency is either a NABERS rating, or the ratio between baseline energy consumption and building
area or annual visitor number.
** Ongoing energy management reports are being provided to North Sydney Council on a monthly
basis by Ecosave’s experienced energy management team. An example Energy Management Report
from December 2013 is included in Appendix A.
![Page 5: COMMUNITY ENERGY EFFICIENCY PROJECT FUNDING 2013€¦ · O I understard, and acknoyvledge that givirq false or misleading hfurmation in this Milestone Report is an offence under the](https://reader036.fdocuments.in/reader036/viewer/2022070720/5ee0fcfead6a402d666c0874/html5/thumbnails/5.jpg)
Conclusion
In conclusion, the CEEP1156 Energy Efficiency Project was a highly successful energy saving project
for North Sydney Council. Through the partnership with Ecosave Pty Ltd, a variety of energy savings
measures were identified and project managed through to completion, with detailed measurement
and verification reports presented at the culmination of the project.
Ongoing energy management reports are generated on a monthly basis to the Council, which
provide further energy saving recommendations.
![Page 6: COMMUNITY ENERGY EFFICIENCY PROJECT FUNDING 2013€¦ · O I understard, and acknoyvledge that givirq false or misleading hfurmation in this Milestone Report is an offence under the](https://reader036.fdocuments.in/reader036/viewer/2022070720/5ee0fcfead6a402d666c0874/html5/thumbnails/6.jpg)
DECLARATION'l'lte AulhttNed Olftcèt ol the otganßatnn rrtakes the lollowtrtg declatattotts
tr I declare that I am authorised to subrnit this Milestone Report (including any attachrnents) on behalf of
. ... .. ...N9*nr.. ..t.y.?.:% .? :y.u.?. ...... w€nþ oÍ ory,a,tßúut)
tr I declare that the information provided in this Milestone Report is tr¡e and accunate.
O I understard, and acknoyvledge that givirq false or misleading hfurmation in this Milestone Report is an offence under the Crininal Code Ad 1995.
tr I understand that progress will only be made in accordanca with the Funding Agreement includirg on satisfactory completion of Milestonæ.
Authorised Offcer Sgnature: ærc.!t?*.t þ:f
Name: /z.o* . .(*12qJ tv. 9cúv¡otl ttõttot4'
Pos¡üon. .?:.'......:.:. .. .. -............................ Organisation,.. .ruo LfA ç16.,.1¿-7 Ac.r'Na (-
Witness Signdure oate, .-{ .t!....t '.ao' V
Name g!-l*-J tÂÃ1#{ tL:?*rlv Mo k?a Ç7Otøet 7 Ct u.Nct L
Position Organisation.
C¡rrtes Act 1914 ard tlE çrÞral bvs ol the Cornmonralth otAtFltalb.
th6 partbs who am comr¡ted ohãt€ epProPfiale cütfitêfltidrv provbbrr.
![Page 7: COMMUNITY ENERGY EFFICIENCY PROJECT FUNDING 2013€¦ · O I understard, and acknoyvledge that givirq false or misleading hfurmation in this Milestone Report is an offence under the](https://reader036.fdocuments.in/reader036/viewer/2022070720/5ee0fcfead6a402d666c0874/html5/thumbnails/7.jpg)
![Page 8: COMMUNITY ENERGY EFFICIENCY PROJECT FUNDING 2013€¦ · O I understard, and acknoyvledge that givirq false or misleading hfurmation in this Milestone Report is an offence under the](https://reader036.fdocuments.in/reader036/viewer/2022070720/5ee0fcfead6a402d666c0874/html5/thumbnails/8.jpg)
1
North Sydney Council | Energy Management Report – November 2013 Porfolio .......................................................................................................................... 2
North Sydney Council | Energy Management Report – November 2013 Chambers ................................................................................................................. 3
North Sydney Council | Energy Management Report - November 2013 Library ....................................................................................................................... 4
North Sydney Council | Energy Management Report – November 2013 Olympic Park Pool .................................................................................................... 5
North Sydney Council | Energy Management Report –November 2013 1 James Place .......................................................................................................... 6
North Sydney Council | Energy Management Report –November 2013 Addendum A Part 1 ................................................................................................. 7
North sydney Council | Energy Management Report – November 2013 Addendum A Part 2 ................................................................................................ 8
North Sydney Council | Energy Management Report – November 2013 Addendum A Part 3 ................................................................................................ 9
North Sydney Council | Summary of Sub Metering Anomolies & Opportunities ......................................................................................................................... 10
![Page 9: COMMUNITY ENERGY EFFICIENCY PROJECT FUNDING 2013€¦ · O I understard, and acknoyvledge that givirq false or misleading hfurmation in this Milestone Report is an offence under the](https://reader036.fdocuments.in/reader036/viewer/2022070720/5ee0fcfead6a402d666c0874/html5/thumbnails/9.jpg)
2
0
50000
100000
150000
200000
250000
300000
350000
Mar Apr May Jun Jul Aug Sep Oct Nov
kW
h
Total Profile kWh Month Consumption
2013
This is the portfolio electric consumption for the Chambers, Library, 1 James Place and North Sydney Pool. The figures show the monthly consumption since the completion of the Energy Performance Contract (EPC), total consumption and profile data for the month of October. There is a reduction of 18% in October 2013 when compared to the month of August 2013 which is the month the EPC project was completed.
0 20000 40000 60000 80000 100000 120000 140000 160000
Sum of DB New Library (kWh)
Sum of DB Existing Library (kWh)
Sum of Council Chambers (kWh)
Sum of Library kWh
Sum of Olympic Pool kWh
Sum of 1 James Pl (kWh)
Site kWh Consumption Overview - November 2013
2013 - Nov
0
50
100
150
200
250
300
350
30
/11
/20
13
22
:00
1/1
1/2
01
3 1
4:3
0
2/1
1/2
01
3 5
:00
2/1
1/2
01
3 2
0:3
0
3/1
1/2
01
3 1
2:0
0
4/1
1/2
01
3 3
:30
4/1
1/2
01
3 1
9:0
0
5/1
1/2
01
3 1
0:3
0
6/1
1/2
01
3 2
:00
6/1
1/2
01
3 1
7:3
0
7/1
1/2
01
3 9
:00
8/1
1/2
01
3 0
:30
8/1
1/2
01
3 1
6:0
0
9/1
1/2
01
3 7
:30
9/1
1/2
01
3 2
3:0
0
10
/11
/20
13
14
:30
11
/11
/20
13
6:0
0
11
/11
/20
13
21
:30
12
/11
/20
13
13
:00
13
/11
/20
13
4:3
0
13
/11
/20
13
20
:00
14
/11
/20
13
11
:30
15
/11
/20
13
3:0
0
15
/11
/20
13
18
:30
16
/11
/20
13
10
:00
17
/11
/20
13
1:3
0
17
/11
/20
13
17
:00
18
/11
/20
13
8:3
0
19
/11
/20
13
19
/11
/20
13
15
:30
20
/11
/20
13
7:0
0
20
/11
/20
13
22
:30
21
/11
/20
13
14
:00
22
/11
/20
13
5:3
0
22
/11
/20
13
21
:00
23
/11
/20
13
12
:30
24
/11
/20
13
4:0
0
24
/11
/20
13
19
:30
25
/11
/20
13
11
:00
26
/11
/20
13
2:3
0
26
/11
/20
13
18
:00
27
/11
/20
13
9:3
0
28
/11
/20
13
1:0
0
28
/11
/20
13
16
:30
29
/11
/20
13
8:0
0
29
/11
/20
13
23
:30
30
/11
/20
13
15
:00
Nov
Total kWh ProfileNovember 2013
![Page 10: COMMUNITY ENERGY EFFICIENCY PROJECT FUNDING 2013€¦ · O I understard, and acknoyvledge that givirq false or misleading hfurmation in this Milestone Report is an offence under the](https://reader036.fdocuments.in/reader036/viewer/2022070720/5ee0fcfead6a402d666c0874/html5/thumbnails/10.jpg)
3
0
5000
10000
15000
20000
25000
30000
35000
Mar Apr May Jun Jul Aug Sep Oct Nov
Council Chambers kWh Month Consumption
Council Chambers Sub Meter Profile (kWh) - Nov 2013
Sum of N1 MDB (kWH)
Sum of N10 DB4 DOC MSERV (KWH)
Sum of N16 LS-1LIFT(kWH)
0
50
100
150
200
250
300
350
400
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23
Nov
2013
Council Chambers Weekly Profile kWh - November 2013
Week 1 Week 2 Week 3 Week 4 Week 5
Observations:
The chambers electric consumption for the month of October
2013 is 10% lower when compared with August 2013. The
electric consumption is trending downwards since the completion
of the EPC project.
The night and weekend load is almost 30% of weekday load. This
should be investigated to try and reduce the load.
![Page 11: COMMUNITY ENERGY EFFICIENCY PROJECT FUNDING 2013€¦ · O I understard, and acknoyvledge that givirq false or misleading hfurmation in this Milestone Report is an offence under the](https://reader036.fdocuments.in/reader036/viewer/2022070720/5ee0fcfead6a402d666c0874/html5/thumbnails/11.jpg)
4
0
5000
10000
15000
20000
25000
30000
35000
40000
Mar Apr May Jun Jul Aug Sep Oct Nov
kWh
Library Month kWh Consumption
2013
Library Sub Meter Profile (kWh) -November 2013
DB Existing Library(kWh)
DB New Library (kWh)
Library - Chiller (kWh)
Library HVAC (kWh)
0
100
200
300
400
500
600
700
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23
Nov
2013
Library Weekly Profile (kWh) November 2013
Week 1 Week 2 Week 3 Week 4 Week 5
Observations
• The library electric consumption for the month of October 2013 is 20% higher when compared with August 2013. The electric consumption is trending upwards since the completion of the EPC project.
• The lighting and HVAC is starting couple of hours before the library actually opens. The lighting and HVAC only needs to start an hour before library opens.
![Page 12: COMMUNITY ENERGY EFFICIENCY PROJECT FUNDING 2013€¦ · O I understard, and acknoyvledge that givirq false or misleading hfurmation in this Milestone Report is an offence under the](https://reader036.fdocuments.in/reader036/viewer/2022070720/5ee0fcfead6a402d666c0874/html5/thumbnails/12.jpg)
5
Observations
• The Olympic pool electric consumption for the month of October 2013 is 29% lower when compared with August 2013. The electric consumption is trending downwards since the completion of the EPC project.
0
50000
100000
150000
200000
250000
Mar Apr May Jun Jul Aug Sep Oct Nov
kWh
Olympic Pool kWh Month Consumption
2013
Olympic Pool Sub Meter Profile (kWh) November 2013
Sum of 25mF - OlympicPool (kWh)
Sum of Restuarant -Olympic Pool (kWh)
Sum of Cafe - OlympicPool (kWh)
0500
1000150020002500
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23
Nov
2013
Olympic Pool Weekly Profile kWh -November 2013
Week 1 Week 2 Week 3 Week 4 Week 5
![Page 13: COMMUNITY ENERGY EFFICIENCY PROJECT FUNDING 2013€¦ · O I understard, and acknoyvledge that givirq false or misleading hfurmation in this Milestone Report is an offence under the](https://reader036.fdocuments.in/reader036/viewer/2022070720/5ee0fcfead6a402d666c0874/html5/thumbnails/13.jpg)
6
Observations
• 1 James Place electric consumption for the month of October 2013
is 4% higher when compared with August 2013. The electric
consumption was trending downwards untill September since the
completion of the EPC project.
• There is electric consumption on Saturday 19th October. Check
booking details.
05000
100001500020000250003000035000400004500050000
Mar Apr May Jun Jul Aug Sep Oct Nov
kWh
1 James Place kWh Month Consumption
2013
1 James Place Sub Meter Profile (kWh) November 2013
Sum of Mech Main - 1James Pl (kWh)
Sum of House Serv - 1James Pl (kWh)
Sum of Heaters - 1 JamesPl (kWh)
0
100
200
300
400
500
600
700
800
900
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23
Nov
2013
1 James Place Weekly Profile kWh - November 2013
Week 1 Week 2 Week 3 Week 4 Week 5
![Page 14: COMMUNITY ENERGY EFFICIENCY PROJECT FUNDING 2013€¦ · O I understard, and acknoyvledge that givirq false or misleading hfurmation in this Milestone Report is an offence under the](https://reader036.fdocuments.in/reader036/viewer/2022070720/5ee0fcfead6a402d666c0874/html5/thumbnails/14.jpg)
7
The night and weekend load is almost 30% of weekday load. This should be investigated to try and reduce the load.
![Page 15: COMMUNITY ENERGY EFFICIENCY PROJECT FUNDING 2013€¦ · O I understard, and acknoyvledge that givirq false or misleading hfurmation in this Milestone Report is an offence under the](https://reader036.fdocuments.in/reader036/viewer/2022070720/5ee0fcfead6a402d666c0874/html5/thumbnails/15.jpg)
8
• The lighting and HVAC is starting couple of hours before the library actually opens. The lighting and HVAC only needs to start an hour before library opens.
![Page 16: COMMUNITY ENERGY EFFICIENCY PROJECT FUNDING 2013€¦ · O I understard, and acknoyvledge that givirq false or misleading hfurmation in this Milestone Report is an offence under the](https://reader036.fdocuments.in/reader036/viewer/2022070720/5ee0fcfead6a402d666c0874/html5/thumbnails/16.jpg)
9
• There is electric consumption on Saturday 19th October. Check booking details
![Page 17: COMMUNITY ENERGY EFFICIENCY PROJECT FUNDING 2013€¦ · O I understard, and acknoyvledge that givirq false or misleading hfurmation in this Milestone Report is an offence under the](https://reader036.fdocuments.in/reader036/viewer/2022070720/5ee0fcfead6a402d666c0874/html5/thumbnails/17.jpg)
10
Issue No. Equipment & Location
Site Opportunity Description Elec
(kWh) Nat Gas
(GJ) Water
(kl) Emissions
(t CO₂) ($)
Person Responsible
Date
1 Lighting/HVAC Chambers The night and weekend load is almost 30% of weekday load.
21,000 22 $6,000 21/10/13
2 Lighting/HVAC Library The lighting and HVAC is starting couple of hours before the library actually opens.
10,000 11 $3,000 21/10/13
3 Lighting/HVAC 1 James Place There is electric consumption on Saturday 19th October.
57,000 61 $16,000 21/10/13
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
88,000 94 $25,000