CEEP MILESTONE 5 REPORT Community Energy Efficiency Program Community Energy Efficiency Program

Transcript of Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In...

Page 1: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

CEEP MILESTONE 5 REPORT

Community

Energy

Efficiency

Program

Community

Energy

Efficiency

Program

Page 2: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

CEEP – Fifth Milestone Requirements

In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement, The City

of Canada Bay Council is submitting a report to address the following deliverables:

Milestone Description and Deliverables Milestone Date DCCEE Funding

(GST Exclusive)

5. Fifth Milestone

Submission of a Milestone Report for acceptance by the

Department in accordance with clause 8.4 indicating the

level of Other Contributions made in relation to and

completion in accordance with approved project plan in

Milestone 2 of the activities described in:

a. 1.2 from Table 1 including evidence of

completed works and testing;

b. 2.2 from Table 2 including evidence of

completed works and testing;

c. 3.2 from Table 3 including evidence of

completed works and testing;

d. 4.2 from Table 4 including evidence of

completed works and testing

e. 5.3.2 and 5.3.3 from Table 5 including a copy

of all fact sheets developed, in Attachment A

to Schedule 2.

Submission of a Final Report in accordance with Schedule 4

for approval by the Department in accordance with clause 8.4

of the Agreement including submitting evidence to the

Department of all expenses incurred by the Recipient in

relation to contingencies forming part of the Budget identified

in Item 2 of this Schedule 2

f. Submission of a Financial Report for

acceptance by the Department in accordance

with clause 8.2 and 8.4 of the Agreement.

Wednesday

30th October

2013

$70,808

Page 3: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 3 of 77 Last Revised: 12/02/2014

PART A: Five Dock Leisure Centre, Crn Queens and William Street, Five Dock NSW 2046

PART Activity

Expected

completion

date

Estimated

cost

A.1

A.2

Lighting,

metering and

HVAC works

1.2.1 Completion of lighting works,

(including testing lighting Lux levels and

taking spot readings), and correct disposal

of lights in accordance with applicable

Local, State, Territory and Commonwealth

legislation including codes and policies.

30th October

2013

$20,000

A.3 Lighting,

metering and

HVAC works

1.2.2 Completion of HVAC works

Schedule and complete installation,

including airflow testing to ensure air

volumes and quality levels meet all

applicable standards.

30th October

2013

$20,000

Page 4: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 4 of 77 Last Revised: 12/02/2014

PART A.1– Completion of lighting works, (including testing lighting Lux levels and taking spot readings). Please refer to appendix C.1 – Envirolite Community Energy Efficiency-Lighting Upgrade Handover Report – Five Dock Leisure Centre, Section 6 for the Lux Levels recorded after installation. (Section 6 of the Handover Report details the measurement procedure, lux meter and positioning guide, lux meter specifications and pre and post lux readings.)

Page 5: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Page Removed for Publication

Page 6: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 6 of 77 Last Revised: 12/02/2014

Below are some images of the completed lighting upgrades a Five Dock Leisure Centre for your review:

Page 7: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 7 of 77 Last Revised: 12/02/2014

Page 8: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 8 of 77 Last Revised: 12/02/2014

Page 9: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 9 of 77 Last Revised: 12/02/2014

PART A.2 – Disposal of lights.

Page 10: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 10 of 77 Last Revised: 12/02/2014

Page 11: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 11 of 77 Last Revised: 12/02/2014

Page 12: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 12 of 77 Last Revised: 12/02/2014

PART A.3 – Schedule and complete installation, including airflow testing to ensure air volumes and quality levels meet all applicable standards.

Below are some images of the completed HVAC upgrades a Five Dock Leisure Centre for your review:

Please refer to Folder – HVAC Technical Specs for further information

Page 13: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 13 of 77 Last Revised: 12/02/2014

Page 14: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 14 of 77 Last Revised: 12/02/2014

Page 15: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 15 of 77 Last Revised: 12/02/2014

PART B: City of Canada Bay Council Depot, 15-17 Regatta Road, Five Dock NSW 2046

PART Activity Expected

completion

date

Estimated

Cost

B.1

B.2

Lighting,

metering

and HVAC

works

2.2.1 Completion of lighting works, (including

testing lighting Lux levels and taking spot

readings), and correct disposal of lights in

accordance with applicable Local, State,

Territory and Commonwealth legislation

including codes and policies.

30th October

2013

$20,000

B.3

Lighting,

metering

and HVAC

works

2.2.2 Completion of HVAC works.

Schedule and complete installation, including

airflow testing to ensure air volumes and

quality levels meet all applicable standards.

30th October

2013

$20,000

Page 16: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 16 of 77 Last Revised: 12/02/2014

PART B.1 – Completion of lighting works, (including testing lighting Lux levels and taking spot readings),

Please refer to Appendix C.2 - Envirolite Community Energy Efficiency-Lighting Upgrade Handover Report – CCBC Depot, section 6 for the Lux Levels recorded after installation. (Section 6 of the Handover Report details the measurement procedure, lux meter and positioning guide, lux meter specifications and pre and post lux readings.)

Page 17: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Page Removed for Publication

Page 18: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 18 of 77 Last Revised: 12/02/2014

Below are some images of the completed lighting upgrades to the Council Depot for your review:

Page 19: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 19 of 77 Last Revised: 12/02/2014

Page 20: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 20 of 77 Last Revised: 12/02/2014

PART B.2 –Disposal of lights in accordance with applicable Local, State, Territory and Commonwealth legislation including codes and policies.

Page 21: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 21 of 77 Last Revised: 12/02/2014

Page 22: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 22 of 77 Last Revised: 12/02/2014

Page 23: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 23 of 77 Last Revised: 12/02/2014

Page 24: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 24 of 77 Last Revised: 12/02/2014

Page 25: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 25 of 77 Last Revised: 12/02/2014

PART B.3 – Schedule and complete installation, including airflow testing to ensure air volumes and quality levels meet all applicable standards.

Below are some images of the completed HVAC upgrades to the Council Depot for your review:

Please refer to folder – HVAC Technical Specs for more information

Page 26: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 26 of 77 Last Revised: 12/02/2014

PART C: City of Canada Bay Council Civic Centre, 1a Marlborough Street, Drummoyne NSW 2047

PART Activity Expected

completion

date

Estimated

cost

C.1

C.2

Lighting,

metering and

HVAC works

3.2.1 Completion of lighting works,

(including testing lighting Lux levels

and taking spot readings), and correct

disposal of lights in accordance with

applicable Local, State, Territory and

Commonwealth legislation including

codes and policies.

30th October

2013

$50,000

C.3

Lighting,

metering and

HVAC works

3.2.2 Completion of HVAC works.

Schedule and complete installation,

including airflow testing to ensure air

volumes and quality levels meet all

applicable standards.

30th October

2013

$80,000

Page 27: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 27 of 77 Last Revised: 12/02/2014

PART C.1 – Completion of lighting works, (including testing lighting Lux levels and taking spot readings),

Please refer to Appendix C.3 - Envirolite Community Energy Efficiency-Lighting Upgrade Handover Report –CCBC Civic Centre, Section 6 for the Lux Levels recorded after installation. (Section 6 of the Handover Report details the measurement procedure, lux meter and positioning guide, lux meter specifications and pre and post lux readings.)

Page 28: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Page Removed for Publication

Page 29: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 29 of 77 Last Revised: 12/02/2014

Below are some images of the completed lighting upgrades to the Council Civic Centre for your

review:

Page 30: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 30 of 77 Last Revised: 12/02/2014

Page 31: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 31 of 77 Last Revised: 12/02/2014

PART C.2 –Disposal of lights in accordance with applicable Local, State, Territory and Commonwealth legislation including codes and policies.

Page 32: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 32 of 77 Last Revised: 12/02/2014

Page 33: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 33 of 77 Last Revised: 12/02/2014

Page 34: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 34 of 77 Last Revised: 12/02/2014

PART C.3 – Schedule and complete installation, including airflow testing to ensure air volumes and quality levels meet all applicable standards.

Below are some images of the completed HVAC upgrades to the Council Civic Centre for your

review:

Please refer to folder – HVAC Technical Specs for further information

Page 35: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 35 of 77 Last Revised: 12/02/2014

PART D: Concord Oval, Cnr Loftus and Gipps Street, Concord NSW 2137

PART Activity Expected

completion

date

Estimated

Cost

D.1

D.2

Lighting,

metering

and HVAC

works

4.2.1 Completion of lighting works, (including

testing lighting lux levels and taking spot

readings), and correct disposal of lights in

accordance with applicable Local, State,

Territory and Commonwealth legislation

including codes and policies.

30th October

2013

$20,000

D.3

Lighting,

metering

and HVAC

works

4.2.2 Completion of HVAC works,

Schedule and complete installation, including

airflow testing to ensure air volumes and

quality levels meet all applicable standards.

30th October

2013

$20,000

Page 36: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 36 of 77 Last Revised: 12/02/2014

PART D.1 – Completion of lighting works, (including testing lighting Lux levels and taking spot readings),

Please refer to Appendix C.4 - Envirolite Community Energy Efficiency-Lighting Upgrade Handover Report – Concord Oval, Section 6 for the Lux Levels recorded after installation. (Section 6 of the Handover Report details the measurement procedure, lux meter and positioning guide, lux meter specifications and pre and post lux readings.)

Page 37: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Page Removed for Publication

Page 38: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 38 of 77 Last Revised: 12/02/2014

Below are some images of the completed lighting upgrades to the Concord Oval for your review:

Page 39: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 39 of 77 Last Revised: 12/02/2014

Page 40: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 40 of 77 Last Revised: 12/02/2014

Page 41: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 41 of 77 Last Revised: 12/02/2014

PART D.2 –Disposal of lights in accordance with applicable Local, State, Territory and Commonwealth legislation including codes and policies.

Page 42: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 42 of 77 Last Revised: 12/02/2014

Page 43: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 43 of 77 Last Revised: 12/02/2014

PART D.3 – Schedule and complete installation, including airflow testing to ensure air volumes and quality levels meet all applicable standards.

Below are some images of the completed HVAC upgrades to the Concord Oval for your review:

Please refer to Folder – HVAC Technical Specs for further information required.

Page 44: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 44 of 77 Last Revised: 12/02/2014

PART E: Administration and communication activities

PART Activity Expected

completion

date

Estimated

Cost

E.1

E.2

Communica

tions

activities

5.3.2 Communication activities completed,

including:

- published Activity-related articles in

‘Bayside Brief’ and ‘The Enzine’ newsletter

- on-site communication – staggered for each

site as completion of each part of the Activity;

12th June

2013

$4,000

E.3

E.4

E.5

Communica

tions

activities

5.3.3 Fact sheets developed and distributed

with rates notices to all ratepayers in the

Recipient’s area post-Activity completion

(35,000 copies)

- case Studies for each Activity site written

and posted on Recipient’s web site; and

- case Studies presented to Local

Government Association of NSW (LGA) and

the Shires Association of NSW (SA)

30th October

2013

$5,000

Page 45: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 45 of 77 Last Revised: 12/02/2014

PART E.1 – Activity-related articles in ‘Bayside Brief’ and ‘The Enzine’ newsletter.

Page 46: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 46 of 77 Last Revised: 12/02/2014

Page 47: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 47 of 77 Last Revised: 12/02/2014

PART E.2 – On-site communication – staggered for each site as completion of each part of the Activity.

Page 48: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 48 of 77 Last Revised: 12/02/2014

PART E.3 – Fact sheets developed and distributed with rates notices to all ratepayers in the Recipient’s area post-Activity completion (35,000 copies).

Page 49: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 49 of 77 Last Revised: 12/02/2014

Page 50: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 50 of 77 Last Revised: 12/02/2014

PART E.4 – Case Studies for each Activity site written and posted on Recipient’s web site.

The City of Canada Bay Council has developed a series of case study video clips for the sites that were upgraded under the CEEP Program, which may be viewed by clicking on the following links:

CEEP Project - Five Dock Leisure Centre: http://youtu.be/XcrkwYiwl5I

CEEP Project – City of Canada Bay Council Works Depot: http://youtu.be/bvb6-FVreO8

CEEP Project – Concord Oval: http://youtu.be/tpFbMEDzZsg

CEEP Project – City of Canada Bay Civic Centre: http://youtu.be/Z85AOKVRlyY

CEEP Program- Project Overview: http://youtu.be/c3VkYr7HwOM

Following the Department’s review and acceptance, these case study videos will be showcased on The City of Canada Bay Council’s website for access by the general public.

Page 51: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 51 of 77 Last Revised: 12/02/2014

PART E.5 – Case Studies presented to Local Government Association of NSW (LGA) and the Shires Association of NSW (SA).

Page 52: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 52 of 77 Last Revised: 12/02/2014

Page 53: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 53 of 77 Last Revised: 12/02/2014

Page 54: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 54 of 77 Last Revised: 12/02/2014

APPENDICIES

Supporting Information for Milestone 5:

Appendix A – Invoices for works completed during this milestone period.

A.1 – Lighting

A.2 – HVAC

A.3 – Sub Metering

A.4 – Building Renewals

A.5 – Consultancy and Project Management

Appendix B – Financial Report

Appendix C – Envirolight Handover Reports

C.1 – Handover Report – Five Dock Leisure Centre

C.2 – Handover Report – CCBC Depot

C.3 – Handover Report – CCBC Civic Centre

C.4 – Handover Report – Concord Oval

Page 55: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Appendix Removed for Publication

Page 56: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 75 of 77 Last Revised: 12/02/2014

Appendix B: Financial Report

Page 57: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 76 of 77 Last Revised: 12/02/2014

Appendix C: Lighting Handover Reports

Page 58: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

The City of Canada Bay – Community Energy Efficiency Program (CEEP) - Milestone 5 Report

Owner: Andrew Dimitriadis Page 77 of 77 Last Revised: 12/02/2014

1a Marlborough Street, Drummoyne NSW 2047

Tel 9911 6555 Fax 9911 6550 www.canadabay.nsw.gov.au

Page 59: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Community Energy Efficiency-Lighting Upgrade

Contract No. 2013/TS50

Handover Report-CCBC Civic Centre

1A Marlborough St,Drummoyne.NSW.2047.

Lighting Upgrade By

Page 60: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 2 -

Introduction This report has been prepared by Envirolite Pty Ltd and details the results achieved from the recent lighting upgrade

work completed at CCBC Civic Centre 1A Marlborough St, Drummoyne as part of the City of Canada Bay Council

CEEP-Lighting Upgrade Project.

Envirolite Pty Ltd, a one hundred percent Australian Owned Company, is proud to have been selected to provide the

lighting solution for this project. Energy reductions and improvements to the working environment have been achieved

via the installation of E1 light fittings which is an Australian developed world leading lighting innovation.

A summary of the benefits achieved from the installation of the new lighting is as follows:

Direct power usage by the lighting has been reduced from 266.9 amps to 105.9 amps a reduction of 60.3%

(This excludes additional savings achieved from the installation of daylight harvesting and motion sensors and in air

conditioning where it is installed due to a reduction in the lighting heat load).

The number of fittings installed on site has reduced from 879 to 816 fittings (7.17%)

The number of lamps in operation has been reduced from 1369 to 912, a reduction of 50.1%.

The number of ballasts in operation has been reduced from 1354 to 822, a reduction of 64.7%.

Lighting levels have been maintained in accordance with the requirements of Australian Lighting Standards.

Note: During the course of the installation, 23 ballasts containing carcinogenic PCB was found, removed and disposed

of according to NSW OH & S and Workcover Regulations.

Page 61: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 3 -

Table of Contents 1 PROJECT DATES 5

2 LIGHT FITTING COUNTS 6

2.1 PRE-EXISTING LIGHT FITTINGS 6 2.1.1 Summary 6 2.1.2 By Location 8

2.2 AS INSTALLED LIGHT FITTINGS 14 2.2.1 Summary 14 2.2.2 By Location 15

3 EXIT LIGHTS 21

3.1.1 Details 21 3.1.2 Summary 21 3.1.3 Location 21

4 SENSORS 22

4.1 SENSOR DETAILS 22 4.2 SENSOR SUMMARY 23 4.3 SENSOR LOCATIONS 23 4.4 SENSOR ID & PROGRAMMING 23

5 FITTING COMPONENTS 27

5.1 COMPARISON OF LAMP AND BALLAST NUMBERS PRE AND POST INSTALLATION 27 5.1.1 Summary 27 5.1.2 Pre-existing 27 5.1.3 As Installed 28

5.2 INSTALLED FITTING COMPONENTS 30 5.2.1 Component Legend 30 5.2.2 Component Breakdown by Fitting 31

AMP READINGS 32

5.3 SUMMARY 32 5.4 AREA BY AREA READINGS 32

6 LUX LEVELS 35

6.1 RECOMMENDED ILLUMINANCE 35 6.2 MEASUREMENT PROCEDURE 36

6.2.1 Lux Meter Positioning Guide 37 6.2.2 Small Room / Area Positioning 37 6.2.3 Medium Room / Area Positioning 38 6.2.4 Large Room / Area Positioning 38

6.3 LUX METER SPECIFICATIONS 39 6.4 PRE AND POST LUX READINGS 40

7 RECYCLING RECONCILIATION 53

7.1 METAL RECYCLING 54 7.2 LAMP RECYCLING 56

8 GENERAL FITTING GUIDELINES 57

8.1 HANDLING E1 LIGHT FITTINGS 57 8.2 CLEANING E1 LIGHT FITTINGS 57 8.3 INSTALLATION OF E1 LIGHTING 57

9 ENVIROLITE PTY LTD WARRANTY 58

Page 62: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 4 -

10 ENVIROLITE PTY LTD CONTACT DETAILS 60

10.1 OPERATIONS ENQUIRIES 60

APPENDICES 61

APPENDIX A – ELECTRICAL CERTIFICATE 61 APPENDIX B – SENSOR COMMISSIONING CHECKLIST 65 APPENDIX C – SENSOR SPECIFICATIONS 68 APPENDIX D – EXIT LIGHT SPECIFICATIONS 121 APPENDIX E –AS BUILT LIGHTING LAYOUTS 130

Page 63: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 5 -

1 Project Dates Work commenced on 21st August 2013 and completed on 5th September 2013.

Page 64: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 6 -

2 Light Fitting Counts 2.1 Pre-existing Light Fittings

2.1.1 Summary Fitting Description Subtotal

2x18W BATTEN SM 11

1x18W BATTEN 29

2x18W BATTEN EMG 5

2x18W PLASTER TROF 2

2x18W TROFFER (300MMX600MM) 10

2x36W PLASTER TROFFER 4

1x36W PLASTER TROFFER 2

2x36W TROFFER (300MMX1200MM) 198

2x36W BATTEN WG 33

2x36W BATTEN EMG 17

2x36W BATTEN SUSPENDED 18

1x36W BATTEN 9

2x36W BATTEN PD 46

2x36W WALL LIGHT 7

1x50W DICHROIC DL 271

1x50W DICHROIC 120 DIA 10

1x36W BATTEN EMG 1

2x18W DL 175-230DIA 61

EXIT LIGHTS 47

1X40W OYSTER LIGHT HALOGEN 4

1X40W WALL LIGHT HALOGEN 6

1x60W INCANDESCANT 11

1x400W High Bay 4

1x100W Flood Light 5

2x18W BATTEN PENDANT 27

Page 65: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 7 -

Fitting Description Subtotal

1x18W CFL Pendant Light 39

1X250W FLOOD LIGHT 2

Total 879

Page 66: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 8 -

2.1.2 By Location

Lower Ground

Fitting Description STAFF

LU

NCH

STAFF

AM

MEN

HALL

LARG

E S

TORE &

STO

RE

CARPA

RK A

ND

STO

RAG

E

KIT

CH

EN

CO

RP

PRIN

TIN

G

OPE

N O

FFIC

E

OFF

ICE 1

OFF

ICE 2

OFF

ICE 3

OFF

ICE 4

STAIR

1

STAIR

2

STAIR

3

Tota

l Lo

wer

Gro

und

2x18W BATTEN SM 11 11

1x18W BATTEN 8 8 2x18W BATTEN EMG 1 1 2 4 2x18W PLASTER TROF 2 2 2x18W TROFFER (300MMX600MM) 0 2x36W PLASTER TROFFER 0 1x36W PLASTER TROFFER 0 2x36W TROFFER (300MMX1200MM) 4 4

2x36W BATTEN WG 20

13 33

2x36W BATTEN EMG 1 4 2 2 9

2x36W BATTEN SUSPENDED 18 18

1x36W BATTEN 1 1 2 2x36W BATTEN PD 0 2x36W WALL LIGHT 4 2 1 7 1x50W DICHROIC DL 2 3 5 1x50W DICHROIC 120 DIA 0 1x36W BATTEN EMG 1 1 2x18W DL 175-230DIA 4 6 2 4 6 2 24 EXIT LIGHTS 1 3 2 2 2 1 11 1X40W OYSTER LIGHT HALOGEN 0 1X40W WALL LIGHT HALOGEN 0 1x60W INCANDESCANT 0 1x400W High Bay 0 1x100W Flood Light 0 2x18W BATTEN PENDANT 0 1x18W CFL Pendant Light 0 1X250W FLOOD LIGHT 0

Total Lower Ground 13 10 8 23 20 4 4 24 6 4 5 6 7 3 2 139

Page 67: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 9 -

Fitting Description2x

18W

BA

TTE

N S

M

1x18

W B

ATT

EN

2x18

W B

ATT

EN

EM

G

2x18

W P

LAS

TER

TR

OF

2x18

W T

RO

FFE

R (3

00M

MX

600M

M)

2x36

W P

LAS

TER

TR

OFF

ER

1x36

W P

LAS

TER

TR

OFF

ER

2x36

W T

RO

FFE

R (3

00M

MX

1200

MM

)

2x36

W B

ATT

EN

WG

2x36

W B

ATT

EN

EM

G

2x36

W B

ATT

EN

SU

SP

EN

DE

D

1x36

W B

ATT

EN

2x36

W B

ATT

EN

PD

2x36

W W

ALL

LIG

HT

1x50

W D

ICH

RO

IC D

L

1x50

W D

ICH

RO

IC 1

20 D

IA

1x36

W B

ATT

EN

EM

G

2x18

W D

L 17

5-23

0DIA

EX

IT L

IGH

TS

1X40

W O

YS

TER

LIG

HT

HA

LOG

EN

1X40

W W

ALL

LIG

HT

HA

LOG

EN

1x60

W IN

CA

ND

ES

CA

NT

1x40

0W H

igh

Bay

1x10

0W F

lood

Lig

ht

2x18

W B

ATT

EN

PE

ND

AN

T

1x18

W C

FL P

enda

nt L

ight

1X25

0W F

LOO

D L

IGH

T

Tota

l Gro

und

RECORDS UNIT 8 5 13LIBRARY 8 8

LIBRARY OFFICE 3 3RECORDS OFFICE CORRIDOR 4 2 6

STAIR 5 1 5 6MALE 4 4

FEMALE 5 5MANAGER CIT SERVIC 2 2PA DIRECTOR OFFICE 8 8DIRECTOR INFO SER 1 2 3

CORRIDOR 1 4 6 3 13CITIZEN SERV UNIT 8 8

CITIZEN AUX. 1 1RECEPTION CUST SERV 46 2 48

STAIR 3 2 2KITCHEN 2 2

ENVIRO OFFICE 5 5TRAFFIC PROPERTY 1 11 12

MANAGER ASSET INFRASTRUCTURE 1 3 4HALL1 1 9 4 14

IT STORE 2 2TOILETS 2 1 2 5

DB 1 1 1HALL2 12 1 1 14

MEETING ROOM 2 2 4STAIR 4 2 2

COMP ROOM 3 3STAIR 2 2 2

IT MANAGER 3 3IT OFFICE 6 6

IT HALL 4 4OPEN OFFICE 01 4 18 22

STAIR 1 4 4OFFICE 1 2 2 4OFFICE 2 2 2 4OFFICE 3 3 3 6OFFICE 4 2 2 4OFFICE 5 3 3 6

OPEN AREA 20 10 12 42OUTSIDE 13 13

Total Ground 0 11 0 0 10 0 2 123 0 4 0 1 6 0 102 10 0 37 12 0 0 0 0 0 0 0 0 318

Gro

und

Page 68: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 10 -

Fitting Description

2x18

W B

ATT

EN

SM

1x18

W B

ATT

EN

2x18

W B

ATT

EN

EM

G

2x18

W P

LAS

TER

TR

OF

2x18

W T

RO

FFE

R (3

00M

MX

600M

M)

2x36

W P

LAS

TER

TR

OFF

ER

1x36

W P

LAS

TER

TR

OFF

ER

2x36

W T

RO

FFE

R (3

00M

MX

1200

MM

)

2x36

W B

ATT

EN

WG

2x36

W B

ATT

EN

EM

G

2x36

W B

ATT

EN

SU

SP

EN

DE

D

1x36

W B

ATT

EN

2x36

W B

ATT

EN

PD

2x36

W W

ALL

LIG

HT

1x50

W D

ICH

RO

IC D

L

1x50

W D

ICH

RO

IC 1

20 D

IA

1x36

W B

ATT

EN

EM

G

2x18

W D

L 17

5-23

0DIA

EX

IT L

IGH

TS

1X40

W O

YSTE

R L

IGH

T H

ALO

GEN

1X40

W W

ALL

LIG

HT

HA

LOG

EN

1x60

W IN

CA

ND

ES

CA

NT

1x40

0W H

igh

Bay

1x10

0W F

lood

Lig

ht

2x18

W B

ATTE

N P

END

ANT

1x18

W C

FL P

enda

nt L

ight

1X25

0W F

LOO

D L

IGH

T

Tota

l Lev

el 1

ROOM 1 4 4ROOM 2 2 2ROOM 3 3 3ROOM 4 38 3 41

ROOM 5 MALE 4 4ROOM 5A FEMALE 4 4

STAIRS 1 5 5ROOM 6 4 4ROOM 7 2 2ROOM 8 4 4STAIRS 2 1 1ROOM 10 3 3ROOM 11 8 8

HALL 1 1ROOM 12 2 2ROOM 13 5 5ROOM 14 6 6ROOM 15 17 1 18ROOM 16 42 1 43ROOM 17 2 2ROOM 18 3 3

DB2 1 1KITCHEN 4 4ROOM 20 2 2

HALL 7 2 9ROOM 23 25 1 6 32ROOM 24 24 1 25

Total Level 1 0 8 0 0 0 4 0 71 0 4 0 3 0 0 130 0 0 0 9 3 6 0 0 0 0 0 0 238

Leve

l 1

Page 69: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 11 -

Rangers Cottage

Fitting Description

KIT

CH

EN

HA

LL

RO

OM

1

RO

OM

2

RO

OM

3

RO

OM

4

RO

OM

5

RO

OM

6

RO

OM

7

RO

OM

8

RO

OM

9

RO

OM

10

RO

OM

11

Toile

t

tota

l Ran

gers

cot

tage

2x18W BATTEN SM 0 1x18W BATTEN 0 2x18W BATTEN EMG 0 2x18W PLASTER TROF 0 2x18W TROFFER (300MMX600MM) 0 2x36W PLASTER TROFFER 0 1x36W PLASTER TROFFER 0 2x36W TROFFER (300MMX1200MM) 0 2x36W BATTEN WG 0 2x36W BATTEN EMG 0 2x36W BATTEN SUSPENDED 0 1x36W BATTEN 1 1 2 2x36W BATTEN PD 1 2 3 1 2 2 11 2x36W WALL LIGHT 0 1x50W DICHROIC DL 2 3 4 9 1x50W DICHROIC 120 DIA 0 1x36W BATTEN EMG 0 2x18W DL 175-230DIA 0 EXIT LIGHTS 0 1X40W OYSTER LIGHT HALOGEN 0 1X40W WALL LIGHT HALOGEN 0 1x60W INCANDESCANT 5 1 1 1 1 1 1 11 1x400W High Bay 0 1x100W Flood Light 0 2x18W BATTEN PENDANT 0 1x18W CFL Pendant Light 0 1X250W FLOOD LIGHT 0

Total Rangers Cottage 4 8 6 3 1 3 2 1 1 1 1 1 0 1 33

Page 70: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 12 -

Civic Hall

Fitting Description

EN

TRY

MA

LE

FEM

ALE

KIT

CH

EN

MA

IN H

ALL

STA

GE

TOIL

ET

LOW

ER

LEV

EL

OU

TSID

E

Tota

l Civ

ic H

all

2x18W BATTEN SM 0 1x18W BATTEN 1 1 2 2x18W BATTEN EMG 1 1 2x18W PLASTER TROF 0 2x18W TROFFER (300MMX600MM) 0 2x36W PLASTER TROFFER 0 1x36W PLASTER TROFFER 0 2x36W TROFFER (300MMX1200MM) 0 2x36W BATTEN WG 0 2x36W BATTEN EMG 0 2x36W BATTEN SUSPENDED 0 1x36W BATTEN 1 1 2x36W BATTEN PD 3 2 2 4 8 10 29 2x36W WALL LIGHT 0 1x50W DICHROIC DL 21 4 25 1x50W DICHROIC 120 DIA 0 1x36W BATTEN EMG 0 2x18W DL 175-230DIA 0 EXIT LIGHTS 2 1 1 2 6 3 15 1X40W OYSTER LIGHT HALOGEN 1 1 1X40W WALL LIGHT HALOGEN 0 1x60W INCANDESCANT 0 1x400W High Bay 4 4 1x100W Flood Light 5 5 2x18W BATTEN PENDANT 20 2 5 27 1x18W CFL Pendant Light 9 30 39 1X250W FLOOD LIGHT 2 2

Total Civic Hall 35 3 8 6 60 15 3 19 2 151

Page 71: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 13 -

Total Sites

Fitting Description

Tota

l Low

er G

roun

d

Tota

l Gro

und

Tota

l Lev

el 1

tota

l Ran

gers

cot

tage

Tota

l Civ

ic H

all

Tota

l All

site

s

2x18W BATTEN SM 11 0 0 0 0 11 1x18W BATTEN 8 11 8 0 2 29 2x18W BATTEN EMG 4 0 0 0 1 5 2x18W PLASTER TROF 2 0 0 0 0 2 2x18W TROFFER (300MMX600MM) 0 10 0 0 0 10 2x36W PLASTER TROFFER 0 0 4 0 0 4 1x36W PLASTER TROFFER 0 2 0 0 0 2 2x36W TROFFER (300MMX1200MM) 4 123 71 0 0 198 2x36W BATTEN WG 33 0 0 0 0 33 2x36W BATTEN EMG 9 4 4 0 0 17 2x36W BATTEN SUSPENDED 18 0 0 0 0 18 1x36W BATTEN 2 1 3 2 1 9 2x36W BATTEN PD 0 6 0 11 29 46 2x36W WALL LIGHT 7 0 0 0 0 7 1x50W DICHROIC DL 5 102 130 9 25 271 1x50W DICHROIC 120 DIA 0 10 0 0 0 10 1x36W BATTEN EMG 1 0 0 0 0 1 2x18W DL 175-230DIA 24 37 0 0 0 61 EXIT LIGHTS 11 12 9 0 15 47 1X40W OYSTER LIGHT HALOGEN 0 0 3 0 1 4 1X40W WALL LIGHT HALOGEN 0 0 6 0 0 6 1x60W INCANDESCANT 0 0 0 11 0 11 1x400W High Bay 0 0 0 0 4 4 1x100W Flood Light 0 0 0 0 5 5 2x18W BATTEN PENDANT 0 0 0 0 27 27 1x18W CFL Pendant Light 0 0 0 0 39 39 1X250W FLOOD LIGHT 0 0 0 0 2 2

Total All Sites 139 318 238 33 151 879

Page 72: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 14 -

2.2 As Installed Light Fittings 2.2.1 Summary Fitting Description Subtotal

1X14W TROFFER SURFACE MOUNTED 2

2X14W TROFFER SURFACE MOUNTED 4

2x26W BATTEN 10

1x14W BATTEN 35

1x14W BATTEN EMG 5

1x14W TROFFER DIM 10

1x26W PLASTER DIM 6

1x26W TROFFER DIM 169

2x26W TROFFER DIM 24

1x26W BATTEN PD 59

1x26W BATTEN EMG 14

2X26W TROFFER SUSPENDED 18

2X26W TROFFER WALL FITTING 6

1x10.5W DR700 LED DOWNLIGHT 185

1X14W TROFFER PLASTER 2

1X36W BATTEN EMG 4

1x16W D1000 LED DOWNLIGHT 112

EXIT LIGHTS 47

1X32W LED OYSTER LAMP 5

1X7W OSRAM LED RELAMP 13

5x36W HIGH BAY 6

1X40W MAT INDUCTION 5

2X30W BATTEN 10

1x12W OSRAM PARATHOM LED RELAMP 18

1X36W BATTEN WEATHERPROOF 17

1X120W MAT FLOOD 2

1X14W WALL LIGHT 6

1X26W WALL LIGHT 1

1X16W D900 LED DOWNLIGHT 21

816

Page 73: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 15 -

2.2.2 By Location

Lower Ground

Fitting Description

STAFF

LU

NCH

STAFF

AM

MEN

HALL

LARG

E S

TORE &

STO

RE

CARPA

RK A

ND

STO

RAG

E

KIT

CH

EN

CO

RP

PRIN

TIN

G

OPE

N O

FFIC

E

OFF

ICE 1

OFF

ICE 2

OFF

ICE 3

OFF

ICE 4

STAIR

1

STAIR

2

STAIR

3

Tota

l Lo

wer

Gro

und

1X14W TROFFER SURFACE MOUNTED 2 2 2X14W TROFFER SURFACE MOUNTED 4 4 2x26W BATTEN 0 1x14W BATTEN 8 8 1x14W BATTEN EMG 1 1 2 4 1x14W TROFFER DIM 0 1x26W PLASTER DIM 0 1x26W TROFFER DIM 4 4 2x26W TROFFER DIM 0 1x26W BATTEN PD 1 18 19 1x26W BATTEN EMG 2 2 2 6 2X26W TROFFER SUSPENDED 18 18 2X26W TROFFER WALL FITTING 4 1 1 6 1x10.5W DR700 LED DOWNLIGHT 0 1X14W TROFFER PLASTER 2 2 1X36W BATTEN EMG 4 4 1x16W D1000 LED DOWNLIGHT 2 4 6 2 4 8 5 31 EXIT LIGHTS 1 3 2 2 2 1 11 1X32W LED OYSTER LAMP 0 1X7W OSRAM LED RELAMP 0 5x36W HIGH BAY 0 1X40W MAT INDUCTION 0 2X30W BATTEN 0 1x12W OSRAM PARATHOM LED RELAMP 0 1X36W BATTEN WEATHERPROOF 3 14 17 1X120W MAT FLOOD 0 1X14W WALL LIGHT 0 1X26W WALL LIGHT 1 1 1X16W D900 LED DOWNLIGHT 0

Total Lower Ground 9 10 8 23 20 4 4 24 6 4 5 8 7 3 2 137

Page 74: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 16 -

Fitti

ng D

escr

iptio

n

1X14

W T

RO

FFE

R S

UR

FAC

E M

OU

NTE

D

2X14

W T

RO

FFE

R S

UR

FAC

E M

OU

NTE

D

2x26

W B

ATT

EN

1x14

W B

ATT

EN

1x14

W B

ATT

EN

EM

G

1x14

W T

RO

FFE

R D

IM

1x26

W P

LAS

TER

DIM

1x26

W T

RO

FFE

R D

IM

2x26

W T

RO

FFE

R D

IM

1x26

W B

ATT

EN

PD

1x26

W B

ATT

EN

EM

G

2X26

W T

RO

FFE

R S

US

PE

ND

ED

2X26

W T

RO

FFE

R W

ALL

FIT

TIN

G

1x10

.5W

DR

700

LED

DO

WN

LIG

HT

1X14

W T

RO

FFE

R P

LAS

TER

1X36

W B

ATT

EN

EM

G

1x16

W D

1000

LE

D D

OW

NLI

GH

T

EX

IT L

IGH

TS

1X32

W L

ED

OY

STE

R L

AM

P

1X7W

OS

RA

M L

ED

RE

LAM

P

5x36

W H

IGH

BA

Y

1X40

W M

AT

IND

UC

TIO

N

2X30

W B

ATT

EN

1x12

W O

SR

AM

PA

RA

THO

M L

ED

RE

LAM

P

1X36

W B

ATT

EN

WE

ATH

ER

PR

OO

F

1X12

0W M

AT

FLO

OD

1X14

W W

ALL

LIG

HT

1X26

W W

ALL

LIG

HT

1X16

W D

900

LED

DO

WN

LIG

HT

Tota

l Gro

und

RECORDS UNIT 12 12LIBRARY 7 1 8

LIBRARY OFFICE 3 3RECORDS OFFICE CORRIDOR 4 2 6

STAIR 5 1 5 6MALE 4 4

FEMALE 5 5MANAGER CIT SERVIC 2 2PA DIRECTOR OFFICE 7 7DIRECTOR INFO SER 2 2

CORRIDOR 1 5 4 3 12CITIZEN SERV UNIT 8 8

CITIZEN AUX. 1 1RECEPTION CUST SERV 46 2 48

STAIR 3 2 2KITCHEN 2 2

ENVIRO OFFICE 4 4TRAFFIC PROPERTY 11 11

MANAGER ASSET INFRA 3 3HALL1 8 2 4 14

IT STORE 2 2TOILETS 2 1 2 5

DB 1 1 1HALL2 11 1 12

MEETING ROOM 4 4STAIR 4 2 2

COMP ROOM 3 3STAIR 2 2 2

IT MANAGER 3 3IT OFFICE 6 6

IT HALL 7 7OPEN OFFICE 01 22 22

STAIR 1 4 4OFFICE 1 2 2OFFICE 2 2 2OFFICE 3 3 3OFFICE 4 2 2OFFICE 5 3 3

OPEN AREA 20 22 42OUTSIDE 2 11 13

Total Ground 0 0 0 11 0 7 2 106 16 2 4 0 0 65 0 0 62 12 0 13 0 0 0 0 0 0 0 0 0 300

Gro

und

Page 75: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 17 -

Fitti

ng D

escr

iptio

n

1X14

W T

RO

FFE

R S

UR

FAC

E M

OU

NTE

D

2X14

W T

RO

FFE

R S

UR

FAC

E M

OU

NTE

D

2x26

W B

ATT

EN

1x14

W B

ATT

EN

1x14

W B

ATT

EN

EM

G

1x14

W T

RO

FFE

R D

IM

1x26

W P

LAS

TER

DIM

1x26

W T

RO

FFE

R D

IM

2x26

W T

RO

FFE

R D

IM

1x26

W B

ATT

EN

PD

1x26

W B

ATT

EN

EM

G

2X26

W T

RO

FFER

SU

SPEN

DED

2X26

W T

RO

FFE

R W

ALL

FIT

TIN

G

1x10

.5W

DR

700

LED

DO

WN

LIG

HT

1X14

W T

RO

FFE

R P

LAS

TER

1X36

W B

ATT

EN

EM

G

1x16

W D

1000

LE

D D

OW

NLI

GH

T

EX

IT L

IGH

TS

1X32

W L

ED

OY

STE

R L

AM

P

1X7W

OS

RA

M L

ED

RE

LAM

P

5x36

W H

IGH

BA

Y

1X40

W M

AT IN

DU

CTI

ON

2X30

W B

ATT

EN

1x12

W O

SR

AM

PA

RA

THO

M L

ED

RE

LAM

P

1X36

W B

ATTE

N W

EATH

ERPR

OO

F

1X12

0W M

AT

FLO

OD

1X14

W W

ALL

LIG

HT

1X26

W W

ALL

LIG

HT

1X16

W D

900

LED

DO

WN

LIG

HT

Tota

l Lev

el 1

ROOM 1 3 3ROOM 2 2 2ROOM 3 3 3ROOM 4 3 35 3 41ROOM 5

MALE 4 4ROOM 5A FEMALE 4 4STAIRS 1 5 5ROOM 6 4 4ROOM 7 2 2ROOM 8 4 4STAIRS 2 1 1ROOM 10 3 3ROOM 11 4 4

HALL 1 1ROOM 12 2 2ROOM 13 5 5ROOM 14 6 6ROOM 15 17 1 18ROOM 16 42 1 43ROOM 17 2 2ROOM 18 3 3

DB2 1 1KITCHEN 4 4ROOM 20 2 2

HALL 7 2 9ROOM 23 25 1 6 32ROOM 24 24 1 25

Total Level 1 0 0 0 8 0 3 4 59 8 3 4 0 0 116 0 0 10 9 3 0 0 0 0 0 0 0 6 0 0 233

Leve

l 1

Page 76: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 18 -

Rangers Cottage

Fitting Description

KIT

CH

EN

HA

LL

RO

OM

1

RO

OM

2

RO

OM

3

RO

OM

4

RO

OM

5

RO

OM

6

RO

OM

7

RO

OM

8

RO

OM

9

RO

OM

10

RO

OM

11

Toile

t

tota

l Ran

gers

cot

tage

1X14W TROFFER SURFACE MOUNTED 0 2X14W TROFFER SURFACE MOUNTED 0 2x26W BATTEN 3 1 3 2 9 1x14W BATTEN 0 1x14W BATTEN EMG 0 1x14W TROFFER DIM 0 1x26W PLASTER DIM 0 1x26W TROFFER DIM 0 2x26W TROFFER DIM 0 1x26W BATTEN PD 2 2 1 1 6 1x26W BATTEN EMG 0 2X26W TROFFER SUSPENDED 0 2X26W TROFFER WALL FITTING 0 1x10.5W DR700 LED DOWNLIGHT 0 1X14W TROFFER PLASTER 0 1X36W BATTEN EMG 0 1x16W D1000 LED DOWNLIGHT 2 3 4 9 EXIT LIGHTS 0 1X32W LED OYSTER LAMP 1 1 1X7W OSRAM LED RELAMP 0 5x36W HIGH BAY 0 1X40W MAT INDUCTION 0 2X30W BATTEN 0 1x12W OSRAM PARATHOM LED RELAMP 5 1 1 1 1 9 1X36W BATTEN WEATHERPROOF 0 1X120W MAT FLOOD 0 1X14W WALL LIGHT 0 1X26W WALL LIGHT 0 1X16W D900 LED DOWNLIGHT 0

Total Rangers Cottage 4 8 6 3 1 3 2 1 1 1 1 1 1 1 34

Page 77: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 19 -

Civic Hall

Fitting Description

EN

TRY

MA

LE

FEM

ALE

KIT

CH

EN

MA

IN H

ALL

STA

GE

TOIL

ET

LOW

ER

LEV

EL

OU

TSID

E

Tota

l civ

ic H

all

1X14W TROFFER SURFACE MOUNTED 0 2X14W TROFFER SURFACE MOUNTED 0 2x26W BATTEN 1 1 1x14W BATTEN 2 6 8 1x14W BATTEN EMG 1 1 1x14W TROFFER DIM 0 1x26W PLASTER DIM 0 1x26W TROFFER DIM 0 2x26W TROFFER DIM 0 1x26W BATTEN PD 2 2 2 4 9 10 29 1x26W BATTEN EMG 0 2X26W TROFFER SUSPENDED 0 2X26W TROFFER WALL FITTING 0 1x10.5W DR700 LED DOWNLIGHT 4 4 1X14W TROFFER PLASTER 0 1X36W BATTEN EMG 0 1x16W D1000 LED DOWNLIGHT 0 EXIT LIGHTS 2 1 1 2 6 3 15 1X32W LED OYSTER LAMP 1 1 1X7W OSRAM LED RELAMP 0 5x36W HIGH BAY 6 6 1X40W MAT INDUCTION 5 5 2X30W BATTEN 10 10 1x12W OSRAM PARATHOM LED RELAMP 9 9 1X36W BATTEN WEATHERPROOF 0 1X120W MAT FLOOD 2 2 1X14W WALL LIGHT 0 1X26W WALL LIGHT 0 1X16W D900 LED DOWNLIGHT 21 21

Total Civic Hall 35 3 8 6 22 14 3 19 2 112

Page 78: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 20 -

Total Sites

Fitting Description

Tota

l Low

er G

roun

d

Tota

l Gro

und

Tota

l Lev

el 1

tota

l Ran

gers

cot

tage

Tota

l Civ

ic H

all

Tota

l All

site

s

1X14W TROFFER SURFACE MOUNTED 2 0 0 0 0 2 2X14W TROFFER SURFACE MOUNTED 4 0 0 0 0 4 2x26W BATTEN 0 0 0 9 1 10 1x14W BATTEN 8 11 8 0 8 35 1x14W BATTEN EMG 4 0 0 0 1 5 1x14W TROFFER DIM 0 7 3 0 0 10 1x26W PLASTER DIM 0 2 4 0 0 6 1x26W TROFFER DIM 4 106 59 0 0 169 2x26W TROFFER DIM 0 16 8 0 0 24 1x26W BATTEN PD 19 2 3 6 29 59 1x26W BATTEN EMG 6 4 4 0 0 14 2X26W TROFFER SUSPENDED 18 0 0 0 0 18 2X26W TROFFER WALL FITTING 6 0 0 0 0 6 1x10.5W DR700 LED DOWNLIGHT 0 65 116 0 4 185 1X14W TROFFER PLASTER 2 0 0 0 0 2 1X36W BATTEN EMG 4 0 0 0 0 4 1x16W D1000 LED DOWNLIGHT 31 62 10 9 0 112 EXIT LIGHTS 11 12 9 0 15 47 1X32W LED OYSTER LAMP 0 0 3 1 1 5 1X7W OSRAM LED RELAMP 0 13 0 0 0 13 5x36W HIGH BAY 0 0 0 0 6 6 1X40W MAT INDUCTION 0 0 0 0 5 5 2X30W BATTEN 0 0 0 0 10 10 1x12W OSRAM PARATHOM LED RELAMP 0 0 0 9 9 18 1X36W BATTEN WEATHERPROOF 17 0 0 0 0 17 1X120W MAT FLOOD 0 0 0 0 2 2 1X14W WALL LIGHT 0 0 6 0 0 6 1X26W WALL LIGHT 1 0 0 0 0 1 1X16W D900 LED DOWNLIGHT 0 0 0 0 21 21

Total All Sites 137 300 233 34 112 816

Page 79: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 21 -

3 Exit Lights 3.1.1 Details

Product Code Description Category Number

LSC102 LE GRANDE SLIDE CONNECT G2 686200-686210 For specifications of installed exit lights refer Appendix D

3.1.2 Summary

Level G2 Slide Connect Subtotal

Lower Ground 10 10

Ground 13 13

Level 1 9 9

Hall 15 15

Total 47 47 3.1.3 Location Exit Light locations are shown on the as built lighting layouts. Refer Appendix E

Page 80: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 22 -

4 Sensors Time out Function. Active in all sensors. Time out settings Settings vary depending on the function and occupancy of the space. See table for time outs.

Description Time Out Meeting Rooms, Board Rooms, 20 minsSmall Office 30 minsOpen Office 20 minsAmenities 30 minsAll other areas 20 minsMeeting Rooms, Board Rooms, 20 mins

Commissioning Notes

Sensor functions have been tailored to suit the client’s needs. There are many factors in an office environment that influence the function of sensors e.g. Wall, carpet and furniture colour, partition height, ambient light and occupancy to name a few. With these factors in mind the above settings were developed in consultation with the City of Canada Bay Council to provide lighting that is compliant with Australian Standards whilst at the same time providing maximum functionality and energy savings. Note: Refer below and relevant drawings for sensor settings and locations. 4.1 Sensor Details

Sensor Type Description Subtotal

ME CP Electronics Passive Infrared Motion Sensor 42

MEDD CP Electronics Passive Infrared Motion Sensor with Dimming 27

M5DD CP Electronics Microwave Motion Detector with Dimming 18

M6 CP Electronics Microwave Motion Detector 4

M6DD CP Electronics Microwave Motion Detector with Dimming 2

Total 93

Page 81: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 23 -

4.2 Sensor Summary

Level ME MEDD M5DD M6 M6DD Subtotal

LG 14 1 4 19

G 11 19 8 2 40

1 5 7 10 22

Ranger 9 9

Hall 3 3

Total 42 27 18 4 2 93 4.3 Sensor Locations Sensor location and type are shown on the as built lighting layouts. Refer Appendix E 4.4 Sensor ID & Programming

Level Location *Sensor ID Type Time Out

(mins) Dimming

Lower Ground Staff Lunch 80 M6 20

Lower Ground Staff Amenities 81 ME 30

Lower Ground Staff Amenities 82 ME 30

Lower Ground Hall 83 ME 20

Lower Ground Carpark 84 M6 20

Lower Ground Carpark 85 M6 20

Lower Ground Carpark 86 M6 20

Lower Ground Corp. Printing 89 MEDD 20

Lower Ground Kitchen 90 ME 20

Lower Ground Office 1 91 ME 30

Lower Ground Office 2 92 ME 30

Lower Ground Office 3 93 ME 30

Lower Ground Office 4 94 ME 30

Lower Ground Open Office 95 ME 20

Lower Ground Open Office 96 ME 20

Page 82: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 24 -

Level Location *Sensor ID Type Time Out

(mins) Dimming

Lower Ground Open Office 97 ME 20

Lower Ground Open Office 98 ME 20

Lower Ground Open Office 99 ME 20

Lower Ground Open Office 100 ME 20

GROUND Office 5 1 MEDD 30

GROUND Office 4 2 MEDD 30 90

GROUND Office 3 3 MEDD 30

GROUND Office 2 4 MEDD 30 90

GROUND Office 1 5 MEDD 30 90

GROUND Open Area 6 M6DD 20

GROUND Open Area 7 M6DD 20

GROUND Open Area 8 ME 20

GROUND Open Area 9 ME 20

GROUND Meeting Room 10 ME 20

GROUND Open Office 11 ME 20

GROUND Open Office 12 ME 20

GROUND It Office 13 M5DD 20

GROUND It Manager 14 MEDD 30

GROUND It Hall 15 ME 20

GROUND It Store 16 MEDD 20

GROUND Computer Room 17 MEDD 30

GROUND Hall 1 18 MEDD 20

GROUND Mgr. Assets 19 MEDD 30

GROUND Traffic Property 20 M5DD 20

GROUND Toilets 21 MEDD 30

GROUND It Hall 22 ME 20

GROUND Open Office 23 ME 20

GROUND Open Office 24 ME 20

GROUND Traffic Property 25 M5DD 20

GROUND Hall 1 26 MEDD 20

GROUND Enviro. Office 27 M5DD 30

Page 83: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 25 -

Level Location *Sensor ID Type Time Out

(mins) Dimming

GROUND Kitchen 28 MEDD 20

GROUND Corridor 29 MEDD 20

GROUND Dir. Info Services 30 MEDD 30

GROUND Citizen Services Unit 32 M5DD 20

GROUND P.A. Director Office 33 M5DD 20

GROUND Corridor 35 MEDD 20

GROUND Mgr. Cit. Services 36 MEDD 30

GROUND Records Office Corridor 37 MEDD 20

GROUND Female 39 ME 30

GROUND Male 40 ME 30

GROUND Records Unit 41 M5DD 20

GROUND Library 42 M5DD 20

GROUND Library Office 43 MEDD 30

Level 1 Room 1 50 MEDD 30 90

Level 1 Room 2 51 MEDD 30

Level 1 Room 3 52 MEDD 30 90

Level 1 Male 55 ME 30

Level 1 Female 56 ME 30

Level 1 Room 4 57 M5DD 20

Level 1 Room 4 58 M5DD 20

Level 1 Room 4 59 M5DD 20

Level 1 Room 4 60 M5DD 20

Level 1 Room 10 61 MEDD 30

Level 1 Room 6 62 MEDD 30

Level 1 Room 7 63 MEDD 30

Level 1 Room 8 64 M5DD 30

Level 1 Room 11 66 ME 30

Level 1 Room 13 67 M5DD 40

Level 1 Room 14 68 M5DD 40

Level 1 Room 15 69 M5DD 40

Level 1 Room 16 70 M5DD 20

Page 84: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 26 -

Level Location *Sensor ID Type Time Out

(mins) Dimming

Level 1 Room 16 71 M5DD 20

Level 1 Kitchen 72 MEDD 20

Level 1 Room 18 73 ME 30

Level 1 Room 17 74 ME 30

Ranger Room 1 106 ME 20

Ranger Hall 107 ME 20

Ranger Hall 108 ME 20

Ranger Hall 109 ME 20

Ranger Room 5 110 ME 20

Ranger Room 3 111 ME 20

Ranger Room 2 112 ME 20

Ranger Kitchen 113 ME 20

Hall Kitchen 114 ME 20

Hall Female 115 ME 30

Hall Male 116 ME 30

* Sensor ID as shown on Plans (see attachments)

Page 85: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 27 -

5 Fitting Components Apart from reducing energy consumption the installation of e1 fittings also provides a reduction in the number of lamps and ballasts in operation and consequently reduces ongoing lighting maintenance costs. Further cost savings are provided by the extended life cycle of the e1 fitting components. 5.1 Comparison of Lamp and Ballast Numbers Pre and Post Installation 5.1.1 Summary

Description Lamps Ballasts

Pre-existing 1369 1354

As Installed 912 822

% Change -50.11% -64.72% 5.1.2 Pre-existing Fitting Description Lamps Ballasts

2x18W BATTEN SM 22 22

1x18W BATTEN 29 29

2x18W BATTEN EMG 10 10

2x18W PLASTER TROF 4 4

2x18W TROFFER (300MMX600MM) 20 20

2x36W PLASTER TROFFER 8 8

1x36W PLASTER TROFFER 2 2

2x36W TROFFER (300MMX1200MM) 396 396

2x36W BATTEN WG 66 66

2x36W BATTEN EMG 34 34

2x36W BATTEN SUSPENDED 36 36

1x36W BATTEN 9 9

2x36W BATTEN PD 92 92

2x36W WALL LIGHT 14 14

1x50W DICHROIC DL 271 271

1x50W DICHROIC 120 DIA 10 10

1x36W BATTEN EMG 1 1

2x18W DL 175-230DIA 122 122

EXIT LIGHTS 94 94

Page 86: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 28 -

Fitting Description Lamps Ballasts

1X40W OYSTER LIGHT HALOGEN 8 4

1X40W WALL LIGHT HALOGEN 6 6

1x60W INCANDESCANT 11 0

1x400W High Bay 4 4

1x100W Flood Light 5 5

2x18W BATTEN PENDANT 54 54

1x18W CFL Pendant Light 39 39

1X250W FLOOD LIGHT 2 2

Total 1369 1354

5.1.3 As Installed

Fitting Description Lamps Ballasts

1X14W TROFFER SURFACE MOUNTED 2 2

2X14W TROFFER SURFACE MOUNTED 8 4

2x26W BATTEN 20 10

1x14W BATTEN 35 35

1x14W BATTEN EMG 5 5

1x14W TROFFER DIM 10 10

1x26W PLASTER DIM 6 6

1x26W TROFFER DIM 169 169

2x26W TROFFER DIM 48 24

1x26W BATTEN PD 59 59

1x26W BATTEN EMG 14 14

2X26W TROFFER SUSPENDED 36 18

2X26W TROFFER WALL FITTING 12 6

1x10.5W DR700 LED DOWNLIGHT 185 185

1X14W TROFFER PLASTER 2 2

1X36W BATTEN EMG 4 4

1x16W D1000 LED DOWNLIGHT 112 112

Page 87: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 29 -

Fitting Description Lamps Ballasts

EXIT LIGHTS 47 47

1X32W LED OYSTER LAMP 5 5

1X7W OSRAM LED RELAMP 13 13

5x36W HIGH BAY 30 12

1X40W MAT INDUCTION 5 5

2X30W BATTEN 20 10

1x12W OSRAM PARATHOM LED RELAMP 18 18

1X36W BATTEN WEATHERPROOF 17 17

1X120W MAT FLOOD 2 2

1X14W WALL LIGHT 6 6

1X26W WALL LIGHT 1 1

1X16W D900 LED DOWNLIGHT 21 21

Total 912 822

Page 88: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 30 -

5.2 Installed Fitting Components 5.2.1 Component Legend

Component Type No. Description

Tube 1 Osram 36w XXT 840

2 Brightgreen 16w D900

3 40w Matsushima Induction Lamp

4 120w Matsushima Induction Lamp

5 GE 26w T5

6 14w Lumos

7 Brightgreen 10.5w DR700 LED Downlight

8 Brightgreen D1000 16w

9 Maxibright 32w Oyster Light

10 Osram 12w Parathom LED Replacement

11 Osram 7w LED Replacement

12 Osram 30W

13 Osram 30w XXT

Ballast 1 Osram QTP8 1x36w

2 Osram QTP8 2x36w

3 Osram Redback

4 Matsushima Ballast 40w 220

5 Matsushima Ballast 120w 220

6 Tridonic PCA T5 1x28 lp

7 Tridonic PCA T5 2x28 lp

8 Tridonic PCA T5 1x14lp

9 Osram QTP5 2x14w

10 Osram QTP5 2x24-39

11 Osram QTP5 26w

12 Osram QTP5 2x26w

13 Osram QTP5 14w

Diffuser 1 Curved Y5 2 Weatherproof Osram Neptune 3 4mm Toughened Tempered Diffuser 4 Flat Y5 5 Rectangle Acrylic

Page 89: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 31 -

5.2.2 Component Breakdown by Fitting

Fitting Description Tube Type Ballast Type

Diffuser Type

1X14W TROFFER SURFACE MOUNTED 6 13 1

2X14W TROFFER SURFACE MOUNTED 6 9 1

2x26W BATTEN 5 12 5

1x14W BATTEN 6 13 5

1x14W BATTEN EMG 6 13 5

1x14W TROFFER DIM 6 8 1

1x26W PLASTER DIM 5 6 4

1x26W TROFFER DIM 5 6 1

2x26W TROFFER DIM 5 7 1

1x26W BATTEN PD 5 11 5

1x26W BATTEN EMG 5 11 5

2X26W TROFFER SUSPENDED 5 12 1

2X26W TROFFER WALL FITTING 5 12 1

1x10.5W DR700 LED DOWNLIGHT 7 3 N/A

1X14W TROFFER PLASTER 6 13 4

1X36W BATTEN EMG 1 1 5

1x16W D1000 LED DOWNLIGHT 8 3 N/A

EXIT LIGHTS N/A N/A N/A

1X32W LED OYSTER LAMP 9 3 N/A

1X7W OSRAM LED RELAMP 11 3 N/A

5x36W HIGH BAY 1 1 & 2 4

1X40W MAT INDUCTION 3 4 3

2X30W BATTEN 13 10 5

1x12W OSRAM PARATHOM LED RELAMP 10 3 N/A

1X36W BATTEN WEATHERPROOF 1 1 2

1X120W MAT FLOOD 4 5 3

1X14W WALL LIGHT 6 13 1

1X26W WALL LIGHT 5 11 3

1X16W D900 LED DOWNLIGHT 2 3 N/A

Page 90: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 32 -

Amp Readings The areas powered by each lighting circuit were identified and at the time of each reading Envirolite Staff were

positioned accordingly to ensure all light fittings were active. Communication during this period was achieved via

Walkie Talkie.

5.3 Summary

5.4 Area by Area Readings

Level Location Circuit Pre (Amps)

Post (Amps) % Change

Lower Ground DB Lower Ground 33 3.1 1.1 -64.5%

37 9.2 2.4 -73.9%

26 4.5 4.5 0.0%

DB5 1 5.1 2.3 -54.9%

3 3.8 1.7 -55.3%

5 5.0 1.3 -74.0%

7 2.8 1.7 -39.3%

9 8.0 2.5 -68.8%

2 4.6 3.0 -34.8%

4 4.3 1.7 -60.5%

6 5.8 2.4 -58.6%

8 5.1 1.7 -66.7%

33 4.0 1.1 -72.5% 33

35 5.7 1.0 -82.5% 35

38 9.1 8.4 -7.7% 38

Location Pre Installation (Amps)

Post Installation (Amps) % Change

Lower Ground 94.6 44.0 -53.49%

Ground 71.8 21.4 -70.19%

Level 1 58.9 18.5 -68.59%

Ranger 8.3 4.3 -48.19%

Hall 33.3 17.7 -46.85%

Total 266.9 105.9 -60.3%

Page 91: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 33 -

Level Location Circuit Pre (Amps)

Post (Amps) % Change

40 5.7 2.4 -57.9% 40

42 4.3 0.4 -90.7% 42

44 4.5 4.4 -2.2% 44

Ground Floor DB1 7 4.5 2.4 -46.7%

9 12.8 3.3 -74.2%

11 1.5 0.2 -86.7%

13 4.7 1.2 -74.5%

15 5.0 1.7 -66.0%

17 8.5 2.1 -75.3%

19 8.7 2.8 -67.8%

21 2.2 0.3 -86.4%

6 1.0 0.2 -80.0%

8 1.0 0.0 -100.0%

10 0.6 0.0 -100.0%

14 3.0 0.3 -90.0%

DB2 1 6.3 1.7 -73.0%

2 4.9 2.2 -55.1%

4 4.7 2.6 -44.7%

6 0.3 0.0 -100.0%

7 0.2 0.2 0.0%

8 1.0 0.2 -80.0%

9 0.5 0.0 -100.0%

10 0.4 0.0 -100.0%

Level 1 DB4 13 9.2 3.2 -65.2%

15 10.0 3.8 -62.0%

41 9.0 3.3 -63.3%

2 4.8 0.4 -91.7%

12 2.3 0.7 -69.6%

28 2.1 0.7 -66.7%

32 6.3 1.9 -69.8%

34 5.3 1.5 -71.7%

Page 92: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 34 -

Level Location Circuit Pre (Amps)

Post (Amps) % Change

42a 0.9 0.4 -55.6%

42b 9.0 2.6 -71.1%

Ranger DB Outside 4 4.8 2.4 -50.0%

Hall DB3 33 4.0 1.1 -72.5%

35 5.7 1.0 -82.5%

38 9.1 8.4 -7.7%

40 5.7 2.4 -57.9%

42 4.3 0.4 -90.7%

44 4.5 4.4 -2.2%

266.9 105.9 -60.3%

Page 93: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 35 -

6 Lux Levels A requirement of the project was that the new lighting installation must comply with Australian Standards

AS/NZS1680, in particular with regards to minimum lux levels.

6.1 Recommended Illuminance

AS/NZS Type of Interior or Activity Maintenance Illuminance

(lx)

1680.2.1

Entrances

Entrance Halls, Lobbies, Foyers 160*

Waiting Rooms 160*

Enquiry Desks 320

Circulation Areas Corridors, Passageways, Ramps 40*

Stairs (internal) 80

Kitchens General 160

Food Preparation, Cooking, Washing Up 240

First Aid Centres Rest Room 40

Treatment Room 320

Toilets 80

Plant Rooms General 80

1680.2.2

General General Tasks Involving Typing, Reading, Writing 320

Computer Rooms Equipment Rooms 320

Meeting Rooms

Meeting Rooms 320

Training Rooms, Seminar Rooms 240

Conference Rooms, Boardrooms 240 * Illuminance applies at floor level

Page 94: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 36 -

6.2 Measurement Procedure Measurements are to be in accord with the requirements of AS/NZS 1680.1 Appendix B.

1. Measurements in theory should be taken at night or if this is not possible with blinds drawn (no daylight

component) and in an area empty of all furniture such that the light level at a point is the sum of ALL light sources

in the room with no masking from desk partitions, cabinets, people etc. This is obviously not usually possible so

all care should be taken to ensure we minimise shadowing or shrouding and omit or discount readings that do

not comply with this requirement.

2. Lux readings are not always at a height of 700-720 mm (see table over page).

3. Measurements should not be taken closer than 1000mm from room perimeter.

4. If in a room a low reading is recorded in isolation when all other readings are consistent careful consideration

should be given to the validity of this reading.

5. The accuracy of the light meter should also be considered and routinely checked against a recently calibrated

unit, or if such a unit is not immediately to hand, a number of meters can be checked with the same light source

for consistency.

6. The particulars of the meter should be included in the report i.e. specifications, model, type

7. If practical, new lamps should be burnt in for 100 hours before measurement. It is noted that seasoning of new

lamps allows for the burning off of particulates and the even distribution of mercury within the tube. This

stabilization process ensures optimal lamp performance and in general light measurements taken after aging or

seasoning will be higher than those taken earlier.

There are other influences on the 100 hour burn in which would make this requirement impractical. These include

the interaction of sensors and daylight harvesting; the potential waiting periods, especially at some locations, is

financially unviable; and, adjusting lights to remain on 24 hours per day for the four to five days needed is not

environmentally responsible.

8. The environment in which measurement is to be recorded should be allowed to stabilize, the lamps should be on

for 1 hour prior to measurement and air conditioning / ventilation operating normally. If measurements are taken

at night, this may not be possible and readings will generally be lower than otherwise expected.

9. For typically required light levels refer 6.1 Recommended Illuminance.

Page 95: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 37 -

10. The layout of the measurement grid can be a square array of points or if the luminaires are in a regular

rectangular array. Refer 6.2.1 Lux Meter Positioning Guide

11. Number of points and areas of measurement grid.

Area > 25m2 - Measured area 9m2 minimum and must include at least 4 luminaires.

Area < 25m2 - Entire area to be checked. Minimum of 9 points.

As an indication of the number of points the following can be used as a guide for a roughly square area.

Size of space No. of points

5m x 5m 9

7m x 7m 16

10m x 10m and above 25

6.2.1 Lux Meter Positioning Guide Position under light fittings: Meter shall be placed directly under the centre of the light fitting at a height of 700mm.

Positions between light fittings: Meter shall be placed as close as practical to the mid way points between light fittings

at a height of 700mm.

6.2.2 Small Room / Area Positioning

Position 1 Light

Position 4

Position 7 Light

Position 2

Position 5

Position 8

Position 3 Light

Position 6

Position 9 Light

Page 96: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 38 -

6.2.3 Medium Room / Area Positioning

Position 1 Light

Position 4

Position 7 Light

Position 10

Position 13 Light

Position 2

Position 5

Position 8

Position 11

Position 14

Position 3 Light

Position 5

Position 9 Light

Position 12

Position 15 Light

6.2.4 Large Room / Area Positioning

Position 1 Light

Position 6

Position 11 Light

Position 16

Position 21 Light

Position 2

Position 7

Position 12

Position 17

Position 22

Position 3 Light

Position 8

Position 13 Light

Position 18

Position 23 Light

Position 4

Position 9

Position 14

Position 19

Position 24

Position 5 Light

Position 10

Position 15 Light

Position 20

Position 25 Light

Page 97: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 39 -

6.3 Lux Meter SpecificationsTesto 540

Page 98: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 40 -

6.4 Pre and Post Lux Readings The following sample lux levels were taken across the upgraded areas to confirm that actual lux levels corresponded

to computer modelling generated lux levels.

Level Area Position Pre Post

G Kitchen 1 193 312

2 246 353

3 232 310

4 260 296

5 268 348

6 270 317

Average 245 323

Hall 1 1 232 495

2 83 456

3 108 472

4 67 601

Average 123 506

Room 1 1 306 335

2 242 378

3 147 405

4 170 410

5 301 362

6 334 389

7 297 401

8 228 423

9 158 390

Average 243 388

G Board Room 1 612 655

2 673 800

3 615 810

4 574 698

5 483 678

Page 99: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 41 -

Level Area Position Pre Post

6 516 576

7 412 668

8 556 794

9 603 852

10 690 946

1 601 866

12 450 679

565.4 751.8

G Office 3 1 406 396

2 563 423

3 421 418

4 472 422

5 755 420

6 540 410

7 280 390

8 431 391

9 382 379

Average 472 405

Office 4 1 198 375

2 416 422

3 305 387

4 437 444

5 432 437

6 275 447

7 217 368

8 311 387

9 294 378

Average 321 405

G Office 2 1 348 381

2 424 383

3 358 426

Page 100: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 42 -

Level Area Position Pre Post

4 462 436

5 600 386

6 497 401

7 352 397

8 413 387

9 296 447

Average 417 405

Reception 1 166 207

2 166 211

3 133 226

4 123 197

5 94 178

6 138 199

7 132 207

8 127 213

9 108 211

Average 132 205

Reception Desk 1 277 318

2 305 307

3 414 380

4 437 322

Average 358 332

G Traffic Property 1 506 407

2 436 403

3 515 389

4 482 401

5 575 417

6 635 422

7 594 398

8 568 397

9 565 394

Page 101: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 43 -

Level Area Position Pre Post

10 598 401

Average 547 402

Managed Assets 1 432 394

2 542 397

3 509 401

4 352 411

5 284 474

6 492 390

Average 435 411

Computer Room 1 320 522

2 310 541

3 196 471

4 160 421

5 161 385

6 132 319

Average 213 443

G Office 5 1 494 386

2 476 428

3 374 366

4 424 418

5 644 400

6 626 498

7 298 361

8 483 343

9 344 412

Average 463 401

Environment Office 1 146 397

2 200 399

3 297 385

4 437 411

5 428 413

Page 102: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 44 -

Level Area Position Pre Post

6 237 407

Average 291 402

Office 1 1 477 437

2 428 434

3 403 401

4 399 396

5 279 395

6 330 380

Average 386 407

Records unit 1 596 420

2 646 401

3 764 410

4 760 378

5 683 423

6 620 379

Average 678 402

Cit. Services Unit 1 431 400

2 475 394

3 564 356

4 446 418

5 498 411

6 511 433

Average 488 402

G Library 1 185 410

2 228 396

3 225 403

4 257 399

5 405 407

6 422 395

7 433 399

Average 308 401

Page 103: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 45 -

Level Area Position Pre Post

Library Office 1 420 466

2 396 457

3 222 399

4 319 411

Average 339 433

LG Large Store 01 1 232 142

2 212 120

3 168 143

4 204 116

5 248 259

6 206 226

Average 212 168

Office 2 1 260 398

2 205 379

3 234 416

4 214 422

5 210 432

6 243 449

Average 228 416

Corp Printing 1 640 467

2 886 507

3 444 426

4 404 444

5 471 427

6 338 449

Average 531 453

Kitchen 1 146 439

2 178 440

3 242 427

4 120 460

Average 172 442

Page 104: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 46 -

Level Area Position Pre Post

LG Office 1 1 268 454

2 383 384

3 244 505

4 296 435

5 188 476

6 126 513

Average 251 461

Office 4 1 290 390

2 257 420

3 299 440

4 330 433

5 327 360

6 290 364

Average 299 401

Staff Lunch 1 132 182

2 157 240

3 132 164

4 106 186

5 105 210

6 82 186

Average 119 195

Female Toilets 1 674 316

2 95 69

3 168 57

4 89 61

5 141 186

6 125 365

Average 215 176

LG Open Office 1 187 401

2 129 388

3 436 423

Page 105: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 47 -

Level Area Position Pre Post

4 351 405

5 212 398

6 367 423

7 438 388

8 464 389

9 310 411

10 356 397

11 220 410

12 261 413

Average 311 404

Office 3 1 330 428

2 190 391

3 257 378

4 402 451

5 187 393

6 307 376

Average 279 403

Stair 3 1 360 415

2 279 339

3 268 372

4 134 358

Average 260 371

LG Amenities 1 95 69

2 168 57

3 89 61

4 141 186

5 125 365

6 137 153

7 92 160

8 163 126

Average 126 147

Page 106: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 48 -

Level Area Position Pre Post

1 Mayor Office 1 240 368

2 202 401

3 165 415

4 210 397

5 178 388

6 167 432

Average 194 400

General Manager Office 1 403 416

2 341 411

3 395 398

4 384 432

Average 381 414

Room 07 1 498 394

2 464 403

3 511 411

4 532 467

5 460 417

6 402 326

Average 478 403

Room 06 1 399 407

2 416 401

3 456 394

4 432 411

5 450 396

6 399 402

Average 425 402

1 Room 10 1 560 440

2 523 408

3 490 424

4 497 437

5 380 378

Page 107: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 49 -

Level Area Position Pre Post

6 405 347

Average 476 406

Room 8 & 9 1 501 435

2 487 382

3 516 413

4 490 418

5 420 314

6 463 326

Average 480 381

Room 11 1 408 386

2 339 363

3 386 394

4 411 401

Average 386 386

Room 14 1 436 411

2 316 399

3 378 401

4 441 415

5 468 387

6 351 405

Average 398 403

1 Room 3 1 411 496

2 425 446

3 405 402

4 378 391

5 430 402

6 359 460

Average 401 433

Open Office 1 415 430

2 386 403

3 399 397

Page 108: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 50 -

Level Area Position Pre Post

4 395 373

5 425 422

6 416 431

7 396 436

8 389 453

9 344 427

10 322 388

11 447 395

12 380 375

13 365 390

Average 391 409

Room 01 1 433 446

2 411 396

3 398 310

4 419 452

5 419 425

6 356 400

Average 406 405

1 Room 02 1 445 461

2 346 375

3 441 390

4 424 413

5 438 432

6 386 450

Average 413 420

Ranger Room 2 1 305 462

2 310 435

3 216 404

4 181 413

5 341 410

6 301 500

Page 109: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 51 -

Level Area Position Pre Post

7 296 419

8 362 430

Average 289 434

Hall 1 52 78

2 57 93

3 72 106

4 105 128

Average 72 101

Room 5 1 418 521

2 426 547

3 390 471

4 303 410

5 358 453

6 306 501

Average 367 484

CP Car Park Storeroom 1 145 208

2 132 211

3 122 222

4 108 199

5 129 186

6 114 197

7 184 211

8 124 221

9 115 216

10 137 188

11 127 175

12 119 160

Average 130 200

Hall Main Hall 1 310 497

2 286 485

3 236 462

Page 110: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 52 -

Level Area Position Pre Post

4 218 499

5 301 384

6 277 415

7 290 432

8 283 417

9 260 439

Average 273 448

Kitchen 1 319 169

2 332 180

3 261 221

4 240 242

5 168 203

Average 264 203

Male Toilet 1 87 134

2 88 149

3 106 143

4 97 118

Average 95 136

Page 111: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 53 -

7 Recycling Reconciliation The light fittings removed from site have been recycled. The components of the lights fittings are recycled as follows:

- Aluminium & brass: The metal ends from tubes are separated and subsequently recycled into cast products

such as ingots used in foundry application.

- Glass from the tubes is separated and recycled into various glass based applications

- Mercury is distilled from the separated powders and then used in the manufacture of dental amalgam

- Phosphor powder from fluorescent tubes is consolidated for future use in the manufacture of land applications

- Metal is recycled into foundry applications

The following reconciliation is based on the weights of the old individual fitting types replaced and the total weights of

materials recycled by Envirolite’s recycling partners.

Page 112: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 54 -

7.1 Metal Recycling

Fitting Description Qty Unit Fitting Weight (kg)

Total Fitting Weight (kg)

2x18W BATTEN SM 11 2.50 27.50

1x18W BATTEN 29 2.50 72.50

2x18W BATTEN EMG 5 2.50 12.50

2x18W PLASTER TROF 2 2.50 5.00

2x18W TROFFER (300MMX600MM) 10 2.50 25.00

2x36W PLASTER TROFFER 4 5.75 23.00

1x36W PLASTER TROFFER 2 5.75 11.50

2x36W TROFFER (300MMX1200MM) 198 5.75 1138.50

2x36W BATTEN WG 33 5.75 189.75

2x36W BATTEN EMG 17 5.75 97.75

2x36W BATTEN SUSPENDED 18 5.75 103.50

1x36W BATTEN 9 5.75 51.75

2x36W BATTEN PD 46 5.75 264.50

2x36W WALL LIGHT 7 5.75 40.25

1x50W DICHROIC DL 271 0.75 203.25

1x50W DICHROIC 120 DIA 10 0.75 7.50

1x36W BATTEN EMG 1 5.75 5.75

2x18W DL 175-230DIA 61 2.50 152.50

EXIT LIGHTS 47 0.50 23.50

1X40W OYSTER LIGHT HALOGEN 4 3.00 12.00

1X40W WALL LIGHT HALOGEN 6 3.00 18.00

1x60W INCANDESCANT 2 0.50 5.50

1x400W High Bay 4 12.00 48.00

1x100W Flood Light 5 6.00 30.00

2x18W BATTEN PENDANT 27 2.50 67.50

1x18W CFL Pendant Light 30 2.20 85.80

1X250W FLOOD LIGHT 2 8.00 16.00

TOTAL 879 2738.30

Page 113: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 55 -

Weight Recycled: 2734.8kg (As provided by recycling partners) Variance: -3.5kg (-0.13%)

Page 114: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 56 -

7.2 Lamp Recycling

2x18W BATTEN SM Total Lamps Unit Lamp Weight (g)

Total Lamp Weight (kg)

1x18W BATTEN 22 68.9 1.52

2x18W BATTEN EMG 29 68.9 2.00

2x18W PLASTER TROF 10 68.9 0.69

2x18W TROFFER (300MMX600MM) 4 68.9 0.28

2x36W PLASTER TROFFER 20 68.9 1.38

1x36W PLASTER TROFFER 8 138.9 1.11

2x36W TROFFER (300MMX1200MM) 2 138.9 0.28

2x36W BATTEN WG 396 138.9 55.00

2x36W BATTEN EMG 66 138.9 9.17

2x36W BATTEN SUSPENDED 34 138.9 4.72

1x36W BATTEN 36 138.9 5.00

2x36W BATTEN PD 9 138.9 1.25

2x36W WALL LIGHT 92 138.9 12.78

1x50W DICHROIC DL 14 138.9 1.94

1x50W DICHROIC 120 DIA 271 31.0 8.40

1x36W BATTEN EMG 10 31.0 0.31

2x18W DL 175-230DIA 1 138.9 0.14

EXIT LIGHTS 122 59.0 7.20

1X40W OYSTER LIGHT HALOGEN 47 10.0 0.47

1X40W WALL LIGHT HALOGEN 4 60.0 0.24

1x60W INCANDESCANT 6 60.0 0.36

1x400W High Bay 2 31.0 0.06

1x100W Flood Light 4 300.0 1.20

2x18W BATTEN PENDANT 5 200.0 1.00

1x18W CFL Pendant Light 54 68.9 3.72

1X250W FLOOD LIGHT 39 59.0 2.30

TOTAL 1369 - 124.06 Weight Recycled: 125.5 kg (As provided by recycling partners) Variance: 1.44 (1.16%)

Page 115: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 57 -

8 General Fitting Guidelines 8.1 Handling E1 Light Fittings

All e1 light fittings contain a matte white High Performance e1 Reflector. It is recommended that light cotton

gloves be worn when handling E1 light fittings so as not to mark or damage the reflector and air conditioning

slots.

If using a cutting implement to remove packaging be careful not to scratch or damage the light fitting.

If a blue protective film is present on the High Performance e1 Reflector, this should be removed prior to

installation.

When lifting the fitting, ensure it is properly supported so as not to bend of crease air conditioning slots.

Plug fitting into a designated surface socket.

Remove fluorescent lamp.

With one hand touching the light fitting, peel off remainder of blue film and discard. Note: Failure to touch fitting

when peeling off film will result in the build up of a static charge, which will release when you next earth yourself.

Replace lamp.

8.2 Cleaning E1 Light Fittings

Ensure all fittings and diffusers are clean and free of any contaminates. Wipe with a clean, lint free, cloth if

necessary.

If the High Performance e1 Reflector becomes marked or soiled it should be gently cleaned, using a circular

motion, with a lint free cloth dipped in methylated spirits.

DO NOT use any abrasive or caustic materials on e1 Lighting products.

8.3 Installation of E1 Lighting

Installation of all e1 Lighting products should be carried out by suitably qualified personnel only

Prior to installation electrical safety of the general area should be assessed by suitably qualified personnel.

Page 116: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 58 -

9 Envirolite Pty Ltd Warranty

The Envirolite Warranty Covers Replacement of:

1. Any component (including the lamps) in the E1 Lighting fittings installed by Envirolite Pty Ltd that fails in the normal course of operation for a period of five (5) years from the date of practical completion.

2. Any component (including the lamps) in LED fittings installed by Envirolite Pty Ltd that fails in the normal course of operation for a period of three (3) years from the date of practical completion.

3. Any component in any sensor installed by Envirolite Pty Ltd that fails in the normal course of operation for a

period of three (3) years from the date of practical completion.

The Warranty Does Not Cover the Replacement of:

1. Any component in the light fittings or sensors installed by Envirolite Pty Ltd that have failed other than in the course of normal operation. This includes but is not limited to failures caused by fire, water damage, earthquakes, power surges, vandalism or other willful or accidental acts that cause damage to the fittings or their components.

2. Failure or damage to any light fitting or sensor component caused by a third party carrying out other works in the building. This includes but is not limited to (a) electrical works that adversely affect the lighting circuits or sensor cables etc and (b) works on the air-conditioning or ceiling grid.

Service calls for the replacement of fitting or sensor components (other than lamps) covered by this warranty will be provided free of cost.

However if the failure of a fitting or sensor component is due to other than normal operation (as covered in Paragraphs 2A and 2B above) then a service call out fee of $100.00 (ex GST) will be charged plus the costs for the supply of replacement components and any associated installation labour. Lamp Failures

A small reserve stock of replacement lamps will be provided to the Building Manager as part of the Scope of Works to allow for the immediate in house replacement of any failures. The Building Manager will be required to keep all failed lamps in the cartons provided and contact Envirolite when 50% of the reserve stock has been used. Envirolite will then replenish the reserve stock to its original numbers and take away the old lamps for recycling. The cost of hire of any man lifting equipment necessary to replace lamps is excluded from this warranty. Failed Sensors and/or Electrical Components in Luminaries.

Envirolite will within a maximum of two (2) workings days following the day of receipt of a service call send one of its service staff to investigate and rectify the failure.

All service calls for replacement of failed components under this warranty should be directed to [email protected]

Page 117: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 59 -

Listing of Envirolite Warranty Reserve Stock

Stock given to Dino Finucci and held at CCBC Civic Centre for all sites.

Item Description Quantity

Lamp Osram XXT 36w (box of 40) 1

Lamp GE 26w (box of 25) 1

LED D1000 2

LED D900 2

LED DR700 6

Transformer ET-REDBACK 60VA/230-240 6

Page 118: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 60 -

10 Envirolite Pty Ltd Contact Details

OFFICE: Unit 4A, 2 Resolution Drive,

CARINGBAH. NSW. 2229

POSTAL ADDRESS: PO Box 220

MIRANDA. NSW. 2228.

PHONE: +61 2 9540 3302

FAX: +61 2 9540 3306

EMAIL: [email protected]

10.1 Operations Enquiries

NAME: Mr. Kerry Powell

MOBILE: 0412 858 303

EMAIL: [email protected]

Page 119: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Appendix A, B, C, D & E removed for publication

Page 120: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Community Energy Efficiency-Lighting Upgrade

Contract No. 2013/TS50

Handover Report-Concord Oval

Loftus St, Concord.NSW.2137.

Page 121: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 2 -

Introduction

Page 122: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 3 -

Table of Contents

1 PROJECT DATES 5

2 LIGHT FITTING COUNTS 6

2.1 PRE-EXISTING LIGHT FITTINGS 6 2.1.1 Summary 6 2.1.2 By Location 7

2.2 AS INSTALLED LIGHT FITTINGS 9 2.2.1 Summary 9 2.2.2 By Location 10 2.2.3 Details 12 2.2.4 Summary 12 2.2.5 Location 12

3 SENSORS 13

3.1 SENSOR DETAILS 13 3.2 SENSOR LOCATIONS 13 3.3 SENSOR ID & PROGRAMMING 14

4 FITTING COMPONENTS 16

4.1 COMPARISON OF LAMP AND BALLAST NUMBERS PRE AND POST INSTALLATION 16 4.1.1 Summary 16 4.1.2 Pre-existing 16 4.1.3 As Installed 17

4.2 INSTALLED FITTING COMPONENTS 18 4.2.1 Component Legend 18 4.2.2 Component Breakdown by Fitting 19

5 AMP READINGS 20

5.1 SUMMARY 20 5.2 AREA BY AREA READINGS 20

6 LUX LEVELS 22

6.1 RECOMMENDED ILLUMINANCE 22 6.2 MEASUREMENT PROCEDURE 23

6.2.1 Lux Meter Positioning Guide 24 6.2.2 Small Room / Area Positioning 24 6.2.3 Medium Room / Area Positioning 25 6.2.4 Large Room / Area Positioning 25

6.3 LUX METER SPECIFICATIONS 26 6.4 PRE AND POST LUX READINGS 27

7 RECYCLING RECONCILIATION 34

7.1 METAL RECYCLING 35 7.2 LAMP RECYCLING 36

8 GENERAL FITTING GUIDELINES 37

8.1 HANDLING E1 LIGHT FITTINGS 37 8.2 CLEANING E1 LIGHT FITTINGS 37 8.3 INSTALLATION OF E1 LIGHTING 37

9 ENVIROLITE PTY LTD WARRANTY 38

Page 123: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 4 -

10 ENVIROLITE PTY LTD CONTACT DETAILS 40

10.1 OPERATIONS ENQUIRIES 40

APPENDICES 41

APPENDIX A – ELECTRICAL CERTIFICATE 41 APPENDIX B – SENSOR COMMISSIONING CHECKLIST 45 APPENDIX C – SENSOR SPECIFICATIONS 48 APPENDIX D – EXIT LIGHT SPECIFICATIONS 65 APPENDIX E –AS BUILT LIGHTING LAYOUTS 74

Page 124: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 5 -

1 Project Dates

Page 125: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 6 -

2 Light Fitting Counts

2.1 Pre-existing Light Fittings

2.1.1 Summary

Page 126: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 7 -

2.1.2 By Location

1 1

5 4 2

16 3 1 1 1 2 1 2 3 6 6 1 1 3 3 21

6 6 3

1 5 4

11 18

1 2 2 1 1 1 2 1

1 1 6

31Total 553 3 1 1 1 2 2 2 3 6 7 4 12 2 1 9 8 3 1 4 4 1 6 6 21 1 24

GROUND

Page 127: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 8 -

Tota

l Com

plex

1 1 1 5

1 12

2 2 7 82

3 18

9 19

29

1 1 2 15

1 17 5 25 56

2 1 1 4 2 3 2 2 5 3 25

4 6 4 14

2 2

6 6

3 3 6

6 3 40 11 7 10 3 10 7 2 99

31Total 66 3 40 4 1 11 7 10 4 1 4 1 17 2 8 6 25 4 2 1 1 14 7 2 5 2 2 5 3 0 10 3 20 419

LEVEL 1 GRANDSTAND AND OTHER

Page 128: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 9 -

2.2 As Installed Light Fittings

2.2.1 Summary

Page 129: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 10 -

2.2.2 By Location

GYM

SPI

N R

OO

M

OFF

ICE 1

OFF

ICE 2

OFF

ICE 3

OFF

ICE 4

OFF

ICE 5

OFF

ICE 6

OFF

ICE 7

CAN

TEEN

STO

RE 1

LAU

ND

RY 7

EN

CLO

SED

WALK

WAY

CLE

AN

ER

STAIR

FO

YER

CH

AN

GE R

OO

M 2

CH

AN

GE R

OO

M 1

REFS

DIS

ABLE

D

FEM

ALE

MALE

STAIR

FO

YER 2

CH

AN

GE R

OO

M 3

CH

AN

GE R

OO

M 4

UN

ION

AREA

PUM

P RO

OM

MID

DLE

WALK

WAY

1 1

7 2 1 1 1 9

1 1 1 2 1 2 3 6 12

21 11 3 3 3 18

6 6 5 4

3

2 2 1 2 1

1 1 1

1 6

1 4 1 2 1 1 2 1 4

Total 23 3 1 1 1 2 2 2 3 6 7 4 16 2 2 11 9 3 1 4 4 2 8 7 21 1 28

Page 130: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 11 -

5

24

33

59

21

12

10

5

19

7

25

18

3

6

6

100

31

5

18

12

Total 6 3 42 4 2 11 8 12 4 1 4 1 18 2 9 10 25 5 2 1 1 14 7 2 5 2 2 5 3 0 11 3 20 419

Green designates area with sensor.

Page 131: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 12 -

2.2.3 Details

Appendix D

2.2.4 Summary

2.2.5 Location

Appendix E

14

Page 132: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 13 -

3 Sensors

Description Time Outs

Commissioning Notes

Refer below and relevant drawings for sensor settings and locations.

3.1 Sensor Details

3.2 Sensor Locations Appendix E

Page 133: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 14 -

3.3 Sensor ID & Programming

Page 134: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 15 -

* Sensor ID as shown on Plans (see attachments)

Page 135: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 16 -

4

4.1 Comparison of Lamp and Ballast Numbers Pre and Post Installation

4.1.1 Summary

4.1.2 Pre-existing

Page 136: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 17 -

4.1.3 As Installed

Page 137: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 18 -

4.2 Installed Fitting Components

4.2.1 Component Legend

Page 138: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 19 -

4.2.2 Component Breakdown by Fitting

Page 139: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 20 -

Amp Readings

5.1 Summary

5.2 Area by Area Readings

Page 140: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 21 -

Page 141: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 22 -

6 Lux Levels

6.1 Recommended Illuminance

Page 142: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 23 -

6.2 Measurement Procedure

6.1 Recommended Illuminance

Page 143: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 24 -

6.2.1 Lux Meter Positioning Guide

6.2.1 Lux Meter Positioning Guide

6.2.2 Small Room / Area Positioning

Page 144: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 25 -

6.2.3 Medium Room / Area Positioning

6.2.4 Large Room / Area Positioning

Page 145: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 26 -

6.3 Lux Meter Specifications

Page 146: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 27 -

6.4 Pre and Post Lux Readings

Page 147: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 28 -

Page 148: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 29 -

Page 149: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 30 -

Page 150: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 31 -

Page 151: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 32 -

Page 152: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 33 -

Page 153: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 34 -

7 Recycling Reconciliation

-

-

-

-

-

Page 154: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 35 -

7.1 Metal Recycling

Page 155: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 36 -

7.2 Lamp Recycling

Page 156: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 37 -

8 General Fitting Guidelines

8.1 Handling E1 Light Fittings

8.2 Cleaning E1 Light Fittings

8.3 Installation of E1 Lighting

Page 157: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 38 -

9 Envirolite Pty Ltd Warranty

The Envirolite Warranty Covers Replacement of:

The Warranty Does Not Cover the Replacement of:

Lamp Failures

Failed Sensors and/or Electrical Components in Luminaries.

Page 158: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 39 -

Stock given to Dino Finucci and held at CCBC Civic Centre for all sites.

Page 159: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 40 -

10 Envirolite Pty Ltd Contact Details

10.1 Operations Enquiries

Page 160: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Appendix A, B, C, D & E removed for publication

Page 162: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 2 -

Introduction This report has been prepared by Envirolite Pty Ltd and details the results achieved from the recent lighting upgrade work

completed at Five Dock Leisure Centre William St, Five Dock as part of the City of Canada Bay Council CEEP-Lighting

Upgrade Project.

Envirolite Pty Ltd, a one hundred percent Australian Owned Company, is proud to have been selected to provide the

lighting solution for this project. Energy reductions and improvements to the working environment have been achieved via

the installation of E1 light fittings which is an Australian developed world leading lighting innovation.

A summary of the benefits achieved from the installation of the new lighting is as follows:

Direct power usage by the lighting has been reduced from 95.8 amps to 25.1 amps, a reduction of 69.6%.

(This excludes additional savings achieved from the installation of daylight harvesting and motion sensors and in air

conditioning where it is installed due to a reduction in the lighting heat load).

The number of fittings installed on site has remained constant at 297 fittings.

The number of lamps in operation has been reduced from 525 to 306, a reduction of 71.6%.

The number of ballasts in operation has been reduced from 511 to 300, a reduction of 70.3%.

Lighting levels have been maintained in accordance with the requirements of Australian Lighting Standards.

Page 163: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 3 -

Table of Contents

1 PROJECT DATES 5

2 LIGHT FITTING COUNTS 6

2.1 PRE-EXISTING LIGHT FITTINGS 6 2.1.1 Summary 6 2.1.2 By Location 7

2.2 AS INSTALLED LIGHT FITTINGS 8 2.2.1 Summary 8 2.2.2 By Location 9

2.3 EXIT LIGHTS 10 2.3.1 Details 10 2.3.2 Summary 10 2.3.3 Location 10

3 SENSORS 11

3.1 SENSOR DETAILS 11 3.2 SENSOR LOCATIONS 12 3.3 SENSOR ID & PROGRAMMING 12

4 FITTING COMPONENTS 14

4.1 COMPARISON OF LAMP AND BALLAST NUMBERS PRE AND POST INSTALLATION 14 4.1.1 Summary 14 4.1.2 Pre-existing 14 4.1.3 As Installed 15

4.2 INSTALLED FITTING COMPONENTS 16 4.2.1 Component Legend 16 4.2.2 Component Breakdown by Fitting 17

5 AMP READINGS 18

5.1 SUMMARY 18 5.2 FLOOR BY FLOOR READINGS 18

6 LUX LEVELS 19

6.1 RECOMMENDED ILLUMINANCE 19 6.2 MEASUREMENT PROCEDURE 20

6.2.1 Lux Meter Positioning Guide 21 6.2.2 Small Room / Area Positioning 21 6.2.3 Medium Room / Area Positioning 22 6.2.4 Large Room / Area Positioning 22

6.3 LUX METER SPECIFICATIONS 23 6.4 PRE AND POST LUX READINGS 24

7 RECYCLING RECONCILIATION 28

7.1 METAL RECYCLING 29 7.2 LAMP RECYCLING 30

8 GENERAL FITTING GUIDELINES 31

8.1 HANDLING E1 LIGHT FITTINGS 31 8.2 CLEANING E1 LIGHT FITTINGS 31 8.3 INSTALLATION OF E1 LIGHTING 31

9 ENVIROLITE PTY LTD WARRANTY 32

Page 164: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 4 -

10 ENVIROLITE PTY LTD CONTACT DETAILS 34

10.1 OPERATIONS ENQUIRIES 34

APPENDICES 35

APPENDIX A – ELECTRICAL CERTIFICATE 35 APPENDIX B – SENSOR COMMISSIONING CHECKLIST 39 APPENDIX C – SENSOR SPECIFICATIONS 43 APPENDIX D – EXIT LIGHT SPECIFICATIONS 64 APPENDIX E – AS BUILT LIGHTING LAYOUTS 73

Page 165: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 5 -

1 Project Dates

Work commenced on 31

st July 2013 and the work was completed on 6

th August 2013.

Page 166: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 6 -

2 Light Fitting Counts

2.1 Pre-existing Light Fittings

2.1.1 Summary

Fitting Description Subtotal

2x18W BATTEN 3

1x18W BATTEN 2

1x36W BATTEN 9

2x36W BATTEN 114

1x36W BATTEN WP 6

2x36W BATTEN WP 10

2x36W PLASTER TROFFER 2

2x58W BATTEN 8

1X50W DICHROIC SUSPENDED 20

1x50W DICHROIC 7

1x16W DL 130DIA LED 3

2x26W DL 200DIA 11

2x36W TROFFER 69

EXIT LIGHTS 17

2x18W BATTEN WP 8

1x400W FLOOD LIGHT (Outside) 2

1x100W SPOT LIGHTS (Outside) 3

2X28W TROFFER 3

Total 297

Page 167: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 7 -

2.1.2 By Location

Fittin

g D

escrip

tion

Gym

Hall

Sports

Hall

Sports

Offic

e

Gym

Offic

e

Hall 1

Entry

Hall 2

Receptio

n

Offic

e 1

Offic

e 2

Offic

e 3

Offic

e 4

Cle

aners

Cupboard

Dis

Toile

t &

Show

er

Sto

re

Male

Toile

ts

Fem

ale

Toile

ts

Kitc

hen

Physio

Health

Clu

b

Health

Clu

b 2

Health

Clu

b 3

Health

Clu

b 5

Health

Clu

b 6

Health

Clu

b 7

Activ

ities R

oom

Activ

ites T

oile

ts

Carp

ark

Entry

Aw

nin

g

Tota

l

2x18W BATTEN 2 1 3

1x18W BATTEN 2 2

1x36W BATTEN 7 1 1 9

2x36W BATTEN 2 1 1 3 2 1 1 1 7 7 42 28 15 1 1 1 114

1x36W BATTEN WP 3 3 6

2x36W BATTEN WP 5 4 1 10

2x36W PLASTER TROFFER 2 2

2x58W BATTEN 8 8

1X50W DICHROIC

SUSPENDED20 20

1x50W DICHROIC 7 7

1x16W DL 130DIA LED 3 3

2x26W DL 200DIA 4 1 6 11

2x36W TROFFER 41 2 2 2 7 15 69

EXIT LIGHTS 3 6 1 2 2 1 1 1 17

2x18W BATTEN WP 8 8

1x400W FLOOD LIGHT

(Outside)2 2

1x100W SPOT LIGHTS

(Outside)3 3

2X28W TROFFER 3 3

Total 5 6 1 1 7 29 55 7 2 2 2 2 1 2 1 15 14 9 8 44 31 16 1 1 1 17 4 10 3 297

Page 168: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

2.2 As Installed Light Fittings

2.2.1 Summary

Fitting Description Subtotal

1x18W BATTEN SENSOR 2

1x18W BATTEN 3

1x36W BATTEN 0

1x36W BATTEN 13

1X36W BATTEN SENSOR 102

1x36W BATTEN WP SENSOR 31

1x36W BATTEN WP 2

1x36W PLASTER 2

1x36W BATTEN 0

1x7W LED REPLACEMENT (OSRAM) 20

1x12W DR700 LED 7

1x16W BRIGHT GREEN LED D900 3

1x16W BRIGHT GREEN LED w\ shroud D900 10

1X36W TROFFER SENSOR 63

2x36W TROFFER DIMMABLE 6

2x36W BATTEN CURVED SUSP. 0

EXIT LIGHTS 17

1x18W BATTEN WP 8

1x250W INDUCTION FLOOD LIGHT (outside) 2

1x40W INDUCTION FLOODLIGHT 3

2X28W TROFFER RELAMP 3

297

Page 169: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 9 -

2.2.2 By Location

Fit

tin

g D

escri

pti

on

Gym

Hall

Sport

s H

all

Sport

s O

ffic

e

Gym

Offic

e

Ha

ll 1

Entr

y

Ha

ll 2

Re

ception

Offic

e 1

Offic

e 2

Offic

e 3

Offic

e 4

Cle

aners

Cupboard

Dis

Toile

t &

Show

er

Sto

re

Male

Toile

ts

Fem

ale

Toile

ts

Kitchen

Physio

He

alth C

lub

He

alth C

lub 2

He

alth C

lub 3

He

alth C

lub 5

He

alth C

lub 6

He

alth C

lub 7

Activitie

s R

oom

Activites T

oile

ts

Ca

rpark

Entr

y A

wn

ing

To

tal

1x18W BATTEN

SENSOR2 2

1x18W BATTEN 3 3

1x36W BATTEN 0

1x36W BATTEN 7 3 1 1 1 13

1X36W BATTEN

SENSOR2 1 1 8 2 42 28 15 1 1 1 102

1x36W BATTEN WP

SENSOR2 15 14 31

1x36W BATTEN

WP1 1 2

1x36W PLASTER 2 2

1x36W BATTEN 0

1x7W LED

REPLACEMENT

(OSRAM)

20 20

1x12W DR700 LED 7 7

1x16W BRIGHT

GREEN LED D9003 3

1x16W BRIGHT

GREEN LED w\

shroud D900

4 6 10

1X36W TROFFER

SENSOR41 7 15 63

2x36W TROFFER

DIMMABLE2 2 2 6

2x36W BATTEN

CURVED SUSP.0

EXIT LIGHTS 3 6 1 2 2 1 1 1 17

1x18W BATTEN WP 8 8

1x250W INDUCTION

FLOOD LIGHT

(outside)

2 2

1x40W INDUCTION

FLOODLIGHT3 3

2X28W TROFFER

RELAMP3 3

Total 5 6 1 1 7 29 55 7 2 2 2 2 1 2 1 15 14 9 8 44 31 16 1 1 1 17 4 10 3 297

Page 170: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 10 -

2.3 Exit Lights

2.3.1 Details

Product Code Description Category Number

LSC102 LE GRANDE SLIDE CONNECT G2 686200-686210

For specifications of installed exit lights refer Appendix D

2.3.2 Summary

Level G2 Slide Connect Subtotal

G 17 17

Total 17 17

2.3.3 Location Exit Light locations are shown on the as built lighting layouts. Refer Appendix E

Page 171: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 11 -

3 Sensors

Time out settings Settings vary depending on the function and occupancy of the space. See table for time outs.

Description Time Outs Meeting Rooms, Board Rooms, 20 mins

Small Office 10 mins

Open Office 20 mins

Amenities 30 mins

Disabled Amenities 10 mins

Hallways 20 mins

Health Club 1-3 20 mins

Health Club 4-6 10 mins

Note: Refer below and relevant drawings for sensor settings and locations.

3.1 Sensor Details

Sensor Type Description Subtotal

ME CP Electronics Passive Infrared Motion Sensor 20

M6 CP Electronics Microwave Motion Detector 5

M1 CP Electronics Microwave Motion Detector Long range 5

Total 30

Page 172: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 12 -

3.2 Sensor Locations Sensor location and type are shown on the as built lighting layouts. Refer Appendix E

3.3 Sensor ID & Programming

Level Zone No. *Sensor ID Type Time Out

(mins) Dimming

Sports Office 1 1 ME 10

Hall 1 1 2 ME 10

Gym Office 1 3 ME 10

Entry 1 4 M6 20

Hall 2 1 7 M6 20

Hall 2 1 8 M6 20

Hall 2 1 10 ME 20

Hall 2 1 15 ME 20

Hall 2 1 17 ME 20

Office 1 1 12 ME 10

Office 2 1 11 ME 10 92

Office 3 1 14 ME 10 92

Office 4 1 13 ME 10 92

Disabled Toilet 1 30 ME 10

Disabled Shower 1 31 ME 10

Male Toilets 1 18 ME 30

Male Toilets 1 19 ME 30

Female Toilets 1 20 ME 30

Female Toilets 1 21 ME 30

Physio 1 9 ME 20

Health Club 6 1 22 ME 10

Health Club 5 1 23 ME 10

Health Club 4 1 24 ME 10

Health Club 3 1 25 M1 20

Health Club 1 26 M1 20

Health Club 1 27 M1 20

Page 173: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 13 -

Level Zone No. *Sensor ID Type Time Out

(mins) Dimming

Health Club 2 1 28 M1 20

Health Club 2 1 29 M1 20

Activities Room 1 5 M6 20

Activities Room 1 6 M6 20

* Sensor ID as shown on Plans (see attachments)

Page 174: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 14 -

4 Fitting Components Apart from reducing energy consumption the installation of e1 fittings also provides a reduction in the number of lamps and ballasts in operation and consequently reduces ongoing lighting maintenance costs. Further cost savings are provided by the extended life cycle of the e1 fitting components.

4.1 Comparison of Lamp and Ballast Numbers Pre and Post Installation

4.1.1 Summary

Description Lamps Ballasts

Pre-existing 525 511

As Installed 306 300

% Change -71.57% -70.33%

4.1.2 Pre-existing

Fitting Description Lamps Ballasts

2x18W BATTEN 6 6

1x18W BATTEN 2 2

1x36W BATTEN 9 9

2x36W BATTEN 228 228

1x36W BATTEN WP 6 6

2x36W BATTEN WP 20 20

2x36W PLASTER TROFFER 4 4

2x58W BATTEN 16 16

1X50W DICHROIC SUSPENDED 20 20

1x50W DICHROIC 7 7

1x16W DL 130DIA LED 3 3

2x26W DL 200DIA 22 22

2x36W TROFFER 138 138

EXIT LIGHTS 17 17

2x18W BATTEN WP 16 8

1x400W FLOOD LIGHT (Outside) 2 2

1x100W SPOT LIGHTS (Outside) 3 3

2X28W TROFFER 6 6

Total 525 511

Page 175: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 15 -

4.1.3 As Installed

Fitting Description Lamps Ballasts

1x18W BATTEN SENSOR 2 2

1x18W BATTEN 3 3

1x36W BATTEN 0 0

1x36W BATTEN 13 13

1X36W BATTEN SENSOR 102 102

1x36W BATTEN WP SENSOR 31 31

1x36W BATTEN WP 2 2

1x36W PLASTER 2 2

1x36W BATTEN 0 0

1x7W LED REPLACEMENT (OSRAM) 20 20

1x12W DR700 LED 7 7

1x16W BRIGHT GREEN LED D900 3 3

1x16W BRIGHT GREEN LED w\ shroud D900 10 10

1X36W TROFFER SENSOR 63 63

2x36W TROFFER DIMMABLE 12 6

2x36W BATTEN CURVED SUSP. 0 0

EXIT LIGHTS 17 17

1x18W BATTEN WP 8 8

1x250W INDUCTION FLOOD LIGHT (outside) 2 2

1x40W INDUCTION FLOODLIGHT 3 3

2X28W TROFFER RELAMP 6 6

Total 306 300

Page 176: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 16 -

4.2 Installed Fitting Components

4.2.1 Component Legend

Component Type No. Description

Tube 1 Osram 18w XXT 840

2 Osram 36w XXT 840

3 Osram 7w LED Replacement

4 Brightgreen 12w DR700

5 Brightgreen 16w D900

6 250w Matsushima Induction Lamp

7 40w Matsushima Induction Lamp

8 GE 28w T5

Ballast 1 Osram QTP8 1x18w

2 Osram QTP8 1x36w

3 Osram QTP8 2x36w

4 Osram Redback

5 Matsushima Ballast 250w 220

6 Matsushima Ballast 40w 220

7 Tridonic Atco PCA 2/36w ECO Dimmable

Diffuser 1 Curved Y5

2 Weatherproof Osram Neptune

3 4mm Toughened Tempered Diffuser

Page 177: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 17 -

4.2.2 Component Breakdown by Fitting

Fitting Description Tube Type Ballast Type

Diffuser Type

1x18W BATTEN SENSOR 1 1 1

1x18W BATTEN 1 1 1

1x36W BATTEN 2 2 1

1x36W BATTEN 2 2 1

1X36W BATTEN SENSOR 2 2 1

1x36W BATTEN WP SENSOR 2 2 2

1x36W BATTEN WP 2 2 2

1x36W PLASTER 2 2 1

1x36W BATTEN 2 2 1

1x7W LED REPLACEMENT (OSRAM) 3 4 N/A

1x12W DR700 LED 4 4 N/A

1x16W BRIGHT GREEN LED D900 5 4 N/A

1x16W BRIGHT GREEN LED w\ shroud D900 5 4 N/A

1X36W TROFFER SENSOR 2 2 1

2x36W TROFFER DIMMABLE 2 7 1

2x36W BATTEN CURVED SUSP. 2 3 1

EXIT LIGHTS N/A N/A N/A

1x18W BATTEN WP 1 2

1x250W INDUCTION FLOOD LIGHT (outside) 6 5 3

1x40W INDUCTION FLOODLIGHT 7 6 3

2X28W TROFFER RELAMP 8 N/A N/A

Page 178: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 18 -

5 Amp Readings The areas powered by each lighting circuit were identified and at the time of each reading Envirolite Staff were

positioned accordingly to ensure all light fittings were active. Communication during this period was achieved via

Walkie Talkie.

5.1 Summary

5.2 Floor by Floor Readings

Level Location Circuit Pre

(Amps) Post

(Amps) % Change

Foyer Main Switchboard 1 1.00 0.00 -100.0%

3 8.20 3.40 -58.5%

5 16.90 2.40 -85.8%

7 15.20 4.80 -68.4%

9 10.50 2.40 -77.1%

11 11.50 2.70 -76.5%

13 0.20 0.00 -100.0%

15 0.00 0.50

17 0.20 0.70 250.0%

35 0.70 0.30 -57.1%

37 0.00 0.10

39 0.20 0.00 -100.0%

Health Club Distribution Board B 2 9.5 3.7 -61.1%

4 8.9 3.4 -61.8%

6 6.5 2.3 -64.6%

10 0.8 0.2 -75.0%

24 5.5 2.2 -60.0%

Total 95.8 29.1 -69.6%

Location Pre Installation

(Amps) Post Installation

(Amps) % Change

Foyer 64.6 17.3 -73.22%

Health Club 31.2 11.8 -62.18%

Total 95.8 29.1 -69.6%

Page 179: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 19 -

6 Lux Levels A requirement of the project was that the new lighting installation must comply with Australian Standards

AS/NZS1680, in particular with regards to minimum lux levels.

6.1 Recommended Illuminance

AS/NZS Type of Interior or Activity Maintenance Illuminance

(lx)

1680.2.1

Entrances

Entrance Halls, Lobbies, Foyers 160*

Waiting Rooms 160*

Enquiry Desks 320

Circulation Areas Corridors, Passageways, Ramps 40*

Stairs (internal) 80

Kitchens General 160

Food Preparation, Cooking, Washing Up 240

First Aid Centres Rest Room 40

Treatment Room 320

Toilets 80

Plant Rooms General 80

1680.2.2

General General Tasks Involving Typing, Reading, Writing 320

Computer Rooms Equipment Rooms 320

Meeting Rooms

Meeting Rooms 320

Training Rooms, Seminar Rooms 240

Conference Rooms, Boardrooms 240

* Illuminance applies at floor level

Page 180: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 20 -

6.2 Measurement Procedure Measurements are to be in accord with the requirements of AS/NZS 1680.1 Appendix B.

1. Measurements in theory should be taken at night or if this is not possible with blinds drawn (no daylight

component) and in an area empty of all furniture such that the light level at a point is the sum of ALL light sources

in the room with no masking from desk partitions, cabinets, people etc. This is obviously not usually possible so

all care should be taken to ensure we minimise shadowing or shrouding and omit or discount readings that do

not comply with this requirement.

2. Lux readings are not always at a height of 700-720 mm (see table over page).

3. Measurements should not be taken closer than 1000mm from room perimeter.

4. If in a room a low reading is recorded in isolation when all other readings are consistent careful consideration

should be given to the validity of this reading.

5. The accuracy of the light meter should also be considered and routinely checked against a recently calibrated

unit, or if such a unit is not immediately to hand, a number of meters can be checked with the same light source

for consistency.

6. The particulars of the meter should be included in the report i.e. specifications, model, type

7. If practical, new lamps should be burnt in for 100 hours before measurement. It is noted that seasoning of new

lamps allows for the burning off of particulates and the even distribution of mercury within the tube. This

stabilization process ensures optimal lamp performance and in general light measurements taken after aging or

seasoning will be higher than those taken earlier.

There are other influences on the 100 hour burn in which would make this requirement impractical. These include

the interaction of sensors and daylight harvesting; the potential waiting periods, especially at some locations, is

financially unviable; and, adjusting lights to remain on 24 hours per day for the four to five days needed is not

environmentally responsible.

8. The environment in which measurement is to be recorded should be allowed to stabilize, the lamps should be on

for 1 hour prior to measurement and air conditioning / ventilation operating normally. If measurements are taken

at night, this may not be possible and readings will generally be lower than otherwise expected.

9. For typically required light levels refer 6.1 Recommended Illuminance.

Page 181: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 21 -

10. The layout of the measurement grid can be a square array of points or if the luminaires are in a regular

rectangular array. Refer 6.2.1 Lux Meter Positioning Guide

11. Number of points and areas of measurement grid.

Area > 25m2 - Measured area 9m

2 minimum and must include at least 4 luminaires.

Area < 25m2 - Entire area to be checked. Minimum of 9 points.

As an indication of the number of points the following can be used as a guide for a roughly square area.

Size of space No. of points

5m x 5m 9

7m x 7m 16

10m x 10m and above 25

6.2.1 Lux Meter Positioning Guide

Position under light fittings: Meter shall be placed directly under the centre of the light fitting at a height of 700mm.

Positions between light fittings: Meter shall be placed as close as practical to the mid way points between light fittings

at a height of 700mm.

6.2.2 Small Room / Area Positioning

Position 1 Light

Position 4

Position 7 Light

Position 2

Position 5

Position 8

Position 3 Light

Position 6

Position 9 Light

Page 182: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 22 -

6.2.3 Medium Room / Area Positioning

Position 1 Light

Position 4

Position 7 Light

Position 10

Position 13 Light

Position 2

Position 5

Position 8

Position 11

Position 14

Position 3 Light

Position 5

Position 9 Light

Position 12

Position 15 Light

6.2.4 Large Room / Area Positioning

Position 1 Light

Position 6

Position 11 Light

Position 16

Position 21 Light

Position 2

Position 7

Position 12

Position 17

Position 22

Position 3 Light

Position 8

Position 13 Light

Position 18

Position 23 Light

Position 4

Position 9

Position 14

Position 19

Position 24

Position 5 Light

Position 10

Position 15 Light

Position 20

Position 25 Light

Page 183: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 23 -

6.3 Lux Meter Specifications Testo 540

Page 184: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 24 -

6.4 Pre and Post Lux Readings The following sample lux levels were taken across the upgraded areas to confirm that actual lux levels corresponded

to computer modelling generated lux levels.

Level Area Position Pre Post

G Amenities Room 1 186 385

2 162 375

3 239 363

4 158 391

5 91 379

6 93 410

7 79 417

8 146 391

Average 144.3 388.9

G Office 1 1 231 556

2 146 511

3 296 517

4 227 535

5 195 586

6 203 542

Average 216.3 541.2

G Office 3 1 173 407

2 258 435

3 106 418

4 249 451

5 118 407

6 156 445

Average 176.7 427.2

G Office 4 1 202 497

2 193 505

3 131 515

4 87 485

Page 185: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 25 -

Level Area Position Pre Post

5 63 586

6 111 575

Average 131.2 527.2

Foyer Entrance 1 205 233

2 110 195

3 115 242

4 163 278

5 229 387

6 228 452

7 266 423

8 229 380

9 287 367

10 157 335

11 149 346

12 70 317

13 61 331

14 86 307

15 103 317

16 84 298

17 70 301

18 104 316

19 147 327

20 163 301

21 169 319

22 164 331

23 188 307

Average 154.2 322.2

Foyer Male 01 toilets 1 263 285

2 271 300

3 176 278

4 293 301

Page 186: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 26 -

Level Area Position Pre Post

5 226 288

6 315 308

7 226 297

8 256 301

9 303 319

10 311 296

11 275 321

12 336 340

Average 270.9 302.8

G Disabled Toilet 1 56 207

2 70 222

3 63 217

Average 63.0 215.3

G Disabled Shower 1 11 201

2 11 195

3 13 207

Average 11.7 201.0

Health Club Middle 1 109 235

2 98 248

3 119 213

4 108 205

5 122 232

6 101 207

7 86 188

8 100 217

9 116 205

Average 106.6 216.7

Health Club Left Hand Side 1 64 220

2 72 231

3 50 217

4 63 235

Page 187: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 27 -

Level Area Position Pre Post

5 97 209

6 47 217

7 72 232

8 90 207

9 58 213

Average 68.1 220.1

Health Club Right Hand Side 1 38 246

2 29 233

3 46 251

4 49 248

5 37 222

6 30 212

7 41 225

8 36 218

9 60 232

Average 40.7 231.9

Page 188: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 28 -

7 Recycling Reconciliation The light fittings removed from site have been recycled. The components of the lights fittings are recycled as follows:

- Aluminium & brass: The metal ends from tubes are separated and subsequently recycled into cast products

such as ingots used in foundry application.

- Glass from the tubes is separated and recycled into various glass based applications

- Mercury is distilled from the separated powders and then used in the manufacture of dental amalgam

- Phosphor powder from fluorescent tubes is consolidated for future use in the manufacture of land applications

- Metal is recycled into foundry applications

The following reconciliation is based on the weights of the old individual fitting types replaced and the total weights of

materials recycled by Envirolite’s recycling partners.

Page 189: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 29 -

7.1 Metal Recycling

Fitting Description Qty Unit Fitting Weight (kg)

Total Fitting Weight (kg)

2x18W BATTEN 3 2.50 7.5

1x18W BATTEN 2 2.50 5.0

1x36W BATTEN 9 5.75 51.75

2x36W BATTEN 114 5.75 655.5

1x36W BATTEN WP 6 5.75 34.5

2x36W BATTEN WP 10 5.75 57.5

2x36W PLASTER TROFFER 2 5.75 11.5

2x58W BATTEN 8 7.00 56.0

1X50W DICHROIC SUSPENDED 20 0.80 16.0

1x50W DICHROIC 7 0.75 5.25

1x16W DL 130DIA LED 3 0.90 2.7

2x26W DL 200DIA 11 0.90 9.9

2x36W TROFFER 69 5.75 396.75

EXIT LIGHTS 17 0.50 8.5

2x18W BATTEN WP 8 2.50 20.0

1x400W FLOOD LIGHT (Outside) 2 12.00 24.0

1x100W SPOT LIGHTS (Outside) 3 6.00 18.0

TOTAL 294 1338.35

Weight Recycled: 1303.00kg (As provided by recorded by recycling partners) Variance: -35.5kg (-2.64%)

Page 190: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 30 -

7.2 Lamp Recycling

Fitting Description Total Lamps Unit Lamp Weight (g)

Total Lamp Weight (kg)

2x18W BATTEN 6 68.90 0.41

1x18W BATTEN 2 68.90 0.14

1x36W BATTEN 9 138.40 1.25

2x36W BATTEN 228 138.40 31.56

1x36W BATTEN WP 6 138.40 0.83

2x36W BATTEN WP 20 138.40 2.77

2x36W PLASTER TROFFER 4 138.40 0.55

2x58W BATTEN 16 199.60 3.19

1X50W DICHROIC SUSPENDED 20 31.00 0.62

1x50W DICHROIC 7 31.00 0.22

1x16W DL 130DIA LED 3 59.00 0.18

2x26W DL 200DIA 22 66.00 1.45

2x36W TROFFER 138 138.40 19.10

EXIT LIGHTS 17 10.00 0.17

2x18W BATTEN WP 16 68.90 1.10

1x400W FLOOD LIGHT (Outside) 2 300.00 0.60

1x100W SPOT LIGHTS (Outside) 3 280.00 0.84

2X28W TROFFER RELAMP 6 96.60 0.58

TOTAL 525 63.54

Weight Recycled: 64.0kg (As provided by recorded by recycling partners) Variance: 0.46 kg (0.73%)

Page 191: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 31 -

8 General Fitting Guidelines

8.1 Handling E1 Light Fittings

All e1 light fittings contain a matte white High Performance e1 Reflector. It is recommended that light cotton

gloves be worn when handling E1 light fittings so as not to mark or damage the reflector and air conditioning

slots.

If using a cutting implement to remove packaging be careful not to scratch or damage the light fitting.

If a blue protective film is present on the High Performance e1 Reflector, this should be removed prior to

installation.

When lifting the fitting, ensure it is properly supported so as not to bend of crease air conditioning slots.

Plug fitting into a designated surface socket.

Remove fluorescent lamp.

With one hand touching the light fitting, peel off remainder of blue film and discard. Note: Failure to touch fitting

when peeling off film will result in the build up of a static charge, which will release when you next earth yourself.

Replace lamp.

8.2 Cleaning E1 Light Fittings

Ensure all fittings and diffusers are clean and free of any contaminates. Wipe with a clean, lint free, cloth if

necessary.

If the High Performance e1 Reflector becomes marked or soiled it should be gently cleaned, using a circular

motion, with a lint free cloth dipped in methylated spirits.

DO NOT use any abrasive or caustic materials on e1 Lighting products.

8.3 Installation of E1 Lighting

Installation of all e1 Lighting products should be carried out by suitably qualified personnel only

Prior to installation electrical safety of the general area should be assessed by suitably qualified personnel.

Page 192: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 32 -

9 Envirolite Pty Ltd Warranty

The Envirolite Warranty Covers Replacement of:

1. Any component (including the lamps) in the E1 Lighting fittings installed by Envirolite Pty Ltd that fails in the normal course of operation for a period of five (5) years from the date of practical completion.

2. Any component (including the lamps) in LED fittings installed by Envirolite Pty Ltd that fails in the normal course of operation for a period of three (3) years from the date of practical completion.

3. Any component in any sensor installed by Envirolite Pty Ltd that fails in the normal course of operation for a

period of three (3) years from the date of practical completion.

The Warranty Does Not Cover the Replacement of:

1. Any component in the light fittings or sensors installed by Envirolite Pty Ltd that have failed other than in the

course of normal operation. This includes but is not limited to failures caused by fire, water damage, earthquakes, power surges, vandalism or other willful or accidental acts that cause damage to the fittings or their components.

2. Failure or damage to any light fitting or sensor component caused by a third party carrying out other works in the building. This includes but is not limited to (a) electrical works that adversely affect the lighting circuits or sensor cables etc and (b) works on the air-conditioning or ceiling grid.

Service calls for the replacement of fitting or sensor components (other than lamps) covered by this warranty will be provided free of cost.

However if the failure of a fitting or sensor component is due to other than normal operation (as covered in Paragraphs 2A and 2B above) then a service call out fee of $100.00 (ex GST) will be charged plus the costs for the supply of replacement components and any associated installation labour.

Lamp Failures

A small reserve stock of replacement lamps will be provided to the Building Manager as part of the Scope of Works to allow for the immediate in house replacement of any failures. The Building Manager will be required to keep all failed lamps in the cartons provided and contact Envirolite when 50% of the reserve stock has been used. Envirolite will then replenish the reserve stock to its original numbers and take away the old lamps for recycling. The cost of hire of any man lifting equipment necessary to replace lamps is excluded from this warranty. Failed Sensors and/or Electrical Components in Luminaries.

Envirolite will within a maximum of two (2) workings days following the day of receipt of a service call send one of its service staff to investigate and rectify the failure.

All service calls for replacement of failed components under this warranty should be directed to [email protected]

Page 193: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 33 -

Listing of Envirolite Warranty Reserve Stock

Stock given to Dino Finucci and held at CCBC Civic Centre for all sites.

Item Description Quantity

Lamp Osram XXT 36w (box of 40) 1

Lamp GE 26w (box of 25) 1

LED D1000 2

LED D900 2

LED DR700 6

Transformer ET-REDBACK 60VA/230-240 6

Page 194: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 34 -

10 Envirolite Pty Ltd Contact Details

OFFICE: Unit 4A, 2 Resolution Drive,

CARINGBAH. NSW. 2229

POSTAL ADDRESS: PO Box 220

MIRANDA. NSW. 2228.

PHONE: +61 2 9540 3302

FAX: +61 2 9540 3306

EMAIL: [email protected]

10.1 Operations Enquiries

NAME: Mr. Kerry Powell

MOBILE: 0412 858 303

EMAIL: [email protected]

Page 195: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Appendix A, B, C & D removed for publication

Page 196: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Community Energy Efficiency-Lighting Upgrade

Contract No. 2013/TS50

Handover Report-CCBC Depot

Regatta Rd,Five Dock.NSW.2046.

Lighting Upgrade By

Page 197: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 2 -

Introduction This report has been prepared by Envirolite Pty Ltd and details the results achieved from the recent lighting upgrade

work completed at CCBC Regatta Rd Depot, Five Dock as part of the City of Canada Bay Council CEEP-Lighting

Upgrade Project.

Envirolite Pty Ltd, a one hundred percent Australian Owned Company, is proud to have been selected to provide the

lighting solution for this project. Energy reductions and improvements to the working environment have been achieved

via the installation of E1 light fittings which is an Australian developed world leading lighting innovation.

A summary of the benefits achieved from the installation of the new lighting is as follows:

Direct power usage by the lighting has been reduced from 122.0 amps to 51.4 amps a reduction of 57.9%.

(This excludes additional savings achieved from the installation of daylight harvesting and motion sensors and in air

conditioning where it is installed due to a reduction in the lighting heat load).

The number of fittings installed on site has reduced from 295 to 292 fittings (-1.02%)

The number of lamps in operation has been reduced from 517 to 393, a reduction of 31.6%.

The number of ballasts in operation has been reduced from 517 to 312, a reduction of 65.7%.

Lighting levels have been maintained in accordance with the requirements of Australian Lighting Standards.

Note: During the course of the installation,1 ballast containing carcinogenic PCB was found, removed and disposed of

according to NSW OH & S and Workcover Regulations.

Page 198: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 3 -

Table of Contents

1 PROJECT DATES 5

2 LIGHT FITTING COUNTS 6

2.1 PRE-EXISTING LIGHT FITTINGS 6 2.1.1 Summary 6 2.1.2 By Location 7

2.2 AS INSTALLED LIGHT FITTINGS 8 2.2.1 Summary 8 2.2.2 By Location 9 2.2.3 Details 10 2.2.4 Summary 10 2.2.5 Location 10

3 SENSORS 11

3.1 SENSOR DETAILS 11 3.2 SENSOR SUMMARY 12 3.3 SENSOR LOCATIONS 12 3.4 SENSOR ID & PROGRAMMING 12

4 FITTING COMPONENTS 15

4.1 COMPARISON OF LAMP AND BALLAST NUMBERS PRE AND POST INSTALLATION 15 4.1.1 Summary 15 4.1.2 Pre-existing 15 4.1.3 As Installed 16

4.2 INSTALLED FITTING COMPONENTS 17 4.2.1 Component Legend 17 4.2.2 Component Breakdown by Fitting 18

5 AMP READINGS 19

5.1 SUMMARY 19 5.2 AREA BY AREA READINGS 19

6 LUX LEVELS 21

6.1 RECOMMENDED ILLUMINANCE 21 6.2 MEASUREMENT PROCEDURE 22

6.2.1 Lux Meter Positioning Guide 23 6.2.2 Small Room / Area Positioning 23 6.2.3 Medium Room / Area Positioning 24 6.2.4 Large Room / Area Positioning 24

6.3 LUX METER SPECIFICATIONS 25 6.4 PRE AND POST LUX READINGS 26

7 RECYCLING RECONCILIATION 32

7.1 METAL RECYCLING 33 7.2 LAMP RECYCLING 34

8 GENERAL FITTING GUIDELINES 35

8.1 HANDLING E1 LIGHT FITTINGS 35 8.2 CLEANING E1 LIGHT FITTINGS 35 8.3 INSTALLATION OF E1 LIGHTING 35

9 ENVIROLITE PTY LTD WARRANTY 36

Page 199: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 4 -

10 ENVIROLITE PTY LTD CONTACT DETAILS 38

10.1 OPERATIONS ENQUIRIES 38

APPENDICES 39

APPENDIX A – ELECTRICAL CERTIFICATE 39 APPENDIX B – SENSOR COMMISSIONING CHECKLIST 43 APPENDIX C – SENSOR SPECIFICATIONS 46 APPENDIX D – EXIT LIGHT SPECIFICATIONS 107 APPENDIX E – AS BUILT LIGHTING LAYOUTS 116

Page 200: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 5 -

1 Project Dates

Work commenced on 9

th August 2013 and completed on 23

rd August 2013.

Page 201: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 6 -

2 Light Fitting Counts

2.1 Pre-existing Light Fittings

2.1.1 Summary

Fitting Description Subtotal

2x36W Aris Surface Mounted 43

2x36W Troffer 1200x300 40

2x36W Batten PD 68

1x18W Batten PD 10

Exit Lights 11

1x36W Batten 16

1x400W High Bay 17

2x58W Batten 19

2x65W Batten 16

2x18W Batten WP 18

2x36W Batten WP 18

1x400W Flood Light 6

1x150W Spot Light 5

1x15W CFL 2

1x60W Incandescent 2

1x40W Wall Light 4

Total 295

Page 202: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 7 -

2.1.2 By Location

Fittin

g D

escrip

tion

Dep

ot

Ad

min

Fro

nt

Bu

ildin

g

Dep

ot

Ad

min

Ba

ck

Bu

ildin

g

SE

S R

oo

m &

Tra

inin

g

SE

S O

uts

ide

Depot

Outs

ide

Mechanic

Work

shop

Mechanic

s O

ffic

e &

Sto

rage

Sto

rage B

uildin

g 1

& 2

Tra

des W

ork

shop

Wash B

ay

Am

enties &

Kitchen &

Toilets

Exis

ting S

tora

ge S

hed

Tim

ber

Sto

rage &

Dog

Are

a

Genera

l Yard

To

tal

2x36W Aris Surface

Mounted43 43

2x36W Troffer

1200x30019 21 40

2x36W Batten PD 3 13 8 9 3 32 68

1x18W Batten PD 2 1 1 6 10

Exit Lights 5 6 11

1x36W Batten 3 8 2 3 16

1x400W High Bay 12 3 2 17

2x58W Batten 5 14 19

2x65W Batten 16 16

2x18W Batten WP 8 10 18

2x36W Batten WP 5 4 9 18

1x400W Flood Light 3 3 6

1x150W Spot Light 1 1 2 1 5

1x15W CFL 2 2

1x60W Incandescent 2 2

1x40W Wall Light 4 4

Total 84 44 9 17 0 17 9 16 20 7 42 4 13 13 295

Page 203: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 8 -

2.2 As Installed Light Fittings

2.2.1 Summary

Fitting Description Subtotal

2x26W Aris Surface Mounted 43

1x26W Troffer 1200x300 40

1x26W Batten PD 11

1x14W Batten PD 5

2x26W Batten PD 16

Exit Lights 11

1x36W Batten PD 44

1x18W Batten WP 23

3x36W High Bay 18

1x36W Batten WP 60

4x36W High Bay WP 2

1x250W Induction Flood Light 3

1x40W Induction Floodlight 7

1x16 W D1000 D\L 4

1x14.5W E27 Relamp 4

1x120W Induction Floodlight 1

292

Page 204: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 9 -

2.2.2 By Location

Fittin

g D

escrip

tio

n

Depot

Adm

in F

ront

Build

ing

Depot

Adm

in B

ack B

uild

ing

SE

S R

oom

& T

rain

ing

SE

S O

uts

ide

Depot

Outs

ide

Me

chanic

Work

shop

Me

chanic

s O

ffic

e &

Sto

rage

Sto

rage B

uild

ing 1

& 2

Tra

des W

ork

shop

Wash B

ay

Am

entie

s &

Kitchen &

To

ilets

Exis

tin

g S

tora

ge S

hed

Tim

ber

Sto

rage &

Dog A

rea

Genera

l Y

ard

To

tal

2x26W Aris Surface Mounted 43 43

1x26W Troffer 1200x300 19 21 40

1x26W Batten PD 6 5 11

1x14W Batten PD 4 1 5

2x26W Batten PD 8 8 16

Exit Lights 5 6 11

1x36W Batten PD 9 16 7 8 4 44

1x18W Batten WP 6 1 6 10 23

3x36W High Bay 12 6 18

1x36W Batten WP 4 8 5 5 26 12 60

4x36W High Bay WP 2 2

1x250W Induction Flood Light 3 3

1x40W Induction Floodlight 1 1 2 2 1 7

1x16 W D1000 D\L 4 4

1x14.5W E27 Relamp 4 4

1x120W Induction Floodlight 1 1

Total 88 46 9 15 0 17 9 16 13 7 42 4 13 13 292

Page 205: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 10 -

Exit Lights

2.2.3 Details

Product Code Description Category Number

LSC102 LE GRANDE SLIDE CONNECT G2 686200-686210

For specifications of installed exit lights refer Appendix D

2.2.4 Summary

Level G2 Slide Connect Subtotal

G 11 11

Total 11 11

2.2.5 Location Exit Light locations are shown on the as built lighting layouts. Refer Appendix E

Page 206: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 11 -

3 Sensors Time out Function. Active in all sensors. Time out settings Settings vary depending on the function and occupancy of the space. See table for proposed time outs.

Description Time Outs

Meeting Rooms, Board Rooms, 20 mins

Office 20 mins

Amenities 30 mins

Disabled Amenities 10 mins

Storage 20 mins

Machinery Workshops 30 mins

Trade Workshops/Wash Bay/Yard 20 mins

Commissioning Notes Sensor functions have been tailored to suit the client’s needs. There are many factors in an office environment that influence the function of sensors e.g. Wall, carpet and furniture colour, partition height, ambient light and occupancy to name a few. With these factors in mind the above settings were developed in consultation with the City of Canada Bay Council to provide lighting that is compliant with Australian Standards whilst at the same time providing maximum functionality and energy savings.

Note: Refer below and relevant drawings for sensor settings and locations.

3.1 Sensor Details

Sensor Type Description Subtotal

ME CP Electronics Passive Infrared Motion Sensor 21

MEDD CP Electronics Infrared Motion Sensor with Dimming 22

M6 CP Electronics Microwave Motion Detector 5

M1 CP Electronics Microwave Motion Detector Long range 5

M5 CP Electronics Microwave Motion Detector 2

C Clipsal Infrascan Outdoor 2

Total 57

Page 207: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 12 -

3.2 Sensor Summary

Level ME MEDD M1 M5 M6 C Subtotal

Offices 10 22 5 1 38

Yard 11 5 2 1 19

Total 21 22 5 5 2 2 57

3.3 Sensor Locations Sensor location and type are shown on the as built lighting layouts. Refer Appendix E

3.4 Sensor ID & Programming

Level Location *Sensor

ID Type

Time Out (mins)

Dimming

Offices SES HQ 1 ME 20

Offices SES Office 2 ME 20

Offices Office 15 3 ME 20

Offices Hall 3 4 ME 20

Offices Training Room 5 ME 20

Offices WC 6 ME 20

Offices Dis. WC 7 ME 20

Offices Kitchen 8 ME 20

Offices Hall 3 9 ME 20

Offices Open Office 2 11 M5 20

Offices Open Office 2 12 M5 20

Offices Hall 2 13 MEDD 20

Offices Office 14 14 MEDD 20

Offices Office 13 15 MEDD 20

Offices Open Office 16 M5 20

Offices Open Office 17 M5 20

Offices Office 12 18 MEDD 20

Offices Office 10 19 MEDD 20

Page 208: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 13 -

Level Location *Sensor

ID Type

Time Out (mins)

Dimming

Offices Office 9 20 MEDD 20

Offices Hall 21 MEDD 20

Offices Office 11 22 MEDD 20

Offices Office 8 23 MEDD 20

Offices Admin Support 24 MEDD 20

Offices Male Toilets 25 ME 30

Offices Hall 26 MEDD 20

Offices Reception 27 MEDD 20

Offices Hall 28 MEDD 20

Offices Office 4 29 MEDD 20

Offices Office 7 30 MEDD 20

Offices Female Toilets 31 MEDD 30

Offices Office 6 32 MEDD 20

Offices Hall 33 MEDD 20

Offices Office 3 34 MEDD 20

Offices Office 2 35 MEDD 20

Offices Office 5 36 MEDD 20

Offices Office 1 37 MEDD 20

Offices Female Toilets 39 ME 30

Yard Mechanics Workshop 40 M1 30

Yard Mechanics Workshop 41 M1 30

Yard Mechanics Office 42 ME 20

Yard Mechanics Storage 43 ME 20

Yard Storage Building 44 M1 30

Yard Storage Building 45 M1 30

Yard Trades Workshop 46 M6 20

Yard Trades Workshop 47 ME 20

Yard Trades Workshop 48 ME 20

Yard Wash Bay 49 M1 20

Yard Kitchen 50 M6 30

Yard Toilets Amenities 51 ME 30

Page 209: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 14 -

Level Location *Sensor

ID Type

Time Out (mins)

Dimming

Yard Toilets 52 ME 30

Yard Amenities Building 53 ME 30

Yard Amenities Building 54 ME 30

Yard Amenities Building 55 ME 30

Yard Amenities Building 56 ME 30

Yard Amenities Building 57 ME 30

Yard Dog Area 58 C 20

Offices SES Outside 59 C 20

* Sensor ID as shown on Plans (see attachments)

Page 210: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 15 -

4 Fitting Components Apart from reducing energy consumption the installation of e1 fittings also provides a reduction in the number of lamps and ballasts in operation and consequently reduces ongoing lighting maintenance costs. Further cost savings are provided by the extended life cycle of the e1 fitting components.

4.1 Comparison of Lamp and Ballast Numbers Pre and Post Installation

4.1.1 Summary

Description Lamps Ballasts

Pre-existing 517 517

As Installed 393 312

% Change -31.55% -65.71%

4.1.2 Pre-existing

Fitting Description Lamps Ballasts

2x36W Aris Surface Mounted 86 86

2x36W Troffer 1200x300 80 80

2x36W Batten PD 136 136

1x18W Batten PD 10 10

Exit Lights 11 11

1x36W Batten 16 16

1x400W High Bay 17 17

2x58W Batten 38 38

2x65W Batten 32 32

2x18W Batten WP 36 36

2x36W Batten WP 36 36

1x400W Flood Light 6 6

1x150W Spot Light 5 5

1x15W CFL 2 2

1x60W Incandescent 2 2

1x40W Wall Light 4 4

Total 517 517

Page 211: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 16 -

4.1.3 As Installed

Fitting Description Lamps Ballasts

2x26W Aris Surface Mounted 86 43

1x26W Troffer 1200x300 40 40

1x26W Batten PD 11 11

1x14W Batten PD 5 5

2x26W Batten PD 32 16

Exit Lights 11 11

1x36W Batten PD 44 44

1x18W Batten WP 23 23

3x36W High Bay 54 36

1x36W Batten WP 60 60

4x36W High Bay WP 8 4

1x250W Induction Flood Light 3 3

1x40W Induction Floodlight 7 7

1x16 W D1000 D\L 4 4

1x14.5W E27 Relamp 4 4

1x120W Induction Floodlight 1 1

Total 393 312

Page 212: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 17 -

4.2 Installed Fitting Components

4.2.1 Component Legend

Component Type No. Description

Tube 1 Osram 18w XXT 840

2 Osram 36w XXT 840

3 Osram Parathom 14.5w E27 LED

4 Brightgreen 16w D1000

5 250w Matsushima Induction Lamp

6 40w Matsushima Induction Lamp

7 GE 26w T5

8 14w Lumos

9 120w Matsushima Induction Lamp

Ballast 1 Osram QTP8 1x18w

2 Osram QTP8 1x36w

3 Osram QTP8 2x36w

4 Osram Redback

5 Matsushima Ballast 250w 220

6 Matsushima Ballast 40w 220

7 Matsushima Ballast 120w 220

8 Osram QTP5 26w

9 Osram QTP5 2x26w

10 Osram QTP5 14w

Diffuser 1 Curved Y5

2 Weatherproof Osram Neptune

3 4mm Toughened Tempered Diffuser

4 Boxed Aristolite Diffuser

5 Flat Y5

6 Rectangle Acrylic

Page 213: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 18 -

4.2.2 Component Breakdown by Fitting

Fitting Description Tube Type Ballast Type

Diffuser Type

2x26W Aris Surface Mounted 7 9 4

1x26W Troffer 1200x300 7 8 5

1x26W Batten PD 7 8 6

1x14W Batten PD 8 10 6

2x26W Batten PD 7 9 6

Exit Lights N/A N/A N/A

1x36W Batten PD 2 2 6

1x18W Batten WP 1 1 2

3x36W High Bay 2 2 & 3 5

1x36W Batten WP 2 2 2

4x36W High Bay WP 2 2 2

1x250W Induction Flood Light 5 5 3

1x40W Induction Floodlight 6 6 3

1x16 W D1000 D\L 4 4 N/A

1x14.5W E27 Relamp 3 N/A N/A

1x120W Induction Floodlight 9 7 3

Page 214: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 19 -

5 Amp Readings The areas powered by each lighting circuit were identified and at the time of each reading Envirolite Staff were

positioned accordingly to ensure all light fittings were active. Communication during this period was achieved via

Walkie Talkie.

5.1 Summary

5.2 Area by Area Readings

Level Location Circuit Pre

(Amps) Post

(Amps) % Change

Workshops DB2 Boilermaker 2 5.2 1.9 -63.5%

DB2 Boilermaker 4 7.9 1.9 -75.9%

DB2 Boilermaker 1 8.9 2.5 -71.9%

DB2 Boilermaker 3 1.5 1.4 -6.7%

DB2 Boilermaker 5 0 0

DB2 Boilermaker 7 0 0

DB Middle Shed 3 0.8 0.6 -25.0%

DB 1 Mechanical Workshop 27 2.8 1.1 -60.7%

DB 1 Mechanical Workshop 29 4.7 4.4 -6.4%

DB 1 Mechanical Workshop 31 1.6 0 -100.0%

DB 1 Mechanical Workshop 35 0 0

DB 1 Mechanical Workshop 26 0 0

DB 1 Mechanical Workshop 28 0 0

DB 1 Mechanical Workshop 30 3.4 0.1 -97.1%

DB 1 Mechanical Workshop 32 4.4 1.3 -70.5%

DB 1 Mechanical Workshop 34 2.5 0 -100.0%

Location Pre Installation

(Amps) Post Installation

(Amps) % Change

Workshops 74.0 27.5 -62.84%

Office 40.6 19.1 -52.96%

SES 2.0 1.7 -15.00%

Other 5.4 3.1 -42.59%

Total 122.0 51.4 -57.9%

Page 215: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 20 -

Level Location Circuit Pre

(Amps) Post

(Amps) % Change

DB2 Carpenters Workshop 31 0.2 0.6 200.0%

33 0.5 0.2 -60.0%

37 8.4 0 -100.0%

26 4.4 3.7 -15.9%

28 4.2 2 -52.4%

DB3 Amenities Block 9 5.4 2.2 -59.3%

11 4.3 2.5 -41.9%

2 1.7 0.9 -47.1%

4 1.2 0.2 -83.3%

Office Main Office 6 4.2 1.4 -66.7%

Main Office 8 3.7 1.9 -48.6%

Main Office 10 4.2 2.3 -45.2%

Main Office 12 4.7 2.8 -40.4%

Main Office 14 5.8 2.9 -50.0%

Main Office 16 3.4 2.5 -26.5%

Main Office 18 2.9 1.9 -34.5%

Main Office 20 1 0 -100.0%

Main Office 22 0.2 0 -100.0%

Main Office 24 10.5 3.4 -67.6%

SES SES 4 2 1.7 -15.0%

Other DB3 1 5.4 3.1 -42.6%

122.0 51.4 -57.9%

Page 216: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 21 -

6 Lux Levels A requirement of the project was that the new lighting installation must comply with Australian Standards

AS/NZS1680, in particular with regards to minimum lux levels.

6.1 Recommended Illuminance

AS/NZS Type of Interior or Activity Maintenance Illuminance

(lx)

1680.2.1

Entrances

Entrance Halls, Lobbies, Foyers 160*

Waiting Rooms 160*

Enquiry Desks 320

Circulation Areas Corridors, Passageways, Ramps 40*

Stairs (internal) 80

Kitchens General 160

Food Preparation, Cooking, Washing Up 240

First Aid Centres Rest Room 40

Treatment Room 320

Toilets 80

Plant Rooms General 80

1680.2.2

General General Tasks Involving Typing, Reading, Writing 320

Computer Rooms Equipment Rooms 320

Meeting Rooms

Meeting Rooms 320

Training Rooms, Seminar Rooms 240

Conference Rooms, Boardrooms 240

* Illuminance applies at floor level

Page 217: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 22 -

6.2 Measurement Procedure Measurements are to be in accord with the requirements of AS/NZS 1680.1 Appendix B.

1. Measurements in theory should be taken at night or if this is not possible with blinds drawn (no daylight

component) and in an area empty of all furniture such that the light level at a point is the sum of ALL light sources

in the room with no masking from desk partitions, cabinets, people etc. This is obviously not usually possible so

all care should be taken to ensure we minimise shadowing or shrouding and omit or discount readings that do

not comply with this requirement.

2. Lux readings are not always at a height of 700-720 mm (see table over page).

3. Measurements should not be taken closer than 1000mm from room perimeter.

4. If in a room a low reading is recorded in isolation when all other readings are consistent careful consideration

should be given to the validity of this reading.

5. The accuracy of the light meter should also be considered and routinely checked against a recently calibrated

unit, or if such a unit is not immediately to hand, a number of meters can be checked with the same light source

for consistency.

6. The particulars of the meter should be included in the report i.e. specifications, model, type

7. If practical, new lamps should be burnt in for 100 hours before measurement. It is noted that seasoning of new

lamps allows for the burning off of particulates and the even distribution of mercury within the tube. This

stabilization process ensures optimal lamp performance and in general light measurements taken after aging or

seasoning will be higher than those taken earlier.

There are other influences on the 100 hour burn in which would make this requirement impractical. These include

the interaction of sensors and daylight harvesting; the potential waiting periods, especially at some locations, is

financially unviable; and, adjusting lights to remain on 24 hours per day for the four to five days needed is not

environmentally responsible.

8. The environment in which measurement is to be recorded should be allowed to stabilize, the lamps should be on

for 1 hour prior to measurement and air conditioning / ventilation operating normally. If measurements are taken

at night, this may not be possible and readings will generally be lower than otherwise expected.

9. For typically required light levels refer 6.1 Recommended Illuminance.

Page 218: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 23 -

10. The layout of the measurement grid can be a square array of points or if the luminaires are in a regular

rectangular array. Refer 6.2.1 Lux Meter Positioning Guide

11. Number of points and areas of measurement grid.

Area > 25m2 - Measured area 9m

2 minimum and must include at least 4 luminaires.

Area < 25m2 - Entire area to be checked. Minimum of 9 points.

As an indication of the number of points the following can be used as a guide for a roughly square area.

Size of space No. of points

5m x 5m 9

7m x 7m 16

10m x 10m and above 25

6.2.1 Lux Meter Positioning Guide

Position under light fittings: Meter shall be placed directly under the centre of the light fitting at a height of 700mm.

Positions between light fittings: Meter shall be placed as close as practical to the mid way points between light fittings

at a height of 700mm.

6.2.2 Small Room / Area Positioning

Position 1 Light

Position 4

Position 7 Light

Position 2

Position 5

Position 8

Position 3 Light

Position 6

Position 9 Light

Page 219: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 24 -

6.2.3 Medium Room / Area Positioning

Position 1 Light

Position 4

Position 7 Light

Position 10

Position 13 Light

Position 2

Position 5

Position 8

Position 11

Position 14

Position 3 Light

Position 5

Position 9 Light

Position 12

Position 15 Light

6.2.4 Large Room / Area Positioning

Position 1 Light

Position 6

Position 11 Light

Position 16

Position 21 Light

Position 2

Position 7

Position 12

Position 17

Position 22

Position 3 Light

Position 8

Position 13 Light

Position 18

Position 23 Light

Position 4

Position 9

Position 14

Position 19

Position 24

Position 5 Light

Position 10

Position 15 Light

Position 20

Position 25 Light

Page 220: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 25 -

6.3 Lux Meter Specifications Testo 540

Page 221: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 26 -

6.4 Pre and Post Lux Readings The following sample lux levels were taken across the upgraded areas to confirm that actual lux levels corresponded

to computer modelling generated lux levels.

Level Area Position Pre Post

Admin Office 11 1 336 431

2 381 460

3 370 458

4 391 489

Average 369.5 459.5

Admin Office 12 1 391 438

2 397 450

3 411 486

4 425 501

Average 406.0 468.8

Admin Office 13 1 360 438

2 386 460

3 396 466

4 403 490

Average 386.3 463.5

Admin Admin Support 1 410 490

2 417 510

3 431 523

4 458 531

5 411 487

6 431 501

Average 426.3 507.0

Admin Office 9 /Safe 1 407 543

2 400 515

3 426 560

Average 411.0 539.3

Admin Office 11 1 336 431

Page 222: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 27 -

Level Area Position Pre Post

2 381 460

3 370 458

4 391 489

Average 369.5 459.5

Admin Office 12 1 391 438

2 397 450

3 411 486

4 425 501

Average 406.0 468.8

Admin Office 13 1 360 438

2 386 460

3 396 466

4 403 490

Average 386.3 463.5

Admin Admin Support 1 410 490

2 417 510

3 431 523

4 458 531

5 411 487

6 431 501

Average 426.3 507.0

Admin Office 9 /Safe 1 407 543

2 400 515

3 426 560

Average 411.0 539.3

Admin Office 10 1 486 503

2 477 515

3 501 523

4 492 499

Average 489.0 510.0

Admin Office 6 1 383 460

Page 223: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 28 -

Level Area Position Pre Post

2 397 467

3 401 501

4 423 517

Average 401.0 486.3

Admin Office 7 1 401 515

2 414 501

3 399 483

4 413 497

Average 406.8 499.0

Admin Office 8 1 385 444

2 391 459

3 414 501

4 381 497

Average 392.8 475.3

Admin Office 4 1 481 507

2 408 487

3 469 501

4 435 479

Average 448.3 493.5

Admin Office 10 1 486 503

2 477 515

3 501 523

4 492 499

Average 489.0 510.0

Admin Office 6 1 383 460

2 397 467

3 401 501

4 423 517

Average 401.0 486.3

Admin Office 7 1 401 515

2 414 501

Page 224: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 29 -

Level Area Position Pre Post

3 399 483

4 413 497

Average 406.8 499.0

Admin Office 8 1 385 444

2 391 459

3 414 501

4 381 497

Average 392.8 475.3

Admin Office 4 1 481 507

2 408 487

3 469 501

4 435 479

Average 448.3 493.5

Admin Female Toilet 1 335 395

2 297 407

3 286 413

4 301 388

Average 304.8 400.8

Admin Office 5 1 444 481

2 413 477

3 426 496

4 439 503

Average 430.5 489.3

Admin Office 1 1 414 467

2 403 483

3 437 507

4 423 469

Average 419.3 481.5

Admin Office 2 1 401 413

2 413 455

3 399 422

Page 225: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 30 -

Level Area Position Pre Post

4 387 407

Average 400.0 424.3

Admin Office 3 1 423 462

2 431 414

3 427 422

4 433 451

Average 428.5 437.3

Male Change Room 1 256 316

2 240 314

3 242 323

4 238 329

5 251 334

6 287 310

Average 252.3 321.0

Lunchroom 1 347 369

2 380 353

3 353 374

4 398 377

5 307 352

6 300 348

Average 347.5 362.2

Storage Bldg 2 1 275 407

2 318 397

3 312 403

4 327 382

5 268 353

6 272 399

Average 295.3 390.2

Mechanics Storage 1 298 435

2 265 404

3 315 394

Page 226: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 31 -

Level Area Position Pre Post

4 305 435

5 268 442

6 215 428

Average 277.7 423.0

Male Change Room 1 256 316

2 240 314

3 242 323

4 238 329

5 251 334

6 287 310

Average 252.3 321.0

Mechanics Office 1 461 487

2 438 445

3 397 505

4 401 475

5 415 518

6 397 467

Average 418.2 482.8

Storage Bldg 1 1 318 414

2 298 397

3 257 365

4 397 438

5 362 417

6 385 423

Average 336.2 409.0

Page 227: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 32 -

7 Recycling Reconciliation

The light fittings removed from site have been recycled. The components of the lights fittings are recycled as follows:

- Aluminium & brass: The metal ends from tubes are separated and subsequently recycled into cast products

such as ingots used in foundry application.

- Glass from the tubes is separated and recycled into various glass based applications

- Mercury is distilled from the separated powders and then used in the manufacture of dental amalgam

- Phosphor powder from fluorescent tubes is consolidated for future use in the manufacture of land applications

- Metal is recycled into foundry applications

The following reconciliation is based on the weights of the old individual fitting types replaced and the total weights of

materials recycled by Envirolite’s recycling partners.

Page 228: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 33 -

7.1 Metal Recycling

Fitting Description Qty Unit Fitting Weight (kg)

Total Fitting Weight (kg)

2x36W Aris Surface Mounted 43 5.75 247.25

2x36W Troffer 1200x300 40 5.75 230.00

2x36W Batten PD 68 5.75 391.00

1x18W Batten PD 10 2.75 27.50

Exit Lights 11 0.50 5.50

1x36W Batten 16 5.75 92.00

1x400W High Bay 17 12.00 204.00

2x58W Batten 19 7.00 133.00

2x65W Batten 16 7.50 120.00

2x18W Batten WP 18 2.75 49.50

2x36W Batten WP 18 5.75 103.50

1x400W Flood Light 6 12.00 72.00

1x150W Spot Light 5 3.50 17.50

1x15W CFL 2 2.50 5.00

1x60W Incandescent 2 0.50 1.00

1x40W Wall Light 4 3.00 12.00

TOTAL 291 - 1710.75

Weight Recycled: 1778.0kg (As provided by recycling partners) Variance: 67.25kg (3.93%)

Page 229: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 34 -

7.2 Lamp Recycling

Fitting Description Total Lamps Unit Lamp Weight (g)

Total Lamp Weight (kg)

2x36W Aris Surface Mounted 86 138.40 11.90

2x36W Troffer 1200x300 80 138.40 11.07

2x36W Batten PD 136 138.40 18.82

1x18W Batten PD 10 68.90 0.69

Exit Lights 11 0.10 0.00

1x36W Batten 16 138.40 2.21

1x400W High Bay 17 300.00 5.10

2x58W Batten 38 160.00 6.08

2x65W Batten 32 180.00 5.76

2x18W Batten WP 36 68.90 2.48

2x36W Batten WP 36 138.40 4.98

1x400W Flood Light 6 300.00 1.80

1x150W Spot Light 5 150.00 0.75

1x15W CFL 2 42.00 0.08

1x60W Incandescent 2 55.00 0.11

1x40W Wall Light 4 59.00 0.24

TOTAL 517 72.08

Weight Recycled: 76.0kg (As provided by recycling partners) Variance: 3.92kg (5.44%)

Page 230: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 35 -

8 General Fitting Guidelines

8.1 Handling E1 Light Fittings

All e1 light fittings contain a matte white High Performance e1 Reflector. It is recommended that light cotton

gloves be worn when handling E1 light fittings so as not to mark or damage the reflector and air conditioning

slots.

If using a cutting implement to remove packaging be careful not to scratch or damage the light fitting.

If a blue protective film is present on the High Performance e1 Reflector, this should be removed prior to

installation.

When lifting the fitting, ensure it is properly supported so as not to bend of crease air conditioning slots.

Plug fitting into a designated surface socket.

Remove fluorescent lamp.

With one hand touching the light fitting, peel off remainder of blue film and discard. Note: Failure to touch fitting

when peeling off film will result in the build up of a static charge, which will release when you next earth yourself.

Replace lamp.

8.2 Cleaning E1 Light Fittings

Ensure all fittings and diffusers are clean and free of any contaminates. Wipe with a clean, lint free, cloth if

necessary.

If the High Performance e1 Reflector becomes marked or soiled it should be gently cleaned, using a circular

motion, with a lint free cloth dipped in methylated spirits.

DO NOT use any abrasive or caustic materials on e1 Lighting products.

8.3 Installation of E1 Lighting

Installation of all e1 Lighting products should be carried out by suitably qualified personnel only

Prior to installation electrical safety of the general area should be assessed by suitably qualified personnel.

Page 231: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 36 -

9 Envirolite Pty Ltd Warranty

The Envirolite Warranty Covers Replacement of:

1. Any component (including the lamps) in the E1 Lighting fittings installed by Envirolite Pty Ltd that fails in the normal course of operation for a period of five (5) years from the date of practical completion.

2. Any component (including the lamps) in LED fittings installed by Envirolite Pty Ltd that fails in the normal course of operation for a period of three (3) years from the date of practical completion.

3. Any component in any sensor installed by Envirolite Pty Ltd that fails in the normal course of operation for a

period of three (3) years from the date of practical completion.

The Warranty Does Not Cover the Replacement of:

1. Any component in the light fittings or sensors installed by Envirolite Pty Ltd that have failed other than in the

course of normal operation. This includes but is not limited to failures caused by fire, water damage, earthquakes, power surges, vandalism or other willful or accidental acts that cause damage to the fittings or their components.

2. Failure or damage to any light fitting or sensor component caused by a third party carrying out other works in the building. This includes but is not limited to (a) electrical works that adversely affect the lighting circuits or sensor cables etc and (b) works on the air-conditioning or ceiling grid.

Service calls for the replacement of fitting or sensor components (other than lamps) covered by this warranty will be provided free of cost.

However if the failure of a fitting or sensor component is due to other than normal operation (as covered in Paragraphs 2A and 2B above) then a service call out fee of $100.00 (ex GST) will be charged plus the costs for the supply of replacement components and any associated installation labour.

Lamp Failures

A small reserve stock of replacement lamps will be provided to the Building Manager as part of the Scope of Works to allow for the immediate in house replacement of any failures. The Building Manager will be required to keep all failed lamps in the cartons provided and contact Envirolite when 50% of the reserve stock has been used. Envirolite will then replenish the reserve stock to its original numbers and take away the old lamps for recycling. The cost of hire of any man lifting equipment necessary to replace lamps is excluded from this warranty. Failed Sensors and/or Electrical Components in Luminaries.

Envirolite will within a maximum of two (2) workings days following the day of receipt of a service call send one of its service staff to investigate and rectify the failure.

All service calls for replacement of failed components under this warranty should be directed to [email protected]

Page 232: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Envirolite Pty Limited – ABN 83 116 943 947 PO Box 220 Miranda NSW 2228. Unit 4A, 2 Resolution Drive, Caringbah.NSW.2229. Phone +61 2 9540 3302; Fax +61 2 9540 3306

Helping you make a world of difference

- 37 -

Listing of Envirolite Warranty Reserve Stock

Stock given to Dino Finucci and held at CCBC Civic Centre for all sites.

Item Description Quantity

Lamp Osram XXT 36w (box of 40) 1

Lamp GE 26w (box of 25) 1

LED D1000 2

LED D900 2

LED DR700 6

Transformer ET-REDBACK 60VA/230-240 6

Page 233: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Page Removed for Publication

Page 234: Community Efficiency Program - Department of the …...CEEP – Fifth Milestone Requirements In accordance with The Community Energy Efficiency Program (CEEP) Milestone Agreement,

Appendix A, B, C & D removed for publication