P A T H A N K O T A I R P O R T S T A T I O N M A N U A L 2 0 1 0
Page 1
COMMUNICATION, NAVIGATION &
SURVEILLANCE MANUAL [Contains information, guidance, procedures and instructions applicable to ACS, Pathankot]
AIRPORTS AUTHORITY OF INDIA
CIVIL AIRPORT, PATHANKOT
Document No.
Address for enquiries: OFFICER-IN-CHARGE (ACS)
AIRPORTS AUTHORITY OF INDIA, Pathankot Tel: 9780957150
Email:[email protected]
DISTRIBUTION:
GM (N&S), AAI, RAJIV-GANDHI BHAVAN, NEW-DELHI GM (CNS-NR), AAI, PALAM AIRPORT, NEW DELHI
Station-in –charge,Civil Enclave Pathankot.
P A T H A N K O T A I R P O R T S T A T I O N M A N U A L 2 0 1 0
Page 2
PREFACE This Manual on Communication, Navigation and Surveillance services is
prepared and maintained by the Aeronautical Communication Station, Pathankot.
Its main aim is to provide the executives at the station (both existing and the
newly posted ones) and the officers on tour with information at a glance
about the city, the airport and the CNS facilities, the latter being of main concern. The Manual provides with latest data available along with the
processes, procedures and instructions that are essential for the provision of safe and efficient air services.
This Manual has been developed as a part of comprehensive documentation
of the CNS procedures, processes and facilities supporting conformance to organizational requirements and compliance with the CHQ CNS Manual.
The information on the CNS facilities available at Pathankot Airport contained in this manual fulfils the essential requirements laid down in
the CHQ CNS Manual. The section on support and maintenance of CNS facilities presages high
degree of reliability, availability and integrity of CNS facilities.
The technical description of all the CNS facilities along with the operation and maintenance plan has been lucidly summarized for quick
review. Safety management plans have also been explained precisely.
Moreover presentation of details through Flow charts, pictures and Tables has
been preferred for easy understanding and to help frame a broad view about the operation of CNS.
Future editions of the Manual will be improved based on the experience
gained and suggestions & feedback received from the users of this Manual. Views, comments & suggestions for improvement of this manual may be sent
to the Officer In-charge, ACS Airports Authority of India, C.A. Pathankot.
(OFFICER- IN-CHARGE)
PAHTANKOT
P A T H A N K O T A I R P O R T S T A T I O N M A N U A L 2 0 1 0
Page 3
OUR VISION AND MISSION
VISION
“To be a world- class organization
Providing leadership in air traffic services And airport management & making India
A major hub in Asia Pacific region by 2016”
OUR MISSION
“To achieve highest standard of safety and quality in air Traffic services and airport management by providing state-
Of-the-art infrastructure for total customer satisfaction, Contributing to economic growth and prosperity of the nation”
Page 4 of 21
Section 1.0
CONTENTS
Sec. No. Sub title Page no. Title Page
Preface
Vision and Mission
1.0 Contents
2.0 Brief Description of Pathankot
3.0 ABBREVIATIONS
4.0 Description of CNS Facilities
5.0 Support and Maintenance of CNS Facilities
6.2 Safe Operation- General
7.0 Facility Operation and Maintenance Plan
7.1 Test Equipments
7.2 SMU Details
7.3 Interruption of Service
8.0 Role of CNS department
9.0 Status of CNS Projects
10.0 Record System
Page 5 of 21
Section 2.0 Brief Description of PATHANKOT
Pathankot is the city of Punjab and it is also situated in extreme north of Punjab. It
is well connected with other major cities by Rail/Road and air.
1. Owner : Airports Authority of India
2. Location : 6 Km from Chakki Bank Railway station
3. ARP Co-ordinates : (32”14”02”N , 075’38’01”E)
4. Status : Suitable up to A320 class of aircraft
under IMC.
5. ATC Watch hours : Dawn to Dusk
6. Aerodrome Technical/ Data
Elevation /Reference Temperature : 311M (1020ft.)
Aerodrome Traffic Density : Low
Resource Fire Fighting category : CAT- VIII
Type of Traffic Permitted : IFR/VFR
Isolation Say ( Dimension) : Dispersal to the east of Rwy abeam
MM(IAF area)
7. Declared Distances (in Mtr) : RWY TORA TODA ASDA LDA 01 2743 3105 3005 3743 19 2743 3108 3018 2743 8. Existing Facilities
Runway Orientation : 01 & 19 ( 009º & 189º)
Runway Dimension : 2743M X 45 M
Runway ( PCN /LCN) : 52/R/B/W/T
Runway Surface : 379m (1200ft.) Concrete at both ends,
rest bitumen.
9. Apron
Capacity : 03 Stands ( A320)
Area : 150m X 110m (7.5m around the dispersal as
Shoulders) 10. Taxiways
Link “K” : Connects Rwy to Apron-166m X 38m
Link “L” : Connects Rwy at 01 dumbbell to ‘K’ link –396m X
38M 11. Ground Lighting Facilities/Visual Aids:
(a) Rwy Lights : Rwy fitted with three aspects OWL lighting
Page 6 of 21
System (Czechoslovakian) (b) Approach lights : (i) Rwl 01: Culvert centre line cross-bar
approach lighting is installed which extends upto 900m (3000ft.) from the rwy threshold with three cross bars at 450m, 600m, and 750m from the runway threshold. (ii) Rwl 19: Four lights 30m (100ft) apart
along extended centre line of rwy are
provided. The first light is placed at the
end of SGA.
12. Communication & Nav-Aid : VHF, NDB, PAR (IAF)
13. Terminal Building
Plinth Area(Sq. mtr) : 3850
Pax capacity : 150(Arr) + 150(Dep.)
Cargo Capacity (M.T) : -
Conveyor Belts :
In Arrival : 01
In Departure : 01
X-Bis : 02
Customer & Immigration Facility : N/A
Baggage Trolleys : 25
Car Parking ( capacity) : 100
14. Fencing (Civil Enclave)
Type : Perimeter wall with Concertina coil on
top
Height : 2.4m
Length : 2900m
15. Land Area : 74 acres, 6 Karnal, 9 Marla
16. Aircraft Movement ATR 42
Page 7 of 21
Section 3.0
Abbreviations:
AAI Airports Authority of India
ACS Aeronautical communication station
AFTN Aeronautical Fixed Telecommunication Network
AM Asst. Manager
AMC Annual Maintenance Contract
AMSS Automatic Message Switching system
APC Airport Controller
ATC Air Traffic Control
BCAS Bureau of Civil Aviation Security
CHQ Corporate Head Quarters
CIP Commercially Important Person
CISF Central Industrial Security Force
CNS Communication Navigation and Surveillance
CPMS Corporate Planning and Management System
CRSD Central Radio Stores Depot
DFMD Door Frame Metal Detector
DME Distance Measuring Equipment
DTO Duty Technical Officer
DVOR Doppler Very High Frequency Omni Range
E/M Equipment Mechanic
EPABX Electronic private automatic Branch Exchange
ETA Expected Time of Arrival
ETD Expected Time of Departure
FIU Flight Inspection Unit
HHMD Hand Held Metal Detector
ICAO International Civil Aviation Organization
ID Identity
MT Motor Transport
NOTAM Notice to Airmen
OIC Officer-in-Charge
PA System Public Address System
PIC Photo Identity Card
RCU Remote Control Unit
RED Regional Executive Director
RHQ Regional Head Quarters
SM Senior Manager
SMU Station Maintenance Unit
UTC Universal Coordinated Time
VIP Very Important Person
Page 8 of 21
Section 4.0 Description of CNS facilities
Name of the Equipment Make QTY FREQ POWER
Date of Installation/ Commission Remarks
COMMUNICATION EQUIPMNET
LAN/WAN Airtel 1 NA NA 01 Computer is in this Network
Mobile Radio (FM) Communication (Hand Sets)
MOTOROLA
03 10W
01.12.2006
SECURITY EQUIPMENTS
X-BIS SYSTEM
Departure Lounge 100100V
Heimann (Ger)
1
01-12-06
Security Hold Area 6040i Heimann
1 01-12-06
DFMD METOR-200 CEIA
1 1
01-12-06 14-09-2007
Section 5.0 Support and Maintenance of CNS Facilities
NAME OF
THE
FACILITY/
LOCATION
Detail of
ACs
UPS Battery back up
Type/Nos
/capacity
Type/
Make
Rating No Voltage
/VA rating
Date of
last
Procureme
nt
XBIS
MACHINE
(i) 100 -100V
(ii) 6040 i
Centralized
AC
Power
one
2KVA
2KVA
12V/28AH
12V/28AH
01-12-2006
Page 9 of 21
Details of telephone/fax/mobile/e-mail of AAI officers at Pathankot Airport (STD Code: 0186)
S.No Name S/Shri Designation/ Unit Telephone Numbers
Office Mobile
1 Amarjit Roy Manager (ATC) 2100044 9646263161 [email protected]
2 R. S. Baghela AM(Elex.) 9257200336 9780957150 [email protected]
3 JEE(Civil) 2100038
Section 6.0 Safe Operation
System efficiency and reliability depends upon the system maintenance,
environment and climatic conditions by adopting following systematic methods and proven techniques. This would enhance the life of system and continue to function with optimum efficiency and maximum reliability. This maintenance is
classified as corrective maintenance, periodic maintenance and trouble shooting.
A. CORRECTIVE MAINTENANCE There are many corrective steps taken at regular intervals to avoid any
deterioration of a system. The first step in corrective maintenance is inspection of the equipment with power off. The main elements of inspection are:
1) Cleanliness of equipment.
2) Building condition, leakage etc.
3) Electrical Connections (Cables & plug in modules)
4) Mechanical joints and linkages including switches.
5) Wiring condition, water vapor, heat or extreme cold can affect internal
And external wiring. Look for frayed, broken or damaged wiring.
6) Recent modifications.
7) Corrosion, broken, burnt or missing parts.
8) Build up of dirt, moisture, insects etc.
9) Improper lubrication of moving parts.
After finding and correcting the trouble, appropriate adjustment procedures are followed. Maintenance records are to be kept and as much data as possible
recorded to assist in future repairs. List of normal indications and what was done to correct the fault.
Page 10 of 21
Records are maintained to include actual measurements taken before and after the repair to accumulate work history. Any malfunctioning noted during maintenance is corrected and if required components replaced.
PERIODIC MAINTENANCE
System efficiency and performance is monitored by checking significant signals and voltages at various levels in the system.
The purpose of daily and weekly recordings of signal parameters and voltages is
done so as to compare these to previous records in order to reduce the parameter deviation from normal or other irregularities of the system performance.
The purpose of monthly and quarterly inspection is to
Ensure that transmitters and associated systems are calibrated and optimally
aligned.
Ensure that monitors are calibrated and alarm limits are correct and
operating as per specifications.
To check warning and alarm systems are working properly as per ICAO specifications.
PERFORMANCE CHECKS
Check operational status. In most cases, the information available at the test jacks (signals and voltages) is sufficient to determine if a module is functioning
correctly.
Check manual/automatic shut down and restart. Voltage and current checks.
Voltages and currents are checked to verify that transmitters and associated equipment are operating properly. Low voltage readings can cause premature
failures as well as changes in transmitter frequency and power out put. Higher than normal voltage can also cause rapid equipment failures. High current readings indicate areas that require immediate action.
i) Check transfer system A to B and B to A (Main to Stand By & Vice Versa)
ii) Verify monitor alarm points. Monitor alarm points are set initially during
installation. This check is to verify that the initial alarm limits have not
changed.
iii) Measure and record all modulation percentages and observe side band and carrier wave forms.
iv) Check field monitor levels.
v) Measure and record system operating frequency.
Page 11 of 21
vi) Check RF amplifier output power and gain.
vii) Measure and record antenna feed cable VSWR
viii) Perform check and calibration of built in test equipment
ix) Transmission line insulation resistance.
TROUBLE SHOOTING General guidelines to locate and trouble shoot a fault is given below:-
i) Check for signs of excessive heat. ii) Verify that all integrated circuits are seated firmly in their sockets and
that there are no bent pins. iii) Check that printed circuit board edge connectors are clean and seated
fully. iv) Check the ribbon cable connectors. v) Check the power supplies. Power supplies are a very common source of
problems. Low voltage/excessive ripple make it appear that an IC is bad. a) Measure the power supply voltages and verify that they are with in
specifications. b) Using an oscilloscope verifies that the power supply output are not
excessively noisy.
vi) Using an oscilloscope and other test equipments verify that clock signals, input signals and control signals are present and correct in shape and
level. By doing these procedures isolate the faulty units, sub unit and come to pin point the fault to the component level.
Section 7.0 Facility Operation and Maintenance Plan
The operation and maintenance phase starts after the users have accepted the
new system these phase can be divided into two activities. 1) Ongoing operation and support
2) Maintenance
Unlike the others steps in the lifecycle these steps continues throughout the systems useful life. Ongoing operation and support is the process of ensuring that the technical system components continue to operate correctly and that the
users use it effectively these responsibility is with technical staff taking care of machine and computer operation and a Member of the user organization
ensuring that the users understand the system and the use it effectively.
Page 12 of 21
PROCESS FLOWCHART (a) Maintenance
No
Yes
Daily/Weekly/Monthly/Six monthly Maintenance schedules
S/off equipment, clean to remove dust /dirt
and physically check all connections & cables .
Switch on equipment and perform
voltage/current /parameter measurements as
per Daily/Weekly/Monthly/Six monthly Maintenance schedules
Observe for any deviation from prescribed value
Any deviation?
Record the readings and make over for operation.
End.
Follow the laid down procedure by the
manufacturer to correct the deviation and record the action taken in the fault log book.
Page 13 of 21
(b) Break down maintenance
No
Yes
No
Yes
Complaint received / fault monitored
Check all panel indications / meter readings / parameters of the equipment
and analyze the fault.
With the help of test equipment carry out measurements to isolate the faulty
module / component / part
Determine the spares required to rectify the fault.
Spare parts/
module avbl.?
Record the action
taken in the fault
log book and m/o
for operation.
End.
Follow the laid down procedure to change the
module /component as per the manufacturer to
correct the fault and make any adjustment if
required to keep the parameters within the
tolerances
Locally
repairable?
Check the faulty module
A B C
Page 14 of 21
PROCESS FOR TAKING NOTAM (NOTICE TO AIRMEN)
No
Yes
Send the faulty
module to SMU/RHQ/CHQ
A B
Purchase spares
required as per laid down procedures
Demand spares
from CHQ / RHQ
Do follow up action to get the
spares
Receive Spares
Do follow up action to
get the repaired/ spare module
Σ
Receive Spare /
Repaired Module
C
Getting request from ATS units to take
NOTAM. Action / cancellation of NOTAM.
Forward to DELHI NOTAM office through
AFTN for taking NOTAM action.
All relevant
data available? Seek clarification.
After receiving NOTAM from DELHI NOTAM office through AFTN intimate ATC through
FAX
Page 15 of 21
Section 7.1 Test Equipment:
S/N Available Test Equipment
Make Model Status Used in
1 Oscilloscope Storage Type - Tektronics
TDS-2022B 100 Mhz
OK T/B
2
Sig. Gen.
Rohde & Schworz SML 02 OK T/B
3 Digital Multimeter
Section 7.2
SMU Details: Special Maintenance Units(SMU) are established at specified airports for component level
repair of un-serviceable modules for various CNS facilities as per the details given below: -
S.No Equipment/Facility SMU location Contact Nos E-mail
1 DME (GCEL) 753
Kolkata 033-25118240 [email protected]
2 DVOR(ASII) 1150
IGI Delhi [email protected]
3 XBIS (ECIL) Hyderabad [email protected]
4 XBIS (Heiman) CMC,DELHI [email protected]
As per N&S directorate/CHQ letter no. CMC/General/02 dated 10-01-2007, all the
coordination among CMC, SMUs and station for repair and return of un-serviceable/faulty
modules/cards has to be made by e-mail as per the detail given below: -
a) Faulty module/Card to be dispatched to the respective SMU and intimation to be
given by e-mail as per Performa CMC-01 and a brief of fault report.
b) SMU on receipt of faulty Card/module shall raise Site Anomaly Report (SAR) and
acknowledge receipt to the station in the Performa CMC-02
c) After repair of card and testing by a competent officer of SMU for proper functioning
the same shall be dispatched to the station and intimation given as per Performa
CMC-03
d) On receipt of the card station will test in the circuit and intimate SMU in the Performa
CMC-04 to close the SAR. However, if the card/module is not OK, the same will be
returned to SMU with same SAR and as per the above procedure.
Page 16 of 21
Section 7.3
Interruption to Service Most of the CNS facilities provided are having standby unit in place which takes over
in case of un-serviceability of main unit. However, in case if there is total failure of
service, all concerned are immediately intimated on phone and NOTAM action is
initiated by issuing a service message to VIDPYNYX for taking appropriate NOTAM
action. NOTAM is either time bound, permanent or with an estimated time. If the
facility is restored before expiry of estimated time, NOTAMC is taken and if the
facility is estimated to be U/S beyond estimated time, NOTAMR is taken indicating
revised estimated time for restoration of the facility.
Section 8.0
ROLE OF CNS DEPARTMENT
1. To provide uninterrupted services of Communication, Navigation and Surveillance
(CNS) facilities for the smooth and safe movement of aircraft (over flying,
departing & landing) in accordance with ICAO standards and recommended
practices.
2. To maintain Security Equipments namely X-Ray Baggage systems (XBIS), Hand
Held Metal Detectors (HHMD) and Door Frame Metal Detectors (DFMD).
3. To maintain the Computer systems including peripherals like printers, UPS etc.
provided in various sections connected as standalone as well as on Local Area
Network (LAN).
4. To maintain the passenger facilitation systems like Public Address (PA) system.
5. To co-ordinate with telephone service providers for provision and smooth
functioning of telephones.
Page 17 of 21
RESPONSIBILITY AND FUNCTIONS
OFFICER IN CHARGE (CNS):-
Overall In-charge of all CNS facilities operating at the station with the available manpower and resources
Responsible for smooth and uninterrupted operation of their respective units.
Responsible for sending various technical returns as required by RHQ/CHQ.
Projecting requirement of spares for the equipment/systems for their
respective unit for procurement action either through local purchase or
through RHQ/CHQ.
To ensure execution of prescribed preventive maintenance schedules i.e.
daily, weekly, monthly, quarterly, half yearly and annual as applicable and
make necessary entries in the records .
Execution of special maintenance schedule i.e. pre flight checks and pre-
monsoon checks.
Carrying out corrective maintenance in case of breakdown of facility
Verification of logbook, maintenance schedules entries.
Providing ground maintenance support for periodical flight calibrations
wherever applicable.
Handling all correspondence related to the respective unit with internal as
well as external agencies.
Monitoring system performance with the help of various test equipment's,
and carry out necessary adjustments in various parameters as and when
required..
Ensuring proper environmental conditions at the site where facility is
installed. These conditions include temperature, dust free environment,
humidity, sensitive and critical area around the facility.
Coordination with Civil / Electrical Engineering wing for maintaining proper
environmental conditions.
Write off action of the obsolete and beyond economic repair equipment/
parts.
Responsible for all matters pertaining to Communication operations.
Page 18 of 21
Liaison with Telephone service providers in ensuring efficiency of telephones
/ hotlines and AFTN circuits.
Ensure timely payment of Telephone bills.
Preparation & onward transmission of monthly, quarterly and annual
communication returns or as required by RHQ / CHQ.
Responsible for maintenance and upkeep of EPABX/LINES/ Various
computers installed in different units.
Maintenance Work
Execution of prescribed preventive maintenance schedules i.e. daily, weekly,
monthly, quarterly, half yearly as applicable. Maintenance team also makes
necessary entries in the records.
Execution of special maintenance schedule i.e. pre flight checks and pre-
monsoon checks.
Monitoring system performance with the help of various test equipment, and
carry out necessary adjustments in various parameters as and when
required..
Attending the breakdown of the facility.
Ensuring proper environmental conditions at the site where facility is installed.
These conditions include temperature, dust free environment and humidity.
Coordination with Civil/Electrical Engineering wing for maintaining proper
environmental conditions.
Taking backup of the data at regular intervals and preserving the same for a
period as decided by ICAO/CHQ. (specially for Radar/AMSS).
Maintenance of PC and accessories belonging to AAI, installed at various
locations of airport.
Page 19 of 21
Section 9.0
Status of CNS Projects Sl
No
Equipment
/Model
Purpose CNSWR No Status PDC Remarks
1 Surveillance
CCTV System
Surveillance in
Terminal
Building
Procurement to be done by CNS (P)
directorate of CHQ. It has to be
expedited in view of increased
threat perception.
Survey for establishment of
surveillance CCTV System has
been carried out on 22/05/09 &
location of cameras & control
room have been identified.
Further info is with CHQ.
Page 20 of 21
Section 10.0
Record Systems Related to Maintenance of Facilities Periodic maintenance of various CNS facilities on
daily/weekly/fortnightly/monthly/quarterly/half yearly and yearly basis as applicable is
carried out as per the maintenance schedule prescribed by AAI CHQ and records are
maintained in Periodic Maintenance (PM) register of the respective equipment/system.
The registers/documents maintained for various CNS facilities is tabulated and is
given on the next three pages. In addition to above fault log book of each
equipment/system is being maintained by the station which indicates nature of fault,
remedial action taken and time taken to rectify the fault.
Log book for each unit/duty officer is also maintained indicating activities and action
taken during his / her shift.
These records are maintained and stored as per CHQ guidelines contained in ED
CNS (O&M) Circular No. 1 of 2006 which is given below: -
No. Nature of document Preservation period of records
1
Routine Maintenance Schedules
a) Daily, Weekly, Monthly One Year
b) Quarterly, Half yearly & Yearly Five Years
2 Handing over reports, History/Fault Log Throughout the life of facility
3 Shift Log book & COM returns One Year
4 Test equipment calibration records Five consequent reports
5
Flight Inspection reports & data
a) Commissioning report & data
recordings
Throughout the life of facility
b) Regular & special flight inspection
reports
Five consequent reports
6 Retention of data required for
investigation
Till the specific order issued in
the matter
Page 21 of 21
Sl. No.
Type of equipment
Frequency of maintenance
Daily Weekly Fortnightly Monthly Quarterly Half-yearly Yearly
2.
3 HHMD X X X X X
Record Daily PM register-HHMD
Fortnightly PM register-HHMD
4 PA System X X X X X
Record Daily PM register-PA System
Fortnightly PM register-PA System
5 XBIS Heimann 6040i & 100100v
X X X X
Record Daily PM Register of XBIS
Weekly PM Register of XBIS
Fortnightly PM Register of
XBIS
6 DFMD X X X X X
Record Daily PM register-DFMD
Fortnightly PM register-DFMD