COMMONWEALTH GAMESATHLETES VILLAGE

THE PROJECT

In the summer of 2014 the city of Glasgow was a successful and proud host of the 2014Commonwealth Games. As part of this event, the facility to create accommodation for all thoseparticipating was to develop the Athletes Village. The creation of a legacy after the Games ofproviding sustainable housing for local people within the area has been exciting. This developmentand project is one that Edison Energy has been delighted to deliver Solar Energy to.

Page 3: Commonwealth Games Case Study

COMMONWEALTH GAMESATHLETES VILLAGE

SYSTEM INFORMATION

With the Games now over and the first tenants arriving, the 700 properties have been adapted andtransferred to Thenue Housing Association, West of Scotland Housing Association and GlasgowHousing Association as well as 300 private owners. We look forward to continuing to deliver ourservice to all 700 properties and ensuring that every householder continues to benefit from the freeelectricity. A community energy project, as successful as the games were.

Page 4: Commonwealth Games Case Study

700HOMES

4,200PANELS

1000kWpGENERATION

350CO2CARBON SAVING

£135,000PER ANNUM

FEED-IN TARIFF REVENUE

Page 5: Commonwealth Games Case Study

MORE ENERGY.MORE CONTROL.

Page 6: Commonwealth Games Case Study

SYSTEM REPORTINGEdison Energy monitors all solar systems online through ourdedicated portal and our team of system analysts evaluateperformance on a daily basis. This ensures maximumefficiency for the lifetime of each system, providing you with asustainable approach to your solar energy project. Systemreporting and monitoring allows transparency and confidencein all our operations, providing you with full information reportson performance, maintenance, energy and revenue.

SYSTEM ANALYSIS& FINANCIAL REPORTINGOur dedicated online portal creates sustainability inour systems, operations and outcomes.

Page 7: Commonwealth Games Case Study

SHAPINGSUSTAINABLEENERGY

Page 8: Commonwealth Games Case Study

STEP 1 Provide us with your Housing Stock details.

Let us provide you with your sustainable solar

energy options in terms of Finance, Installation

& Maintenance.

We will manage projects for you, from legal

process through to detailed surveys,

maintenance and monitoring.

STEP 2

STEP 3

Page 9: Commonwealth Games Case Study

Edison Energy Ltd14 Carmyle AvenueGlasgowG32 8HJT 0141 764 1130E [email protected]

CONTACT US TODAY TO ASSIST YOU IN ACHIEVING YOUR SUSTAINABLEHOMES ENERGY STRATEGY AND CREATE YOUR ENERGY INDEPENDENCE.

Approved Installer

shaping sustainable energy

edisonenergy