Commerical Traffic Infograph...OPEN SPACES SERVICE AREAS 5 MILES 40 MILES 72 MILES 10 22 07...
1
OPEN SPACES SERVICE AREAS 5 MILES 40 MILES 72 MILES 10 22 07 IMPROVEMENTS We’ve invested $27.5 million in 17 construction projects since 2016 that benefit freight customers. Installed Truck Parking System at every KTA service area Improved parking & added 38 new spaces Highway speed lanes & removal of gates to keep traffic moving Lengthened ramps at 11 locations, with more planned Elevated 42 bridges to a minimum height of 15’ 9” Learn more about improvements to KTA at: www.ksturnpike.com
Transcript of Commerical Traffic Infograph...OPEN SPACES SERVICE AREAS 5 MILES 40 MILES 72 MILES 10 22 07...
![Page 1: Commerical Traffic Infograph...OPEN SPACES SERVICE AREAS 5 MILES 40 MILES 72 MILES 10 22 07 IMPROVEMENTS We’ve invested $27.5 million in 17 construction projects since 2016 that](https://reader034.fdocuments.in/reader034/viewer/2022042416/5f316c960b685940b16ef848/html5/thumbnails/1.jpg)
OPEN SPACESSERVICE AREAS
5 MILES
40 MILES
72 MILES
102207
IMPROVEMENTSWe’ve invested $27.5 million in 17 construction projects
since 2016 that benefit freight customers.
Installed Truck Parking Systemat every KTA service area
Improved parking &added 38 new spaces
Highway speed lanes & removalof gates to keep traffic moving
Lengthened ramps at 11locations, with more planned
Elevated 42 bridges to a minimum height of 15’ 9”
Learn more about improvements to KTA at: www.ksturnpike.com