Commercial Roll Line Shrink Reduction P09712 Levi Stuck Evan DeCotis Cinthia Sanchez Joseph Fitzery...

4
Commercial Roll Line Shrink Reduction P09712 Levi Stuck Evan DeCotis Cinthia Sanchez Joseph Fitzery Ryan Dennison
  • date post

    19-Dec-2015
  • Category

    Documents

  • view

    214
  • download

    0

Transcript of Commercial Roll Line Shrink Reduction P09712 Levi Stuck Evan DeCotis Cinthia Sanchez Joseph Fitzery...

Commercial Roll Line Shrink Reduction

P09712

Levi Stuck Evan DeCotisCinthia SanchezJoseph FitzeryRyan Dennison

Customer NeedsCust.

Need #Importance Customer Need (Description) Comments / Status

    Eliminate TIMWOOD Waste:Some aspects are beyond the scope of this

project. Focus will be on and Transportation and Defects.

CN1 3 a) Transportation WasteAbout 25 minutes on conveyor system. Improve

movement and flow of racks across facility.

CN2 1 b) Inventory Waste

Improvements may be realized by focusing on Transportation and Defects.

CN3 1 c) Motion Waste

CN4 1 d) Waiting

CN5 1 e) Overproduction

CN6 1 f) Overprocessing

CN7 9 g) Defects 5-10% current spoilage rate

    Safety:  

CN8 9 a) Maintain Current Standards Bakery currently meets standards but improving them is not a major focusCN9 3 b) Improving Current Standards

CN10 3 Implementing Flow Improvements Value stream mapping

CN11 9 Standardization of ProcessCurrently there is minimal standardization at the

plant

CN12 9 Introduce Metrics None existing, baseline needs to be established

CN13 3 Visual Aids Changeovers, hot pans, proof box time, etc.

CN14 9 Minimal Cost Do not exceed $5,000

Cust. Need #: Enables cross-referencing with Specifications

Importance: 9=Very Important, 3=Important, 1=Somewhat Important

Specifications

Eng. Spec. #

Importance Source Specification (Description)Unit of

MeasureMarginal

ValueIdeal Value

Comments / Status

ES1 9 CN7 Reduce the number of defects% reduction in

defects25% 75%

ES8 3 CN10, CN11

Throughput will be increased % rate increase 5% 15%

ES2 9 CN7 Categorize defects according to where each defect occurred # of areas >= 2 >= 5K-roll, Proof Box, Oven,

Conveyor, Bagging

ES3 9 CN7 Categorize defects by type # of defect types >= 2 >= 4Rolls not grouped, fingerprints in

dough, dry spots, etc.

ES5 1CN3, CN4,

CN10Reduction in unnecessary human labor

% labor time reduction

20% 75%

ES9 9 CN11 Process time variation will be reduced, standardization Minute range 30-45 10-20Alternative measurement:

standard deviations

ES4 3 CN8, CN9Ensure that design changes do not cause an increase in injuries and/or OSHA recordable incidents

% decrease in injuries

0% 20%

ES10 9 CN12Metrics for X% of all value-added operations (not including material handling)

% of VA operations

50% 100%

ES6 3 CN10Any changes to the line can be taught to someone with prior knowledge to the process within X minutes

Minutes 45 15Minimal time lost due to any

necessary retraining

ES12 3 CN12Data collection (metrics) can be taught to someone with no prior knowledge of process within X minutes

Minutes 45 10 Ability to capture metrics easily

ES11 1 CN12 All metrics can be collected within X minutes or less Minutes 30 min Real timeAllows for quick status reports

on line performance

ES13 3 CN13Intended message portrayed in 5 seconds or less, and provokes the proper response

Seconds <5 <1

ES14 3 CN14 This project will be implemented using little capital investment USD <= $5,000 <= $1,000

Eng. Spec. #: Enables cross-referencing to other documentsSource: Customer need #Importance: 9=Very Important, 3=Important, 1=Somewhat ImportantMarginal Value: Minimum value expectedIdeal Value: Best value possible within realistic expectations

Deliverables

Customer Needs Assessment (Final)

Specifications (Preliminary)

One page project summary (Final)

WBS and team roles (Final)

2 – quarter schedule (Final)

Three week plan (Final)

Benchmarking