Commercial Roll Line Shrink Reduction P09712 Levi Stuck Evan DeCotis Cinthia Sanchez Joseph Fitzery...
-
date post
19-Dec-2015 -
Category
Documents
-
view
214 -
download
0
Transcript of Commercial Roll Line Shrink Reduction P09712 Levi Stuck Evan DeCotis Cinthia Sanchez Joseph Fitzery...
Commercial Roll Line Shrink Reduction
P09712
Levi Stuck Evan DeCotisCinthia SanchezJoseph FitzeryRyan Dennison
Customer NeedsCust.
Need #Importance Customer Need (Description) Comments / Status
Eliminate TIMWOOD Waste:Some aspects are beyond the scope of this
project. Focus will be on and Transportation and Defects.
CN1 3 a) Transportation WasteAbout 25 minutes on conveyor system. Improve
movement and flow of racks across facility.
CN2 1 b) Inventory Waste
Improvements may be realized by focusing on Transportation and Defects.
CN3 1 c) Motion Waste
CN4 1 d) Waiting
CN5 1 e) Overproduction
CN6 1 f) Overprocessing
CN7 9 g) Defects 5-10% current spoilage rate
Safety:
CN8 9 a) Maintain Current Standards Bakery currently meets standards but improving them is not a major focusCN9 3 b) Improving Current Standards
CN10 3 Implementing Flow Improvements Value stream mapping
CN11 9 Standardization of ProcessCurrently there is minimal standardization at the
plant
CN12 9 Introduce Metrics None existing, baseline needs to be established
CN13 3 Visual Aids Changeovers, hot pans, proof box time, etc.
CN14 9 Minimal Cost Do not exceed $5,000
Cust. Need #: Enables cross-referencing with Specifications
Importance: 9=Very Important, 3=Important, 1=Somewhat Important
Specifications
Eng. Spec. #
Importance Source Specification (Description)Unit of
MeasureMarginal
ValueIdeal Value
Comments / Status
ES1 9 CN7 Reduce the number of defects% reduction in
defects25% 75%
ES8 3 CN10, CN11
Throughput will be increased % rate increase 5% 15%
ES2 9 CN7 Categorize defects according to where each defect occurred # of areas >= 2 >= 5K-roll, Proof Box, Oven,
Conveyor, Bagging
ES3 9 CN7 Categorize defects by type # of defect types >= 2 >= 4Rolls not grouped, fingerprints in
dough, dry spots, etc.
ES5 1CN3, CN4,
CN10Reduction in unnecessary human labor
% labor time reduction
20% 75%
ES9 9 CN11 Process time variation will be reduced, standardization Minute range 30-45 10-20Alternative measurement:
standard deviations
ES4 3 CN8, CN9Ensure that design changes do not cause an increase in injuries and/or OSHA recordable incidents
% decrease in injuries
0% 20%
ES10 9 CN12Metrics for X% of all value-added operations (not including material handling)
% of VA operations
50% 100%
ES6 3 CN10Any changes to the line can be taught to someone with prior knowledge to the process within X minutes
Minutes 45 15Minimal time lost due to any
necessary retraining
ES12 3 CN12Data collection (metrics) can be taught to someone with no prior knowledge of process within X minutes
Minutes 45 10 Ability to capture metrics easily
ES11 1 CN12 All metrics can be collected within X minutes or less Minutes 30 min Real timeAllows for quick status reports
on line performance
ES13 3 CN13Intended message portrayed in 5 seconds or less, and provokes the proper response
Seconds <5 <1
ES14 3 CN14 This project will be implemented using little capital investment USD <= $5,000 <= $1,000
Eng. Spec. #: Enables cross-referencing to other documentsSource: Customer need #Importance: 9=Very Important, 3=Important, 1=Somewhat ImportantMarginal Value: Minimum value expectedIdeal Value: Best value possible within realistic expectations